Professional Documents
Culture Documents
Please note: InfoMine USAs subscription fees are charged on a per user basis. Unauthorized redistribution of InfoMine USA information, including the forwarding of email publications to third parties and the copying of printed publications, is prohibited without prior written authorization of InfoMine USA, Inc.
If you wish to add users to your subscription please contact us. After your company has purchased its first subscription to Mining Cost Service, second and third users at the same location receive their subscriptions at a 50% discount. Four or more subscribers receive a 75% discount, and 10 or more added subscribers are eligible for special bulk rates. For information on discounts for other company locations, please contact us.
Tel: 509-328-8023 Fax: 509-328-2028 Email: jleinart@infomine.com LEGAL COPYRIGHT NOTICE 2009 InfoMine USA, Inc.
InfoMine USA, Inc. 1120 North Mullan Rd., Suite 100 Spokane Valley, WA 99206 USA 509-328-8023 FAX 509-328-2028
Mining Cost Service Section EP Electric Power - United States CONTENTS United States
Page Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Rate Schedule Summaries - Western U.S. Alaska . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Arizona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 California . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Colorado . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Idaho . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Minnesota . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Montana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Nevada . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 New Mexico . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Page Rate Schedule Summaries - Western U.S. North Dakota . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Oregon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 South Dakota . . . . . . . . . . . . . . . . . . . . . . . . . . 51 Utah . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Washington . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 Wisconsin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Wyoming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Estimators Guide to Industrial Electric power Rates - All U.S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 Compiled by Jerry Olson
INTRODUCTION
Electric Power Service Rate Schedule Summaries - Western U. S.
The rate schedule tables contain summaries of electric power schedules for companies serving the majority of the western U.S. land area. Companies serving municipalities only have not been included. The state maps show approximate service area boundaries for each utility as determined through a variety of government and industry sources. Some companies have many different rate schedules for a variety of purposes. Only those schedules considered most applicable to the mining industry are included here. Many of these schedules are very complex. Space limitations prevent inclusion of any information other than that necessary for cost estimating purposes. The power company should be consulted when more specific details are needed. Some of these companies presently have no industrial customers and therefore no appropriate rate schedules established. Often special contracts are written to cover such circumstances. All charges listed in these schedules are monthly unless stated otherwise. A typical monthly power bill consists of a fixed customer charge, plus a demand charge based on the maximum 15 minute energy draw, and an energy charge calculated from the total KWH consumed in the billing period. Many schedules provide for rate adjustments for the varying cost of power or fuel which must be purchased by the power company. Where these adjustments are identifiable in the schedules provided, they have either been included in the energy charges or listed under "remarks". Adjustments in parenthesis are negative, i.e. credited to the customer. Adjustments for varying local taxes are not included in this summary. Some utilities offer discounts ranging from 2% to 10% to customers taking delivery of power at primary or transmission voltages. In these cases, the customer must maintain his own transformers and related equipment. Where these discounts could be identified from the rate schedules provided, they are listed under "remarks". Charges sometimes vary according to time of day, day of week, and season of year. These are usually listed as "on-peak", "mid-peak" and "off-peak" rates. On-peak rates apply when the utility load is customarily greatest. Off-peak rates apply when the load is customarily least. Where detailed information is required, the power company should be consulted.
EP- U.S.
Copyright 2008 InfoMine USA, Inc.
INTRODUCTION
(continued)
EP - U.S. 2
ALASKA
Power Company
Alaska Electric Light & Power
Sched No.
24
Schedule Name
Large Commercial w/demand metering
Demand Charge
November - May: June - October:
(dollars)
11.53/KW 7.35/KW
Energy Charge
November - May: June - October:
(cents)
4.930/KWH 4.620/KWH
Minimum Demand
50 KW
Remarks
Customer charge: $99.24/mo. Power cost adjustment of $(0.028778)/KWH. Regulator cost adjustment $0.000362/KWH, effective 10/2008. Customer charge: $99.24/mo. Continuous during months of June through October, interruptible during November through May. Power cost adjustment of $(0.028778)/KWH. Regulator cost adjustment $0.000362/KWH, effective 10/2008. Cost of fuel adjustment varies from $0.1135 to $0.5505/KWH. 2008 rate. Customer charge: Three-Phase $89.67/mo.
41
9.20/KW 7.35/KW
5.300/KWH 4.810/KWH
GS-2
Small Commercial
32.000/KWH 22.000/KWH
No charge
All usage:
9.560/KWH
10.80/KW
All usage:
8.7742/KWH
20 KW
Customer charge: $61.44/mo. Includes fuel & purchased power cost adjustment factor and a regulatory cost charge. Customer charge: $100.00/mo. Subject to cost of power adjustment factor which changes quarterly, currently $0.1724/KWH, 12/2008.
Copper Valley
All demand:
12.00/KW
200 KW demand or less: 0 to 10,000 KWH/mo.: Over 10,000 KWH/mo.: >200 KW demand: 0 to 10,000 KWH/mo.: Over 10,000 KWH/mo.:
All demand:
12.00/KW
Customer charge: $100.00/mo. Subject to cost of power adjustment factor which changes quarterly, currently $0.1724/KWH, 12/2008. Base charge: $60.00/mo. Subject to fuel cost adjustment factor. Minimum charge: $100.00/mo.
800
Large Power
8.40/KW
20 KW
EP - U.S. 3
EP - U.S. 4
Copyright 2008 InfoMine USA, Inc.
ALASKA
Power Company
Glacier Highway Electric Association Golden Valley Electric Association Association Homer Electric Association GS-2 General Service All demand: 9.98/KW First 15,000 KWH: All additional: 16.448/KWH 15.409/KWH 25 KW
Sched No.
Schedule Name
Demand Charge
(dollars)
Energy Charge
(cents)
Minimum Demand
Remarks
Purchased by Alaska Electric Light & Power. Customer charge: $100.00/mo. Energy charges include fuel cost adjustment. Customer charge: $150.00/mo. Subject to wholesale power cost adjustment and regulatory clauses. 7/2008. Customer charge: $50.00/mo. Subject to a purchased power adjustment of $0.1945/KWH, effective 9/2008. Customer charge: $50.00/mo. Subject to cost of power adjustment of $0.043274/KWH effective 10/2008. Subject to fuel cost rate adjustment clause: $0.0829/KWH effective 8/06. 2006 rate Facility charge: $13.37/mo. Subject to monthly power cost adjustment. An experimental interruptible service is available by special contract. $10.00 minimum charge per mo. Subject to fuel cost adjustment. 2006 rate.
All demand:
7.1683/KW
10.333/KWH
GS-2
Large Commercial
All demand:
11.39/KW
All usage:
37.490/KWH
10 KW
LP
Large Power
All demand:
5.67/KW
12.700/KWH 11.380/KWH
50 KW
All demand:
2.53/KW
21.240/KWH 19.590/KWH
All demand:
5.00/KW
All usage:
11.0362/KWH
Small/Large Commercial
All demand:
7.00/KW
All usage:
9.200/KWH
LP
Large Power
All demand:
10.00/KW
All usage:
15.000/KWH
25 KVA
Consumer charge: $100.00/mo. Subject to fuel cost adjustment charge. Minimum charge: $100.00/mo.
ALASKA
Power Company
Nushagak Cooperative
Sched No.
Schedule Name
Large Commercial
Demand Charge
All demand:
(dollars)
8.50/KW
Energy Charge
All usage:
(cents)
24.360/KWH
Minimum Demand
20 KW
Remarks
Customer charge: $75.00/mo. Subject to a fuel cost adjustment of $0.2352/KWH. 2008 Rate. Minimum charge $21.25/mo.
General Service
No charge 3.90/KW
First 500 KWH: 500 - 10,000 KWH: 10,001 - 100,000 KWH: Over 100,000 KWH: All usage:
Interruptible Service Unalakleet Valley Electric Association Commercial Rate Over 10 KW: 4.90/KW
0.317 times price per gal for #2 heating oil 30.800/KWH 0.0039/KWH
Basic customer charge: $100.00/mo. Only applicable during off peak time. Subject to fuel cost adjustment. Minimum charge: $15.32/mo. 2006 rate.
ARIZONA
Power Company
Ajo Improvement Company
Sched No.
Schedule Name
General Electric Service
Demand Charge
All demand:
(dollars)
No charge
Energy Charge
All usage:
(cents)
11.564/KWH
Minimum Demand
Remarks
Customer charge: $5.20/mo. Purchased power cost adjustment included.
E-32
General
All demand: First 100 KW: All additional: First 100 KW: All additional: First 100 KW: All additional:
Secondary: First 5,000 KWH: All additional: Primary: First 5,000 KWH: All additional:
Daily basic charge: Self contained meter: $0.575 Primary voltage: $2.926 Transmission voltage: $22.422 Subject to a purchased power and fuel cost adjustment factor.
EP - U.S. 5
EP - U.S. 6
Copyright 2008 InfoMine USA, Inc.
ARIZONA
Power Company
Arizona Public Service Company
Sched No.
E-34
Schedule Name
Demand Charge
(dollars)
15.297/KW 14.507/KW 10.577/KW
Energy Charge
All usage:
(cents)
3.715/KWH
Minimum Demand
3,000 KW
Remarks
Daily basic charge: Self contained meter: $0.575 Primary voltage: $2.926 Transmission voltage: $22.422 Subject to a purchased power and fuel cost adjustment factor. Unbundled service also available. Daily basic charge: Self contained meter: $0.608 Primary voltage: $2.926 Transmission voltage: $22.422 Subject to a purchased power fuel cost adjustment. *Off-Peak demand is only charged for off-peak demand that is greater than on-peak demand.
(continued)
Extra Large All demand: General Service Secondary: - Bundled Primary: Transmission:
E-35
Extra Large All demand: General Service On-Peak: Time-of-Use Secondary: Primary: Transmission: Off Peak: Secondary: Primary: Transmission:
All demand:
All usage:
5.200/KWH
Customer charge: $35.00/mo. Subject to cost of fuel and purchased power adjustment. Customer charge: $50.00/mo. Subject to cost of fuel and purchased power adjustment. *Peak: 6:00 A.M. - 9:00 P.M.
Peak: Non-Peak:
13.50/KW No charge
Peak* Non-Peak:
5.925/KWH 5.000/KWH
Industrial Service
All demand:
12.50/KW
All usage:
4.410/KWH
350 KVA
Customer charge: $35.00/mo. Subject to cost of fuel and purchased power adjustment.
ARIZONA
Power Company Continental Divide Electric Cooperative Sched No. LPS Schedule Name Large Power Service Demand Charge Utility owned substation: Consumer owned substation: All demand: (dollars) 14.00/KVA 13.75/KVA 8.00/KW All usage: 2.200/KWH 50 KW to 500 KW 15 KVA Customer charge: $30.00/mo. Over 500KW available by special contract. 2005 rate. System charge: $40.00/mo. Fuel cost adjustment applies. 2006 rate. Base rate: $20.00/mo. Subject to cost of purchased power adjustment. Customer charge: $15.00/mo. Subject to a fuel cost adjustment of $0.015/KWH, effective 6/2006. 2006 rate. Customer charge: $50.00/mo. Subject to a fuel cost adjustment of $0.015/KWH, effective 6/2006. 2006 rate. Customer charge: $70.00/mo. Subject to a cost of purchased power adjustment of $0.006/KWH and environmental charge of $0.000875/KWH. Customer charge: $5.50/mo. Subject to a fuel cost adjustment of $(0.019)/KWH, effective 8/06. Environmental surcharge: $0.000875/KWH. 2006 rate. Customer service charge: $500.00/mo. Other details negotiated. 2006 rate. Energy Charge All usage: (cents) 4.180/KWH Minimum Demand 50 KVA Remarks Customer charge: $40.00/mo. Subject to fuel and purchased power cost adjustment.
Dixie Escalante Rural Electric Cooperative Duncan Valley Electric Cooperative TPD
No charge 10.00/KW
All usage:
5.966/KWH
General Service 2
All demand:
6.37/KW
All usage:
6.115/KWH
50 KW
All usage:
10.969/KWH
Up to 300 KVA
Large Commercial
All usage:
9.876/KWH
350 KVA
All demand:
9.75/KW
All usage:
4.558/KWH
100 KW
General Service
All demand:
No charge
All usage:
10.150/KWH
EP - U.S. 7
EP - U.S. 8
Copyright 2008 InfoMine USA, Inc.
ARIZONA
Power Company Navopache Electric Cooperative Sched No. B Schedule Name Commercial & Industrial Service Time-of-Use Demand Charge On-Peak* Off-Peak: (dollars) 7.25/KW 7.20/KW Energy Charge All usage: (cents) 2.747/KWH Minimum Demand 50 KVA Remarks Customer charge: Secondary Voltage - $155.00/mo.; Primary Voltage - $244.00/mo. 7% discount for delivery at 14.4KV and above. Subject to a power cost adjustment. On-Peak*: 6.00 A.M. - 9:00 P.M. A Commercial & Industrial Service All demand: 8.70/KW First 300 KWH/KW: All additional: 5.197/KWH 2.747/KWH 50 KVA Customer charge: Secondary Voltage - $120.00/mo.; Primary Voltage - $244.00/mo. 7% discount for delivery at 14.4KV and above. Subject to a power cost adjustment. Customer charge: $12.47/mo. Subject to a cost of fuel and purchased power adjustment.
E-36
General Service
Over 5 KW:
Winter 2.34/KW
Summer 4.05/KW
First 350 KWH/KW: Next 180 KWH/KW: Next 155 KWH/KW: All additional: All usage: On-Peak: Shoulder-Peak: Off-Peak:
E-32
Customer charge: $15.04/mo. Subject to a cost of fuel and purchased power adjustment. Winter - May 1 to October 31. Summer - November 1 to April 30.
*Peak:
Winter Summer
5:00 A.M. to 9:00 A.M. Monday - Friday 2:00 P.M. to 7:00 A.M. Monday - Friday 5:00 A.M. to 9:00 A.M. Monday - Friday 11:00 A.M. to 2:00 P.M. Monday - Friday
ARIZONA
Power Company Sierra Southwest Services, Inc. Sched No. Schedule Name Demand Charge (dollars) Energy Charge (cents) Minimum Demand Remarks Wholesale producer which provides power to co-ops and other utilities. Rates subject to purchased power cost adjustment. P General Power Service Large Commercial Service General Service All demand: Cooperative's Transformers Customer's Transformers All demand: All usage: 6.50/KVA 5.50/KVA All usage: 8.400/KWH 6.210/KWH 50 KVA to 1,000 KVA Customer charge: $42.00/mo. Subject to a wholesale power rate adjustment. 2006 rate. Subject to a power cost adjustment. 2006 rate.
050
6.50/KW
GS-2
> 10KW:
4.00/KW
All usage:
11.397/KWH
10 KW to 200 KW 10 KW to 11,999 KW
GS-3
General Service
Over 10KW:
15.88/KW
All usage:
6.157/KWH
10
General Service
All demand:
No charge
May - October: First 3,400 KWH: All additional: November - April: First 3,400 KWH: All additional:
13
1,675.88/mo. 6.52/KW
Customer owned transformers $0.206 discount on demand. Time-of-use and unbundled rates also available. Delivered at primary voltage of 46KV or higher. Time-of-use and unbundled rates
14
All demand:
9.97/KW
4.6001/KWH 4.3701/KWH
3,000 KW
EP - U.S. 9
EP - U.S. 10
Copyright 2008 InfoMine USA, Inc.
ARIZONA
Power Company Unisource Energy Services Sched No. LGS Schedule Name Large General Service Demand Charge All demand: (dollars) 10.71/KW Energy Charge All usage: (cents) 6.7062/KWH Minimum Demand 5 KW to 1,000 KW Remarks Customer charge: $15.50/mo. 1 year contract required. Rates include a purchased power cost adjustment. Customer charge: for service less than 69kv, $365.00/mo., greater than or equal to 69kv, $400.00/mo. Rates include a purchased power cost adjustment.
(Formerly Citizens Utilities Co.) LPS Large Power Service All demand: Service < 69 /KV Service > 69 /KV All usage: 17.895/KW 11.61/KW 5.326/KWH 500 W
All demand:
3.00/KW
First 3,000 KWH: Next 147 KWH/KW: Next 150 KWH/KW: All additional:
10 KW
CALIFORNIA
Power Company Lassen Municipal Utility District Sched No. 1025 Schedule Name Demand Charge (dollars) 6.00/KW Energy Charge All usage: (cents) 13.000/KWH Minimum Demand Remarks Customer charge: $25.00/mo. per meter. 500 KW Service charge: $230.00/mo. Discount for customer owned transformers taking service at 69KV or higher: $.15/KVA for 1st 1,000KVA; $.10/KVA for all additional KVA.
General All demand: Service Demand General Power Service Time-Metered All demand:
1070
7.00/KW
All usage:
12.500/KWH
CALIFORNIA
Power Company Department of Water and Power, City of Los Angeles Sched No. A-2 Schedule Name Demand Charge (dollars) 13.78/KW 12.62/KW 2.25/KW 1.65/KW 8.52/KW 4.10/KW 0.80/KW 7.80/KW 3.76/KW 0.80/KW Energy Charge All usage: (cents) 2.181/KWH Minimum Demand 30 KW Remarks Service Charge: $25.00/mo. Rate subject to energy cost and energy subsidy adjustment. Service Charge: $50.00/mo. Rate subject to energy cost and energy subsidy adjustment. High Peak Period: Monday -Friday 1:00 P.M. - 4:59 P.M. Low Peak Period: Monday -Friday 11:00 A.M. - 12:59 P.M. 5:00 P.M. - 6:59 P.M. Base Period: All other time. Pacific Gas and Electric Company A-10 Medium General Demand Metered Service Secondary voltage: Winter: Summer: Primary voltage: Winter: Summer: Transmission voltage: Winter: Summer: Maximum demand: Secondary voltage: Winter: Summer: Primary voltage: Winter: Summer: Transmission voltage: Winter: Summer: Summer: On-Peak* Partial Peak** Off-Peak*** Winter: Partial-Peak** Off-Peak*** 50 KW 9.934/KWH 13.107/KWH 9.459/KWH 12.497/KWH 8.447/KWH 11.010/KWH 500 KW 14.380/KWH 9.873/KWH 8.029/KWH 8.791/KWH 7.748/KWH Substantial savings available for interruptible options to this schedule. Rates include all energy rate adjustments. Customer base charge: $13.55236/meter/day plus an additional negotiated rate of $3.97799 to $4.11992/meter/day. Customer charge: $3.94251/day. Optional meter data access charge $0.98563/meter/day. Substantial savings available for interruptible options to this schedule. Rates include all energy rate adjustments. Maximum demand 500 KW.
