You are on page 1of 12

Project Footnote

Number Description Size Designer Date Number


8G1-95 1995 Concrete and Asphalt Repair/Replacement Program Full LRK 5/11/1995
8G6A-E-97 1997 Asphalt Repair/Replacement Program Full LRK 5/7/1997
8G6A-F-97 1997 Concrete Repair/Replacement Program Full LRK 5/7/1997
8G6A-F-97 1997 Concrete Repair/Replacement Program - AS BUILT Full LRK 5/7/1997
8G1-98
1998 Concrete and Asphalt Repair/Replacement Program
9E3-98 Full LRK 5/7/1998
8G4-99
1999 Concrete and Asphalt Repair/Replacement Program
8G5-99 1/2 LRK 6/30/1999
8G4-99
1999 Concrete and Asphalt Repair/Replacement Program - AS BID
8G5-99 Full LRK 6/30/1999
2002 Concrete and Asphalt Repair/Replacement Program -
8G1-02 100% SUBMISSION
8G2-02 Full LRK 5/1/2002
2002 Concrete and Asphalt Repair/Replacement Program -
8G1D-02 General Location Map (Color) - Landside Roadways
8G2B-02 1/2 LRK 4/4/2002
8G1-022002 Concrete and Asphalt Repair/Replacement Program - CONFORMED SET
8G2-02 Full LRK 5/1/2002
8G8-98 Employee Parking Lot Expansion Full LRK 9/8/1998

10/24/2008 01:49:25
8G6C-97 Landside Parking Lot Repairs (As Built) LRK 5/7/1997
8G6E-97 Commuter Apron Repairs (As-Built) LRK 5/7/1997
8G6B-97 Repairs to Dobbs Parking Lot (As-Built) LRK 5/7/1997
8G5D-97 Cargo 1 Parking Lot Repairs LRK 5/7/1997
8G5A-97 US Airways Hangars 4 and 5 Access Road - Includes Alternate #2 (As-Built) LRK 5/7/1997 8
8G5C-97 Taxiway "E" Spall Repairs LRK 5/7/1997
8G5D-97 Cargo 1 Parking Lot Repairs - Add Alternates #5 & #6 LRK 5/7/1997 13
8G5A-97 US Airways Hangars 4 and 5 Access Road - Add Alternates #1, #2, #3 and #4 LRK 5/7/1997 14
8G5C-97 Taxiway "E" Spall Repairs LRK 5/7/1997
8G5F-97 Landside Repairs - Add Alternate #7 LRK 5/7/1997 15
8G6B-97 Repairs to Dobbs Parking Lot LRK 5/7/1997
8G6B-97 Commuter Apron Repairs LRK 5/7/1997
8G6A-97 Runway 28C Overrun Repairs LRK 5/7/1997
8G8C-97 Landside Parking Lot Repairs - Add Alternate #1 LRK 5/7/1997 24
8G6D-97 Substation Fencing #2 and #5 LRK 5/7/1997
8G1B-98 Replace Slabs on the Airside Terminal Apron LRK 5/7/1998
