Prepared for: City and Borough of Juneau 155 South Seward Street Juneau, AK 99801
Prepared by:
Project 135-12556-09001
City and Borough of Juneau Draft Stormwater Guidance Manual TABLE OF CONTENTS
Title Page No.
Acknowledgments........................................................................................................................................ iv Chapter 1. Introduction ..............................................................................................................................1-1 Background and Objectives for Manual ....................................................................................................1-1 Overview of Stormwater Management Measures.........................................................................1-1 Objective.......................................................................................................................................1-2 What This Manual Addresses .......................................................................................................1-2 Geographic Considerations ........................................................................................................................1-3 Montana Creek..............................................................................................................................1-5 Duck Creek and Jordan Creek ......................................................................................................1-6 Douglas Island ..............................................................................................................................1-6 Direct Discharges to Large Water Bodies.....................................................................................1-7 Steep Hillsides ..............................................................................................................................1-7 Unpopulated Areas .......................................................................................................................1-7 Applicability to State and Interjurisdictional Projects ...............................................................................1-8 Relationship of This Manual to Federal, State and Local Regulatory Requirements ................................1-8 Chapter 2. How to Use This Manual..........................................................................................................2-1 Chapter 3. Stormwater Quality ..................................................................................................................3-1 Background ................................................................................................................................................3-1 Thresholds and Exemptions .......................................................................................................................3-1 Source Control ..............................................................................................................................3-1 Water Quality Treatment ..............................................................................................................3-2 Source Control ...........................................................................................................................................3-4 General BMPs for Commercial Development ..............................................................................3-4 Site-Specific BMPs for Commercial Development ......................................................................3-7 BMPs for Residential Development ...........................................................................................3-21 Water Quality Treatment .........................................................................................................................3-29 Biofiltration Swale ......................................................................................................................3-31 Filter Strip ...................................................................................................................................3-38 Infiltration Basin .........................................................................................................................3-43 Wet Pond.....................................................................................................................................3-47 Constructed Wetland...................................................................................................................3-54 Catch Basin Insert .......................................................................................................................3-59 Filtration......................................................................................................................................3-62 Hydrodynamic Separator ............................................................................................................3-68 Oil-Water Separator ....................................................................................................................3-70 Spill Control Device ...................................................................................................................3-76 Flow Splitter ...............................................................................................................................3-79 Snow Disposal Facility ...............................................................................................................3-83 Emerging Technologies ..............................................................................................................3-92 Chapter 4. Stormwater Quantity ................................................................................................................4-1
Background ................................................................................................................................................4-1 Thresholds and Exemptions .......................................................................................................................4-2 Source Control ..............................................................................................................................4-2 Flow Reduction.............................................................................................................................4-3 Stormwater Quantity Source Control.........................................................................................................4-4 Large-Scale Site Design................................................................................................................4-4 Small-Scale Site Design................................................................................................................4-4 Implementation .............................................................................................................................4-6 Flow Reduction..........................................................................................................................................4-8 Runoff Dispersion.........................................................................................................................4-9 Rain Garden ................................................................................................................................4-15 Downspout Infiltration Systems: Trench and Dry Well .............................................................4-19 Perforated Stub-Out Connections ...............................................................................................4-24 Chapter 5. Conveyance Systems and Hydraulic Structures .......................................................................5-1 Background ................................................................................................................................................5-1 Design Event Storm Frequency .................................................................................................................5-1 Determination of Design Flows .................................................................................................................5-2 Off Site Analysis........................................................................................................................................5-2 Backwater Analysis ...................................................................................................................................5-2 Conveyance System Route Design ............................................................................................................5-3 Easements, Access, and Dedicated Tracts .................................................................................................5-3 Easements, Access, and Dedicated Tracts ....................................................................................5-3 Pipe System Design Criteria ......................................................................................................................5-4 Analysis Methods .........................................................................................................................5-4 Acceptable Pipe Sizes ...................................................................................................................5-5 Pipe Materials ...............................................................................................................................5-5 Pipe Slope and Velocity................................................................................................................5-6 Pipes on Steep Slopes ...................................................................................................................5-7 Pipe System Layout Criteria .........................................................................................................5-7 Pipe Structure Criteria...................................................................................................................5-8 Outfalls.......................................................................................................................................................5-9 General Design Criteria for Outfall Features................................................................................5-9 Tightline Systems .......................................................................................................................5-11 Culvert Criteria ........................................................................................................................................5-11 Culvert Design Criteria ...............................................................................................................5-12 Fish Passage Criteria...................................................................................................................5-12 Open Conveyances...................................................................................................................................5-13 Private Drainage Systems ........................................................................................................................5-14 Discharge Locations....................................................................................................................5-14 Drainage Stub-Outs.....................................................................................................................5-14 Chapter 6. Stormwater Site Plan ................................................................................................................6-1 Background ................................................................................................................................................6-1 Threshold ...................................................................................................................................................6-1 Exemptions ................................................................................................................................................6-1 Plan Elements.............................................................................................................................................6-1 Cover Sheet...................................................................................................................................6-1 Project Engineer's Certification ....................................................................................................6-2 Phased Project Submittals.............................................................................................................6-2 Proposed Project Description........................................................................................................6-2 Site Map........................................................................................................................................6-2
ii
TABLE OF CONTENTS
Schedule of Structures ..................................................................................................................6-3 General Drawing Site and/or Grading Plan Sheets .......................................................................6-4 Plan and Profile Sheet...................................................................................................................6-4 BMP Design..................................................................................................................................6-5 Off Site Analysis...........................................................................................................................6-5 Maintenance Plan..........................................................................................................................6-5 Pollution Source Control...............................................................................................................6-5 References................................................................................................................................................. R-1 Appendix A. Small Project Stormwater Management.............................................................................. A-1 Water Quality............................................................................................................................................ A-1 Source Control ............................................................................................................................. A-1 Water Quality Treatment ............................................................................................................. A-1 Water Quantity.......................................................................................................................................... A-1 Source Control ............................................................................................................................. A-1 Runoff Reduction......................................................................................................................... A-1 Conveyance............................................................................................................................................... A-1 Stormwater Site Plan................................................................................................................................. A-2 Appendix B. Hydrologic Analysis and Design Methodology .................................................................. B-1 Introduction............................................................................................................................................... B-1 Hydrologic Methodology and Data Objectives ........................................................................... B-1 Hydrologic Design Data .............................................................................................................. B-1 Water Quality Design Data Analysis ........................................................................................................ B-4 Rainfall Data ................................................................................................................................ B-4 Rainfall Data Analysis ................................................................................................................. B-4 Water Quality Storm ................................................................................................................................. B-5 Water Quality Design Depth........................................................................................................ B-6 Water Quality Design Intensity ................................................................................................... B-6 Hydrologic Design Methods ..................................................................................................................... B-7 Water Quality Volume Determination......................................................................................... B-7 Rational Method .......................................................................................................................... B-8 SCS Unit Hydrograph ................................................................................................................ B-10 Continuous Simulation............................................................................................................... B-20 References............................................................................................................................................... B-20 Appendix B Attachment ........................................................................................................................ BA-1 Appendix C. Recommended Plant List..................................................................................................... C-1 Turf Grass ................................................................................................................................................. C-1 Grasses ...................................................................................................................................................... C-1 Wetland, Non-Woody ............................................................................................................................... C-1 Trees and Shrubs, Woody ......................................................................................................................... C-1
iii
ACKNOWLEDGMENTS
Text from the following documents has been used in the development of this manual without individual acknowledgment or footnotes: Alaska Storm Water Guide, Alaska Department of Environmental Conservation, 2009 Alaska Highway Drainage Manual, Alaska Department of Transportation and Public Facilities, 1995 Stormwater Management Manual for Western Washington, Washington State Department of Ecology, 2005 Stormwater Management Manual, City of Portland, 2008 Stormwater Management and Site Development Manual, Pierce County, Washington, 2008 Surface Water Design Manual, King County, Washington, 2009 Sources of figures, tables and photographs have been indentified.
iv
NOTE TO REVIEWERS
This version of the Stormwater Guidelines Manual has been written in a format to elicit discussion on the manuals organization, thresholds for application of structures and practices, exemptions from requirements and potential stormwater control structures. Some of the sections in this manual, particularly the introduction, may be changed in tone and level of detail in the final versions of the manual. Notes to the reviewer have been added where specific further input is necessary. The organization and presentation of the requirements can be changed in the process of developing the manual. Whichever way the manual is ultimately organized, it will include the thresholds and concepts presented here. This manual has also been written in a format that assumes the manual will be adopted by reference in the City and Borough of Juneau municipal code. An assessment of the existing code and recommended code changes is discussed in a separate memorandum delivered to the City and Borough of Juneau on December 30, 2008. That memorandum discusses the issue of adopting the manual by reference in the municipal code.
CHAPTER 1. INTRODUCTION
BACKGROUND AND OBJECTIVES FOR MANUAL
Stormwater runoff is a natural occurrence, but the quantity and water quality of runoff can be significantly affected by land development: Most development activities replace permeable soils with impermeable roads, parking lots and roofs, causing more stormwater to runoff rather than be absorbed into the soils on-site. Stormwater picks up whatever pollutants are present on a site; for developed sites these are frequently trash, oils and grease, fertilizers, pesticides, pet waste, and sediment. Stormwater drains typically discharge directly into a river, stream, lake or saltwater, so these pollutants are introduced directly into natural water bodies with no treatment.
Many communities around the United States have strict stormwater requirements for development to mitigate stormwater impacts. Federal regulatory programs require these municipal stormwater programs for all medium to large cities in urbanized areas or adjacent to sensitive water bodies. While the City and Borough of Juneau (CBJ) is not yet subject to these federal regulatory requirements, it likely will be in the future. Also, without stormwater requirements, and as development density increases in the CBJ, stormwater impacts will be noticeable. At that point it will be more difficult and expensive to correct the situation. This Stormwater Guidance Manual is the first step in putting into place requirements that will prevent the creation of stormwater problems associated with new development.
BMPs that have been shown to work best at specific sites and types of developments are identified in Chapters 3 through 5 of this manual. These have been tailored to conditions in the Juneau area, as discussed below. In many cases, a single BMP will not be enough to adequately reduce pollution from stormwater. Most developments will need a series of BMPs, including site design, source control, and treatment control practices to meet stormwater requirements.
1-1
Objective
The objective of the CBJs Stormwater Guidance Manual is to address impacts on the environment from stormwater runoff and to ensure that stormwater treatment and conveyance infrastructure is developed in a safe and efficient manner. The manual provides the following information: Thresholds and exemptions for structural stormwater controls Hydrologic and hydraulic design methods Design, construction, and operational details for stormwater structures Management practices that are required to prevent and reduce stormwater pollution from commercial, industrial and residential development. Design and construction of stormwater conveyance structures Submittal requirements for stormwater plan for local approval.
Development Size
Developments of all sizes have direct and cumulative impacts on water quality and habitat. Regulating small developments, however, is expensive and resources may be better allocated to regulating large developments with more potential to cause pollution. This manual requires water quantity controls for developments establishing more than 2,000 square feet of impervious surface and requires water quality treatment controls for developments establishing more than 5,000 square feet of impervious surfaces that have the potential to transport pollutants to the environment. Developments below these thresholds are encouraged to apply the stormwater control techniques and source control practices to the maximum extent practical. Larger developments with more potential to cause pollution shall be required to develop more detailed reporting to assure that the requirements of this manual are met. A separate set of simplified reporting requirements is presented for smaller developments in Appendix A.
Why distinguish between new development, redevelopment, and existing development? Redevelopment is when an already-developed site undergoes some sort of change. This may or may not impact stormwater. For example, adding a new parking lot does impact stormwater, while interior remodeling probably wont affect stormwater. This manual includes specific criteria to identify only redevelopment projects that do impact stormwater. The manual does not address stormwater impacts from existing development, but the BMPs presented could certainly be used by owners of those sites.
EPA regulations typically treat new development and redevelopment the same. This manual proposes that redevelopment projects have the same requirements as new development projects in order to minimize the impacts from new or replaced surfaces. To not discourage redevelopment projects, replaced surfaces are not required to be brought up to new stormwater standards unless the noted cost or space thresholds are exceeded. As long as the replaced surfaces have similar
1-2
1. INTRODUCTION
pollution-generating potential, the amount of pollutants discharged shouldnt be significantly different. However, if the redevelopment project scope is sufficiently large that required space criteria are exceeded, it is reasonable to require the replaced surfaces to be brought up to current stormwater standards. This is consistent with other utility standards. Maintenance activities such as a road surface overlay or reroof shall be exempt from the requirements for construction of water quality and flow reduction BMPs. Utility projects where the trench surface is replaced in kind shall also be exempt from requirements for construction of water quality and flow reduction BMPs.
GEOGRAPHIC CONSIDERATIONS
The Juneau area is unique in many ways, and a one size fits all strategy for stormwater management is not appropriate. The steep topography of the coastal range makes development a challenge in upland areas, leading to fairly high density urbanized development in the flatter lowland areas. Unfortunately, because these flatter areas are often near streams, lakes, wetlands, or Gastineau Channel, stormwater contaminants may flow directly into these water bodies from developed sites. The geographic regions described below and shown in Figure 1-1 warrant different levels of stormwater regulation and controls. Stormwater considerations associated with each of these regions are described below and in Chapters 3 through 6. Juneau has many drainages that, because they are steep or ephemeral, do not support resident or anadromous fish populations. Except for Montana Creek, this manual does not impose additional protections for these streams.
1-3
1-4
1. INTRODUCTION
Montana Creek
Montana Creek is a productive fishery and scenic area that is highly valued by the community. The creek has been identified as perhaps the highest priority creek for protection within Juneau. Most of the upper basin is federally owned and not subject to modification or development. Some areas in the lower basin are in private property and there is concern that development will damage the creek ecosystem. Development in the watershed could lead to pollutants from stormwater affecting stream and riparian habitat. In addition, development within the drainage area of Montana Creek tributaries may cause changes in the flow regime that may lead to habitat degradation both in the tributaries and the main stem. This manual proposes that the Montana Creek drainage area have a higher level of protection: Lower thresholds for water quality treatment (i.e. water quality treatment devices will be required for smaller parking lots and roads) Higher enforcement of source control requirements Increased level of flow reduction: requirements/encouragement for approaches that reduce or slow runoff.
1-5
Douglas Island
Douglas Island has small areas of commercial and dense residential development but otherwise is sparsely developed. The island is mostly drained by small creeks with small populations of anadromous fish. Douglas Island is perhaps the only area in Juneau where large-scale development can occur. Whether Douglas Island will see large-scale development will depend on the local economy and construction of a second bridge across the Gastineau Channel. Large-scale future development in areas of Douglas Island has the potential to cause habitat degradation and flooding if flows from development are not controlled. This is particularly acute for steep areas such as the east side of the island where residential development is increasing up the slope. Along with the runoff will come the potential for pollutants from stormwater to impact stream and riparian habitat. CBJ has the opportunity now to address these potential impacts proactively through identification of sensitive areas, and implementation of stormwater BMPs to protect them. Little information is currently available about sensitive streams and habitat areas on Douglas Island. Lacking information to the contrary, CBJ will operate under the assumption that all stream, riparian, and wetland areas are high-value habitat that should receive high-level protection. Similar to Montana Creek, these protections will consist of the following: Lower thresholds for water quality treatment (i.e. water quality treatment devices will be required for smaller parking lots and roads) Higher enforcement of source control requirements Increased level of flow reduction: requirements/encouragement for approaches that reduce or slow runoff; flow detention using ponds or tanks.
1-6
1. INTRODUCTION
Large water bodies such as Auke and Mendenhall Lakes, the Mendenhall River, Gold Creek, Lemon Creek, and Gastineau Channel will be less affected by increased stormwater flow rates and volumes than smaller streams. This manual does not require flow control for areas that drain directly to these water bodies. Water quality BMPs will be required, along with adequate conveyance and outfall facilities to minimize erosion and other potential impacts. Water quality for stormwater discharge to saltwater is governed by Alaskas marine water quality standards.
Steep Hillsides
As development advances into steep hillside areas, stormwater runoff has the potential to be more hazardous than in flatter terrain. Steep slopes frequently have thin soils and can generate more runoff than flatter areas. Runoff can be more difficult to collect in a pipe system, it will have higher velocities, and it will entrain more sediment and debris. To protect against these problems, this manual employs a lower threshold for requiring off-site analysis of downstream effects in steep hillside areas.
Unpopulated Areas
The urbanized areas of Juneau (Downtown, Mendenhall Valley and Douglas Island) cover only a small portion of the borough. Large developments in areas outside the urban services boundary (Figure 1-1), such as Taku Inlet, will be considered on a case-by-case basis.
1-7
1-8
1. INTRODUCTION
TABLE 1-1. SUMMARY OF FEDERAL, STATE AND LOCAL STORMWATER REGULATIONS Program or Permit National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit NPDES General permit for Stormwater Discharges from Construction Activity (also known as the Construction General Permit (CGP)) NPDES MultiSector General Permit (MSGP) for stormwater from industrial sites Who is Regulated EPAdesignated medium-sized cities Description Requires development of a program that: regulates stormwater practices for new development, redevelopment and construction sites; identifies and eliminates illicit discharges to the stormwater system; provides public education and involvement; and implements an operations and maintenance program for municipal operations. Requires operators to develop and implement a Stormwater Pollution Prevention Plan (SWPPP) to define measures to be taken to reduce erosion and pollution during construction. For guidance on developing a SWPPP and design of construction site BMPs, refer to the ADOT&PFs Alaska Stormwater Pollution Prevention Plan Guide. Relation to Stormwater Management and this Manual CBJ is not currently designated by EPA to require a permit, however, it may be required to obtain coverage in 2012.
Hydrologic methodologies and data in this may be used to design temporary stormwater control structures.
The MSGP requires permitted industrial facilities, including those owned or operated by municipalities, to develop a site-specific SWPPP to control stormwater pollution. In Juneau, this permit has been required for affected gravel operations and mines. Satisfying the requirements of this manual will not relieve the responsibility of obtaining an industrial stormwater discharge permit.
Stormwater controls on these permitted industrial sites should benefit stormwater quality coming off these sites. While not the intended audience for this manual, operators of these sites could use this manual as a resource.
Project proponents where any sort of fill material will be added to a regulated water body
Section 404 of the Clean Water Act authorizes Not directly related to the Secretary of the Army to issue permits for stormwater requirements in the discharge of dredged or fill material into this manual waters of the United States, including navigable waters and wetlands. The term discharges of fill material means the addition of rock, sand, dirt, concrete, or other material into the waters of the United States incidental to construction of any structure. A Section 404 permit may require stormwater quality or quantity BMPs as mitigation. In Juneau, the Corps of Engineers issues permits for fill in Class A & B wetlands. CBJ (Wetland Review Board) issues a Wetland Permit for fill in Class C & D wetlands.
1-9
TABLE 1-1 (continued). SUMMARY OF FEDERAL, STATE AND LOCAL STORMWATER REGULATIONS Program or Permit Federal Clean Water Act Section 401 Water Quality Certification Who is Regulated Project proponent for any project that may impact water quality in a regulated water body Project proponent for any project that may impact water quality in a regulated water body Description Relation to Stormwater Management and this Manual
Requires any applicant for a federal permit for Not directly related to any activity that may affect the quality of stormwater requirements in waters of the United States to also obtain a this manual water quality permit from the state in which the discharge originates or will originate. In Alaska, the ADEC issues water quality permits. This act requires that every state participating in the federal Coastal Management Program use erosion and sediment control management measures. The Alaska Coastal Management Program (ACMP) requires that estuaries, wetlands, tide flats, lagoons, rivers, streams and lakes be managed to protect natural vegetation, water quality, important fish and wildlife habitat, and natural water flow. The ACMP states that contractors for projects within the coastal zone must use all feasible and prudent steps to maximize conformance with this requirement. State and federal resource agencies that issue permits often require erosion control measures to ensure that a project will be consistent with the ACMP. There currently are no endangered species in the Juneau area. In 1990, the eastern stock of Steller sea lion was listed as threatened by the National Marine Fisheries Service. The Endangered Species Act can be used to introduce increased stormwater regulation through federal programs such as the National Flood Insurance Program. Given the relatively small population and few other municipalities in the area, this may be unlikely. This manual could be used as a resource for stormwater management BMPs that would fulfill the requirements of the Coastal Zone Act.
Any activities that may injure an endangered species within its critical habitat are subject to review and regulation.
Not currently an issue, but would become a significant issue if a local species is designated as endangered.
1-10
1. INTRODUCTION
TABLE 1-1 (continued). SUMMARY OF FEDERAL, STATE AND LOCAL STORMWATER REGULATIONS Program or Permit Who is Regulated Description EPA requires the State of Alaska to periodically prepare a list of all surface waters in the state for which beneficial usessuch as drinking, recreation, aquatic habitat, and industrial useare impaired by pollutants. Waters placed on the 303(d) list require the preparation of total maximum daily load (TMDL) plans. TMDLs identify the maximum amount of a pollutant to be allowed to be released into a water body so as not to impair uses of the water, and allocate that amount among various sources. TMDLs for fecal coliform bacteria, debris, habitat modification and sediment have been developed for several streams in Juneau (Duck, Jordan, Lemon, Vanderbilt and Pederson Hill Creeks). These TMDLs all identify stormwater runoff as a major source of pollutants, and recommend that CBJ develop a stormwater management program. Stormwater Disposal Plans, Alaska Department of Environmental Conservation Alaska Statute 41.14.870, Anadromous Fish Act Project proponent Modification of a stormwater treatment or disposal system requires approval of ADEC per 18 AAC 72.600 Should ADEC pursue enforcement of this regulation, water quality treatment requirements in this manual may need to be changed to match requirements of AAC. BMP requirements in this manual will provide stormwater management standards for ADF&G staff to use in this review Relation to Stormwater Management and this Manual The stormwater management measures proposed in this manual will help address these pollutants. In the future, more stringent requirements could be imposed if current efforts for cleanup are not determined to be successful.
Impaired Water State of Body List (303(d) Alaska list) and Water Department of Cleanup Plans Environmental (TMDLs) Conservation, residents and businesses within each watershed
Project proponent
The Alaska Department of Fish and Game (ADF&G) regulates construction activities that will affect freshwater anadromous fish habitat. Any activity that will pollute or change the natural flow or bed of a stream important for the spawning, rearing, or migration of anadromous fish must be approved by ADF&G to ensure that the construction plans and specifications will protect fish and game. Often, the ADF&G permit requires an erosion and sediment control plan.
Project proponent
Local regulations affecting surface water, Some local regulation is stormwater and water quality are found in CBJ discussed in this manual. Municipal Code Titles 19, 49 and 75. Compliance with this manual does not guarantee compliance with all CBJ stormwater regulations.
1-11
Each chapter details the geographic areas, thresholds and exemptions for the stormwater control structures and practices that are required for development in Juneau. Details of design methodology, construction and maintenance are provided in Chapters 3 through 6. Figure 2-1 is a flow chart summary of the application of the requirements. Additional stormwater requirements for land use and grading permits are found in CBJs codes and ordinances.
Yes
Water Quality
Water Quantity
Conveyance
Site Plan
2-1
Preventing pollutants from contacting stormwater is a much more effective and cost-efficient method of pollution control than removing pollutants from stormwater. Water quality treatment BMPs are expensive to construct and maintain and are not 100-percent effective at removing pollutants. Many pollutants have biological and physical impacts at very low concentrations that approach irreducible levels. Many water quality treatment BMPs cannot feasibly remove pollutants below these concentrations.
3-1
Small Project Development (>2,000 square feet and <5,000 square feet of impervious area) No
Yes
Residential Determine Pollution Source Control Measures Commercial Pollution Source Control
Basic Determine Water Quality Treatment Measures Advanced (oil control) Stormwater Quality Treatment Design
In addition, advanced stormwater quality treatment (oil control) is required for the following: High use parking lots, based on number of stalls (e.g., 30 stalls) High use intersections (average daily traffic >15,000) High use roads (average daily traffic >25,000) Commercial facilities generating high loads of oils and greases.
3-2
3. STORMWATER QUALITY
The facility choices for oil control are intended to achieve the goals of no ongoing or recurring visible sheen, and to have a 24-hour average Total Petroleum Hydrocarbon (TPH) concentration no greater than 10 mg/l, and a maximum of 15 mg/l for a discrete sample (grab sample). Options for oil control include: Oil water separators Sand Filtration Catch Basin Inserts
Exemptions
Maintenance activities and utility projects that replace trench surface in kind shall be exempt from the requirement to construct stormwater quality control structures.
3-3
Good Housekeeping
Preventive Maintenance
3-4
3. STORMWATER QUALITY
Construct impervious areas that are compatible with the materials handled. Portland cement concrete, asphalt, or equivalent material may be considered. Use drip pans to collect leaks and spills from industrial/ commercial equipment such as cranes at ship/boat building and repair facilities, log stackers, industrial parts, and trucks and other vehicles that are stored outside. Empty drip pans immediately after a spill or leak is collected in an uncovered area. At industrial and commercial facilities, drain oil and fuel filters before disposal. Discard empty oil and fuel filters, oily rags and other oily solid waste into appropriately closed and properly labeled containers, and in compliance with the Uniform Fire Code. For the storage of liquids, use containers, such as steel and plastic drums, that are rigid and durable, resistant to corrosion due to weather and fluid content, non-absorbent, water tight, rodent-proof, and equipped with a close-fitting cover.
Note: Evidence of stormwater contamination can include the presence of visible sheen, color or turbidity in the runoff, or present or historical operational problems at the facility. Simple pH measurements with litmus or pH paper can be used to test for stormwater contamination in areas subject to acid or alkaline contamination.