General June - October: Service November - May: Primary - Rate A Facilities charge: Large General Service Rate A (Subtrans.) Facilities charge: June - October: High Peak: Low Peak: Base Period: November - May: High Peak: Low Peak: Base Period:
A-3
500 KW
E-19
Summer Peak* 12.30/KW Summer Partial Peak** 2.80/KW Winter Partial Peak** Summer: *Peak **Partial Peak ***Off-Peak Winter: **Partial Peak ***Off-Peak 1.00/KW
12:00 P.M. - 6:00 P.M. Monday - Friday 8:30 A.M. - 12:00 P.M.; 6:00 P.M. - 9:30 P.M. Monday - Friday 9:30 P.M. - 8:30 A.M. Monday - Friday plus Saturday, Sunday & Holidays 8:30 A.M. - 9:30 P.M. Monday - Friday 9:30 P.M. - 8:30 A.M. Monday - Friday plus Saturday, Sunday, & Holidays
EP - U.S. 11
EP - U.S. 12
Copyright 2008 InfoMine USA, Inc.
CALIFORNIA
Power Company Pacific Gas and Electric Company (continued) Sched No. Schedule Name Demand Charge Maximum demand: (dollars) 7.14/KW Energy Charge Summer: On-Peak* Partial Peak** Off-Peak*** Winter: Partial Peak** Off-Peak*** Summer: On-Peak* Partial Peak** Off-Peak: Winter: Partial Peak** Off-Peak*** (cents) 13.717/KWH 9.488/KWH 7.740/KWH 8.476/KWH 7.476/KWH 1,000 KW 14.081/KWH 9.525/KWH 7.554/KWH 8.176/KWH 7.178/KWH 20 KW 1.29/KW 0.88/KW All usage: 3.947/KWH 500 KW 7.264/KWH Customer Charge: $32.85421/day. Substantial discounts available for interruptible service. Rates include all energy rate adjustments. Meter data access charge: $0.98563/meter/day. Minimum Demand 1,000 KW Remarks Customer Charge: $24.64066/day. Substantial discounts available for interruptible service. Rates include all energy rate adjustments. Meter data access charge: $0.98563/meter/day.
Summer partial Peak** 2.64/KW Summer Peak: 11.95/KW Winter partial Peak** 1.00/KW
E20P
A-32
General Service
Rates include all energy rate adjustments. Basic charge: Single -phase - $10.35/mo.; Three-Phase - $14.22/mo. Rates Include all energy rate adjustments. Basic charge: $372.39/mo. Discount of 1.0% for metering at primary voltage. If delivery is at primary voltage, distribution demand charges will be reduced by 30%. *Peak: Monday - Friday, 6:00 A.M. - 10:00 P.M.
AT-48
Generation & Transmission On-Peak* November - April: 2.28/KW May - October: 1.22/KW Distribution: 1.60/KW
Medium Power
10.22/KW
All usage:
9.550/KWH
50 KW
Membership fee: $5.00. Load cannot be greater than 250KW. 2006 rate. Membership fee: $5.00 2006 rate.
310
All demand:
10.22/KW
All usage:
8.700/KWH
250 KW
CALIFORNIA
Power Company Sacramento Municipal Utility District Sched No. GS Schedule Name General Service Demand Secondary Demand Charge Over 20 KW Winter: Summer: (dollars) 6.00/KW 6.00/KW Energy Charge First 7,300 KWH: Winter: Summer: All additional: Winter: Summer: GS General TOU 3 Service Time-of-use Primary Super-Peak: Summer: On-Peak: Winter: Summer: Off-Peak Winter: Summer: Super-Peak: On-Peak: Off-Peak: San Diego Gas and Electric Company ALTOU General Service Large -Time Metered June 1 - September 30: 2:00 P.M. - 8:00 P.M. October 1 - May 31: 12:00 P.M. - 10:00 P.M. June 1 - September 30: 12:00 P.M. - 2:00 P.M. & 8:00 P.M. - 10:00 P.M. All other times (dollars) Summer: Winter: 0.11906/KWH 0.11594/KWH 0.0954/KWH 0.10545 /KWH 0.7284/KWH 0.07967/KWH 0.11437/KWH 0.09228/KWH 0.07022/KWH 0.11179/KWH 0.10217/KWH 0.07692/KWH 20 KW to 12,000 KW Rates include all adjustments. Service charge: $58.22/mo. per meter for less than 500 KW demand. $232.87 per meter per month for greater than 500 KW demand. (cents) 10.090/KWH 11.130/KWH 8.040/KWH 8.580/KWH 30 KW to 499 KW Customer charge: $85.00/mo. Plus facilities charge of $2.70/KW installed capacity. Energy surcharge applies. Minimum Demand 21 KW to 299 KW Remarks Customer charge: $18.00/mo. Energy surcharge applies to all energy consumed.
5.53/KW 10.91/KW
3.78/KW 10.91/KW
Summer - 11:00 A.M. - 6:00 P.M. Monday - Friday Winter - 5:00 P.M. - 8:00 P.M. Monday - Friday Summer - 6:00 A.M. - 11:00 A.M. & 6:00 P.M. - 10:00 P.M. Monday - Friday Winter - 6:00 A.M. - 5:00 P.M. & 8:00 P.M. - 10:00 P.M. Monday - Friday
EP - U.S. 13
EP - U.S. 14
Copyright 2008 InfoMine USA, Inc.
CALIFORNIA
Power Company NV Energy Sched No. A-2 Schedule Name Medium General Service Demand Charge All demand: (dollars) 6.67/KW Energy Charge All usage: Summer: Winter: (cents) 12.305/KWH 9.626/KWH Minimum Demand 50 KW to 200 KW Remarks Customer charge: $100.00/mo. Rates include all energy rate adjustment. Discounts for primary distribution or transmission voltage delivery. Customer charge: $550.00/mo.
A-3
200 KW
Summer: 5:00 P.M. - 10:00 P.M. Winter: 10:00 A.M. - 10:00 P.M. Summer: 7:00 A.M. - 5:00 P.M. All other hours 9.54/KW All use: Summer: Winter: *KWH per KW of max demand Customer charge: $94.65/mo. Minimum charge: $1.00 per KW of contract demand. Energy rates include all adjustment factors. Discounts may apply. 500 KW On-Peak:* Mid-Peak:** Off-Peak:*** Summer: 9.865/KWH 7.142/KWH 3.574/KWH Winter: N/A 7.417/KWH 3.948/KWH Customer charge: $458.04/mo.
GS-2
All demand:
6.279/KWH 5.235/KWH
Summer: Monday - Friday 12:00 P.M. - 6:00 P.M. Winter: Monday - Friday 5:00 P.M. - 9:00 P.M. Summer: Monday - Friday Winter: Monday - Friday All other hours 8:00 A.M. - 12:00 P.M.; 6:00 P.M. - 11:00 P.M. 8:00 A.M. - 5:00 P.M.
CALIFORNIA
Power Company Surprise Valley Electrification Corporation Turlock Irrigation District ID Sched No. A Schedule Name Large Power Service Demand Charge All demand: (dollars) 5.14/KW Energy Charge All usage: (cents) 4.040/KWH Minimum Demand 50 KVA Remarks Basic customer charge: $10.00/mo. Subject to wholesale power cost adjustments. Customer charge: $82.00/mo. 2.5% discount applied to energy charge for delivery at 12,000 volts. 6% discount applied to energy charge for delivery at 69,000 volts. Power factor charge per KVA or portion thereof $1.10. Customer Charge: $250.00/mo. 2.5% discount applied to energy charge for delivery at 12,000 volts. 6% discount applied to energy charge for delivery at 69,000 volts. Power factor charge per KVA or portion thereof $1.10.
Winter: Summer:
8.92/KW 10.70/KW
35 KW 5.370/KWH 7.070/KWH
HT
Winter: Summer:
7.99/KW 8.85/KW
On-Peak* Off-Peak:
500 KW
COLORADO
Power Company
Delta-Montrose Electric Association
Sched No.
3
Schedule Name
Large Commercial Industrial
Demand Charge
All demand:
(dollars)
10.62/KW
Energy Charge
All usage:
(cents)
5.788/KWH
Minimum Demand
50 KW
Remarks
Basic charge: $130.00/mo.
4&5
All usage: Distribution voltage: Transmission voltage: First 200 KWH/KW: Next 200 KWH/KW: All additional:
Subject to cost of power adjustment. Transmission voltage is greater than 46KV. Facilities charge: $182.25/mo.
LP
EP - U.S. 15
EP - U.S. 16
Copyright 2008 InfoMine USA, Inc.
COLORADO
Power Company
Grand Valley Power
Sched No.
LP-1
Schedule Name
Large Power Service
Demand Charge
All demand:
(dollars)
4.55/KW
Energy Charge
First 200 KWH/KW: Next 200 KWH/KW: All additional:
(cents)
8.293/KWH 6.520/KWH 4.556/KWH
Minimum Demand
50 KW
Remarks
Customer charge: $50.00/mo. 2% discount for service at primary distribution voltage. Subject to purchased cost adjustment $0.0023143/KWH, effective 1/2008. Customer charge: $122.00/mo.
043
Large Power
All demand:
16.86/KW
All usage:
3.735/KWH
50 KVA
LP
All demand:
16.13/KW
All usage:
2.940/KWH
Discount for delivery at 7.27KV or 12.47KV. Minimum charge: $56.00. Subject to wholesale cost of power adjustment. Service charge: $36.00 per meter per month. 37.5 KVA Facility charge: $26.00/mo. 5% demand discount for delivery at primary voltage if customer owns and maintains transformers. 2006 rate.
LP
Large Power
All demand:
12.32/KW
First 50 KWH/KW: Next 100 KWH/KW: Next 100 KWH/KW: All additional:
63/64
All demand:
6.54/KW
All usage:
4.442/KWH
66/67
All usage:
2.972/KWH
50 KW
All demand:
8.40/KW
All usage:
2.767/KWH
50 KVA
COLORADO
Power Company
KC Electric Association
Demand Charge
(dollars)
Energy Charge
First 10,000 KWH: All additional:
(cents)
10.650/KWH 8.650/KWH 7.800/KWH 6.800/KWH 5.800/KWH
Minimum Demand
Remarks
Three-phase monthly minimum: $30.00.
0006
All demand:
5.50/KW
800 KVA
LP-30
All demand:
13.25/KW
50 KW
LP-31
All demand:
10.50/KW
All usage:
4.820/KWH
50 KW
LP
All demand:
11.00/KW
All usage:
3.720/KWH
50 KVA
IS-2
All demand:
11.00/KW
All usage:
3.140/KWH
Delivery at primary voltage Customer charge: $2,198.00/mo. 40 KW Monthly facility charge: $70.00 2006 rate. Service charge: $88.40/mo.
All demand:
14.50/KW
All usage:
4.8803/KWH
All demand:
4.35/KW
50 KW
60
Large Power
All demand:
17.89/KVA
All usage:
3.849/KWH
25 KVA
EP - U.S. 17
EP - U.S. 18
Copyright 2008 InfoMine USA, Inc.
COLORADO
Power Company
Poudre Valley Rural Electric Association
Sched No.
LP-08
Schedule Name
Large Power Service
Demand Charge
All demand:
(dollars)
17.00/KW
Energy Charge
All usage:
(cents)
5.410/KWH
Minimum Demand
37.5 KW
Remarks
Facility charge: $66.00/mo. Subject to cost of purchased power adjustment. Minimum charge: $1.50/KVA of installed transformer capacity. Facilities charge: $66.00/mo. Subject to cost of purchased power adjustment. Minimum charge $1.50/KVA of installed transformer capacity. 5% discount for primary delivery. Customer charge: $100.00/mo. For delivery at 69KV or 44KW. Customer charge: $450.00/mo. Customer charge: $75.00/mo.
All demand:
16.15/KW
All usage:
4.750/KWH
500 KW
C2
All demand:
14.50/KW
All usage:
8.3898/KWH
50 KW
C3
All demand:
14.37/KW
All usage:
7.5088/KWH
1,500 KW
LP-A
5.10/KW
First 200 KWH/KW: Next 200 KWH/KW: All additional: First 200 KWH: Next 200 KWH: All additional: First 200 KWH: Next 200 KWH: All additional:
45 KW to 500 KW 500 KW
LP-B
All demand:
9.00/KW
LP-B
All demand:
8.73/KW
500 KW
COLORADO
Power Company
San Miguel Power Association
Sched No.
3
Schedule Name
Demand Charge
(dollars)
19.05/KW
Energy Charge
All usage:
(cents)
5.8676/KWH
Minimum Demand
50 KW to 1,000 KW 50 KVA
Remarks
Customer charge: $29.86/mo. 2008 rate.
General Service All demand: Three-Phase Service Three-Phase & Large Power Service Large Power Service Large Power Time-of-Day Demand Industrial Primary Voltage All demand:
25.00/KW
All usage:
5.078/KWH
LP
All demand:
17.85/KW
All usage:
5.153/KWH
50 KVA
Service charge: $136.00/mo. Large loads are negotiated. Service charge: $163.35/mo. 1,500KVA. Service charge based on cost of facilities. Charge for Three-Phase service: $40.20/mo. Subject to wholesale power cost adjustment. 2008 rate. Service charge: $45.20/mo. Subject to wholesale power cost
LT
On-Peak: Off-Peak:
18.50/KW 0.00/KW
All usage:
5.467/KWH
50 KVA
IPDRI
All demand:
14.05/KW
All usage:
3.807/KWH
100 KVA
IPTDI
Industrial On-Peak: Time-of-Day Facility Demand: Primary Voltage Large Power Service All demand:
12.25/KW 7.20/KW
All usage:
2.262/KWH
LP-S
No charge
All usage:
9.461/KWH
LPPRIM
27.10/KW
All usage:
3.535/KWH to
1,000 KVA Service charge: 50.00/mo. Subject to purchased power 5,000 KVA adjustment. 2008 rate. 50 KVA Minimum charge: $105.00.
12
All demand:
No charge
All usage:
8.424/KWH
50 53
All demand:
3.94/KW
All usage: First 200 KWH/KW: Next 200 KWH/KW: All additional:
Service charge: $50.00 per meter per month. If transformers are customer owned there is a $0.50/KW demand discount. 2008 rate.
EP - U.S. 19
EP - U.S. 20
Copyright 2008 InfoMine USA, Inc.
COLORADO
Power Company
XCEL Energy
Sched No.
SG
Schedule Name
Secondary General Service
Demand Charge
All demand: Winter: Summer:
(dollars)
8.40/KW 9.58/KW
Energy Charge
All usage:
(cents)
0.288/KWH
Minimum Demand
Up to 4,000 KW
Remarks
Facilities charge: $25.00/mo. Subject to electric cost adjustment.
(Formerly Public Service Company of Colorado) PG Primary General Service All demand: Winter: Summer: All usage: 7.21/KW 8.39/KW 0.282/KWH Up to 4,000 KW Delivery at primary distribution voltage. Service charge: $130.00/mo. Subject to electric cost adjustment. Delivery at primary distribution voltage. Service charge varies. Subject to electric cost adjustment.
TG
0.276/KWH
IDAHO
Power Company
Avista Utilities
Sched No.
21
Schedule Name
Large General Service Extra Large General Service
Demand Charge
First 50 KW: All additional:
(dollars)
275.00/mo. 3.50/KW
Energy Charge
First 250,000 KWH: All additional:
(cents)
5.384/KWH 4.594/KWH
Minimum Demand
50 KW
Remarks
$0.20/KW discount for delivery at primary voltage of 11KV or higher. Minimum charge $250.00/mo. $.20/KW discount for delivery at primary voltage of 11KV or higher. Minimum charge: $571,460/yr. Purchased by Avista Utilities.
25
10,000.00/mo. 3.25/KW
4.411/KWH 3.736/KWH
2,500 KVA
Citizens Utilities Company Clearwater Power Company 2-5 General Service Large Commercial Over 50 KW: 5.68/KW First 15,000 KWH: All additional: 5.677/KWH 4.350/KWH 15 KVA
03
General Service
Over 10 KW:
7.65/KW
All usage:
4.605/KWH
IDAHO
Power Company
Idaho County Light and Power Idaho Power Company
Sched No.
LP
Schedule Name
Large Power & Lighting Service Large General Service
Demand Charge
First 50 KW: All additional: Summer: Secondary Service: Primary Service: Transmission Service:
(dollars)
No charge 5.00/KW
Energy Charge
First 100,000 KWH: All additional: Summer: Secondary Service: First 2,000 KWH All additional: Primary Service: Transmission Service:
(cents)
7.750/KWH 7.250/KWH
Minimum Demand
Remarks
Service Charge: $50.00/mo. 2/2008 rate.
Customer charge: Transmission or primary service: $210.00/mo. Secondary service: $12.00/mo. Power cost adjustment $0.002419/KWH, effective 6/1/2007. Basic load demand charge of $0.67/KW secondary service, $0.95/KW for primary service and $0.50/KW for transmission service also apply.
