No. Years of Condition Status
TYPE OF EQUIPMENT Quantity capacity/outpu Brand and Type Current Location
manufacture (Good/Bad) Kepemilikan
t
1 2 3 4 6
I OFFICE EQUIPMENT
Plotter 2 A0 Encad/Cadjet-2, HP Designjet 500 2003-2005 Good Jakarta, Duri Own
Scanner 3 A3, A4 Umax 2100 XL, Umax 4100 2002 Good Jakarta, Duri Own
Computer, Laptop 50 P3-P4 Acer, Wearness, Toshiba, dll 2004-2006 Good Jakarta, Duri Own
Printer 15 A2-A3 Deskjet, Laserjet, dll 2003-2006 Good Jakarta, Duri Own
Digitzer 1 A3 - 1998 Good Jakarta Own
Blueprint 1 A0 Regma 1996 Good Jakarta Own
Foto Copy 3 A3, A4 Xerox 2005 Good Jakarta, Duri Own
Mesin Ketik 3 - Canon, Panasonic 2000 Good Jakarta, Duri Own
Calculator 10 - Casio, Panasonic, dll 2000-2006 Good Jakarta, Duri Own
Meja - Kursi 75 - Bostinco, Lokal, dll 1998 Good Jakarta, Duri Own
Filling Cabinet 10 - Bbostinco, Elite, dll 2000-2006 Good Jakarta, Duri Own
White Board 2 2mX1m Lokal 2000 Good Jakarta, Duri Own
Vacum Cleaner 2 - Electrolux 1999 Good Jakarta, Duri Own
Despenser 5 - - 2000-2006 Good Jakarta, Duri Own
II COMMUNICATION
Facsimile 2 - Panasonic 20003 Good Jakarta, Duri Own
Telepon 15 - Panasonic 2002 Good Jakarta, Duri Own
Handphone 10 - Nokia 2002-2006 Good Jakarta, Duri Own
Battery Charger 10 - - 2002-2006 Good Jakarta, Duri Own
Handy Talky (HT) 8 3W Alinco, Icom F3 1998 Good Jakarta, Duri Own
Megaphone 1 - Sanwa 1997 Good Jakarta Own
III VEHICLE
Pick up, Jeep 5 - Ford, Suzuki, Honda CRV 2005-2006 Good Jakarta, Duri Own
Minibus 11 - Toyota, Isuzu, Daihatsu 1998-2006 Good Jakarta, Duri Own
Motor 1 - Ssuzuki Shogun 2006 Good Jakarta, Duri Own
IV SAFETY
Safety Boundary 4 - Lokal 2006 Good Jakarta, Duri Own
PPE & P3K 4 - Lokal 2006 Good Jakarta, Duri Own
Safety Belt 10 - Hearnes 2005 Good Jakarta, Duri Own
Safety Helmet 50 - Lokal 2004-2006 Good Jakarta, Duri Own
Safety Shoes 25 - Eagle, Caterpilar, dll 2004-2006 Good Jakarta, Duri Own
Safety Work Uniform 25 - Lokal 2005 Good Jakarta, Duri Own
Raincoat 10 - Lokal 2006 Good Jakarta, Duri Own
V FIELD EQUIPMENT
Theodolit 3 20 detik Wild Sokisha 1995 Good Jakarta Own
Pompa Air 2 2 l/s : 5 I/d Honda 1998, 2006 Good Jakarta Own
LIST OF EQUIPMENT
Current
No. Years of Condition Status
TYPE OF EQUIPMENT Quantity capacity/outpu Brand and Type Current Location
manufacture (Good/Bad) Kepemilikan
t
1 2 3 4 6
Alat Bor Pipa 2 - Bosch 1996 Good Jakarta Own
Alat Stel Pipa 2 50 bar Sun Rise 1996 Good Jakarta Own
Waterpass 3 0,2 mm Wild Sokisha 1998 Good Jakarta Own
Mesin Las 2 400 A Chang Cai 1997, 2000 Good Jakarta Own
Genset 3 30 Kv Mitsubishi 1996-2000 Good Jakarta Own
Alat Bpotong Pipa 2 - Makita 1996-1999 Good Jakarta Own
Bor Listrik 3 - Makita 1996-2006 Good Jakarta Own
Alat Potong Listrik 1 - Makita 1996 Good Jakarta Own
Compressor 1 350 CFM Airman 1995 Good Jakarta Own
Merger Test 1 1000 Volt Hioki 1996 Good Jakarta Own
Grounding Test 1 - Kyoritsu 1996 Good Jakarta Own
Tang Ampere 1 - Hioki 1996 Good Jakarta Own
Planimeter 1 - Kent Koizumi 1996 Good Jakarta Own
Blender Last 4 - Yamato 1996 Good Jakarta Own
Multitester 2 - Sanwa 1997 Good Jakarta Own
CBR Test 1 - Mitutoyo 1997 Good Jakarta Own
Sand Cone Test 1 - Elephant 1997 Good Jakarta Own
Recession Leveling 1 0.02 mm Fuji Seimitsikeiki 1997 Good Jakarta Own
Tang Press Hydraulic 1 - - 1996 Good Jakarta Own
Gurinda Tangan 5 - Makita 1997 Good Jakarta Own
Self Recording Current Meter 4 - Aott 1998 Good Jakarta Own
Roll Meter 5 - Yamiya 1998 Good Jakarta Own
Camera 3 - Yasica, Pentax, Olympus 2005-2006 Good Jakarta Own
EDM (Electronic Distance Measurement) - - Nikon 1999 Good Jakarta Own
Kompas - - - 2006 Good Jakarta Own
Stereosciope - - - 1996 Good Jakarta Own
GPS (Global Positioning Survey) 1 - - 1997 Good Jakarta Own
Cylinder Test 20 - - 1998 Good Jakarta Own
Slump Test 5 - - 1997 Good Jakarta Own
Hammer Test 1 - - 1998 Good Jakarta Own
CBR Test 1 - MBT 1997 Good Jakarta Own
Soil Density Test 1 - MBT 1998 Good Jakarta Own
Undisturbed Sampling Soil 5 - MBT 1997 Good Jakarta Own
Hand Boring of Soil 2 8 m' MBT 1998 Good Jakarta Own
Sondir (DCPT) Test 1 2 ton - 1998 Good Jakarta Own
Triple Prisma - - - 1998 Good Jakarta Own
Single Prisma - - - 1998 Good Jakarta Own
Drilling Tools 4 - - 1998 Good Jakarta Own
Step Down 2 - - 1998 Good Jakarta Own
Genset + Lighting Facility 2 - - 1997 Good Jakarta Own
Fiber Air 1000 Volt 1 - - 1998 Good Jakarta Own
LIST OF EQUIPMENT
Current
No. Years of Condition Status
TYPE OF EQUIPMENT Quantity capacity/outpu Brand and Type Current Location
manufacture (Good/Bad) Kepemilikan
t
1 2 3 4 6
Water Tank 1 - - 1997 Good Jakarta Own
Electric Welding 2 - - 1998 Good Jakarta Own
Manual Welding 2 - - 1997 Good Jakarta Own
Dynamo 1 - - 1998 Good Jakarta Own
Steel Cutter 1 - - 1997 Good Jakarta Own
Stang Blender 1 - - 1998 Good Jakarta Own
Vibrator Beton 6 Yanmar 1996 Good Cibinong Own
Stamper 2 Mikasa 1995 Good Cibinong Own
Compactor Vibro 1 V 40 Sakai 1996 Good Cibinong Own
Takel 5 3 ton : 5 ton Elephant 1996 Good Cibinong Own
