SINCOR

Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 1/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SERVICES OTEPI FOSTER WHEELER ENGINEERING INFIELD PIPELINE SYSTEM GENERAL CIVIL WORKS SPECIFICATION

REVISION INDEX: This document has 24 pages. REV. G-0 H-0 H-1 H-2 DATE APR. 27, 1999 JUN. 03, 1999 JUL.07, 1999 JUL.22, 1999 PAGE (S) 1 - 24 1 - 24 1 - 27 1- 24 COMMENT (S) Issue for IDC Issue for approval Issued for Tender Issue for Tender

*** This document was previously issued as: None

OFW APPROVAL

SINCOR APPROVAL

PREPARED BY J.L. Garca Discipline Engineer

CHECKED BY R.D. Daz Discipline Leader

APPROVED BY

APPROVED BY R. P. Ayala Discipline Leader

APPROVED BY

L. Macazaga
Project Manager

N.Baker
Engineer Manager

/ /19

/ /19

/ /19

/ /19

/ /19

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 2/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

INDEX
SECTION N PAGE

1. 2. 3. 3.1.

CONSTRUCTION JOB SPECS. LAYOUT REMOVAL AND DISPOSITION OF EXISTING FENCES DEFORESTATION Light Deforestation and Cleanliness (stubble, low vegetation in general) with Mostly Maximum Height of 8 m CLEANING GRUBBING REMOVAL OF ORGANIC SOIL Common Removal of Disposal Earths EXCAVATION Classification Water in Excavations Excavation for Banking in Any Type of Material Excavation in Borrow at Sites of Any Type of Material SOIL IMPROVEMENT BACK FILL Trench Filling with Excavation Material

5 5 6 6 6 7 7 7 8 9 9 10 10 11 12 12

4. 5. 6. 6.1. 7. 7.1. 7.2. 7.3. 7.4. 8. 9. 9.1.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 3/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

10. COMPACTION 10.1. Fill and Compaction Control

13 13 15 16 16 16 16 16 17 17 17 17 18 18 18 18 19 19 19 20

11. LEVELING 12. SOIL EROSION AND SEDIMENTATION CONTROL 13. ROAD 13.1. 13.2. 13.3. 13.4. Conditioning of the Support Surface Construction of the Sub Base with Site Material. Supply Transportation and Asphaltic Priming Placement with RC-250. Supply Transportation and Placement of Asphaltic Hot Concrete Type III.

14. TRENCHING 14.1. 14.2. Excavation with Machine Without Shore, Until 2 m Depth Machine Excavation (with shore) Over 2 m Depth

15. RIVER AND ROAD CROSSING 15.1. 15.2. 15.3. 15.4. River Crosses Supply and Placement of Counterweights Road Crossing Roads and Rural Roads Crossing with Trench Openings

16. FENCING 16.1. 16.2. Valve Station Fence Temporary Fences

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 4/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

17. SLOPE PROTECTION 17.1. Slopes Priming with RC-250

21 21 21 21 23 23

18. UNDERGROUND PIPE INSTALLATION 18.1. Piping Placement

19. SIGNALING OF BURIED SECTIONS 20. PROTECTION OF VALVE STATION

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 5/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

1.

CONSTRUCTION JOB SPECS. LAYOUT THE CONTRACTOR will execute the necessary works for the definition of the polygonal base of the project, which references are given in the project drawings in order to establish coordinates and quotes indicated in the drawings, specifications and site instructions, in order to allow that the installations of the project stay at the foreseen site. The layout will be executed according to the approved working program. It will be the contractor's responsibility any mistake and consequence of it. The work will be started locating all the references found over the terrain, which will be clearly visible indicated or reestablished outside the construction boundaries; in case that they disappear or become altered during construction, their reconstruction and new location will be at the contractor's expense. Once these works are done, it will then proceed to layout the structures pipes roads axis, channels, discharges and other elements indicated in the project. During layout advance, the contractor will require an inspection for the correspondent approval, without with the next work could not be started.

