S.No.

1 1

Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation

Quantity 3

Unit 4

930995.6 40000 970995.6

Cft. Cft. Cft.

Refilling of excaved soil a. Column footings b. Basement wall foundation 22032.36 43274.89 65307.25 Cft. Cft. Cft.

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building 93099.56 6619.4163 99718.98 Cft. Cft. Cft.

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows 9000 13000 22828.39 500 45328.39 Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft. Cft.

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 189435.77 17200 87199.51 8500 7462.44 5666.31 8332.62 53274.89 1800

Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level

57343.08 290714.45 28338.15

Kg's Kg's Kg's

d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

24879.03 18890.91 27780.12 177613.16 6001.02 574216.83

Kg's Kg's Kg's Kg's Kg's Kg's cft.

7 Super structure brick masonry 6" th: in 1:6 CM

8180

8180 8 Super structure brick masonry 4.5" th: in 1:4 CM

Cft. Cft. Cft.

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2 100 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 100 0 100 12 Plastering in two coats a. Ceilings b. Internal walls c. External walls 44385 27457.15 8400 80242.15 13 Internal wall paintings a. Ceiling b.Walls 44385 27457.15 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts 100 Sq.fts 75 50 125 Sq.fts Sq.fts Sq.fts

71842.15 14 External wall paintings 8400 8400 15 Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 125 100 100 0 325 16 17 Supplying and fixing Iron gate Floorings

Sq.fts Sq.fts Sq.fts

Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

45444.86 45444.86

18

Tiles a. toilet flooring b. Toilet dadoing 479.89 839.92 Sq.fts Sq.fts

c. kitchen dadoing 19 Terrace a. Finishing

0 1319.81 0 0

Sq.fts Sq.fts Sq.fts Sq.fts

TOTAL AMOUNT FOR SUBCELLAR CELLAR FLOOR QUANTITY S.No. 1 1 Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation Quantity 3 Unit 4

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 88069.95 17200 7462.44 8332.62 53274.89 1800 Cft. Cft. Cft. Cft. Cft. Cft. Cft.

Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams

57343.08

Kg's Kg's Kg's

24879.03

Kg's Kg's

27780.12

Kg's

g. Slab h. Lintels i. Chajjas

177613.16 6001.02 0 236273.33

Kg's Kg's Kg's Kg's

7 Super structure brick masonry 6" th: in 1:6 CM

8180 8180

Cft. Cft. Cft. Cft.

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2 100 0 100 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 100 0 100 12 Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 25907.17 8400 34810.05 13 Internal wall paintings a. Ceiling b.Walls 43255.2 25907.17 69162.37 14 External wall paintings 8400 8400 15 Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 250 100 100 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts 100 75 50 0 225 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

450 16 Supplying and fixing Iron gate

Sq.fts

17

Floorings

45444.86 45444.86

Sq.fts Sq.fts

18

Tiels for a. toilet flooring b. Toilet dadoing c. kitchen dadoing 4450 1500 2950 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 0 0 TOTAL AMOUNT FOR CELLAR

GROUND FLOOR S.No. 1 1 Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation Quantity 3 Unit 4

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation

c. Under flooring d. Bed blocks for holdfast to Doors/Windows 5 V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 6 Supplying and fabrication of Fe415 steel for 8332.62 53274.89 1800 1800 72669.95 Cft. Cft. Cft. Cft. Cft.

7462.44

Cft.

a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

0 0 0 24879.03 0 27780.12 177613.16 6001.02 6001.02 242274.35

Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Cft. Cft. Cft. Cft.

7 Super structure brick masonry 6" th: in 1:6 CM

8180 8180

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 500 300 100 Sq.fts Sq.fts Sq.fts

d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2

100 1000 225 225 450

Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

11

Ventilators openings a. Ventilators -V b. Ventilators -V1 125 125 250 Sq.fts Sq.fts Sq.fts

12

Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 40434.35 8400 49337.23 Sq.fts Sq.fts Sq.fts Sq.fts

13

Internal wall paintings a. Ceiling b.Walls 35895 40434.35 76329.35 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

14

External wall paintings

8400 8400

15

Enamil paintings a. Doors b. Windows 1000 550 Sq.fts Sq.fts

c. Ventilators d. Gates

250 1800

Sq.fts Sq.fts Sq.fts

16 17

Supplying and fixing Iron gate Floorings Sq.fts Sq.fts

45444.86 45444.86

18

Tiels for a. toilet flooring 4500 Sq.fts

b. Toilet dadoing c. kitchen dadoing

6500 11000

Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 0 0 TOTAL AMOUNT FOR GROUND FLOOR FIRST FLOOR

S.No. 1 1

Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation

Quantity 3

Unit 4

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams

7462.44

Cft.

f. Beams g. Slab h. Lintels i. Chajjas 6 Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

8332.62 53274.89 1800 1800 72669.95

Cft. Cft. Cft. Cft. Cft.

0 0 0 24879.03 0 27780.12 177613.16 6001.02 6001.02 242274.35

Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Cft. Cft. Cft. Cft.

7 Super structure brick masonry 6" th: in 1:6 CM

10230 10230

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2 600 200 800 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 350 200 550 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts 750 500 250 0 1500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

12

Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 40434.35 8400 49337.23 Sq.fts Sq.fts Sq.fts Sq.fts

13

Internal wall paintings a. Ceiling b.Walls 32430.64 40434.35 72864.99 Sq.fts Sq.fts Sq.fts

14

External wall paintings

8400 8400

Sq.fts Sq.fts

15

Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 2850 1500 800 550 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

16 17

Supplying and fixing Iron gate Floorings Sq.fts Sq.fts

45444.86 45444.86

18

Tiels for a. toilet flooring b. Toilet dadoing c. kitchen dadoing 11000 4500 6500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 0 0 TOTAL FOR FIRST FLOOR SECOND FLOOR

S.No. 1

Description of Item 2

Quantity 3

Unit 4

Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 8332.62 53274.89 1800 1800 72669.95 Cft. Cft. Cft. Cft. Cft.