Power Sprayer 0 Good Cibinong Own
Molen 6 1 m3 Glory 1996 Good Cibinong Own
Schafolding 200 Lokal 1995 Good Cibinong Own
LIST OF EQUIPMENT
Current
No. Years of Condition Status
TYPE OF EQUIPMENT Quantity capacity/outpu Brand and Type Current Location
manufacture (Good/Bad) Kepemilikan
t
1 2 3 4 6
VI STEEL STRUCTURE (PARTNER)
Automatic CNC Machine for Angle Profiles ex FICEP 1 unit A.16-34 NT S.p.A, ITALY CIBINONG
Automatic CNC Machine for Angle Profiles ex FICEP 1 unit A.15-34 NT S.p.A, ITALY CIBINONG
Automatic CNC Machine for Angle Profiles ex VERNET 1 unit UP 124.CNC.5X, FRANCE CIBINONG
Automatic CNC Machine for PLATE VERNET 1 unit P.G 80.CNC, FRANCE CIBINONG
Duplicating Table Taco for Steel Plate ex FICEP 2 units 801 S.p.A, ITALY CIBINONG
Mechanical Punch Machine 8 units 16 - 100 ton CIBINONG
Punch and Cutting Machine 2 units 80 ton CIBINONG
BAND SAW 3 units CIBINONG
DRILLING MACHINE D = 80 mm CIBINONG
MARKING MACHINE 40 ton CIBINONG
HYDRAULIC MARKING 100 ton CIBINONG
BENDING MACHINE 150 ton CIBINONG
CUTTING MACHINE 13 mm CIBINONG
HOIST 5 units 3 - 5 ton CIBINONG
FORKLIFT 3 ton CIBINONG
Ir. HARYONO YB
Direktur Utama
APPENDIX A.03 - RESUMES OF PERSONNEL
ASSIGNED TO PROJECT
CURRICULUM VITAE
BAMBANG SUTADJI
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS (a) Location; (b) Client; (c) Month/Year; (d) Position Held; (e) Exact Duties Rendered; (f)
Time Spent]:
SUTANTO
April 1999 : One Day Lead Awareness Course, Associated Octel Cilacap.
Feb 1999 : Workshop environmental Management System ISO !$))!, Surveyor
Indonesia Institute for The development of Professional Process,
Jakarta.
Dec 1998 : Pelatihan Pembinaan Penguasaan dan Penerapan Teknologi
Lindungan Lingkungan Kegiatan Migas dan Pabum Departemen
Pertambangan Energi, Dirjen Migas.
Aug 1998 : Seminar Sehari lingkungan Hidup
Strategi dan Kiat-kiat Menuju Krisis Peduli Lingkungan yang
Kompetitif dalam Mengantisipasi Pengembangan Otonomi Daerah
dan Perdagangan Bebas.
Bapedal bekerjasama dengan Lembaga Kegiatan Ekobnomi &
Bisnis, Jakarta.
May 1998 : Workshop Performance Management system, Profesional
Development program dan Reward System, Pertamina, Cilacap.
March 1998 : workshop Competency Based Interviewing bagi Line Manager,
Pertamina, Cilacap.
June 1997 : Semina 2 Hari Pengelolaan Mutu Terpadu bagi Pimpinan Manajer,
Pertamina, Cilacap.
June 1997 : Process Safety Management Implementation Course, Mobil EHS
Surabaya.
March – May 1997 : Kursus Kader pimpinan Angkatan XI/1997, Pertamina, Jakarta.
April 1996 : Lokakarya Kelembagaan yang Efektif dalam Pengelolaan
Lingkungan di Lembaga Pemerintahan dan Perusahaan
swasta/BUMN, Jakarta.
Jan 1995 : Seminar Sehari Keselamatan dan Kesehatan Kerja Proses Safety
Manajemen,, Pertamina, Sumbagsel.
June 1994 : Lokakarya Bidang Pembinaan Kesehatan dan Keselamatan Kerja,
Jakarta.
Feb 1994 : Temu Karya ke-2 Fungsi KK-LL, Plaju.
Jan – Feb 1993 : Penataran Kewaspadaan Nasional (Tarpadnas) Angkatan XXI,
Jakarta.
Jan 1993 : Seminar Nasional Keselamatan dan Kesehatan Kerja Tahun 1993,
Jakarta.
Jan 1992 : konvensi Nasional Keselamatan dan Kesehatan Kerja Tahun 1992,
Jakarta.
June 1991 : penataran Peradilan Tata Usaha Negara, Pertamina, Plaju.
May 1991 : Safety and Environmental Workshop, Pertamina, Jakarta.
June 1990 : Bimbingan Keahlian Teknik FS/LL Lanjutan, Pertamina, Jakarta.
March 1989 : Insurance Course PT Tugu Pratama Indonesia, Cirebon.
Aug – Sept 1988 : Kursus Basic Refinery Operations & Economic, Bandung.
Feb – March 1988 : Kursus Keselamatan Kerja dan Hiperkes Bagi Teknisi Perusahaan,
Dept. Tenaga Kerja dan Pertamina, Cirebon, Jakarta.
Feb 1987 : Seminar Pengembangan Manajemen Panitia Pembinaan
Keselamatan dan Kesehatan Kerja, Jakarta.
April 1985 : Kursus Pengawas Keselamatan Kerja Angkatan III, Jakarta.
Nop – Dec 1984 : Kursus Teknik Mengajar, Pertamina, Jakarta.
Feb 1982 : Lokakarya Asuransi Properti, Tugu pratama Indonesia, Balikpapan.
Jan 1981 : Loss Control Management workshop, Frank & Davis and
Associates of Sydney Australia, Jakarta.
Nop 1980 : Advanced Supervisory Course III/80, Pertamina, Balikpapan.
Oct 1979 : Penataran Fire & Safety, Pertamina, Bandung.
July 1978 : Lokakarya Penyusunan Norma-norma Ergonomi di Tempat Kerja,
Depnaker, Bogor.
Aug 1975 : Safety Inspector Course II, Pertamina UP-III, Plaju.
9. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED:
Sept 2005 – present : HES Coordinator for Engineering & Construction Management
Project, PT Chevron Pacific Indonesia
May 2005 : HES Manager for Tangguh LNG Project Proposal, JGC/PT Brown
Root & Indonesia.
2002 – April 2005 : Ahli Utama Keselamatan & Kesehatan Kerja HSE Pengolahan –
Dit. Hilir PT Pertamina Persero
1997 – 2002 : Kabid LKKK (Lingkungan Keselamatan dan Kesehatan Kerja)
Pertamina UP IV – Cilacap
1989 – 1997 : Kabid LKKK Pertamina UP III – Plaju & Sungai Gerong
1981 – 1989 : LKKK Pertamina UP V – Balikpapan as Safety Officer, Fire Officer
(Pjs. Ka. LKKK)
1975 – 1981 : Ka. LKKK Pertamina UEP IV Lap. Tanjung Kalsel.