For the temporary storage of solid wastes contaminated with liquids or other potential pollutant materials, use dumpsters, garbage cans, drums and comparable containers that are durable, corrosion-resistant, non-absorbent, non-leaking and equipped with either a solid cover or screen cover to prevent littering. If covered with a screen, the container must be stored under a lean-to or equivalent structure. Where feasible, store potential stormwater pollutant materials inside a building or under a cover and/or containment. Minimize use of toxic cleaning solvents, such as chlorinated solvents, and other toxic chemicals. Use environmentally safer raw materials, products, additives, etc., such as substitutes for zinc used in rubber production. Stencil warning signs at stormwater catch basins and drains, e.g., Dump no waste. Where exposed to stormwater, use containers, piping, tubing, pumps, fittings, and valves that are appropriate for their intended use and for the contained liquid. If pollutant materials are stored on-site, have spill containment and cleanup kits readily accessible. Place and maintain spill kits at outside areas where there is a potential for fluid spills. These kits should be stocked as appropriate for the materials being handled and the size of the potential spill. If a spill has reached or may reach a sanitary or a storm sewer, groundwater or surface water, notify the local sewer authority immediately. Notification must comply with and federal spill reporting requirements.
Note: Recommended items for spill kits include salvage drums or containers, such as high density polyethylene, polypropylene or polyethylene sheet-lined steel; polyethylene or equivalent disposal bags; an emergency response guidebook; safety gloves/clothes/equipment; shovels or other soil removal equipment; and oil containment booms and absorbent pads; all stored in an impervious container.
Do not flush absorbent materials or other spill cleanup materials to a storm drain. Collect the contaminated absorbent material as a solid and place in appropriate disposal containers.
3-5
Employee Training
Train all employees who work in pollutant source areas in identifying pollutant sources and in understanding pollutant control measures, spill response procedures, and environmentally acceptable material handling practicesparticularly those related to vehicle/equipment liquids such as fuels, and vehicle/equipment cleaning.
Inspections
Conduct visual inspections quarterly during storm events to achieve the following: Verify that the descriptions of the pollutant sources identified by the pollution prevention team are accurate. Verify that the stormwater pollutant controls (BMPs) being implemented are adequate. Update the site map to reflect current conditions. Include observations of the presence of floating materials, suspended solids, oil and grease, discoloration, turbidity and odor in stormwater discharges, in outside vehicle maintenance/repair, and in liquid handling and storage areas. In areas where acid or alkaline materials are handled or stored, use a simple litmus or pH paper to identify the types of stormwater contaminants. Conduct at least one dry season inspection each year. Determine whether there are unpermitted non-stormwater discharges to storm drains or receiving waters, such as process wastewater and vehicle/equipment washwater, and either eliminate or obtain a permit for such a discharge.
Record Keeping
Retain the following reports for three years: Visual inspection reports, which should include: the scope of the inspection, the personnel conducting the inspection, the dates of the inspection, major observations regarding stormwater (performance of the BMPs, etc.), and actions taken to correct BMP inadequacies. Reports on spills of oil or hazardous substances in greater than Reportable Quantities (Code of Federal Regulations Title 40 Parts 302.4 and 117), including oil, gasoline or diesel fuel that causes a violation of water quality standards, or, that causes a film or sheen upon or discoloration of the surface waters or adjoining shorelines or causes a sludge or emulsion to be deposited beneath the surface of the water or upon adjoining shorelines.
3-6
3. STORMWATER QUALITY
Structural Source Control BMPs for New or Substantially Remodeled Fueling Stations
3-7
The fueling island must have a roof or canopy to prevent the direct entry of precipitation onto the spill containment pad. The roof or canopy should, at a minimum, cover the spill containment pad (within the grade break or fuel dispensing area) and preferably extend several additional feet to reduce the introduction of windblown rain. Connect all roof drains to storm drains outside the fueling containment area. Stormwater collected on the fuel island containment pad must be conveyed to a sanitary sewer system, if approved by the sanitary authority; or to an approved treatment system such as an oil-water separator and a basic treatment BMP. Discharges from treatment systems to storm drains or surface water or to the ground must not display ongoing or recurring visible sheen and must not contain a significant amount of oil and grease. Alternatively, stormwater collected on the fuel island containment pad may be collected and held for proper off site disposal. Conveyance of any fuel-contaminated stormwater to a sanitary sewer must be approved by the local sewer authority and must comply with pretreatment regulations. These regulations prohibit discharges that could cause fire or explosion. An explosive or flammable mixture is defined under state and federal pretreatment regulations, based on a flash point determination of the mixture. If contaminated stormwater is determined not to be explosive, then it could be conveyed to a sanitary sewer system. Transfer the fuel from delivery tank trucks to the fuel storage tank in impervious contained areas and ensure that appropriate overflow protection is used. Alternatively, cover nearby storm drains during the filling process and use drip pans under all hose connections.
3-8
3. STORMWATER QUALITY
Building, Repair, and Maintenance of Boats and Ships Description of Pollutant Sources
Most marinas and boatyards are located on or adjacent to coastal waters, lakes and rivers, and their activities can contribute significant pollution directly to these water bodies. The following BMPs apply to onshore repair activities, mobile operations, and on-water fueling and repair operations. These can pollute stormwater and surface water with toxic organic compounds and oils/greases, heavy metals, suspended solids, nutrients and abnormal pH. The toxic organic compounds most commonly associated with activities at marinas and boatyards are hydrocarbons and solvents. Hydrocarbons include lubrication oil, gasoline, fuel oil and exhaust residues. Components of gasoline, diesel fuel, kerosene and solvents can be acutely toxic. Solvents such as tetrachloroethylene, tetrachloroethane, trichloroethylene, trichloroethane, and methylene chloride are used as degreasing agents and in varnishes, paint removers and lacquers. Many solvents are known carcinogens. Heavy metals are found in paint particles, metal shavings, engine oils, bilge water and runoff from maintenance and repair areas and include lead, mercury, copper, nickel, cadmium, zinc, chromium, and arsenic. Metals, such as chromated copper arsenate (CCA) are in wood preservatives commonly used in dock and pier construction. Metals generally do not break down into less harmful chemicals and tend to accumulate where they are released into the environment. Soil may enter a water body during construction and by stormwater runoff. Operating boats in shallow waters can scour the bottom and re-suspend bottom sediment, as well as cut off or uproot plants. Sediments are also stirred up during dredging operations. Sediments can affect a water body in several ways: By smothering bottom-dwelling plants and animals By decreasing clarity, which may reduce the amount of available light that plants and phytoplankton need to grow, as well as affect the ability of animals to find food By clogging fish gills By increasing sediment oxygen demand, resulting in the depletion of dissolved oxygen By attaching to contaminants, such as heavy metals and hydrocarbons.
Nutrients, particularly nitrogen and phosphorus, are essential to plant growth. However, in elevated concentrations, they stimulate nuisance plant growth in the form of algal blooms or excessive growth of weeds. When excessive plant growth dies and decays, dissolved oxygen concentrations may become depleted and kill fish and other animals. Algal blooms can reduce light penetration and harm beneficial plants. Also, excessive growth of tiny plants attached to the blades of larger plants can harm the growth of the larger plant. Weed-like plants tend to out-compete normal plants and may smother animals. Like excessive nutrients, abnormal pH can harm plant growth and animal life.
Operational BMPs
The following BMPs are required for operations engaged in boat building, mooring, maintenance and repair:
3-9
Move maintenance and repair activities onshore if possible. This action reduces some of the potential for direct pollution of water bodies. Shelter any blasting and spray painting activities by hanging wind blocking tarps to prevent dust and overspray from painting. Use ground cloths or drip pans for collection of strips and spills in painting, maintenance, repair and finishing activities. Collect bilge and ballast water that has an oily sheen on the surface. Properly dispose of it rather than dumping it in surface waters or on land. Employ a bilge pump-out service or use oil absorbent pads to capture the oil in bilge water before pumping. If pads are used, they must be recycled or properly disposed of. To avoid spilling directly in surface water bodies, perform paint and solvent mixing, fuel mixing and similar handling of liquids on-shore. Clean up spills immediately. Do not wash spills to a storm drain or surface water. Collect and properly dispose of wash water from washing painted boat hulls. Consider taking the boat to a local boat yard that is equipped to collect and treat the wash water. Never dispose of wash water containing soap or other chemicals to storm drains or surface waters. This practice is acceptable if washing a boat with only water.
The following BMPs are optional unless the above minimum BMPs fail to provide adequate source control: Boat construction and structural repair activities should be covered. A tarp should be placed above the water surface underneath the work area on boats or docks to collect spills, drips, paint chips and loose solids when work is performed over water. All used oil and oil filters should be recycled. Most marinas now offer used oil recycling services. No soaps or detergents of any kind should be used to wash the topsides of hulls of boats where the wash water will enter surface waters. Use sanders that have dust containment bags. Store and maintain appropriate spill cleanup materials in a clearly marked location. Ensure that employees are familiar with the sites spill control plan and/or proper spill cleanup procedures. Sweep maintenance yard areas, docks, and boat ramps as needed to collect sandblasting material, paint chips, oils and other loose debris. These collected materials are to be properly disposed of. Do not hose down the area to a storm drain or to the water.
3-10
3. STORMWATER QUALITY
Deicing and Anti-Icing Operations; Airports and Streets Description of Pollutant Sources
This section applies to deicing and anti-icing operations to control ice and snow on streets, highways, airport runways and aircraft. Deicers commonly used on highways and streets include sand, calcium magnesium acetate, calcium chloride, magnesium chloride, sodium chloride, urea, and potassium acetate. Deicers used on aircraft are typically ethylene glycol and propylene glycol. These deicing and anti-icing compounds become pollutants when they enter storm drains or surface water after application. Leaks and spills of these chemicals can also occur during handling and storage. BMPs for aircraft deicers and antiicers must be consistent with aviation safety and the operational needs of the aircraft operator.
The following BMPs are optional unless the above minimum BMPs fail to provide adequate source control: Establish a centralized aircraft de/anti-icing facility or, centralize activities in designated areas of the tarmac equipped with separate collection drains for the spent deicer liquids. Consider installing an aircraft de/anti-icing chemical recovery system, or contract with a chemical recycler.
Choose one or more of the following options for stockpiles greater than 5 cubic yards of erodible or water soluble materials: Store in a building or a paved and bermed covered area. Place temporary plastic sheeting over the material.
3-11
Pave the area and install a stormwater drainage system. Place curbs or berms along the perimeter of the area to prevent the run-off of uncontaminated stormwater and to collect and convey drainage to treatment. Slope the paved area in a manner that minimizes the contact between stormwater (e.g., pooling) and leachable materials in compost, logs, bark, wood chips, etc. For large stockpiles that cannot be covered, implement containment practices at the perimeter of the site and at any catch basins as needed to prevent erosion and discharge of the stockpiled material offsite or to a storm drain. Ensure that contaminated stormwater is not discharged directly to catch basins without being conveyed through a treatment BMP.
The following BMPs are optional unless the above minimum BMPs fail to provide adequate source control: Include limits on toxic materials and phosphorous in the specifications for de/anti-icers, where applicable. Consider using anti-icing materials rather than deicers if it will result in less adverse environmental impact. Select cost-effective de/anti-icers that cause the least adverse environmental impact.
The following BMPs are optional unless the above minimum BMPs fail to provide adequate source control: Intensify roadway cleaning in early spring to help remove particulates from road surfaces. Include limits on toxic metals in the specifications for de/anti-icers.
3-12
3. STORMWATER QUALITY
The following BMP is optional unless the above minimum BMPs fail to provide adequate source control: Install biofiltration swales and filter strips to treat roadside runoff wherever practical and use engineered topsoils wherever necessary to maintain adequate vegetation. These systems can improve infiltration and stormwater pollutant control upstream of roadside ditches.
3-13
The following BMPs are optional unless the above minimum BMPs fail to provide adequate source control: Consider storing damaged vehicles inside a building or other covered containment until all liquids are removed. Remove liquids from vehicles retired for scrap. Clean parts with aqueous detergent based solutions or non-chlorinated solvents such as kerosene or high flash mineral spirits, and/or use wire brushing or sand blasting whenever practicable. Avoid using toxic liquid cleaners such as methylene chloride, 1,1,1trichloroethane, trichloroethylene or similar chlorinated solvents. Choose cleaning agents that can be recycled. Inspect all BMPs regularly, particularly after a significant storm. Identify and correct deficiencies to ensure that the BMPs are functioning as intended. Avoid hosing down work areas. Use dry methods for cleaning leaked fluids. Recycle grasses, used oil, oil filters, antifreeze, cleaning solutions, automotive batteries, hydraulic fluids, transmission fluids, and engine oils. Do not mix dissimilar or incompatible waste liquids stored for recycling.
3-14
3. STORMWATER QUALITY
Treatment
Contaminated stormwater runoff from vehicle staging and maintenance areas must be conveyed to a sanitary sewer, if allowed by the local sewer authority, or to an oil-water separator, applicable filter, or other equivalent oil treatment system.
3-15
The following BMPs are optional unless the minimum required BMPs fail to provide adequate source control:
Use mulch or other erosion control measures when soils are exposed for more than one week during the dry season or two days during the rainy season. If oil or other chemicals are handled, store and maintain appropriate oil and chemical spill cleanup materials in readily accessible locations. Ensure that employees are familiar with proper spill cleanup procedures. Till fertilizers into the soil rather than dumping or broadcasting onto the surface. Determine the proper fertilizer application for the types of soil and vegetation encountered. Till a topsoil mix or composted organic material into the soil to create a well-mixed transition layer that encourages deeper root systems and drought-resistant plants.
3-16
3. STORMWATER QUALITY
Use manual and/or mechanical methods of vegetation removal rather than applying herbicides, where practical.
The following BMPs are optional unless the minimum required BMPs fail to provide adequate source control: Consider alternatives to the use of pesticides such as covering or harvesting weeds, substitute vegetative growth, and manual weed control/moss removal.
3-17
Once a pesticide is applied, its effectiveness should be evaluated for possible improvement. Records should be kept showing the applicability and inapplicability of the pesticides considered. An annual evaluation procedure should be developed including a review of the effectiveness of pesticide applications, impact on buffers and sensitive areas (including potable wells), public concerns, and recent toxicological information on pesticides used/proposed for use. Rinseate from equipment cleaning and/or triple-rinsing of pesticide containers should be used as products or recycled into product. The application equipment used should be capable of immediate shutoff in the event of an emergency. Consider the use of soil amendments, such as compost, that are known to control some common diseases in plants. The following are three possible mechanisms for disease control by compost addition (U.S. EPA Publication 530-F-9-044): Successful competition for nutrients by antibiotic production; Successful predation against pathogens by beneficial microorganisms; Activation of disease-resistant genes in plants by composts.
3-18
3. STORMWATER QUALITY
dependent on watering. The amount of water applied depends on the normal rooting depth of the turfgrass species used, the available water holding capacity of the soil, and the efficiency of the irrigation system. Consult with the local water utility to help determine the optimum irrigation practices. Fertilizer management: Turfgrass is most responsive to nitrogen fertilization, followed by potassium and phosphorus. Fertilization needs vary by site, depending on plant, soil and climate conditions. Evaluation of soil nutrient levels through regular testing ensures the best possible efficiency and economy of fertilization. Fertilizers should be applied in amounts appropriate for the target vegetation and at the time of year that minimizes losses to surface and ground waters. Do not fertilize during a drought or when the soil is dry. Alternatively, do not apply fertilizers within three days prior to predicted rainfall. The longer the period between fertilizer application and either rainfall or irrigation, the less fertilizer runoff occurs. Use slow release fertilizers such as methylene urea, IDBU, or resin-coated fertilizers when appropriate, generally in the spring. Use of slow release fertilizers is especially important in areas with sandy or gravelly soils. Time the fertilizer application to periods of maximum uptake. Generally fall and spring applications are recommended, though turf specialists recommend four applications a year. Properly trained persons should apply all fertilizers. At commercial and industrial facilities, fertilizers should not be applied to grass biofiltration swales, filter strips or buffer areas that drain to sensitive water bodies unless approved by the local jurisdiction.
The following BMPs are optional unless the minimum required BMPs fail to provide adequate source control: Integrated Pest Management is the most effective BMP measure that can be taken for herbicide, insecticide, and fungicide use. An IPM program might consist of the following steps: Step 1: Correctly identify problem pests and understand their lifecycle. Step 2: Establish tolerance thresholds for pests. Step 3: Monitor to detect and prevent pest problems. Step 4: Modify the maintenance program to promote healthy plants and discourage pests. Step 5: Use cultural, physical, mechanical or biological controls first if pests exceed the tolerance thresholds. Step 6: Evaluate and record the effectiveness of the control and modify maintenance practices to support lawn or landscape recovery and prevent recurrence. Fertilizers should be worked into the soil rather than dumped or broadcast onto the surface. Determine the proper fertilizer application for the types of soil and vegetation involved. Soil should be tested for the correct fertilizer usage. Use mechanical methods of vegetation removal rather than applying herbicides. An effective measure that can be taken to reduce pesticide use, excessive watering, and removal of dead vegetation involves careful soil mixing and layering prior to planting. A
3-19
topsoil mix or composted organic material should be roto-tilled into the soil to create a transition layer that encourages deeper root systems and drought-resistant plants. This practice can improve the health of planted vegetation, resulting in better disease resistance and reduced watering requirements. Use native plants in landscaping. Native plants do not require extensive fertilizer or pesticide applications
3-20
3. STORMWATER QUALITY
3-21
Household Hazardous Material Use, Storage, and Disposal Description of Pollutant Sources
Household hazardous materials are materials found in homes that exhibit characteristics such as corrosivity, ignitability, reactivity or toxicity. These include oil-based paints and stains, paint thinner, gasoline, charcoal starter fluid, cleaners, waxes, pesticides, fingernail polish removal and wood preservatives. When these products are emptied onto the ground through leaks, spills or improper disposal, they may enter the stormwater conveyance system and flow directly into local water bodies, harming fish and wildlife. They can also infiltrate into the ground and contaminate drinking water. Ground water contamination occurs when these products are poured down a sink drain or a toilet and into a septic system. If these products are poured down sink drains and toilets into municipal sewers, hazardous compounds will pass through the wastewater treatment plant and contaminate receiving waters, or they can harm the biological process used at the treatment plant, reducing overall treatment efficiency. When hazardous materials are disposed of in a household garbage can, they can leak in landfills and contaminate groundwater.
Operational BMPs for Household Hazardous Material Use, Storage, and Disposal
The following BMPs are required: Follow manufacturers directions in the use of all hazardous materials. Place drip pans and ground cloths under any work areas outdoors and at all potential drip and spill locations during movement and use of hazardous materials. When hazardous materials are in use, place the container inside of a tub or bucket to minimize spills. Keep appropriate spill cleanup materials on hand. Cat litter is good for many oil-based spills. Keep tight fitting lids on all containers. Inspect containers regularly for corrosion, structural failures, spills, leaks, and overfills. Replace containers as needed. Store containers inside of a building unless this is not permitted due to site constraints or fire code requirements. Store containers off the ground. Keep them out of the weather to avoid rusting, freezing, cracking, labels falling off, etc. Dispose of hazardous materials and their containers properly. Never dump products labeled poisonous, corrosive, caustic, flammable, inflammable, volatile, explosive danger, warning, caution or dangerous outdoors, in a stormwater drain or into sinks, toilets or drains. Call the local waste utility for information on disposal methods, collection events, and alternative products.
The following BMPs are optional unless the minimum required BMPs fail to provide adequate source control:
3-22
3. STORMWATER QUALITY
Use less toxic products whenever possible. If an activity involving the use of hazardous material can be moved indoors out of the weather, then do so. Make sure that ventilation is adequate. Hazardous materials should be stored out of reach of children. Never transfer or store these materials in food or beverage containers that could be misinterpreted by a child as something to eat or drink. Latex paints are not a hazardous waste but are not accepted in liquid form at landfills. To dispose, leave uncovered in a protected place until dry, then place in the garbage. To dry waste paint quickly, pour cat litter into the can to absorb the paint. Once the paint is dry, leave the lid off when placing it in the garbage so the garbage collector can see that it is no longer liquid.
3-23
3-24
3. STORMWATER QUALITY
The following BMPs are optional unless the minimum required BMPs fail to provide adequate source control: Double-bag animal excrement and tie securely before throwing away. Or, seal it in a leakproof container before throwing away. Pay attention to the pet food selected. The type of pet food affects the quality and quantity of pet waste. The easier food is to digest, the more completely it will be digested, resulting in smaller stools that will decompose more quickly. Rice-based food is the most easily digested, followed by soy and wheat-based foods; corn-based food does not break down well. Canned foods often contain red dye, which cannot be digested and will pass through an animals
3-25
system. Consult a veterinarian with questions about the nutritional value of a particular brand of pet food. Control where pets relieve themselves. Make the yard more appealing to the pet by tilling a small section of the ground, thus reserving that spot solely for the pets needs. On walks, carry a scoop and a plastic bag, or a bucket with a lid and handle. Install a pet septic system that connects to the home sewer or the septic system in the yard. Some use enzymes to break down stools, allowing them to leach into the ground. These products may be found at a local pet store; if not, the store may know how to order them from a pet-products catalog.
3-26
3. STORMWATER QUALITY
3-27
3-28
3. STORMWATER QUALITY
And water quality control BMPs that satisfy the requirements for Advanced (Oil Control) water quality treatment: Catch Basin Insert Oil-water separator Filtration.
In addition, descriptions are provided for the following site-specific or ancillary facilities associated with water quality treatment: Spill Control Device Flow Splitter Snow Disposal Facility.
Spill control devices shall be required where a piped system drains a pollution generating impervious surface. Flow splitters shall be required upstream of a water quality facility that is designed to treat the water quality peak flow rate. Basic information is also provided on how to assess emerging technologies for water quality treatment to determine their appropriateness for local use.
3-29
TABLE 3-1. BMP APPLICATION TABLE Biofiltration Swale / Filter Strip M L M U L L Efficiency of Water Quality Treatment BMPsa Wet Catch Pond or Infiltratio Basin Hydrodynami Wetland n Basinb Insert Filtration c Separator H M M U U M H M H U U M L L L L M L H M H M H M M L L L M L Oil Separato r M L L L H L
Pollutant of Concern Sediment Nutrients Heavy Metals Organic Compounds Trash and Debris Oxygen Demanding Substances Bacteria Oil and Grease Pesticides a. b.
U M U
H U U
U U U
L L L
M H U
L L L
L M L
L = Low Removal Efficiency; M = Medium Removal Efficiency; H = High Removal Efficiency; U = Unknown Removal Efficiency Including trenches and pervious pavements
3-30
3. STORMWATER QUALITY
Biofiltration Swale
Description
Biofiltration swales (Figure 3-2) are open, gently sloped channels to convey water. They function to slow water velocity and filter sediment and other pollutants. Swales that dry out between rain events are grass swales and should be planted with mixed grasses; swales that remain wet most of the time are wet swales and should be planted with wetland vegetation.
Application
Biofiltration swales are good to use in combination with end-of-pipe treatment like constructed wetlands or sediment basins and are appropriate along streets, parking lots and perimeters of building sites.
3-31
Hydraulic residence time for water: 9 minutes maximum Freeboard height: 6 minimum Longitudinal slope: Grass swales: 1% to 3% or up to 6% with check dams Wet swales: 2% maximum. Use steps, gabion walls, or check dams to reduce slope Sheet flow from street Multiple dispersed inlets (curb cuts) Single inlet (armored) Grass swales: water table must be minimum 2 feet below bottom of swale; site can be over-excavated in areas with impermeable or clay soils Wet swales: no restrictions or need for underdrain; not appropriate for areas of highly infiltrative (gravelly, cobbly) soils Permit infiltration but not be highly erosive: preferred sandy loam, loamy sand, loam soils Composition: sand 35-60%, clay 10-25%, silt 30-55%, organics 20% (no animal waste) Do not apply fertilizers, pesticides, or insecticides Vegetation must be established before introducing high flows (approximately 6 months) Grass swales: Seed mix: See vegetation recommendations below Seed rate: 200 lbs per acre Wet swales: Vegetation: See vegetation recommendations below Cover: use a combination of plugs, perennial seed, and annual seed to establish 100% cover in first year.
Topsoil:
Vegetation:
Design Procedure
The following is the procedure to be followed to design biofiltration swales: 1. Determine design flow rate 2. Identify swale type (wetland or grass) 3. Establish longitudinal slope of swale and swale bottom width 4. Use Mannings equation to calculate flow depth and find flow cross sectional area. Assume a Mannings coefficient of 0.2 0.35 (approx 0.24 if mowed infrequently) 5. Compute flow velocity at design flow rate (V = Q/A, Q=design flow rate, A=cross sectional area of flow in swale)
3-32
3. STORMWATER QUALITY
6. Iteratively calculate channel length necessary to achieve hydraulic residence time of 9 minutes maximum (L = 60Vt, V = flow velocity, t = residence time of 9 minutes, 60 for conversion of seconds to minutes). If the stormwater does not enter at a single location, hydraulic residence time is calculated as the flow-weighted average. 7. If required length is not available on site, adjust slope and width of swale design. 8. Select vegetation appropriate to swale type. Check dams 12-15 inches tall constructed of riprap in slopes greater than 3%. Underdrains of Schedule 40 PVC perforated pipe, 6-inch diameter. Note: underdrain must infiltrate or drain freely to an acceptable discharge point.
Figures 3-3 and 3-4 show typical cross-sections for biofiltration swales in areas with permeable soils and areas with impermeable soils, respectively.