7462.44

Cft.

Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level

0 0 0

Kg's Kg's Kg's

d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

24879.03 0 27780.12 177613.16 6001.02 6001.02 242274.35

Kg's Kg's Kg's Kg's Kg's Kg's Kg's Cft. Cft. Cft. Cft.

7 Super structure brick masonry 6" th: in 1:6 CM

9510 9510

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2 500 300 800 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 350 200 550 12 Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 35487.01 8400 44389.89 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts 800 500 100 100 1500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

13

Internal wall paintings a. Ceiling b.Walls 34539.6 35487.01 Sq.fts Sq.fts

70026.61 14 External wall paintings 34539.6 34539.6 15 Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 2850 16 17 Supplying and fixing Iron gate Floorings 1500 800 550

Sq.fts Sq.fts Sq.fts

Sq.fts Sq.fts Sq.fts Sq.fts

45444.86 45444.86

Sq.fts Sq.fts

18

Tiels for a. toilet flooring b. Toilet dadoing c. kitchen dadoing 11000 4500 6500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 0 0 TOTAL FOR SECOND FLOOR THIRD FLOOR

S.No. 1 1

Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation

Quantity 3

Unit 4

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level

a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 8332.62 53274.89 1800 1800 72669.95 Cft. Cft. Cft. Cft. Cft.

7462.44

Cft.

Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

0 0 0 24879.03 0 27780.12 177613.16 6001.02 6001.02 242274.35

Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Cft. Cft.

7 Super structure brick masonry 6" th: in 1:6 CM

789.72 789.72

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

Cft. Cft.

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 b. Windows- W2 500 300 800 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 350 200 550 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts 800 500 100 100 1500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

12

Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 24877.12 8400 33780 Sq.fts Sq.fts Sq.fts Sq.fts

13

Internal wall paintings a. Ceiling b.Walls 34809.99 24877.12 59687.11 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

14

External wall paintings

34809.99 34809.99

15

Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 2850 Sq.fts 1500 800 550 Sq.fts Sq.fts Sq.fts

16 17

Supplying and fixing Iron gate Floorings Sq.fts Sq.fts

45444.86 45444.86

18

Tiels for a. toilet flooring b. Toilet dadoing c. kitchen dadoing 11000 4500 6500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 0 0 TOTAL FOR THIRD FLOOR FOURTH FLOOR

S.No. 1 1

Description of Item 2 Earth work excavation for a. excavation for sub-cellar & cellar b. Basement wall foundation

Quantity 3

Unit 4

Refilling of excaved soil a. Column footings b. Basement wall foundation

Filling the earth work in the plinth level a. Inside building for plinth level raised b. Out side the building

V.P.C.C. in 1:4:8 for a. Under Column footings b. Under Basement wall foundation c. Under flooring d. Bed blocks for holdfast to Doors/Windows

V.R.C.C. in M20 for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas 8332.62 53274.89 1800 1800 72669.95 Cft. Cft. Cft. Cft. Cft.

7462.44

Cft.

Supplying and fabrication of Fe415 steel for a. allround the building b. Footings c. Column Pedestal Below plinth beam level d. Column from plinth to beam bottom e. Plinth beams f. Beams g. Slab h. Lintels i. Chajjas

0 0 0 24879.03 0 27780.12 177613.16 6001.02 6001.02 242274.35

Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Kg's Cft. Cft. Cft. Cft.

7 Super structure brick masonry 6" th: in 1:6 CM

9510 9510

8 Super structure brick masonry 4.5" th: in 1:4 CM

0 0

9 Doors openings a. Main door-MD1 b.Doors- D1 c.Doors-D2 d.Doors-D3 10 Windows openings a. Windows- W1 500 Sq.fts 800 500 100 100 1500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

b. Windows- W2

300

Sq.fts

800 11 Ventilators openings a. Ventilators -V b. Ventilators -V1 350 200 550 12 Plastering in two coats a. Ceilings b. Internal walls c. External walls 502.88 30117.24 8400 39020.12 13 Internal wall paintings a. Ceiling b.Walls 32469.26 30117.24 62586.5 14 External wall paintings 8400 8400 15 Enamil paintings a. Doors b. Windows c. Ventilators d. Gates 1500 800 550 0 2850 16 17 Supplying and fixing Iron gate Floorings

Sq.fts

Sq.fts Sq.fts Sq.fts

Sq.fts Sq.fts Sq.fts Sq.fts

Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

45444.86 45444.86

Sq.fts Sq.fts

18

Tiels for a. toilet flooring b. Toilet dadoing c. kitchen dadoing 11000 4500 6500 Sq.fts Sq.fts Sq.fts Sq.fts Sq.fts

19

Terrace a. Finishing 603799

603799 TOTAL FOR FOURTH FLOOR 20 21 22 a. Escalators For water supply and Sanitary fitting charges complete. For Electrification,wiring & switches

Sq.fts

18% of the total cost 18% of the total cost

b. 8 person Lift c. Genset (500 kv.) d. Fire and safety system e.Security system work g. 4 side elevation ACP.

Total Cost of the Project. Fourty two Crores forty two lakhs seventy two thousand six hundred and fifty five only

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

0 Total

Total

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Rate 5

Amount 6

Total

Total

Total 0 Total 0

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Rate 5

Amount 6

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

red and fifty five only