CONFIDENTIAL

AP/OCT 2010/BSD250

UNIVERSITI TEKNOLOGI MARA FINAL EXAMINATION

COURSE COURSE CODE EXAMINATION TIME

BUILDING TECHNOLOGY AND MATERIALS II BSD250 OCTOBER 2010 3 HOURS

INSTRUCTIONS TO CANDIDATES 1. 2. 3. 4. This question paper consists of five (5) questions. Answer four (4) questions in the Answer Booklet. Start each answer on a new page. Do not bring any material into the examination room unless permission is given by the invigilator. Please check to make sure that this examination pack consists of: i) ii) the Question Paper an Answer Booklet - provided by the Faculty

DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO


This examination paper consists of 3 printed pages
Hak Cipta Universiti Teknologi MARA CONFIDENTIAL

CONFIDENTIAL

AP/OCT 2010/BSD250

QUESTION 1 a) With the aid of sketches, briefly explain the construction of flying shore and gives example in what condition it is applied. (9 marks) b) With the aid of sketches, describe the method of constructing the 'Jack' or 'Miga' pile underpinning. (16 marks)

QUESTION 2

a) Prefabricated structures are one of the alternatives to create better construction site process. Explain in detail the advantages of using prefabricated structures. (10 marks) b) Identify five (5) factors influencing the need for medium/high rise buildings. (15 marks)

QUESTION 3

A 16-storey building with 4-storey basement parking area proposed on a site in city centre. The site surrounded with existing buildings and roads, which are always busy. The soil condition of the site contains a lot of 'cobbles' and 'boulders'. The client insisted that the building should be completed within the shortest possible time and there is no constraint on the budget. The basement structure is of a reinforced cast in-situ diaphragm wall construction. a) Considering the information above, select a suitable technique to construct the basement in order to speed up the construction of the building. Discuss in detail the sequence of construction based on the technique selected in detail. (12 marks) b) Draw a typical cross-sections, to explain clearly the constructional method of the reinforced cast in-situ diaphragm wall and their associated ground anchors, where necessary. (13 marks)

Hak Cipta Universiti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

AP/OCT 2010/BSD250

QUESTION 4 a) Describe the construction method of 1.5m diameter 'Drilled Caisson'. (10 marks) b) Explain three (3) widely practiced methods widely practiced for soil improvement in Malaysia. (15 marks)

QUESTION 5 a) List five (5) uses of Polyvinyl Chloride (PVC) in construction industry. (5 marks) b) Explain five (5) advantages and disadvantages of Polyvinyl Chloride (PVC) as a building material compared to other materials of similar uses. (20 marks)

END OF QUESTION PAPER