Vegetation Recommendations
The following recommendations for vegetation should be followed in design of biofiltration swales (see Appendix C for recommended plant list: Consider sun/shade conditions for adequate growth; avoid planting shade-tolerant vegetation in any portion without prolonged shading. Grass swale seed mix: Red or tall fescue 60 to 70% Perennial and annual rye grass 10 to 15% Kentucky bluegrass 10 to 15% Meadow barley 10 to 15% Rush 4 spacing on center Bulrush 6 to 12 spacing on center Sedge 6 spacing on center
Wetland plants:
Maintenance
Maintenance requirements for biofiltration swales are as follows: Inspect twice per year for debris and sediment that prevents flow or restricts plant growth Check for eroded areas and reseed or replant as needed Grass swale: Mow grass twice per year and remove grass clippings. Perform monthly inspection and maintenance as outlined in Table 3-2. Do not mow. Perform inspection and maintenance outlined in Table 3-3.
Wet swale:
3-33
6-8
6-8
3-34
3. STORMWATER QUALITY
6-8 PERMEABLE SOIL D1 WRAPPED IN FILTER FABRIC 6 DIAMETER PERFOR ATED PIPE UNDERDRAIN 6
6
2
6-8
3-35
TABLE 3-2. MAINTENANCE CHECKLIST FOR GRASS BIOFILTRATION SWALE Problem Sediment Accumulatio n on Grass Conditions to Check For Sediment depth exceeds 2 inches or inhibits vegetation growth in 10 percent or more of swale. Recommended Maintenance Remove sediment deposits on grass treatment area of the biofiltration swale. When finished, swale should be level from side to side and drain freely toward outlet. There should be no areas of standing water once inflow has ceased. Any of the following may apply: remove sediment or trash blockages, improve grade from head to foot of swale, remove clogged check dams, add underdrains or convert to a wet biofiltration swale. Level the spreader and clean so that flows are spread evenly over entire swale width.
Standing Water
When water stands in the swale between storms and does not drain freely. Flow spreader uneven or clogged so that flows are not uniformly distributed through entire swale width. When small quantities of water continually flow through the swale, even when it has been dry for weeks, and an eroded, muddy channel has formed in the swale bottom. When grass is sparse or bare or eroded patches occur in more than 10 percent of the swale bottom. When the grass becomes excessively tall (greater than 10 inches); when nuisance weeds and other vegetation starts to take over. Grass growth is poor because sunlight does not reach swale. Inlet/outlet areas clogged with sediment and/or debris. Trash and debris accumulated in the biofiltration swale.
Flow Spreader
Add a low-flow pea-gravel drain the length of the swale or by-pass the base flow around the swale.
Determine why grass growth is poor and correct that condition. Re-plant with plugs of grass from the upper slope: plant in the swale bottom at 8-inch intervals. Or reseed into loosened, fertile soil. Mow vegetation or remove nuisance vegetation so that flow is not impeded. Grass should be mowed to a height of 3 to 4 inches. Remove grass clippings.
If possible, trim back over-hanging limbs and remove brushy vegetation on adjacent slopes. Remove material so that there is no clogging or blockage in the inlet and outlet area. Remove leaves, litter, and oily materials, and reseed or resod, and regrade, as needed. Clean curb cuts and level spreaders as needed. For ruts or bare areas less than 12 inches wide, repair the damaged area by filling with crushed gravel. If bare areas are large, generally greater than 12 inches wide, the swale should be regraded and reseeded. For smaller bare areas, overseed when bare spots are evident, or take plugs of grass from the upper slope and plant in the swale bottom at 8-inch intervals.
3-36
3. STORMWATER QUALITY
TABLE 3-3. MAINTENANCE CHECKLIST FOR WET BIOFILTRATION SWALE Problem Sediment Accumulatio n Water Depth Conditions to Check For Sediment depth exceeds 2 inches in 10% of the swale treatment area. Water not retained to a depth of about 4 inches during the wet season. Vegetation becomes sparse and does not provide adequate filtration, OR vegetation is crowded out by very dense clumps of cattail, which do not allow water to flow through the clumps. Inlet/outlet area clogged with sediment and/or debris. Accumulation of trash or debris blocking flow Recommended Maintenance Remove sediment deposits in treatment area.
Build up or repair outlet berm so that water is retained in the wet swale. Determine cause of lack of vigor of vegetation and correct. Replant as needed. For excessive cattail growth, cut cattail shoots back and compost off-site. Note: normally wetland vegetation does not need to be harvested unless die-back is causing oxygen depletion in downstream waters.
Wetland Vegetation
Remove clogging or blockage in the inlet and outlet areas. Remove trash and debris from wet swale.
Check design flows to ensure that swale is large enough to handle flows. Bypass excess flows or enlarge swale. Replant eroded areas with fibrous-rooted plants such as Juncus effusus (soft rush) in wet areas or thimbleberry (Rubus parviflorus) in dryer areas.
3-37
Filter Strip
Description
Filter strips are vegetated sections of land designed to accept runoff as overland sheet flow from upstream development (see Figures 3-5 and 3-6). They may adopt any naturally vegetated form, from turf grass to emergent wetland to small forest. The dense vegetative cover facilitates pollutant removal. Filter strips differ from swales in that swales are concave conveyance systems, while filter strips are located parallel to the contributing area, have fairly level surfaces, and provide treatment of sheet flow. Vegetated filter strips function by slowing runoff velocities, trapping sediment and other pollutants, and providing some infiltration and biologic uptake. Because they do not pond water on the surface for long periods, vegetated filter strips help maintain the temperature of the water and deter the creation of habitat for disease vectors such as mosquitoes.
Application
Filter strips can be used to treat runoff from parking lots and low volume residential to high volume streets and highways. Vegetated filter strips are generally not suitable for steep slopes or large impervious areas that can generate high-velocity runoff.
3-38
3. STORMWATER QUALITY
Figure 3-6. Typical Vegetated Filter Strip (Adapted from City of Portlands Stormwater Management Manual, Revision 4, 2008)
3-39
Design Procedure
The following is the procedure to be followed to design vegetated filter strips (see Washington State Department of Transportations (WSDOT) Highway Runoff Manual for more detailed calculation information): 1. Determine the design flow rate (Q) 2. Using Mannings equation, calculate the flow depth at the design flow rate (y) 3. Calculate design flow velocity: V = Q/Ly (L = filter length) 4. Using a 9-minute (minimum) residence time, calculate the width of the filter strip.
Vegetation Recommendations
The following recommendations for vegetation should be followed in design of vegetated filter strips: Grasses such as red fescue, annual rye grass, Bering hairgrass, and bluejoint reedgrass work well; see Appendix C for recommended species Seed rate: 200 pounds per acre Apply 20-20-10 fertilizer at 600 pounds per acre A combination of shrubs, groundcovers, and trees can also be used (see Appendix C for recommended species). When planting shrubs, trees or groundcovers, use annual and perennial seed to achieve 100-percent cover in the first year. Snow plowing may damage woody species along roads and parking lots. Maintain adequate distance between paved surface and trees and shrubs. In areas where deicing salts may be used, salt tolerant species should be planted.
Maintenance
All facility components and vegetation shall be inspected for proper operation and structural stability. These inspections shall occur, at a minimum, quarterly for the first two years from the date of installation, two times per year thereafter, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations and maintenance activities. Components listed in Table 3-4 shall be inspected and maintained as stated. A maintenance program shall be implemented as follows: Maintenance Schedule: SummerMake any structural repairs. Improve filter medium as needed. Clear drain. Mow. Irrigate as needed. FallReplant exposed soil and replace dead plants. Remove sediment and plant debris. WinterMonitor infiltration/flow-through rates. Clear inlets and outlets/overflows to maintain conveyance. SpringRemove sediment and plant debris. Replant exposed soil and replace dead plants. All seasonsRemove trash and debris and weed as necessary.
3-40
3. STORMWATER QUALITY
TABLE 3-4. MAINTENANCE CHECKLIST FOR VEGETATED FILTER STRIP Conditions to Check For Recommended Maintenance
Structural Components, including inlets and outlets, check dams, and flow spreader, shall slowly and evenly treat and infiltrate stormwater. Clogged inlets or outlets Ineffective flow spreaders Sediment accumulationSediment depth exceeds 2 inches in 10 percent of the treatment area. Remove sediment, debris, and vegetation blockage from catch basins, trench drains, curb inlets, and pipes to maintain at least 50-percent conveyance capacity at all times. Clear accumulated silt and vegetation. Remove sediment deposits in treatment area.
Vegetation shall be maintained to cover a minimum of 90 percent of the facility. Dead or strained vegetation Manually remove sediment accumulation. Replant per planting plan. Irrigate as needed. Mulch annually. DO NOT apply fertilizers, herbicides, or pesticides. Tall grass Weeds Cut back to 4 to 6 inches one or two times each year. Manually remove weeds. Remove plant debris.
Growing/Filter Medium, including soil and gravels, shall sustain healthy plant cover and infiltrate within 48 hours. Erosion and gullies Slope slippage Ponding Fill, lightly compact, and install flow spreader/plant vegetation to disperse flow. Restore or create outfalls, check dams, or splash blocks where necessary. Stabilize slopes. Rake, till, or amend to restore infiltration rate.
Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the City inspector. AccessMaintain ingress/egress to design standards. Infiltration/Flow ControlAll facilities shall drain within 48 hours. Record time, date, weather and site conditions when ponding occurs. Pollution PreventionAll sites shall implement BMPs to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor
3-41
standing water for small wiggling sticks perpendicular to the waters surface. Note holes/burrows in and around facilities.
3-42
3. STORMWATER QUALITY
Infiltration Basin
Description
Infiltration basins are trenches, depressions or planters that are used to temporarily store stormwater runoff, allowing pollutants to filter out as the water infiltrates through a vegetation and soil medium or rock and sand (see Figures 3-7 and 3-8). Infiltration basins are usually flat-bottomed or shallow landscaped depressions. The basin can be designed as a concrete planter to infiltrate roof runoff, a swaleshaped depression to infiltrate parking lot runoff or a shallow earthen rain-garden. Infiltration basins function by receiving stormwater runoff from the impervious and pervious surfaces in a drainage area. An inlet pipe (see Figures 3-9 and 3-10) or sheet flow conveys the stormwater into the basin, where it is temporarily stored until it infiltrates into the ground. Infiltration basins can provide complete on-site infiltration of small storm events.
Application
Infiltration structures are ideal for infiltrating runoff from small drainage areas (<5 acres), but they need to be applied carefully. Basins should be installed where soils are permeable enough to provide adequate infiltration. Infiltration basins should not be placed where runoff with a high sediment loads is anticipated. Sediment will clog the filtration bed and lead to failure of the structure. Consider using infiltration basins for secondary treatment after a filter strip, sediment forebay or swale. Because infiltration basins convey stormwater to groundwater, they are not suitable for primary treatment of runoff from sites with a high pollutant load such as fueling stations. All infiltration facilities should be protected from sediment during construction to preserve their infiltration capacity.
Design
An infiltration basin is a shallow artificial pond designed to infiltrate stormwater though permeable soils into the groundwater aquifer. High groundwater levels, large sediment particles and debris, and lowpermeability soils are factors that can reduce infiltration basin performance. Infiltration basins can be designed to retain water or to infiltrate water rapidly through the system. The design shall carefully consider and prevent flooding on the site. Infiltration basins are designed with an overflow pipe or weir that operates during flood conditions. The outflow can be a pipe or a grate elevated to allow 12 inches of water storage. Depending on soil and infiltration conditions, the basin may need a perforated drain pipe in a gravel filter bed. It is best to pre-treat water with a filter strip, swale or sediment forebay. For better infiltration, extend the gravel filter bed at least 12 inches below the frost line where possible.
Design Requirements
Existing infiltration rates will determine whether the facility can be designed to allow stormwater to infiltrate through it. Existing infiltration rate also determines the type of basin, but additional variables and unique site conditions of the project shall be factored in by the engineer to determine the configuration of the facility. The required setback is 5 feet from property lines and 10 feet from building foundations. Infiltration basins shall meet the following setback requirements from downstream slopes: minimum of 100 feet from slopes of 10 percent; add 5 feet of setback for each additional percent of slope up to 30 percent; infiltration basins shall not be used where slopes exceed 30 percent.
3-43
Figure 3-8. Small Infiltration Basin, Portland, Oregon (Abby Hall, EPA)
Figure 3-9. Inlet to Infiltration Basin, Emeryville, California (Abby Hall, EPA)
3-44
3. STORMWATER QUALITY
The maximum designed ponding time shall be a function of the facility storage depth. Basins should be designed to store the design volume and infiltrate it into the ground within 72 hours. Overflow from the basin should be directed to a swale or other conveyance, sized to prevent erosion. Maximum facility storage depth is 12 inches from the top of the growing medium to the overflow inlet elevation. A minimum of 2 inches of freeboard shall be provided. Maximum side slopes are 3 to 1. Minimum bottom width is 2 feet. Bottom of infiltration basin maximum slope is 6% Drain rock may be required below the growing medium of a basin. For infiltration facilities where drain rock is specified to retain stormwater prior to infiltration, the specification is 1inch -inch washed drain rock. Where drain rock is specified primarily for detention and conveyance, the specification is -inch washed drain rock. For all flow-through facilities, inch wash drain rock shall be used. Drain rock and growing medium must be separated by filter fabric or use a 2- to 3-inch layer of - -inch washed, crushed rock. Piping shall be cast iron, ABS Schedule 40, or PVC Schedule 40. A 3-inch pipe minimum is required. Piping installation must follow the current Uniform Plumbing Code. For streets, 6-inch or 8-inch ASTM 3034 SDR 35 PVC pipe and perforated pipe are required. Basin soil shall be a sandy loam mixed with compost or a sand/soil/compost blend. It shall be roughly one-third compost by volume, free-draining, and support plant growth. Growing medium shall be 18 inches deep. Infiltration basins need not be vegetated, however plants will provide additional biological treatment and will help dispose of water through evapotranspiration. Plantings may include grasses, some wetland plants, shrubs and trees. See Appendix C for recommended species. Wildflowers, native grasses, and ground covers can be selected and designed to eliminate the need for mowing. Fine to medium hemlock bark or well-aged organic yard debris compost is recommended for basins. It should be placed in the facility only in areas above the high-water line. It must be weed free and applied 2 to 3 inches thick to cover all soil between plants.
Facility Design
Maintenance
Maintenance shall be performed as outlined in Table 3-5.
3-45
Recommended Maintenance
Remove sediment buildup when 1 inch collects on soil surface to allow for infiltration, this may require the removal and replacement of the top surface of the topsoil. Water drained or pumped and sediments removed from the infiltration basin. Excavate and replace filter fabric or rock and soil subgrade.
Accumulation of sediment and poor growth of plants due to saturated soil Vegetation in the infiltration basin is sparse or bare. Weeds and other vegetation are taking over. Inlet/outlet areas clogged with sediment and/or debris.
Determine why vegetation growth is poor and correct that condition. Replant or reseed the basin. Remove nuisance vegetation so that flow is not impeded. Remove material so that there is no clogging or blockage in the inlet and outlet area.
3-46
3. STORMWATER QUALITY
Wet Pond
Description
A wet pond is a constructed stormwater pond that retains a permanent pool of water, partially planted with wetland vegetation that stores stormwater runoff and releases the design water quality flow as well as an overflow (see Figure 3-11). Wet ponds function to settle and remove sediment, provide infiltration and enable some uptake of pollutants by vegetation.
Application
Wet ponds are designed to provide water quality treatment. Wet ponds treat water both by gravity settling and by biological uptake of algae and microorganisms and can remove some dissolved pollutants such as phosphorus. Wet ponds are appropriate for subdivision developments, commercial/industrial developments and drainage from large areas. Consider using wet ponds as a secondary treatment method after swales, filter strips or sand filters.
Wet ponds can be integrated as an aesthetic and recreational attraction within a development. Wet ponds can be single purpose facilities, providing only water quality treatment, or they may be combined with a detention pond to also provide flow control. If combined, the wet pond storage volume can often be stacked under that of the detention pond with little further loss of development area. Before final planting, wet ponds can be used as a temporary sediment control facility during construction.
3-47
Design
The primary design factor that determines a wet ponds particulate removal efficiency is the volume of the wet pond in relation to the volume of stormwater runoff. The larger the wet pond volume in relation to the volume of runoff, the greater the potential for pollutant removal. For a basic wet pond, the wet pond volume provided shall be equal to or greater than the total volume of runoff. Design features of the wet pond that contribute to maximizing its pollutant removal efficiency are energy dissipation at the inlet, a large length-to-width ratio, and broad water exchange surface across cells. Maximizing the flow path between inlet and outlet, including the vertical path, enhances treatment by increasing residence time. Use rounded forms for wet ponds, as angular forms create dead spots for water flow. Wet pond performance varies based on design features, maintenance frequency, storm characteristics, and pond algae dynamics. Provide erosion control around all inlets and outlets, including rock, plants or vegetative mats. Figure 3-12 shows a typical wet pond plan.
When the pond surface or the entire pond volume is frozen, runoff residence time in the pond and physical treatment will be significantly reduced. Freezing water in the pond inlet and outlet piping may result in conveyance by overland flow paths.
3-48
3. STORMWATER QUALITY
Design Procedure
Procedures for determining wet pond dimensions: 1. Identify volume of runoff from the contributing catchment area. 2. Determine wet pond dimensions following the design criteria outlined. A simple way to check the volume of each wet pond cell is to use the following equation: V = h(A1 + A2 )/2 Where h is wet pond average depth, A1 is surface area of wet pond and A2 is the bottom area of wet pond. 3. Determine water quality design flow through the proposed outlet and determine primary overflow water surface. 4. Design pond outlet pipe for the proposed water quality flow. Outlet pipe must be sufficient to convey the proposed flow through the pipe in full pond conditions. Account for the critical depth and velocity head in the pipe.
3-49
waived if recommended by a geotechnical engineer for specific site conditions. The geotechnical analysis shall address situations in which one of the two cells is empty while the other remains full of water. The top of the berm may extend to the water quality design water surface or be 1 foot below the water quality design water surface. If at the water quality design water surface, then berm side slopes should be 3H: 1V. Berm side slopes may be steeper (up to 2:1) if the berm is submerged 1 foot. Submerging the berm is intended to enhance safety by discouraging pedestrian access when side slopes are steeper than 3H: 1V. An alternative to the submerged berm design is the use of barrier planting to prevent easy access to the divider berm in an unfenced wet pond. If good vegetation cover is not established on the berm, erosion control measures should be used to prevent erosion of the berm back-slope when the pond is initially filled. Berm may be a retaining wall provided that the design is prepared and stamped by a licensed civil engineer.
Embankments
The Alaska Department of Natural Resources requires safety design and review for all structures that impound water. Embankments that impound water are considered a dam if the impoundment has a storage capacity above natural ground level (including both water and sediment storage volumes) greater than 50 acre-feet (2.17 million cubic feet) and the maximum vertical distance from the natural bed of the watercourse at the upstream or downstream toe of the barrier, whichever yields the greater measurement, to the top of the barrier height is greater than 10 feet. In this case, embankments must comply with requirements of the Department of Natural Resources Dam Safety and Construction Unit.
3-50
3. STORMWATER QUALITY
An emergency spillway shall be provided and designed to handle a full 100-year event peak flow off the catchment basin. The spillway shall maintain at least 6 inches of freeboard between the 100-year water surface elevation and the top of the embankment. Spillway shall be placed with consideration of downstream facilities. The drain invert shall be at least 6 inches below the top elevation of the dividing berm or baffle. Deeper drains are encouraged where feasible, but must be no deeper than 18 inches above the pond bottom to prevent highly sediment-laden water from escaping the pond when drained for maintenance. The drain shall be at least 8 inches (minimum) diameter and shall be controlled by a valve. Use of a shear gate is allowed only at the inlet end of a pipe located within an approved structure. Operational access to the valve shall be provided to the finished ground surface. The valve location shall be accessible and well-marked with 1 foot of paving placed around the box. It must also be protected from damage and unauthorized operation. A valve box is allowed to a maximum depth of 5 feet without an access manhole. If over 5 feet deep, an access manhole or vault is required. All metal parts shall be corrosion-resistant. Galvanized materials should not be used unless unavoidable. CBJ may require a bypass/ shutoff valve to enable the pond to be taken offline for maintenance purposes. A gravity drain for maintenance is recommended if grade allows. It is anticipated that sediment removal will only be needed for the first cell in the majority of cases. The gravity drain is intended to allow water from the first cell to be drained to the second cell when the first cell is pumped dry for cleaning.
3-51
The method of construction of soil/landscape systems can cause natural selection of specific plant species. Consult a soil restoration or wetland soil scientist for site-specific recommendations. The soil formulation will impact the plant species that will flourish or suffer on the site, and the formulation should be such that it encourages desired species and discourages undesired species. For wet pond depths in excess of 6 feet, it is recommended that some form of recirculation be provided in the summer, such as a fountain or aerator, to prevent stagnation and low dissolved oxygen conditions. A flow length-to-width ratio greater than the 3:1 minimum is desirable. If the ratio is 4:1 or greater, then the dividing berm is not required, and the pond may consist of one cell rather than two. A one-cell pond must provide at least 6 inches of sediment storage depth. A tear-drop shape, with the inlet at the narrow end, rather than a rectangular pond is preferred since it minimizes dead zones caused by corners. A small amount of base flow is desirable to maintain circulation and reduce the potential for low oxygen conditions during late summer. Evergreen or columnar deciduous trees along the west and south sides of ponds are recommended to reduce thermal heating, except that no trees or shrubs may be planted on berms meeting the criteria of dams regulated for safety. In addition to providing shade, trees and shrubs discourage waterfowl use and the attendant phosphorus enrichment problems they cause. Trees should be set back so that the branches will not extend over the pond. Evergreen trees or shrubs are preferred to avoid problems associated with leaf drop. Columnar deciduous trees (e.g., hornbeam, Lombardy poplar, etc.) typically have fewer leaves than other deciduous trees. The number of inlets to the facility should be limited; ideally there should be only one inlet. The flow path length should be maximized from inlet to outlet for all inlets to the facility. The access and maintenance road could be extended along the full length of the wet pond and could double as play courts or picnic areas. Placing finely ground bark or other natural material over the road surface would render it more pedestrian friendly. The following design features should be incorporated to enhance aesthetics where possible: Provide pedestrian access to shallow pool areas enhanced with emergent wetland vegetation. This allows the pond to be more accessible without incurring safety risks. Provide side slopes that are sufficiently gentle to avoid the need for fencing (3:1 or flatter). Create flat areas overlooking or adjoining the pond for picnic tables or seating that can be used by residents. Walking or jogging trails around the pond are easily integrated into site design. Include fountains or integrated waterfall features for privately maintained facilities. Provide visual enhancement with clusters of trees and shrubs. On most pond sites, it is important to amend the soil before planting since ponds are typically placed well below the native soil horizon in very poor soils. Make sure dam safety restrictions against planting do not apply. Orient the pond length along the direction of prevailing summer winds (typically west or southwest) to enhance wind mixing.
3-52
3. STORMWATER QUALITY
Maintenance
Maintenance shall be performed as outlined in Table 3-6.
TABLE 3-6. CHECKLIST FOR WET POND MAINTENANCE Problem Sediment Accumulation in the First Wet Pond Cell Eroded Banks Conditions to Check For Sediment depth exceeds 18 inches in the wet pond or inhibits vegetation growth. When the bank slopes are not in compliance with the wet pond geometry. Debris accumulated in the pond after a large storm. When grass is sparse or bare or eroded patches occur in the wet pond bottom. When the grass becomes excessively tall (greater than 10 inches); when nuisance weeds and other vegetation starts to take over. Inlet/outlet areas clogged with sediment and/or debris. Bank stabilization/ energy dissipation features are missing or out of place Recommended Maintenance Sediments should be tested for toxicants if land uses in the catchment include commercial or industrial zones. Water drained or pumped from the pond prior to sediment removal can be discharged to storm drains. Eroded areas of the pond shall be regraded to match original design geometry. All debris and accumulated petroleum products should be removed from the wet pond. Determine why grass growth is poor and correct that condition. Replant with plugs of grass from the upper slope: plant in the wet pond bottom at 8-inch intervals. Or reseed into loosened, fertile soil. Mow vegetation or remove nuisance vegetation so that flow is not impeded. Grass should be mowed to a height of 3 to 4 inches. Remove grass clippings.
Vegetation
Remove material so that there is no clogging or blockage in the inlet and outlet area. Replace all missing and displaced riprap with the same size stones. Depth and width of the riprap shall remain as designed originally.
3-53
Constructed Wetland
Description
Constructed wetlands are shallow ponds with complex topography and emergent vegetation (see Figure 3-13). Wetlands are constructed to replace natural wetlands or mitigate impacts when natural wetlands are filled or impacted by development, and to treat stormwater runoff. Stormwater treatment wetlands are designed to treat stormwater runoff through physical settling and the biological processes associated with emergent aquatic plants. Stormwater treatment wetlands are used to capture pollutants in a managed environment so that they will not reach natural wetlands and other ecologically important habitats. Other functions include flow control and wildlife habitat enhancement.
Figure 3-13. Nancy Street Wetland on Mendenhall Loop Road, Juneau; Constructed from a Gravel Pit
Application
Mitigation wetlands are intended to function as full replacement habitat for fish and wildlife, providing the same functions and harboring the same species diversity and biotic richness as the wetlands they replace. Stormwater treatment wetlands are used to capture and transform pollutants, just as wet ponds are, and over time pollutants will concentrate in the sediment. Stormwater wetlands perform well to remove sediment, metals, and pollutants that bind to humic or organic acids. Phosphorus removal in stormwater wetlands is highly variable. During winter a frozen surface will limit the flow path through the wetland and winter flows will likely receive little physical treatment. Low biological activity during the winter will also result in little treatment of stormwater.