2.

REMOVAL AND DISPOSITION OF EXISTING FENCES THE CONTRACTOR will present to THE OWNER a work plan, which will be considered the start and finish dates of the works, the execution procedure, the provisional storage sites and recommended disposition of the fence material. THE CONTRACTOR shall have the work plan approval by THE COMPANY to initiate the works. Unless otherwise specified, fence removal products will be THE CONTRACTOR's property, who shall remove them immediately from the site, within the term established for it in the work plan. Comprehends the supply of equipment, supervision and manpower necessary to remove the fence of barbed wire in the working areas.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 6/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

3.

DEFORESTATION 3.1. Light Deforestation and Cleanliness (stubble, low vegetation in general) with Mostly Maximum Height of 8 m Comprehends the works for removal and cleanliness of trees, woods, underbrushes, bushes, roots, vegetal disposals and, in general, all types of vegetation. Once the necessary topographic works for the demarcation of the zone to be deforested (as indicated in the drawings) are executed, and cleanliness, and being obtained from the authorities the necessary permits for the havoc (previous inspection conformity), the works comprehended within this party could be started. For banking and fillings, the minimum dimensions in which this operations will be executed, will be the complete areas covered by them, widened in 1.50 m to the outside of the initiation sticks of the respective slopes. The products from deforestation and cleanliness will be THE CONTRACTOR's property, who shall immediately retire them from the site. THE CONTRACTOR will be directly responsible and will respond economically and judicially if it were the case, for the damages that it could cause to thirds or property of the client, and in general, to others property for the realization of the works comprehended within this party.

4.

CLEANING Material Disposal: 1. The trees, roots, brushes and other vegetation shall be disposed of by THE CONTRACTOR as directed by THE COMPANY. 2. Any excess on-site material not used as fill shall be disposed of as directed by THE COMPANY. 3. Any excavated material found to be contaminated shall be disposed the site conforming to local regulations.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 7/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

5.

GRUBBING Once the necessary topographic works for the demarcation of the zone to be deforested and cleared are executed, and the necessary permits and authorizations for clearing, grubbing and burning are obtained, with approval of THE COMPANY, THE CONTRACTOR may start this phase of the works. Unless the contrary is specified, deforestation and clearing products shall be THE CONTRACTOR's property. He shall remove them immediately from the site regardless of whether the decision is made to save or burn these products. The products shall be stored in a previously approved and prepared zone inside the project boundary. Any burning will be under controlled conditions, with proper precautions taken to avoid fire propagation. Deforestation and clearing and grubbing works will be executed before earth moving commences. THE CONTRACTOR will be directly responsible for any fire propagation and damages caused to other properties due to the works described in this Work Scope Specification.

6.

REMOVAL OF ORGANIC SOIL Once the site is surveyed, work areas are defined, and deforestation, clearing and grubbing occurs, with prior approval by THE COMPANY, removal of organic soil can begin. THE CONTRACTOR will be responsible for quoting the quantity of excavation, and for hauling procedures for stockpiling and disposing of organic soil, subsequent COMPANY's approval. 6.1. Common Removal of Disposal Earths This party comprehends the removal works, transportation and cast of the superficial coat, which for its quality or condition is not appropriated to built seat for the fills neither to be utilized in the construction of them. The common removal works could be started once the layout is executed. The thickness of the coat to be removed will be the one assigned by the inspection, which equally will indicate the cast place or material stocking.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 8/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

7.