ARNOLD SINAGA
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]:
BAMBANG ADHIONO
9. EMPLOYMENT RECORD :
April 2002 – present : PT Encona Inti Industri, as Senior Architect
January 1988 – 2002 : PT. Encona Engineering Inc. Jakarta
As Project Manager, Team Leader and Architect
October 1996 – May 2000 : PT Encona Engineering Inc. Jakarta, as Division Manager
January 1997 – March 1999 : PT Gatra Kilang Persada Jakarta, as Project Architect
November 1989 - July 1994 : PT Inti Era Cipta Jakarta
As Project Manager and Architect
March 1985 - August 1987 : PT. Dwidelta Corporation Jakarta as Architec
1983 - 1985 : PT Soilex Consultant Yogyakarta, as Director
1982 - 1983 : PT Pillar Emas Engineering Yogyakarta,as Architect
April 1981 - March 1984 : PT Wiratman and Associates Jakarta,as Chief Regional / Resident
Engineer
A. RAILWAY STATION
a. Jakarta and Bogor (Pasar Senen, Cipinang and Bogor Railway Station)
b. February 2001 – January 2002
c. Senior Architect
d. Base on the actual condition of PT Kereta Api Indonesia/ Indonesia Railway Company land area
and railway station also, especially at Pasar Senen Station, Cipinang Station and Bogor Station, PT
Kereta Api Indonesia have idea to renovated, renewal and development of several railway station.
Senior Architect was responsible for the following duties :
- Prepare basic concept planning and design, include in coordinating with the relevant
engineering
- Prepare and presented the design to the Government Officer
- Coordinating with Technical Director of PT Kereta Api Indonesia, Project Management Officer
and Railway Station Authority
- Reviewing of the Architectural Design Drawing
- Prepare and finalized Detail Design Drawing, Technical Specifications and Bill of Quantities
- Finalized of the Design Report
Client : PT Kereta Api Indonesia (Persero)
e. 12 months (schedule)
B. BASE TRANSCEIVER STATION – PT TELEKOMUNIKASI SELULAR
a. Sumatera, Kalimantan and Sulawesi Island
b. September 2000 – February 2001
c. Team Leader
d. The master plan of the location of Base Transceiver Station/ BTS Tower were around Indonesia
Archipelago and this year, the BTS was planned to covering all Indonesia big island.
Every location of BTS Tower, consist of Structural Steel Tower and Main Shelter Building for
electronic equipment, power distribution switch and other equipment needed.
Many type of the tower was designing, i.e. Mini Tower/ 12 meter, Steel Structure Tower/ SST 32
meter, SST 42 meter, SST 62 meter, SST 72 meter, SST 92 meter and mono-pole.
Team Leader was responsible for the following duties :
- Coordinating with PT Telekomunikasi Selular / PT Telkomsel and many constructing company
- Reviewing of the Design Drawing and Technical Specifications
- Prepared the Concept and Finalization of the Report, i.e. Preliminary Report, Weekly Report,
Monthly Report and Final Report
- Prepare and finalized Project Completion Report
Client : PT Telekomunikasi Selular / PT Telkomsel
e. 5 months
C. BALI INTERNATIONAL AIRPORT PROJECT, PHASE II
a. Kuta - Denpasar, Bali Island.
b. February 1999 – August 2000
c. Senior Architect.
d. According to the master plan of the Bali International Airport – I Gusti Ngurah Rai phase 2, the
Existing International Passenger Terminal Building must be follow to the new one, especially on the
lay out of passengers flow and space configuration.
Base on that concept, the architectural team was designing the arrangement of passengers
circulation flow, re-setting passengers waiting lounge, commercial area, security checking, ticket
counter, check-in area, baggage handling area, boarding area, air crew lounge etc.
Target year is 2005 annual passenger is estimated at about 3.420.000 for domestic and 6.100.000
for international passengers.
Senior Architect was responsible for the following duties:
- Assist to the Chief of Building Engineering in coordinating the engineering section.
- Coordinating with Directorate General Air Communications and Airport Authority.
- Reviewing of the Architectural Design Drawing and Design Report.
- Prepare and finalized Detail Design Drawing, Technical Specifications and Bill of Quantity
- Conception and finalized of the Detail Design Report
- Prepare the Project Completion ( Phase 2 and Additional Work) Report
Associated Consultants:
- Local Consultant : PT. Asana Wirasta Setia Jakarta.
- Foreign Consultant : Pacific Consultant International Japan.
Client : Ministry of Communications, Directorate General Air Communications.
e. 32 months.
D. NATIONAL MONUMENT
a. Jakarta
b. March 1997 – July 1997
c. Liaison Officer/ Architectural
d. National Monument Park are biggest artificial park (80 ha) in Indonesia, especially at Jakarta and
this park have a Tugu Nasional, built on 1960 as symbol and mark of Jakarta Capital City.
Liaison Officer/ Architectural was responsible to technical coordinating among the design drawing,
technical specification, design and constructions activity on site.
Client : Government of Indonesia/ DKI Jakarta Province
e. 4 months
Target year is 2005 annual passenger is estimated at about 3.420.000 for domestic and 6.100.000
for international.
Deputy Project Manager was responsible for the following duties:
- Assistant to the Project Manager in coordinating the engineering section. Consist if Building
Engineering Section, Mechanical Engineering Section, Civil Engineering Section, Electrical
Engineering Section, Fuel Engineering Section and Air Communication System Engineering
Section
- Coordinating with State Federal Agencies.
- Assistant to the Project Manager in coordinating with the Project Management Services and
Airport Authority.
Associated Consultants:
- Local Consultant : PT. Asana Wirasta Setia Jakarta.
- Foreign Consultant : Pacific Consultant International Japan.
Client : Ministry of Communications, Directorate General Air Communications.
e. 32 months
G. JAKARTA STOCK EXCHANGE BUILDING
a. Jakarta, Indonesia
b. March 1994 - May 1995
c. Chief of Engineering Section
d. The Construction Management Services were manager the Time Schedule, Quality Assurance and
Technical Aspect for the Jakarta Stock Exchange Building which has 33 storey.
Chief of the Engineering Section was responsible for the following duties :
- Review Architectural Design Drawing
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractors submission material.
- Monitor contractor’s overall construction planning and scheduling.
- Reviewed approval of site Inspection.
- Reviewed approval of progress payment invoices submitted by contractors before client
approval.
Associated Consultants:
- Foreign Consultant : Bovis Indonesia Ltd, - British, USA
Client : PT Danayasa Arthatama Ltd. Jakarta
e. 14 months
H. RESETTLEMENT / TRANSMIGRATION PROJECT
a. Pekanbaru, Bengkulu, Palangkaraya, Balikpapan and Samarinda
b. July 1994 - September 1995
c. Project Coordinator
d. The Project, comprises the supervision of construction of resettlement housing , clean water
distribution system and Mc.Adam road at Pekanbaru/ Riau Province, Bengkulu Province,
Palangkaraya/ Central Kalimantan Province, Balikpapan and Samarinda/ East Kalimantan Province.
Included in the overall project is the construction of bridge and water dam.