Winter Secondary Service: First 2,000 KWH: All additional: Non-Summer: Primary Service: Transmission Service:
19
Summer: Secondary Service: Primary Service: Transmission Service: Non-Summer: Secondary Service: Primary Service: Transmission Service:
Summer On-Peak: Secondary Service: Primary Service: Transmission Service: Summer Mid-Peak: Secondary Service: Primary Service: Transmission Service: Summer Off-Peak: Secondary Service: Primary Service: Transmission Service: Non-Summer Mid-Peak: Secondary Service: Primary Service: Transmission Service: Non-Summer Off-Peak: Secondary Service: Primary Service: Transmission Service:
3.4034/KWH 2.9111/KWH 2.8808/KWH 3.2335/KWH 2.6280/KWH 2.600/KWH 3.0138/KW 2.4493/KW 2.4234/KW 2.9091/KW 2.3773/KW 2.3475/KW 2.7775/KW 2.2681/KW 2.2397/KW 4.560/KWH
Customer charge: Transmission or primary service: $210.00/mo. Secondary service: $12.50/mo. Facilities charge: 1.7% x company investment in company owned facilities beyond point of delivery. Power cost adjustment $0.2419/KWH, effective 6/1/2007. Basic load demand charge of $0.67/KW secondary service, $0.95/KW for primary service and $0.46/KW for transmission service also apply.
EP - U.S. 21
Large Commercial
Over 50 KW:
2.80/KW
All usage:
50 KW to 3,000 KW
Basic charge: $246.40/mo. 5% primary voltage discount. Subject to power cost adjustment. 5 year contract required.
EP - U.S. 22
Copyright 2008 InfoMine USA, Inc.
IDAHO
Power Company
Kootenai Electric Cooperative
Sched No.
6
Schedule Name
Large Commercial
Demand Charge
First 50KW: All additional:
(dollars)
0.00 2.75/KW
Energy Charge
All usage:
(cents)
4.900/KWH
Minimum Demand
51 KW to 1,000 KW
Remarks
Facility charge: $200.00/mo. Discount of $.10/KW on demand charge for delivery at primary voltage. Base charge: $7,500.00/mo. Primary service. Facility charge: $14.56/mo. 7% discount for delivery at primary voltage. Subject to a fuel cost adjustment charge. 2008 rate. Minimum bill: $10.00/mo. Customer charge: $42.23/mo.
All demand:
4.63/KW
All usage:
3.250/KWH
1,000 KW
LP
All demand:
5.51/KW
All usage:
5.550/KWH
50 KW
C-2
All demand:
6.48/KW 10.19/KW
3.271/KWH 4.100/KWH
50 KW 50 KVA
Customer charge: $88.75/mo. Basic charge: $50.00/mo. Development rate available. Voltage rate Subject to a power cost adjustment of $0.00/KWH, effective 4/2007. Basic charge: $80.00/mo. Subject to a power cost adjustment. Voltage Rate currently $0.00/KWH, effective 4/2007.
All demand:
5.25/KVA
All usage:
4.030/KWH
300 KVA
IDAHO
Power Company
Rocky Mountain Power (Formerly Pacific Corp.) 6
Demand Charge
May - October: November - April: High Voltage
(dollars)
7.40/KW 5.60/KW
Energy Charge
All usage:
(cents)
3.0561/KWH
Minimum Demand
80 KW to 15,000 KW
Remarks
Customer charge: $282.89/mo. Delivery at 44KV or 69KV or greater.
10.68/KW 8.79/KW
All usage:
2.9564/KWH
Customer charge: $87.51/mo. primary voltage, $29.17/mo. secondary voltage. Voltage discount of $0.53/KW for customer taking service at 2,300 volts or higher; owns & maintains all transformers & other equipment. Sold to Idaho Power Co.
Prairie Power Cooperative Raft River Rural Electric Coop. Salmon River Electric Cooperative B Large All demand: General Service Medium Commercial Service All demand: 4.00/KW All usage: 3.600/KWH 50 KVA
1.52/KW
All usage:
3.500/KWH
30 KW
Customer charge: $581.00/mo. Discount available for delivery at primary voltage. Subject to fuel cost adjustment. Customer charge: $10,595.42/mo.
2.76/KW
All usage:
3.710/KWH
800 KW
MINNESOTA
Power Company
Agralite Cooperative
Sched No.
Schedule Name
Demand Charge
(dollars)
Energy Charge
All usage: Winter: Summer:
(cents)
8.220/KWH 9.520/KWH
Minimum Demand
<150 KVA
Remarks
Service charge: $45.00/mo.
Small N/A Commercial Multi-phase Service LP Large Power Service Large Commercial Power All demand: 7.25/KW
All usage:
4.130/KWH
150 KVA
EP - U.S. 23
CP
All demand:
6.12/KVA
All usage:
4.260/KWH
50 KVA
EP - U.S. 24
Copyright 2008 InfoMine USA, Inc.
MINNESOTA
Power Company
Alliant Energy
Sched No.
Schedule Name
General Service
Demand Charge
First 200 KW: Next 800 KW: Next 9,000 KW: Next 20,000 KW: Next 30,000 KW: All demand: June - August: September - May: Peak* Off-Peak:
(dollars)
Winter: 9.98/KW 9.43/KW 8.93/KW 8.80/KW 7.46/KW Summer: 15.75/KW 15.66/KW 15.48/KW 15.41/KW 13.16/KW
Energy Charge
All usage: On-Peak: June - September: 1.935/KWH October - May: 1.235/KWH
(cents)
Off Peak: 1.235/KWH 0.535/KWH
Minimum Demand
20,000 KW
Remarks
LP
6.440/KWH 4.440/KWH
50 KW
3.100/KWH
*Peak: 6:00 P.M. - 10:00 P.M. Benco Cooperative 06 Industrial All demand: 7.50/KW All usage: 3.300/KWH 25 KVA Customer charge: $125.00/mo. $.50/KW discount for service at primary voltage. Subject to purchased power cost adjustment. Customer charge: $68.00/mo. Minimum charge: $136.00 2008 rate. Service charge: $52.00/mo. Subject to power cost adjustment. Purchased cost adjustment $0.00/KWH, effective 12/2008. Customer charge: $315.50 plus $1.25/KVA greater than 45 KVA. Customer is given prior notification of demand period and can reduce load to zero to eliminate All demand: charges.
GS-6
7.25/KW
All usage:
5.000/KWH
50 KW
LP
Large Power
All demand:
7.20/KW
All usage:
4.200/KWH
50 KW
Large Power
All demand:
6.19/KWH
All usage:
3.800/KWH
250 KVA
MINNESOTA
Power Company
Connexus Energy
Sched No.
2-2
Schedule Name
General Commercial Phase Service
Demand Charge
June - September: October - May :
(dollars)
10.80/KW 6.85/KW
Energy Charge
First 200 KWH/KW: Next 200 KWH/KW: All additional:
(cents)
5.230/KWH 3.920/KWH 3.380/KWH
Minimum Demand
25 KVA
Remarks
Basic service charge: $25.00/mo. $.15/KVA discount for delivery plus 1% discount for metering at primary voltage. $1.50 credit per KWH for all KWH used over 62,500. 2008 rate. Subject to purchased power cost adjustment. New development credit available, effective 10/2007. Facility charge: $25.00/mo. Subject to purchased power cost adjustment.
Large Power
All demand: First 100 KWH/KW: June - August: 7.45/KW All additional: September - May: 4.90/KW All demand: 7.30/KW All usage:
8.350/KWH 6.050/KWH
50 KVA
LP
Large Power-30
4.300/KWH
50 KW
46
General Service June - August: 9.15/KW First 200 KWH/KW: September - May: 6.05/KW Next 200 KWH/KW: All Additional: General Service Peak demand: All usage: Time-of-Day June - August: 16.45/KW Rate December - February: 10.15/KW March - April - May: 7.00/KW Maximum Demand: 4.20/KW *Peak: 4:00 P.M. - 11:00 P.M
54
Fixed charge: $30.00/mo. $.15/KW discount for delivery plus 2% discount for metering at primary voltage. Subject to purchased power cost adjustment.
GS
General Service All demand: Service December - February: 11.00/KW Three-Phase March - May: 8.00/KW June - August: 18.00/KW September - November: 8.00/KW Interruptible Peak* December - February: 14.40/KW March - May: 9.90/KW June - August: 18.80/KW September-November: 9.90/KW Excess demand: 3.90/KW Base demand: 5.00/KW *Peak: 5:00 P.M. - 10:00 P.M
4.600/KWH 3.700/KWH
C&I
All usage:
3.600/KWH
200 KVA
EP - U.S. 25
Federated REA
10
All demand:
3.75/KW
4.850/KWH 4.250/KWH
Customer charge: $30.00/mo. Energy charge increased by 5.5 mills. Subject to purchased power cost adjustment.
EP - U.S. 26
Copyright 2008 InfoMine USA, Inc.
MINNESOTA
Power Company
Freeborn-Mower Electric Cooperative
Sched No.
5
Schedule Name
Three-Phase Large Service
Demand Charge
All demand:
(dollars)
5.10/KW
Energy Charge
All usage:
(cents)
5.720/KWH
Minimum Demand
125 KVA
Remarks
Subject to cost of purchased power adjustment. Customer charge: $60.00/mo. Peak alert schedule available. 2006 rate.
Large Power
All demand: June - August: 9.20/KW September - May: 7.00/KW All demand: 5.25/KW
All usage:
6.000/KWH
50 KVA Facility charge: $35.00/mo. Subject to purchased power cost adjustment. 2006 rate. 7% discount of both demand and energy charge at primary distribution voltage. 1,000 KVA Consumer charge negotiated. Summer: June - August Winter: December - February Other: September - November, March - May.
LP
Large Power
7.600/KWH 6.200/KWH
IS
Industrial Service
4.485/KWH 2.927/KWH
Non-coincidental demand: First 2,000 KW/mo. 3.20/KW All additional: 2.15/KW LPIS Large Power Interruptible Industrial Service Coincidental demand: Summer: Winter: Other months: Non-coincidental demand: Kandiyohi Cooperative Electric Power Assn. 20 Commercial Large All demand: June - August September - May All usage: 19.00/KW 14.50/KW 10.00/KW 4.00/KW All usage: 13.65/KW 7.65/KW 6.000/KWH 50 KVA 3.000/KWH 50 KW Fixed monthly charge: $1,080.00/yr. Summer: June - August Winter: December - February Other: September - November, March - May. Access charge: $42.00/mo. Minimum monthly charge: $41.00/mo. plus $0.75/KW greater than 50KW demand. 2006 rate.
MINNESOTA
Power Company
Lake Country Power
Sched No.
45
Schedule Name
Demand Charge
(dollars)
9.75/KW
Energy Charge
All usage:
(cents)
4.700/KWH
Minimum Demand
50 KVA
Remarks
Fixed charge: $70.00/mo. Maximum demand 1,000 KVA. Fixed charge: $70.00/mo. Maximum demand 1,000 KVA. Larger demand by contract. Customer Charge: $35.00/mo. Subject go power cost adjustment.
46
11.00/KVA 6.00/KVA
All usage:
4.700/KWH
50 KVA
General Three-Phase
All demand:
All usage: Summer: Winter: First 800 KWH: Over 800 KWH:
All demand:
11.25/KW
All usage:
Customer charge: $45.00/mo. Subject to power cost adjustment. 2006 rate. Fixed charge: $120.00
19
Large Power
All demand: June - August September - May All demand: Non-summer: Summer:
5.150/KWH
75 KW to 500 KW 75 KW
LP
Large Power
3.620/KWH
Fixed charge: $50.00/mo. Subject to purchased power cost adjustment. Minimum charge: $50.00/mo. Primary voltage discount: $.15/KVA and 2% discount for primary metering. 2006 rate. Fixed charge: $60.00/mo. Peak demand is demand coincident with Great River Energys peak demand. Maximum demand is the highest demand in the month 2006 rate.
Winter: December - February 13.16/KW Shoulder: March - May September - November 7.00/KW Summer: June - August 17.26/KW Maximum: 3.42/KW
All usage:
3.630/KWH
2,000 KW
EP - U.S. 27
EP - U.S. 28
Copyright 2008 InfoMine USA, Inc.
MINNESOTA
Power Company
Minnesota Valley Coop
Sched No.
B
Schedule Name
Three-Phase Service
Demand Charge
All demand:
(dollars)
5.30/KW
Energy Charge
Summer: First 2,000 KWH: All additional: Winter: First 2,000 KWH: All additional:
(cents)
8.300/KWH 7.500/KWH 7.600/KWH 6.800/KWH
Minimum Demand
25 KW
Remarks
Service charge: $18.80/mo. 3% discount for delivery at primary voltage. Summer: June - September Winter: October - May
Large Power Rate North Itasca Electric Coop. TOD LP B Large Power TOD All demand: 14.36/KW All usage: 5.000/KWH
Negotiated on an individual basis. Minimum charge: $1.00/KVA installed. Monthly charge: $25.00/mo.
3.00/KW
Summer: First 700 KWH: All additional: Winter: First 700 KWH: All additional:
All demand:
7.81/KW
First 100 KWH/KW: All additional: Secondary service: First 360 KWH/KW: All additional: Primary service: First 360 KWH/KW: All additional: Transmission service: First 360 KWH/KW: All additional: All usage:
Customer charge: $57.78/mo. Subject to power cost adjustment. Three year contract required. Subject to cost of energy adjustment.
Secondary service: First 100 KW: All additional: Primary service: First 100 KW: All additional: Transmission service: First 100 KW: All additional:
6.50/KW 10.75/KW
Service charge: $55.00/mo. to Loads in excess of 300 KVA 300 KVAnegotiated individually.
MINNESOTA
Power Company
P.K.M. Electric Cooperative
Sched No.
4
Schedule Name
Large Power Service Three-Phase
Demand Charge
All demand:
(dollars)
No charge*
Energy Charge
All usage:
(cents)
6.300/KWH
Minimum Demand
Oover 150 KVA
Remarks
Facility charge: $27.00/mo. * In lieu of metered demand charges, a monthly capacity charge of 1/12 of 12% of the total investment in electrical facilities will be billed. 2008 rate. Facilities charge: $38.00/mo.
Single & 3-Phase All demand: Service January - March: April - December:
8.00/KW 5.00/KW
First 35,000 KWH: January - March: April - December: All additional: January - March: April - December:
Three-Phase Small Commercial Service Three-Phase All demand: Large Commercial Service Large Commercial or Large Power Large Power Service Demand: Plus installed KVA: 8.90/KW
All usage:
Customer charge: $35.00/mo. Subject to purchased power cost adjustment. 2006 rate. Customer charge: $40.00/mo. Subject to purchased power cost adjustment. 2006 rate. Industrial rates available for customers requiring more than 1,000 KVA.
B-1
All usage:
4.250/KWH
350 KVA
Class IV
5.75/KW 0.50/KVA
All usage:
6.000/KWH
LP3
All demand: September -May: 6.10/KW June - August: 9.50/KW All demand: 7.30/KW
All usage:
4.900/KWH
Subject to purchased power cost adjustment. Three-Phase fixed charge: $21.00/mo. 2006 rate. Customer charge: $1.20/mo. installed KVA. Service charge: $57.50/mo. Subject to a power cost adjustment.
LP5
Large Power Service Large Power Service Multi-Phase General Power Three-Phase
50 KW
All demand:
6.00/KW
37.5 KVA
10.00/KW 7.85/KW
4.900/KWH 4.700/KWH
EP - U.S. 29
EP - U.S. 30
Copyright 2008 InfoMine USA, Inc.
MINNESOTA
Power Company
Steele-Waseca Cooperative Electric
Sched No.
TP-03
Schedule Name
Large Power Rate
Demand Charge
All demand:
(dollars)
12.50/KW
Energy Charge
All usage:
(cents)
5.10/KWH
Minimum Demand
100 KW
Remarks
Service charge: $85.00/mo. Subject to purchased power cost adjustment. 2008 rate. Facility charge: $63.00/mo. 2% discount available for metering at primary voltage. Power cost adjustment $0.00224/KWH. 2008 rate. Service charge: $42.00/mo.
LP
All demand:
8.09/KW
All usage:
4.900/KWH
50 KVA
Multi-Phase & All demand: Large Single Phase Small Commercial All demand:
11.55/KW
All usage:
5.250/KWH
6.00/KW
Facility charge: $75.00/mo. plus $5.50/10KVA greater than 50 KVA. Demand based on lesser of KWH usage/40 or actual demand. Facility charge: $130.00/mo. plus $5.50/10KVA greater than 100 KVA.
Industrial
All demand:
9.00/KW
All usage: June - August: September - May: Peak: Off-Peak: Long Term: Short Term: First 400 KWH/KW: All additional:
100 KVA 5.000/KWH 4.500/KWH 4.500/KWH 3.500/KWH 4.800/KWH 4.200/KWH 3.400/KWH 25 KW Up to 350 KVA
L-P
All demand:
6.50/KW
Facility charge: $28.50 per 50 KVA installed. Subject to cost of purchased power adjustment. 2006 rate. Basic charge: $21.25/mo. $.15/KW discount for service at primary voltage. Subject to a power cost adjustment.
CI
9.50/KW 6.50/KW
MINNESOTA
Power Company
XCEL Energy
Sched No.
A14
Schedule Name
General Service
Demand Charge
Secondary voltage: October - May: June - September: Voltage discounts: Primary: Transmission: Transformed transmission:
(dollars)
6.81/KW 10.15/KW
Energy Charge
(cents)
Minimum Demand
Remarks
Customer charge: $22.00/mo. Secondary voltage 208V - 2.4KV, primary voltage 2.4KV - 69KV, transmission transformed voltage 2.4 - 69KV with company owned transformers. Rates subject to fuel cost charge. Currently $0.02103/KWH, effective 11/2007.
All usage: 2.169/KWH Energy charge credit: 0.900/KWH (Applies to all KWH > 400 KWH/KW) Voltage discounts: Primary: Transmission: Transferred transmission: All usage: On-Peak: Off-Peak: Energy Discounts: Primary: Transmission: Transformed transmission: 0.070/KWH 0.110/KWH 0.160/KWH 100 KW 2.871/KWH 1.712/KWH 0.070/KWH 0.160/KWH 0.110/KWH
A15
Winter Summer Secondary voltage: 6.81/KW 10.15/KW Off-Peak: 2.20/KW 2.20/KW Voltage discounts: Primary 0.90/KW Transmission 2.20/KW Transformed transmission: 1.65/KW 0.90/KW 2.20/KW 1.65/KW
Customer charge: $25.00/mo. Secondary voltage: 480V or higher. Primary voltage: 2.4KV or higher. Rates subject to a fuel cost adjustment.