EXCAVATION Once topographic works are done to demarcate and reference the plant excavation area, and deforestation, clearing of vegetation, grubbing and the removal of the organic soil are accomplished, excavation works can be initiated after THE COMPANY has given approval. All excavation materials adequate for fill construction from stockpiling will be utilized and transported to the sites according to the drawings and with the following specifications. When stockpile materials are being utilized for filling, the stockpile operations shall adjust to the compaction equipment performance. When the project has a need for fill construction and in THE COMPANY's judgment is the excavation material is not adequate for this purpose, THE COMPANY may order the disposal of such material and its substitution with other material he estimates is adequate, even though not contemplated in the project. All excavating and earth moving equipment and machines shall be approved by THE COMPANY's inspector and shall be maintained throughout the contract in good working order. Excavation work shall be performed to the lines, grades and slopes specified on the project construction drawings. Slopes of all excavations shall be cut true and straight, and all trees, roots, stumps, brush and other vegetation, loose stones and boulders shall be removed in areas to be excavated, filled, graded or in areas which will support roads, embankments or foundations. Excavations for foundations deeper than one meter shall be excavated using a maximum slope of one and a half horizontal to one vertical or shall be shored and braced by members of suitable sizes. THE CONTRACTOR shall be responsible for the design, construction and satisfactory performance of all temporary excavation support system. Shoring, bracing and sheeting shall be removed, as the excavation is backfilled in a manner to prevent cave-in. When excavations are over 1600 mm in depth, shoring bracing shall be used unless slope can not be extended

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 9/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

THE CONTRACTOR shall submit to THE COMPANY his proposed method and measurement of excavation, spoil disposal, pumping arrangements and methods of supporting excavations. Excavations shall be opened in such lengths and depths at one time in accordance with accepted safe engineering practice. THE CONTRACTOR shall fully cooperate with THE COMPANY, especially in regard to the sequence and timing of trench excavation, placing of spoil and backfilling to ensure the most efficient execution of the work. All drainage work shall be completed in advance of construction of roadways and paved areas. Excavations taken to a greater depth than is necessary shall be backfilled with concrete or suitable material as directed by THE COMPANY at THE CONTRACTOR's own expense. 7.1. Classification Excavation work shall be classified by either of the following: 1. Earth excavation shall consist of removal, storage and/or disposal of all materials required to be removed, such as topsoil, clay, sand, gravel, rock fragments, boulders, soft and disintegrated rock or any other material that can effectively be removed using conventional excavating machines equipped with a single tooth ripper blade. 2. Rock excavation, shall consist of removal, storage and/or disposal of bedrock formations and other fully hardened materials which require continuous drilling and blasting. If possible excavated rock shall be crushed and used as onsite material. Blasting of rock shall only be carried out with the prior written approval of, and under the supervision of a certified Blasting Engineer. All local regulations are to be complied with. 7.2. Water in Excavations 1. All excavations shall be kept free of water at all times until completion of construction and backfilling of the excavations. 2. THE CONTRACTOR shall provide all pumping, temporary drains, cuts and sumps as necessary for this purpose. All such cuts and sumps shall be filled in with concrete or other suitable fill as directed by THE COMPANY.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 10/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

3. Water pumped from excavations shall be directed either onto the adjoining ground without causing damage or into an adjacent permanent drainage system as directed by THE COMPANY. While discharging to a permanent drainage system precautions shall be taken to ensure that existing drainage systems are protected from blockage by the ingress of materials. 7.3. Excavation for Banking in Any Type of Material Under this party the excavation works of the natural terrain will be done, once the superficial coat of the disposable top soil has been removed and has as a goal to achieve the modified quotes of the terrain established in the project. It also comprehends the final disposal of the excavated soils and their transportation, as well as the resultant slopes conformation. Once the works specified in points 3,4,5 and 6 are complied and the connected topographic works, it will proceed to realize the excavation works comprehended within this item. All the adequate materials for the fill construction will be used and transported to the sites indicated by the inspection. In conjunction with the banking advance, the slopes conformation work will be executed according to the pendant given in the drawing in order the slope surface will not remain with free materials that could cause any landslides. 7.4. Excavation in Borrow at Sites of Any Type of Material It comprehends the excavation works through mechanical equipment at the borrow site to provide materials for the construction of terrepleins, conditioning of the sub base and construction of the granular base, including its charge, transportation and unloading from the borrow site to the job site. Once the topographic works to delimit and reference the borrow material site are executed, there will be executed the deforestation and cleanliness works and will proceed with the removal of the vegetal coat according to the specified in points 3,4,5 and 6, being able to proceed immediately with the excavation of selected material for the terrepleins. The borrow material site will be established by THE CONTRACTOR and approved by THE COMPANY.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 11/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