The Project Coordinator was responsible for the following duties:
- Assist to Project Director in coordinating to several Site Manager of several project in
connection with the quality control, quantity assurance, certificate for variation order, Monthly
Report and Final Report.
- Coordinating with all State Federal Agencies (National Agencies and Province Agencies).
- Monitoring contractor’s overall construction planning and scheduling
- Reviewed for approval of Site Inspection
- Reviewed for approval of progress payment invoices by several contractor, before client
approved.
- Prepare and finalize the Project Completion Report.
Client : Ministry of Transmigration and Resettlement
e. 16 months
I. SUDIRMAN CENTRAL BUSINESS DISTRICT
a. Jakarta
Included in the overall project is the construction of seven new elevated station buildings, and the
Gambir Station is the biggest station in the overall project along Manggarai and Jakarta Kota
station. Gambir station needs some plaza for parking area (private car, taxi and Soekarno-Hatta
Airport shuttle bus) at National Monument/ Monas side.
The plaza design must be unity with the planning and design of National Monument, because the
area of Gambir Station is a part of National Monument area (80 ha).
The Chief Architectural Section was following duties:
- Making conceptual and preliminary design Review Architectural Design Drawing
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractors submission material.
- Monitor contractor’s overall construction planning and scheduling.
- Reviewed approval of site Inspection.
- Reviewed approval of progress payment invoices submitted by contractors before client
approval.
Associated Consultants:
- Local Consultant :
PT. Wiratman and Associate, PT. Asianenco,
PT. Exacta and PT Chandra Wahana Raya.
- Foreign Consultant : Pacific Consultants International / PCI - Japan
Transportation Consultants Inc / JTC and
Japan Electrical Consulting Co. Ltd/JEC.
Client : Ministry of Communications.
Directorate General of Land Transport and Island Water Ways.
e. 8 months.
L. PARK VIEW APARTMENT
LETJEN S.PARMAN MAIN ROAD, SLIPI
a. Jakarta
b. October 1993 - April 1994
c. Senior Architect
d. The apartment building project was supervision work of the construction of the high rise building (30
storey).
The Architect was the following duties:
- Review Architectural Design Drawing
- Prepare the design of detail drawing
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractors submission material.
- Reviewed approval of site inspection.
e. 7 months.
M. AMBHARA HOTEL
SULTAN ISKANDARSYAH ROAD, BLOK M. KEBAYORAN BARU
a. Jakarta
b. February 1994 – August 1994
c. Senior Architect.
d. According to the master design of the Ambhara Hotel as four stars hotel at south area of Jakarta
city, the existing building was burn and the contractor prepare construction drawing as detail
documents.
The main activities at that hotel project were project design review and supervision activities of the
construction of middle rise building.
Senior Architect was responsible for the following duties:
- Review Architectural Design Drawing
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractors submission material.
- Reviewed approval of site Inspection.
Client : ALatief Corporation, Jakarta
e. 6 months.
a. Jakarta
b. July 1992 – February 1993
c. Chief Architectural Engineering Section
d. Jabotabek Railway Project. Central Line Track Elevation, Jakarta consist of Gambir Station,
Gondangdia Station, Mangga Besar Station, Sawah Besar Station, Jayakarta Station, Cikini Station
and Juanda Station.
At that time, the basic design was prepare by engineering design stage team, but the detail drawing/
construction document not yet completely corrected and finished.
Chief Architectural Engineering Section was the following duties:
- Review Architectural Design Drawing
- Design of the Detail Design drawing
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractors submission material.
- Monitor contractor’s overall construction planning and scheduling.
- Reviewed approval of site Inspection.
- Reviewed approval of progress payment invoices submitted by contractors before client
approval.
Associated Consultants:
- Local Consultant : PT. Wiratman and Associate, PT. Asianenco,
PT. Exacta and PT Chandra Wahana Raya.
- Foreign Consultant : Pacific Consultants International / PCI -
Japan Transportation Consultants Inc / JTC and
Japan Electrical Consulting Co. Ltd/JEC.
Client : Ministry of Communication.
Directorate General of Land Transport and Island Water Ways.
e. 32 months.
R. BUKIT ASAM COAL MINING PROJECT
a. Tanjung Enim, South Sumatra.
b. March 1988 - November 1989
c. Chief of Construction Supervision Team
d. Township development of Bukit Asam Coal Mining Project at Tanjung Enim, South Sumatra. The
Project covering Grading Construction of Roads, Utilities, Residential area for 300 houses complete with
its facilities.
The resident facilities consist of Hospital, Multi purpose Building, Water Treatment Plant, Electrical
power plant and Main office building (4 storeys). This project is to serve coal mining staff at Tanjung
Enim, which covers 8,29 square kilometers.
Chief of Construction Supervision Team, with 48 staffs, was responsibilities and conducted project/
design review and supervision activities of Bukit Asam Coal Mining Facility project. The main
activities which consist of :
- Overall construction control Schedule.
- Coordinating with owner, concerning Quality Assurance, Quantity Control and Payment of
Certificate proposed by contractor
Client : PT. Tambang Batubara - Bukit Asam / PTBA
Ministry of Mining
e. 21 months.
S. GRAMEDIA MAIN BUILDING
JALAN PALMERAH SELATAN
a. Jakarta
b. January 1988 – March 1988
c. Architect / member of Construction Management Team
d. This project consist of the construction management of the construction of office building and
printing factory area, published printing industry area and many published management office (8
storey)
Architect in the Construction Management Team was responsibilities and conducted :
- Overall detail design on the construction stage and checking architectural material schedule
- Coordinating with owner and another section, concerning to the quality assurance and quality
control
- Participate in all meeting and some time directed.
Client : PT Gramedia Percetakan - Jakarta
e. 3 months.
T. EDUCATIONAL COMPLEX – WIDURI FOUNDATION
a. Jakarta
b. Desember 1987 – April 1988
c. Architect / member of Owner Engineer Team
d. The educational development complex of Widuri Foundation at Cinere Residential Area Jakarta,
which consist of covering land clearing, grading, construction of roads, Utilities, Residential area for
3 houses, Kinder Garten, Secondary School, Junior High School, High School, Special/ Incase
Dormitory completed with its facilities.
Included many residential facilities consist of hospital facility, multiporpuse building, water treatment
plant, electrical power house and main office building.
Architect as a member of Owner Engineer Team was following responsibilities and conduct :
- Overall construction control schedule
- Participate in all meeting and prepare minutes of meeting (if any)
- Coordinating with another person in the owner engineer team, concerning quality assurance, quality
control and payment of consultant and contractor certificate
Client : Yayasan Widuri, Jakarta
e. 5 months.
U. INDONESIA NAVY MAIN BASE
a. Teluk Ratai, Lampung
b. March 1985 - August 1987
c. Architect and Environmental Engineer
d. The design of the Indonesia Navy Main Base at Teluk Ratai, Lampung has special and specific
characteristic design on the very-very high secret activities.
The project consist of Office Building Administration and command), In Housing Training Center,
Marine Air Base, Navy Home Port, Ammunition Dump Area, Educational complex, Business Area
(local market, shopping area),Sport and Recreation Facility (theatre, indoor and outdoor sport),
Hospital (public and staff hospital facility), Staff Housing and Dormitory.