8G1C-98 Taxiway "Y" Shoulder Construction (General) LRK 5/7/1998
9E3-98 Taxiway "Y" Shoulder Construction (Electrical) LRK 5/7/1998
8G1A-98 Slab Replacement at the Fuel Farm Truck Parking Lot LRK 5/7/1998
40G2A-98 Taxiway "A" Slab Replacement LRK 5/7/1998
40G3B-95 Taxilane Repair on Lower West Ramp - Add Alternate #1 LRK 5/7/1998 27
40G3B-95 Corporate Jets Apron Rehabilitation LRK 5/7/1998
40G3C-98 UPMC Parking Lot Rehabilitation - Add Alternate #2 LRK 5/7/1998 28
8G5A-99 Taxiway "C4" Slab Replacement LRK 6/30/1999
8G5A-99 Slab Replacement Around Concourses A & B LRK 6/30/1999
8G5E-99 Slab Replacement on Landside Roadway DP-W - Add Alternate #3 LRK 6/30/1999 9
8G5C-99 Taxiway "D" Slab Replacement - Add Alternate #2 LRK 6/30/1999 10
8G5B-99 Taxiway "V6" Slab Replacement LRK 6/30/1999
84GA-99 Pavement Crack Sealing LRK 6/30/1999
8G4B-99 McCaslin Road Bridge Rehabilitation - Add Alternate # 4 LRK 6/30/1999 11
40G2A-99 Runway 10-28 Joint Sealing LRK 6/30/1999
40G2B-99 Airfield Drainage Installation LRK 6/30/1999
40G1A-99 East Gate Access Road Rehabilitation LRK 6/30/1999
8G5A-99 Taxiway C4 Slab Replacement (As-Built) LRK 6/30/1999
8G5E-99 Slab Replacement on Landside Roadway DP-W - Add Alternate #3 (As-Built) LRK 6/30/1999 21
8G5C-99 Taxiway "D" Slab Replacement - Add Alternate #2 (As-Built) LRK 6/30/1999 22
8G5B-99 Taxiway V6 Slab Replacement (As-Built) LRK 6/30/1999
8G5D-99 Slab Replacement Around Concourses A & B (As-Built) LRK 6/30/1999
84A-99 Pavement Crack Sealing (As-Built) LRK 6/30/1999
8G4B-99 McCaslin Road Bridge Rehabilitation - Add Alternate #4 (As-Built) LRK 6/30/1999 23
40G2A-99 Runway 10-28 Joint Sealing (As-Built) LRK 6/30/1999
40G2B-99 Airfield Drainage Installation (As-Built) LRK 6/30/1999
40G1A-99 East Gate Access Road Rehabilitation (As-Built) LRK 6/30/1999
40G1-00 Reconfigure Gate at Main Entrance - Add Alternates #1 & #2 LRK 7/19/2000 12
8G1-06 & Taxiway 'Z1' & Hangar 6 Parking Lot Replacement - North and West Sides As-Bid
13G3-06 Full LRK Feb-07