3-54
3. STORMWATER QUALITY
Stormwater wetland design has the potential to be integrated aesthetically into a site because of the abundance of emergent aquatic vegetation. The most critical factor for a successful design is the provision of an adequate supply of water for most of the year. Careful planning is needed to be sure sufficient water will be retained to sustain good wetland plant growth. Since water depths are shallower than in wet ponds, water loss by evaporation is an important concern. Stormwater wetlands are a good water quality facility choice in areas with high winter groundwater levels. They are best used as secondary treatment. Wet ponds can have wetland edges and swales can have depressions that are wetlands. Constructed stormwater wetlands do not replace natural wetlands, and existing wetlands should not be used for stormwater treatment. Before final planting the drainage pathway can be used as a temporary sediment control facility during construction.
Design
When used for stormwater treatment, wetlands employ some of the same design features as wet ponds. However, instead of gravity settling, pollutant removal mediated by aquatic vegetation and the microbiological community associated with that vegetation becomes the dominant treatment process and factors that affect plant vigor and biomass are the primary concern. Construct a sediment forebay at the inlet 4 to 8 feet deep, not including 1 food of sediment storage. The sediment forebay should be 10 percent of the total water quality volume. The forebay allows for settling of sediment, organic debris and trash. The forebay inlet shall be protected by rock to prevent erosion. To increase plant and wildlife diversity, the soil surface shall be variable and not smooth. Include deep marsh areas at 6 to 18 inches deep, shallow marsh areas at 0 to 6 inches deep, wet meadow at 0 to 6 inches above the water surface, and transition shrub zones at 6 to 12 inches. Benches and islands can also be used to increase planting diversity. The maximum side slope is 10H: 1V. Flow length to width ratio shall be 3:1 minimum to maximize water and plant contact. Use berms and islands to meander water. The residence time for water shall be 24 to 36 hours. Allow for control of outlet through use of a weir or reverse flow pipe. Water draw-down will be possible for construction, planting needs and maintenance.
3-55
Figure 3-14. Constructed Wetland Plan (Source: King County Surface Water Design Manual)
The top of berm shall be either at the water quality design water surface or submerged 1 foot below the water quality design water surface, as with wet ponds. Correspondingly, the side slopes of the berm must meet the following criteria: If the top of berm is at the water quality design water surface, the berm side slopes shall be no steeper than 3H: 1V. If the top of berm is submerged 1 foot, the upstream side slope may be up to 2H: 1V. If the berm is at the water surface, then its slope should be not greater than 3H: 1V. A steeper slope (2:1 rather than 3:1) is allowable if the berm is submerged in 1 foot of water. Other configurations within the wetland geometry constraints may be approved by CBJ.
3-56
3. STORMWATER QUALITY
Lining Requirements
In infiltrative soils, both cells of the stormwater wetland shall be lined. If soil permeability allows sufficient water retention, lining may be waived. Lining is unnecessary if the second cell will retain water for at least 10 months of the year and the first cell will retain at least 3 feet of water year-round. A complete precipitation record shall be used when establishing these conditions. Evapotranspiration losses shall be taken into account as well as infiltration losses. Many wetland plants can adapt to periods of summer drought, so a limited drought period is allowed in the second cell. This may allow a treatment liner rather than a low permeability liner to be used for the second cell. The first cell must retain water year-round in order for the pre-settling function to be effective. If a low permeability liner is used, a minimum of 18 inches of native soil amended with good topsoil or compost must be placed over the liner. For geomembrane liners, a soil depth of 3 feet is recommended to prevent damage to the liner during planting.
Planting Requirements
The wetland cell shall be planted with emergent wetland plants following the recommended plant list in Appendix C or the recommendations of a wetland specialist. Cattails (Typha latifolia) are not recommended. They tend to escape to natural wetlands and crowd out other species. In addition, the shoots die back each fall and will result in oxygen depletion in the wet pool unless they are removed. Vegetation must occasionally be harvested and sediment dredged in stormwater treatment wetlands, further interfering with use for wildlife habitat. Use of native plants is suggested due to the fact that invasive species may create problems and negate the function of the wetlands. Revegetation methods include transplanting plugs from nearby wetlands, purchasing native plugs from local nurseries and collecting or purchasing seed. Plugs should be the primary method in emergent areas, because establishing plants with seed is difficult in inundated areas. Vegetate 30 to 50 percent of the marsh area in the first year. In year two, maintain at least 50-percent coverage, revegetating as necessary. Recommended plants include willow and dogwood in shrub transition, sedges and grasses in wetland meadow, and sedges and rush in shallow and deep marsh areas.
Maintenance
Maintenance shall be performed as outlined in Table 3-7. Wetlands should be inspected at least twice per year during the first three years during both growing and non-growing seasons to observe plant species presence, abundance and condition; bottom contours and water depths relative to plans; and sediment, outlet and buffer conditions. Maintenance should be scheduled around sensitive wildlife and vegetation seasons. Plants may require watering, physical support, mulching, weed removal, or replanting during the first three years.
3-57
TABLE 3-7. CHECKLIST FOR CONSTRUCTED WETLANDS MAINTENANCE Problem Sediment Accumulation in the First Cell Trash and Debris Accumulation Poor Vegetation Coverage Nuisance Plant Species Inlet/Outlet Conditions to Check For Sediment depth exceeds 18 inches in the first cell or inhibits vegetation growth. Debris accumulated in the wetlands. When grass is sparse or bare or eroded patches occur in the wetlands. When unwanted plant species are overgrown in the wetlands. Inlet/outlet areas clogged with sediment and/or debris. Bank stabilization/ energy dissipation features are missing or out of place. Recommended Maintenance Sediments should be tested for toxicants if land uses in the catchment include commercial or industrial zones. Water drained or pumped from the pond prior to sediment removal can be discharged to storm drains. All large visible debris accumulated in the wetlands should be removed. Determine why grass growth is poor and correct that condition. Replant with plugs of grass from the upper slope. Or reseed into loosened, fertile soil. Nuisance plant species should be removed and desirable species should be replanted. Remove material so that there is no clogging or blockage in the inlet and outlet area. Replace all missing and displaced riprap with the same size stones. Depth and width of the riprap shall remain as designed originally.
3-58
3. STORMWATER QUALITY
Application
Catch basin inserts are not recommended as a substitute for other BMPs, but can be used for to following purposes: As temporary sediment control devices and pretreatment at construction sites For oil control at small sites When an existing catch basin lacks a sump or has an undersized sump In specialized small drainage applications for specific target pollutants where clogging of the medium will not be a problem. The media system shall function so that it does not become plugged or blinded shortly after deployment and cause the stormwater to bypass the media before full use of the media is realized. The insert must have the ability to pass high flows without causing excessive ponding; no ponding to occur for the 25-year storm event. Catch basin inserts shall be accessible as needed for maintenance and should not be limited by continuous vehicle parking. Catch basin inserts shall be designed and installed according to the manufacturers recommendations. For catch basin inserts designed for oil control, refer to the design requirements in the King County 2005 Surface Water Design Manual Considerations shall be made for freezing conditions.
Design Criteria
3-59
Figure 3-15. Catch Basin Insert (Adapted from King County 2005 Surface Water Design Manual)
Maintenance
Catch basin inserts require significant inspection and maintenance to ensure that they are functioning properly. Inspections shall occur, at a minimum, monthly during the wet season and bi-monthly during the dry season, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations and maintenance activities. Components listed in Table 3-8 shall be inspected and maintained as stated. A maintenance program shall be implemented as follows: Maintenance Schedule: Dry Season (May 1 to September 30): Bi-monthly inspections. Wet Season (October 1 to April 30): Monthly inspection to ensure proper operation, and during and immediately after a large storm event of 1 inch per 24 hours.
3-60
3. STORMWATER QUALITY
TABLE 3-8. MAINTENANCE CHECKLIST FOR CATCH BASIN INSERTS Conditions to Check For Clogged inlets or outlets Pollutant accumulation Structural integrity, loose fittings, broken or missing components Recommended Maintenance Remove sediment or debris blockage. Remove according to the manufacturers instructions. Immediately repair or replace any major damage to prevent catastrophic failure. Minor damage, such as dents or rust spots, may not need immediate replacement, but should be monitored.
Adapted from City of Portland Stormwater Management Manual, Revision 4 (2008) and the King County Surface Water Design Manual (2005)
Manufacturers instruction for maintenance activities and frequency shall be followed. The Manufacturers operation and maintenance manual shall be kept with the maintenance log. Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the CBJ inspector. AccessMaintain ingress/egress to design standards. Pollution PreventionAll sites shall implement BMPs to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the waters surface. Note holes/burrows in and around facilities.
3-61
Filtration
Description
Media filters are structural facilities used to filter stormwater, allowing pollutants to settle and filter out as the water percolates through the media. Two types of media filters are commonly used: sand filters and StormFilters. Sand filters can be installed at, above or below ground; StormFilters are installed below ground.
Sand Filter
Sand filters are designed to collect and treat the design runoff volume to remove suspended solids, phosphorous, and insoluble organics (including oils) from stormwater. A typical sand filtration system consists of a pretreatment system, flow spreaders, sand bed and underdrain piping. The sand filter bed includes a geotextile fabric between the sand bed and the bottom underdrain system. Although there are several variations of a sand filter, only sand filter vaults installed below the frost line are appropriate in Juneau. During winter months, surface sand filters would likely be frozen and would not operate as designed. Surface sand filters are appropriate for temporary sediment control.
StormFilters
StormFilters (Figure 3-16) are a passive media filtration system, patented by Contech Construction Products Inc. StormFilters are designed to treat a variety of pollutants, such as sediments, oil and grease, metals, organics, and nutrients. These systems come in variable configurations for different site conditions.
Figure 3-16. StormFilter cartridge and vault. (Source: Contech Construction Products Inc.)
Application
Media filtration can be used in most residential, commercial, and industrial developments where debris, heavy sediment loads, and oils and greases will not clog or prematurely overload the media, or where adequate pretreatment is provided for these pollutants. Specific applications include residential subdivisions, parking lots for commercial and industrial establishments, gas stations, high-use sites, highdensity multi family housing, roadways, and bridge decks.
3-62
3. STORMWATER QUALITY
Pretreatment is necessary to reduce velocities to the media filter and remove debris, floatables and large particulate matter. In high water table areas, adequate drainage of the sand filter may require additional engineering analysis and design considerations. The following site characteristics should be considered in siting a media filtration system: Space availability, including space for a presettling basin Sufficient hydraulic head Sand filters require at least 4 feet from inlet to outlet StormFilters require at least 1.8 to 3.0 feet from inlet to outlet depending on the configuration
Adequate operation and maintenance capability, including accessibility Sufficient pretreatment of oil, debris and solids in the tributary runoff Filtration is not suitable in sites with high groundwater where infiltration of groundwater into the vault and underdrain will interfere with the hydraulic operation of the filter.
Runoff to be treated by the sand filter must be pretreated (e.g., presettling basin, etc. depending on pollutants) to remove debris, other solids and oil from high use sites. Design the presettling cell for sediment collection and removal. A V-shaped bottom, removable bottom panels, or equivalent sludge handling system should be used. The presettling cell must provide 1 foot of sediment storage. The pre-settling chamber must be sealed to trap oil and trash. This chamber is usually connected to the sand filtration chamber through an invert elbow to protect the filter surface from oil and trash. If a retaining baffle is necessary for oil/floatables in the presettling cell, it must extend at least 1 foot above to 1 foot below the design flow water level. Provision for the passage of flows in the event of plugging must be provided. Access opening and ladder must be provided on both sides of the baffle. Inlet bypass and flow spreading structures (e.g., flow spreaders, weirs or multiple orifice openings) should be designed to capture the applicable design flow rate, minimize turbulence and spread the flow uniformly across the surface of the sand filter. Energy dissipation devices should be installed to prevent gouging of the sand medium and to promote uniform flow. Include emergency spillway or overflow structures.
3-63
Sand specification: The sand in a filter must consist of a medium sand meeting the size gradation (by weight) given in Table 3-9. The contractor must obtain a grain size analysis from the supplier to certify that the No. 100 and No. 200 sieve requirements are met.
TABLE 3-9. SAND MEDIA SPECIFICATION Sieve Size 4 8 16 30 50 100 200 Percent Passing 95-100 70-100 40-90 25-75 2-25 <4 <2
Optimize sand inlet flow distribution with minimal sand bed disturbance. A maximum 8-inch distance between the top of the spreader and the top of the sand bed is suggested. Flows may enter the sand bed by spilling over the top of the wall into a flow spreader pad or a pipe and manifold system may be used. A pipe and manifold system must retain the required dead storage volume in the first cell, minimize turbulence, and be readily maintainable. If an inlet pipe and manifold system is used, the minimum pipe size should be 8 inches. Multiple inlets are recommended to minimize turbulence and reduce local flow velocities. Erosion protection must be provided along the first 1 foot of the sand bed adjacent to the spreader. Geotextile fabric secured on the surface of the sand bed, or equivalent method, may be used. The filter bed should consist of a sand top layer, and a geotextile fabric second layer with an underdrain system. The following are design criteria for the underdrain piping: (types of underdrains include a central collector pipe with lateral feeder pipes, a geotextile drain strip in an 8-inch gravel backfill or drain rock bed, or longitudinal pipes in an 8-inch gravel backfill or drain rock with a collector pipe at the outlet end.) Upstream of detention, underdrain piping should be sized to handle double the two-year return frequency flow. Downstream of detention, underdrain piping should be sized for the two-year return frequency flow. In both instances, there should be at least 1 foot of hydraulic head above the invert of the upstream end of the collector pipe. Underdrain pipes should have a minimum internal diameter of 6 inches and two rows of -inch holes spaced 6 inches apart longitudinally (maximum), with rows 120 degrees apart (laid with holes downward). Maximum perpendicular distance between two feeder pipes must be 15 feet. All piping is to be Schedule 40 PVC or greater wall thickness. Main collector underdrain pipe should be at a slope of 0.5 percent minimum. A geotextile fabric must be used between the sand layer and drain rock or gravel and placed so that 1 inch of drain rock/gravel is above the fabric. Drain rock should be 0.75- to 1.5-inch rock or gravel backfill, washed free of clay and organic material.
3-64
3. STORMWATER QUALITY
Cleanout wyes with caps or junction boxes must be provided at both ends of the collector pipes. Cleanouts must extend to the surface of the filter. A valve box must be provided for access to the cleanouts. Access for cleaning all underdrain piping should be provided. This may consist of installing cleanout ports, which tee into the underdrain system and surface above the top of the sand bed. To facilitate maintenance of the sand filter, an inlet shutoff/bypass valve is recommended.
To prevent anoxic conditions, a minimum of 24 square feet of ventilation grate should be provided for each 250 square feet of sand bed surface area. For sufficient distribution of airflow across the sand bed, grates may be located in one area if the sand filter is small, but placement at each end is preferred. Small grates may also be dispersed over the entire sand bed area. Provide adequate access to vaults. Removable panels must be provided over the entire sand bed. Provide a sand filter inlet shutoff/bypass valve for maintenance A geotextile fabric over the entire sand bed may be installed that is flexible, highly permeable, three-dimensional matrix, and adequately secured. This is useful in trapping trash and litter.
Filter products are customized using different filter media to target site-specific pollutants. The manufacturer should be consulted to determine the best media combination for a specific site. The following information from the manufacturer provides a brief description of the available media: Perlite is naturally occurring puffed volcanic ash. Effective for removing suspended solids, oil and grease. CSF Leaf Media and MetalRx are created from deciduous leaves processed into granular, organic media. CSF is most effective for buffering acid rain and removing soluble metals, suspended solids, oil and grease. MetalRx, a finer gradation, is used for higher levels of metal removal. Zeolite is a naturally occurring mineral used to remove soluble metals, ammonium and some organics.
3-65
Granular activated carbon (GAC) has a micro-porous structure with an extensive surface area to provide high levels of adsorption. It is primarily used to remove oil and grease and organics such as polycyclic aromatic hydrocarbons and phthalates.
Maintenance
All components shall be inspected for proper operation and structural stability, at a minimum quarterly for the first two years from the date of installation, two times per year thereafter, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations, and maintenance activities. Components listed in Table 3-10 shall be inspected and maintained as stated for sand filters.
TABLE 3-10. MAINTENANCE CHECKLIST FOR SAND FILTERS Conditions to Check For Clogged inlets or outlets Recommended Maintenance Remove sediment, debris and vegetation blockage from catch basins, trench drains, curb inlets, and pipes to maintain at least 50-percent conveyance capacity at all times. Repair/seal cracks, replace when repair is insufficient. Clear accumulated silt. Rake and remove oil and sediment.
Structural Components, including inlets and outlets, and flow spreader, shall freely convey stormwater.
Cracked drain pipes, liners, wall or traps Ineffective flow spreaders Sediment accumulationSediment depth exceeds 1/2 inch.
Filter Medium, including sand and gravels or similar material, shall infiltrate within 24 hours. Erosion Ponding Filter Performance Frequent overflow into the spillway or overflow structure or slow drawdown are indicators of plugging problems. A sand filter should empty in 24 hours following a storm event, depending on pond depth. If the hydraulic conductivity drops to 1 inch per hour, corrective action is needed Rapid drawdown in the sand bed (greater than 12 inches per hour) indicates shortcircuiting of the filter Rake and remove oil and sediment. Aerate the filter surface. Till the filter surface (late-summer roto-tilling is suggested). Replace the top 4 inches of sand. Inspect geotextiles for clogging. Inspect the cleanouts on the underdrain pipes and along the base of the embankment for leakage. Check for accumulation of debris on or in the flow spreader and refill rills and gullies with sand. Rake, till or amend to restore infiltration rate.
Adapted from City of Portland Stormwater Management Manual, Revision 4 (2008) and Stormwater Management Manual for Western Washington (2005)
3-66
3. STORMWATER QUALITY
StormFilters shall be maintained in accordance with the manufacturers requirements. A maintenance program shall be implemented as follows: Maintenance Schedule: SummerMake any structural repairs. FallRake to remove oil and sediment. WinterMonitor flow-through rates. Clear inlets and outlets/overflows to maintain conveyance. SpringRake to remove oil and sediment. All seasonsRemove trash and debris and weed as necessary.
Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the CBJ inspector. AccessMaintain ingress/egress to design standards. Infiltration/Flow ControlAll facilities shall drain within 48 hours. Record time, date, weather and site conditions when ponding occurs. Pollution PreventionAll sites shall implement BMPs to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the water's surface. Note holes/burrows in and around facilities.
3-67
Hydrodynamic Separator
Description
Hydrodynamic separators are water quality treatment devices designed to clean stormwater by improving fluid dynamics to aid in settling and separation of large particles. In addition, hydrodynamic separators can be designed to trap and retain oils and floatables. Hydrodynamic separators are typically installed online and may be cost-effective because no separate flow control is necessary. Hydrodynamic separators are typically proprietary devices marketed under names such as Stormceptor (see Figures 3-17 and 3-18), Vortechs or Downstream Defender.
Application
Hydrodynamic separators are most effective where the materials to be removed from runoff are heavy particulateswhich can be settledor floatables which can be captured, rather than solids with poor settleability or dissolved pollutants.
Design
Hydrodynamic separators are typically designed as a proprietary plastic or metal insert into a standard concrete 48-inch-diameter or larger catch basin. Stormwater tangentially enters the basin below the effluent line, imparting a circular flow motion. Due to centrifugal forces, suspended particles move to the center of the device and settle to the bottom. In combined sewer overflow situations, reports indicate that the practical lower limit of vortex separation is a particle with a settling velocity of 12 to 16.5 feet per hour. As such, the focus for vortex separation in combined sewers has been with settleable solids generally 200 microns and larger, given the presence of the lighter organic solids. For inorganic sediment, the above settling velocity range represents a particle diameter of 50 to 100 microns. Head loss is a function of the size of the target particle. At 200 microns, it is normally minor but increases significantly if the goal is to remove smaller particles. Flows higher than the design rate pass over the insert and are less likely to entrain previously separated sediment, oil and floatables. Water flows initially around the perimeter between the inner and outer chambers, and then into the inner chamber, giving rise to a sudden change in velocity that enhances removal efficiency. The opposite extreme is to introduce the water tangentially into a round manhole with no internal parts of any kind except for an outlet hood. Separator sizing is based on the peak flow rate to be treated. According to manufacturers specifications, if an in-line facility is used, the design peak flow is four times the peak of the design treatment event. If an off-line facility is used, the design peak flow is equal to the peak of the design treatment event. Head loss differs with the product and the model but is generally on the order of 1 foot or less in most cases. Some separators, such as the Stormceptor, can be sized using a proprietary continuous model using local rain data. Care must taken when using this approach as the local data for Juneau is likely be from the airport gage, and sizing may not be appropriate in areas with higher rainfall such as near downtown. General relationships have been developed between performance and the geometry of a vortex separator. The primary determinants of performance of vortex separators are the diameters of the inlet pipe and chamber, with all other geometry proportional to these two. Performance is related to the ratios of chamber to inlet diameters (D2/D1). As D2/D1 approaches 1 the efficiency decreases. Performance is related to the ratios of height between the inlet and outlet and the inlet diameter (H1/D1). As the H1/D1 ratio decreases, the efficiency decreases. These relationships may allow qualitative comparisons of the alternative designs of manufacturers.
3-68
3. STORMWATER QUALITY
Advantages of hydrodynamic separators include performance at the desired level in a compact space and cost-effective pre-treatment. Limitations of hydrodynamic separators include standing water that remains between storms that may be a concern for mosquito control. Application of these separators is limited by the capacity of the largest model size and potential backwater caused by head loss through the structure. Hydrodynamic separators do not remove dissolved pollutants. Non-steady flows of stormwater also decrease the efficiency of vortex separators from what may be estimated or determined from testing under constant flow.
Maintenance
As some systems have standing water that remains between storms, there is concern about mosquito breeding. A loss of dissolved pollutants may occur as accumulated organic matter in the units. Removal of accumulated material shall be performed with a vacuum truck. It may be necessary to remove and dispose of the floatables separately due to the presence of petroleum product.
3-69
Oil-Water Separator
Description
Oil-water separators rely on passive mechanisms that take advantage of oil being lighter than water. All units use the principles of separation and coalescence of oil/grease from water. The result is distinct layers that can be discharged to separate disposal points. The two types of oil-water separators typically used for stormwater treatment are coalescing plate separators (CPS) and baffle type or American Petroleum Institute (API) type separators.
API Units
API units are divided into multiple compartments separated by baffles extending from the top of the vault. The baffle walls block oil in the oil-water separation chamber. Baffles can be installed at the bottom of the vault to trap solids and sludge that accumulate over time. Figure 3-19 shows a typical API unit.
Figure 3-19. Baffle Oil-Water Separator Separators (King County 2005 Surface Water Design Manual)
3-70
3. STORMWATER QUALITY
CPS Units
CPS units are baffled vaults containing several equally spaced inclined corrugated plates stacked and bundled together. Oil droplets form a film on the plates; as the film builds up the oil migrates upwards. As the oil reaches the end of the plate large oil droplets are released which float to the surface of the water where they remain until the unit is cleaned. The plate pack increases the treatment effectiveness significantly, allowing CPS units to achieve specified treatment levels with a smaller vault size than a simple baffle separator. Figure 3-20 shows a typical CPS unit.
Figure 3-20. Coalescing Plate Oil-Water Separators (King County 2005 Surface Water Design Manual)
3-71
Application
Oil-water separators are designed to remove free oil and are not generally effective in separating oil that has become either chemically or mechanically emulsified and dissolved in water. Detergents should not be used to clean parking areas and other surfaces that flow to the stormwater system. Units should not be installed downstream of facilities and conveyance structures that cause turbulence. Oil-water separators work best to treat runoff from areas that are almost entirely impervious and that generate a high load of hydrocarbons. API units should be used for: Fueling stations Wash rack/pads
CPS units should be used for: Vehicle/heavy equipment repair/sales and fueling yards Impound yards Where high concentrations of oil or grease are expected to discharge to the storm system.
3-72
3. STORMWATER QUALITY
Baffle height to water depth ratios should be 0.85 for top baffles and 0.15 for bottom baffles. Separator and pipe system should be installed below the frost line.
Design Procedure
The following is the procedure to be followed to design baffle oil-water separators (see the King County 2005 Surface Water Design Manual for more detailed calculation information): 1. Determine the design flow rate (Q). 2. Calculate the minimum vertical cross sectional area. 3. Calculate the width and depth of the vault. 4. Calculate the length of the vault. 5. Check the separator length-to-width ratio. 6. Compute and check that the minimum horizontal surface area criterion is satisfied. 7. Compute and check the horizontal surface area of the vault forebay. 8. Design the flow splitter and high-flow bypass. The following is the procedure to be followed to design coalescing plate separators (see the King County 2005 Surface Water Design Manual for more detailed calculation information): 1. Determine the design flow rate (Q). 2. Calculate the plate minimum effective separation area. 3. Calculate the collective projected surface area. 4. Check with specific separator manufacturers.
Submittal Requirements
Plans for oil-water separators must be submitted to CBJ for approval. The submittal shall include the following information: The pollutant loading and spill potential of the area drained The type and size of the receiving facility The outlet location and type The schedule of maintenance Other BMPs the facility has implemented. Specify appropriate performance tests by a professional engineer after installation and shakedown and/or certification that the separator is functioning in accordance with design objectives. Expeditious corrective actions must be taken if it is determined that the separator is not achieving acceptable performance levels.
The following additional information may be required, depending on site conditions: Facility dimensions and setbacks from property lines and structures Profile view of facility, including typical cross-section details with dimensions; these details shall match manufacturers specifications and details
3-73
All piping associated with the facility, including pipe materials, sizes, slopes, and invert elevations at every bend or connection.
