MEASUREMENT SHEET

Title: WORKING OUT QUANTITIES OF RCC FRAME STRUCTURE.

DESCRIPTION

S.No

TOTAL

No

4x2
4x2
4

10'-0"
8'-0"
10'-0"

8'-0"

10'-0"
10'-0"
-

800
640
320

SFT
SFT
SFT

BATH (7'-0" x 4'-6")


LONG WALLS
SHORT WALLS
CEILING

2
2
1

7'-0"
4'-6"
7'-0"

4'-6"

10'-0"
10'-0"
-

140
90
31.5

SFT
SFT
SFT

CONSULTATION ROOM (12'-0" x 14'-0")


LONG WALLS
SHORT WALLS
CEILING

2
2
1

14'-0"
12'-0"
14'-0"

12'-0"

10'-0"
10'-0"
-

280
240
168

SFT
SFT
SFT

RECEPTION (19'-6" x 19'-0")


LONG WALLS
SHORT WALLS
CEILING

2
2
1

19'-6"
19'-0"
19'-6"

19'-0"

10'-0"
10'-0"
-

390
380
370.5

SFT
SFT
SFT

BETWEEN GRID 2,3 & D,F


(7'-0" X 9'-6")
LONG WALLS
SHORT WALLS
CEILING

2
1
1

9'-6"
7'-0"
9'-6"

7'-0"

10'-0"
10'-0"
-

190
70
66.5

SFT
SFT
SFT

4176.5

SFT

70
35
49
168
35

SFT
SFT
SFT
SFT
SFT

1 PROVIDING INTERNAL PLASTER


USING 1:6 , 0.5" thick INCLUDING
COST OF SCPFOLDING
ARRANGEMENT
ROOM (10'-0" x 8'-0")
LONG WALLS
SHORT WALLS
CEILING

TOTAL
OPENINGS
BETWEEN GRID 2 & 3
D1
D2
D3
D4

1
1
2
4x2
2

7'-0"
5'-0"
3'-6"
3'-0"
2'-6"

10'-0"
7'-0"
7'-0"
7'-0"
7'-0"