10/24/2008 01:49:25
8G2-95 Landside Terminal Parking Lot (South) - Add Alternate #1(As-Built) LRK 5/11/1995 1
8G3-95 Airside Ramp Improvements (As-Built) LRK 5/11/1995
9E1-95 Airside Ramp Improvements (As-Built) LRK 5/11/1995
8G1-95 Drainage Improvements at Old Route 978 (Materials Only) (As-Built) LRK 5/11/1995
8G1-95 Slab Replacement at the Fuel Farm Island (As-Built) LRK 5/11/1995
8G1-95 Drainage Project #1 (As-Built) LRK 5/11/1995
8G1-95 Drainage Project #2 (As-Built) LRK 5/11/1995
8G1-95 Drainage Project #3 (As-Built) LRK 5/11/1995
8G1-95 Drainage Project #4 (As-Built) LRK 5/11/1995
8G1-95 Drainage Project #5 (As-Built) LRK 5/11/1995
Runway 10L-28R Asphalt Rejuvenator and Crack and Joint Sealing - Add Alternate
8G2-95 #1 LRK 5/11/1995 25
8G2-95 Landside Terminal Parking Lot (South) - Add Alternate #2 LRK 5/11/1995 26
8G3-95 Airside Ramp Improvements LRK 5/11/1995
9E1-95 Airside Ramp Improvements LRK 5/11/1995
8G1-95 Runway 10-28 Slab Replacement LRK 5/31/1995
8G4A-96 Runway 10R-28L Crack and Joint Sealing (As-Built) LRK 1/31/1996
8G4-96 FBO Road Improvements - Add Alternate #3 (As-Built) LRK 4/19/1996 2
8G4-96 Rehab of Dobbs Parking Lot - Add Alternates #1 & #2 (As-Built) LRK 4/19/1996 3
8G2-96 Substation Fencing #1 (SW) - (As-Built) LRK 4/19/1996
8G2-96 Substation Fencing #2 (SE) Add Alternate #1 (As-Built) LRK 4/19/1996 4
8G2-96 Substation Fencing #3 -(As-Built) LRK 4/19/1996
8G2-96 Substation Fencing #4 (Central Normal and Central Emergency) -(As-Built) LRK 4/19/1996
8G2-96 Substation Fencing #5 - Add Alternate #2 (As-Built) LRK 4/19/1996 5
8G2-96 Cargo 1 Parking Lot Rehabilitation (As-Built) LRK 4/19/1996
Drainage Project #1 - Drainage Improvements at the Anthony Crane Hangar (As-
40G1-96 Built) LRK 4/19/1996
40G1-96 Drainage Project #2 - Tunnel Drainage Repairs (As-Built) LRK 4/19/1996
40G1-96 Drainage Project #3 - New Polymer Trench Drains in Hangar Area (As-Built) LRK 4/19/1996
Drainage Project #4 - New Trench Drain in Front of the Administration Building (As-
40G1-96 Built) LRK 4/19/1996
Drainage Project #5 - New Trench Drain on the West Side of West Ramp - Add
40G1-96 Alternate #4(As-Built) LRK 4/19/1996 6
Drainage Project #6 - New Trench Drain on the East Side of the West Ramp - Add
40G1-96 Alternate #3 (As-Built) LRK 4/19/1996 7
8G2-96 Substation Fencing #1 (SW) LRK 4/19/1996
8G2-96 Substation Fencing #2 (SE) - Add Alternate #1 LRK 4/19/1996 16
8G2-96 Substation Fencing #3 LRK 4/19/1996
8G2-96 Substation Fencing #4 (Central Normal and Central Emergency) - Base Bid LRK 4/19/1996
8G2-96 Substation Fencing #5 - Add Alternate #2 LRK 4/19/1996 17
8G2-96 Cargo 1 Parking Lot Rehabilitation LRK 4/19/1996
8G2-96 Drainage Project #1 - Drainage Improvements at the Anthony Crane Hangar LRK 4/19/1996
8G2-96 Drainage Project #2 - Tunnel Drainage Repairs LRK 4/19/1996
8G2-96 Drainage Project #3 - New Polymer Trench Drains in the Hangar Area LRK 4/19/1996
8G2-96 Drainage Project #4 - New Trench Drains in Front of the Administration Building LRK 4/19/1996
8G2-96 Drainage Project #5 - New Trench Drain of the West Side of the West Ramp LRK 4/19/1996