Maintenance
Oil-water separators shall be inspected for proper operation and structural stability. These inspections shall occur, at a minimum, quarterly for the first two years from the date of installation, two times per year thereafter, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations and maintenance activities. Components listed in Table 3-11 shall be inspected and maintained as stated.
TABLE 3-11. MAINTENANCE CHECKLIST FOR OIL-WATER SEPARATORS Conditions to Check For Clogged inlets or outlets Pollutant accumulation Recommended Maintenance Remove sediment or debris blockage.
Clean oil-water separators regularly to keep accumulated oil from escaping during storms. They must be cleaned by October 15 to remove material that has accumulated during the dry season, after all spills, and after a significant storm. Replace wash water in the separator with clean water before returning it to service. Remove accumulated oil when the thickness reaches 1 inch. Coalescing plates may be cleaned in-situ or after removal from the separator. A vacuum truck may be used for oil, sludge and washwater removal.
Remove sediment at a minimum when the amount of sediment is greater than 6 inches. Immediately repair or replace any major damage to prevent catastrophic failure. Minor damage, such as dents or rust spots, may not need immediate replacement, but should be monitored.
Adapted from City of Portland Stormwater Management Manual, Revision 4 (2008) and the King County Surface Water Design Manual (2005)
A maintenance program shall be implemented as follows: Maintenance Schedule: Dry Season (May 1 to September 30): Make any structural repairs. Wet Season (October 1 to April 30): Monthly inspection to ensure proper operation, and during and immediately after a large storm event of 1 inch per 24 hours.
Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the CBJ inspector. AccessMaintain ingress/egress to design standards. Confined Space EntryMaintenance personnel entering the vault should follow state regulations pertaining to confined space entry, if applicable.
3-74
3. STORMWATER QUALITY
Pollution PreventionAll sites shall implement best management practices to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the waters surface. Note holes/burrows in and around facilities.
3-75
Application
Spill control devices are required upstream of water quality facilities for piped systems that receive runoff from pollutant generating surfaces such as roads, parking lots or areas where a hazardous spill could contaminate receiving waters.
Design
The tee section must extend 18 inches below the outlet elevation, and 60 cubic feet of dead storage volume must be provided below the outlet elevation for storage of oil, grease, and solids. The tee section is used only to temporarily capture and store contents from a spill. Any pumping devices shall be installed downstream of the spill control manhole to prevent oil emulsification. Metal parts shall be corrosion-resistant. Zinc and galvanized coatings shall be avoided to prevent aquatic toxicity effects.
Submittal Requirements
Plans for spill control devices must be submitted to CBJ for approval. The submittal shall include the following information: The pollutant loading and spill potential of the area drained The type and size of the receiving facility The outlet location and type The schedule of maintenance Other BMPs the facility has implemented.
The following additional information may be required, depending on site conditions. Facility dimensions and setbacks from property lines and structures Profile view of facility, including typical cross-section details with dimensions; these details shall match manufacturers specifications and details All piping associated with the facility, including pipe materials, sizes, slopes, and invert elevations at every bend or connection.
3-76
3. STORMWATER QUALITY
Figure 3-21. Spill Control Tee Section in a Manhole (City of Portland Stormwater Management Manual, Revision 4 (2008))
3-77
Maintenance
Spill control devices shall be inspected for proper operation and structural stability. These inspections shall occur, at a minimum, quarterly for the first two years from the date of installation, two times per year thereafter, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations and maintenance activities. Components listed in Table 3-12 shall be inspected and maintained as stated.
TABLE 3-12. MAINTENANCE CHECKLIST FOR SPILL CONTROL DEVICES Conditions to Check For Clogged inlets or outlets Pollutant accumulation Sediment accumulation Structural integrity, loose fittings, broken or missing components Recommended Maintenance Remove sediment or debris blockage. Remove accumulated oil when the thickness reaches 1 inch. Remove sediment at a minimum when the amount of sediment is greater than 6 inches. Immediately repair or replace any major damage to prevent catastrophic failure. Minor damage, such as dents or rust spots, may not need immediate replacement, but should be monitored.
Adapted from City of Portland Stormwater Management Manual, Revision 4 (2008) and the Stormwater Management Manual for Western Washington (2005)
A maintenance program shall be implemented as follows: Maintenance Schedule: Dry Season (May 1 to September 30): Make any structural repairs. Wet Season (October 1 to April 30): Monthly inspection to ensure proper operation, and during and immediately after a large storm event of 1 inch per 24 hours.
Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the CBJ inspector. AccessMaintain ingress/egress to design standards. Pollution PreventionAll sites shall implement best management practices to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the waters surface. Note holes/burrows in and around facilities.
3-78
3. STORMWATER QUALITY
Flow Splitter
Description
Flow splitters are used to bypass stormwater flows in excess of the water quality storm for off-line stormwater facilities that have been designed to handle only the water quality event. Flow rates in excess of the treatment facility design rates may cause flushing of trapped pollutants or erosion. Flow splitters are typically manholes or vaults with a weir wall or standpipe to control the flow split.
Application
Where structures are designed to operate off-line, a flow splitter structure will be needed to divert treatment water to the structure.
Design
A flow splitter shall be designed to direct the required water quality flow rate (see Appendix B) to the water quality facility, with capacity to bypass additional flow up to the design flow used to size the upstream pipe system. The splitter may be installed in a Type 2 manhole or vault. Either design shown in Figure 3-22 (weir) or Figure 3-23 (standpipe) or an equivalent design may be used. The top of the weir or standpipe shall be located at the water surface for the design flow; flow exceeding the design flow enters the bypass line. The maximum head shall be minimized for flow in excess of the water quality design flow. Specifically, flow to the water quality facility at the 100-year water surface must not increase the design water quality flow by more than 10 percent. For ponding facilities, backwater effects must be included in designing the height of the weir or standpipe in the manhole. Ladder or step access and handhold access shall be provided. If the weir wall is higher than 36 inches, two ladders, one on either side of the wall, must be used. Special applications, such as roads, may require the use of a modified flow splitter. The weir wall may be fitted with a notch and adjustable weir plate to proportion runoff volumes other than high flows. As an alternative to using a solid top plate in Figure 3-23, a full tee section may be used with the top of the tee at the 100-year water surface. This alternative would route emergency overflows (if the overflow pipe were plugged) through the water quality facility rather than allowing back up from the manhole. The minimum clearance between the top of the weir wall and the bottom of the manhole cover must be 4 feet; otherwise, dual access points should be provided. The weir wall must be made of reinforced concrete or another suitable material resistant to corrosion, and have a minimum 4-inch thickness. All metal parts must be corrosion resistant. Preferred materials include aluminum, stainless steel and plastic. Zinc and galvanized materials are discouraged because of aquatic toxicity. Painted metal parts should not be used because of poor longevity.
3-79
Figure 3-22. Flow Splitter with Weir (Adapted from King County 2005 Surface Water Design Manual)
3-80
3. STORMWATER QUALITY
Figure 3-23. Flow Splitter with Standpipe (Adapted from King County 2005 Surface Water Design Manual)
Maintenance
Flow splitters shall be inspected for proper operation and structural stability. These inspections shall occur, at a minimum, quarterly for the first two years from the date of installation, two times per year thereafter, and within 48 hours after each major storm event. The facility owner must keep a log, recording all inspection dates, observations, and maintenance activities. Components listed in Table 3-13 shall be inspected and maintained as stated.
3-81
TABLE 3-13. MAINTENANCE CHECKLIST FOR FLOW SPLITTERS Conditions to Check For Clogged inlets or outlets Ineffective flow splitting Sediment accumulation Structural integrity, loose fittings, broken or missing components Recommended Maintenance Remove sediment or debris blockage. Clear any sediment or debris blockage. Remove sediment at a minimum when the amount of sediment is greater than 1/3 the distance between the bottom of the structure and the invert of the outlet pipe. Immediately repair or replace any major damage to prevent catastrophic failure. Minor damage, such as dents or rust spots, may not need immediate replacement, but should be monitored.
Structural Components, including inlets and outlets and weirs, shall split flow as designed.
A maintenance program shall be implemented as follows: Follow maintenance schedule for associated water quality facility. Maintenance RecordsRecord date, description, and contractor (if applicable) for all structural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make available upon request of the CBJ inspector. AccessMaintain ingress/egress to design standards. Pollution PreventionAll sites shall implement best management practices to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact ADEC Division of Spill Prevention and Response (907-465-5340) for immediate assistance responding to spills. Record time, date, weather and site conditions if site activities contaminate stormwater. Vectors (mosquitoes and rodents)Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the waters surface. Note holes/burrows in and around facilities.
3-82
3. STORMWATER QUALITY
3-83
Avoid sites that would negatively impact wetlands. Meltwater from snow disposal sites should not be discharged to wetlands such that the discharge significantly reduces overall functionality of either the entire contiguous wetland feature or the impacted fraction alone. The intent is to ensure that meltwater quality and discharge volume are managed to support an acceptable long-term threshold functionality of the receiving wetland, while allowing some adjustment in species composition in a small fraction of the wetland. Select sites that offer optimum opportunity for slope and aspect orientation. Sites should be selected that are generally suitable for constructing storage pads that are sloped down from south to north. The intent is to provide optimum opportunity for conformance with site design and operation criteria. Note that the aspect of the site need not be northerly, but the site should be amenable to constructing a pad sloping generally from south to north.
Design Information
The following information is required for snow disposal site design: Soil InvestigationA soil investigation is performed to provide knowledge of the soil and potential problems with geotechnical concerns such as freeze/thaw effects and other constraints to site construction. A detailed soils report is required if the site is suspected of marginal conditions for site stability due to high groundwater, high potential for saturation or erosion concerns. Surveying and MappingA map shall be created to document watercourses, stormwater features and other criteria that may be affected by the site. Mapping should include the following features: Site topography with 2-foot contour intervals Existing roads, culverts, ditches, storm drains and other drainage features Location and depth of domestic wells and on-site sewage disposal systems within 500 feet of site boundaries Surface water features within 500 feet of the site, including wetlands, creeks, and lakes
Groundwater InvestigationA site-specific groundwater investigation is conducted to protect potable aquifer supplies and receiving waters. Site-specific groundwater level (seasonal high and low), gradient, direction and the uses of the local aquifer should be compiled or determined.
3-84
3. STORMWATER QUALITY
Figure 3-24. Multiple V-Swale Snow Site Design Concept (Source: Municipality of Anchorage)
The intent of V-swales is to maintain movement of meltwater inside the snow pack away from fine sediments generated on top of and adjacent to the pack. This minimizes contact of flowing water with easily eroded sediments and reduces turbidity released from the site. Properly operated and constructed V-swale snow disposal pads are anticipated to limit turbidity at pad discharge points to a seasonal average of about 50 nephelometric turbidity units (NTU). Pad OrientationOrient V-swale snow storage pads preferentially with the downslope (discharge) end of the swale axis to the north. The intent is to promote melt of the snow pack (due to a more favorable aspect and proper site operation) to progress preferentially
3-85
from the uphill side of the stored snow toward the downhill (discharge) side. Promoting this melt progression minimizes exposure of loose sediment to flowing meltwater. Pad VegetationVegetate all unarmored snow storage pad surfaces. A vegetated surface is essential to properly operate a snow disposal site. Vegetation resists pad erosion, traps fine sediments mobilized in snowmelt, and promotes absorption of metals and other pollutants. Select and design a vegetative mix that is resistant to seasonal shallow burial (1 to 2 inches of loose sand fill annually) and to elevated salt and metals soil concentrations. When constructing the pads, track-walk all V-swale side slopes immediately prior to their vegetation. Track-walking consists of imprinting the ground surface with crawler tractor tread marks along the fall line (i.e., directly up-slope and downslope). Channel and Berm ArmoringArmor all critical pad surfaces and flow channels, provide permanent and temporary setback markers, and accommodate for icing storage in select armored channels. In particular: perform the following: Construct armored surfaces along the centerline of each V-swale; along the crests of all multiple, interior V-swales; along the toe of all perimeter and interior berms; along all discharge channels; and at all discharge points (Figure 3-24). Armor from an elevation of 1 foot up from the toe of each berm and extending down the side of the berm and across the pad surface for a distance of 10 feet from the toe of the berm. Armor the central (longitudinal) channel of each V-swale to a minimum width of 15 feet. Armor both sides of the crest of each interior V-swale for a distance of 10 feet from the top of the crest. Armor a 20-foot-wide band in front of the toe of the end perimeter berm for the full width of the lower end of each V-swale. Armor shall be at least 4 inches thick. Maintain the elevation of all armored surfaces slightly depressed below the vegetated pad surfaces to ensure flow of meltwater onto and through the armored surface and not parallel to it. Size armoring material according to expected flow velocities and Figure 3-24. Peak discharge of snowmelt from snow disposal sites can be up to 1 cfs. Provide subdrain or other design elements along all discharge channels to accommodate decreased channel flow capacity lost to icing storage early in the melt season.
Mark limits of snow storage area. Provide permanent snow poles as snow storage setback guides at a distance of 10 feet from the toe of the end perimeter berm and 5 feet from the toe of all interior and lateral berms. Where multiple V-swales are constructed, provide supports for temporary setback poles along the interior crests of all V-swales.
Meltwater Detention and DischargeProvide dry ponds for early season meltwater detention and/or infiltration and for late season sedimentation. See specific design criteria for sedimentation or infiltration basins elsewhere in the manual. Supplementary criteria and criteria deserving emphasis are described below. Detention pond design is primarily based on hydrologic characteristics of the meltwater from snow sites and secondarily sedimentary removal rates. Design for minimum storage volume at the beginning of the winter. Storage volume goals for the pond above the allotted sediment and ice/snow storage shall provide for dilution of meltwater so that treatment goals for chloride are met.
3-86
3. STORMWATER QUALITY
Meltwater properties for design purposes are: 1-hour concentration of 8,000 parts per million (ppm) in 1 cfs of meltwater 4-day average concentration of 6,000 ppm chloride in 1 cfs of meltwater 30-day average concentration of 1,000 ppm in 0.5 cfs of meltwater Treatment goals for chloride (based on EPA recommendations), as measured at the end of any allowable stream mixing zones, include the following: (1) a 4-day average concentration of 230 ppm exceeded less than once in 3 years, and (2) a 1-hour average concentration of 860 ppm exceeded less than once in 3 years. The treatment goal for chloride as measured at the point of site discharge into wetlands is a 30-day average concentration of <3,200 ppm to maintain wetland functionality and minimum impact zones. The intent is to ensure that meltwater quality and discharge are maintained to support an acceptable long-term threshold functionality of the entire receiving wetland while allowing some local species change and adjustment in a small fraction of the wetland. The pond treatment goal for sediment, as measured at the point of pond discharge, is 95 percent removal of all particle sizes >100m (0.1 mm) in diameter.
OutletsProvide floating oil-absorptive booms guyed around all detention pond outlets. Provide cleanout access aprons at all inlets to detention ponds. Provide heavy maintenance vehicles access to all pond control structures. Provide for dispersion of all meltwater discharge into wetlands and for flow energy dissipation at discharge points into lakes and streams. Design wetland dispersion structures to limit the size of the wetland impact zone while assuring flows low enough to prevent erosion and extended, artificial ponding.
Waste Sediment AreasProvide a separate storage area with proper drainage and access for any waste sediment storage proposed for the site. Access to the storage area should not require traverse of any part of the snow storage area or its immediate access routes. Drainage from any sediment storage areas may be directed to the snow site detention pond but should not be directed across any portion of the snow storage pad. Traffic Access: Prohibit uncontrolled vehicular access to the site. A lockable gate should be provided. Construct access driveway with a minimum width of 24 feet and a maximum width of 34 feet. If site access is from a paved road, pave the approach at least 450 feet into the site. The maximum grade is 8 percent. Approach centerline radii shall be 40 feet and match the off-site access road. Install permanent lighting at all disposal sites anticipated to be operated while dark. Safety is the primary reason for lighting; lighting for disposal operations is a secondary concern. Strategically locate lighting at vehicular access points, retention basins, or other necessary areas. Provide a minimum of 0.3 foot-candles at these locutions. Give particular attention to adjoining property users to avoid stray lighting annoyances.
Lighting/Illumination:
Landscaping:
3-87
Ensure that landscaping on the outside of the berms and buffer areas of the site provides year-round visual enhancement where possible. Plant woody vegetation away from equipment circulating and maneuvering areas. Provide a vegetative ground cover for the non-armored areas of the snow disposal pads, which is necessary for the proper functioning of the pad. Select salt-tolerant plants and perform maintenance as necessary on an annual basis. Install an inexpensive irrigation system to be used at least during plant establishment periods.
Operational Considerations
Operations include managing litter, placing snow in winter, and maintaining vegetation in summer. While not part of design criteria, operational considerations are essential to the objectives of snow disposal site performance. Snow placement (see Figure 3-25). Place snow across the full width of each V-swale. Do not place snow along the length of swales. If multiple interior swales are used in a site design, fill must be placed across either the full width of all the swales or across the complete width of one or more of the swales. Swales must not be filled across some fraction of their width or on one side along their length. Non-conformance will increase turbidity in meltwater. Supports to allow use of temporary setback staking along interior swale crests can help operators prevent partial filling of adjacent swales when operations call for filling just one interior swale. Sequence placement of hauled snow starting at the downhill side of the site and filling uphill (always across the full width of each swale cross section) to minimize erosion of the dirt released from the snow pack during the latter stages of melt. Maintain the snow fill in as compact and thick a mass as possible. This will reduce the footprint of the residual dirt when it is finally released from the snow mass to the pad, and therefore substantially reduce the total mass of sediment mobilized by the final meltwater flows. Maintain a snow fill setback from all berms. Maintain a 10-foot setback from the end of a V-swale and a 5-foot setback from all side berms. Snow fill should overlap the armor placed along berms but should not extend past setback markers.
Maintain vegetation of all non-armored pad surfaces. With proper initial application of an appropriate seed mix, very little attention should be required to promote seasonal growth of vegetation across the surface of the snow storage pad. Little or no mowing should be required. However, traffic and regrading of the site should be absolutely minimized, particularly in the late melt season. Confine access to the pad or to control structures to traffic along armored features. Maintain all materials storage, including waste sediment, separate from the snow storage pad. No temporary storage of any sort should be allowed on the pad surface. No traffic should be allowed during the melt season and access should be restricted throughout the year.
Maintenance
Maintenance shall be performed as outlined in Table 3-14.
3-88
3. STORMWATER QUALITY
TABLE 3-14. MAINTENANCE CHECKLIST FOR SNOW DISPOSAL SITE Problem Sediment Accumulation Water Depth Conditions to Check For Sediment depth exceeds 2 inches in 10% of the swale treatment area. Water not retained to a depth of about 4 inches during the wet season. Vegetation becomes sparse and does not provide adequate filtration, OR vegetation is crowded out by very dense clumps of cattail, which do not allow water to flow through the clumps. Recommended Maintenance Remove sediment deposits in treatment area.
Build up or repair outlet berm so that water is retained in the wet swale. Determine cause of lack of vigor of vegetation and correct. Replant as needed. For excessive cattail growth, cut cattail shoots back and compost off-site. Note: normally wetland vegetation does not need to be harvested unless die-back is causing oxygen depletion in downstream waters.
Wetland Vegetation
3-89
TABLE 3-14 (continued). MAINTENANCE CHECKLIST FOR SNOW DISPOSAL SITE Problem Inlet/Outlet Conditions to Check For Inlet/outlet area clogged with sediment and/or debris. Accumulation of trash or debris blocking flow Swale has eroded or scoured due to flow channelization, or higher flows. Sediment depth exceeds 2 inches or inhibits vegetation growth in 10 percent or more of swale. When water stands in the facility between storms and does not drain freely. When small quantities of water continually flow through the swale, even when it has been dry for weeks, and an eroded, muddy channel has formed in the swale bottom. When grass is sparse or bare or eroded patches occur in more than 10 percent of the swale bottom. When the grass becomes excessively tall (greater than 10 inches); when nuisance weeds and other vegetation start to take over. Inlet/outlet areas clogged with sediment and/or debris. Trash and debris accumulated in the facility. Recommended Maintenance Remove clogging or blockage in the inlet and outlet areas.
Check design flows to ensure that swale is large enough to handle flows. Bypass excess flows or enlarge facility. Replant eroded areas with fibrous-rooted plants such as Juncus effusus (soft rush) in wet areas or snowberry(Symphoricarpos albus) in dryer areas. Remove sediment deposits. When finished, facility should drain freely toward outlet. There should be no areas of standing water once inflow has ceased.
Standing Water
Any of the following may apply: remove sediment or trash blockages, improve grade from head to foot of swale, remove clogged check dams, add underdrains or convert to a wet biofiltration swale. Add a low-flow pea-gravel drain the length of the swale or bypass the base flow around the swale.
Determine why grass growth is poor and correct that condition. Replant with plugs of grass or reseed into loosened, fertile soil. Mow vegetation or remove nuisance vegetation so that flow is not impeded. Grass should be mowed to a height of 3 to 4 inches. Remove grass clippings.
Inlet/Outlet
Remove material so that there is no clogging or blockage in the inlet and outlet area. Remove leaves, litter, and oily materials, and reseed or re-sod, and regrade, as needed.
3-90
3. STORMWATER QUALITY
TABLE 3-14 (continued). MAINTENANCE CHECKLIST FOR SNOW DISPOSAL SITE Problem Erosion/ Scouring Conditions to Check For Eroded or scoured swale bottom due to flow channelization, or higher flows. Recommended Maintenance For ruts or bare areas less than 12 inches wide, repair the damaged area by filling with crushed gravel. If bare areas are largegenerally greater than 12 inches widethe swale should be regraded and reseeded. For smaller bare areas, overseed when bare spots are evident.
3-91
Emerging Technologies
This section addresses the protocol for assessing emerging technologies that have not been evaluated in sufficient detail to be acceptable for general usage in new development or redevelopment situations. This section provides a framework to assess these technologies and links to evaluations conducted by other state and federal agencies.
Background
Many water quality treatment BMPs have been used for years for temporary construction treatment and post-construction treatment of stormwater. However, stormwater treatment is still a relatively new field with new stricter treatment criteria, and many new technologies such as filters and catch basin inserts have been recently brought to the market. Emerging technologies are new technologies that have not been evaluated using approved protocols, but for which preliminary data indicate that they may provide a desirable level of stormwater pollutant removal. Some emerging technologies have already been installed in other areas as parts of treatment trains or as stand-alone systems for specific applications. In some cases, these technologies are necessary to remove metals, hydrocarbons, and nutrients. Emerging technologies can also be used for retrofits and where land availability is unavailable for larger natural systems.
Design
Emerging technologies shall be evaluated against currently existing practices and shall be used only if they can provide quality control efficiency of equal or greater value. A decision to use an emerging technology of a lesser value must be justified for individual projects on a case-by-case basis. Design of each emerging technology will depend on the technology itself. Most emerging technologies will have a manufacturers design procedure, or design support might be provided by manufacturer. These measures shall be used when they are available. Design specifications of the products are unique and proprietary to each manufacturer. Manufacturers design and rated capacity for each model must be based on tests of products and the manufacturer should be able to provide documentation that will support this claim. Some potential advantages of emerging technologies are: Smaller size for use in retrofit and urban applications Cost-effective as pre-treatment devices Less maintenance Typically precast and easy to install.
Limitations of new technologies may include the following: As some of the systems have standing water that remains between storms, there is concern about mosquito breeding. As the products come in standard sizes, the facilities will be oversized in many cases relative to the design treatment storm, possibly increasing the cost. Maintenance may be less frequent but may require additional skills on the part of the maintenance crew and will sometimes require assistance from the manufacturer.
3-92
3. STORMWATER QUALITY
Non-steady flows of stormwater may decrease the efficiency of the new technology. Emerging technologies may not remove dissolved pollutants. A loss of dissolved pollutants may occur as accumulated organic matter decomposes in the units. Traditional treatment technologies such as wet ponds and extended detention basins are generally believed to be more effective at removing very small particles, down to the range of 10 to 20 microns. If the stormwater particles are mostly fine, the new technologies will not be as efficient as traditional treatment BMPs such as wet ponds and swales.
References
The US EPA publishes a list of environmental technology fact sheets including stormwater treatment at the following web site: http://www.epa.gov/owm/mtb/mtbfact.htm
3-93
EPAs Environmental Technology Verification (ETV) programs Water Quality Protection Center verifies the performance of stormwater technologies. Reports summarizing the performance of these technologies is at (see Storm Water Source-Area Treatment Devices):
www.epa.gov/etv
Washington State Department of Ecology has historically conducted a process to evaluate emerging technologies for permanent and construction site stormwater runoff applications and to convey judgments made by local jurisdictions and others on their acceptance. See the link below for Ecologys protocol and evaluation results: http://www.ecy.wa.gov/programs/wq/stormwater/newtech/
The Technology Acceptance and Reciprocity Partnership (TARP) was formed by the states of California, Illinois, Maryland, Massachusetts, New Jersey, New York, Pennsylvania, and Virginia. This program works as a clearinghouse for evaluation of new environmental technologies. Information on their program can be found in the following link: http://www.dep.state.pa.us/dep/deputate/pollprev/techservices/tarp/
3-94
4-1
Thresholds
Stormwater quantity source controls shall be applied where possible and where required by CBJ code. Due to identified potential impacts from increased water quantity, stormwater quantity source control measures should be further encouraged in the following areas: Montana Creek Duck Creek and Jordan Creek Basin Class A Wetlands.
4-2
4: STORMWATER QUANTITY
Exemptions Stormwater quantity source controls will not be required where stormwater runoff is piped directly from the site to saltwater or the following large water bodies that will not be affected by increased runoff peaks or volumes:
Mendenhall River Mendenhall Lake Auke Lake.