This project is 30.000 Ha (mainland) and 20.000 Ha (ocean).
Architect and environmental engineer as a member of design team/ consultant was the following duties :
- Prepare and development of Project proposal, Preliminary design Report, Final Design Report,
Preliminary design drawing, Final Design Drawing.
- Prepare minutes of meeting.
- Participate in all meeting and some time directed.
Associated Consultants:
- Foreign Consultant : Kock's Consult GMBH Koblenz Germany.
Client : TNI Angkatan Laut (Indonesia Navy Corp) and
Badan Pengembangan dan Penerapan Teknologi / BPPT.
e. 29 months.
V. AMBARRUKMO PALACE HOTEL, EAST WING ARCADE
a. Yogyakarta
b. December 1984 – February 1985
c. Architect
d. The area of east wing arcade consist of small office lobby, souvenir shop area and another rest
area. Main activities on the design stage i.e. preparing the design drawing, technical specification
and cost estimate concerning to the design stage.
Architect was the following duties and responsibilities:
- Prepare and development of technical proposal, Preliminary design Report and Draing, Final
Design Report and Drawing.
- Participate in the technical meeting
Client : PT HII / Ambarrrukmo Palace Hotel
e. 2 months.
W. LEBKRA KALIURANG HOTEL
a. Kaliurang, Yogyakarta
b. October 1984 – January 1985
c. Architect
d. The residential hotel consist of front office, guest lobby, restaurant/ lounges, souvenir shop area,
50 room bays and another hotel facilities. Main activities on the design stage i.e. preparing the
design drawing, technical specification and cost estimate concerning to the design stage.
Architect was the following duties and responsibilities:
- Prepare and development of technical proposal, Preliminary design Report and Drawing, Final
Design Report and Drawing.
- Participate in the technical meeting
Client : Prof Soetiyono SH/ Lebkra Hotel Group
e. 4 months.
X. OFFICE BUILDING AND PRINTING INDUSTRY
JALAN KH ACHMAD DACHLAN
a. Yogyakarta
b. July 1984 – September 1984
c. Architect
d. Published Printing Industry consist of management office building, printing factory and another
facility for printing industry. Main activities on the design stage i.e. preparing the design drawing,
technical specification and cost estimate concerning to the design stage.
Architect was the following duties and responsibilities:
- Prepare and development of Project proposal, Preliminary design Report, Final Design Report,
Preliminary design drawing, Final Design Drawing.
- Prepare minutes of meeting.
- Participate in all meeting and some time directed.
Client : PT Percetakan Persatuan
e. 2 months.
Y. TOEGOE HOTEL
PANGERAN MANGKUBUMI MAIN ROAD
a. Yogyakarta
b. June 1984 – September 1984
c. Architect / Constructions Stage
d. The project area as a 3 stars hotel consist of 400 room bays and another hotel facilities area. Main
activities on the construction stage i.e. preparing the detail design drawing, shop drawing/
construction drawing, preparing material technical data and specification, according to basic design
concept and technical guidance shown on the design documents.
Architect was the following duties and responsibilities:
- Prepare and development of technical data and specification, Construction Detail design Drawing/
Shop drawing.
- Participate in the technical meeting
Client : PT Jakarta Hotel
e. 4 months.
Z. ELTENIT FACTORY
a. Blitar (East Java)
b. May 1984 – August 1984
c. Architect
d. Eltenit Industry/ Factory consist of management office building, product (building material) factory
and another facility for building material industry. Main activities on the design stage i.e. preparing
the design drawing, technical specification and cost estimate concerning to the design stage.
Architect was the following duties and responsibilities:
- Participate in the technical meeting Prepare and development of Technical project proposal,
Preliminary design Report, Final Design Report, Preliminary design drawing, Final Design Drawing.
a. Yogyakarta
b. June 1982 – March 1983
c. Architect
d. The design of the university at Celeban Yogyakarta has local characteristic and on the nationalistic
activities.
The project consist of educational building (4 storey), university library, in house hospital, rector
office/ administration building and dormitory.
Architect was the following duties :
- Prepare and development of Project proposal, Preliminary design Report, Final Design Report,
Preliminary design drawing, Final Design Drawing.
- Prepare minutes of meeting.
- Participate in all meeting and some time directed.
Client : Perguruan Taman Siswa Yogyakarta
e. 9 months.
AE. CINEMAS AND SHOPPING CENTER
PARAKAN INDAH
a. Temanggung – Central Java Province
b. March 1982 – October 1982
c. Project Manager
d. Design ,supervision and construction of the cinemas and shopping center Parakan Indah at
Temanggung handled by same company / turnkey project. The project consist of office building, two
cinemas building, 20.000 m2 shopping area, parking building and another facilities/ equipment area/
building, i.e. air handling unit room, generator room.
The manager was following duties:
- Coordinating to Civil Engineering section, Facility and utility Engineering Section, Quantity
Surveyor Section and Administration on the design stage and construction stage. In-connection
with quality assurance, quality control, time schedule, certificate of variation order, several
report and final report.
- Coordinating with all state federal agencies at local governmental and project management
services.
- Monitor sub-contractor’s detail construction planning and scheduling, in-connection with overall
planning and scheduling.
- Reviewed approval of site Inspection.
- Reviewed approval of progress payment invoices submitted by contractors before client
approval.
Client : Temanggung, local government
(Pemerintah Daerah tingkat II Temanggung)
e. 7 months.
AF. WM OFFICE BUILDING
a. Batu, Malang (East Java)
b. May 1982 – August 1982
c. Architect
d. The project as a management office for building material industry/ factory consist of management
office, product (building material sample) storage and another facility for office building. Main
activities on the design stage i.e. preparing the design drawing and technical specification on the
design stage.
Architect was the following duties and responsibilities:
- Prepare and development of technical project proposal, Preliminary design Report, Final Design
Report, Preliminary design drawing, Final Design Drawing.
- Participate in technical meeting
Client : PT Wanita Mataram
e. 3 months.
AG.CAMPUS OF UNIVERSITAS MUHAMMADIYAH
a. Tidar ,Magelang
b. December 1980- August 1981
c. Architect
d. Design of the campus at Tidar Magelang has specific design with Islam campus characteristic. The
project. consist of rector office building, educational building (3 storey) for 4 faculties, central
library, mosque an another campus facility. This project is 20 ha large.
Architect was the following duties :
- Prepare and development of Project proposal, Preliminary design Report, Final Design Report,
Preliminary design drawing, Final Design Drawing.
- Prepare minutes of meeting.
- Participate in all meeting and some time directed.
Client : Universitas Muhammadiyah Magelang
e. 8 months.
AH. SECOND AGRICULTURE TRAINING PROJECT / IN SERVICE TRAINING CENTER
a. Central Java Province and Daerah Istimewa Yogyakarta Province
b. March 1980 – August 1984
c. Resident/ Regional Engineer
d. The project consist of supervision of In Services Training Centre/ ISTC and Sekolah Pembangunan
Pertanian (Farming High School), design of remaining utility of ISTC and the other school area.