The explotation of the borrow material site shall be executed in the most possible regular manner, executing the slopes conformation at the same time that the excavation advances. In case of landslides occur for CONTRACTOR's causes, this shall realize the collection and cleanliness at his own expense without receiving any payment for this concept. In every case, THE CONTRACTOR shall guarantee good-looking conditions and safety for the borrow zone, at inspection judgment. The exploitation rhythm of the borrow material site will be conditioned to the performance of the equipment used to build the terrepleins. 8. SOIL IMPROVEMENT This item comprehends all the necessary works to condition through scarification and recompaction of the existent soil at the site or the substitution of it, a fill material that fulfills with the constructive specifications that are mentioned in the following paragraphs: The material to be used will be soils of the site duly compacted. At those sites where the terrain level has been obtained through banking or where the Inspector Engineer demands it, it will proceed then to condition the sub base in a thickness of 0.30 m. The material shall be adequately compacted at its maximum dry density and optimum humidity correspondent to the modified proctor assay. During the conditioning of the soil, the Inspector Engineer shall practice the correspondent tests that allow to determine the compaction reached; if this were less than the demanded in these specifications, THE CONTRACTOR shall, at his own expenses, continue with the compaction or scarify the coat in its whole thickness and compact again. The thickness of each compaction coat to be used will not be more than 0.20 m. The coats will extend in lengths not more than 100 m, keeping between them a minimum joint of 1.0 m in transversal direction.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 12/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

Taking on account the granulometric properties of the soils to be compacted soils basically granulated), it is recommended the use of vibro compacted equipment of weight not less than p= 10 Ton in its compaction. The coat thickness and the passing numbers to be used will be adjusted in site through a test compaction terreplein. The result will depend on the weight and type of available equipment of THE CONTRACTOR. In case of local rains the compaction process will be stopped and under any circumstance the extension of new coats will be allowed until complete sanitation of the last compacted coat is guaranteed to the optimum correspondent humidity. In object to accelerate the sanitation or drying of the last compacted coat, it is recommended its scarification through the use of harrows, accelerating by this mean its drying. 9. BACK FILL 9.1. Trench Filling with Excavation Material Under this item THE CONTRACTOR will execute the necessary filling works in the pipe trenches, and in general, all that parts of work where filling is required. The item work does not include excavation and transportation of borrow material. THE CONTRACTOR will use in the fillings, with preference, materials from site excavation that have been laboratory tests and approved by the Inspector Engineer. The compacted filling until 0.30 m over the pipe loin will be constituted by selected earth, without stones and clods bigger than 0.05 m and in conditions of optimum humidity according to the proctor tests used as a reference for the filling compaction sites. Over that level could be accepted hard stones and clods until 0. 15 m diameter, taking care that the stones become involved in earth and is no contact between them. The filling will be made simultaneously at both sides of the pipes, in such a manner that the alignment is the adequate.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 13/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

