Professional Documents
Culture Documents
MD : 713KVA
CT ratio : 50/5 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MD KVA : PF :
Supervisor
Manager
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Sign
SUPERVISOR
MANAGER
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Sign
SUPERVISOR
MANAGER
BATTERY 6
10
11
12
Battery-2 Reading
Total Voltage
Acuator coolant Engine Clean DG Total hrs PWM Oil temperat start time Set run percenta pressure ure ge
Engine speed
Battery voltage
Voltage
Current
Procured Material
Supervisor
Manager
BATTERY 6
10
11
12
Battery-2 Reading
Total Voltage
Acuator coolant Engine Clean DG Total hrs PWM Oil temperat start time Set run percenta pressure ure ge
Engine speed
Battery voltage
Voltage
Current
Procured Material
Supervisor
Manager
DG READING at Runing
KVA : 500
Date
Sl. No.
Engine coolant Engine Total hrs Acuator Oil Engine start temperat stop time run PWM % pressure speed time ure
Voltage
R Y B R
Current
Y B
Power in KW
PF
Frequen Remarks cy
Sign
SUPERVISOR
Manager
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 Total Energy consumption in the month : Final KWH : Intial KWH : KWH / month : R-Y Y-B B-R R
LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH
Current Amps Y B
PF
F Hz
% of load TAP
KWH/day
SUPERVISOR
MANAGER
MC : 1
MC : 1000
MC : 1
MLRP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
10
11
12
13
14
15
MC : 1
AC1 DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
MC : 1000
10
11
12
13
14
15
MC :120
MC :1000 Total EB, KWH/day Total DG, KWH/day Total EB+DG, KWH/day
MC :1000
MC :1000
ACCP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 KWH KWH/day
DG3 KWH/day
Sign
10
11
12
13
14
15
Month :
Year : Sl.No Sub LT panel Intial EB,KWH Final EB,KWH EB KWH/ MONTH
Intial DG,KWH
Final DG,KWH
DG KWH/ MONTH
T KWH/ MONTH
1 2 3 4 5 6 7
MLRP(1000) UPS I/P(1000) CA(1000) AC1(1000) AC2(1000) AC3(1000) ACCP(120) Total Total EB KWH/ Month Total DG KWH/ Month
Sl.No
Main DG Panel
Intial DG,KWH
Final DG,KWH
DG KWH/ MONTH
1 2
DG2(1000) DG3(1000)
Total 1 EB
Supervisor
Manager
MC : 1
MC : 1000
MC : 1
MLRP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
MC : 1
AC1 DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
MC : 1000
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
MC :120
MC :1000 Total EB, KWH/day Total DG, KWH/day Total EB+DG, KWH/day
MC :1000
MC :1000
ACCP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 KWH KWH/day
DG3 KWH/day
Sign
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Average per month Description unit Avg ltrs / hr Avg KWH / ltr 55.1 3.4
Supervisor
Manager
Daily Report
Date : BESCOM Energy Consumption
SL.No 1 2 3
Present
Previous
Diff
Remarks
Total submeter(sm) reading Description Loss from HT to Sum of SubMeter(=HT-SM) Total loss(=Total SM loss+ACCP) KPIT Energy Consumption(=Total SM-(CA-ACCP)) Shailendra techno park Engy consumtion(CA)
Daily
Monthly
SL.No 1
Diesel Generator(DG) Energy & Diesel Consumption Consumption Total Energy of this Present Previous Diff month(KWH) (KWH)
Remarks
Total 2 MLRP(1) UPS(1000) CA(1) AC1(1) AC2(1000) AC3(1000) 3 Total submeter(sm) reading Description Daily Monthly SubMeter Reading
KPIT Energy Consumption(=Total SM-CA) Shailendra Techno Park Engy consumtion(CA) Diesel Consumption & hrs run Total Hrs Diesel Reading Description Daily ltr Monthly ltr Remain Daily monthly Consumed consumed (ltr) DG2 DG3 Barrel Total
Avg Ltr/Hr
T A Day Caf water, EB & DG consumption details Present Previous Diff Consumption
KWH KWH KWH ltrs
Remarks
Prepared by :
Supervisor
Manager
EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable 2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP
EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable 2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP
2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1
2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1
2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC
2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC
4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG3 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 2R x 40mm x 6mm NEUTRAL CU STRIP DG1 2R x 40mm x 6mm NEUTRAL CU STRIP DG3 2R x 40mm x 6mm NEUTRAL CU STRIP 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel
4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG3 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 2R x 40mm x 6mm NEUTRAL CU STRIP DG2 2R x 40mm x 6mm NEUTRAL CU STRIP DG3 2R x 40mm x 6mm NEUTRAL CU STRIP 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel
Sl.no.
Sound of Transformer
Oil and Winding Temperature HT outgoing panel spring should be in charge mode Transformer yard no vegetation grown
10
11
Surge arrestor relay status HT outgoing & LT Kiosk Panel door should be closed Technician sign Supervisor sign Manager sign Remarks :
12
Earthing Details
Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Earth Pit No. TF NE1 TF NE2 TF BE1 TF BE2 LBS BE1 DGLA LTP BE1 RMU BE1 RMU BE2 MC BE BLA1 BLA2 DG2 NE1 DG2 NE2 DG3 NE1 DG3 NE2 DG2 BE1 DG2 BE2 DG3 BE1 DG3 BE2 PB1 PB2 PB3 PB4 PB5 PB6 UN1 UN2 UN3 UN4 UN5 UPB1 UPB2 UPB3 SRE1 Location Transformer yard Transformer yard Outside transformer yard Outside transformer yard Outside transformer yard Transformer yard Transformer yard RMU yard RMU yard RMU yard Left back side of building Left back side of building Basement entrance Basement entrance Basement entrance Basement entrance DG yard DG yard DG yard DG yard Left back side of building Left back side of building Left back side of building Left back side of building Left back side of building Left back side of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Right Frontside of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Purpose Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Lighting Arrestor Body Earthing Body Earthing Body Earthing Body Earthing Lighting Arrestor Lighting Arrestor Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Type of Electrode Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Type of Conductor & Size 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 50x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm GI strip 50x6mm GI strip 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm GI strip 50x6mm GI strip 50x6mm GI strip 50x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm Cu strip with sleeve 50x6mm Cu strip with sleeve 50x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 25x6mm Cu strip with sleeve 25x6mm Cu strip with sleeve 25x3mm Cu strip with sleeve Remarks Transformer Neutral Transformer Neutral Transformer Body Earthing Transformer Body Earthing LBS Body Earthing DG Exhaust Pipe Lighting Arrestor Old LT & STP panel Body Earthing RMU Panel body Earthing RMU Panel body Earthing Meter Cubical Panel body Earthing Building Lighting Arrestor Building Lighting Arrestor DG2 Neutral Earthing connected to main DG2 panel DG2 Neutral Earthing connected to main DG2 panel DG3 Neutral Earthing connected to main DG3 panel DG3 Neutral Earthing connected to main DG3 panel DG2 Body Earthing DG2 Body Earthing DG3 Body Earthing DG3 Body Earthing Used for basement main panel Body earthing Used for basement UPS I/P & APFC panel Body earthing AHU panel-1,2,3 & ODU Body earthing AHU panel-1,2,3 & ODU Body earthing LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing Isolator Transformer 1 (Sub UPS O/P Panel 1) Isolator Transformer 2A & B (Sub UPS O/P Panel 2A & B) Isolator Transformer 3 (Sub UPS O/P Panel 3) Isolator Transformer 2 (Sub UPS O/P Panel 2) Isolator Transformer 2 (Sub UPS O/P Panel 2) Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for racks, etc., Used for hub room dedicate earthing, lab tables, etc., Used for hub room dedicate earthing, lab tables, etc., Lift 1 Panels, car, etc., Body earthing Lift 2 Panels, car, etc., Body earthing Lift 3 Panels, car, etc., Body earthing
Server racks Copper Plate 1Cx25sqmm cu cable earthing 36 SE1 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable 37 SE2 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable 38 LBE1 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip 39 LBE2 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip 40 LBE3 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip Note : UPS Neutral earthing connected to Isolator Transformer to Sub UPS O/P panel 1R x 1C Cables as per SLD
DEC-2010
Monthly Report
Date : BESCOM Energy Consumption PF : MD KVA:
Sl No. 1 2 3 a) b) c) d) e) f) g)
Present
Previous
Diff
Consumption (KWH)
Rate 6 6
Amount
Remarks
SubMeter Reading MLRP(1000) UPS(1000) CA(1000) AC1(1000) AC2(1000) AC3(1000) ACCP(120) 6 6 6 6 6 6 6 6 6 6 6 6 PF KVAH MD
Total submeter(sm) reading Losses B/W HT to submeter(HT-SM) Total Loss (SM+ACCP) KPIT Energy Common Area(CA) HT Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 6 Tax 5% Total Amount KPIT Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 6 Tax 5% Loss 6 Total Amount CA Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 5.6 Tax 5% loss 5.6 Total Amount DG Reading & Charges Consumption Diff (KWH) OLD METER
PF KVAH MD
PF KVAH MD
Description
Present
Previous
Rate 14 14
Amount
Remarks
TOTAL Units 2 DG2 DG3 TOTAL Units 3 a) b) c) d) e) f) MLRP(1) UPS(1000) CA(1) AC1(1) AC2(1) AC3(1) Total submeter(sm) reading KPIT Energy Common Area(CA) hours KWH ltrs consumed Remain Ltrs SubMeter Reading 14 14 14 14 14 14 14 14 14 Description Rate Diesel ltrs Total KWH Diff NEW METER 14 14
Amount 42.16 14
Descriptions
HT Reading, KWH Reading of Submeter(MLRP, UPS, CA, AC1, AC2, AC3 & ACCP; DG Reading(Hrs, Ltrs, KWH); EB Reading
Remarks
Per Day Consumption Calculation & Daily Report Making. EB Reading & Going for rounds Going for rounds EB Reading & Going for rounds EB Reading & Going for rounds EB Reading; Switch of all the Lights( stairs, lobby, basement, 6:00 AM street light). 7 Shift handing over 8 7:00 AM 9 7:30 AM Checking all the lights, Switch ON the Lifts, Going For rounds. EB, Submeter & DG KWH Reading, A-Check oF DG'S. 10 8:00 AM PM Check of HT yards & Transformer, LT Panels. 11 9:00 AM EB KWH Readings, PM Check of Lifts. 12 10:00 AM PM check of STP Plant, Pumps & Motors 13 11:00 AM EB Readings, Going for rounds & Follow Up Works. 14 12:00 PM Going for rounds & Follow Up Works. 15 1:00 PM Shift handing over 16 1:30 PM EB Reading, Going for Rounds 17 2:00 PM 18 3:00 PM Lift room, Lift Car & Terrace AC M/C Check & Follow Up Work EB, Submeter & DG KWH Reading & Follow UP Works 19 4:00 PM 20 5:00 PM 21 22 6:00 PM 23 7:00 PM 8:00 PM 24 25 8:30 PM 9:00 PM 26 27 10:00 PM 28 11:00 PM 6:00 PM Checking of STP Plants, Pumps & motors & Follow Up works EB Reading & Going for rounds; Switch ON all Lights( Stair, lobby, Basement lights) Switch ON The street lights, Checking for ligths Going for Rounds EB Reading & Switch OFF the some of lights (Stair, lobby, Basement & Street light) Shift handing over Going for rounds, Switch OFF the any One Lift & follow Up works EB Readings, Going for rounds & Follow Up Works. Follow Up Works
NOTE : Going for Rounds : checking of Main Panel, RTCC Panel, CA Panel, HT yards, Lifts, Lights, etc.,
SL.NO 1 2 3 4 5 6
CLEANING
Clean the Engine fule & Air houses Clean the Alternator Clean and Verify cable terminal box (Externaly) Clean the Air & Fule Filters (Externaly) Clean the Redator & Cooland pipe Lines Cleanthe Batteries & Cables INSPECTION
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Check the Battery Voltage Check the specific gravity of Batteries Check the Battery Electroyte level Check all house pipes for any leakages & arrest it immedately Check the Condition of air inlet restriction indicatior Check oil Engine Lubrication oil level Check the Abnormal noise & vibraction while taking trial Run Check the Engine starter motor cable terminals for any looseness Check the Engine control panels & display working condition Ensure selector switch poisition in control panel is in auto mode Check the condition of rediator fan belt and its tension Drain water from fuel water seperator through drain valve Check the radiator water level Check the Diesel level in the Daily fuel tank Done By Technician Checked By Supervisor Checking Autority
Remark's
TIME : 12:00 AM KWH Reading Opening DIFF (kwh) Average diesel ltrs/hr/day Average units kwh/ltr/day
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Closing (hr)
Run/Day (hr)
Closing (kwh)
units/Day (kwh)
Sign
Sum of hrs/month Sum of units/month Total Diesel consumption in the month : Total units/month Avg lts/hr/month Avg kwh/ltr/month
SUPERVISOR
Manager
Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DG2 NE1 DG2 Neutral Earthing DG2 NE2 DG2 Neutral Earthing DG3 NE1 DG3 Neutral Earthing DG3 NE2 DG3 Neutral Earthing DG2 BE1 DG2 BE2 DG3 BE1 DG3 BE2 PB1 DG2 Body Earthing DG2 Body Earthing DG3 Body Earthing DG3 Body Earthing Basement Panel Body Earthing
Sl.No. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Verfied By :
Manager sign :
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Closing (Kwh)
units/Day (kwh)
Water Consumption(ltrs) Reading Closing Opening Consumption DIFF (Ltrs) (Ltrs) /day(ltrs)
Closing (Kwh)
units/Day (kwh)
Remarks
Sign
Sum of KWH/month Description Total EB / Month Total DG/ month SUPERVISOR Units(Kwh)
Sum of Ltrs/month Total Units consumption in the month : Description Total Water Consumption/Month Litres
Sum of Kwh/month
Manager