CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : RR no : E4HT-348 Consumption DATE Present KWH Previous KWH Diff Consumpti on in KWH/Day

KVAH MD KVA PF % of Demand Remarks load SIGN KWH READING OF HT

CD: 950 KVA MC: 1000

MD : 713KVA

CT ratio : 50/5 A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Total Consumption in KWH / Month

MD KVA : PF :

Supervisor

Manager

SHAILENDRA TECHNO PARK


DG:2 Diesel in tank Clean Water Separator Coolant Battery level Charger Daily PM Check List Check Engine Engine Cracks& sound & oil level LooseCon. vibration MONTH: Cummulative Check for Hours Leaks Done By Name

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Sign

SUPERVISOR

MANAGER

SHAILENDRA TECHNO PARK


DG:3 Diesel in tank Clean Water Separator Coolant Battery level Charger Daily PM Check List Check Engine Engine Cracks& sound & oil level LooseCon. vibration MONTH: Cummulative Check for Hours Leaks Done By Name

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Sign

SUPERVISOR

MANAGER

SHAILENDRA TECHNO PARK


DG:2 Clean DG Set Rating: 500KVA Drain Water Separator Clean Air Filters Check Air Cleaner Check Coolant Weekly PM Check List Check Check Check Engine Loose Belts oil Wires Check Cracks Check for Leaks MONTH: Engine sound & vibration Battery Charger Cummula tive Hours

Cell No. Specipic Gravity Voltage Battery-1

BATTERY 6

10

11

12

Battery-2 Reading

Total Voltage

Acuator coolant Engine Clean DG Total hrs PWM Oil temperat start time Set run percenta pressure ure ge

Engine speed

Battery voltage

Power in Power in Frequenc KW KVA y

Voltage

Current

Procured Material

Any Remarks & Action Taken

PM Dony by Name: Sign

Supervisor

Manager

SHAILENDRA TECHNO PARK


DG:3 Clean DG Set Rating: 500KVA Drain Water Separator Clean Air Filters Check Air Cleaner Check Coolant Weekly PM Check List Check Check Check Engine Loose Belts oil Wires Check Cracks Check for Leaks MONTH: Engine sound & vibration Battery Charger Cummula tive Hours

Cell No. Specipic Gravity Voltage Battery-1

BATTERY 6

10

11

12

Battery-2 Reading

Total Voltage

Acuator coolant Engine Clean DG Total hrs PWM Oil temperat start time Set run percenta pressure ure ge

Engine speed

Battery voltage

Power in Power in Frequenc KW KVA y

Voltage

Current

Procured Material

Any Remarks & Action Taken

PM Dony by Name: Sign

Supervisor

Manager

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE DG No : Month :


Make: Powerica cummins

DG READING at Runing

KVA : 500

Date

Sl. No.

Engine coolant Engine Total hrs Acuator Oil Engine start temperat stop time run PWM % pressure speed time ure

Voltage
R Y B R

Current
Y B

Power in KW

PF

Frequen Remarks cy

Sign

SUPERVISOR

Manager

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month : Voltage DATE TIME 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 Total Energy consumption in the month : Final KWH : Intial KWH : KWH / month : R-Y Y-B B-R R

LT READING-LOG SHEET Capacity : 3200A Remarks Sign Power (KW) Energy Reading in KWH

Current Amps Y B

PF

F Hz

% of load TAP

KWH/day

AVG PF : Final KVAH : Intial KVAH : KVAH/month :

SUPERVISOR

MANAGER

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC : 1

MC : 1000

MC : 1

MLRP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

UPS INPUT E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

Common Area E,KWH/day DG, KWH/day T,KWH/day

10

11

12

13

14

15

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC : 1

AC1 DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

MC:1000 AC2 E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

MC : 1000

AC3 E,KWH/day DG, KWH/day T,KWH/day

10

11

12

13

14

15

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC :120

MC :1000 Total EB, KWH/day Total DG, KWH/day Total EB+DG, KWH/day

MC :1000

MC :1000

ACCP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 KWH KWH/day

EB KWH KWH/day KWH

DG2 KWH/day KWH

DG3 KWH/day

Sign

10

11

12

13

14

15

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

Month :
Year : Sl.No Sub LT panel Intial EB,KWH Final EB,KWH EB KWH/ MONTH

Sub Panel Monthly Reading

Intial DG,KWH

Final DG,KWH

DG KWH/ MONTH

T KWH/ MONTH

1 2 3 4 5 6 7

MLRP(1000) UPS I/P(1000) CA(1000) AC1(1000) AC2(1000) AC3(1000) ACCP(120) Total Total EB KWH/ Month Total DG KWH/ Month

