ABB BUDGATARY offer for 500 KW Solar Inverter Customer : M / s.Enfinity Solar Solutions Pvt Ltd Project name : 25 MW SOLAR Power Plant ABB Ref no. : ABB / SOLAR / 20101215 / 10 Date of issue : 15-12-2010 ABB Non Binding Budgetary offer and it is for tendering purpose only.
Original Description:
Original Title
1015122010 500 KW Solar Offer With SLA for 3 Years
ABB BUDGATARY offer for 500 KW Solar Inverter Customer : M / s.Enfinity Solar Solutions Pvt Ltd Project name : 25 MW SOLAR Power Plant ABB Ref no. : ABB / SOLAR / 20101215 / 10 Date of issue : 15-12-2010 ABB Non Binding Budgetary offer and it is for tendering purpose only.
ABB BUDGATARY offer for 500 KW Solar Inverter Customer : M / s.Enfinity Solar Solutions Pvt Ltd Project name : 25 MW SOLAR Power Plant ABB Ref no. : ABB / SOLAR / 20101215 / 10 Date of issue : 15-12-2010 ABB Non Binding Budgetary offer and it is for tendering purpose only.
Sub : Offer for 500 KW Solar Inverter for 25 MW Solar Power Plant
With reference to the above, we take pleasure in submitting our Techno commercial offer your kind consideration for supply of system for above,
We hope to have been of service to you and are at your disposal for any further information you may need. Thanking you and assuring you of our best attention & Services at all times, we remain,
Yours faithfully For ABB Limited
Xavier Scaria Marketing Solar Inverters
Important Notice: This Budgetary offer is preliminary and not final and as such not binding. It is tendered for discussion only, does not constitute an offer to sell and/or term to contract and ABB can, without notice make any change in ABBs own discretion. Any contract to sell the subject matter of proposal shall be subject to prior mutual agreement as to price (which may be different than that shown herein), schedule, scope of work and terms.
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 3 of 17
TABLE OF CONTENTS
1. ABB DRIVE SYSTEM 2. TECHNICAL DESCRIPTION OF SOLAR INVERTER 3. SCOPE OF SUPPLY OF WORK 4. PRICE SCHEDULE 5. GENERAL TERMS & CONDITIONS ANNEX-1 SPARE PARTS LIST ANNEX-2 CONTACT PERSON ANNEX-3 SERVICE LEVEL AGREEMENT
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page + of 17
1. ABB DRIVE SYSTEM ABB is well established supplier of complex Electrical System & Automation in all kind of industries. ABB is a world leader in drives technology and the global leader in electrical engineering. We offer the widest product range in Drive packages designed to meet your needs
That means one single point of responsibility and ensures correct dimensioning of the system components. Furthermore, the selected components are optimized to deliver the highest reliability and efficiency resulting in low operating and total lifetime cost and increasing your direct profits. We have the right solution for your demands.
Single Point of Contact We will have a dedicated Order handling manager, who will be responsible for executing the order within the agreed time and cost. This is mutually beneficial and you will not have to deal with numerous suppliers and resolve project issues.
World-wide Service Network With our extensive worldwide service, we are able to guarantee in most of the countries top class service throughout the total lifetime of the equipment. Additionally, we provide personal training through our global training centers. For further information please visit as under www.abb.com/motors&drives
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 5 of 17
2. TECHNICAL DESCRIPTION OF SOLAR INVERTER
ABB introduces new series of solar inverters that raises product reliability, efficiency and ease of installation to new levels. The inverter is aimed at system integrators and end users who require high performance solar inverter for large photovoltaic power plants and industrials and commercials buildings. The inverter are available from 100Kw to 500 KW and optimized for cost-efficient multi megawatt power plants
ABBs solar inverter are high efficient with proven components, Compact and modular design .The host of life cycle services ensures ABB central inverter provide a rapid return on investments.
Highlights of ABBs Solar inverters.
- High Efficiency and long operating life
- Modular and compact product design.
- Extensive DC and AC side protection
- Power Factor compensation as standard
- Fast and Easy installation
- Complete Range of industrial type data communication option including remote monitoring
- Life cycle service and support through ABBs Extensive global service networks.
- MPPT ( maximum Peak power tracking )algorithm ensures maximum energy feed to network
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 6 of 17
3. SCOPE OF SUPPLY OF WORK
1. The PVS800-57 -500 KW A solar inverter cabinet having Inbuilt MPPT tracking system. Transformer less Design Electrical and Mechanical Design As per IEC Cabinet Enclosure class IP42 Floating DC Side with no grounding on DC +ve or ve. Operating MPPT voltage 450-750V Output Voltage -300VAC DC input 4nos ( busbar +/-) Network Monitoring Relay for Safe Disconnection RETA-01 module for Ethernet communication E-Stop Cat 0 Earth Monitoring Bender relay
Exclusions Extended DC Inputs in Inverter Cabinet heater Inverter Moniotring String monitoring system Junction Boxes LV transformer All external cabling. Any mechanical Component Erection of above equipment. Mounting frames if any Any other Items not mentioned in scope of supply All control, communication, Power Cable
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 7 of 17
4. PRICE SCHEDULE
Sr. No: ITEM DESCRIPTION / SPECIFICATION Qty.
Unit Pirce, CIF Mumbai Total Price CIF Mumbai 1 Design, engineering, supply of ABB make new generation Solar inverter PVS800-57-0500KW-A Mounted in ABB standard panel With standard three year warranty
50 Rs.4,755,000 (Four million Seven hundred and fifty five thousand only) Rs. 237,750,000 (Two hundred and thirty seven million, seven hundred and fifty thousand only) Total Price for 25 MWp plant, CIF Mumbai basis
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 8 of 17
5. GENERAL TERMS & CONDITIONS
PRICES:
The quoted prices are for CIF Mumbai.
EXCISE DUTY, SALES TAX AND OTHER LEVIES:
The prices quoted are exclusive of all taxes, duties, levies, octroi etc., which have to be borne by you at actual at the time of delivery. You shall furnish necessary declaration forms wherever applicable
The customer Duty is excluded and to borne by you.
Present rates of Excise Duty is @10.0% Educational cess 3% and CST @ 2% against Form C in absences of form c 12.5% is applicable. VAT TIN Number 29450069265. Tax as applicable as VAT.
TERMS OF PAYMENT 20% advance against PO 80% against an irrevocable and divisible confirmed L/C. LC shall be opened within one month from the date of PO. Usance period for LC shall be 30 days and negotiating documents are Suppliers invoice Packing slip Routine Test Certificate
DELIVERY:
20 weeks from valid and Clear PO and Advance receipt.
FREIGHT & INSURANCE:
In Customers Account from Port of Landing or unless otherwise specified.
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 9 of 17
WARANTEE: Warranty period is 12 months from date of commissioning and 18 months from date of supply whichever is earlier. The warranty period is extended up to 36 month from date of commissioning or 39 month from date of supply whichever is earlier upon following condition. Inverter is maintained properly along with periodic preventive maintenance program as scheduled by ABB. The equipment will be released in due time for preventive maintenance to ABBs Representative for servicing/Maintenance purpose Warranty will be void if customers fail to provide the equipment for preventive maintenance. Warranty does not cover consumable Items like Fuses, Air filter. The list is given in Appendix-1 The equipment warranty will be void if equipment is not kept in environment as recommended by ABB.
Force majeure The following circumstances shall be regarded as cases of force majeure if they occur after acknowledge of order and if they are beyond ABBs reasonable control such as but not limited to the act of God, war, riots , civil commotion, storm, floods, fire and industrial disputes and any other circumstances beyond reasonable control of ABB Ltd. Each obligation of ABB ltd is suspended during the time and extent that ABB Ltd is prevented from or delayed in complying with that obligation by force majeure including a reasonable time required for de-mobilization / re- mobilization. If ABB Ltd is prevented from or delayed in complying with an obligation under the contract by force majeure for period beyond of at least 90 days then ABB Ltd may by notice to the customer terminate the contract.
Limitation of Liability: Notwithstanding anything contained in this AGREEMENT, its Appendices or orders to the contrary, with respect to any and all claims arising out of the performance or non-performance of obligations under this AGREEMENT or purchase orders, whether arising in contract, tort, warranty, strict liability or otherwise, ABB's liability shall not exceed in the aggregate 100% of the Purchase order value or payments received whichever is lower.
Consequential Losses: ABB shall in no event be liable for loss of profit, loss of revenues, loss of use, loss of production, costs of capital or costs connected with interruption of operation, loss of anticipated savings or for any special, indirect or consequential damage or loss of any nature whatsoever.
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 10 of 17
ARBITRATION: All disputes arising in connection with this Agreement / Purchaser Order shall be finally settled and governed by the provisions of Arbitration and Conciliation Act, 1996. The arbitration panel shall consist of three arbitrators, one to be appointed by each Party and the third arbitrator shall be appointed by the two appointed arbitrators. The third arbitrator shall serve as a chairman. The award of the arbitral tribunal shall be final and binding on both Parties. The place of arbitration shall be at any metro city in india. The proceedings shall be conducted in English language.
VALIDITY: Our proposal is valid for your acceptance up to 30 days beyond this date, the prices / terms and conditions are subject to our conformation / revision.
COMMISSIONING &SUPERVISION:
Commissioning at extra at Rs 10,000/ Per Man-day (From 9:00 AM to 6:00PM).Travel, Boarding and lodging at actual to customer account.
For ABB Ltd.
Xavier Scaria
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 11 of 17
ANNEX-1 Spare parts list- ABB Solar Inverter Recommended Spare for PVS800 -500 KW inverter( Strategic Spare Parts) 1. PVS800-104-0250KW-A+C126+V991 -1 No 2. LCL- Filter SLCL-15 -1 No 3. RDCU-12 Control Board- with ISU Software 4. RDCU-12 C control Board with PV Software 5. ABPB-44 Branching Unit -1 No Consumable Items which are not covered under warranty 1. Fuse (170 M 6412, 800A, 690V) 2. Fuse (170 M 5398, 800A, 1250 V) 3. Fuse ( 170M4393, 400A 1250V) 4. HRC Fuse Link, 20A, 690V) 5. Air Filter( to be replaced regularly as per maintenance Schedule
Commissioning Spares 1. RAMP for Module Removing 2. Fuse (170 M 6417, 800A, 690V) 3. Fuse (170 M 5398, 800A, 1250 V) 4. Fuse ( 170M4393, 400A 1250V) 5. HRC Fuse Link, 20A, 690V) 6. Resistor CBHX 165 C 5R414 7. CDP 312R Control panel 8. CDP Control Panel Cable
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 12 of 17
ANNEX 2 Escalation Matrix
Name Position Function Telephone E-mail Xavier Scaria Engineer Marketing 9972584164 xavier.scaria@in.abb.com GK Bhadri AVP Head- Service 9901490127 gk.bhadri@in.abb.com Chandrakumar AVP Head-Renewable 9901490995 chandrakumar.s@in.abb.com Chawla D VP Head- Marketing 9901490125 d.chawla@in.abb.com Sreevatsa KN VP Head- Drives 9901490980 kn.sreevatsa@in.abb.com
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 13 of 17
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 1+ of 17
ANNEX-3 SERVICE LEVEL AGREEMENT
This Service level agreement is valid for 36 months from the date of commissioning or 39 months from the date of delivery at designated port. The agreement includes
Technical Support
Technical Support service includes:
a. 24 hours telephone service in case, the CUSTOMERs technicians may need assistance. b. Technical Support will be provided by a certified ABB engineer c. Technical Support is available at all times and will be capable of coordinating the initial actions to resolve the emergency situations that may arise in or outside the ordinary working day with regard to the operation and maintenance of the Equipment.
Preventive Maintenance Preventive maintenance service includes: a. Actions at the customers premises determined by the start-up year of the drive b. Qualified and certified drives specialist to perform maintenance work c. Components replacement defined in the maintenance schedule with 100% genuine parts d. Visual inspection of the electrical drive and its environmental conditions e. Inspection of the connections, the ribbon cables and the fiber optic cables f. Functional inspection of the fan(s) and the cooling system g. Inspection of the emergency stop and the prevention of unexpected start-up circuit if applicable h. Inspection of the fault logger i. Inspection and storage of the parameters j. Functional testing of the drive under normal conditions, if planned k. Basic measurements with the supply voltage l. Inspection of the drive spare part inventory m. Reforming of spare module capacitors n. A service report
ABB carries out, on the said Equipment, the preventive maintenance actions according to ABBs preventive maintenance schedule, if specified. The preventive maintenance schedules for the Solar Inverter( PCU). The maintenance work shall be limited to the scope of the services and supply specified in the preventive maintenance schedules. ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 15 of 17
Labour and displacement cost, overnights and allowance required related to preventive maintenance are included in the present contract price, with no extra cost for the Purchaser, Preventive maintenance performed by ABB will always be provided by a certified ABB engineer.
ABB will deliver after each preventive maintenance visit a service report. The service report includes details of the work carried out (measures taken, routine tasks, changed elements, modifications and adjustments), findings, equipment status diagnosis and recommendations. ABB ensures that all spare parts, materials, equipment, and tools required in order to perform the scheduled preventive maintenance are available and prepared in the workplace with sufficient time in advance.
ABB ensure that all the inspections included in the preventive maintenance schedule are carried out at the intervals recommended with the modifications mutually agreed by the Parties, taking the Commercial Operation requirements and the teams needs into account ABBs standard service report is used
ABB will train the customers service personnel, to be able to perform first level Repair especially for the purpose of fixing simple Problem in PCU and carrying out minor maintenance work following ABBs acceptance and the preventive maintenance program. Within the timeframe proposed by ABB, the customer may choose the most convenient date on which to carry out the programmed stops taking into account logistics, electricity sale prices, public holidays, etc. Additionally, maintenance stops, etc. shall be carried out, as far as possible, during periods of low electricity sales prices in order to minimize the effect of said stops on the Plants economic balance. In the event that none of the dates included within the timeframe proposed by ABB is convenient to the CUSTOMER, it shall propose alternative dates which shall be considered by ABB and, if these do not affect the Plants expected safety, output, availability or useful life, nor entail an additional increase in its costs, ABB shall accept said modification proposals. In case of major inspections due to Preventive Maintenance or unexpected on-site repairs, the widest possible range of working hours shall be established, even foreseeing the need for one or more work shifts and activities on weekends and public holidays, with the objective of reducing the Plants unavailability time as much as possible.
Repair service on-site
Repair service on-site includes: a. Qualified and certified drives specialist to perform repair work b. Inspection of the fault logger c. Genuine spare parts to repair drive d. Functional testing of the drive under normal conditions e. Inspection and storage of the parameters f. Repair report
ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 16 of 17
Labour and displacement costs, overnight stays and allowance required to repair possible failures are included.
Response time Response time service includes: a. Qualified and certified ABB engineer to arrive on-site within specific time to start troubleshooting b. In the event of failure report (Written notification), ABB guarantees a maximum response time of 48 hours during normal working hours (from 8:00 am to 6:00 pm, Monday to Saturday) and 72 hours on, Sundays and public holidays. By response we understand the start of repair work in the Plant.
Spare part packages and modules
The recommended Strategic Spare stock (hereinafter referred as SSP) refers to the set of spare parts indicated in the ANNEX-1 will be supplied by ABB, under the CUSTOMERs request, invoiced separately and always quoted in advance. Strategic Spare Parts will be in stock at site and will be available to ABB under the following conditions: a. SSP will be quoted in advance to the CUSTOMER. b. The CUSTOMER will purchase Spare Parts, according to its exclusive decision. c. ABB will request in advance needed spare parts to carry out preventive maintenance. This request will be in a written format, included in the Maintenance Report.
The warranty period for new spare parts, modules, exchange units, refurbished units and repair service for electronic boards is 12 months from the date of invoice. The repair warranty covers the complete repaired board. However, when a whole product, i.e. a frequency converter or a module is repaired, the warranty is limited to the repaired area / replaced parts. The repaired units are equipped with a sticker of approval from our Electronics Repair Center. The warranty becomes void if any repair / modification is performed by an unauthorized party without written agreement with us.
The faulty parts must be returned to us within 30 days from the delivery of the replacing part, freight prepaid.
The items accepted for warranty shall either be replaced or repaired. Only the faulty parts / products are compensated, no field repair work, handling fees, distance costs or any other indirect costs. Possible customs duties or similar are not covered. Further, if special / non- standard transport arrangements are required, ABB does not cover the freight and forwarding ABB Solar Inverter System Customer :Nfs Enfinity Solar Solutions Pvt Ltd
Project Name : Application :25 NW SOLAR POWER PROJECT Offer no :ABBfSOLARf20101215f10 Date of issue :15-12-2010
ABB Non Binding Budgetary offer and it is for tendering purpose only Page 17 of 17
costs. The final approval / disapproval of warranty is made after the defective items have been returned and tested by us, or by the original part manufacturer.
Limitations to spare part and electronics repair service warranty
Fuses are not accepted under warranty. Warranty can be declined due to customers inappropriate handling of the part or product, neglect of ESD-instructions or insufficient packing of the part. Please note that the repair work can be conducted by certified ABB engineers or certified Drives Alliance Partners only. In case warranty is denied due to above mentioned reasons or the faulty part returned by the customer is found without fault in our tests, we reserve the right to charge for the replacing delivery at current price list prices.
Training services Familiarization As a part of this contract, ABB will familiarize the CUSTOMER with the service products, tools and processes: a. Technical support request handling b. Service request handling (warranty / no warranty)
Minor preventive maintenance As part of this contract , ABB will train CUSTOMERs personnel to be able to perform minor maintenance tasks. These tasks are limited to: a. Fan replacements b. Water cooling system check, filter, and ion compound replacement c. Filter replacements (cabinet) d. Cleaning e. Hands on training course
Basic operations and Maintenance training Basic operation & maintenance issues are included in the training course