To complete the backfilling will be used local material from excavation compacted, running heavy machinery over the backfill, leaving a windrow to compensate future backfilling compaction due to rain and natural material settlement. 10. COMPACTION A. All areas to receive fill, foundations, embankments, roads, except trench areas for piping, shall be proof rolled and compacted to a minimum of 95% of the maximum dry density determined by the modified Proctor Test (ASTM D-1557), prior to fill or concrete placement. Any loose, soft or wet soils shall be removed and replaced with compacted structural fill as specified by THE COMPANY. B. All fill materials shall be placed in maximum 0.20 m thick loose horizontal lifts and compacted by suitable mechanical means. C. To yield the required in-place densities of the various fills, test sections shall be prepared at the site from which the best combination of compaction equipment and number of passes shall be established. D. Where a large number of lifts are required to complete a backfill operation and the elapsed time between placements is large, the surface of each lift shall be gently sloped to facilitate drainage and prevent pounding on the fill. E. For bedding of underground pipes, the trench shall be excavated 0.10 to 0.15 m below the pipe and filled with granular soil material to a height of at least the middle of the pipe. Backfill material placed in an excavated trench shall be compacted with equipment, which will produce the degree of compaction specified. The amount of water used in compaction shall be limited to that indicated by Modified Proctor Tests, thorough soaking or flooding shall not be allowed. Until a minimum cover of 0.30 m is obtained over pipes, only hand operated tamping equipment shall be used. Heavy compacting equipment, however, shall not be used until the cover is adequate to prevent damage to the pipe. 10.1. Fill and Compaction Control THE CONTRACTOR AND COMPANY will perform all field control and laboratory tests as required on onsite and imported fill materials as the work progresses to insure conformance with required gradation consistency, moisture

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 14/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

content and density, and in addition, shall inspect existing areas, cut areas and fill areas in order to specify proof rolling requirements. A. The following minimum testing shall be performed: 1. Structural Fill One standard sieve analysis and one Modified Proctor Test with corresponding Proctor curve shall be performed on every 1500 cubic meter. If there is a large variation in analysis, more frequent tests shall be made. 2. Onsite General Fill One Standard sieve analysis and one modified Proctor test shall be made for every 1500 cubic meter of general fill. 3. In Place Density and Moisture content Testing As a minimum the following in place density and moisture content testing on compacted fill shall be performed: a) Under and around equipment foundations - one every 75 cubic meters b) Under paving area - one every 150 cubic meters on Road base - one every 75 cubic meters c) Embankment - one every 350 cubic meters As a minimum, at least one set of these density tests must be performed on every lift of fill and further placement shall not be allowed until the required density is achieved. The number of tests shall be increased if THE COMPANY's inspector determines that the moisture content is not uniform or if the compacting effort is variable and not considered sufficient to attain the specified density. B. Inspection THE COMPANY's inspector shall be present during all earthwork operations. An inspection shall be made on completed excavation and onsite material for its acceptance as fill. No permanent work shall commence without the

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 15/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

inspector's permission and the inspector shall have the full authority to stop or reject fill operations if they do not conform to the specification or drawings. C. Testing Procedure 1. "Modified Proctor" shall be done in accordance with ASTM Designation D1 557 and "Standard Proctor" shall be done in accordance with ASTM D698 2. "Sieve Analysis" shall be done in accordance with ASTM Designation D422. 3. Liquid Limit, Plastic limit and plasticity index shall be determined in accordance with ASTM Designation D-4318. 4. In place density shall be done in accordance with ASTM D-2922. 5. Moisture content shall be done in accordance with ASTM D-3017. 11. LEVELING THE CONTRACTOR will start the works with the previous approval of THE COMPANY, based on the information and content in the drawings. References will be established through stakes color painted with a color code jointly established with THE COMPANY. These stakes will contain data necessary for all the other CONTRACTOR's, such as, cut and fill indicators, stations, axis or any other data required for the correct execution of the works. THE CONTRACTOR is responsible for the maintenance, restitution, relocation or total or partial removal of the reference system for whatever construction exigencies may occur, according to THE COMPANY instructions. Contemplates establishing at the site all the quotes elevations indicated in the drawings and specifications, in order to allow that the project installations stay at the established quotes. It includes the location of monuments or definitive references, bench marks (B.M.) with their quotes and UTM coordinates clearly established, in such a manner to allow, at any moment, the making of leveling or checking.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 16/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

12.

SOIL EROSION AND SEDIMENTATION CONTROL THE CONTRACTOR shall provide all erosion and sediment control facilities for the various excavations and spoil areas as shown on the project construction drawings. CONTRACTOR's work shall include, but not necessarily be limited to, construction or berms, ditches, traps, drains, sedimentation ponds or any other practical means to minimise sediment discharge to natural streams, rivers, lakes or canals outside of areas being worked. Extreme caution shall be exercised to minimize disturbance to natural areas. All erosion and sediment control facilities for the various excavation and spoil areas shall be coordinated with THE COMPANY prior to starting the work.