The project consist of Sekolah Pembangunan Pertanian-Sekolah Pertanian Menengah Atas
(Farming High School)/ SPP-SPMA Baros (Tegal), In Service Training Centre/ ISTC Ungaran,
Sekolah Pembangunan Pertanian-Sekolah Peternakan Menengah Atas (Cattle-breeding Farming
High School)/ SPP-SnakMA Tegalrejo (Magelang), ISTC Wonocatur (Yogyakarta) and SPP-SPMA
Kusumanegara (Yogyakarta).
The each school consist of multi purpose building, classical building, school-laboratory, job training
building and area, student dormitory, staff and teacher housing and also administration office
building.
Resident/ Regional Engineer was the following duties and responsibilities:
- Review Architectural and Engineering Design Drawing
- Prepare, development and finalize of project schedule, project supervision monthly report,
quality control procedure and reporting, project supervision final report.
- Checking and approval of shop drawing / construction drawing.
- Checking and recommendation of contractor submission materials.
- Participate in all site meeting and directed, also prepare minute of meeting
- Monitor contractor’s overall construction planning and scheduling.
- Reviewed approval of site Inspection.
- Reviewed approval of progress payment invoices submitted by contractors before client
approval.
- General management for financial aspect, human resources, project operations and technical
matters
Client : Ministry of Agriculture.
e. 48 months.
AI. SUGAR INDUSTRY
FACTORY,PLANT AREA,OFFICE BUILDING,STAFF HOUSING AND FACILITIES
a. Tegal , Pekalongan (Central Java)
b. 1978 – November 1979
c. Engineer
d. Design and construction
Client : Sragi Sugar Factory / PTP XIV
e. 18 months
AJ. BRATANG BIRD MARKET
a. Surabaya
b. 1978
c. Junior Architect
d. Planning and Design
Client : The Government of East Java Province,
Inpres (Presidents Instruction) Project
e. 6 months
AK. DELTA PLAZA , PEMUDA MAIN ROAD
a. Surabaya
b. 1977
c. Junior Architect/ Government Employee in engineering (member of Surabaya City Planning
Committee)
d. Supervision and controlling activity
e. 2 months
AL. GEDUNG PEMUDA
RENEWAL AND RENOVATION OF BUILDING, PEMUDA MAIN ROAD
a. Surabaya
b. 1977
c. Junior Architect/ Government Employee in engineering (member of Surabaya City Planning
Committee)
d. Supervision and controlling activity
e. 3 months
AM. YUNIOR HIGH SCHOOL / SMP - SLTP
a. Surabaya and around the East Java Province
b. 1977
c. Junior Architect
d. Planning and Design of 27 (twenty seven) school locations
Client : Ministry of Education
e. 6 months
AN. DARMO SATELITE TOWN
a. Surabaya
b. 1976
c. Junior Architect
d. Design and Supervision of Residential Estate
e. 2 months
AO.WANITA MOSQUE
a. Surabaya
b. 1975
c. Junior Architect
d. Design (3 Storey)
e. 7 months
AP. GENERAL HOSPITAL- DR.SOETOMO
a. Surabaya
b. 1975
c. Junior Architect
d. Supervision
Client : Ministry of Health
e. 3 months
AQ.INDONESIA RED CROSS BUILDING
a. Surabaya
b. 1975
c. Junior Architect
d. Design (2 storey)
Client : Indonesia Red Cross / Ministry of Health
e. 5 months
AR. GUBENG RAILWAY STATION
a. Surabaya
b. 1974
11. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[MANAGEMENTS, (a) Location; (b) Month/Year; (c) Position Held; (d) Exact Duties Rendered); (e) Time
Spent]
WENWEN SULISTYAWAN
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent; (f) Exact Duties
Rendered] :
L. PT. Kayaco
− Club House and Country Club Construction PT. Labersa Hutahaean, Pekanbaru
a. Pekanbaru Riau
b. PT. Kayaco, PT. Labersa Hutahaean
c. Juli - September 2004
d. Structural Expert
e. 3 Months
f. --
U. LAPI-ITB
− Jayanti and Jangari Tourism Area Pre-design
a. Cianjur, Jawa Barat
b. Pemerintah Kabupaten Cianjur
c. Oktober - Desember 2003
d. Civil engineer
e. 3 Months
f. --
W. --
− Workshop and Building Planning Eks. Kharisma Motor
a. Bandung
b. Mr. Zaini
c. January - October 2002
d. Project Manager, Structural Engineer
e. 10 Months
f. --
AD. --
− GSG Planning
a. Garut
b. Bapak. Arief Nurjaman
c. 1991
d. Structural Expert
e. 2 Months
f. --
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK
ASSIGNED [PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]:
WISNU WIDAYAT
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
A. BD-1 BUILDING WORKS FOR 3.8 MTPA TRAIN CAPACITY TANGGUH LNG PROJECT
a. Jakarta
b. JGC / Brown Root Indonesia
c. May 2005 – present
d. Site Surveyor / Geotechnical Engineer
e. 20 months (on going)
B. STUDY AND ENGINEERING INCLUDE AERIAL SURVEY OF BEKASAP INFIELD DRAINAGE
SYSTEM (BEKASAP DRAIN 2)
a. Duri, Pekanbaru
b. PT Caltex Pacific Indonesia
c. April 2005 – Mar 2006
d. Geotechnical Engineer
e. 12 months
C. SOIL INVESTIGATION & TOPOGRAPHY SURVEY FOR MUTIARA SOIL BIOREMEDIATION
FACILITY PROJECT
a. Duri, Riau
b. PT Caltex Pacific Indonesia
c. July – Sept 2004
d. Site Surveyor / Geotechnical Engineer
e. 2 months
ZAINUL ULUM
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
A. PEKERJAAN SURVEY DAN PENYELIDIKAN GEOTEKNIK BATANG FIELD PROYEK SLN WP-25
a. Duri, Riau
b. PT Multi Structure
c. Nov 2006 – Jan 2007
d. Project Manager
e. 3 months
B. FEASIBILITY STUDY FOR JETTY
a. Lampung
b. PT Truba Alam Manunggal
c. Nov 2006 – Jan 2007
d. Geodetic Surveyor/Engineer
e. 2 months (on going)
C. FEASIBILITY STUDY FOR COAL FIRED STEAM POWER PLANT
a. Lampung
b. PT Truba Alam Manunggal
c. Nov 2006 – Jan 2007
d. Geodetic Surveyor/Engineer
e. 2 months (on going)
D. GEOTECHNICAL INVESTIGATION OF HAUL ROADS SURVEY AT AREA-12
a. Duri, Riau
b. PT Tripatra Engineers & Constructors
c. Aug – Sept 2006
d. Project manager
e. 2 months
E. GEOTECHNICAL INVESTIGATION SURVEY
a. Duri, Riau
b. PT Tripatra Engineers & Constructors
HISBARUDIN
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECT, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Duties Rendered] :
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK
ASSIGNED [PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]:
1991 – 1994 : PT Pulau Laut Group (Jakarta), Business Development Officer, directly responsible for
of a variety of shipping oriented projects:
- Pulau Laut Container Depot in Surabaya (1994)
- Pulau Laut Fleet Development. ( 1994 )
- Dwipa Container Handling Equipment and Truck Procurement (1994)
- Feasibility Study of Tanjung Priok Cargo Distribution and Consolidation Center (1994)
- General Cargo Terminal Operation of Dwipa Group in Tanjung Priok Port, Jakarta
(1993)
- Preliminary Feasibility Study Multi-Purpose Bulk Terminal in Port of Tanjung
Priok, ( 1993)
- Preliminary Preinvestment Study of Shorebase Terminal in Tanjung Priok Port (
1993)
- Pulau Laut Container Depot in Tanjung Priok (1993)
- Feasibility Study of Container Terminal in Semarang, Central Java (1992)
- Feasibility Study of Container Terminal in Port of Surabaya, East Java (1992)
- Feasibility Study of Multi-purpose Terminal in Port of Tanjung Priok, Jakarta (1992)
- Feasibility Study of Palm Oil Terminal in Port of Belawan, North Sumatera (1991)
- Pulau Laut Container Depot in Semarang (1991)
PAPERS :
- Posisi dan Peran Maritim Indonesia Dalam Percaturan Global, ITB Ocean Expo 2000 (IOE-2000),
Seminar Nasional Pengembangan Infrastruktur Maritim di Indonesia, 31 Agustus – 01 September 2000.