MONTANA
Power Company
Beartooth Electric Cooperative
Sched No.
Schedule Name
Small Commercial Large Commercial
Demand Charge
(dollars)
Energy Charge
All usage:
(cents)
7.875/KWH
Minimum Demand
25 KVA
Remarks
Monthly charge: $26.25/mo.
All demand:
8.35/KW
All usage:
5.040/KWH
GS
All usage:
6.400/KWH
50 KVA
Base rate: $40.00/mo. 2006 rate. Basic charge: $90.00/mo. plus $1.00/KVA.
CI
45 KW
EP - U.S. 31
EP - U.S. 32
Copyright 2008 InfoMine USA, Inc.
MONTANA
Power Company
Fall River Rural Electric Cooperative Fergus Electric Cooperative
Sched No.
03
Schedule Name
General Service
Demand Charge
Over 10 KW:
(dollars)
7.65/KW
Energy Charge
All usage:
(cents)
4.605/KWH
Minimum Demand
Remarks
Customer charge: $45.00/mo.
50
Commercial Over 8 KW: Large Power & Multi-Phase Service Large General Service Large Industrial Service First 20 KW: Next 80 KW: All additional: All demand:
12.00/KW
7.355/KWH 5.355/KWH
25
First 5,,000 KWH: Next 145,000 KWH: All additional: All usage:
20 KW
Basic charge: $72.00/mo. plus $1.23/KW demand. Applies to southern Montana service areas. Basic charge: $387.00/mo. plus $1.23/KW. 1.5% discount for metering at primary voltage. $.15/KW discount for delivery at primary voltage. Basic charge: $72.00/mo. plus $1.23/KW. 1.5% discount for metering at primary voltage. primary voltage. Basic charge: $387.00/mo. plus $1.23/KW load size. 1.5% discount for metering at primary voltage. $.15/KW discount for delivery at primary voltage. Facilities charge: $20.00/mo. Demand greater than 1,000 KW is negotiated. 2007 rate.
22
All demand:
2.94/KW
4.400/KWH 3.700/KWH
100 KW
48
All demand:
2.94/KW
All usage:
3.600/KWH
1,000 KW
Small Commercial
All demand:
1.25/KW
6.300/KWH 5.600/KWH
P-03
Three-Phase
All demand:
12.50/KW
All usage:
5.250/KWH
50 KVA
2008 rate.
MONTANA
Power Company
Lincoln Electric Cooperative
Sched No.
D
Schedule Name
Large Commercial Service Industrial Service
Demand Charge
All demand:
(dollars)
5.26/KW
Energy Charge
All usage:
(cents)
4.320/KWH
Minimum Demand
50 KVA
Remarks
Base charge: $37.00/mo. Energy charge includes line and transmission charges. Base charge: $210.00/mo. Energy charge includes line and transmission charges. Base rate: $8.50/mo.
All demand:
5.26/KW
All usage:
4.320/KWH
1,000 KVA
3-96
Over 10KW:
5.25/KW
6-96
All demand:
6.25/KW
Minimum billing $1.00/demand of installed transformer KVA unless negotiated otherwise. Base charge: $40.00/mo. 5% discount for delivery at primary voltage. Minimum charge: $47.00/mo.
B-3
Three-Phase
Over 10 KW:
13.05/KW
4.700/KWH 3.750/KWH
GS-3
No Charge
First 1,500 KWH: Next 3,500 KWH: All additional: All usage:
General All demand: Services with Demand Large Commercial All demand:
4.10/KW
Basic charge: $42.50/mo. 2008 rate. Basic charge: $127.50/mo. 2006 rate. Customer charge: $37.10/mo.
5.00/KW
All usage:
3.295/KWH
3,000 KW
Over 50 KW:
8.86/KW
All usage:
3.570/KWH
50 KVA
All demand:
7.77/KW
All usage:
3.260/KWH
1,000 KVA
30
All demand: At primary voltage: Summer: Winter: At secondary voltage: Summer: Winter:
Base rate: $25.00/mo. Primary voltage customers provide own transformers at 2.4KV or higher. Subject to fuel cost adjustment.
EP - U.S. 33
EP - U.S. 34
Copyright 2008 InfoMine USA, Inc.
MONTANA
Power Company
Northern Electric Cooperative
Sched No.
B-2
Schedule Name
Three-Phase Service
Demand Charge
All demand:
(dollars)
4.68/KW
Energy Charge
All usage:
(cents)
7.500/KWH
Minimum Demand
Remarks
Service charge: $20.00/mo.
B-3
Three-Phase All demand: Large Power Service Large Commercial Secondary All demand:
10.00/KW
300 KVA
Northern Lights
5.50/KVA
300 KVA
Basic charge: $50.00/mo. Economic development rate available. Subject to power cost adjustment, currently $0.00/KWH, effective 4/2007. Basic charge: $80.00/mo. Subject to a power cost adjustment of $0.00/KWH, effective 4/2007. Service charge: $1,365.10/mo.
5.25/KVA
All usage:
4.030/KWH
300 KVA
Northwestern Energy
General Service All demand: Transmission Level General Service All demand: Substation Level Three-Phase Commercial and Industrial Three-Phase Service Over 35 KW:
1.117357/KW
All usage:
5.4447/KWH
50 KVA
1.572398/KW
All usage:
5.4779/KWH
50 KVA
Park Electric Cooperative, Inc. Ravalli County Electric Cooperative Southeast Electric Cooperative Sun River Electric Cooperative GS
First 3,000 KWH: All additional: 4.60/KW First 10,700 KWH: All additional: All usage:
Commercial & Industrial Service Large Commercial General Service (Transmission) Large Power Service First 20 KW: All additional: All demand: 0.00/KW 5.62/KW 8.02473/KW
GS-2
All usage:
5.180/KWH
50 KVA
GS-3
All usage:
4.012/KWH
LP
All demand:
12.8413/KW
5.270/KWH 2.760/KWH
30 KW
MONTANA
Power Company
Vigilante Electric Cooperative
Sched No.
GS
Schedule Name
Industrial Three-Phase Service
Demand Charge
All demand:
(dollars)
3.00/KW
Energy Charge
First 1,000 KWH: Next 19,000 KWH: All additional:
(cents)
5.500/KWH 4.300/KWH 4.000/KWH
Minimum Demand
Remarks
Transformer charge at $0.90/KVA but not less than $21.00/mo. or greater than $90.00/mo. applies. 2006 rate.
Large Commercial
All demand:
7.75/KW
50 KVA
NEVADA
Power Company Sched No. Schedule Name Demand Charge (dollars) Energy Charge (cents) Minimum Demand Remarks
*Consult utility for current rates. Commercial & Industrial All demand: 6.90/KW All usage: 2.780/KWH 50 KVA to 1,000 KVA 50 KVA Customer charge: $26.00/mo.
LGS-C Large All demand: General Service LGS-OP Industrial All demand:
6.50/KW
All usage:
5.344/KWH
Customer charge: $45.00/mo. Peak schedule also available. Customer charge: $45.00/mo. for off peak usage.
No charge
All usage:
5.344/KWH
50 KVA
EP - U.S. 35
EP - U.S. 36
Copyright 2008 InfoMine USA, Inc.
NEVADA
Power Company
Nevada Power Company
Sched No.
Schedule Name
Demand Charge
Secondary voltage: Summer On-peak* Summer Mid-Peak: Summer Off-Peak: Rest of year: Primary voltage: Summer On-Peak* Summer Mid-Peak: Summer Off-Peak: Rest of year: Transmission voltage: Summer On-Peak* Summer Mid-Peak: Summer Off-Peak: Rest of year:
(dollars)
7.23/KW 0.53/KW 0.00/KW 0.25/KW 7.75/KW 0.53/KW 0.00/KW 0.24/KW 7.75/KW 0.53/KW 0.00/KW 0.24/KW
Energy Charge
Secondary voltage: Summer On-peak* Summer Mid-Peak: Summer Off-Peak: Rest of year: Primary voltage: Summer On-Peak* Summer Mid-Peak: Summer Off-Peak: Rest of year: Transmission voltage: Summer On-Peak* Summer Mid-Peak: Summer Off-Peak: Rest of year: Deferred Charge: Green Power:
(cents)
10.895/KWH 9.456/KWH 6.431/KWH 6.919/KWH 10.110/KWH 8.751/KWH 6.386/KWH 6.559/KWH 9.740/KWH 8.468/KWH 6.386/KWH 6.437/KWH 0.000/KWH 0.071/KWH 8.043/KWH 0.000/KWH 0.071/KWH 6.300/KWH
Minimum Demand
300 KW
Remarks
Customer charge: $162.80/mo. plus facilities charge of $2.85/KW secondary, $255.80/mo. plus $2.30/KW - primary, and transmission voltage, $267.10/mo. plus $0.44/KW. Subject to energy cost adjustment. On-Peak*: June - September 10:00 A.M.-7:00P.M. Mid-Peak: June - September 10:00 A.M. - 1:00 P.M. and 7:00 P.M. - 10:00 P.M.
LGS-1 Large General Service-1 Overton Power District No. 5 Raft River Rural Electric Cooperative Sierra Pacific Power Company 8
Large All demand: General Service Large General Service Medium General Service All demand:
5.60/KW
All usage:
2.700/KWH
GS-2
All demand:
3.15/KW
All usage:
10.103/KWH*
50 KW to 500 KW
Customer charge: $18.00/mo. 1.25% - 2.5% discount for primary distribution. 5% - 10% discount for transmission voltage delivery. *Rate includes all adjustments. Facilities charge per KW of maximum demand $6.03/mo.
GS-3
1,000 KW
Winter 5:01 P.M.-10:00 P.M. Summer 10:01 A.M.-10:00 P.M. 7:00 A.M.- 5:00 P.M. (Winter only)
Customer charge: $495.00/mo. 1.25% - 2.5% discount for primary distribution. 5% - 10% discount for transmission voltage delivery. Facilities charge per KW of maximum demand $6.79/mo.
NEVADA
Power Company
Valley Electric Association
Sched No.
GS
Schedule Name
General Service
Demand Charge
All demand:
(dollars)
1.90/KW
Energy Charge
All usage:
(cents)
6.703/KW
Minimum Demand
50 KW
Remarks
Facilities charge: $30.00/mo. Power cost adjustment of $0.01908/KWH, effective 2/2006. Facility charge: $30.00/mo., plus a $6.50 overhead charge. Power cost adjustment of $0.01908/KWH, effective 2/2006. Summer Peak: 11:00 A.M.-8:00 P.M. Winter Peak: 6:00 A.M.-6:00 P.M.
All demand:
6.50/KW
Summer: May - September Summer On-Peak Summer Off-Peak: Winter: October - April Winter On-Peak: Winter Off-Peak:
50 KW 7.703/KWH 5.703/KWH 7.703/KWH 5.703/KWH 5.267/KWH 50 KVA to 1,000 KVA 1,000 KVA to 5,000 KVA
All demand:
6.00/KW
All usage:
All demand:
5.50/KW
All usage:
4.491/KWH
NEW MEXICO
Power Company
Central New Mexico Electric Cooperative
Sched No.
2
Schedule Name
Commercial Service
Demand Charge
All demand:
(dollars)
18.32/KW
Energy Charge
All usage:
(cents)
6.500/KWH
Minimum Demand
50 KVA
Remarks
System charge: $30.00/mo. Subject to fuel and purchased power cost adjustment. System charge $100.00/mo. 2006 rate.
28
All demand:
16.66/KW
All usage:
2.994/KWH
All demand:
3.00/KW
50 HP
Minimum charge: $150.00/mo. Subject to a cost of fuel adjustment. Minimum charge: $400.00/mo.
EP - U.S. 37
All demand:
4.00/KW
1,000 KW
EP - U.S. 38
Copyright 2008 InfoMine USA, Inc.
NEW MEXICO
Power Company
Columbus Electric Cooperative
Sched No.
5
Schedule Name
Large Power Service
Demand Charge
All demand:
(dollars)
12.00/KW
Energy Charge
All usage:
(cents)
5.200/KWH
Minimum Demand
50KVA to 350KVA 50 KVA to 350 KVA
Remarks
Customer charge: $35.00/mo. Subject to cost of fuel and purchased power adjustment. Customer charge: $50.00/mo. Subject to cost of fuel and purchased power adjustment.
Peak:* Non-Peak:
13.50/KW No charge
Peak* Non-Peak:
5.925/KWH 0.500/KWH
*Peak: 6:00 A.M. - 9:00 P.M. 6 Industrial Service All demand: 12.50/KW All usage: 4.441/KWH 350 KVA Customer charge: $35.00/mo. Subject to cost of fuel and purchased power adjustment. Customer charge: $40.00/mo. Subject to fuel and purchased power cost adjustment. System charge: $40.00/mo.
LPS
All usage:
4.180/KWH
50 KVA
No charge 10.00/KW
All usage:
5.966/KWH
15 KVA
All demand:
5.60/KW
8.3957KWH 6.6295/KWH
50 KVA
Customer charge: $125.00/mo. *Plus power cost recovery $0.01/HWH. Facilities charge: $85.00/mo. Energy charge is increased 5% for service at secondary voltage. 2006 rate. System charge: $30.00/mo. Subject to purchased power cost adjustment. 2006 rate. Power costs determined by negotiated contract. System charge: $46.67/mo. 2006 rate.
All demand:
11.50/KW
All usage:
5.500/KWH
50 KVA
Power Service
15.50/KW 15.00/KW
All usage:
3.560/KWH
50 KVA
IP
Industrial Power Service TOU Power Service On Peak: Primary service: Secondary service: Off-Peak: Primary service: Secondary service: All usage: 18.92/KW 19.42/KW 5.85/KW 6.35/KW 3.580/KWH
3,000 KVA
16
NEW MEXICO
Power Company
Lea County Electric Electric Cooperative
Sched No.
23
Schedule Name
Petroleum & Industrial
Demand Charge
All demand:
(dollars)
4.40/KW
Energy Charge
All usage:
(cents)
5.924/KWH
Minimum Demand
75 KW
Remarks
Customer charge: $100.00/mo. Monthly fixed charge: $30.17/mo. for 7.2 KV primary voltage and $32.33/mo. for 14.4 KV primary voltage. Primary service delivery. Subject to a fuel and purchased power cost adjustment. System charge: $20.00/mo. Subject to a cost of purchased power adjustment. Customer charge: Secondary Voltage - $155.00/mo.; Primary Voltage - $244.00/mo. 7% discount for delivery at 14.4 KV and above. Subject to a power cost adjustment. On-Peak*: 6.00 A.M. - 9:00 P.M.
404
Power Service
All demand:
12.00/KW
All usage:
5.700/KWH
50 KVA
On-Peak* Off-Peak:
7.25/KW 7.20/KW
All usage:
2.747/KWH
50 KVA
All demand:
8.70/KW
5.197/KWH 2.747/KWH
50 KVA
Customer charge: Secondary Voltage - $120.00/mo.; Primary Voltage - $244.00/mo. 7% discount for delivery at 14.4 KV and above. Subject to a power cost adjustment. Customer charge: $30.00/mo. Subject to a purchased power cost adjustment. 2006 rate. Customer charge: $85.00/mo. Subject to a fuel purchased power cost adjustment clause. Sells wholesale to members only, therefore has no rates.
05
Power Service
All demand:
14.50/KW
All usage:
3.100/KWH
50 KVA
Large Commercial
On-Peak: Off-Peak:
11.00/KW 5.25/KW
7.000/KWH 5.979/KWH
50 KVA
EP - U.S. 39
EP - U.S. 40
Copyright 2008 InfoMine USA, Inc.
NEW MEXICO
Power Company
Public Service Company of New Mexico (Bernalillo County, Clayton, Deming, Las Vegas, Sandoval County, Santa Fe County, Valencia County) 4B Large Power Service Time-of-Use On-Peak: Over 500 KW: Summer: 10.18/KW 11.80/KW
Sched No.
3B
Schedule Name
General Power Service Time-of-Use
Demand Charge
On-Peak: Over 50 KW: Summer:
(dollars)
4.00/KW 4.65/KW
Energy Charge
On-Peak* Summer - June - August: Other - September - May: Off-Peak: All usage: Summer- June - August: Other - September - May: On-Peak* Summer - June - August: Other - September - May: Off-Peak: All usage: Summer - June - August: Other - September - May:
(cents)
11.923/KWH 9.388/KWH
Minimum Demand
50 KW
Remarks
Customer charge: $200.00/mo. or $232.50/mo. for summer use. $.30/KW credit for consumer owned substation. On-Peak*: Monday - Friday 8:00 A.M.-8:00 P.M.
51.439/KWH 44.378/KWH
Customer charge: $5,090.00/mo. or $5,900.00/mo. for summer use. Seven year commitment required for mine/mill operations. Incentives available for new economic development. On-Peak*: Monday - Friday 8:00 A.M.- 8:00 P.M.
29.585/KWH 29.585/KWH
5B
8.48/KW
On-Peak* Summer - June - August: Other - September - May: Off-Peak: All usage: Summer- June - August: Other - September - May:
Customer charge: $57,840.00/mo. or $67,840.00/mo. for summer use. One year commitment required. Delivery at 12 KV or higher. Incentives available for new economic development. On-Peak*: Monday - Friday 8:00 A.M.- 8:00 P.M.
29.826/KWH 29.826/KWH
Roosevelt County Electric Cooperative Sierra Electric Cooperative, Inc. Socorro Electric Cooperative
7.75/KW
All usage:
5.9476/KWH
37 KVA
Subject to a fuel and purchased power cost adjustment. 2008 rate. Service charge: $50.00/mo.