13.

ROAD 13.1. Conditioning of the Support Surface Comprehends personnel supply, equipment and necessary materials to realize the support surface conditioning required for the correct execution of the works indicated in the drawings and specifications. It includes scarification, conformation and compaction activities. 13.2. Construction of the Sub Base with Site Material. Comprehends personnel supply, equipment and the necessary materials for the construction of the road sub base either with site borrow material or without it. Materials will be compacted at a maximum density of 95 % of the modified proctor. The construction will be made according to the drawings and specifications. In the unitary price it is included the earth spreading, the elimination of material not apt for compaction, the application of water for compaction, the compaction it self and the grading conformation. 13.3. Supply Transportation and Asphaltic Priming Placement with RC-250. Comprehends personnel supply, equipment and the necessary materials to realize the application of asphaltic priming at a rate of 2 ItS/M2 over a finished base that has not been previously treated with asphaltic material, or of asphaltic folder, all according to the indicated in the drawings and specifications. Supply, Transportation and Placement of Asphaltic Hot Concrete BAC-1 Type.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 17/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

13.4. Supply Transportation and Placement of Asphaltic Hot Concrete Type III. Comprehends personnel supply, equipment and the necessary materials to realize the supply, transportation and placement of the asphaltic melts in hot (asphaltic concrete type BAC-1 and type 111) required for the correct execution of the works indicated in the drawings and specifications. The asphaltic melts shall be compacted at 95 % of the average density of the briquettes made at the laboratory. 14. TRENCHING 14.1. Excavation with Machine Without Shore, Until 2 m Depth THE CONTRACTOR will excavate with machine to the depth according to the line and pendant indicated in the drawings for the installation of pipes and in general all those parts of the work where trenches or pits are required. All the excavation works for the trenches that for its conditions or dimensions are not able to be made with mechanical equipment, will be made by hand. This excavation will not have a depth more than 2.00 m. 14.2. Machine Excavation (with shore) Over 2 m Depth THE CONTRACTOR will excavate with machine to the depth according to the line and pendant indicated in the drawings for the installation of banking, piping. This excavation will be with depths higher than two meters (2m). In this party, due to the excavation depth, shore will be included. Shore is the conjunction of necessary activities to guarantee the staying at its place of the material from the trench walls. In those parts that are dangerous for the work, personal and equipment safety.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 18/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

15.

RIVER AND ROAD CROSSING 15.1. River Crosses The works to be executed consist of the necessary operations to install buried pipes under the river bed, creek or flood areas, according to the detail drawing correspondent to each crossingapproved for construction. Likewise, it is considered included all the manpower, materials and required equipment for the following operations: protection works; reforestation; slopes protection and; other existent works; control and deviation of water courses; excavation; timbering; sheet pilling or breaced if necessary, bent; alignment, welding and covering of the joint, radiography 100 %, pipe placing, fill and compaction of the trench and casting of leftover material at the sites indicated by the Inspector Engineer. Costs of any other necessary work to realize the river crossings and creeks in the installation of buried pipes, are included. 15.2. Supply and Placement of Counterweights Consists in the supply and placement of the reinforced concrete anchorage blocks (counterweights) according to the indicated in the drawing of correspondent typical crossings. The distance between counterweights will be indicated in the cited drawing; besides it includes all the manpower, materials and necessary equipment to realize the excavations and placement of the counterweights. It is considered included all the manpower, materials and required equipment for the supply and placement of anchorage counterweights to the distance indicated in the project drawings. 15.3. Road Crossing The work to be executed consist in the conjunction of operations described as follows, necessary to run through the pipe by a paved road (see typical crossing drawings). In this item, it is included demolition and reposition of the asphaltic coat, bases and sub bases, trench excavation, bends, alignment, welding and covering of