10/24/2008 01:49:25
Drainage Project #6 - New Trench Drain of the East Side of the West Ramp - Add
8G2-96 Alternate #3 LRK 4/19/1996 18
8G4-96 FBO Road Improvements - Add Alternate #3 LRK 4/19/1996 19
8G4-96 Rehabilitation of Dobbs Parking Lot - Add Alternates #1 and #2 LRK 4/19/1996 20
As-Built Fiber Optic Cable - Corporate Air - Allegheny County Airport LRK 6/6/2002
8G2-96 1996 PIT Concrete & Asphalt Program - As-Built LRK
8G8-97 Apron & Taxiway Slab Settlement Repair Baker 3/98

10/24/2008 01:49:25
Existing AGC Airport Layout Plan PB, URS Apr-98
Existing AGC Airport Layout Plan Biro Tech May-89
52-G1-89 Apron Grading & Drainage Plans Baker-TKA 12/30/1988
8P3-88 Concrete Pavement Rehabilitation GAI 4/28/1989
54RB&PL89 Landside Roadways - Intersection Details (As-Built) Baker-TKA 6/16/1989
54RB&PL89 Landside Roadways- Plan Sets (As-Builts) Baker-TKA 6/16/1989
54RB&PL89 Landside Roadways - Typical Sections (As-Builts) Baker-TKA 6/16/1989
54RB&PL89 Landside Roadways - Intersection Details (As-Built) Baker-TKA 6/16/1989
8P1-91 Concrete Pavement Rehabilitation and Taxiway 'T' Plan MEC Mar-91
52-G1-89 Automotive Fuel Area Baker-TKA 5/1/1991
8P3-91 Rehab of Runway 10C-28C and Taxiway 'W' Plan Baker Feb-92
8P4-92 Extension of Taxiway "N" (As-Built) Baker May-94
8E4-92 Extension of Taxiway "N" (As-Built) Baker May-94
8P3-92 Relocation of Taxiway "W" (As-Built) Baker May-94
9E1-92 Relocation of Taxiway "W" (As-Built) Baker May-94
Existing PIT Airport Layout Plan Alleg. Co. Jan-96
Stormwater Associated with Industrial Activity Drainage Map Baker Mar-97
Pittsburgh International Airport Major Utilities Baker Aug-97
8G2-99 Rehabilitation of Taxiway 'E' and Rehabilitation of Runway 10C-28C Baker Feb-99
8G1-99 Rehabilitation of Taxiway 'E' and Rehabilitation of Runway 10C-28C Baker Feb-99
9E2-99 Rehabilitation of Taxiway 'E' and Rehabilitation of Runway 10C-28C Baker Feb-99
9E1-99 Rehabilitation of Taxiway 'E' and Rehabilitation of Runway 10C-28C Baker Feb-99
47G1-01 Conformed Drawings, ACAA Widebody Deicing Facility Baker, P&P 5/15/2001
Terraced Employee Parking Lot Expansion Baker Aug-01
Employee Surface Lot Expansion Baker Aug-01
Pittsburgh International Airport Parking Lot Layout Baker Jan-02
As Built Drawings - Voyager Jet Center Allegheny
LRK Feb-07
County Airport - Hangar Apron & Parking Lot

10/24/2008 01:49:25
258-61.59 Electrical Plans, Distribution & Field Lighting Systems HEI 1974
Taxiway Lighting Alleg. Co. Aug-52
Paving Grass Islands Adjacent to Loading Aprons Baker Nov-67
9K-14 Readjustment of Taxiway Lighting and Underground Conduits Alleg. Co. Dec-67
8G-21 Reconstruction Sections of Conc. For Taxiways 'S' and 'T' Alleg. Co. May-70
8P-2-81 Taxiway 'O' Birotech Jul-81
911th Tactical Airlift Group, US Air Force Reserve Base Layout GRW 6/1/1988
8G2-01 Rehabilitation of Airside Apron C&S Apr-01

4G1-01 AGC RW 10-28 Grooving & Joint/Crack Sealing LRK Jul-01


40G1-05 &
2005 AGC Concrete & Asphalt Program - As-Bid LRK May-05
40G2-05
8G4A-04 2005 PIT Concrete & Asphalt - B Gates - As-Bid LRK May-05

8G5-03 &
8G6-03 2005 PIT Concrete & Asphalt - Conformed LRK May-03

8G3-04 & 2004 PIT Concrete & Asphalt - As-Bid LRK May-04
8G4-04
40G1-04 2004 AGC Concrete & Asphalt - As-Bid LRK May-04
40G1B-02 AGC Trench Drain Replacement LRK Jul-03
8G5-03 &
2003 PIT Concrete & Asphalt - Conformed LRK May-03
8G6-03
40G1-04 2004 AGC Concrete & Asphalt - Conformed LRK May-04

40G1-05 & 2005 AGC Concrete & Asphalt Program - Conformed LRK Jul-05
40G2-05

Miscellaneous PIT drawings

10/24/2008 01:49:25
Drawer
1
1
1
1

1
1

10/24/2008 01:49:25
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

10/24/2008 01:49:25
3
3
3
3
3
3
3
3
3
3

3
3
3
3
3
3
3
3
3
3
3
3
3
3

3
3
3

3
3
3
3
3
3
3
3
3
3
3
3

10/24/2008 01:49:25
3
3
3
3
3
3

10/24/2008 01:49:25
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

10/24/2008 01:49:25
5
5
5
5
5
5
5
5

6
6

10/24/2008 01:49:25

You might also like