12.00/KW
All usage:
5.360/KWH
LGE
Large Commercial
All demand:
12.00/KVA
All usage:
5.560/KWH
50 KVA
Subject to a fuel and purchased power cost adjustment. Economic dev. rates available. Customer charge: $35.00/mo. Customer charge: $75.00/mo. Subject to a purchased power cost adjustment. Industrial rates negotiated.
Springer Electric
All demand:
8.00/KW
All usage:
7.750/KWH
50 KVA
NEW MEXICO
Power Company
Public Service Company of New Mexico (Alamogordo, Bayard, Lordsburg, Ruidoso, Silver City) 9 Industrial Power Service General Service First 2,000 KVA: All additional: 13,400/mo. 5.95/KVA All usage: 7.440/KWH Delivery at 69 KV or above. Subject to a power cost adjustment.
Sched No.
3
Schedule Name
Large General
Demand Charge
First 50 KW: All additional:
(dollars)
1,256.35/mo. 14.88/KW
Energy Charge
First 300 KWH/KW: All additional:
(cents)
5.502/KWH 4.758/KWH
Minimum Demand
Remarks
Subject to a fuel and purchased power cost adjustment. $1.25/KW discount for primary service.
Xcel Energy
614
First 1000 KWH* Next 6000 KWH: Next 6000 KWH: All additional:
Service charge: $10.00/mo. *Add 150 KWH for each KW demand in excess of 10KW to this block. Subject to a fuel cost adjustment of $0.029544/KWH, effective 12/2007. 1.5% discount for delivery at 12 KV or greater. Subject to a fuel cost adjustment of $0.029544/KWH, effective 12/2007.
703
1,654.00/mo. 7.76/KW
NORTH DAKOTA
Power Company
Burke-Divide Electric Coop.
Sched No.
B1
Schedule Name
Demand Charge
(dollars)
No charge 8.10/KW
Energy Charge
First 1,000 KWH: All additional:
(cents)
9.700/KWH 5.400/KWH
Minimum Demand
Remarks
Subject to a cost of purchased power adjustment. Base rate: $43.20/mo.
Commercial First 10KW: & Industrial All additional: Lighting and Power Urban Commercial Over 10 KW:
UC-2
6.50/KW
First 2,000 KWH: Next 8,000 KWH: Att additional: First 250 KWH/KW: All additional:
50 KW
Customer charge: $23.00/mo. Large loads are negotiable. 2005 rate. Subject to a cost of power adjustment. Facility charge: $100.00/mo. Time-of-use schedule available.
310
All demand:
9.95/KW
50 KW
EP - U.S. 41
EP - U.S. 42
Copyright 2008 InfoMine USA, Inc.
NORTH DAKOTA
Power Company
Cavalier Rural Electric Cooperative
Sched No.
Schedule Name
Demand Charge
All demand:
(dollars)
6.75/KW*
Energy Charge
First 1,500 KWH/KW: Next 200 KWH/KW: All additional:
(cents)
0.000/KWH 5.100/KWH 4.700/KWH
Minimum Demand
50 KW
Remarks
*If load can be controlled over the system Peaks not to exceed 400 hrs/yr, demand charge will be eliminated. Cost of power adjustment of $0.0016/KWH, effective 7/2006. 7% primary service discount. Customer charge: $34.00/mo. Incentive rate available. Basic charge: $34.00/mo. Subject to a purchased power cost adjustment. Minimum charge $1.00/KVA or as negotiated. 2006 rate. 8% discount for delivery at primary voltage. Customer charge: $28.00/mo.
All demand:
6.73/KW
First 150 KWH/KW: Next 150 KWH/KW: All additional: First 150 KWH/KW: Next 150 KWH/KW: All additional: All usage:
51 KW
Three-Phase All demand: Large Commercial Service Goldenwest Electric Cooperative KEM Electric Cooperative P-03 Three-Phase Service Multi-Phase Service All demand:
8.61/KW
151 KW
12.50/KW
50 KVA
All demand:
8.70/KW
First 1,000 KWH: Next 2,000 KWH: Next 2,000 KWH: All additional: First 1500 KWH: Next 1000 KWH: All additional:
50 KW
50
General Service
Over 15KW:
11.00/KW
Transformer capacity-over 15 KVA; $.75 KVA/mo. 10% discount for delivery at primary voltage. Customer charge: $31.00/mo. 2006 rate. 50 KW 5% discount for delivery and metering at primary voltages of 2.4 KV or greater. Subject to a cost of fuel adjustment $0.00842/KWH, effective 10/06. Base rate: primary $90.00/mo.; secondary $35.00/mo. Subject to a cost of fuel adjustment of $0.0155/KW, effective 10/2007. Base rate: negotiated. Subject to a cost of fuel adjustment of $0.0155/KWH, effective 10/2007.
30
Primary: October - May June - September Secondary: October - May June - September
3.255/KWH 3.336/KWH
39
All demand:
2.25/KW
All usage:
2.900/KWH
500 KW
NORTH DAKOTA
Power Company
MOR-GRAN-SOU Electric Cooperative
Sched No.
5
Schedule Name
Demand Charge
(dollars)
7.05/KW
Energy Charge
First 3,000 KW: All additional:
(cents)
6.700/KWH 5.000/KWH
Minimum Demand
50 KVA to 1,000 KVA 50 KW
Remarks
Base charge: $81.00/mo.
C2
All demand:
11.00/KW
All usage:
4.600/KWH
2% discount on KWH for delivery at primary voltage of 7.2 KV or above. Base charge: $50.00/mo. for an investment by the Cooperative up to $3,750.00 or 50 KVA of transformer capacity, plus 15% per year for additional investment. Subject to a purchased power adjustment. Williams and Mountrail cooperatives merged. Distribution base rate: $97.00/mo. for new loads. Substation negotiated.
501-2
Commercial Industrial
Distribution Delivery: First 360 KWH/KW: All additional: Substation Delivery: All usage:
Large Commercial
First 100 KWH: Next 900 KWH: All additional: First 100 KW: All additional: 8.70/KW 7.10/KW First 360 KWH/KW: All additional:
75 KW
Facility charge: $22.00/mo. Northern Plains Electric was formed by the merger of Baker Electric and Tri -County Electric. Base charge: $20.00/mo. Discount may apply if service furnished at primary voltage. Three year contract required Subject to a cost of energy adjustment.
Large Power
Over 10 KW:
5.00/KW
5.800/KWH 4.600/KWH
50 KVA
Secondary service First 100 KW: All additional: Primary service First 100 KW: All additional: Transmission service First 100 KW: All additional:
80 KW
EP - U.S. 43
EP - U.S. 44
Copyright 2008 InfoMine USA, Inc.
NORTH DAKOTA
Power Company
Sheyenne Valley Electric Cooperative Slope Electric Cooperative LCR Large All demand: Commercial-Rural 9.00/KW First 200 KWH/KW: All additional: 5.900/KWH 4.500/KWH 25 KVA
Sched No.
Schedule Name
Demand Charge
(dollars)
Energy Charge
(cents)
Minimum Demand
Remarks
Purchased by Nodak Electric.
Base rate: first 75 KVA/mo., $1.00/KVA, next 75 KVA/mo., $0.50/KVA, all additional $0.25/KVA. Service charge: $15.00/mo. 2006 rate. Service charge: $25.00/mo. 2006 rate Rates determined on a case by case basis. Merged with Mountrail Electric Cooperative, see Mountrail-Williams.
C1
8.00/KW
First 1,500 KWH: All additional: First 100 KWH/KW: All additional:
50 KVA
S1
8.00/KW
500 KVA
West Plains Electric Corp. Williams Electric Cooperative Xcel Energy (Northern States Power Company)
Large Power
General Service
Secondary voltage: Winter: Summer: Voltage Discount/mo. Primary voltage: Winter: Summer: Transmission voltage: Winter: Summer:
2.890/KWH*
Customer charge: $15.40/mo. Rates Subject to a fuel cost adjustment of $0.01720/KWH, effective 11/2007.
OREGON
Power Company
Blachly-Lane County Coop. Electric Assn.
Sched No.
Schedule Name
Demand Charge
Distribution demand: Power demand:
(dollars)
2.77/KW 3.11/KW
Energy Charge
All usage: April - June: July - March: Administrative:
(cents)
2.350/KWH 3.400/KWH 0.390/KWH
Minimum Demand
100 KVA
Remarks
Service charge: $550.00/mo. 6% discount for delivery at primary voltage. Distribution and power charges are added to determine total electricity charges. Service charge: $2,000.00/mo. 6% adjustment for delivery at primary voltage. 5/2006
3.52/KW 3.11/KW
All usage: April - June: July - March: Administrative: First 15,000 KWH: All additional:
General Service
No charge 4.00/KW
Customer charge: $65.00/mo. Subject to a fuel cost adjustment factor. Use less than 350KW. Facility charge: $65.00/mo.
Industrial Service
No charge 3.00/KW
First 15,000 KWH: Next 385,000 KWH: All additional: Summer: Winter: Summer: Winter:
350 KW
300
Commercial All demand: & Industrial Service Commercial All demand: & Industrial Service High Voltage General Over 50 KW Service, Large Commercial General Service Demand Primary Service Large Commercial All demand:
7.73/KW
Basic charge: $90.96/mo. 2006 rate. Basic charge: $446.73/mo. At some points a delivery charge of $0.45/KWH is also levied. 2006 rate. 15 KVA Facilities charge: $15.00/mo.
350
7.59/KW
2-5
5.68/KW
5.677/KWH 4.350/KWH
4.55/KW
All usage:
3.124/KWH
30 KW or 9,000 KW
Service charge: $67.00/mo. Subject to a purchased power cost adjustment clause. 2006 rate. Delivery at 69 KV or above. 2006 rate.
All demand:
4.55/KW
All usage:
3.90/KWH
All demand:
4.90/KW
All usage:
5.600/KWH
50 KW
EP - U.S. 45
EP - U.S. 46
Copyright 2008 InfoMine USA, Inc.
OREGON
Power Company
Columbia Rural Electric Assn.
Sched No.
3
Schedule Name
General Service Three-Phase
Demand Charge
General Over 30KW: Time-of-day Peak: Off-Peak:
(dollars)
4.90/KW 4.90/KW 1.93/KW
Energy Charge
First 10,000 KWH: All additional: April - May: June: July: August: September - March:
(cents)
6.650/KWH 4.220/KWH 3.900/KWH 4.000/KWH 4.220/KWH 4.320/KWH
Minimum Demand
Remarks
5% discount for delivery at primary voltage. Subject to cost of energy adjustment. Basic charge: $35.00/mo. For qualifying loads over 250KW alternate Time-of-Day metering, demand: On-Peak: 4.90/KW Off-Peak: 1.93/KW
Consumers Power
46
4.60/KW
All usage:
4.948/KWH
100 KW
Basic charge: $60.00/mo. Discount of $.0043/KWH for all KWH above 50% load factor. All demand greater than 4,500KW rates negotiated. Consumer charge: $83.00/mo. Minimum charge of $3.890/KVA of required transformer capacity. 5% discount for primary distribution where customer maintains and owns facilities. Multi-Phase Customer charge: $25.00/mo.
7.19/KW
All usage:
4.280/KWH
30 KW
5.75/KW
First 100 KWH/KW: Next 250 KWH/KW: All additional: First 100 KWH/KW: Next 275 KWH/KW: All additional: First 250 KWH/KW: All additional: All usage: Distribution:
7.450/KWH 7.100/KWH 6.100/KWH 6.800/KWH 5.550/KWH 5.400/KWH 6.500/KWH 5.500/KWH 2.270/KWH 3.630/KWH 500 KVA
5.75/KW
All demand:
5.75/KW
1,000 KVA
25T
All demand:
3.39/KW
50 KW to 1,000 KW
Basic charge: $28.00/mo. Subject to a power cost adjustment factor. Basic charge: $85.00/mo. Demand is determined monthly, Energy and distribution cost vary by customer. Subject to a BPA adjustment.
48T
Energy October: November - January: February - June: July - September: Distribution Customer 1: Customer 2:
1,000 KW +
OREGON
Power Company
Eugene Municipal Utilities Water & Electric Board
Sched No.
G-2
Schedule Name
Medium General Service
Demand Charge
Primary Service: Secondary Service:
(dollars)
5.85/KW 6.00/KW
Energy Charge
All usage: Primary: Secondary: All usage: Primary: Secondary:
(cents)
4.090/KWH 4.164/KWH
Minimum Demand
31 KW
Remarks
Basic charge: 28.25/mo. for secondary and $1,725.00 for primary service. Basic charge: $2,150.00/mo. for secondary and $2,086.00/mo. for primary service. Energy charge includes BPA surcharge.
G-3
Large Primary Service: General Service First 300 KW: Over 300 KW: Secondary Service: First 300 KW: Over 300 KW:
Harney Electric Cooperative Hood River Electric Cooperative Idaho Power Company 2 Commercial & All demand: Industrial Power Large General Service All demand: Secondary: Summer: Non-Summer: Primary: Summer: Non-Summer: Transmission: Summer: Non-Summer: 19 Large All demand: General Service Secondary: Summer: Winter: Primary: Summer: Winter: Transmission: Summer: Winter: 4.80/KW All usage: 3.54/KWH 50 KVA
*Consult utility for current rates. Energy and demand 5% discount for delivery at primary voltage. Customer charge: Secondary Service: $15.00/mo. plus $0.38/KW. Primary Service: $125.00 plus $0.78/KW. 2.2917/KWH 2.0646/KWH 2.2406/KWH 2.0186/KWH Mid-Peak 3.1978/KWH 3.1187/KWH 2.2175/KWH 2.0530/KWH 2.1780/KWH 2.0092/KWH Off-Peak 2.9805/KWH 2.7836/KWH 2.0667/KWH 1.9587/KWH 2.0300/KWH 1.9169/KWH 1,000 KW to 25,000 KW Transmission Service: $125.00 plus $0.41/KW. Power cost adjustment of $0.004116/KWH, effective 8/8/2005. Discount for service taken at 44 KV or above. Customer charge: Secondary Service: $125.00/mo. plus $0.38/KW. Primary Service: $125.00 plus $0.78/KW. Transmission Service: $125.00 plus $0.41/KW. Power cost adjustment $0.004116/KWH, effective 8/8/2005.
4.51/KW 4.12/KW 4.26/KW 3.86/KW 4.12/KW 3.74/KW All usage: Secondary: Summer: Winter: Primary: Summer: Winter:
All usage: Secondary: Summer: Non-Summer: Primary: Summer: Non-Summer: Transmission: Summer Non-Summer: On-peak: 3.3657/KWH --2.4567/KWH --2.4131/KWH ---
30 KW 3.2306/KWH 2.9232/KWH
EP - U.S. 47
EP - U.S. 48
Copyright 2008 InfoMine USA, Inc.
OREGON
Power Company
Lane Electric Cooperative
Sched No.
GS-3
Schedule Name
General Service Three-Phase
Demand Charge
Over 50 KW:
(dollars)
5.05/KW
Energy Charge
All usage: Distribution: First 10,000 KWH Next 50,000 KWH All additional: First 5,000 KWH: All additional: First 50,000 KWH: All additional: First 50,000 KWH: All additional: All usage:
(cents)
2.750/KWH 4.910/KWH 2.710/KWH 1.400/KWH 5.080/KWH 4.270/KWH 3.430/KWH 3.214/KWH 3.200/KWH 3.139/KWH 4.610/KWH
Minimum Demand
50 KW
Remarks
Basic charge: $60.00/mo. 7% discount for service at primary voltage. 2006 rate.
Commercial
Over 25 KW:
5.75/KW
5% discount for service at primary voltage. Facility charge: $48.00/mo. 50 KW Facilities charge: $50.00/mo. Primary service discount available. Facilities charge: $50.00/mo.
All demand:
3.96/KW
300
All demand:
3.84/KW
50 KW
G2
Large Commercial
All demand:
4.25/KW
50 KVA
Customer charge: $32.00/mo. Subject to a BPA cost recovery adjustment of $(0.00170)KWH, effective 10/2008. Customer charge: $32.00/mo. Subject to a BPA cost recovery adjustment of $(0.00170)KWH, effective 10/2008. Basic charge: Secondary: 51-100KW 101-300KW greater than 300KW Primary: 51-100KW 101-300KW greater than 300KW
LP
All demand:
4.25/KW
All usage:
3.947/KWH
1,000 KVA
Pacific Power
28 General Service
All demand: Secondary: Primary: Load size charge: Secondary: 51-100 KW: 101-300 KW: > 300 KW: Primary: 51 - 100 KW 101-300 KW: > 300 KW:
2.21/KW 2.87/KW
0.259/KWH 0.044/KWH
Up to 1,000 KW
1.250/KWH 1.230/KWH
OREGON
Power Company
Pacific Power (continued)
Sched No.
48
Schedule Name
Large General Service
Demand Charge
All demand: Secondary: Primary: Transmissions:
(dollars)
1.31/KW 1.43/KW 0.78/KW
Energy Charge
Transmission & Ancillary On-peak: Secondary: Primary: Transmissions: Reactive Power Charge Secondary: Primary: Transmissions:
(cents)
Minimum Demand
1,000 KW
Remarks
Basic charge: Facility capacity less than 4,000KW Secondary: $310.00/mo. Primary: $270.00/mo. Transmission: $260.00/mo. Facility capacity greater than 4,000KW Secondary: $580.00/mo. Primary: $480.00/mo. Transmission: $480.00/mo.