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 19/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

the joints; radiographs 100 %, tubing placement, placement of a poor concrete coat f c = 100 kg /CM2 thickness 10 cm, warning strip of buried pipes, fill with selected material and compaction until reach a density of 95 % of the modified proctor, according to the indicated in the specifications for paved roads and at the satisfaction of the Inspector, casting of excavated leftover material, poor concrete, granular base construction, removal and reposition of concrete ditches and metallic defenses, etc. The material casting site will be at a distance of 1 kilometer . It is also included within the costs correspondent to public safety measures (daily and nightly system of signs, flagmen, detours, etc.), required during all the time of execution of the crossing. There are considered included all the manpower, materials and required equipment for the execution of the works described in the point 15.4, Roads and Rural Roads Crossings. 15.4. Roads and Rural Roads Crossing with Trench Openings The work to be executed consists in the conjunction of operations necessary to buried the pipe through a road without pavement, and trench excavation at open sky. Covered crossings for this specification are those identified as "roads", "road not paved" and "earth road". This party will include demolition and reposition of ditches, granular base, detection and crossing of buried pipes crossing, trench excavation, bent, alignment, welding and covering of joints, radiography 100 %, pipe placing, fill and compaction of the trench, poor concrete, e = 10 cm fc = 120 kg/cM2 concrete covering to the pipe, construction of granular base and concrete ditches. It also comprehends all the costs correspondent to public safety measures (daily and nightly system of signs, flagmen, temporary detours, etc.), required during the time of execution of the crossing. There are considered included all the manpower, materials and required equipment to execute the works described in the typical crossings drawing. 16. FENCING 16.1. Valve Station Fence It comprehends the supply of materials, equipment, supervision and manpower necessary for the construction of the cyclone screen fence in the areas where

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 20/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

the project drawings indicate. Including in this party, the access doors and/or way out and all the works necessary for the correct and total installation of the fence, which will be of 2.10 m height and double top arm, in the perimetric area of the valve station. The main galvanized components of the fence could be summarized as follows: Corner tubes 2 Intermediate tubes 2" (spaced at 3 m). Stringer tube 1 1/4 ". Inferior tube 1 1/4 ". Galvanized screen caliper #9 of holes "0.05xO.O5". Top double arms; 6 barb wires, caliper 16. Doors with anchorage poles 2". Tie wire, caliper 16. Intermediate poles will be founded in the soil as a minimum 0.40 and filling them with concrete of resistance 180 kg/cm', dimensions of this hole in plant will be "0.20 x 0.20" as a minimum. It is important to highlight that this cyclone screen will be lower completed with tube of 1 1/4 " (will not have concrete curbstone). 16.2. Temporary Fences When required, CONTRACTOR shall install temporary fences and supply all personnel and materials required. At third party property sites where contractor needs to pass personnel and machinery to do the work. CONTRACTOR shall keep closed the temporary fences each time he needs to open it. At the end of the work CONTRACTOR shall replace temporary fence for a new one with the same quality of the original one.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 21/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

17.

SLOPE PROTECTION 17.1. Slopes Priming with RC-250 It comprehends the works of application of asphalt by priming in the slopes indicated in the project drawings. A cut stone coat will be placed, of maximum diameter 10 mm (fine gravel), supported with a screen of hencoop wire, then an agglomerate will be placed (RC-250) and its application will be in hot, at pressure and through a distribution truck designed to uniformly irrigate the asphaltic material. RC-250 proportion to be placed will be 5 litters by square meter of covered area. A first coat will be realized with 80 % RC-250 and 20 % gasoil and the second coat with 100 % RC-250.

18.