- Analisis Pengaruh Penanaman Modal Terhadap Pertumbuhan Ekonomi Regional di Indonesia
selama Pembangunan Jangka Panjang Pertama, 1998.
- A Computer Simulation Modelling Study for Port Planning of Main Public Terminal, Port of
Palembang, South Sumatera , Indonesia ( M.Sc thesis ), 1988.
- Design Report on Chittagong Harbour : Developing a Plan for a Harbour in Bangladesh Which
Would Accommodate Bigger Vessels and Increase the Throughput ( Dipl.HE design report ), 1987
- Perencanaan Teknis Jalan Gemolong – Purwodadi ( Tugas Akhir S1 Teknik Sipil ), 1983
TEDDY RAZAKI
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent; (f) Exact Duties
Rendered] :
A. FREELANCE
− Natuna Great Mosque Complex and Supporting Facilities Project, Dinas Puspida Housing
Project, Maritime Campus Building, STAI Building
a. Kabupaten Natuna
b. –
c. 2006 - 2007
d. Planning
e. --
f. –
B. FREELANCE
− Mr. Sujatmoko’s House Project
a. Solo
b. –
c. 2006 - 2007
d. Planning
e. --
f. –
C. FREELANCE
− Mrs. Yenni Vitaria’s House Project
a. Bintaro
b. –
c. 2006 - 2007
d. Planning
e. --
f. –
D. FREELACE
− Mr. fredy’s House Project
a. Bandung
b. –
c. 2006 – 2006
d. Planning
e. --
f. –
E. FREELANCE
− Regent’s open Veranda
a. Lhocksukon, North Aceh
b. –
c. 2004
d. Planning
e. --
f. –
F. FREELENCE
− Mr. Maman’s House Project
a. Cinunuk Bandung
b. –
c. 2004
d. Planning
e. --
f. –
G. FREELANCE
− Iboih Beach Tourism Area Planning
a. Sabang, NAD
b. –
c. 2003
d. Planning
e. --
f. –
H. FREELANCE
− City Center Master Plan
a. Lhocksukon, NAD
b. -
c. 2003
d. Planning
e. -
f. –
I. FREELANCE
− Masjid Darut
a. Tauhid Design Competition, Bandung
b. –
c. 2003
d. Planning
e. -
f. -
AFA PT Encona Inti Industri Page 2 of 5
CURRICULUM VITAE
J. FREELANCE
− Mr. Maman’s House Project
a. Sukanumi, West Java
b. –
c. 2002
d. Planning
e. –
f. –
K. FREELANCE
− Mr. M. Natsir’s house Project
a. Bandung, West Java
b. –
c. 2002
d. Planning
e. –
f. –
L. FREELANCE
− Housing Project
a. Bali
b. –
c. 2001
d. Planning
e. –
f. –
M. FREELANCE
− Mr. Bachtiar Djafar’s house Project
a. Medan, North Sumatra
b. –
c. 2001
d. Planning
e. –
f. –
N. PT. telier Enam Bandung
− Fedex Office Project, Mr. Paul Siregar’s House Project,
a. Denpasar, Bali
b. –
c. 1990 – 2001
d. Planning
e. –
f. –
O. PT. telier Enam Bandung
− ARS International school, Children Potential Depelovment, Center Suryakanti, BNI Branch Asia
Afrika Renovation Project, BRI Naripan Renovation Project, Seni Rupa ITB Building, IPTN
Mosque, Bank Duta Merdeka, Kasoem House Project Dago Pakar,
a. Bandung
b. –
c. 1990 – 2001
d. Planning
e. –
f. –
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
A. BD-1 BUILDING WORKS FOR 3.8 MTPA TRAIN CAPACITY TANGGUH LNG PROJECT
a. Papua
b. JGC/PT Brown Root Indonesia JO
c. Oct 2005 – present
d. Architect
e. 22 months (on going)
B. NASHA OFFICE PROJECT
a. Jakarta
b. PT Nusapersada Abadi Sejahtera
c. June – July 2005
d. Architect
e. 2 months
C. WASTE MANAGEMENT FACILITIES DETAIL ENGINEERING DESIGN DEVELOPMENT
PROJECT
a. Duri, Riau
b. PT Caltex Pacific Indonesia
c. May – July 2005
d. Architect
e. 3 months
D. KOMATSU NEW FOUNDRY PLANT PROJECT
a. Jakarta
b. PT Komatsu Indonesia Tbk
c. March – Aug 2005
IMAN NURJAMAN
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent; (f) Exact Duties
Rendered] :
A. Free Lancer
− Natuna Great Mosque Center Planning and it’s supporting facility.
− Dinas Puspida Kabupaten Natuna’s Housing Complex planning.
− Maritime Campus Building Planning, Kabupaten Natuna
− STAI Building, Kabupaten Natuna
− Master Plan
a. Natuna
b. –
c. 2006
d. Architect
e. –
f. –
B. Free Lancer
− House at Jl. Hegarmanah Bandung
− House at Jl. Hegarmanah, Bogor.