Flow Reduction
Flow reduction BMPs include methods for short distance conveyance of stormwater from a site that slows runoff velocities and allows for infiltration. Due to the large volumes of precipitation, potential for icing and glaciation, steep slopes, small lot sizes and poor infiltrating soils, the extent of implementation of these measures will be made on a site-by-site basis and will require close collaboration with CBJ permit reviewers and site inspectors.
Thresholds
Where feasible, flow reduction BMPs should be used to the maximum extent for all developments. Due to identified potential impacts from increased water quantity, these BMPs should be further encouraged in the following areas: Montana Creek Duck Creek and Jordan Creek Basin Class A Wetlands.
Exemptions
Flow reduction will not be required where stormwater runoff is piped directly from the site to saltwater or the following large water bodies that will not be affected by increased runoff volumes: Mendenhall River Mendenhall Lake Auke Lake.
4-3
4: STORMWATER QUANTITY
be selected to minimize the need for additional chemical fertilizers and herbicides. In this way native vegetation can be superior to other materials such as turf grass.
Soil Amendment of Graded Areas Areas of rich topsoil should be left in place or, if excavated in construction areas, utilized elsewhere on the site to amend areas with sparse or nutrient deficient topsoil. After construction,
graded areas to be landscaped should be amended to improve infiltration and absorption of water and to improve soil fertility. The City of Seattle currently requires all graded areas to be landscaped to have 12 inches of compost tilled into the native soil.
Sidewalks
Impervious surfaces for sidewalks can be minimized by reducing widths and only requiring sidewalks on one side of the street where pedestrian safety allows. Sidewalks can be constructed using pervious surface
4-5
such as pavers or gravel. Sidewalks can be disconnected from other impervious surfaces by grading the sidewalks to drain the a grassed or landscaped area between the road and the sidewalk
Driveways
Driveway sizes and widths can be reduced by designing common driveways that serve multiple properties or use a hammerhead rather than larger circular vehicle turnarounds. As with roadway design, driveway widths and design must be balanced by the need for emergency access and snow storage and removal.
Building Footprint
Construction of taller narrower buildings will result in less impervious surface than traditional buildings. Structured parking will result in less impervious surface than traditional parking lots. These structures may be more expensive than traditional structures, and existing codes and zoning may restrict their application.
Pervious Pavements
Pervious pavement as a replacement for traditional impervious pavements is widely used in many climates of the United States. Pervious pavements include gravel surfaces, modular block paving, and pervious concrete and asphalt. Pervious pavements have traditionally been used in low traffic load areas such as driveways and parking lots; however, new designs are now being used in industrial high load situations. Pervious concrete and asphalt pavements are constructed with uniform large aggregate over a highly permeable aggregate base. Pervious pavements can clog with sediment but can be cleaned with vacuum sweepers or pressure washers. The permeability of these surfaces is typically so high that even with extreme clogging the permeability would likely exceed the adjacent or underlying soil. Recent pavement designs have been used in cold weather snowy climates without significant issues with freezethaw, frost heave or damage from snow plowing. Depending on the underlying soil, pervious pavements can greatly increase site infiltration and at least provide some runoff detention and filtration.
Rainwater Harvesting
In other parts of the United States, rain water is commonly stored and used on site for irrigating landscapes. Although irrigation demand in the Juneau area is not great, rainwater harvesting could still be feasible for replacing some domestic or commercial water use. Tanks or cisterns as small as 100 gallons can be installed and plumbed for use in toilet flushing, clothes washing, irrigation and commercial uses. Storage tanks would need to be installed within a building or below the frost line to avoid freezing. State and local regulations prohibiting storage and use must be investigated.
Green Roofs
A green roof is a low-maintenance vegetated roof system that stores rainwater in a lightweight engineered soil medium, where the water is taken up by plants and transpired into the air. As a result, much less water runs off the roof, compared to conventional rooftops. Green roofs are used extensively in cold climate areas of the Midwest and Northeast. Green roofs are expensive to install and some of the benefits such as reduced summer cooling demand and protection of roof from extreme summer heat are not applicable to Juneau.
Implementation
LID practices and techniques discussed in this section can be implemented through a variety of means.
4-6
4: STORMWATER QUANTITY
Point Systems
Several municipalities promote LID implementation through use of a point system that requires LID construction from a menu of LID practices. This method allows the developer the flexibility to install what measures will work on a particular site. The City of Fife, Washington, for example, has developed a spreadsheet to implement a point system requiring construction of water quantity source control measures. In the spreadsheet, the developer enters the total area of the site and selects from a suite of options. The spreadsheet calculates a point total based, for example, on the number of plants installed and the area of rain gardens or green roofs. A similar tool could be developed for Juneau to encourage or require quantity source control measures appropriate for Juneau.
Pilot Projects
Many of the structures and techniques discussed in this manual are relatively new and the CBJ public may not be familiar with them. Many of these techniques may not have been tried in Juneau and may need to tried, tested and modified in order to work in the Juneau climate. Some of these structures (i.e. pervious pavement sidewalks, curb cut biofiltration swales, or street tree box filters) could be implemented soon as pilot projects in high profile (or low profile) locations in order to test and advertise their use. Because many of these structures may have not been implemented in Juneau, inspection during construction is crucial to ensure that the structures will operate as designed. CBJ staff will need to be educated on proper bonding, construction and maintenance where CBJ will inherit infrastructure from private developers. Many municipalities have tried innovative programs to gain experience with LID structures and to implement them on existing private property. Kansas City, Missouri has used reverse auctions for building rain gardens and installing rain barrels. In this auction, private property owners bid on letting the municipality install devices on their property. Property owners with the lowest bids (sometimes $0) win the auction. Owners can be required to maintain the structures for a certain period. The Municipality of Anchorage has used grants to encourage construction of rain gardens on private residential properties.
4-7
FLOW REDUCTION
This section outlines the design, construction and maintenance for short-distance conveyance and infiltration structures to slow runoff: Runoff Dispersion Infiltration Trench and Dry Well Rain Garden Perforated Stub-out Connection.
Figure 4-2 shows a flow chart for the application of flow dispersion and infiltration.
Figure 4-2. Flow Diagram Showing Dispersion and Infiltration Applications, (from King County)
4-8
4: STORMWATER QUANTITY
Runoff Dispersion
Description
Runoff dispersion is a strategy for reducing the runoff generated by areas of onsite impervious surface as well as non-native pervious surfaces. This approach utilizes the natural capacity of vegetation to mitigate runoff quantity and quality impacts of developed surfaces.
Application
Runoff dispersion is particularly useful in smaller developed parcels, such as single-family homes, without large areas of impervious surfaces, such as shopping area parking lots. Runoff dispersion may be applied to any impervious surface such as roofs, driveways, sidewalks or parking areas; it can also be applied to non-native pervious surface such as lawn, landscaped areas, or pasture.
Vegetated segments dedicated to runoff dispersion must be available along the flow path the runoff follows from the developed surface to its ultimate discharge point. This is the vegetated flow path. The slope of the vegetated flow path segment must be no steeper than 15 percent For sites with septic systems, runoff discharge must be located down-slope of the primary and reserve drainfield areas. Runoff dispersion methods are not permitted on slopes steeper than 20 percent. Dispersion methods proposed on slopes steeper than 15 percent or within 50 feet of a steep slope must be approved by a geotechnical engineer or engineering geologist.
Design criteria for vegetated receiving areas are as follows: Undisturbed native vegetation is the preferred landscape. Areas may be used for passive recreation or may contain utility and utility easements except for septic systems. Vegetated areas must contain a mix of groundcover, shrubs and trees appropriate for site shade and moisture conditions with the following specifications: Trees: a minimum of two species of native trees, one of which is a conifer. Shrubs: a minimum of two native species spaced to cover the entire landscaped area, excluding tree planting locations.
4-9
Groundcover: two to three native species, evenly spaced to cover the entire landscaped area, excluding tree and shrub planting locations.
When planting, apply mulch, such as hog fuel or ground tree bark, between plants for weed control. An 18-inch diameter circle should be cleared around each plant location. Plants and root systems in direct contact with un-composted mulch have poor survivability. Plantings should be well-established over 90 percent of the area before runoff is dispersed into the vegetated area.
Design Specifications
To use splash blocks for dispersion (Figure 4-3), the following specifications apply: A maximum roof area of 1,400 square feet may be discharged to a single splash block unless the vegetated flow path segment is longer than 100-feet. Note: the splash block should be located away from the building or other provisions should be made to prevent flooding/erosion problems. For purposes of maintaining adequate separation of flows discharged from adjacent dispersion devices, the flow path segment for the splash block must have at least 50 feet of separation from an adjacent flow path segment at the downstream end of whichever segment is the shorter.
To use rock pads for dispersion (see Figure 4-4), the following specifications apply: A rock pad, composed of crushed rock, is 2 feet wide (perpendicular to flow) by 3 feet long by 6 inches deep.
4-10
4: STORMWATER QUANTITY
A maximum impervious surface area of 1,400 square feet may be drained to a single rock pad unless the vegetated flow path segment is longer than 100 feet. For purposes of maintaining adequate separation of flows discharged from adjacent dispersion devices, the vegetated flow path segment for the rock pad must have at least 50 feet of separation from an adjacent flow path segment at the downstream end of whichever segment is the shorter.
Figure 4-4. Dispersion Trench and Rock Pad Applied to a Driveway (from King County)
To use gravel-filled trenches for dispersion (see Figure 4-5), the following specifications apply: All trenches are filled with 3/4-inch to 1-1/2-inch washed rock. All trenches must be placed at least 10 feet from any building and must be as parallel as possible to the contour of the ground. For purposes of maintaining adequate separation of flows discharged from adjacent dispersion devices, the outer edge of the vegetated flow path segment for the dispersion trench must have at least 50 feet of separation from an adjacent flow path segment at the downstream end of whichever segment is the shorter. The simple 10-foot-long trench must be at least 2 feet wide by 18 inches deep. The 10-foot trench length is the maximum allowed without a notch grade board. No more than 1,400 square feet of impervious area may be drained to a single 10-foot trench unless the vegetated flow path segment is longer than 100 feet.
4-11
Figure 4-5. 10-foot Dispersion Trench Cross Section Applied to Roof(from King County)
The 50-foot-long trench with notch grade board must be at least 2-feet wide by 24-inches deep (see Figure 4-6) The 50-foot trench length is the longest allowed.
4-12
4: STORMWATER QUANTITY
No more than 5,000 square feet of impervious area may be drained to a single 50-foot trench unless the vegetated flow path segment is longer than 100 feet. If the developed surface is non-native pervious surface, no more than 17,500 square feet may be drained to a single 50-foot trench with a 100-foot vegetated flow path segment. Combinations of different surfaces draining to a single rock pad are allowed; areas should be proportional to the maximums permitted. Manifolds may be used to split flows between up to four 50-foot trenches.
Figure 4-6. 50-foot Dispersion Trench with Notch Board (from King County)
To use sheet flow for dispersion (see Figure 4-7), the following specifications apply: Sheet flow is the grading of a developed surface (either a strip of impervious surface or a patch of non-native pervious surface) as needed to avoid the concentration of runoff before and after discharge from the surface. Two types of sheet flow dispersion, one for impervious surface and one for pervious surface, are specified below.
4-13
The strip of impervious surface may be either roof (with no gutter) or pavement. The edge of the impervious strip and the ground adjacent to or immediately below the edge must be level or sloped no more than 5 percent along the edge. A 2-foot-wide, 4- to 6-inch-deep, strip of crushed rock or the extended base course of a road or driveway must be provided at or below the edge of the impervious strip to facilitate dispersal of runoff. No more than a 25-foot-wide strip of impervious surface may be sheet-flowed in this manner unless the vegetated flow path segment is longer than 100 feet. The topography of the non-native pervious surface must be such that runoff will not concentrate prior to discharge from surface. For purposes of maintaining adequate separation of flows discharged from adjacent dispersion devices, the outer edge of the vegetated flow path segment must have at least 50 feet of separation from an adjacent flow path segment at the downstream end of whichever segment is the shorter.
Maintenance
Maintenance requirements for runoff dispersion methods are as follows: Inspect once per year and after major storm events for size and placement of dispersion device and continued vegetation establishment in flow paths. Check for eroded areas or bare spots and reseed or replant as needed Check for concentrated flow releases. If observed, can be mitigated by leveling the edge of the pervious area and/or regrading or replenishing the rock in the dispersion device, such as in rock pads and gravel-filled trenches. Remove noxious weeds or invasive vegetation.
4-14
4: STORMWATER QUANTITY
Rain Garden
Description
A rain garden is a small-scale water quality BMP that mimics natural drainage features by collecting, absorbing, and filtering stormwater runoff from roof tops, driveways, patios, lawns, sidewalks, and other impervious manmade structures (see Figures 4-8 and 4-9). Rain gardens are shallow landscaped depressions that can be shaped and sized to fit any area designated to provide water quality. During a rain storm, rain gardens fill and quickly infiltrate runoff water into the ground instead of discharging to a street or storm drain system. Rain gardens are typically used in residential areas but are similar to infiltration basins discussed in the water quality chapter.
Application
Rain gardens are a simple water quantity and quality control BMP that can be fit into most residential properties. However rain gardens should be constructed in areas with relatively good infiltration and are more safely and easily constructed on slopes less than 12 percent.
Design
Rain gardens can be designed to fit the space and budget determined by the site. Runoff in excess of the capacity of the rain garden will overflow and must be safely conveyed downstream. Using this method, rain gardens can be designed by homeowners or landscapers without complicated design calculations. Alternatively, rain gardens can be sized based on the water quality design event and infiltration capacity of the soil described for the infiltration basin in the water quality chapter.
Location
Considerations for location of rain gardens include: Avoid clayey soils or locations where water ponds. Avoid construction within the drip line of existing trees to prevent disturbance of tree roots. Rain gardens should not be sited above on-site septic systems or drain fields.
4-15
Figure 4-8. Rain Garden at the side of a house (Abby Hall, EPA)
4-16
4: STORMWATER QUANTITY
Figure 4-10. Rain Garden Profile (taken from Washington State University, Rain Garden: Handbook for Western Washington Homeowners)
Soil
The planting soil required will depend upon the soils available on property. As a general rule, the recommended soil type should be 50 to 60 percent sand, 20 to 30 percent compost, and 20 to 30 percent topsoil. Place soil mix at least 6 inches below edge of rain garden for ponding. A properly functioning rain garden should infiltrate storm runoff within a few hours. Mulch helps keep the soil moist, replenishes organic material in the soil, prevents erosion, and discourages weeds in the rain garden. Two to three inches of shredded or chipped wood works well. Place the mulch on the sides and around edges of the rain garden. Coarse compost tends not to float as easily as chipped wood and works well for the bottom of the rain garden.
Vegetation
Use a variety of small trees, shrubs, herbs, or grasses. See Appendix C for recommended plant list. Select plants that enhance the area and have appropriate water needs (native plants and hardy cultivars). Cover exposed soil with 2 to 3 inches of mulch. Water to establish plants.
Maintenance
Generally, rain gardens can be maintained with little effort after the plants are established. During the first two years, weeding and watering may be needed as the plants establish themselves. Thinning in later years may be needed as the plants mature. Table 4-1 outlines general maintenance for a rain garden.
4-17
TABLE 4-1. CHECKLIST FOR RAIN GARDEN MAINTENANCE Problem Sediment Accumulation Eroded Banks Conditions to Check For Sediment is plainly visible or inhibits vegetation growth. Recommended Maintenance Remove sediment buildup on soil surface to allow for infiltration.
Bank slopes are not in Eroded areas of the rain garden shall be regraded to match compliance with the basin original design geometry. Mulch as needed to prevent erosion geometry. and weeds. Vegetation is sparse or bare. Weeds and other vegetation are taking over. Inlet/outlet areas clogged with sediment and/or debris. Determine why vegetation growth is poor and correct that condition. Replant or reseed the rain garden. Remove nuisance vegetation so that flow is not impeded.
Inlet/Outlet
Remove material so that there is no clogging or blockage in the inlet and outlet area. Keep inlet and outlet clear of debris and well protected with rock.
4-18
4: STORMWATER QUANTITY
Application
Downspout infiltration systems are not designed to directly infiltrate runoff from pollutant-generating impervious surfaces. The feasibility of downspout infiltration must be evaluated as follows for all subdivision single-family lots smaller than 22,000 square feet. If site-specific tests indicate less than 3 feet of permeable soil from the proposed final grade to the seasonal high groundwater table, then a runoff dispersion system per the previous section may be used in lieu of infiltration. On lots or sites with more than 3 feet of permeable soil from the proposed final grade to the seasonal high groundwater table, downspout infiltration is considered feasible if the soils are outwash type soils and the infiltration trench can be designed to meet the minimum design criteria specified below. Infiltration trenches and dry wells should not receive runoff from stormwater hotspots (such as gas stations) unless the stormwater has already been fully treated by another stormwater treatment practice to avoid potential groundwater contamination.
If downspout infiltration is not feasible, runoff dispersion can be used in lieu of infiltration. For subdivision single-family lots 22,000 square feet or larger, downspout infiltration is optional, and the above evaluation procedure may be used if downspout infiltration is being proposed voluntarily.
Maximum length of trench must not exceed 100 feet from the inlet sump. Minimum spacing between trench centerlines must be 6 feet. Filter fabric must be placed over the drain rock as shown on Figure 4-11 prior to backfilling. Infiltration trenches may be placed in fill material if the fill is placed and compacted under the direct supervision of a geotechnical engineer or professional civil engineer with geotechnical expertise, and if the measured infiltration rate is at least 8 inches per hour. Trench length in fill must be 60 feet per 1,000 square feet of roof area.
4-19
Infiltration trenches should not be built on slopes steeper than 25 percent. A geotechnical analysis and report may be required on slopes over 15 percent or if located within 200 feet of the top of a steep slope or landslide hazard area. Trenches may be located under pavement if a small yard drain or catch basin with grate cover is placed at the end of the trench pipe such that overflow would occur out of the catch basin at an elevation at least 1 foot below that of the pavement, and in a location that can accommodate the overflow without creating a significant adverse impact on downhill properties or drainage systems. This is intended to prevent saturation of the pavement in the event of system failure.
4-20
4: STORMWATER QUANTITY
4-21
4-22
4: STORMWATER QUANTITY
Maintenance
Table 4-2 outlines general maintenance for downspout infiltration.
TABLE 4-2. CHECKLIST FOR DOWNSPOUT INFILTRATION MAINTENANCE Problem Inlet/Outlet Conditions to Check For Inlet/outlet (catch basin) areas clogged with sediment and/or debris. Recommended Maintenance Remove material so that there is no clogging or blockage in the inlet and outlet area. Keep inlet and outlet clear of debris and well protected with rock.
Water ponding in infiltration pond Remove sediment from trench/ drywell, replace filter fabric, replace gravel/rock filter after rainfall ceases and appropriate time allowed for infiltration (24 hours or design infiltration time).
4-23
Application
A perforated stub-out may be used in areas with infiltrative soils where implementation of runoff dispersion might cause erosion or flooding problems, either on site or on adjacent lots. This provision might be appropriate, for example, for lots constructed on steep hills where downspout discharge could be cumulative and might pose a potential hazard for lower lying lots, or where dispersed flows could create problems for adjacent offsite lots. This provision does not apply to situations where lots are flat and onsite downspout dispersal would result in saturated yards. Installation of perforated pipe should not be used in areas of high ground water for infiltration. Perforated pipe can lower groundwater levels and negatively impact adjacent wetlands.
Design
Location of the connection should be selected to allow a maximum amount of runoff to infiltrate into the ground (ideally a dry location on the site that is relatively well drained). For sites with septic systems, the perforated portion of the pipe must be downgradient of the drainfield primary and reserve areas. This requirement can be waived if site topography will clearly prohibit flows from intersecting the drainfield or where site conditions (soil permeability, distance between systems, etc) indicate that this is unnecessary. To facilitate maintenance, the perforated pipe portion of the system should not be located under impervious or heavily compacted surfaces (e.g., driveways and parking areas).
Figure 4-14. Perforated Stub Out Connection (Source King County, Washington)
Perforated stub-out connections should consist of at least 10 feet of perforated pipe per 5,000 square feet of roof area laid in a level, 2-foot wide trench backfilled with washed drain rock. The drain rock should
4-24
4: STORMWATER QUANTITY
extend to a depth of at least 8 inches below the bottom of the pipe and should cover the pipe. The pipe should be laid level and the rock trench covered with filter fabric and 6 inches of fill (see Figure 4-14). Potential runoff discharge toward a landslide hazard area must be evaluated by a professional engineer with geotechnical expertise or a licensed geologist, hydrogeologist, or engineering geologist. The perforated portion of the pipe may not be placed on or above slopes greater than 20 percent or above erosion hazard areas without evaluation by a professional engineer with geotechnical expertise or qualified geologist and jurisdiction approval.
Maintenance
Table 4-3 outlines general maintenance for perforated stub-out connections.
TABLE 4-3. CHECKLIST FOR PERFORATED SUB-OUT CONNECTION MAINTENANCE Problem Inlet/Outlet Conditions to Check For Inlet/outlet (catch basin) areas clogged with sediment and/or debris. Water ponding in infiltration pond after rainfall ceases and appropriate time allowed for infiltration (24 hours or design infiltration time). Recommended Maintenance Remove material so that there is no clogging or blockage in the inlet and outlet area. Keep inlet and outlet clear of debris and well protected with rock. Remove sediment from trench/ drywell, replace filter fabric, replace gravel/rock filter.
4-25
Where space and topography permit, open conveyances are the preferred means of collecting and conveying stormwater.
5-1
TABLE 5-1. DESIGN FLOOD FREQUENCIES Return Period (Exceedance Probability) 100 years (1%) 25 years (4%) 10 years (10%) 100 years (1%) 10 years (10%) 25 years (2%) 100 years (1%)
Type of Structure Culverts Trunk Storm Sewer System Storm Sewer Feeder Lines Outfall Energy Dissipation Side Ditches, Storm Water Inlets and Gutter Flow Side Ditches, Storm Water Inlets and Gutter Flow in Depressed Roadway Sections Bridges in Designated Flood Hazard Areas
BACKWATER ANALYSIS
A computer program capable of backwater profile analysis such as HEC-RAS for surface water conveyance or SWMM (Storm Water Management Model) for pipe conveyance is recommended over hand calculations.
5-2
EASEMENTS, ACCESS, AND DEDICATED TRACTS Easements, Access, and Dedicated Tracts
Natural Channels and Stormwater Facilities
All man-made drainage facilities and conveyances and all natural channels (on the project site) used for conveyance of altered flows due to development (including swales, ditches, stream channels, lake shores, wetlands, potholes, estuaries, gullies, ravines, etc.) shall be located within easements or dedicated tracts as required by the county. Easements shall contain the natural features and facilities and shall allow county access for purposes of inspection, maintenance, repair or replacement, flood control, water quality monitoring, and other activities permitted by law. All drainage facilities such as detention or retention ponds or infiltration systems to be maintained by the county shall be located in separate tracts dedicated to the county. Conveyance systems can be in easements. Drainage facilities shall not be located in dedicated public road right-of-way areas, with the exception of county and highway facilities. Drainage facilities that are designed to function as multi-use recreational facilities shall be located in separate tracts or in designated open space and shall be privately maintained and owned, unless accepted by and dedicated to the county.
Maintenance Access
A minimum 15-foot wide access easement shall be provided to drainage facilities from a public street or right-of-way. Access easements shall be surfaced with a minimum 12-foot width of crushed rock, or other approved surface to allow year-round equipment access to the facility. Maintenance access must be provided for all manholes, catch basins, vaults, or other underground drainage facilities to be maintained by the county. Maintenance shall be through an access easement or dedicated tract. Drainage structures for conveyance without vehicular access must be channeled.
5-3
Conveyance systems to be maintained and operated by CBJ must be located in a dedicated tract or drainage easement granted to CBJ. Any new conveyance system located on private property designed to convey drainage from other private properties must be located in a private drainage easement granted to the contributors of stormwater to the systems to convey surface and stormwater and to permit access for maintenance or replacement in the case of failure. All drainage tracts and easements, public and private, must have a minimum width of 15 feet. In addition, all pipes and channels must be located within the easement so that each pipe face or top edge of channel is no closer than 5 feet from its adjacent easement boundary. Pipes greater than 5 feet in diameter and channels with top widths greater than 5 feet shall be placed in easements adjusted accordingly, so as to meet the required dimensions from the easement boundaries. Easements as shown in Table 5-2 are minimums for drainage facilities.
TABLE 5-2. MINIMUM EASEMENT WIDTHS FOR CONVEYANCE SYSTEMS FOR ACCESS, INSPECTION AND MAINTENANCE Conveyance Width Channels 30 feet wide Channels > 30 feet wide Pipes/Outfalls 36 inches Pipes/Outfalls 60 and >36 inches Pipes/Outfalls > 60 inches a. Easement Width Channel Width + 15 feet from top, one side Channel Width + 15 feet from top, both sides 15 feet centered on pipe 20 feet centered on pipea 30 feet centered on pipea
Analysis Methods
Two methods of hydraulic analysis using Manning's equation are used for the analysis of pipe systems. The first method is the Uniform Flow Analysis Method, commonly referred to as the Manning's Equation, and is used for the design of new pipe systems and analysis of existing pipe systems. The second method is the Backwater Analysis Method described earlier in this chapter and is used to analyze the capacity of both proposed, and existing, pipe systems. If CBJ determines that, as a result of the project, runoff for any event up to and including the 25-year, 24-hour event would cause damage or interrupt vital services, a backwater (pressure sewer) analysis shall be required. Results shall be submitted in tabular and graphic format showing hydraulic and energy gradient. When using the Manning's equation for design, each pipe in the system shall be sized and sloped such that its barrel capacity at normal full flow is equal or greater than the required conveyance capacity. Table 5-3 provides the recommended Manning's n values for preliminary design for pipe systems. (Note: The n
5-4
values for this method are 15 percent higher in order to account for entrance, exit, junction, and bend head losses.) Mannings n values used for final pipe design must be documented in the Stormwater Site Plan. Nomographs may also be used for sizing the pipes. For pipes flowing partially full, the actual velocity may be estimated from engineering nomographs by calculating Qfull and Vfull and using the ratio of Qdesign/Qfull to find V and d (depth of flow).
