Professional Documents
Culture Documents
To provide member value by identifying, communicating, and promoting quality knowledge, professional development and networking opportunities.
Be a global provider of automotive quality knowledge and learning opportunities for advancing individual and organizational performance excellence. Engage, grow and retain members through new and improved communities and cutting-edge technologies. Develop and sustain a strong Council Leadership to support our members.
Minitab
Phone (US & Canada): 1-866-740-1260 Phone (International): +1-303-248-0285 Access Code: 2383527
Number 15
Importing Data
Note: Use File > New > Minitab Worksheet to import data into a blank worksheet
Number 14
Number 13
Formulas in Worksheet
Number 12
Autofill
Use autofill to create patterned data Use the Control key to create repeated patterned data
Worksheet Zooming
Use the Control key and your mouse wheel to zoom in and out of the worksheet
Number 11
Graph Editing
Graph Editing
Double-click on the graph components to change fonts, colors, add a date/time stamp, etc. Right-click on the graph to add titles, gridlines, data labels, etc.
Before Editing
Boxplot of Weld Strength
89.5
After Editing
Bo xp lo t o f We ld Stre ng th
February 26 - March 30
Shift 1 2 Shift 3
88.5
88.0
88.0
89.0
89.5
Number 10
Bo x p lo t o f We ld Stre ng th
February 26 - March 30 Sun 1 Mon
Bo x p lo t o f We ld Stre ng th
February 26 - March 30
Weekday
88.0 88.5 89.0 89.5
Shift
Weld Strength
Weld Strength
Number 9
Brushing
Brushing Options
We see strength values that are lower than expected and want to do further investigation Right-click > Brush > right-click > Set ID Variables
Brushing Options
The Data Options button for any Graph or Control Chart allows you to include or exclude data based on brushed rows
Number 8
Splitting Graph
Weld Strength
Weld Strength
89.0
88.5
88.0
10
20
30
40
50
60
70
80
90
60
70
80
90
Index
Index
Before paneling
After paneling
Number 7
Updating Graphs
Updating Graphs
Available for core graphs and Control Charts Right-click on icon in upper left corner to update graph
Automatic Updates sets graph to automatically update anytime data in worksheet change Update Graph performs one-time update
Core Graphs and Control Charts Graph is up-to-date Data used to create graph have changed On-hold, some condition prevents auto-update All Other Graphs Graph is up-to-date, but cannot be updated Data used to create graph have changed, and graph cannot be updated
Number 6
Layout Tool
Layout Tool
To combine multiple graphs into one window, choose Editor > Layout Tool
Bo x p lo t o f We ld S t re n g t h
F e brua ry 26 - M a rch 30 1 Shift
Number 5
ReportPad
Save Report As saves the report as a .RTF or .HTML Move to Word Processor moves the ReportPad contents to your default word processor (i.e. cut and paste) Copy to Word Processor copies the ReportPad contents to your default word processor (i.e. copy and paste)
Number 4
Automating
To save an Exec
To save the commands as an Exec, right-click on the highlighted History commands and choose Save As
To run an Exec
Run the Exec at any time using File > Other Files > Run an Exec > Select File and browse to your *.MTB
Number 3
Customizing
Number 2
Documentation
Help
Pre-analysis Help Guide Includes a glossary, methods and formulas, and examples 1 2
StatGuide
Post-Analysis Interpretation of Results StatGuide provides examples and their interpretation
Technical Support
Phone
1-814-231-2MTB (2682)
Email
techsupport@minitab.com
Web
http://customer.minitab.com/
Additional Resources
Answers Knowledgebase
www.minitab.com/answers
Training
Public Training On-site Training Remote Training
Number 1
Web-based, e-Learning MINITAB-based Exercises & Quizzes Online Progress Tracker Completion Certificates
Contact Information
1. Follow @ASQautomotive and @minitab 2. Post a comment about the Webinar. Tweet must include @ASQautomotive and @minitab. A random person will be chosen from the entries. 1. Become a fan of the ASQ Automotive Facebook page. 2. Post a comment about the Webinar on the wall. A random person will be chosen from the entries.
ASQ Automotive Division Webinar Series ASQ Automotive Division Verification of attendance ASQ RU
Date: April 20 8PM EDT Title: Minitab tips and tricks Presenter: Pete Roy - Minitab Electronic division meeting: 1 hour RU = 0.3 /rewarded under section E: Meetings
ASQ Automotive Division Webinar Series Thank you for attending the Webinar
For video from this webinar please check our website: www.asq.org/auto Twitter: @ASQautomotive Facebook: ASQ Automotive division Slides will be posted at: http://www.slideshare.net/oldeck Comments & Questions: waltoldeck@gmail.com