Facility charge: Capacity greater than 4,000KW Secondary: $1.60KW Primary: $0.80KW Transmission: $0.45KW Capacity less than 4,000KW Secondary: $1.75KW Primary: $0.85KW Transmission: $0.45KW Portland General Electric Company 89-S Large Non-residential Secondary Voltage Large Non-residential Primary voltage Distribution: First 1,000 KW: All additional: Transmission: Distribution: First 1,000 KW: All additional: Transmission:
All usage: System charge: On-Peak Off-Peak: All usage: System charge: On-Peak Off-Peak: All usage: System charge: On-Peak: Off-Peak: All usage: Energy charge: System charge:
1,000 KW 0.420/KWH 6.071/KWH 5.021/KWH 1,000 KW 0.352/KWH 5.832/KWH 4.833/KWH 1,000 KW 0.325/KWH 5.732/KWH 4.754/KWH
Basic charge: $130.00/mo. Alternative pricing plans available based on daily, monthly, or annual energy costs. Customer charge: $230.00/mo. Alternative pricing plans available based on daily, monthly, or annual energy costs. Basic charge $1,000.00 Alternative pricing plans available based on daily, monthly, or annual energy costs. Customer charge: Secondary: Primary:
89-P
89-T
Large Distribution: Non-residential First 1,000 KW: Sub-transmission All additional: Transmission: Large Non-residential Standard Transmission: Distribution: Secondary: First 30 KW: All additional: Primary: Transmission: Distribution:
83
5.665/KWH 0.431/KWH
30 KW
$25.00/mo. $90.00/mo.
5.454/KWH 0.364/KWH
EP - U.S. 49
EP - U.S. 50
Copyright 2008 InfoMine USA, Inc.
OREGON
Power Company
Surprise Valley Electrification Corporation Tillamook Peoples Utility District
Sched No.
A
Schedule Name
Large Power Service
Demand Charge
All demand:
(dollars)
5.14/KW
Energy Charge
All usage:
(cents)
4.040/KWH
Minimum Demand
50 KVA
Remarks
Subject to wholesale power cost adjustments. Basic customer charge $10.00/mo. Basic charge: $35.00/mo. 10% discount for months October - April.
G-2
General Service
Over 50 KW:
3.80/KW
6.350/KWH 4.100/KWH
LP-3
Minimum charge: $3,000/mo. Heavy Load: Monday - Saturday 7:00 A.M. - 10:00 P.M. Intermediate Load: Monday - Saturday 7:00 A.M. - 10:00 P.M. 2006 rate.
Large Commercial
Over 20 KW:
4.50/KW
Time-of-day metering is available. Customer charge: $35.00/mo. An availability charge is also levied $0.76/KW of max demand in last 18 months. Availability charge: $0.68/KW demand included. Basic charge: $200.00/mo. High load hour demand is between 4am to 9pm. M - Sat. Basic charge: $20.00/mo. 2006 rate.
Industrial Service
4.50/KW
Over 15 KW:
6.90/KW
All usage:
6.500/KWH
All demand:
6.50/KW
All usage:
4.000/KWH
100 KW
2006 rate.
0.00/KW 5.50/KW
8.450/KWH 5.500/KWH
SOUTH DAKOTA
Power Company
Black Hills Electric Cooperative
Sched No.
2
Schedule Name
General Three-Phase
Demand Charge
All demand:
(dollars)
6.75/KW
Energy Charge
First 4000 KWH: Next 4000 KWH: All additional:
(cents)
7.500/KWH 4.200/KWH 3.900/KWH
Minimum Demand
50 KVA
Remarks
Customer charge: $40.00/mo. Subject to cost of purchased power adjustment factor. 5% primary service discount. Service charge: $10.00/mo.
GS-15 Commercial & Industrial General Service GL-14 General Service Large
First 1,000 KWH: Next 2,000 KWH: Next 12,000 KWH: All additional:
On-Peak: First 50,000 KWH: First 125 KVA: 970.00/mo. Next 450,000 KWH: All additional: 6.20/KVA All additional: Off-Peak: All additional: No charge All usage: Transmission: Distribution:
Substation ownership discount: $.25/KVA for transmission voltage; $.15/KVA for primary voltage. Subject to energy cost adjustment.
IC-15
Transmission service charges apply when power delivered at 69 KV, distribution charges apply when power is delivered at less than 69 KV.
50-8
Industrial
Non-coincidental:
Standard:
4.000/KWH
350 KVA
50
All demand:
9.00/KW
8.800/KWH 5.400/KWH
50 KW
A-P
8.50/KW
All usage:
4.800/KWH
Basic charge: $59.20/mo. Subject to cost of purchased power adjustment factor. 50 KW Facilities charge: $12.00/mo. 2006 rate.
General Service
All demand:
No charge
First 600 KWH: Next 600 KWH: All additional: First 600 KWH: Next 600 KWH: All additional:
EP - U.S. 51
Commercial Three-Phase
Coincidental: Non-coincidental:
12.00/KW 9.00/KW
500 KW
EP - U.S. 52
Copyright 2008 InfoMine USA, Inc.
SOUTH DAKOTA
Power Company
Charles Mix Electric Association
Sched No.
E-10
Schedule Name
Demand Charge
(dollars)
11.00/KW
Energy Charge
First 150 KWH/KW: All additional:
(cents)
6.900/KWH 4.500/KWH
Minimum Demand
Remarks
Non-coincident rates are available. 2008 rate.
Three-Phase All demand: Large Commercial & Industrial Three-Phase Commercial & Industrial All demand:
GS-1
7.00/KW
3.700/KWH 3.600/KWH
100 KW
6% discount for delivery at primary voltage. Subject to cost of purchased power adjustment. Minimum charge: $32.50/mo. 5% discount for delivery at primary voltage. Facilities charge: $60.00/mo. 2006 rate.
Clay-Union Electric
L-CD
Coincidental KW:
12.80/KW
6.500/KWH 2.600/KWH
50 KVA
46
9.15/KW 6.05/KW
Fixed charge: $25.00 Discount of $0.15/KW of Billing Demand when service taken by the consumer at the available primary voltage. Also additional discount for primary metering. Minimum charge: $1.65/KVA demand/mo. Minimum charge: $1.65/KVA demand/mo. 10 KW Subject to purchased power adjustment clause. 2006 rate.
2A
All demand:
9.25/KW
First 200 KWH/KW: All additional: First 200 KWH/KW: All additional: First 100 KWH: Next 900 KWH: All additional:
Grand Electric Cooperative H-D Electric Coop., Inc. 4 Commercial & All demand: Industrial Lighting and Power Commercial & Industrial 8.50/KW All additional: First 2,000 KWH: 6.400/KWH 5.750/KWH
7.100/KWH 5.900/KWH
SOUTH DAKOTA
Power Company
LaCreek Electric Association Lake Region Electric Association
Sched No.
LP
Schedule Name
Large Power
Demand Charge
All above 10KW
(dollars)
7.00/KW
Energy Charge
First 100 KWH/KW: Next 200 KWH/KW: All additional: First 100 KWH/KW: All additional:
(cents)
6.500/KWH 5.100/KWH 4.500/KWH 5.800/KWH 3.750/KWH
Minimum Demand
Remarks
Customer charge: $32.50/mo. Subject to purchased power adjustment charge. 2008 rate.
All demand:
11.50/KW
50 KVA
Subject to purchased power adjustment clause. Customer charge: $36.00/mo. Merged with Southeast Electric. McCook has separate rate schedules for now. 2006 rate. Base rate: $15.00/mo. 5% discount for primary service. Fuel cost adjustment of $0.00917/KWH, effective 10/2007. Base rate: $17.00/mo. Purchased fuel cost adjustment cost adjustment. $0.009171/KWH, effective 10/2007. *Peak: Monday - Friday 8:00 A.M. - 10:00 P.M.
All demand:
7.50/KW
4.700/KWH 2.900/KWH
100 KW
30
All demand:
5.00/KW
50 KW
33
LC
Large Commercial
All demand:
3.20/KW
First 200 KWH/KW: Next 200 KWH/KW: All additional: All usage:
50 KW
LP
All demand:
20.20/KW
50 KVA
7% discount for delivery at primary voltage. Facilities charge: $237.00/mo. Special contracts for interruptible power available. 2006 rate. Subject to cost of power adjustment. 2006 rate. Subject to cost of power adjustment. Demand is measured during Peak hours only. 2006 rate. On-Peak*: 7:00 A.M.- 9:00 P.M.
23C-1
Commercial
All demand:
9.00/KW
First 300 KWH: All additional: First 10,000 KWH: All additional:
30 KW
25C-2
Large Commercial
All demand:
10.00/KW
100 KW
EP - U.S. 53
EP - U.S. 54
Copyright 2008 InfoMine USA, Inc.
SOUTH DAKOTA
Power Company
Northern States Power Company (Xcel Energy)
Sched No.
E15
Schedule Name
General Service
Demand Charge
All demand: October - May: June - September:
(dollars)
6.74/KW 9.35/KW 0.80/KW 1.50/KW 2.05/KW
Energy Charge
All usage:
(cents)
3.090/KWH
Minimum Demand
Remarks
Customer charge: $15.25/mo. A credit of $0.0055/KWH applies to all usage greater than 360 times demand. Current fuel clause adjustment of $0.01236/KWH, effective 11/2007.
Voltage discounts: Primary: Transmission Transformed: Transmission: E16 General Time-of-Day October - May: On-Peak: Off-Peak: June - September: On-Peak: Off-Peak:
3.56/KWH 2.67/KWH
Customer charge: $18.25/mo. Discounts available for receiving power at primary voltage. A credit of $0.0055/KWH applies to all usage greater than 360 times demand. Current fuel clause adjustment $0.01236/KWH, effective 11/2007.
Voltage discounts: Primary: 0.80/KW Transmission Transformed 1.50/KW Transmission: 2.05/KW Northwestern Public Service Company 34 Large Commercial & Industrial Service First 100 KW: Next 400 KW: All additional: 6.13/KW 5.43/KW 4.73/KW
Discounts: Primary: Transmission Transformed: Transmission: First 100 KWH/KW Next 300 KWH/KW Next 100 KWH/KW All additional:
0.060/KWH 0.090/KWH 0.120/KWH 3.258/KWH 1.558/KWH 1.058/KWH 0.558/KWH 2% discount for metering at primary voltage. Rider to this schedule available for new loads of 5KW or above, giving a 30% discount on demand plus bonus discounts of 20%, 30%, 40%, and 50% based upon achieved load factors of 50%, 60%, 70%, and 80% respectively. 50 KVA Subject to power cost adjustment factor. Monthly minimum: $1.00/KVA. Customer charge: $25.50/mo. Subject to cost of fuel adjustment.
C-50
Large Commercial
All demand:
8.00/KW
5.400/KWH 4.300/KWH
602 603
Secondary service: First 100 KW: All additional: Primary service: First 100 KW: All additional:
Secondary Service: First 360 KWH/KW: All additional: Primary Service: First 360 KWH/KW: All additional: All usage:
Rosebud Electric
LP
Large Power
All demand:
SOUTH DAKOTA
Power Company
Sioux Valley Southwestern
Sched No.
LP
Schedule Name
Large Power Service
Demand Charge
Over 50 KW:
(dollars)
7.30/KW
Energy Charge
First 450 KWH/KW: All additional:
(cents)
3.800/KWH 2.800/KWH
Minimum Demand
50 KW
Remarks
Facility charge: $1.20/mo. Installed KVA. $.0005/KWH discount for service at primary distribution voltage. Subject to cost of wholesale power adjustment. Facility charge: $50.00/mo. Subject to a purchased power cost adjustment. 2006 rate. Facility charge: $70.00/mo Special metering charge: $20.00/mo. 2006 rate. Facilities charge: $150.00/mo.
GS3LP
General Service
8.50/KW
3.900/KWH
40 KW
OPS3LP
Off-Peak Service Three-Phase Coincidental demand: Large Power Maximum demand Multi-Phase Service Coincidental demand:
All usage: 13.50/KW 1.60/KW 14.80/KW First 100 KWH: All additional: First 150 KWH: Next 2,350 KWH: All additional KWH: First 150 KWH: Next 2,350 KWH: Next 2,500 KWH: All additional: 7.50/KW First 650 KWH: Next 9,350 KWH: Next 30,000 KWH: All additional:
2.800/KWH
40 KW
6.500/KWH 2.600/KWH 20.000/KWH 9.200/KWH 6.000/KWH 20.000/KWH 9.000/KWH 7.500/KWH 6.000/KWH 9.600/KWH 6.900/KWH 5.900/KWH 4.300/KWH 50 KVA
Commercial
2006 rate.
Large Commercial
Subject to cost of purchased power adjustment. $36.00/mo. for service over 50 KVA to 250 KVA, $60.00/mo. for service over 250 KVA. Base charge: $50.00/mo. 2008 rate.
Multi-Phase
Coincidental demand:
7.00/KW
50 KVA
EP - U.S. 55
EP - U.S. 56
Copyright 2008 InfoMine USA, Inc.
UTAH
Power Company
Bridger Valley Electric Association
Sched No.
LP
Schedule Name
Large Power
Demand Charge
All demand:
(dollars)
11.85/KW
Energy Charge
All usage:
(cents)
2.7862/KWH
Minimum Demand
up to 350 KW 350 KW to 2,000 KW 2,000 KVA
Remarks
Customer charge: $70.00/mo. 2008 rate. Customer charge: $130.00/mo. 2008 rate.
LPS
Large Power
All demand:
12.85/KW
All usage:
2.7363/KWH
All demand:
10.13/KW
All usage:
2.3139/KWH
Customer charge: negotiated. 2008 rate. Customer charge: $30.00/mo. Over 500KW available by special contract. 2005 rate. Monthly charge: $182.25/mo.
Large Commercial
All demand:
8.00/KW
All usage:
2.200/KWH
50 KW to 500 KW 37.5 KW
All demand:
5.85/KW
First 200 KWH/KW: Next 200 KWH/KW: All additional: All usage:
LP
Coincidental demand:
5.85/KW
$23.56 demand charge per KW/mo. Peak billing demand. 1,000 KW Base rate: $15.00/mo. Subject to a cost of purchased power adjustment. Base rate: $30.00/mo. Subject to a cost of purchased power adjustment. Customer charge: $29.00/mo.
All demand:
5.50/KW
All usage: First 5,000 KWH: Over 5,000 KWH: All usage:
Over 5 KW:
5.50/KW
LP
All demand:
11.00/KW
All usage:
3.720/KWH
IS-2
All demand:
11.00/KW
All usage:
3.140/KWH
50 KVA
Customer charge: $2,198/mo. Delivery at primary voltage of 4.16 KV, 12.5 KV, or 24.9 KV. Customer charge: $45.00 per meter per month.
All demand:
6.50/KW
All usage:
5.344/KWH
50 KVA
UTAH
Power Company
Pacific Corp. (Rocky Mountain Power)
Sched No.
6
Schedule Name
General Service Distribution Voltage Large General Service
Demand Charge
(dollars)
Energy Charge
All usage: May - September:
(cents)
Minimum Demand
Remarks
All demand: May - September 13.91/KW October - April 11.16/KW - April: October
Up to Customer charge: $25.00/mo. 2.9271/KWH 1,000 KW $0.72/KW discount for service at 2.7000/KWH 2.3 KV or higher if customer owns transformers. Customer charge: $25.00/mo. Voltage discount $0.83/KW for service at 2350 KV through customer transformers. On-Peak*: Monday - Friday May - September 1:00 P.M. - 9:00 P.M. *Off-Peak: Monday - Friday October - April 7:00 A.M. - 11:00 P.M.
On-Peak: May - September: October - April: Off Peak: May - September: October - April:
On-Peak: May - September: October - April: Off-Peak: May - September: October - April:
1,000 KW
General Service Facility charge: High Voltage Demand: On-Peak: May - September: October - April: Off Peak:
On-Peak: May - September: October - April: Off-Peak: May - September: October - April:
Customer charge: $170.00/mo. 3.2247/KWH 2.4247/KWH 2.0247/KWH 2.0247/KWH On-Peak*: Monday - Friday May - September 1:00 P.M. - 9:00 P.M. *Off-Peak: Monday - Friday October - April 7:00 A.M. - 11:00 P.M.
All demand:
5.60/KW
All usage:
2.700/KWH
50 KW
Large Power All demand: Service 50 to 1,000 KVA Industrial Power Service All demand:
6.00/KW
All usage:
5.267/KWH
5.50/KW
All usage:
4.4491/KWH
EP - U.S. 57
EP - U.S. 58
Copyright 2008 InfoMine USA, Inc.
WASHINGTON
Power Company
Avista Utilities
Sched No.
21
Schedule Name
Large General Service Extra Large General Service
Demand Charge
First 50 KW: All additional:
(dollars)
250.00/mo. 3.00/KW
Energy Charge
First 250,000 KWH: Over 250,000 KWH:
(cents)
5.720/KWH 5.110/KWH
Minimum Demand
Remarks
$.20/KW discount for delivery at primary voltage of 11 KV or higher.
25
9,000.00/mo. 2.75/KVA
All usage: First 500,000 KWH: Next 550,000 KWH: Over 6,000,000 KWH:
$0.80/KW at 60 KV and $1.00/KW at 115 KV. $.20/KW discount for delivery at primary voltage of 11 KV or higher. Annual minimum charge: $571,610.00 effective, 1/2008. Monthly charge: Single-Phase: $13.20/mo. Multi-Phase: $19.80/mo.. On-Peak*: Monday - Saturday 7:00 A.M. - 10:00 P.M.
22
0.00/KW 6.60/KW
23
0.00/KW 5.60/KW
10
General Service
4.68/KW 0.66/KW
Customer charge: $13.00/mo. plus $.15 times the highest monthly billing demand in 12 months over 50KW. BPA cost adjustment applies to all energy used. 2006 rate. On-Peak*: Monday - Saturday 7:00 A.M. - 10:00 P.M.
80
All demand: January February March April May June July August September October November December
4.14/KW 4.01/KW 3.80/KW 3.43/KW 3.41/KW 3.77/KW 4.29/KW 4.29/KW 4.29/KW 3.74/KW 4.29/KW 4.29/KW
All usage: January February March April May June July August September October November December Plus BPA cost adjustment:
1,000 KW 2.090/KWH 2.650/KWH 2.480/KWH 2.160/KWH 2.090/KWH 2.350/KWH 2.900/KWH 3.650/KWH 3.140/KWH 2.460/KWH 3.040/KWH 3.070/KWH 1.000/KWH
WASHINGTON
Power Company
Big Bend Electric Coop Chelan County PUD 2
Sched No.