UNDERGROUND PIPE INSTALLATION 18.1. Piping Placement Piping, connections, valves and other accessories shall be installed according to the alignments, depths and slopes indicated in the drawings and according to THE COMPANY instructions. It will not be admitted change without previous written approval of THE COMPANY. When excavating the bottom of the trench, it will be conformed its seat to obtain the type of support specified in the drawings. In any case, it will be permitted support the pipes and pieces directly over the stones, rock or live edges or terrain with inadequate support capacity; if this occurs, excavation depth will be increased (0.25 m. external diameter) that will be filled with granular material approved by THE COMPANY. All the pipes that pass through concrete structures shall be protected in an adequate manner. Any pipe shall not be buried, covered or hid before it has been inspected and verified.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 22/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

Necessary marks and signals that allow to verify at all moment the slopes of the grades and the levels of the site. The pipes will be carefully revised and approved by THE COMPANY before being placed in the trench. THE CONTRACTOR shall make all the tests foreseen in the sanitary standards and will submit it at the consideration of THE COMPANY for his approval. 18.1.1. Placement of elbow pipes and accessories THE CONTRACTOR will install all the elbow pipes and accessories at the length of the piping axis, according to the drawings and these specifications. Elbow pipes and necessary accessories that are not found in the market, will be fabricated at the site or supplied by THE CONTRACTOR, for which, with enough anticipation, will submit the designs to THE COMPANY consideration. 18.1.2. Cleanliness and care of the piping THE CONTRACTOR will clean with the appropriate equipment the interior and exterior of the whole pipes before their installation and will remain in that shape during all the total period of construction and installation. It will also take care that any material or tool is not forgotten in the interior of the pipe. For that, he will adopt a routine of continuous revision of the materials and tools, practices and methods of work of his personnel. THE CONTRACTOR, when finishing the pipes placement, shall immediately close the open extreme through an adjusted wood or metal cork. THE CONTRACTOR will take all the necessary precautions to avoid the pipe flotation during its placement, obstructing the entrance of superficial waters to the trench, assuring proper water exits of it and partially filling the pipes, if it were necessary. Repair of any damage presented for unfulfillment of the recommendations above mentioned will be at THE CONTRACTOR's expense.

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 23/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

18.1.3. Handling, revision and hauling up of the piping THE CONTRACTOR will transport the materials from his deposits to the place of placement through means previously mentioned and approved by THE COMPANY. At the placement site the pipes and pieces will be hauled up with the appropriated equipment, taking all the necessary precautions against covering damages, deformation, etc. Before placing a tube or piece in their final place shall be inspected again and any defect that could appear shall be arranged at THE COMPANY satisfaction, or shall be substituted by other without defect at THE CONTRACTOR's expense. THE CONTRACTOR will use adequate equipment to haul up and place the pipes in the trench or its supports. In a special way, he will take care of that the capacity of charge at the required distance has a margin enough for a safety and controlled placement of the pipes. THE CONTRACTOR will take on account the separation that the equipment shall have at the border of the trench in function with its weight with charge. The mechanical activities for the haul up, turn and translation under charge, shall be executed with softness to guarantee a correct placement, and free of damages to the tubes and pieces. THE COMPANY could demand tests or demonstrations of the equipment functioning under charge and will reject, in defense of the personal safety and of the materials, all defective equipment or of insufficient capacity. 19. SIGNALING OF BURIED SECTIONS It comprehends personnel supply, equipment and the necessary materials to realize the supply, transportation and placement of signaling of buried sections (see typical signaling drawings) 20. PROTECTION OF VALVE STATION It comprehends personnel supply, equipment and the necessary materials to realize the supply, transportation and placement of protection of valve station (see typical protection drawings.)

SINCOR
Project Title: SINCOR UPSTREAM PROJECT CONSULTING & DETAIL ENGINEERING SINCOR Document : SINCOR Interface Code SINCOR Class: (Otepi Foster Wheeler) N: *** Page /File: Rev./Date 1060-08-16-N-SP-001 01 01 1069-08-01-1200-ET-001 24/ 1060-08-16-N-SP-001_H2 H-2 / JUL.22, 1999

These protections are designed to avoid vehicles impact against internal installations of the valve stations.