Type of Pipe Material A. Concrete pipe and CPEP-smooth interior pipe B. Annular Corrugated Metal Pipe or Pipe Arch: 1. 2 x inch corrugation (riveted) a. plain or fully coated b. paved invert (40% of circumference paved): (1) flow full depth (2) flow 0.8 depth (3) flow 0.6 depth c. treatment 5 2. 2.3 x 1-inch corrugation 3. 3.6 x 2-inch corrugation (field bolted) C. Helical 2 x -inch corrugation and CPEP-single wall D. Spiral rib metal pipe and PVC pipe E. Ductile iron pipe cement lined F. High density polyethylene pipe (butt fused only)
0.024 0.018 0.016 0.013 0.013 0.027 0.030 0.024 0.011 0.012 0.009
0.028 0.021 0.018 0.015 0.015 0.031 0.035 0.028 0.013 0.014 0.009
Pipe Materials
All storm drainage pipe, except as otherwise provided for in these standards, shall be a rubber-gasketed concrete pipe, minimum 18-inch diameter; or double-walled, corrugated, polyethylene pipe, with a smooth internal diameter (AASHTO M-294 Type S) ADS N-12 plastic pipe (minimum 12-inch diameter) or approved equal, with a joint meeting ADOT & PF standards as amended by CBJ, except for perforated pipe and major underground detention facilities. ADS N-12 pipe shall have a minimum cover of 2 feet
5-5
measured from the top of pipe to the top of paved surface. The rubber-gasket requirement may be waived if it can be shown that joint leakage will not be detrimental to the road prism. When extreme slope conditions or other unusual topographic conditions exist, other pipe materials and methods such as, but not limited to, PVC, HDPE, or ductile iron pipe may be used with prior approval by CBJ. If other pipe materials are to be used, they shall meet the minimum requirements of the following and shall have prior approval by CBJ: Ductile iron, Class 50 or 52 Reinforced concrete pipe Corrugated aluminum pipe Aluminum spiral rib pipe Aluminized Type 2 corrugated steel (meeting AASHTO treatment M274 and M56) Corrugated high density polyethylene pipe (CPEP) - single wall, fully corrugated meeting AASHTO standard M-252 (permitted only outside public right-of-way and for use in temporary storm sewer systems and as downspout/footing/yard drain collectors on private property) Polyvinyl chloride (PVC) sewer pipe (SDR 35, meeting requirements of ASTM D3034) High density polyethylene (HDPE) pipe. Pipe must comply with requirement of Type III C5P34 per ASTM D1248 and have the PPI recommended designation of PE3408 and have an ASTM D3350 cell classification of 345434C or 345534C. Pipe shall have a manufacturer's recommended hydrostatic design stress rating of 800 psi based on a material with a 1,600 psi design basis determined in accordance with ASTM D2837-69. Pipe shall have a suggested design working pressure of 50 psi at 73.4 degrees F and maximum SDR of 32.5 but a smaller SDR (thicker section) may be required based upon the design engineer calculations. Designs utilizing HDPE pipe shall include consideration of the material's thermal expansion/contraction properties for anchoring and alignment.
All metal parts must be corrosion resistant. Examples of preferred materials include aluminum, stainless steel, and plastic. Zinc and galvanized materials are discouraged because of aquatic toxicity. Painted metal parts shall not be used because of poor longevity. Pipe material, joints, and protective treatment shall be in accordance with ADOT & PF Standard Specifications and AASHTO and ASTM treatment standards as amended by the CBJ. The applicant is responsible for contacting the county to determine the allowable pipe materials which can be used.
5-6
Downsizing of pipes is only allowed under special conditions as allowed by CBJ (i.e., no hydraulic jump can occur; downstream pipe slope is significantly greater than the upstream slope; velocities remain in the 3 to 8 fps range, etc.). Downsizing of downstream culverts within a closed system with culverts 18-inches in diameter or smaller will not be permitted. Normally pipes connecting into a structure shall match crown elevations (see exceptions in the layout criteria below).
TABLE 5-4. MAXIMUM PIPE SLOPES AND VELOCITIES Pipe Slope Above Which Pipe Anchors Required and Minimum Anchor Spacing 20% (1 anchor per 100 feet of pipe) 10% (1 anchor per 50 feet of pipe) Max. Slope Allowed 20%c 20%c Max. Velocity at Full Flow 30 fps 30 fps
Pipe Material Spiral Riba, PVCa, CPEP-single wall Concretea or CPEP-smooth interiora Ductile Iron HDPEb
40% (1 anchor per pipe section) 50% (1 anchor per 100 feet of pipe cross slope installations only)
None None
None None
a. Not allowed in landslide hazard areas. b. Butt-fused pipe joints required. Above-ground installation is required on slopes greater than 40% to minimize disturbance to steep slopes. c. Maximum slope of 200% allowed for these pipe materials with no joints (one section) with structures at eac Key:........................................................................................................................PVC = Polyvinyl chloride pipe ............................................................................................. CPEP = Corrugated high density polyethylene pipe ...................................................................................................................... HDPE = High density polyethylene
5-7
Connections to a pipe system shall be made only at catch basins or manholes. No wyes or tees are allowed except on private roof/footing/yard drain systems on pipes 8-inches in diameter, or less, with clean-outs upstream of each wye or tee. Provide 6 inches minimum vertical and 3 feet minimum horizontal clearance (outside surfaces) between storm drain pipes and other utility pipes and conduits. Suitable pipe cover over storm pipes in road rights-of-way shall be calculated for HS-20 loading by the Project Engineer. Pipe cover is measured from the finished grade elevation down to the top of the outside surface of the pipe. Pipe manufacturers recommendations are acceptable if verified by the Project Engineer. PVC, SDR 35, minimum cover shall be 3 feet in areas subject to vehicular traffic; maximum cover shall be 25 feet per WSDOT/APWA Standard Specifications Section 7-04. Pipe cover in areas not subject to vehicular loads, such as landscape planters and yards, may be reduced to a 1 foot minimum. Access barriers are required on all pipes 18 inches and larger exiting a closed pipe system. Debris barriers (trash racks) are required on all pipes entering a pipe system. See CBJ Engineering Standard Details. Where a minimal fall is necessary between inlet and outlet pipes in a structure, pipes must be aligned vertically by one of the following in order of preference: Match pipe crowns Match 80 percent diameters of pipes Match pipe inverts.
Where inlet pipes are higher than outlet pipes, drop manhole connections may be required or increased durability in the structure floor may be required. High Density Polyethylene (HDPE) pipe systems longer than 100 feet must be anchored at the upstream end if the slope exceeds 25 percent and the downstream end placed in a minimum 4 foot long section of the next larger pipe size. This sliding sleeve connection allows for the high thermal expansion/contraction coefficient of the pipe material.
5-8
The maximum slope of the ground surface for a radius of 5 feet around a catch basin grate shall be 3:1. Catch basins shall be provided within 50 feet of the entrance to a pipe system to provide for silt and debris removal. Maximum surface runs between inlet structures on the paved roadway surface shall be as summarized in Table 5-5.
TABLE 5-5. MAXIMUM SURFACE RUNS BETWEEN INLET STRUCTURES Roadway Slope (%) 0.4 to 1 1 to 6 6 to 8 8 to 12 Maximum Spacing (feet) 200 350 350 150
Structures not acting as points of entry for stormwater shall have locking lids and have solid covers. Locking lids will be installed on all structures containing restrictor or flow devices. The locking lids shall be of a quality and design acceptable to the county. The WSDOT Hydraulics Manual can be used in determining the capacity of inlet grates when capacity is of concern. When verifying capacity, assume grate areas on slopes are 80 percent free of debris, and vaned grates are 95 percent free. In sags or low spots, assume grates are 50 percent free of debris, and vaned grates, 75 percent free. A metal frame and grate for catch basin and inlet, that is deemed bicycle safe, shall be used for all structures collecting drainage from the paved roadway surface (see CBJ Engineering Standard Details ). When the road profile equals or exceeds 6 percent between structures, an asphalt berm shall be installed around the inlet of the structure or the catch basin may be recessed into the curb.
OUTFALLS
All piped discharges to streams, rivers, ponds, lakes, or other open bodies of water are designated outfalls and shall provide for energy dissipation to prevent erosion at or near the point of discharge. Properly designed outfalls are critical to reducing the chance of adverse impacts as the result of concentrated discharges from pipe systems and culverts, both onsite and downstream. Outfall energy dissipation systems include rock splash pads, flow dispersal trenches, gabion or other energy dissipaters, and tightline systems. A tightline system is typically a continuous length of pipe used to convey flows down a steep or sensitive slope with appropriate energy dissipation at the discharge end.
5-9
The following sections provide general design criteria for various types of outfall features.
TABLE 5-6. ROCK PROTECTION AT OUTFALLS Discharge Velocity at Design Flow (fps) 0-5 Minimum Dimensions for Required Protection Type Rock lininga Thickness 1 foot Width Diameter + 6 feet Length 8 feet or 4 x diameter, whichever is greater 12 feet or 4 x diameter, whichever is greater As required Height Crown + 1 foot
>5 - 10
Riprapb
2 feet
Crown + 1 foot
>10 - 20 >20
As required
Crown + 1 foot
a.
Rock lining shall be quarry spalls with gradation as follows: ......................................................................................................................................................................... ......................................................................................................................................................................... .........................................................................................................................................................................
b. Riprap shall be reasonably well graded with gradation as follows: ......................................................................................................................................................................... ......................................................................................................................................................................... ......................................................................................................................................................................... Note: Riprap sizing governed by side slopes on outlet channel is assumed to be approximately 3:1.
5-10
Bank stabilization, bioengineering, and habitat features may be required for disturbed areas. Outfalls that discharge to the ocean or a major water body may require tide gates. Contact the CBJ for specific requirements.
Tightline Systems
Tightline systems may be needed to prevent aggravation or creation of a downstream erosion problem. The following general design criteria apply to tightline systems: Outfall tightlines may be installed in trenches with standard bedding on slopes up to 20 percent. In order to minimize disturbance to slopes greater than 20 percent, it is recommended that tightlines be placed at grade with proper pipe anchorage and support. Except as indicated above, tightlines or conveyances that traverse the marine intertidal zone and connect to outfalls should be buried to a depth sufficient to avoid exposure of the line during storm events or future changes in beach elevation. If non-native material is used to bed the tightline, such material should be covered with at least 3 feet of native bed material or equivalent. High density polyethylene pipe (HDPE) tightlines must be designed to address the material limitations, particularly thermal expansion and contraction and pressure design, as specified by the manufacturer. The coefficient of thermal expansion and contraction for solid wall polyethylene (SWPE) pipe is on the order of 0.001 inch per foot per Fahrenheit degree. Sliding sleeve connections should be used to address this thermal expansion and contraction. These sleeve connections consist of a section of the appropriate length of the next larger size diameter of pipe into which the outfall pipe is fitted. These sleeve connections should be located as close to the discharge end of the outfall system as is practical. Due to the ability of HDPE tightlines to transmit flows of very high energy, special consideration for energy dissipation must be made. Flows of very high energy will require a specifically engineered energy dissipater structure.
CULVERT CRITERIA
For the purpose of this manual, culverts are single runs of pipe that are open at each end and have no structures such as manholes or catch basins. Approved pipe materials are detailed in the pipe system design criteria earlier in this chapter. Galvanized or aluminized pipe are not permitted in marine environments or where contact with salt water may occur, even infrequently through backwater events.
5-11
Inlets and outlets shall be protected from erosion by rock lining, riprap, or biostabilization as detailed in Table 5-6. Debris and access barriers are required on inlet and outlet ends of all culverts greater than 18 inches in diameter. Culverts greater than 36 inches in diameter within stream corridors are exempt. Minimum culvert velocity shall be 2 feet per second and maximum culvert velocity shall be 15 feet per second. Thirty (30) feet per second may be used with an engineered outlet protection designed. No maximum velocity for ductile iron or HDPE pipe shall be established but outlet protection shall be provided. All CPEP and PVC culverts and pipe systems shall have concrete or rock headwalls at exposed pipe ends. Bends are not permitted in culvert pipes. Minimum cover over culverts shall depend on site conditions and culvert material and design. If the minimum cover cannot be provided on a flat site, use ductile iron pipe and analyze for loadings. Maximum culvert length: 250 feet Minimum separation from other pipes: 6 inches vertical (with bedding) and in accord with the CBJ design criteria. 3 feet horizontal.
Trench backfill shall be bank-run gravel or suitable native material compacted to 95 percent Modified Proctor test to a depth of 2 feet; 90 percent below 2 feet compacted in 8 inch to 12 inch lifts or as specified by a geotechnical engineering report. All driveway culverts shall be of sufficient length to provide a minimum 3:1 slope from the edge of the driveway to the bottom of the ditch. Culverts shall have beveled end sections to match the side slope.
5-12
of Transportation and Public Facilities for the Design, Permitting, and Construction of Culverts for Fish Passage, 2001.
OPEN CONVEYANCES
Open conveyances can be either roadside ditches, grass lined swales, or a combination thereof. Consideration must be given to public safety when designing open conveyances adjacent to traveled ways and when accessible to the public. Where space and topography permit, open conveyances are the preferred means of collecting and conveying stormwater. Open conveyances shall be designed by one of the following methods: Manning's Equation (for uniform flow depth, flow velocity, and constant channel crosssection) Direct Step Backwater Method (utilizing the energy equation) Standard Step Backwater Method (utilizing a computer program).
Velocities must be low enough to prevent channel erosion based on the native soil characteristics or the compacted fill material. For velocities above 5 feet per second, channels shall have either rock-lined bottoms and side slopes to the roadway shoulder top with a minimum thickness of 8 inches, or shall be stabilized in a fashion acceptable to the county. Water quality shall not be degraded due to passage through an open conveyance. See Table 5-7.
TABLE 5-7. OPEN CONVEYANCE PROTECTION Velocity at Design Flow (fps) Greater Than 0 5 8 12 a. Less Than or Equal To 5 8 12 20 Protection Grass Lining c Riprap a, c Riprap b Slope mattress, gabion, etc. Thickness N/A 1 feet 2 feet Varies Minimum Height Required Above Design Water Surface (feet) 0.5 2 2 1
Riprap shall be in accordance with Section 9-13.1 of the WSDOT standard specifications. Riprap shall be a reasonably well graded assortment of rock with the following gradation: ......................................................................................................................................................................... ......................................................................................................................................................................... .........................................................................................................................................................................
b. Riprap shall be a reasonably well graded assortment of rock with the following gradation: ......................................................................................................................................................................... ......................................................................................................................................................................... ........................................................Note: Riprap sizing governed by side slopes on channel, assumed ~3.1. c. Bioengineered lining allowed for design flow up to 8 fps.
5-13
Channels having a slope less than 6 percent and having peak velocities less than 5 feet per second shall be lined with vegetation. Channel side slopes shall not exceed 2:1 for undisturbed ground (cuts) as well as for disturbed ground (embankments). All constructed channels shall be compacted to a minimum 95 percent compaction as verified by a Modified Proctor test. Channel side slopes adjacent to roads shall not exceed 4:1 and will meet all other AASHTO and county road standards. Channels shall be designed with a minimum freeboard of one-half-foot when the design flow is 10 cubic feet per second or less and 1 foot when the design discharge is greater than 10 cubic feet per second. Check dams for erosion and sedimentation control may be used for stepping down channels being used for biofiltration.
Discharge Locations
Stormwater will not be permitted to discharge directly onto CBJ roads or system without the prior approval of the CBJ with the exception of Single Family Residences. Discharges to a county system shall be into a structure such as an inlet, catch basin, manhole, through an approved sidewalk underdrain or curb drain, or into an existing or created county ditch. Concentrated drainage will not be allowed to discharge across sidewalks, curbs, or driveways. All buildings are required to have roof downspouts and subsurface drains directed to either an infiltration system, dispersion system, or to the stormwater drainage system. See Chapter 4 for additional information on roof downspout infiltration and dispersion.
Drainage Stub-Outs
If drainage outlets (stub-outs) are to be provided for each individual lot, the stub-outs shall conform to the following: Each outlet shall be suitably located at the lowest elevation on the lot, so as to service all future roof downspouts and footing drains, driveways, yard drains, and any other surface or subsurface drains necessary to render the lots suitable for their intended use. Each outlet shall have free-flowing, positive drainage to an approved stormwater conveyance system or to an approved outfall location. Outlets on each lot shall be located with a 5-foot-high, 2- x 4-inch stake marked storm or drain. For stub-outs to a surface drainage, the stub-out shall visibly extend above surface level and be secured to the stake. The developer and/or contractor is responsible for coordinating the locations of all stub-out conveyance lines with respect to the utilities (e.g., power, gas, telephone, television). All individual stub-outs shall be privately owned and maintained by the lot home owner including from the property line to the riser on the main line.
5-14
THRESHOLD
A full site plan shall be prepared for development establishing more than 5,000 square feet of new or replaced impervious surface, as indicated in Figure 6-1.
Site Plan
Small Project Development (>2,000 square feet and <5,000 square feet of impervious area) No Yes Appendix A Small Project Stormwater Management
Figure 6-1. Stormwater Management Decision Path for Development of a Full Site Plan
EXEMPTIONS
Maintenance activities and utility projects that replace trench surface in kind shall be exempt from the requirement to complete a Stormwater Site Plan.
PLAN ELEMENTS
Full Stormwater Site Plans shall include each of the following sections (if sections do not apply, list and mark NA).
Cover Sheet
A Full Stormwater Site Plan will have a cover sheet with the project name, applicant's name, address, and telephone number, project engineer's name, address and phone number, date of submittal, contact's name, address, and telephone number, and the name, address and phone number of the contractor, if known.
6-1
Site Map
Use a scale of 1 inch = 100 feet. On a topographic map, show existing conditions and the proposed project including (as applicable) but not limited to: Project boundaries, subbasin boundaries, and offsite area tributary to the project Major drainage features (such as channels and detention facilities and floodways), and flow path to receiving waters Existing topography for the site Finished grades Existing structures within 100 feet of project boundaries Utilities Existing paved surfaces, including roads Easements, both existing and proposed Areas of possible significant environmental concern (e.g., gullies, ravines, swales, wetlands, steep slopes, estuaries, springs, creeks, lakes, etc.). For natural drainage features show direction of flow 100-year flood plain boundary (if applicable)
6-2
Existing and proposed wells onsite and on adjacent properties (both of record and not of record) within specified setbacks Proposed structures including roads and parking surfaces Lot dimensions and areas Proposed drainage facilities Limits of clearing and grading Required natural buffer areas
Contour intervals on the site plan shall be at a minimum as follows: 2-foot intervals for slopes of 0 to 15 percent 5-foot intervals for slopes of 16 to 40 percent 10-foot intervals for slopes greater than 40 percent
Topography must be field verified for drainage easements and conveyance systems. Contours shall extend a minimum of 25 feet beyond property lines and shall extend sufficiently to depict existing conditions. If survey is restricted to the project site due to lack of legal access, contours shall be provided by other means; i.e., comprehensive drainage maps, etc. Identify unit areas greater than 1 acre contributing to a reach of swale or to a catch basin including offsite area. Identify areas contributing to retention/detention facilities. Show the following on the site map (or on a schedule) for unit areas: total project area; total impervious (new and replaced), pollution generating impervious, pollution generating pervious, and total disturbed area; average slope; and estimated ultimate infiltration rate and Soil Conservation Service (SCS) Soil Group. Conveyance data, identifier (for reference to model output), length, slope, inverts up and down Overland flow paths and distances Soil types Locations of soil pits and infiltration tests Spot water surface elevations, discharges and velocities for the design event
Schedule of Structures
Show the following information: Catch basin/manhole Street name Cross-street (nearest) Stationing Coordinate System (i.e., Northings and Eastings), if used Street side Catch basin/manhole diameter or size Invert in/out
6-3
Pipe diameter in/out Type of each structure and pipe, i.e., Type II, concrete.
6-4
When intersecting road profile grades have a difference of 1 percent or less, a vertical curve is not required. All other vertical grade intersections will require a minimum 50-foot vertical curve. Storm drainage text to be shown in profile only to avoid duplication of text. Number of structure will be shown in the plan
BMP Design
Identify pollutants of concern anticipated in runoff from the site. Provide discussion of BMP selection including rationale for why a BMP with a higher pollutant removal efficiency was not selected. Provide calculations demonstrating that water quality BMPs are sized to the water quality design event.
Maintenance Plan
The importance of maintenance for the proper functioning of stormwater control facilities cannot be overemphasized. A substantial portion of failures (clogging of filters, resuspension of sediments, loss of storage capacity, etc.) of such facilities is due to inadequate maintenance. At private facilities, a copy of the plan shall be retained onsite or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the plan shall be retained in the appropriate department. Should proposed maintenance differ from that shown in the BMP descriptions the project engineer will prepare a maintenance plan. The maintenance plan shall describe required type and frequency of longterm maintenance of drainage facilities and identification of the party (or parties) responsible for maintenance and operation.
6-5
REFERENCES
Miller, J. 1963. Technical Paper Number 47: Probable Maximum Precipitation and Rainfall-Frequency Data for Alaska. Weather Bureau, Department of Commerce, Washington DC. U.S. Department of Agriculture. April 1973. A Method for Estimating Volume and Rate of Runoff in Small Watersheds Technical Paper 149. USDA Soil Conservation Service, Washington DC. Shoephorster, D.B. and C.E. Furbush. 1974. Soils of the Juneau Area. Department of Agriculture, Soil Conservation Service, Palmer, Alaska. Precipitation Depth Frequency for the Highland Drive Drainage Project. November 1990. G.N. McDonald and Associates, Anchorage, AK. Alaska Highway Drainage Manual. 1995. Alaska Department of Transportation and Public Facilities, Juneau, AK. Memorandum of Agreement Between the Alaska Department of Fish and Game and Alaska Department of Transportation and Public Facilities for the Design, Permitting, and Construction of Culverts for Fish Passage. 2001. Alaska Department of Fish and Game, Alaska Department of Transportation and Public Facilities, Juneau, AK. Armstrong, R. and R. Carlson. 2003. Analysis of Rainfall Frequency for Selected Alaskan Cities. University of Alaska-Fairbanks, Fairbanks, AK. Stormwater Management Manual for Western Washington. 2005. Washington State Department of Ecology, Olympia, WA. Hydraulics Manual. 2007. Washington State Department of Transportation, Olympia, WA. Highway Runoff Manual. 2008. Washington State Department of Transportation, Olympia, WA. Stormwater Management Manual. 2008. City of Portland, Portland, OR. Alaska Storm Water Guide. 2009. Alaska Department of Environmental Conservation, Juneau, AK. Surface Water Design Manual. 2009. King County, Seattle, WA.
R-1
Runoff Reduction
Where feasible Small Projects shall implement flow reduction practices discussed in Chapter 4 to the maximum extent practical. These BMPs include: Runoff Dispersion Runoff infiltration using trenches or drywells Rain gardens Perforated Stub-out Connections
Because implementation of these techniques are subject to site constraints such and site soil infiltration and potential for creating nuisance flows consultation with CBJ Engineering Department staff may be required.
CONVEYANCE
CBJ code requires that proposed development shall accommodate flows from the post-development 25year event. Runoff from the site must be safely conveyed from the site with out causing flooding or erosion upstream or downstream of the site. Guidance on conveyance analysis and design are found in Chapter 5.
A-1
A-2
B-1
Figure B-1. Annual Rainfall Isohyets (Juneau Forecast Office, National Weather Service 1992)
B-2
Development in the downtown zone (Downtown, Lemon Creek and Douglas) shall use rainfall parameters based on the downtown gage; areas in the airport zone (Mendenhall Valley and North Douglas) shall use rainfall parameters based on the airport gage. Although the upper Mendenhall Valley has a high precipitation, it is included in the airport area as subdividing the valley may be problematic. Hydrologic data for sizing infrastructure in CBJ outside the urbanized area will need to be determined by the developer. Precipitation intensity and amounts in the Juneau typically increase with higher elevation. More precipitation occurs as snowfall at higher elevations. All rainfall gages used in this manual and most development in the Juneau area are at or near sea level. Hydrologic data for sizing infrastructure above 500 feet will need to be determined by the developer.
Water Quality Depth (inches) Downtown Area Airport Area 2.33 1.67
Note to Reviewer: The water quality treatment level was set to treat 90 percent of precipitation. This level is used by many other municipalities but could be set at a lower level. The impact of this level on water quality treatment cost should be assessed as a step in finalizing the treatment level. Table B-2 shows the 24-hour rainfall depths for different recurrence intervals for the two geographic areas selected for use by this manual. Table B-2 rainfall depths are based on the results several analyses of Juneau area rainfall data. The rainfall data and analyses are discussed later in this appendix. Full results of these analyses are shown as an attachment to this appendix.
TABLE B-2. RECURRENCE INTERVAL RAINFALL DEPTHS 2-year Airport Armstrong and Carlson 2003 Downtown McDonald 1990 a. National Weather Service, 1990s 2.01 2.83 24-hour Rainfall Depths (in) 5-year 10-year 25-year 2.41 3.56 2.67 4.02 3.00 4.57 100-year 5.19a 5.35
B-3
Note: Results from a National Weather Service rainfall duration intensity study for Alaska should be available in two to three years. Data from that study may replace the precipitation rainfall depths and intensities in Tables B-1 and B-2.