Schedule Name
General Service General
Demand Charge
Over 50 KW:
(dollars)
6.00/KW
Energy Charge
First 20,000 KWH: All additional: All usage:
(cents)
4.760/KWH 2.860/KWH 2.440/KWH
Minimum Demand
Remarks
Facility charge: $20.00/mo. Three-Phase service.
Over 40 KW:
2.31/KW
40 KW
Customer charge: $15.25/mo. Three-Phase service. Minimum monthly charge: $26.95. Customer charge: $62.10/mo. Applies only to new loads. Existing loads serviced at lower rates. Basic charge: $7.00 per day.
Industrial Service
All demand:
3.23/KW
All usage:
1.260/KWH
E-5
All demand:
4.86/KW
All usage:
3.610/KWH
34
30 KW 6.44/KW 5.66/KW September - March: April - May: 4.510/KWH 4.000/KWH 1,500 KW 5.66/KW 4.37/KW September - March: April - August: 4.510/KWH : 4.000/KWH
Customer charge: $36.00/mo. Discount available for off-peak demand. Customer charge: $120.00/mo. Discount available for off-peak demand. * On-Peak: Monday - Saturday 7:00 A.M. - 10:00 P.M.
85
Industrial Service
2-5
Over 50 KW
5.68/KW
5.677/KWH 4.350/KWH
15 KVA
First 10,000 KWH: All additional: April - May: June: July: August: September - March
5% discount for delivery at primary voltage. Subject to cost of energy adjustment. Basic charge: $35.00/mo. 10/2008 rate.
EP - U.S. 59
EP - U.S. 60
Copyright 2008 InfoMine USA, Inc.
WASHINGTON
Power Company
Cowlitz County Public Utility District
Sched No.
5
Schedule Name
Demand Charge
(dollars)
5.23/KW
Energy Charge
All usage:
(cents)
4.260/KWH
Minimum Demand
50 KW
Remarks
Customer charge: $25.00/mo.
General All demand: Service Primary Voltage Large Commercial & Industrial Service All demand: Primary voltage: Transmission voltage:
8/9
5.49/KW 4.81/KW
Customer charge: $50.00/mo. Customer owned transformers. Schedule 8 is for primary service and schedule 9 is for transmission level delivery service. Customer charge: $0.263/day. Contractual service is available to new power loads over 3,000KW. Minimum charge: $7.00/mo. plus $3.00/KW of demand in excess of 30KW. 2006 rate. Minimum charge: $250.00/mo. 2008 rate.
General Service
Over 50 KW:
1.00/KW
All usage:
1.850/KWH
Up to 2,500 KW
400
$250.00/mo. 3.57/KW
All usage:
5.009/KWH
50 KW to 500 KW 500 KW
500
Primary Industrial
All usage:
4.226/KWH
2.1
All usage: April - August: Sept. - March: All usage: April - August: Sept. - March: All usage: April - August: Sept. - March:
3.160/KWH 3.990/KWH
Customer charge: $44.96/mo. Primary service discount:$0.25/KW. 2008 rate. Customer charge: $161.78/mo. Primary service discount $0.25/KW demand. 2008 rate. Customer charge: $421.67/mo. Primary service discount $0.25/KW demand. 2008 rate.
2.2
7.31/KW
3.070/KWH 3.830/KWH
2.3
Industrial Service
All demand:
7.51/KW
3.150/KWH 3.960/KWH
WASHINGTON
Power Company
Grant County PUD Public Utility District
Sched No.
2
Schedule Name
General Service
Demand Charge
(dollars)
Energy Charge
First 8,000 KWH: All additional:
(cents)
3.9000/KWH 2.340/KWH 1.835/KWH 1.040/KWH
Minimum Demand
Up to 500 KW 200 KW to 5,000 KW 5,000 KW to 15,000 KW 50 KW
Remarks
Basic charge: $0.62/day for Three-Phase service. Basic charge: $110.00/mo.
4.10/KW
14
Industrial Service
All demand:
4.00/KW
1.014/KWH 2.500/KWH
55
Medium All demand: General Service Primary Metered Service Primary Metered Transmission Large Commercial All demand:
7.04/KW
All usage:
4.220/KWH
Customer charge: $22.04/mo. Subject to power cost adjustment. Customer charge: $64.77/mo. Minimum 5 year contract required. Subject to power cost adjustment. Customer charge: $74.09/mo. Minimum 5 year contract required. Subject to power cost adjustment. Basic charge: $246.40/hp/mo. 5% primary voltage discount.
82
6.97/KW
All usage:
3.950/KWH
84
All demand:
6.34/KW
All usage:
3.830/KWH
C2
Over 50 KW:
2.80/KW
All demand:
4.560/KWH
50 KW to 3,000 KW
4.65/KW 3.70/KW
Three-Phase facility charge: $21.00/mo. Over 20,000 KWH available to primary service only. 2006 rate.
EP - U.S. 61
EP - U.S. 62
Copyright 2008 InfoMine USA, Inc.
WASHINGTON
Power Company
Klickitat County Public Utility District
Sched No.
3A7
Schedule Name
Large General Service
Demand Charge
All demand: March - June: July - February: All demand: January February March April May June July August September October November December
(dollars)
4.06/KW 5.51/KW
Energy Charge
All usage: March - June: July - February: All usage: Off-Peak: January February March April May June July August September October November December On-Peak: January February March April May June July August September October November December
(cents)
2.320/KWH 4.180/KWH
Minimum Demand
Remarks
Basic charge: $38.00/mo. Use must exceed 180,000KWH/A.
3A8
Industrial
2,500 KW 2.640/KWH 2.480/KWH 2.190/KWH 1.750/KWH 1.480/KWH 1.750/KWH 2.750/KWH 3.290/KWH 3.430/KWH 2.250/KWH 3.260/KWH 3.200/KWH 3.510/KWH 3.400/KWH 3.110/KWH 2.480/KWH 2.480/KWH 3.040/KWH 3.920/KWH 5.680/KWH 4.140/KWH 3.020/KWH 3.980/KWH 4.090/KWH 4.270/KWH 2.770/KWH 2.630/KWH 1,000 KW to 10,000 KW
5.67/KW 5.45/KW 5.10/KW 4.48/KW 4.44/KW 5.05/KW 5.93/KW 5.93/KW 5.93/KW 5.00/KW 5.93/KW 5.93/KW
Basic charge: $110.00/mo. plus $0.50/KW. Service at primary voltage. On-Peak: Daily: 6:00 A.M. - 10:00 P.M.
20
Over 50 KW:
4.40/KW
Basic charge: $0.73/day for Three-Phase service. Minimum charge: $450.00/mo. * On-Peak: Monday - Saturday 7:00 A.M. - 10:00 P.M. *See Inland Power & Light
31
On-Peak* Off-Peak:
4.20/KW 2.47/KW
Lincoln Electric Cooperative Mason County PUD #1 General All usage: 6.600/KWH
WASHINGTON
Power Company
Mason County Public Utility District #3
Sched No.
21
Schedule Name
General Service with Demand
Demand Charge
All demand:
(dollars)
6.56/KW
Energy Charge
All usage:
(cents)
4.010/KWH
Minimum Demand
50 KVA
Remarks
Customer charge: $1.94/day. $0.40/KW of demand discount customers who receive power at primary voltage and furnish own transformer. Facility charge: $23.00/mo. 2006 rate. Basic charge: $50.00/mo. Economic development rate available. Power cost adjustment $0.00/KWH, effective 4/2007. Basic charge: $80.00/mo. Power cost adjustment of $0.00/KWH, effective 4/2007. Customer charge: $100.00/mo. 3% primary voltage discount of energy costs. Basic charge: $12.00/mo.
General or Over 50 KW Three-Phase Service Large Power All demand: Secondary Voltage Rate
5.50/KW
50 KVA
5.50/KVA
300 KVA
5.25/KVA
All usage:
4.030/KWH
300 KVA
No charge
5.200/KWH 5.040/KWH
50 KVA
General Service
Over 50 KW:
2.00/KW
2.25/KW
Orcas Power & Light Company Pacific County Public Utility District #2
1.61/KW
Basic charge: $31.25/mo. Subject to power cost adjustment. Basic charge: $28.00/mo. Subject to a 3% power cost adjustment, effective 1/2007. Basic charge: $50.00/mo. Subject to a 3% power cost adjustment, effective 1/2007.
All demand:
5.90/KW
All demand:
5.50/KW
All usage:
3.010/KWH
5,000 KW
EP - U.S. 63
EP - U.S. 64
Copyright 2008 InfoMine USA, Inc.
WASHINGTON
Power Company
Pacific Power and Light Company (Pacific Corp) Service Area
Sched No.
36
Schedule Name
Demand Charge
(dollars)
3.75/KW
Energy Charge
First 40,000 KWH: All additional:
(cents)
4.357/KWH 3.993/KWH
Minimum Demand
Up to 999 KW
Remarks
Basic charge: Up to 100 KW, $225.00/mo.; 101 KW - 300 KW, $83.00 + $1.47/KW; Over , 300 KW $166.00 + $1.20/KW. Discounts: 1% for primary metering; $.30/KW for delivery. Basic charge: Up to 3,000 KW, $1,205.00 + $0.91/KW; Over 3,000 KW, $1,450.00 + $0.83/KW. Discounts: 1% for primary metering; $.30/KW for delivery at primary voltage.
48T
3.499/KWH
1,000 KW
* On-Peak: Monday - Friday 6:00 A.M. - 10:00 P.M. All demand: 2.50/KW All usage: 2.500/KWH 500 KW
All demand:
2.50/KW
All usage:
3.100/KWH
Basic charge: $35.00/mo. Three-Phase Service. Usage can not exceed 500KW. Customer charge: $19.37/mo. Three-Phase service. Basic charge: $26.50/mo. 50 KW Basic charge: $50.00/mo.
General Service Commercial All demand: Over 50 KW: October - March: April - September: 6.36/KW
All usage:
5.984/KWH
All usage: First 20,000 KWH: October - March: April - September: All additional: October - March: April - September All usage:
3.821/KWH
25
8.72/KW 5.81/KW
8.8276/KWH 8.0402/KWH 6.3589/KWH 6.3589/KWH 6.0996/KWH 350 KW Subject to energy cost adjustment clause. Basic charge: $100.00/mo. Facilities charge: $25.00/mo. BPA adjustment of $0.0112/KWH.
26
Large Demand October - March: General Service April - September: Industrial Rate Over 35 KW: (Demand meter)
WASHINGTON
Power Company
Snohomish County Public Utility District #1
Sched No.
20
Schedule Name
General Service
Demand Charge
Over 100 KW:
(dollars)
3.62/KW
Energy Charge
First 30,000 KWH: All additional: Winter 7.520/KWH 6.050/KWH
(cents)
Summer 6.730/KWH 5.170/KWH
Minimum Demand
Up to 10,000 KW
Remarks
Customer charge: $0.29/day. 5% discount for customer owned distribution system, metered at primary voltage. Minimum charge: $7,345.00/mo.
36
All demand:
2.77/KW
5,000 KW
Over 40 KW:
5.00/KW
150 KW
Customer charge: $24.00/mo. Industrial accounts over 300 KW require special contracts. Basic charge: $16.00/mo. Contract required for voltages over 1,000 KVA. 2006 rate.
General Service
All demand:
3.25/KW
All usage:
6.500/KWH
20 KW
EP - U.S. 65
EP - U.S. 66
Copyright 2008 InfoMine USA, Inc.
WISCONSIN
Power Company
Alliant
Sched No.
Cg-2
Schedule Name
Commercial Service -Standard
Demand Charge
Maximum demand: June - September: October - May: Customer demand:
(dollars)
9.23/KW 7.88/KW 2.00/KW
Energy Charge
All usage: June - September: October - May: Maximum charge:
(cents)
5.950/KWH 4.872/KWH 13.691/KWH
Minimum Demand
75 KW
Remarks
Customer charge: $0.9205/day. Monthly charges the greater of customer demand plus maximum energy charge or the total of customer and maximum demand plus the standard energy charge. Customer demand is the greatest demand in the previous 11 month period. Customer charge: $7.6700/day. 2.5% discount on KWH and On-Peak KW, and $0.22/KW of customer demand discount at primary voltage. An interruptible rider is also available. Subject to cost of fuel adjustment. Customer demand is greatest demand in the previous month period.
Cp-1
Maximum demand 14 hr: June - September: 11.23KW October - May: 9.87/KW Customer demand: 2.00/KW Maximum demand 12hr: June - September: 11.79/KW October - May: 10.36/KW Customer demand: 2.00/KW
June - September 14hr option - On-Peak: 14hr option - Off-Peak: 12hr option - On-Peak: 12hr option - Off-Peak: October - May 14hr option - On-Peak: 14hr option - Off-Peak: 12hr option - On-Peak: 12hr option - Off-Peak: Maximum charge:
200 KW 6.251/KWH 3.593/KWH 6.564/KWH 3.593/KWH 5.341/KWH 3.593/KWH 5.608/KWH 3.593/KWH 13.691/KWH 5,000 KW
Cp-2
On-Peak demand: June - September 14hr - On-Peak: 12hr - On-Peak: October - May 14hr - On-Peak: 14hr - On-Peak: Customer charge:
10.67/KW 11.20/KW
June - September 14hr option - On-Peak: 14hr option - Off-Peak: 12hr option - On-Peak: 12hr option - Off-Peak: October - May 14hr option - On-Peak: 14hr option - Off-Peak: 12hr option - On-Peak: 12hr option - Off-Peak:
Customer charge: $18.411/day. Subject to cost of fuel adjustment. An interruptible rider is available. Customer demand is based on previous months high.
LP
All demand:
11.65/KW
All usage:
5.300/KWH*
Facility charge: $65.00/mo. Previously Adams/Marquette. 2% discount for delivery at primary voltage of 12.5 KV & coop-owned transformers. 5% discount for primary voltage delivery. Subject to cost of fuel and purchased power adjustment.
WISCONSIN
Power Company
Bayfield Electric Cooperative
Sched No.
5
Schedule Name
General Three-Phase Service
Demand Charge
All demand:
(dollars)
0.00/KW
Energy Charge
All usage:
(cents)
9.600KWH
Minimum Demand
50 KVA
Remarks
Facility charge: $50.00/mo. Subject to cost of fuel and purchased power adjustment. 2006 rate. Service charge: $50.00/mo. Subject to a power cost adjustment. Facility charge: $50.00/mo. Subject to a power cost adjustment. Facility charge: $90.00/mo. Subject to a power cost adjustment.
11.00/KW
All usage:
4.200/KWH
50 KVA
8.70/KW
All usage:
6.200/KWH
25 KVA
5.000/KWH
150 KVA
LP
5.350/KWH
25 KW
Fixed charge: $70.00/mo. Five year contract is required. Subject to a purchased power cost adjustment. On-Peak*: 5:30 P.M. - 8:30 P.M.
CP-1
All demand:
5.00/KW
All usage:
3.950/KWH
100 KVA
Monthly minimum $1.00/KW 2006 rate. Customer charge: $30.00/mo. + $1.50/KVA demand. Subject to power cost adjustment clause. Currently $0.01147/KWH. 2006 rate. Facility charge: $50.00/mo., for >500 KVA, $60.00/mo. Fixed charge: $1.00/KVA of installed transformer capacity for the first 500 KVA. Subject to power cost adjustment Interruptible rate subject to 10 minute notice. 2002 rate. *Consult utility for current rates.
CP-1
All demand:
7.50/KW
All usage:
5.590/KWH
50 KW
12,22
All demand:
6.75/KW
First 150 KWH x KW demand: All additional: For demand >500 KVA
50 KW
EP - U.S. 67
EP - U.S. 68
Copyright 2008 InfoMine USA, Inc.
WISCONSIN
Power Company
East Central Electric Association
Sched No.
GS
Schedule Name
General Service
Demand Charge
All demand: December - February: March - May: 8.00/KW June - August: September - November: Peak: December - February: March - May: 9.80/KW June - August: September - November: Base demand: On-Peak: Winter Summer: Off-Peak: Customer demand: Transmission charge:
(dollars)
11.00/KW 18.00/KW 8.00/KW
Energy Charge
First 400 KWH/KW: All additional:
(cents)
4.600/KWH 3.700/KWH
Minimum Demand
Remarks
Service charge: $55.00/mo. 2008 rate.
TD
Time-of-Day Service
All usage: 13.65/KW 21.30/KW 9.80/KW 3.50/KW All usage: Administrative Credit:
3.300/KWH
Facility charge: $90.00/mo. 2006 rate. On-Peak: Daily 5:00 P.M. - 10:00 P.M.
6.030/KWH 0.750/KWH
50 KVA
Service charge: $50.00/mo. Installed load must be <500 KVA. Subject to energy cost adjustment. Administrative credit applies to all usage greater than 400 hours of the billing demand. On-peak fixed at highest demand in month as defined below. On-Peak*: 5:00 P.M. - 9:00 P.M.
Head of Lakes Electric Association Cooperative Jackson Electric Cooperative LP Large Power All demand: September - May: June - August: All usage: 7.50/KW 9.50/KW 4.50/KW All usage: 4.900/KWH 5.100/KWH 50 KVA to 500 KVA 50 KVA
Facility charge: $70.00/mo. Subject to purchased power cost adjustment. 2006 rate. Facility charge: $100.00/mo. Reactive demand $2.40/KVAR/yr. A second demand charge is levied equal to Jump River demand cost times 1.08. Merged with Northern States Power Co, - WI, effective 1/1/1987. See Northern States for rates.
11Q
WISCONSIN
Power Company
Madison Gas and Electric Company
Sched No.
Schedule Name
Demand Charge
Winter: Summer: Distribution
(dollars)
6.855/KW 8.388/KW 3.75/KW
Energy Charge
Winter: Summer:
(cents)
6.470/KWH 7.534/KWH
Minimum Demand
75 KW to 200 KW
Remarks
Customer charge: $1.1672/day. An optional time-of-use rate for customers in this demand range is available. Customer charge: $5.2274/day. On-Peak*: Monday - Friday 10:00 A.M. - 9:00 P.M.
