Professional Documents
Culture Documents
ETAP
7.0.0
Revision: Config.:
V-Control 0
Load 1
Total 2
XFMR3 0
Reactor 0
Line 0
Cable 1
Impedance 0
Tie PD 0
Total 1
Method of Solution: Maximum No. of Iteration: Precision of Solution: System Frequency: Unit System: Project Filename: Output Filename:
60 Hz English EL
C:\EL\Untitled.UL1
ETAP
7.0.0
Revision: Config.:
Adjustments
Apply Tolerance Transformer Impedance: Reactor Impedance: Overload Heater Resistance: Transmission Line Length: Cable Length: Adjustments
Yes Yes No No No
Individual /Global
Individual Individual
Percent
Individual /Global
Individual Individual
Degree C
ETAP
7.0.0
Revision: Config.:
Initial Voltage
% Mag. 100.0 100.0 100.0 100.0 100.0 100.0 Ang. 0.0 -120.0 120.0 0.0 -120.0 120.0
Generation
MW 0.001 0 0 0 0 0 0.001 Mvar 0 0 0 0 0 0 0.000 MW 0 0 0
Load
Mvar 0 0 0 0 0 0 0.000
Mvar Limits
Max. Min.
0.001 0 0 0.001
ETAP
7.0.0
Revision: Config.:
ETAP
7.0.0
Revision: Config.:
Branch Connections
CKT/Branch
ID Cable1 Conn. 3 phase Cable Type Bus1 From Bus Bus2
Connected Bus ID
To Bus
ETAP
7.0.0
Revision: Config.:
Bus
ID * Bus1 kV 0.415 Phase A B C Bus2 0.415 A B C
Voltage
% Mag. 100.000 100.000 100.000 93.938 100.645 100.374 Ang. 0.0 -120.0 120.0 -0.3 -120.5 120.5
Generation
MW 0.001 0 0 0 0 0 Mvar 0 0 0 0 0 0
Load
MW 0 0 0 0.001 0 0 Mvar 0 0 0 0 0 0 Bus1 Bus2 ID
Load Flow
Phase A B C A B C MW 0.001 0.000 0.000 -0.001 0.000 0.000 Mvar 0.000 0.000 0.000 0.000 0.000 0.000 Amp 5.7 0.0 0.0 5.7 0.0 0.0 % PF 100.0 0.0 0.0 100.0 0.0 0.0
XFMR
% Tap
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it) # Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
7.0.0
Revision: Config.:
Bus/Panel/Phase Adapter
ID kV Phase Type Phase
Voltage
% Mag Ang.
Load*
kW kvar CKT ID
Load Flow
Phase kW kvar Amp %PF
XFMR
% Tap
Panel1
0.240
AN
98.32
-0.3
1.4
0.0
Bus2
AN
-1.4
0.000
6.0
100.0
Type: P=Panel, PA=Phase Adapter * For panel it indicates internal loads and directly connected loads. Connected panel loads are not included. For bus it indicates directly connected loads. Connected panel loads are not included.
ETAP
7.0.0
Revision: Config.:
Bus
ID Bus1 kV 0.415 Rated Amp Phase A B C Bus2 0.415 A B C MW 0.001 0 0 0.001 0 0 Mvar 0 0 0 0 0 0
Bus Load
MVA 0.001 0 0 0.001 0 0 % PF 100.0 0 0 100.0 0 0 Amp 5.7 0 0 5.7 0 0 % Loading
* Indicates operating load of a bus exceeds the bus critical limit ( 100.00 % times the continuous rating).
ETAP
7.0.0
Revision: Config.:
CKT / Branch
ID Cable1 Conn. 3 phase Type Cable Phase A B C * Indicates a branch with operating load exceeding the branch capability
ETAP
7.0.0
Revision: Config.:
CKT / Branch
ID Cable1 Phase A B C
Losses
kvar 0.0 0.0 0.0 0.0
% Bus Voltage
From 100.0 100.0 100.0 To 93.9 100.6 100.4
ETAP
7.0.0
Revision: Config.:
Bus Voltage
OverVoltage UnderVoltage 105.0 95.0
Generator Excitation
OverExcited (Q Max.) UnderExcited (Q Min.) 100.0 100.0
Branch Current
Line Current Unbalanced Rate (LIUR) Current Unbalanced Factor (IUF) Neg. Seq. Current Unbalanced Factor (IUF) Zero Seq. 3.0 3.0 3.0
ETAP
7.0.0
Revision: Config.:
Critical Report
Device ID Bus2 Cable1 Cable1 Cable1 Bus Cable Cable Cable Type Condition Under Voltage LIUR (Pos. Seq.) IUF 2 (Neg. Seq.) IUF 0 (Zero Seq.) Rating/Limit 0.415 1.895 1.895 1.895 Unit kV Amp Amp Amp Operating A 0.225 3.790 1.895 1.895 Operating B 0.241 1.895 1.895 1.895 Operating C 0.240 1.895 1.895 1.895 %Op. A 93.9 200.0 100.0 100.0 %Op. B 100.6 100.0 100.0 100.0 %Op. C 100.4 100.0 100.0 100.0
ETAP
7.0.0
Revision: Config.:
Phase Source (Swing Buses): A B C Source (Non-Swing Buses): A B C Total Demand: A B C Apparent Losses: A B C System Mismatch:
MW 0.001 0.000 0.000 0 0 0 0.001 0.000 0.000 0.000 0.000 0.000 0.000
Mvar 0.000 0.000 0.000 0 0 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000
% PF 100.00 Lagging
Leading
100.00 Lagging
Number of Iterations: