You are on page 1of 22

3GENERATION CONSRUCTION SDN.

BHD

AS0272087-M

FLOW CHART OF REGISTRATION OF COMPANY


REGISTRATION OF COMPANY

1. Choose and register with secretary companies. Step 1: Get and fill form 13A to find the company names. Then, submitted this form to SSM (Syarikat Suruhanjaya Malaysia) to get the approval letter. Step 2: New Incorporation: Form Memorandum and Articles of Association ( M&A) Form 48A must be signed by the director Form 6 declaration of compliance for secretary company All of the form above must be submitted to SSM to get the form 9 Form 48F Company secretary declaration. This form do not used to submit to SSM, it only will keep by the secretary company. Step 3: Post in Corporation: the company numbers will be find in form 9 Form 24 Return of Allotment of Shares Form 49 Return giving particulars and register of directors managers and secretaries and change of particulars. Form 44 notice of situation of registered office and office hours and particulars of changes All of this form must be submitted to SSM.

2. Make a saving account in bank: The company secretary will send a letter to bank including the directors name. The directors will be accepted to sign the cheque.

3. Register the company with KWSP and PERKESO - Register the employee and staff.

4. Register with PKK (Pusat Khidmat Kontraktor) - Fill the PKK/1/98/PIN5 form

5. Register with CIDB (Construction Industry Development Board) - Fill the R1/95(Pin.2/01) form
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

REGISTRATION OF COMPANY 1.0 SECRETARY COMPANIES INTRODUCTION Before we register our company, we have to submit the required registration documents and fees payable to the Commission. Our company shall have: 1. At least two directors (the director and promoter can be the same person) 2. A company secretary who is member of a professional body prescribed by the Minister or is licensed by the Commission. Both the director and company secretary must have their principal or only place of residence within Malaysia. PROCEDURE FOR REGISTRATION 1. Conduct a name search Before proposing a name for incorporation of company, a name search has to be done to determine whether the name can be used to register the company. The steps are: a) Complete Form 13 A b) Pay RM 50.00 fee for each name applied. The name if approved , shall be reserved for three months from the date of approval

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

2. New in Corporation Submit the following document: 1. Memorandum and Article of Association: a) Original copy stamped at any stamp office with an RM100.00 stamp in the memorandum and another RM100.00 stamp in the articles. b) The first director and secretaries are named in the memorandum and articles of association in front of a witness.

A company having a share capital may be registered as a private company if the memorandum and articles: a) Restricts the right to transfer its share ; b) Limits the number of its members to not more than fifty; c) Prohibits any invitation to the public to subscribe any share or debenture of the company ; and d) Prohibits any invitation to the public to deposit money with the company for fixed period. 2. Form 48A Statutory Declaration by a director or promoter before appointment. The director or promoter declares under oath that a) He/she is not a bankrupt ; and b) He/she has not been convicted of an offence and sentenced by the Court.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

This declaration should be signed in front of any one of the following persons of authority 1. commissioner of Oaths ; 2. President of the sessions Court ; 3. Magistrate ; or 4. Those empowered under the statutory declaration Act 1960. 3. Form 6 Declaration of Compliance This declaration state that all the requirement of the companies Act 1965 has been complied with. It must be signed by the company secretary who handles the registration and is named in the Memorandum and Articles of Association. a. b. c. Original copy of Form 13A A copy of the approving the name A copy of the Identity Card of each director and company secretary.

Registration fees for share capital: Authorized Share Capital (RM) Up to 100,000 100,001 - 500,000 500,001 - 1 million 1,000,001 5 million 5,000,001 10 million 10,000,001 25 million 25,000,001 50 million 50,000,001 100 million 100,000,001 and above Issue of Certificate of Incorporation Fees (RM) 1,000 3,000 5,000 8,000 10,000 20,000 40,000 50,000 70,000

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The following certificate will be issued when all document for registration are in order: 1. Form 8 Certificate of incorporation for a public company 2. Form 9 Certificate of Incorporation for a private company 3. Post in Corporation The company number will be finding in form 8 or 9. The company number is important to register the company with the PKK (Pusat Khidmat Kontraktor) and CIDB (Construction Industry Development Board). After get the Form 9- Certificate of Incorporation for Private Company, fill up the another form from secretary: 1. Form 24 Return of Allotment of Shares 2. Form 49 Return Giving Particulars In Register of Directors Managers and Secretaries and Change of Particulars. 3. Form 44 Notice of Situation of Registered Office and Office Hours and Particulars of Changes Required Documents Register Application Form (PNA.40) To register, we have to fill in this form completely. This form also stated the registration payment which is RM 30.00 for own name, RM 60.00 for partnership, RM 20.00 for changes registration and RM 5.00 for every branch. Beside that, RM 10.00 for business information, RM 10.00 for certificate, RM 5.00 for copy registration form have been prove, RM 1.00 not been prove and fail checking.

Application for Business Name Approval Form (PNA.42)


LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

This form is used by applier to propose their business name to the SSM. Then SSM will choose the suitable name for them. If the application does not fulfill the conditions, it will be reject. The conditions are: a. The business name does not suitable with the business b. They apply the same name with other application. c. Use the words that controlled by Registration. d. Use the name which is not the real name.

The name that has been approved can not be change or add and it cannot be transfer to other person.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

2.0 MAKE A SAVING ACCOUNT IN BANK Before register with PKK (Pusat Khidmat Kontraktor) or CIDB

(Construction Industry Development Board), the company must make the saving account in bank first. The company must submit the copy of financial statement to PKK and CIDB. The company secretary will prepared an application letter to the bank to make the saving account from the bank. This letter contains the directors name, which will be accepted to sign the cheque. This director had been chosen and agrees from all the board of directors. After fill all the form, it will be submit to the bank include the copy of identity card the directors who accepted to sign the cheque.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

3.0 REGISTER THE COMPANY WITH KWSP AND PERKESO KWSP Register the Employee All employees must register with KWSP form KWSP 1. This form must attach together with Form 49 or Business Certificate Registration in 7 days from date employee paid salary for their staffs. After registration, the employee will get the reference numbers. This reference numbers is able to use in every KWSP affair. The employees also will get these documents: a) Form KWSP 6 (Form A) to pay monthly payment to KWSP b) Form KWSP 3 to register the staffs as members c) Employee Registration Certificate this certificate must show in employees premise. d) Employee Guides Book. The employee can apply to register more than one employees numbers to make the affair of monthly payment be easier. Form KWSP 6 (Form A) Every month, KWSP Form 6 will supply to the employee. This form contains the datas such as KWSP membership numbers, NK (nombor kawalan), NIRC and name of staffs who register with KWSP. All of these data will be printed by KWSP computers.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Form KWSP 6 will supply to employee at the end of the month to pay the payment to KWSP for the next month. When KWSP form 6 (Form A) received, make sure all the numbers, name and employee address on this form is right. The employee not supposed to attach the hand written, typed or photocopy of Form KWSP 6 (Form A). The employee also not allowed using the empty Form KWSP 6 (Form A) to print the members data with their own computers.

PERKESO Form 1 used to register employee. For the private limited company, these forms needed: 1. Form 9 (Akta Syarikat 1965) 2. Borang 49 (Companies Act 1965) 3. Form 13 (Company change the name) (PREPARE 2 COPIES EACH 1) Form 2 used to register the staff. The form 2 must filled in two copies of original form with the staff information. Every single of Form 1 and Form 2 must have the company chop. After finished the form, the applicant is embolden to submit by hand or pos to PERKESO address: PERTUBUHAN KESELAMATAN SOSIAL, WISMA PERKESO, NO.83 JALAN HOSPITAL, 30450 IPOH, PERAK DARUL RIDZUAN.

4.0 REGISTER WITH PKK (PUSAT KHIDMAT KONTRAKTOR)


LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

First, the applicant must fill the Contractor of Civil and Electrical Works Application Form (PKK/1/98/PIN.5). Then, the form will be send to PKK with fee process, RM 100.00 for the class A contractors. The fee must be paid to Manager of PKK using bank draft. The other way of payment will not acceptance. The address to send the application form including the fee process is: Pengarah, Pusat Khidmat Kontarktor, Kementerian Pembangunan Usahawan, Tingkat 15 & 16, Medan MARA, Jalan Raja Laut, 50652, Kuala Lumpur. The applicant must inform what the type of class they want to apply. The register contractors allowed to join the tender depend on their class. For class A, the financial limit is more than RM 10,000,000.00. The class A contractor allowed to operation around the country (Malaysia). The applicant also must inform the type of Header and Sub-Header they want to apply. There are six type headers exist in PKK, such as: Header I Header II Civil engineering works Building works

Header III Mechanical, Sanitary and water engineering works Header IV Other specialist civil engineering works Header V Quarrying metal and earth supply, cartage and transport Header VI Forest and land development Header VII Telecommunication works

Registration condition
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

10

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The company must register with Suruhanjaya Syarikat Malaysia (SSM) first. The applicant must inform the company capitals. For class A contractors, the minimum capital is RM 600,001.00. The company should have at least one of their boards of director, shareholders or staff that have technical qualification. For class A contractors, a relevance degree or diploma with the application domains is needed. The degree or diploma must be recognized from government. If the company has the experienced board directors, shareholders or staff, they must show the evidence of their experience. The company, who already had their own plant or appliance, must show the purchase receipt, registration book of vehicles or any document can used to proof that the plant and appliance is their own. If the company has the rental plant or appliance, they need to show the authentic document from the rental agencies. The agency right from suppliers must be attaching for the mechanical works. If the shareholders have shared more than 5% or RM 50,000.00 in the other company, their application will never attend. The application will not deliberate if the board of director or staff already has a post in the other company, which that company already registers with PKK. When the company application passes, they will get the information from the registration offer letters. The letter also obtains the registration class, header and sub-header. The letters also tell the amount the registration fee. For class A contractors, the registration fee is RM 5,000.00. The registration fee must being paid between 30 days from the date of the offer latters. The payment must paid by Bank Draft or Pos Order to MANAGER, PUSAT KHIDMAT KONTRAKTOR. The other way of payment will not acceptance.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

11

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The authentic period is two years. The applicant can renew the application 3 months before the expired date of registration. After the expired date, the registration not considers anymore and if the company still wants to register, they need to make a new registration application. Bumiputra Recognition There are a few rules if the company wants to apply the Bumiputra Recognition. The rule was written in surat Pekeliling Perbendaharaan Bil.4 Tahun 1995. i. ii. iii. iv. v. vi. Share of the company must majority or more than 51% owned to Bumiputra shareholders. There are majorities or more than 51% Bumiputra board of directors in the company. There are majorities or more than 51% Bumiputra staffs in the company. Executive, Director or Manager or others key post in the company is Bumiputra. Organization chart must shown the managing of the company is fully control by the Bumiputra; and Financial managing controlled by the Bumiputra.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

12

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The Others Document Must Be Attach with the Application is: i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. xii. NIRC copys (passport copys if foreigner) of board of director, shareholders, officers and staffs. Copys of KWSP statement (Form A) last 3 months with resist copys. Authentic certificate copys of board of directors, shareholders, officers and staffs. Permit copys from Jabatan Tenaga Rakyat or Jabatan Imegresen if have foreigner board of directors. Authentic experience documents from board of directors, officers and staffs. Authentic bank or others money institution documents about financial facilities. Bank statement copys for current account after 3 months. Authentication of plants/machineries rental and registration of companys vehicles copies. Authentication document of plants/equipment/vehicles. Authentication documents copys of materials credit facilities. Letter of acceptance, Works Order copys for finished projects if the applicants main contractor. Stamped and authentic Sub-Contracts agreement between main contactor and sub-contactors copys, including the Letter of Acceptance copys and work finished certificate from client to main contactor if the applicant is sub-contactor.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

13

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

For private limited company, these documents must be attached together with the application: i. ii. Copys of Form 9 and Memorandum and Articles of Association. Authentication copys by Suruhanjaya Syarikat Malaysia (SSM): a. The last Annual Return Of A Company Having A Share Capital letter and Form 24 (Return of Allotment of Shares) for addition share after that Annual Return, OR b. All of Form 24 (Return of Allotment of Shares) AND all of stamped Form 32A copies if had change in share properties. c. The last Form 49 (Return Giving Particulars in Register of Directors. Managers and Secretaries and Changes of Particulars). iii. If the company shares owned to others company, attach the authentication by Suruhanjaya Syarikat Malaysia copy of Annual Return Of A Company Having A Share Capital and copys of Form 24.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

14

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

3G Construction Sdn. Bhd. work is shown below: Header Header I Header II Sub-Header Sub-Header 1 Civil engineering work Sub-Header 1 Construction work not including reinforcement concrete structure. Sub-Header 2 (a) (b) Not exceeding 4 level Exceeding 4 level reinforcement concrete building reinforcement concrete building. Sub-Header 3 Pre-cast timber building Sub-Header 4 Pre-cast concrete building Sub-Header 5 Steel structure building Sub-Header 6 Pattern roof works Sub-Header 8 (b) Re-paint and repair building works 5.0 REGISTERION CIDB 15

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The new construction company must be registering under Construction Industry Development Board (CIDB) before undertake to execute and complete any construction works in Malaysia. Scope Of Registerion The first, the construction company must know the registration categories and namely, 1. Civil Engineering Construction 2. Building Construction 3. Mechanical and electrical Which are further classified into various specialization group in the table below Grade G1 G2 G3 G4 G5 G6 G7 Tendering Capacity (RM) Not exceeding 100,000 Not exceeding 500,000 Not exceeding 1 Million Not exceeding 3 Million Not exceeding 5 Million Not exceeding 10 Million No Limit

Application Details A new local firm or companies or locally incorporated companies and local firms or companies currently engaged in construction activities shall apply for
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

16

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

registration using Form CIDB R1/95.(PIN 1/99) from CIDB Perak Office, Lot 5.02, 5th floor, Bangunan KWSP, Jalan Greentown, 30450 Ipoh, Perak. The processing Fees shall be accompanied by payment of RM50.00. Processing fees can be in the form of cash or postal order or money order or companys cheque made payable to Construction Industry Development Board Malaysia

Processing Time and Certificates of Registration Under Normal circumstances, if the submission are complete and in order, applicants will be informed of the outcome not later than 2 months from date of submission of applications. Qualified local construction firms or companies or locally incorporated companies shall be registered with CIDB and shall be issued Certificates of Registration which authorize the firms to undertake and complete construction works within the scope of their grades and categories long as the certificates are still valid. The validity of registration shall be valid for minimum of one year and not more than three year.

Categories, specialization and grades of registration Qualified applicants shall be registered in the appropriate grades, appropriate categories and appropriate specialization and will be issued the
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

17

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

relevant registration certificates. The table is registration category and the specialization for our company (3G Construction Sdn.Bhd) Category Civil engineering Construction (CE) Specialization CE01 Road and pavement construction Description Construction of road and road reinstatement, pavement, bus bays, open car parks and related works such as kerbs and footways. CE08 Slope Protection System CE11 Concrete Repairs CE12 Soil Investigation and Stabilisation Reinforcement of structures by way of pressure grouting. Services services include and strength to sampling, testing soil and Slope protection works

investigation classification,

determine

composition. Also includes soil stabilization works such as micro piling, ground anchoring, sand drains and ground grouting. Category Civil engineering Construction (CE) 18 Specialization CE14 Landscaping Description Provision of and turfing.

landscaping

services including tree planting

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

CE21 General Civil Engineering Works

General

civil

engineering

works, including earthworks, sub-soil drainage.

Building Construction (B)

B01 Prefabricated Building and Industrial Industrial plant.

Construction of building and Industrial systems. plant using prefabricated components and

B02 Steel Framed Buildings and Industrial Plant B03

Construction of steel framed buildings and industrial plant

Building

restoration

and

Restoration and Conservation conservation B04 General Buildings and Maintenance General including roofing building fixing and works, partitions, general

maintenance of buildings

Category Building Construction (B)

Specialization B05 Piling

Description Installation of all piling-sheet precase piles,

types

of and

driven

reinforced

prestressed concrete piles.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

19

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

B06 Concrete Repairs

Reinforcement of structure by way of pressure grouting, guniting, etc.

B07 Interior Decoration

Interior design, planning and the decoration of building. This includes ceiling panels.

B08 Waterproofing Installation B09 Landscaping

Waterproofing roofs and walls. Provision and turfing. of

of

basement,

landscaping

services including tree planting

B10 Plumbing

Installation, pipes,

repairs

and works,

servicing of water and gap sanitary plumbing fixtures and mains.

Category Building Construction (B)

Specialization B11 Signcraft Installation

Description Installation of an integrated sign posting etc. system Also for complexes, airport, shopping centres, includes setting up of exhibition stands.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

20

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

B12 Aluminium /metal and glass works B13 Tiles installation and bricklaying works B14 Paint works B15 Roof installation and metal cladding B16 Construction and pool equipment system B17 Prestressing and posttensioning works Category Building Construction (B) B19 Formwork system specialization Specialization B18 Metal work

Aluminium /metal and glass works.

Tiles

installation

and

bricklaying works.

Paint works.

Roof installation and metal cladding.

Construction

and

pool

equipment system.

Prestressing

and

post-

tensioning works.

Description Metal work.

Formwork specialization.

system

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

21

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288

22

You might also like