Cg-1B Commercial & Industrial Lighting & Power Power Cg-2 Commercial & Industrial Lighting & Power Time-of-Use
200 KW
Cp-1
5.25/KW 1.00/KW
20 KW
Customer charge: $35.00/mo. Subject to cost of power adjustment factor. Customer charge: $70.00/mo. Subject to cost of power adjustment factor.
Cp-3
Cp-1
All usage:
7.650/KWH
20 KW to 200 KW
Customer charge: $30.00/mo. Subject to cost of purchased and produced power adjustment. 2008 rate. Customer charge: $60.00/mo. Subject to cost of purchased and produced power adjustment. 2008 rate. *Peak determined by customer options. Monday - Friday 9:00 A.M. - 9:00 P.M. or 8:00 A.M. - 8:00 P.M.
Cp-3
6.00/KW 1.50/KW
On-Peak: Off-Peak:
7.900/KWH 5.810/KWH
200 KW
Commercial Power
All demand:
13.00/KW
All usage:
5.500/KWH
60 KW
EP - U.S. 69
EP - U.S. 70
Copyright 2008 InfoMine USA, Inc.
WISCONSIN
Power Company
Oconto Electric Cooperative
Sched No.
0003 & 0103
Schedule Name
Large Power Time-of-Use
Demand Charge
All demand:
(dollars)
22.57/KW
Energy Charge
On-Peak: Off-Peak:
(cents)
5.200/KWH 3.500/KWH
Minimum Demand
50 KW
Remarks
Facility charge: $45.00/mo. On-Peak*: Monday - Friday 8:00 A.M. - 8:00 P.M. *Consult utility for current rates.
P-1
6.00/KW 0.90/KW
All usage:
4.410/KW
15 KW
Subject to power cost adjustment. $(0.0239)/KWH, effective 8/2006. $0.20/KW discount for customers who maintain own transformers. Primary service discount: 1.25%. 2006 rate. *Consult utility for current rates.
Three-Phase Service
9.870/KWH 11.330/KWH
Up to 500 KVA
Customer charge: $50.00/mo. Subject to cost of power adjustment. *Demand coincidental to peak periods of the co-op. Facility charge: $55.50/mo. Large loads negotiated. 2008 rate. * Summer: June - August Facility charge: $.50/KVA/mo. 2006 rate. Facilities charge: $45.00/mo.
All usage: 12.00/KW 10.00/KWH 9.00/KW First 5,000 KWH: All additional: All usage:
5.300/KWH
50 KVA
30
50 KVA
All demand:
10.91/KW
50 KVA
(Formerly Trempealeau Electric Cooperative) Rock County Electric Cooperative Medium Commercial All demand: 10.50/KW All usage: 4.700/KWH 75 KW Customer charge: $34.00/mo. Subject to power cost adjustment factor. Customer charge: $100.00/mo. Time-of-day option available.
Large Commercial
All demand:
10.50/KW
All usage:
3.600/KWH
250 KW
WISCONSIN
Power Company
Scenic Rivers Cooperative
Sched No.
Schedule Name
Commercial
Demand Charge
On-Peak: Off-Peak:
(dollars)
6.00/KW 0.00/KW
Energy Charge
First 500 KWH: All additional KWH:
(cents)
6.000/KWH 3.400/KWH
Minimum Demand
75 KVA
Remarks
Fixed charge: $27.00/mo, plus $0.50 per KVA over 75 KVA. Subject to power cost adjustment. Service charge: $35.00/mo. plus $1.00 per each extra meter. Rate for customers who can shed their loads On-Peak control days. 2006 rate. *Consult utility for current rates.
Three-Phase
4.800/KWH
50 KW
EP-1
Large Power
6.90/KW 1.60/KW
All usage:
2.870/KWH
10 KW
EP-3
November - February: On-Peak* Off-Peak: March - October: On-Peak: Off-Peak: All usage:
Customer charge: $140.00/mo. Subject to power cost adjustment. *Peak hours: Monday - Friday 9:00 A.M. - 9:00 P.M. Facility charge: $45.00/mo. Subject to fuel adjustment clause. 2006 rate. Facilities charge: $80.00/mo. plus $0.50/KVA in excess of 50 KVA.
R-9
All demand:
8.00/KW
4.78/KWH 4.48/KWH
50 KW
Cg-1
General Secondary General Primary Time-of-use On-Peak: Less than 12,470 volts: 12,470 - 138,000 volts: Over 138,000 volts: Maximum demand: Less than 12,470 volts 12,470 - 138,000 volts More than 138,000 volts
All usage:
11.763/KWH
40 KW
Facilities charge: $0.5000/day Fuel adjustment: $0.00469/KWH Facilities charge: $17.26027/day On-Peak*: Monday - Friday 8:00 A.M. - 10:00 A.M. or 10:00 A.M. - 10: P.M.
Cp 1
On-Peak: Less than 12,470 volts 12,470 - 138,000 volts More than 138,000 volts Off-Peak: Less than 12,470 volts 12,470 - 138,000 volts More than 138,000 volts
EP - U.S. 71
EP - U.S. 72
Copyright 2008 InfoMine USA, Inc.
WISCONSIN
Power Company
Wisconsin Public Service Corporation
Sched No.
CP
Schedule Name
Large Commercial & Industrial Service
Demand Charge
Secondary: Customer demand: Summer On-Peak: Intermediate: Off-Peak: Winter On-Peak: Intermediate: Off-Peak: Primary: Customer demand: Summer On-Peak: Intermediate: Off-Peak: Winter On-Peak: Intermediate: Off-Peak: Transmission Customer demand: Summer On-Peak: Intermediate: Off-Peak: Winter On-Peak: Intermediate: Off-Peak:
(dollars)
1.957/KW 10.758/KW 8.069/KW 0.00/KW 5.918/KW 4.439/KW 0.00/KW 1.722/KW 10.484/KW 7.863/KW 0.00/KW 5.768/KW 4.326/KW 0.00/KW 0.00/KW 10.295/KW 7.721/KW 0.00/KW 5.663/KW 4.247/KW 0.00/KW
Energy Charge
Secondary: On-Peak*** Off-Peak: Primary: On-Peak: Off-Peak: Transmission: On-Peak: Off-Peak:
(cents)
5.699/KWH 2.848/KWH 5.547/KWH 2.773/KWH 5.472/KWH 2.734/KWH
Minimum Demand
1,000 KW
Remarks
Customer charge per month: Under 6,000 volts: $322.00; 6,000 - 15,000 volts: $375.00; Over 15,000 volts: $858.00. Subject to a fuel cost adjustment ($0.01599)/KWH, effective 1/2008. Discounts: Primary metering: 1.1% for 6 KV to15 KV, 2% for over 15 KV. Primary deliver: $.36/KW for 6 KV to 15 KV, to $.55/KW for over 15 KV.
*Winter:
10:00 A.M. - 12:00 P.M. Monday - Friday 5:00 P.M. - 8:00 P.M. Monday - Friday
**Winter: 7:00 A.M. - 10:00 A.M. Monday - Friday 12:00 P.M. - 5:00 P.M. Monday - Friday 8:00 P.M. - 10:00 P.M. Monday - Friday Summer: 7:00 A.M. - 10:00 A.M. Monday - Friday 4:00 P.M. - 11:00 P.M. Monday - Friday
***Winter: Summer:
7:00 A.M. - 10:00 P.M. Monday - Friday 7:00 A.M. - 11:00 P.M. Monday - Friday
Cg20
On-Peak: Off-Peak:
6.414/KWH 3.659/KWH
100 KW
Customer charge: Single phase:$59.50/mo. Three-Phase: $113.60/mo. Discounts: Primary metering -1.1% for 6 KV to 15 KV, 2% for over 15 KV; Primary delivery - $.36/KW for 6 KV to 15 KV, $.55/KW for over 15 KV. Subject to a fuel cost adjustment ($0.01599)/KWH, effective 4/2007.
WISCONSIN
Power Company
Xcel Energy
Sched No.
Cg-5
Schedule Name
General Service
Demand Charge
Secondary: Summer: Winter: Primary: Summer: Winter:
(dollars)
10.65/mo. 8.65/mo. 10.15/mo. 8.20/mo.
Energy Charge
Secondary: Summer: Winter: Primary:
(cents)
5.242/KWH 4.742/KWH 2% discount
Minimum Demand
25 KW
Remarks
Customer charge: $30.00/mo. Subject to energy cost adjustment. Energy charge credit for all KWH in excess of 400 times billing demand $0.0007/KWH.
Cg-9
Customer charge: $155.00/mo. Merged with Lake Superior District Power Company, effective January 1, 1987. Subject to energy cost adjustment. Energy charge credit for all KWH in excess of 400 times billing demand $0.007/KWH. On-Peak*: Monday - Friday 9:00 A.M. - 9:00 P.M.
3.906/KWH 3.906/KWH
Transmission Transformed: Summer: 8.69/KW/mo. Winter: 6.80/KW/mo. Transmission Untransformed: Summer: 8.65/KW/mo. Winter: 6.77/KW/mo.
WYOMING
Power Company Beartooth Electric Cooperative Big Horn Rural Electric Company CI Sched No. Schedule Name Commercial Demand Charge (dollars) Energy Charge All usage: (cents) Minimum Demand Remarks *Consult utility for current rates.
All demand:
5.25/KW
50 KVA
EP - U.S. 73
EP - U.S. 74
Copyright 2008 InfoMine USA, Inc.
WYOMING
Power Company Black Hills Power & Light Company Sched No. Schedule Name Demand Charge First 5 KW: Next 45 KW: All additional: (dollars) No charge 4.35/KW 3.90/KW Energy Charge First 1,000 KWH: Next 2,000 KWH: Next 12,000 KWH: All additional: First 50,000 KWH: Next 950,000 KWH: All additional: (cents) 6.800/KWH 6.450/KWH 6.200/KWH 5.890/KWH 4.550/KWH 4.400/KWH 3.610/KWH 125 KVA Minimum Demand Remarks Customer charge: $9.50/mo.
On-Peak: First 125 KVA: Next 175 KVA: All additional: Off-Peak: 1.5 x on-Peak: All additional: On-Peak: Off-Peak: 1.5 x on-Peak: All additional: All demand:
Substation ownership discount: $.25/KVA for transmission service; $.15/KVA for primary distribution service.
IC-11
3.740/KWH 3.000/KWH
5,500 KVA
LP
Large Power
All usage:
2.7862/KWH
Customer charge: $70.00/mo. Demand must be less than 350 KVA. 2006 rate. 350 KVA to 2,000 KVA 2,000 KVA Customer charge: $130.00/mo. 2006 rate.
LPS
Large Power
All demand:
12.85/KW
All usage:
2.7363/KWH
All demand:
10.13/KW
All usage:
2.3139/KWH
Customer charge: varies 2006 rate. Facility charge: $50.00/mo. 5% discount for delivery at primary voltage. Minimum charge: $1,173.00/mo.
LP
Large Power
All demand:
20.55/KW
All usage:
3.692//KWH
50 KW
Service >30 KV 2-30 KV Cheyenne Light Fuel & Power Company General Service
Transformer Discounts: Company owned Customer owned -$6.00/KW $4.00/KW $2.00/KW All usage: 3.968/KWH 3.762/KWH
Secondary: Primary:
WYOMING
Power Company Fall River Rural Electric Coop. Garland Light & Power Sched No. 3 Schedule Name General Service General Service Demand Charge Over 10 KW: (dollars) 7.65/KW Energy Charge All usage: (cents) 4.605/KWH Minimum Demand Remarks Customer charge: $45.00/mo.
All demand:
4.00/KW
First 200 KWH/KW Next 200 KWH/KW All additional: All usage:
25 KVA
Subject to power cost adjustment. Facilities charge: $65.50/mo. 2006 rate. Subject to power cost adjustment. Minimum charge: $85.00/mo.
B-3
All demand:
18.85/KW
B-4
2.00/KWH 18.60/KWH
All usage:
2.508/KWH
1,000 KW
Facilities charge: $225.00/mo. Subject to power cost adjustment. Schedule for transmission voltage delivery. Facilities charge: $85.00/mo.
B-1 B-2
5.75/KW
11.480/KWH 3.310/KWH
45 KVA
LP
Large Power
12.32/KW
First 50 KWH/KW: Next 100 KWH/KW: Next 100 KWH/KW: All additional:
375 KVA
5% demand discount for delivery at primary voltage if customer owns and maintains transformers. Facility charge: $26.00/mo. Rate includes all adjustments. 2008 rate. Minimum charge: $10.00/mo.
C-2
All demand:
6.480/KW
All usage:
3.271/KWH
20 KW
39
All demand:
6.00/KW
50 KW
5% discount for delivery at primary voltage. Base rate $16.00/mo. Subject to a power supply cost adjustment of $(0.00355)/KWH, effective 4/2007.
EP - U.S. 75
EP - U.S. 76
Copyright 2008 InfoMine USA, Inc.
WYOMING
Power Company Niobrara Electric Association Sched No. LP Schedule Name Large Power Service Demand Charge All demand: (dollars) 20.20/KW Energy Charge All usage: (cents) 4.071/KWH Minimum Demand 50 KVA Remarks 7% discount for delivery at primary voltage. Facilities charge: $237.00/mo. Special contracts for interruptible power available. Basic charge: Secondary delivery: $16.50/mo. Primary delivery: $19.50/mo.
25
General Service
11.57/KW 11.20/KW
Secondary: First 1,000 KWH Next 8,000 KWH: All additional: Primary: First 40,000 KWH Next 8,000 KWH: All additional:
48T
10.96/KW
All usage:
Basic charge: $3,605.00/mo. 1% discount for primary metering. Delivery discounts: $.30/KW for primary $.60/KW for transmission. On-Peak*: Monday - Friday 7:00 A.M. - 11:00 P.M.
LP
Large Power
2.65/KW 5.35/KW
3.987/KWH 1.987/KWH
50 KVA
Basic charge: $75.00/mo. Discount for delivery at primary voltage. $0.40/KVA of contract capacity.
(Formerly, Sheridan-Johnson Rural Electric Assn.) LPT Large Power Transmission Level Basic demand: Wholesale demand: 0.95/KW 6.77/KW All usage: 1.587/KWH 1,000 KW Basic charge: $600.00/mo. Available only at 69 KV or greater for coal mining and processing. Sold to Pacific Power & Light Co. LP Large Power All demand: 22.56/KW First 50,000 KWH: All additional: 5.310/KWH 3.210/KWH 50 KVA Any loads over 1,000 KVA are negotiable. Facilities charge: $60.00/mo. 2008 rate.
WYOMING
Power Company Wyrulec Company Sched No. GS-3 Schedule Name General Service Three-Phase Demand Charge (dollars) Energy Charge All usage: (cents) 10.430/KWH Minimum Demand 50 KVA Remarks Basic charge: $42.00/mo. Special rates available for service over 350 KVA. Basic charge: $600.00/mo. Available only to customers who own their substations.
2.690/KWH
350 KVA
Yampa Valley
All demand:
No charge
All usage:
6.691/KWH
50 KVA
EP - U.S. 77
0.115
0.097
0.088
0.087
0.070
0.062
0.075
0.064
0.060
0.123 0.094
0.081 0.069
0.064 0.059
0.101 0.094
0.070 0.069
0.058 0.059
0.094 0.077
0.071 0.064
0.064 0.059
0.110 0.106
0.071 0.067
0.056 0.051
0.107 0.097
0.070 0.062
0.056 0.049
0.077 0.073
0.059 0.055
0.052 0.049
0.185 0.206
0.155 0.182
0.141 0.172
0.175 0.180
0.151 0.164
0.142 0.157
0.156 0.168
0.145 0.160
0.140 0.157
0.137
0.103
0.089
0.131
0.093
0.079
0.116
0.098
0.092
0.170
0.159
0.155
0.158
0.147
0.142
0.151
0.144
0.142
0.127
0.087
0.069
0.127
0.088
0.071
0.086
0.070
0.064
0.047 0.050
0.043 0.042
0.041 0.040
0.137 0.055
0.115 0.042
0.109 0.037
0.040
0.034
0.031
Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.
EP-US 79
0.204
0.167
0.152
0.195
0.163
0.151
Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.
EP-US 80
0.107 0.110
0.091 0.088
0.085 0.080
0.084 0.106
0.075 0.084
0.065 0.073
0.072 0.085
0.063 0.075
0.060 0.070
0.070 0.107
0.055 0.085
0.049 0.076
0.068 0.085
0.054 0.070
0.048 0.065
0.058 0.067
0.051 0.063
0.048 0.061
0.097 0.133
0.092 0.113
0.089 0.105
0.091 0.139
0.082 0.110
0.078 0.100
0.084 0.118
0.079 0.104
0.078 0.099
0.140 0.148
0.129 0.126
0.125 0.117
Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.
EP-US 81
0.047 0.067
0.043 0.064
0.041 0.063
0.141
0.128
0.123
0.132
0.124
0.121
0.119
0.114
0.113
0.074
0.055
0.048
0.056
0.045
0.041
0.048
0.038
0.034
0.087
0.057
0.045
0.082
0.055
0.044
0.050
0.039
0.035
0.158 0.144
0.110 0.108
0.090 0.094
0.137 0.139
0.095 0.106
0.079 0.093
0.088 0.117
0.073 0.099
0.068 0.092
Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.
EP-US 82
CANADA British Columbia British Columbia Hydro and Power Authority Manitoba Manitoba Hydro New Brunswick New Brunswick Power Nova Scotia Nova Scotia Power, Inc Quebec Hydro-Quebec
0.081
0.057
0.048
0.066
0.050
0.044
0.045
0.038
0.036
0.079
0.054
0.043
0.075
0.050
0.041
0.041
0.034
0.031
0.116
0.085
0.072
0.107
0.075
0.063
0.086
0.069
0.063
0.112
0.087
0.076
0.111
0.083
0.072
0.091
0.077
0.072
0.108
0.078
0.064
0.108
0.070
0.054
0.060
0.047
0.043
Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.