You are on page 1of 2

Mousa Ababseh Pacifica, CA 94044 Cell (650) 255-8932 Email:ababsehm@gmail.

com

SUMMARY

Goal-driven Production Manager with experience in fast-paced, FDA compliance (cGMP) environments requiring expertise in production scheduling, quality management, team building, training, cost control and troubleshooting. Effective in utilizing resources, improving processes, increasing quality and reducing costs. Knowledgeable with Lean Manufacturing and six Sigma methodologies.

EXPERIENCE

GE Healthcare South San Francisco, CA 2004DEC 2010 MFG Quality Leader / Material Rejection Manager Led the Materials Review Board, and review/approve nonconforming material and related system documentation. Reduced Lag time to Material Rejection by 82%. Reduced Max time in Material Rejection by 65%. Maintained and improved process according to ISO 13485, MDD, and cGMP. Monitored and Trained employee on the new/improved processes. Implemented lean manufacturing by Appling the 5 SS (Sort, Standardize, Sweep, Simplify, and Self Discipline). Improved production over all by 10%

Maintained employee productivity and commitment to quality by encouraging and facilitating involvement in process improvements and implementing applicable suggestions.
Facilitated ongoing process improvement by continually monitoring production performance and customer complains. Monitored all quality complaints of customers, managed process and documented all resolutions provided to customers. Provided technical support to new products and improved quality systems of projects. Investigated all complaints and resolved at times at customer sites. Coordinated with Customer Quality Team and recommended improvements in project. Improved existing processes, implemented new procedures and trained different departments on the new processes. Reduced the Supplier Correction Action Request (SCAR) by 40%. Managed the flow of defective units from field return, production, receiving to Material Rejection area, testing, closing work order, and shipping to Stock or Scrap. Manager of the DCAS (Data Collection and Analysis System) a. Produced DCAS weekly report identifying defects & trending. b. Improved DCAS meeting by implementation of PowerPoint that clarifies & speeds presentation of defects identified by DCAS program. Provided effective control of defective material including root cause

analysis, identification, implementation of corrective and preventative actions (CAPA) and compliance verification. Additionally, managed and tracked all calibrated equipment, reduced the number of units that required calibration by 40%. Managed the local Radiation Monitoring and Control program, responsible for personnel exposure reporting, dosimetry distribution and control and compliance. Experienced as a Facility Environment Health & Safety (EHS) program coordinator with responsibility Including: a. Fire Drill Leader b. Ionization Radiation Protection Champion c. Facility Monthly Inspection Leader. d. Created safe and healthful work environment by conducting monthly meeting that focus on safety and housekeeping, ultimately resulting in 0 lost time accident over 5 years.

GE-IMATRON 20012004 Integration Production Supervisor Managed staff of 7 production integrators, Led the team with quality improvement initiatives. Led and supervised production operations for our next generation CT scanner. Implemented lean manufacturing by Appling the 5 SS (Sort, Standardize, Sweep, Simplify, and Self Discipline). Improved production by 20% and reduced rejections 10% while maintaining productivity by adjusting schedules daily and cross-training staff on all operations. As data expert, collaborated with technical writing team on writing and updating Technical manual. Trained a highly productive work force. Managed document control, create new ECOs and ECRs also created and updated B.O.M. TOSHIBA AMERICA MRI South San Francisco, CA 19942001 Technical Specialist Tested incoming production units of MRI System. Ensure proper operation and calibration to tightly controlled specification. Tested and debugged modules up to system level. Beta tested Array coils and other coils and worked with engineering to develop a Comprehensive test plan. Resulted in successfully releasing the product to production area. Trained technician on testing coils and RF module stations. Conducted investigation on field returns units. EDUCATION: Bachelor of Science, Electrical Engineering San Francisco State University, San Francisco, CA
CERTIFICATION: Regulatory Affairs Certificate

South San Francis

UCSC-EXTENSION, Silicon Valley, CA, conferred June 2010

You might also like