− House at JL. Setraduta Lestari, Bandung
a. Bandung & Bogor
b. –
c. 2006
d. Architect
e. –
f. –
NICO SAPUTRA
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
a. Jakarta
b. PT Bank Bukopin
c. Nov 2004 – Feb 2005
d. Architect
e. 4 months
F. NUSAPERSADA ABADI SEJAHTERA OFFICE PROJECT
a. Jakarta
b. PT Nusapersada Abadi Sejahtera
c. Nov 2004 – Feb 2005
d. Architect
e. 4 months
G. HANGGAR GADING AIRPORT PROJECT
a. Yogyakarta
b. PT Waskita Karya (Persero)
c. March – May, 2004
d. Architect
e. 3 months
H. WAREHOUSE RITRA KONNAS FREIGHT CENTER PROJECT
a. Jakarta
b. Ritra Konnas Freight Center
c. March – May, 2004
d. Architect
e. 3 months
I. AULA GEREJA St. ARNOLDUS
a. Bekasi
b. Yayasan Gereja Arnoldus
c. April – May 2004
d. Architect
e. 2 months
EDI TJAHJONO
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Exact Duties Rendered; (f)
Time Spent]:
FAJAR WIDIANTORO, ST
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
c. 2006
d. Junior Architect
e. -
F. EDISON TOWN CENTRE
a. Baltimore, Maryland USA
b. Design Development Group (DDG) Inc, - USA
c. 2006
d. CADD Draftmen
e. -
G. ELEMENTARY SCHOOL REHABILITATION PROJECT at 14 LOCATIONS
a. Cimahi - Indonesia
b. Dinas Pendidikan, City Government of Cimahi
c. 2006
d. Junior Architect
e. 3 months
H. HOUSE AT BATUNUNGGAL INDAH
a. Batununggal Indah, Bandung - Indonesia
b. Mr. Budi Permana
c. Junior Architect
d. 2006
e. –
I. NATIONAL ART GALLERY SINGAPORE DESIGN COMPETITION
a. Singapore
b. Government of Singapore
c. 2007
d. Junior Architect
e. –
J. CIMAHI COMMUNITY PARK DESIGN COMPETITION
a. Cimahi - Indonesia
b. City Government of Cimahi
c. 2007
d. Junior Architect
e. -
K. PERTAMINA FERRY PORT MALUKU - AMBON
a. Maluku - Ambon, Indonesia
b. -
c. 2007
d. Junior Architect
e. -
O. CIMAHI MALL
a. Cimahi - Indonesia
b. -
c. 2004
d. Junior Architect
e. -
P. PERTAMINA SHELTER AND DISPLAY FOR ELPIJI AND KEROSENE
a. -
b. Pertamina
c. 2004
d. Junior Architect
e. -
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]
SJAFRUDIN BEMPAH
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECT, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Capacity; (f) Main Component; (g)
Duties Rendered] :
c. 1987 - 1994
d. Surveyor
E. IKK & BNA PROJECT
a. North Sulawesi
b. -
c. 1985 - 1987
d. Surveyor
F. EXTRA HIGH VOLTAGE PROJECT
a. Jakarta
b. -
c. 1982 - 1985
d. Inspector
G. WISMA BUMI PUTRA PROJECT
a. Jakarta
b. -
c. 1981 - 1982
d. Surveyor
H. GARDU INDUK GANDUL DAN UNGARAN PROJECT
a. Central Java
b. -
c. 1981 - 1982
d. Surveyor / Drafter
I. EXTRA HIGH VOLTAGE PROJECT
a. Surabaya, Ungaran
b. -
c. 1981 - 1982
d. Surveyor / Drafter
J. BONTANG – SANTAL ROAD PROJECT
a. Bontang
b. PT Bina Marga
c. 1980
d. Drafter
K. PALIMANAN – CIREBON ROAD PROJECT
a. West Java
b. PT Bina Marga
c. 1980
d. Drafter
L. PENAJAM – BATUAJI ROAD PROJECT
a. East Kalimantan
b. PT Bina Marga
c. 1980
d. Surveyor / Drafter
M. SEMBAWA ROAD PROJECT
a. South Sumatera
b. PT Bina Marga
c. 1979
d. Drafter
N. BURSA BUILDING PROJECT
a. Jakarta
b. -
c. 1979
d. Surveyor
O. KIMIA FARMA BUILDING PROJECT
a. Jakarta
b. PT Kimia Farma
c. 1979
d. Surveyor
P. PROYEK AIR MINUM CIREBON - YOGYA
a. Cirebon - Yogyakarta
b. PAM
c. 1979
d. Surveyor / Drafter
Q. MEDAN ROAD PROJECT
a. Medan
b. PT Bina Marga
c. 1979
d. Surveyor / Drafter
R. LNG BONTANG PROJECT
a. Bontang
b. -
c. 1978
d. Surveyor / Drafter
S. KONIMEX PROJECT
a. Solo
b. PT Konimex
c. 1978
d. Surveyor / Drafter
T. SEKRETARIAT NEGARA PROJECT
a. Jakarta
b. Local Government
c. 1979
d. Surveyor / Drafter
U. BPP PROJECT
a. Tanjung Priok, Jakarta
b. -
c. 1978
d. Surveyor / Drafter
V. UNION CARBIDE PROJECT
a. Jakarta
b. PT Union
c. 1978
d. Surveyor / Drafter
W. PUSPIPTEK PROJECT
a. Serpong
b. Puspiptek
c. 1978
d. Surveyor / Drafter
X. BUKIT ASAM PROJECT
a. South Sumatera
b. PT Bukit Asam
c. 1977
d. Surveyor / Drafter
Y. FE. BRIDGING PROJECT
a. Bali, Lombok, Sumbawa, Sumba, Flores
b. -
c. 1977
d. Surveyor / Drafter
Z. RUTENG KEDIDIN ROAD PROJECT
a. Flores
b. PT Bina Marga
c. 1977
d. Surveyor / Drafter
AA. SUMBAWA BESAR – BIMA ROAD PROJECT
a. Sumbawa
b. PT Bina Marga
c. 1977
d. Surveyor / Drafter
BB. LEMBAGA ADMINISTRASI NEGARA PROJECT
a. Jakarta
b. -
c. 1976
d. Surveyor / Drafter
CC. KHI PROJECT
a. -
b. PT Krakatau Steel
c. 1976
d. Surveyor / Drafter
DD. SMP / SMA PROJECT
a. -
b. PT Krakatau Steel
c. 1976
d. Surveyor / Drafter
EE. NIEGHBOURHOOD CENTRE PROJECT
a. -
b. PT Krakatau Steel
c. 1976
d. Drafter
FF. SITE & SERVICE PERUMNAS KLENDER PROJECT
a. Jakarta
b. PT Krakatau Steel
c. 1976
d. Drafter
GG. GKN PROJECT
a. Bandung
b. -
c. 1976
d. Tender Analyst
HH. PLTU ANCOL PROJECT
a. Jakarta
b. PT TIJA
c. 1975
d. Surveyor
II. HUTAMA KARYA PROJECT
a. Jakarta
b. PT Hutama Karya
c. 1975
d. Surveyor
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent]:
ALFIANDRI
11. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent; (f) Exact Duties
Rendered] :
ASEP RAHMAT, ST
10. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED
[PROJECTS, (a) Location; (b) Owner, (c) Month/Year; (d) Position Held; (e) Time Spent; (f) Exact Duties
Rendered] :
NORTH DURI DEVELOPMENT – DRAINAGE & CANAL IMPROVEMENT, • Developed design criteria for water structures and canal works
GEOTECHNICAL INVESTIGATION • Developing EPC Tender Documents for construction on main canal
and secondary canal 8
Projects Main Component are as follows : • Further hydraulic analyses to study drainage canal system base on
the North Duri Development base map and recommendation for road
• Performed detailed engineering design for Duri Drainage system and and well pads elevation in Area-12 base on developed flood map.
geotechnical investigation. • Performing geotechnical investigation and geotechnical
• Objectives: recommendation for future development of Area-12.
• Designing drainage canal system covering all Duri Field (9,200 ha)
including main canal, secondary canal and tertiary canal.
• Developing flood map and flood risk analyses
• Developing EPC Tender Document
EXOR-I (EXPORT ORIENTED REFINERY)-I
PERTAMINA - BALONGAN