November 1, 1976
15-minute
B-4
9 8 7 Storm Depth (in) 6 5 4 3 2 1 0 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Percent Exceedence
1.51 in
Municipalities have used several methods for setting the water quality treatment levels. These methods include, the 90-percent exceedance, 91% runoff using continuous simulation or the intensity or volume that would treat 90 percent of total precipitation (King County 2009, City of Portland 2008, ADEC, 2009). Because water quality treatment BMPs typically treat runoff from impervious surfaces, the assumption that the volume of precipitation equals volume the amount of runoff is valid. King Countys water quality treatment level has been set to achieve 80% removal of total suspended sediment. In a storm depth/percent exceedance plot, municipalities have observed a significant elbow or increase in storm depths around the 90-percent exceedance. BMPs sized to treat precipitation greater than the 90-percent exceedance will be significantly larger and have a decreasing return on volume of runoff treated than BMPs sized for depth at the 90-percent level.
B-5
Because Juneau does not have a distinct period of melt of accumulated winter snow and because snow accounts for a small percentage of total precipitation water quality depths and intensities were based only on recorded precipitation.
Airport
The 90-percent precipitation depth was determined using the following assumptions. Runoff from storm events with depths less than the water quality depth would be 100 percent treated. In storm events with depths greater than the design depth, the portion less than the design depth was assumed to receive 100-percent treatment while the portion greater than the design depth was assumed to receive no treatment. The water quality design depth was calculated from this series by determining the level where 90 percent of the total precipitation would receive 100-percent treatment.
This analysis resulted in a storm depth of 1.67 inches for the airport.
Downtown
Because the downtown gage only recorded daily rainfall totals, this analysis was not possible with the downtown rain data. The following proposed method is simplified and makes a broad assumption. This methodology could be revised in future work. However additional data at a more frequent time interval may be required. The water quality depth was assumed to be proportional to the 2-year 24-hour rainfall depth for the airport gauge. The ratio for the airport data was applied to the 2-year 24-hour depth determined from the downtown gage. This resulted in a water quality storm depth of 2.33 inches for downtown.
1.67in.( wqdepth Airport ) = 0.83 (ratio of wq depth to 2-yr 24-hr depth) 2.01in.(2 yr 24hrdepth Airport )
0.83 (ratio of wq depth to 2-yr 24-hr depth) 2.81 (2-yr 24-hr depthDowntown) = 2.33 in (wq design depthDowntown)
Airport
The water quality design intensity was determined from the hourly rainfall data at the airport gage. Analysis assumed that rainfall intensities below the design intensity received 100-percent treatment while rates above the design rate received no treatment. The intensity that corresponds to 90 percent of the total precipitation was 0.15 inches/hour. Rainfall factors from Miller 1963 were used to convert this to an intensity of 0.38 inches/hour for drainage areas with a time of concentration less than 10 minutes and 0.22 inches/hour for storms in basins with a time of concentration of 30 minutes.
B-6
Downtown
Because the downtown gage only recorded daily rainfall totals this analysis was not possible using the downtown rain data. The following proposed method is simplified and makes a broad assumption. This methodology could be revised in future work. However additional data at a more frequent time interval may be required. The water quality intensity was assumed to be proportional to the 2-year 1-hour storm depth for the airport gauge. The ratio from the airport data was applied to the 2-year 1-hour storm depths for the downtown (McDonald 1990) and resulted in a rate of 0.68 inches/hour for drainage areas with a time of concentration of 10 minutes and 0.40 inches/hour for storms for basins with a time of concentration of 30 minutes. 10-minute time of concentration:
0.38in / hr ( wq int ensity (10 min) Airport ) = 1.27 (ratio of wq intensity to 2yr 1 hr. depth 0.30(2 yr 1hrdepth Airport )
1.27 (ratio of wq depth to 2-yr 1-hr depth) 0.54 (2-yr 1-hr depthDowntown) = 0.68 in/hr (wq design intensity (30-minute)Downtown) 30-minute time of concentration:
0.22in / hr ( wq int ensity (30 min) Airport ) = 0.73 (ratio of wq intensity to 2-yr 1-hr depth) 0.30(2 yr 1hrdepth Airport )
0.73 (ratio of wq depth to 2-yr 1-hr depth) 0.54 (2-yr 1-hr depthDowntown) = 0.40 in/hr (wq design intensity (30-min)Downtown) Table B-1 shows the design depths and intensities to be used for the airport and downtown areas.
B-7
I A Example:
= =
For a 10-acre residential subdivision in the Airport area, with 28 percent impervious cover, the WQv required would be: WQv = (1.67)(0.302)(10)/12 or 0.420 acre-feet of required treatment storage.
Rational Method
This method is most appropriate for sizing water quality treatment BMPs and conveyance systems that drain smaller, quickly responding tributary areas (i.e., less than 10 acres) where very short, intense storms tend to generate the highest peak flows. The Rational Method may also be used for conveyance sizing in any size basin if the attenuation effects of existing storage features in the basin are ignored. The following is the traditional Rational Method equation: QR = CIA where Q C I A = = = = peak flow (cfs) for a storm of return frequency R estimated runoff coefficient (portion of rainfall that becomes runoff) water quality peak rainfall intensity (inches/hour) drainage subbasin area (acres)
C Values
The allowable runoff coefficients to be used in this method are shown in Table B-4 by type of land cover. These values were selected following a review of the values previously accepted by King County, Washington for use in the Rational Method and as described in several engineering handbooks. The values for single-family residential areas were computed as composite values (as illustrated in the following equation) based on the estimated percentage of coverage by roads, roofs, yards, and unimproved areas for each density.
B-8
TABLE B-4. RUNOFF CEFFICIENTSC VALUES FOR THE RATIONAL METHOD General Land Covers Land Cover Dense forest Light forest Pasture Lawns Playgrounds Gravel areas Pavement and roofs Open water (pond, lakes, wetlands) C
0.10
Single Family Residential Areasa Land Cover Density 0.20 DU/GA (1 unit per 5 ac.) 0.40 DU/GA (1 unit per 2.5 ac.) 0.80 DU/GA (1 unit per 1.25 ac.) 1.00 DU/GA 1.50 DU/GA 2.00 DU/GA 2.50 DU/GA 3.00 DU/GA 3.50 DU/GA 4.00 DU/GA 4.50 DU/GA 5.00 DU/GA 5.50 DU/GA 6.00 DU/GA C 0.17 0.20 0.27 0.30 0.33 0.36 0.39 0.42 0.45 0.48 0.51 0.54 0.57 0.60
For drainage basins containing several land cover types, the following formula may be used to compute a composite runoff coefficient, Cc: Cc = (C1A1 + C2A2 + + CnAn)/At where At = A1,2,n = C1,2,n = total area (acres) areas of land cover types (acres) runoff coefficients for each area land cover type
Tc Time of Concentration
The time of concentration is defined as the time it takes runoff to travel overland (from the onset of precipitation) from the most hydraulically distant location in the drainage basin to the point of discharge. Note: When Cc of a drainage basin exceeds 0.60, it may be important to compute Tc and peak rate of flow from the impervious area separately. The computed peak rate of flow for the impervious surface alone may exceed that for the entire drainage basin using the value at Tc for the total drainage basin. The higher of the two peak flow rates shall then be used to size the conveyance element.
B-9
Tc is computed by summation of the travel times Tt of overland flow across separate flow path segments defined by the six categories of land cover listed in Table B-4, which were derived from a chart published by the Soil Conservation Service in 1975. The equation for time of concentration is: Tc = T1 + T2 ++ Tn where T1,2,n = travel time for consecutive flow path segments with different land cover categories or flow path slope Travel time for each segment t is computed using the following equation: Tt = L/60V where Tt = travel time (minutes) Note: Tt through an open water body (such as a pond) shall be assumed to be zero with this method. L = the distance of flow across a given segment (feet) V = average velocity (feet/second) across the land cover = kR So where kR = time of concentration velocity factor; see Table B-5 So = slope of flow path (feet/feet) Alternate methods for calculating time of concentration are discussed in the following section.
TABLE B-5. kR VALUES FOR TT USING THE RATIONAL METHOD Land Cover Category Forest with heavy ground litter and meadow Fallow or minimum tillage cultivation Short grass pasture and lawns Nearly bare ground Grassed waterway Paved area (sheet flow) and shallow gutter flow kR 2.5 4.7 7.0 10.1 15.0 20.0
B-10
depression storage, and an infiltration rate that decreases during the course of a storm. With the SCS method, the direct runoff can be calculated for any storm, either real or fabricated, by subtracting infiltration and other losses from the rainfall to obtain the precipitation excess. Additional information on the unit hydrograph and computer programs can be found on the NRCS web site: http://www.wsi.nrcs.usda.gov/products/W2Q/H&H/H&H_home.html
The SCS unit hydrograph method is used in wide variety of proprietary hydrologic programs such as Stormshed and public domain hydrologic programs such as HEC-HMS. HEC-HMS is available from the U.S. Army Corps of Engineers Hydrologic Engineering Center: http://www.hec.usace.army.mil/
Application
Where hydrographs of design flows are required for basins of 10 acres to 1,300 acres (approximately 2 square miles), the SCS unit hydrograph method may be used. Care should be taken in applying this method to areas of frozen ground and where snowmelt peaks govern. Two types of hydrographs are used in the SCS procedure: unit hydrographs and dimensionless hydrographs. A unit hydrograph represents the time distribution of flow resulting from 1 inch of direct runoff occurring over the watershed in a specified time. A dimensionless hydrograph represents the composite of many unit hydrographs. The dimension-less unit hydrograph is plotted in nondimensional units of time versus time to peak and discharge at any time versus peak discharge. Characteristics of the dimensionless hydrograph vary with the size, shape and slope of the tributary drainage area. The most significant characteristics affecting the dimensionless hydrograph shape are the basin lag and the peak discharge for a given rainfall. Basin lag is the time from the center of mass of rainfall excess to the hydrograph peak. Steep slopes, compact shape, and an efficient drainage network tend to make lag time short and peaks high; flat slopes, elongated shape, and an inefficient drainage network tend to make lag time long and peaks low.
Rainfall-Runoff Equation
A relationship between accumulated rainfall and accumulated runoff was derived by SCS from experimental plots for numerous soils and vegetative cover conditions. Data for land-treatment measures, such as contouring and terracing, from experimental watersheds were included. The equation was developed mainly for small watersheds for which only daily rainfall and watershed data are ordinarily available. It was developed from recorded storm data that included the total amount of rainfall in a calendar day but not its distribution with respect to time. The SCS runoff equation is therefore a method of estimating direct runoff from 24-hour or 1-day storm rainfall. The equation is: Q = (P - Ia) / (P - Ia) + S (7.8) where Q = accumulated direct runoff, inches P = accumulated rainfall (potential maximum runoff), inches Ia = initial abstraction including surface storage, interception, and infiltration prior to runoff, inches S = potential maximum retention, inches
2
B-11
The areas potential maximum detention, S, is related to its curve number, CN: S = (1000 /CN) 10 The relationship between Ia and S was developed from experimental watershed data, removing the need to estimate Ia for common usage. The empirical relationship used in the SCS runoff equation is: Ia = 0.2S Substituting 0.2S for Ia, the SCS rainfall-runoff equation becomes: Q = (P - 0.2S) / (P + 0.8S) When developing the runoff hydrograph, the above equation for Q is used to compute the incremental runoff depth for each time interval from the incremental precipitation depth given by the design storm hyetograph. This time distribution of runoff depth is often referred to as the precipitation excess and provides the basis for synthesizing the runoff hydrograph.
2
Drainage Area
The drainage area of a watershed is determined from topographic maps and field surveys. For large drainage areas it might be necessary to divide the area into subdrainage areas to account for major land use changes, obtain analysis results at different points within the drainage area, or locate stormwater drainage facilities and assess their effects on the flood flows. Also a field inspection of existing or proposed drainage systems should be made to determine if the natural drainage divides have been altered. These alterations could make significant changes in the size and slope of the subdrainage areas.
Rainfall
The SCS method is based on a 24-hour storm event with a 10-minute temporal distribution. The Type IA storm distribution is a typical time distribution that the SCS has prepared from rainfall records for the Pacific maritime climate. To use this distribution it is necessary for the user to obtain the 24-hour rainfall value (from the tables in the attachment to this appendix) for the frequency of the design storm desired.
Curve Numbers
In hydrograph applications, runoff is often referred to as rainfall excess or effective rainfallall defined as the amount by which rainfall exceeds the capability of the land to infiltrate or otherwise retain the rainwater. The principal physical watershed characteristics affecting the relationship between rainfall and runoff are land use, land treatment, soil types and land slope. Land use is the watershed cover, and it includes both agricultural and nonagricultural uses. Items such as type of vegetation, water surfaces, roads, roofs, etc. are all part of the land use. Land treatment applies mainly to agricultural land use, and it includes mechanical practices such as contouring or terracing and management practices such as rotation of crops. The SCS uses a combination of soil conditions and land-use (ground cover) to assign a runoff factor to an area. These runoff factors, called runoff curve numbers (CN), indicate the runoff potential of an area when the soil is not frozen. The higher the CN, the higher is the runoff potential. Runoff curve numbers have not been calibrated to Alaska and should be applied conservatively. Soil properties influence the relationship between rainfall and runoff by affecting the rate of infiltration. The SCS has divided soils into four hydrologic soil groups based on infiltration rates (Groups A, B, C and D). Soils maps of the Juneau area can be found in Shoephorster and Furbush 1974.
B-12
Consideration should be given to the effects of urbanization on the natural hydrologic soil group. If heavy equipment can be expected to compact the soil during construction or if grading will mix the surface and subsurface soils, appropriate changes should be made in the soil group selected. Also runoff curve numbers vary with the antecedent soil moisture conditions, defined as the amount of rainfall occurring in a selected period preceding a given storm. In general, the greater the antecedent rainfall, the more direct runoff there is from a given storm. A five-day period is used as the minimum for estimating antecedent moisture conditions. Antecedent soil moisture conditions also vary during a storm; heavy rain falling on a dry soil can change the soil moisture condition from dry to average to wet during the storm period. Tables B-6 and B-7 give curve numbers for various land uses. These tables are based on an average antecedent moisture condition i.e., soils that are neither very wet nor very dry when the design storm begins. Curve numbers should be selected only after a field inspection of the watershed and a review of zoning and soil maps. Table B-8 gives conversion factors to convert average curve numbers to wet and dry curve numbers.
B-13
B-14
B-15
TABLE B-8. CONVERSION OF AVERAGE ANTECEDENT MOISTURE CONDITIONS TO WET AND DRY CONDITIONS (SOURCE: USDA SOIL CONSERVATION SERVICE TP-149)
B-16
Travel time (Tt) is the ratio of flow length to flow velocity: Tt = L/ 60V where Tt = travel time (minutes) L = flow length (feet) V = average velocity (feet/sec) and 60 = conversion factor from seconds to minutes Time of concentration (Tc) is the sum of Tt values for the various consecutive flow segments. Tc = Tt1+ Tt2 + ... Ttm where Tc = time of concentration (minutes) and m = number of flow segments Water moves through a watershed as sheet flow, shallow concentrated flow, open channel flow or some combination of these. The type of flow that occurs is best determined by field inspection.
Sheet Flow
Sheet flow is runoff that flows over the ground surface as a thin, even layer, not concentrated in a channel. It usually occurs in the headwater of streams. With sheet flow, the friction value (ns) (a modified Mannings effective roughness coefficient that includes the effect of raindrop impact; drag over the plane surface; obstacles such as litter, crop ridges and rocks; and erosion and transportation of sediment) is used. These ns values are for very shallow flow depths of about 0.1 foot and are only used for travel lengths up to 300 feet. Table B-9 gives Mannings ns values for sheet flow for various surface conditions. Table B-10 gives Mannings n normal values for various surfaces. For sheet flow of up to 300 feet, use Mannings kinematic solution to directly compute Tt: Tt = 0.42( ns L )0.8/ (P2)0.527(so)0.4 where Tt = travel time (min) ns = sheet flow Mannings effective roughness coefficient (from Table B-9) L = flow length (ft) P = 2-year, 24-hour rainfall (in) so = slope of hydraulic grade line (land slope, ft/ft) A commonly used method of computing average velocity of flow, once it has measurable depth, is the following equation: V = kso where V = velocity (ft/s) k = time of concentration velocity factor (ft/s) so = slope of flow path (ft/ft)
k is computed for various land covers and channel characteristics with assumptions made for hydraulic radius using the following rearrangement of Mannings equation: k =1.49(R) 0.67/n where R = an assumed hydraulic radius n = Mannings roughness coefficient for open channel flow
B-17
B-18
TABLE B-10. VALUES OF THE ROUGHNESS COEFFICIENT, n Type of Channel and Description
A. Constructed Channels a. Earth, straight and uniform 1. Clean, recently completed 2. Gravel, uniform selection, clean 3. With short grass, few weeds b. Earth, winding and sluggish 1. No vegetation 2. Grass, some weeds 3. Dense weeds or aquatic plants in deep channels 4. Earth bottom and rubble sides 5. Stony bottom and weedy banks 6. Cobble bottom and clean sides c. Rock lined 1. Smooth and uniform 2. Jagged and irregular d. Channels not maintained, weeds and brush uncut 1. Dense weeds, high as flow depth 2. Clean bottom, brush on sides 3. Same, highest stage of flow 4. Dense brush, high stage B. Natural Streams B-1 Minor streams (top width at flood stage < 100ft.) a. Streams on plain 1. Clean, straight, full stage no rifts or deep pools 2. Same as above, but more stones and weeds 3. Clean, winding, some ponds and shoals 4. Same as above, but some weeds 5. Same as 4, but more stones 6. Sluggish reaches, weedy deep pools 7. Very weedy reaches, deep pools, or floodways with heavy stand of ................ b. Mountain streams, no vegetation in channel, banks usually steep, trees and bru 1. Bottom: gravel, cobbles and few boulders 2. Bottom: cobbles with large boulders
Mannings na (Normal)
0.018 0.025 0.027 0.025 0.030 0.035 0.030 0.035 0.040 0.035 0.040 0.080 0.050 0.070 0.100
B-19
Limitations
The following limitations apply in estimating travel (Tt): Mannings kinematic solution should not be used for sheet flow longer than 300 feet. In watersheds with storm drains, carefully identify the appropriate hydraulic flow path to estimate Tc. Storm sewers generally handle only a small portion of a large event. The rest of the peak flow travels by streets, lawns, and so on, to the outlet. Consult a standard hydraulics textbook to determine average velocity in pipes for either pressure or non-pressure flow. A culvert or bridge can act as a reservoir outlet if there is significant storage behind it. A hydrograph should be developed to this point and the level pool routing technique should be used to determine the outflow rating curve through the culvert or bridge.
Continuous Simulation
A continuous simulation model has considerable advantages over the single-event-based methods such as the SCS or the Rational Method. Continuous simulation models are capable of simulating a wider range of hydrologic responses than the single-event models. Single-event models cannot take into account antecedent conditions due to storm events that may occur just before or just after the single event (the design storm) that is under consideration and therefore may undersize required infrastructure. The Hydrologic Simulation ProgramFortran (HSPF) is a popular example of a continuous simulation model. Continuous simulation models require runoff parameters to be calibrated to local data and a longterm continuous rainfall record. Because only a few continuous models have been developed in Juneau and the rainfall record is incomplete and at best at an hourly interval, continuous simulation is unlikely to be used for small developments in Juneau.
REFERENCES
Miller, J. 1963. Technical Paper Number 47: Probable Maximum Precipitation and Rainfall-Frequency Data for Alaska. Weather Bureau, Department of Commerce, Washington D.C. Shoephorster, D.B. and C.E. Furbush. 1974. Soils of the Juneau Area. Department of Agriculture, Soil Conservation Service, Palmer, Alaska.
B-20
Kanan, R. 1990. Rain, Rain and More Rain (http://pajk.arh.noaa.gov/info/articles/our_rain.htm). Weather Forecast Office, National Weather Service. Juneau Alaska. Alaska Highway Drainage Manual. 1995. Alaska Department of Transportation and Public Facilities, Juneau, Alaska. Precipitation Depth Frequency for the Highland Drive Drainage Project. November 1990. G.N. McDonald and Associates, Anchorage, Alaska. Armstrong, R. and Carlson, R. 2003. Analysis of Rainfall Frequency for Selected Alaskan Cities. University of Alaska-Fairbanks, Fairbanks, Alaska. Stormwater Management Manual for Western Washington. 2005. Washington State Department of Ecology, Olympia, Washington. Stormwater Management Manual. 2008. City of Portland, Portland, Oregon. Surface Water Design Manual. 2009. King County, Seattle, Washington. U.S. Department of Agriculture. April 1973. A Method for Estimating Volume and Rate of Runoff in Small Watersheds Technical Paper 149. USDA Soil Conservation Service, Washington D.C. Alaska Storm Water Guide. 2009. Alaska Department of Environmental Conservation, Juneau, Alaska.
B-21
APPENDIX B ATTACHMENT
TABLE B1-1. RAINFALL DEPTH FOR JUNEAU INTERNATIONAL AIRPORT Rainfall Depth (inches) 1.5 year Recurrence Interval 0.08 0.12 0.15 0.21 0.27 0.41 0.53 0.86 1.25 1.54 1.85 2 year Recurrence Interval 0.09 0.13 0.17 0.21 0.30 0.46 0.58 0.94 1.36 1.69 2.01 5 year Recurrence Interval 0.11 0.17 0.21 0.21 0.38 0.57 0.71 1.13 1.63 2.04 2.41 10 year Recurrence Interval 0.13 0.19 0.24 0.21 0.43 0.65 0.79 1.26 1.81 2.28 2.67 25 year Recurrence Interval 0.14 0.22 0.28 0.21 0.49 0.75 0.91 1.41 2.05 2.58 3.00
Duration (hr) 0.083 (5 min) 0.167 (10 min) 0.25 (15 min) 0.5 (30 min) 1 2 3 6 12 18 24
TABLE B1-2. 24-HOUR RAINFALL DEPTH FOR JUNEAU Rainfall Depth (inches) 2-Year 5-Year 10-Year 20-Year 25-Year 50-Year 100-Year 200-Year Recurrenc Recurrenc Recurrenc Recurrenc Recurrenc Recurrenc Recurrenc Recurrenc e Interval e Interval e Interval e Interval e Interval e Interval e Interval e Interval Downtown Airport Auke Bay 2.829 1.895 2.063 3.562 2.409 2.615 4.017 2.732 2.961 4.437 3.03 3.28 4.568 3.123 3.38 4.962 3.405 3.681 5.347 3.681 3.975 5.728 3.956 4.265
McDonald, 1990.
BA-1
TABLE B1-3. RAINFALL DEPTHS FOR JUNEAUINTERNATIONAL AIRPORT Rainfall Depth (inches) Rainfall Duration 1 hr 3 hr 6 hr 12 hr 18 hr 1-Year Recurrenc e Interval 0.35 0.77 1.09 1.43 1.66 2-Year Recurrenc e Interval 0.43 1.02 1.46 1.95 2.26 5-Year Recurrenc e Interval 0.53 1.35 1.95 2.63 3.06 3.38 10-Year Recurrenc e Interval 0.61 1.6 2.32 3.14 3.66 4.05 25-Year Recurrenc e Interval 0.72 1.93 2.82 3.82 4.45 4.93 50-Year Recurrenc e Interval 0.8 2.18 3.18 4.32 5.04 5.59 100-Year Recurrenc e Interval 0.88 2.43 3.56 4.84 5.65 6.27
TABLE B1-4. RAINFALL DEPTHS FOR JUNEAUDOWNTOWN Rainfall Depth (inches) Rainfall Duration 1 hr 3 hr 6 hr 12 hr 18 hr 1-Year Recurrenc e Interval 0.46 1.2 1.74 2.34 2.74 2-Year Recurrenc e Interval 0.54 1.42 2.08 2.81 3.28 5-Year Recurrenc e Interval 0.63 1.72 2.53 3.43 4 4.44 10-Year Recurrenc e Interval 0.7 1.95 2.86 3.89 4.56 5.04 25-Year Recurrenc e Interval 0.8 2.25 3.31 4.51 5.27 5.85 50-Year Recurrenc e Interval 0.87 2.47 3.65 4.97 5.81 6.45 100-Year Recurrenc e Interval 0.95 2.7 3.99 5.44 6.36 7.06
BA-2
GRASSES
Festuca rubra, Red Fescue - Uplands Deschampsia cespitosa, Tufted Hairgrass - Moist soils to upland Calamagrostis canadensis, Blue joint Reedgrass - Wet Meadow to well drained upland Hordeum brachyantherum, Meadow Barley - Moist soils and wet meadow
WETLAND, NON-WOODY
Carex sitchensis, Sitka Sedge - Wet meadow to standing water Carex kellogii, Kelloggs Sedge - Moist to well drained, disturbed sites Carex mertensii, Mertens Sedge - Moist and wet meadow Iris setosa, Iris or Wild Flag - Moist to saturated Scirpus microcarpus, Small Leaf Bulrush - Saturated to standing water Juncus effusus, Common Rush - Saturated to standing water Eriophorum angustifolium, Cottongrass - Saturated to standing water Menyanthes trifoliata, Buckbean - Saturated to standing water Eleocharis palustris, Spike Rush - Saturated to standing water Caltha palustris, Marsh Marigold - Standing water Lysichiton americanum, Skunk Cabbage - Standing water
C-1
Rubus spectabilis, Salmonberry Moist to upland Rubus parviflorus, Thimbleberry - Upland Populus balsamifera, Cottonwood - Upland near water bodies Sambucus racemosa, Elderberry, Upland and streambanks Tsuga heterophylla, Western Hemlock - Moist to upland
C-2