Sl.No

Main DG Panel

Intial DG,KWH

Final DG,KWH

DG KWH/ MONTH

1 2

DG2(1000) DG3(1000)

Total 1 EB

Supervisor

Manager

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC : 1

MC : 1000

MC : 1

MLRP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

UPS INPUT E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

Common Area E,KWH/day DG, KWH/day T,KWH/day

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC : 1

AC1 DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

MC:1000 AC2 E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

MC : 1000

AC3 E,KWH/day DG, KWH/day T,KWH/day

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

KWH READING of MAIN PANEL


Month :

MC :120

MC :1000 Total EB, KWH/day Total DG, KWH/day Total EB+DG, KWH/day

MC :1000

MC :1000

ACCP DATE TIME 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 KWH KWH/day

EB KWH KWH/day KWH

DG2 KWH/day KWH

DG3 KWH/day

Sign

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

SHAILENDRA TECHNO PARK-BANGALORE

Diesel Consumption, Purchase & Remaining


Month : Oct 2011 Diesel purchase Date Diesel(ltr) Rate(Rs.) 1500 46.08 Amount(Rs.) 69120 total amount with transportation(Rs.) 69520 Previous month Remained particular ltr DG2 DG3 Total 1500 Diesel consumption Description DG2 DG3 Total ltr 821.53 683.53 1505.06 Hour 12.7 14.6 27.3 KWH 2777.9 2267.2 5045.1 69120 Remain diesel Description Total Diesel Consumed Remaining ltr 2399.9 1505.1 894.84 Description KWH Litres Profit Unit 5045.1 1505.06 69520 418.2 481.7 899.9 Profit Rate(Rs.) Amount(Rs.) 14 46.08 70631.4 70553.1648 78.2352 Total diesel Description purchase remained Total diesel ltr 1500 899.9 2399.9

Average per month Description unit Avg ltrs / hr Avg KWH / ltr 55.1 3.4

Supervisor

Manager

SHAILENDRA TECHNO PARK-BANGALORE

Daily Report
Date : BESCOM Energy Consumption

SL.No 1 2 3

Description HT Reading(1000) LT Reading(1)

Present

Previous

Diff

Consumption Total Energy of this month(KWH) (KWH)

Remarks

SubMeter Reading MLRP(1000) UPS(1000) CA(1000) AC1(1000) AC2(1000) AC3(1000) ACCP(120)

Total submeter(sm) reading Description Loss from HT to Sum of SubMeter(=HT-SM) Total loss(=Total SM loss+ACCP) KPIT Energy Consumption(=Total SM-(CA-ACCP)) Shailendra techno park Engy consumtion(CA)

Daily

Monthly

SL.No 1

Description DG2(1000) DG3(1000)

Diesel Generator(DG) Energy & Diesel Consumption Consumption Total Energy of this Present Previous Diff month(KWH) (KWH)

Remarks

Total 2 MLRP(1) UPS(1000) CA(1) AC1(1) AC2(1000) AC3(1000) 3 Total submeter(sm) reading Description Daily Monthly SubMeter Reading

KPIT Energy Consumption(=Total SM-CA) Shailendra Techno Park Engy consumtion(CA) Diesel Consumption & hrs run Total Hrs Diesel Reading Description Daily ltr Monthly ltr Remain Daily monthly Consumed consumed (ltr) DG2 DG3 Barrel Total

Daily Avg Kwh/ltr

Monthly Avg Kwh/ltr

Avg Ltr/Hr

5 Description EB Actual EB(EB-DG) DG Water Observation :

T A Day Caf water, EB & DG consumption details Present Previous Diff Consumption
KWH KWH KWH ltrs

Total Energy of this month


KWH KWH KWH ltrs

Remarks

Prepared by :

Supervisor

Manager

EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable 2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP

EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable EB INCOMER 8R x 3.5C x 400Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG1 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG2 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable DG3 INCOMER 3R x 3.5C x 300Sq.mm AYFY Cable 2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP

2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1

2R x 3.5C x 185 Sq.mm AYFY Cable TO MLRP 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 3R x 3.5C x 400Sq.mm AYFY Cable TO UPS 2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1

2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC

2R x 3.5C x 185 Sq.mm AYFY Cable TO AHU PCC1 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC2 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 2R x 3.5C x 240 Sq.mm AYFY Cable TO AHU PCC3 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 1R x 3.5C x 185 Sq.mm AYFY Cable TO COMMON AREA 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC

4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG3 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 2R x 40mm x 6mm NEUTRAL CU STRIP DG1 2R x 40mm x 6mm NEUTRAL CU STRIP DG3 2R x 40mm x 6mm NEUTRAL CU STRIP 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel

4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC 4R x 3.5C x 185 Sq.mm AYFY Cable TO APFC DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG1 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG3 CONTROL & BATTERY CHARGE CU UNARM CABLE 24C x 1.5 Sqmm & 2C x 2 Sqmm DG2 2R x 40mm x 6mm NEUTRAL CU STRIP DG2 2R x 40mm x 6mm NEUTRAL CU STRIP DG3 2R x 40mm x 6mm NEUTRAL CU STRIP 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel 6C x 2.5Sqmm Control CU UNARM CABLE to APFC Panel

SHAILENDRA TECHNO PARK


Month ; Date Descriptions 1 Oil level in conservator tank (Main and OLTC) 1 2 3 4 5 6 7 Transformer Daily PM Check List 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Sl.no.

Oil leakages if any arrest immediately

Counter reading of OLTC

Sound of Transformer

Control knob should be in remote state

Checking the color of silica gel(in breather)

Oil and Winding Temperature HT outgoing panel spring should be in charge mode Transformer yard no vegetation grown

10

Bucholz Relay Status

11

Surge arrestor relay status HT outgoing & LT Kiosk Panel door should be closed Technician sign Supervisor sign Manager sign Remarks :

12

SHAILENDRA TECHNO PARK-BANGALORE

Earthing Details
Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Earth Pit No. TF NE1 TF NE2 TF BE1 TF BE2 LBS BE1 DGLA LTP BE1 RMU BE1 RMU BE2 MC BE BLA1 BLA2 DG2 NE1 DG2 NE2 DG3 NE1 DG3 NE2 DG2 BE1 DG2 BE2 DG3 BE1 DG3 BE2 PB1 PB2 PB3 PB4 PB5 PB6 UN1 UN2 UN3 UN4 UN5 UPB1 UPB2 UPB3 SRE1 Location Transformer yard Transformer yard Outside transformer yard Outside transformer yard Outside transformer yard Transformer yard Transformer yard RMU yard RMU yard RMU yard Left back side of building Left back side of building Basement entrance Basement entrance Basement entrance Basement entrance DG yard DG yard DG yard DG yard Left back side of building Left back side of building Left back side of building Left back side of building Left back side of building Left back side of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Right Frontside of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Purpose Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Lighting Arrestor Body Earthing Body Earthing Body Earthing Body Earthing Lighting Arrestor Lighting Arrestor Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Body Earthing Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Neutral Earthing Body Earthing Body Earthing Body Earthing Type of Electrode Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Type of Conductor & Size 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 50x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm GI strip 50x6mm GI strip 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm GI strip 50x6mm GI strip 50x6mm GI strip 50x6mm GI strip 25x6mm GI strip 25x6mm GI strip 50x6mm Cu strip with sleeve 50x6mm Cu strip with sleeve 50x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 40x6mm Cu strip with sleeve 25x6mm Cu strip with sleeve 25x6mm Cu strip with sleeve 25x3mm Cu strip with sleeve Remarks Transformer Neutral Transformer Neutral Transformer Body Earthing Transformer Body Earthing LBS Body Earthing DG Exhaust Pipe Lighting Arrestor Old LT & STP panel Body Earthing RMU Panel body Earthing RMU Panel body Earthing Meter Cubical Panel body Earthing Building Lighting Arrestor Building Lighting Arrestor DG2 Neutral Earthing connected to main DG2 panel DG2 Neutral Earthing connected to main DG2 panel DG3 Neutral Earthing connected to main DG3 panel DG3 Neutral Earthing connected to main DG3 panel DG2 Body Earthing DG2 Body Earthing DG3 Body Earthing DG3 Body Earthing Used for basement main panel Body earthing Used for basement UPS I/P & APFC panel Body earthing AHU panel-1,2,3 & ODU Body earthing AHU panel-1,2,3 & ODU Body earthing LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing Isolator Transformer 1 (Sub UPS O/P Panel 1) Isolator Transformer 2A & B (Sub UPS O/P Panel 2A & B) Isolator Transformer 3 (Sub UPS O/P Panel 3) Isolator Transformer 2 (Sub UPS O/P Panel 2) Isolator Transformer 2 (Sub UPS O/P Panel 2) Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub & UPS Socket Used for racks, etc., Used for hub room dedicate earthing, lab tables, etc., Used for hub room dedicate earthing, lab tables, etc., Lift 1 Panels, car, etc., Body earthing Lift 2 Panels, car, etc., Body earthing Lift 3 Panels, car, etc., Body earthing

Server racks Copper Plate 1Cx25sqmm cu cable earthing 36 SE1 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable 37 SE2 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable 38 LBE1 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip 39 LBE2 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip 40 LBE3 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip Note : UPS Neutral earthing connected to Isolator Transformer to Sub UPS O/P panel 1R x 1C Cables as per SLD

SHAILENDRA TECHNO PARK-BANGALORE

DEC-2010

Monthly Report
Date : BESCOM Energy Consumption PF : MD KVA:

Sl No. 1 2 3 a) b) c) d) e) f) g)

Description HT Reading(1000) LT Reading(1)

Present

Previous

Diff

Consumption (KWH)

Rate 6 6

Amount

Remarks

SubMeter Reading MLRP(1000) UPS(1000) CA(1000) AC1(1000) AC2(1000) AC3(1000) ACCP(120) 6 6 6 6 6 6 6 6 6 6 6 6 PF KVAH MD

Total submeter(sm) reading Losses B/W HT to submeter(HT-SM) Total Loss (SM+ACCP) KPIT Energy Common Area(CA) HT Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 6 Tax 5% Total Amount KPIT Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 6 Tax 5% Loss 6 Total Amount CA Energy Charges Description Units rate Amount Demand charges 200 Energy Charges 5.6 Tax 5% loss 5.6 Total Amount DG Reading & Charges Consumption Diff (KWH) OLD METER

PF KVAH MD

PF KVAH MD

Sl No. 1 DG2 DG3

Description

Present

Previous

Rate 14 14

Amount

Remarks

TOTAL Units 2 DG2 DG3 TOTAL Units 3 a) b) c) d) e) f) MLRP(1) UPS(1000) CA(1) AC1(1) AC2(1) AC3(1) Total submeter(sm) reading KPIT Energy Common Area(CA) hours KWH ltrs consumed Remain Ltrs SubMeter Reading 14 14 14 14 14 14 14 14 14 Description Rate Diesel ltrs Total KWH Diff NEW METER 14 14

Description DG2 DG3 Total

Amount 42.16 14

SHAILENDRA TECHNO PARK


Month ; Lift No. Date Sl.no. Descriptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Car door sensor working condition Display Status in all Floor & also Inside Car Opening & Closing Button Status All Number buttons Status Car should be match with Floor Level during landing Car Lights Status Lift Speed, Door close & open speed Any abnormal noise during run & landing Switch Status inside car Fireman switch Lift room tempurature Supply Voltage Lift room & car cabin is free from dust Switches should in be Auto status Oil level & grease in runing & mechnical parts Technician sign Supervisor sign Manager sign Remarks : 1st shift 1 2nd shift 1st shift 2 2nd shift 1st shift 3 2nd shift 1st shift Lift Daily PM Check List 4 2nd shift 1st shift 5 1st shift 2nd shift 6 1st shift 2nd shift 7 1st shift 2nd shift 8 1st shift 2nd shift 9 1st shift 1st shift 10 2nd shift

SHAILENDRA TECHNO PARK


Month ; Lift No. Date Sl.no. Descriptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Car door sensor working condition Display Status in all Floor & also Inside Car Opening & Closing Button Status All Number buttons Status Car should be match with Floor Level during landing Car Lights Status Lift Speed, Door close & open speed Any abnormal noise during run & landing Switch Status inside car Fireman switch Lift room tempurature Supply Voltage Lift room & car cabin is free from dust Switches should in be Auto status Oil level & grease in runing & mechnical parts Technician sign Supervisor sign Manager sign Remarks : 1st shift 11 2nd shift 1st shift 12 2nd shift 1st shift 13 2nd shift 1st shift 14 1st shift 2nd shift 15 1st shift 2nd shift Lift Daily PM Check List 16 1st shift 2nd shift 17 1st shift 2nd shift 18 1st shift 1st shift 19 2nd shift 1st shift 20 2nd shift

SHAILENDRA TECHNO PARK


Month ; Lift No. Date Sl.no. Descriptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Car door sensor working condition Display Status in all Floor & also Inside Car Opening & Closing Button Status All Number buttons Status Car should be match with Floor Level during landing Car Lights Status Lift Speed, Door close & open speed Any abnormal noise during run & landing Switch Status inside car Fireman switch Lift room tempurature Supply Voltage Lift room & car cabin is free from dust Switches should in be Auto status Oil level & grease in runing & mechnical parts Technician sign Supervisor sign Manager sign Remarks : 1st shift 21 2nd shift 1st shift 22 2nd shift 1st shift 23 1st shift 2nd shift 24 1st shift 2nd shift 25 1st shift 2nd shift 26 1st shift 2nd shift 27 1st shift 1st shift 28 2nd shift 1st shift 29 2nd shift 1st shift 30 2nd shift 1st shift 31 2nd shift

Shailendra Techno Park, Bangalore Daily works list Sl No. Time


12:00 AM 1 2 3 4 5 6 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM

Descriptions
HT Reading, KWH Reading of Submeter(MLRP, UPS, CA, AC1, AC2, AC3 & ACCP; DG Reading(Hrs, Ltrs, KWH); EB Reading

Remarks

Per Day Consumption Calculation & Daily Report Making. EB Reading & Going for rounds Going for rounds EB Reading & Going for rounds EB Reading & Going for rounds EB Reading; Switch of all the Lights( stairs, lobby, basement, 6:00 AM street light). 7 Shift handing over 8 7:00 AM 9 7:30 AM Checking all the lights, Switch ON the Lifts, Going For rounds. EB, Submeter & DG KWH Reading, A-Check oF DG'S. 10 8:00 AM PM Check of HT yards & Transformer, LT Panels. 11 9:00 AM EB KWH Readings, PM Check of Lifts. 12 10:00 AM PM check of STP Plant, Pumps & Motors 13 11:00 AM EB Readings, Going for rounds & Follow Up Works. 14 12:00 PM Going for rounds & Follow Up Works. 15 1:00 PM Shift handing over 16 1:30 PM EB Reading, Going for Rounds 17 2:00 PM 18 3:00 PM Lift room, Lift Car & Terrace AC M/C Check & Follow Up Work EB, Submeter & DG KWH Reading & Follow UP Works 19 4:00 PM 20 5:00 PM 21 22 6:00 PM 23 7:00 PM 8:00 PM 24 25 8:30 PM 9:00 PM 26 27 10:00 PM 28 11:00 PM 6:00 PM Checking of STP Plants, Pumps & motors & Follow Up works EB Reading & Going for rounds; Switch ON all Lights( Stair, lobby, Basement lights) Switch ON The street lights, Checking for ligths Going for Rounds EB Reading & Switch OFF the some of lights (Stair, lobby, Basement & Street light) Shift handing over Going for rounds, Switch OFF the any One Lift & follow Up works EB Readings, Going for rounds & Follow Up Works. Follow Up Works

NOTE : Going for Rounds : checking of Main Panel, RTCC Panel, CA Panel, HT yards, Lifts, Lights, etc.,

SHAILENDRA TECHNO PARK - BANGALORE


'A' CHECK FOR DG SET Make: KVA : MONTH OF:-

SL.NO 1 2 3 4 5 6

CLEANING
Clean the Engine fule & Air houses Clean the Alternator Clean and Verify cable terminal box (Externaly) Clean the Air & Fule Filters (Externaly) Clean the Redator & Cooland pipe Lines Cleanthe Batteries & Cables INSPECTION

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Check the Battery Voltage Check the specific gravity of Batteries Check the Battery Electroyte level Check all house pipes for any leakages & arrest it immedately Check the Condition of air inlet restriction indicatior Check oil Engine Lubrication oil level Check the Abnormal noise & vibraction while taking trial Run Check the Engine starter motor cable terminals for any looseness Check the Engine control panels & display working condition Ensure selector switch poisition in control panel is in auto mode Check the condition of rediator fan belt and its tension Drain water from fuel water seperator through drain valve Check the radiator water level Check the Diesel level in the Daily fuel tank Done By Technician Checked By Supervisor Checking Autority

Remark's

CLIENT : SHAILENDRA TECHNO PARK-BANGALORE Month :


MC : 31.1

DG NO ; DIESEL, HOUR & UNITS READING of DG LOG BOOK


MC :1 MC :1000

TIME : 12:00 AM KWH Reading Opening DIFF (kwh) Average diesel ltrs/hr/day Average units kwh/ltr/day

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Diesel Reading Closing Opening Consumption DIFF (mm) (mm) (Litres)

Closing (hr)

Hours Reading Opening DIFF (hr)

Run/Day (hr)

Closing (kwh)

units/Day (kwh)

Sign

Sum of Ltrs/month Description Total ltrs / Month Total hrs/ month DG

Sum of hrs/month Sum of units/month Total Diesel consumption in the month : Total units/month Avg lts/hr/month Avg kwh/ltr/month

SUPERVISOR

Manager

Client : Shailendra Techno Park Pvt Ltd


Date :

Srikanth & Ramesh Enterprises

Earth Test Report


Tested By : Earthing Location Transformer yard Transformer yard Outside transformer yard Outside transformer yard Outside transformer yard Transformer yard Transformer yard RMU yard RMU yard RMU yard Left back side of building Left back side of building Basement entrance Basement entrance Basement entrance Basement entrance DG yard DG yard DG yard DG yard Left back side of building Earthing pit No. TF NE1 TF NE2 TF BE1 TF BE2 LBS BE1 DGLA LTP BE1 RMU BE1 RMU BE2 MC BE BLA1 BLA2 Earthing prupose Transformer Neutral Earthing Transformer Neutral Earthing Transformer Body Earthing Transformer Body Earthing LBS Body Earthing Lighting Arrestor Body Earthing RMU Body Earthing RMU Body Earthing Meter cubicle Body Earthing Lighting Arrestor Lighting Arrestor Type of electrode Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Value in ohm Remarks

Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

DG2 NE1 DG2 Neutral Earthing DG2 NE2 DG2 Neutral Earthing DG3 NE1 DG3 Neutral Earthing DG3 NE2 DG3 Neutral Earthing DG2 BE1 DG2 BE2 DG3 BE1 DG3 BE2 PB1 DG2 Body Earthing DG2 Body Earthing DG3 Body Earthing DG3 Body Earthing Basement Panel Body Earthing

Client : Shailendra Techno Park Pvt Ltd


Date :

Srikanth & Ramesh Enterprises

Earth Test Report


Tested By : Earthing Location Left back side of Transformer yard building Left back side of building Left back side of building Left back side of building Left back side of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Right Frontside of building Left Frontside of building Left Frontside of building Left Frontside of building Right Frontside of building Right Frontside of building Right Frontside of building Near Water Sump Near Water Sump Near Water Sump Earthing pit No. PB2 PB3 PB4 PB5 PB6 UN1 UN2 UN3 UN4 UN5 UPB1 UPB2 UPB3 SRE1 SE1 SE2 LBE1 LBE2 LBE3 Earthing prupose Basement Panel Body Earthing Floor Panel Body Earthing Floor Panel Body Earthing Floor Panel Body Earthing Floor Panel Body Earthing UPS o/p Panel1 Neutral Earthing UPS o/p Panel2 Neutral Earthing UPS o/p Panel3 Neutral Earthing UPS o/p Panel2&3 Neutral Earthing UPS o/p Panel Neutral Earthing UPS o/p Panel1Body Earthing UPS o/p Panel2 Body Earthing UPS o/p Panel3 Body Earthing Server racks earthing Static Earthing Static Earthing Lift Body Earthing Lift Body Earthing Lift Body Earthing Type of electrode GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate Copper Plate GI Pipe GI Pipe GI Pipe GI Pipe GI Pipe Value in ohm Remarks

Sl.No. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Verfied By :

Manager sign :

CLIENT : T-A-Day Caf Month :


MC : 1

EB, DG & Water Consumption Reading of DG LOG BOOK


MC :1000

SHAILENDRA TECHNO PARK-BANGALORE TIME : 12:00 AM


MC :1

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Closing (Kwh)

EB Reading Opening DIFF (kwh)

units/Day (kwh)

Water Consumption(ltrs) Reading Closing Opening Consumption DIFF (Ltrs) (Ltrs) /day(ltrs)

Closing (Kwh)

DG Reading Opening DIFF (kwh)

units/Day (kwh)

Remarks

Sign

Sum of KWH/month Description Total EB / Month Total DG/ month SUPERVISOR Units(Kwh)

Sum of Ltrs/month Total Units consumption in the month : Description Total Water Consumption/Month Litres