Professional Documents
Culture Documents
CONTENT
1 2 3 4 5 Scope _________________________________________________________________ 2 Overview of Drive Test for Cluster __________________________________________ 2 Preparation before Drive Test _____________________________________________ 2 Laptop Software Preparation _____________________________________________ 2 TEMS Setup ____________________________________________________________ 3
5.1 5.2 5.3 Setup TEMS for DriveTest _________________________________________________ 3 Configure TEMS Equipment ________________________________________________ 4 Configure TEMS Properties_________________________________________________ 7
6.2.1 Round 1 Drive Test - (MS1) 3G Voice (MS2) PS R99 FTP DL _____________________________ 12 6.2.1.1 Introductions _____________________________________________________________ 12 6.2.1.2 Command Sequence Preparation_____________________________________________ 12 6.2.1.3 Running Tests ____________________________________________________________ 14 6.2.2 Round 2 Drive Test - (MS1) HSDPA, (MS2) 3G Idle mode_______________________________ 15 6.2.2.1 Introductions _____________________________________________________________ 15 6.2.2.2 Command Sequence Preparation_____________________________________________ 15 6.2.2.3 Running Tests ____________________________________________________________ 17
Appendix ____________________________________________________________ 18
7.1 7.2 7.3 Command Sequences ____________________________________________________ 18 Create a dialup connection ________________________________________________ 18 Province ID ____________________________________________________________ 18
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] 2. Install driver for TEMS phone and GPS
5 TEMS Setup
5.1 Setup TEMS for DriveTest
Following figure show the equipment setup overview with 1 laptop, 2 TEMS UE and a GPS for Drive Test
GPS UE UE
TEMS
Figure 1 - TEMS setup inside the van using 1 laptop with 2 TEMS UE
Procedure: Turn on inverter power supply. Switch on the computer Unplug all phone cables, GPS cables connecting to the computer Connect UE to the USB port (if not included in TEMS box) Connect GPS to the USB port (if any). Check the COM port Assignment of all connected devices a. Turn on Computer Management (Start -> Settings-> Control Panel -> Administrator Tools -> Computer Management) Note down all COM ports created as shown 1. 2. 3. 4. 5. 6.
3. Add all UE, scanners and GPS to the TEMS according to the COM port assignment.
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] Click on Add Equipment at Top-Left of Equipment Configuration window to add new equipment. Keep in mind to select right port and right handset type.
4. Make sure the following assignment for voice and data calls. a. TEMS # 1 : i. MS-1 : UE 1 ii. MS-2 : UE 2 iii. DC1 : UE 1 Data Cable iv. DC2 : UE 2 Data Cable v. PS1: GPS 5. Then click Connect All Equipment and make sure that all devices are properly connected.
3. Select RAT Control Tab a. Choose WCDMA only This is done to make sure that we only perform drivetest 3G (WCDMA) network. Note that there may be error message prompt up, please just ignore it. Then click OK button to confirm and apply.
4. Select Discard Message Tab a. Make sure all message is unchecked unless CDMA box. Then click OK button to confirm and apply.
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] you will take DT for at least 2 services for a long time. During the test time, you should take a portable hard disk for backing up data and storage purposes.
b. Set TEMS swaps file automatically i. Select Recording Properties in Logfile Tab
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] iii. check Swap files after reaching message and enter 100000 iv. uncheck Clear history buffer at start of new logfile then click OK
C:\tems_log
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] d. Each province is divided into clusters {e.g Hanoi is divided into 15 clusters called from Cluster1 (C1) to Cluster15 (C15) }. For easy to post-analyze and optimize, you have to named log files as following form: Province_Cxx_mmdd_yy_Roundi .log where Province_(prefix): which province you take DT, please have a list of Province ID in Appendix 7.3 , e.g: HNI=Hanoi, HPG=Haiphong... Cxx_(prefix): is the cluster number where you take DT; e.g: C01, C02 C15 mmdd_yy:this information is automatically generated by Tems, and this conveys information of month, date and ordered number created logfile ordered, e.g:0315_01 means logfile number one of the fifteenth of March; 0318_05 means logfile number five of the eighteenth of March. _Roundi_(suffix): ordered number of DT round, e.g: Round1 means ordered number of DT round is first, Round2 means ordered number of DT round is second Example: HNI_C01_0318_01 _Round1.log This is the first logfile which is created in Cluster number one in Hanoi province on the eighteenth of March. HPG_C05_0412_13_Round2.log This is the thirteenth logfile which is created 3 in Cluster number five in Haiphong province on the twelfth of April.
2.1.2 After DriveTest You should handover your logfiles Once you finish a working day so that Motorola Engineers will do post-analysis and keep tracing your DT progress. This can be done by: Directly Copy to Motorolas sever or Motorola EngineersLaptop at the Motorola Office. Or you can upload your logfiles on free servers such as: http://www.mediafire.com; http://www.4shared.com; http://.ifile.it and so on. Regardless of the way you take, please editing an email including link where you put logfiles, your DT progress and difficul things you cope with during DT. You can send email to list below: manhhungbui@motorolasolutions.com;q16311@motorolasolutions.com; gmj786@motorolasolutions.com; XPMV76@motorolasolutions.com;
6.2.1.1 Introductions
The Round 1 Drive Test will do two service tests 3G Voice CS Call and PS R99 FTP DL 3G Voice CS Call Call with 2 mins each, inter-call wait time 10 seconds. Data PS R99 FTP download with 3 MB file, inter-call wait time 10 seconds. o Note:* When perform Data PS R99 FTP DL DriveTest, You must force Handset/Data card in R99 mode. Otherwise, it may switch to HSDPA services. o Please have see Appendix 7.2 to knowhow make a dial up connections
If command sequence file is ready, then load the corresponding command sequence; o Open 3g_voicecallandPS_r99ftpdl.xml, Please copy command sequence in Appendix 7.1 If not, then make the command sequence as follows: a. Create Loop for 3G Voice CS call with followings: i. General Loop, Press Add below 1. Loop Type = Fix no of occurrence 2. Loop Count = 99999 ii. Voice/Video Dial, Press Add Under, i.e. as sub-item under Loop 99999 1. Equipment = MS1 2. Phone Number = 100117 (the number to the other testing end) 3. Duration = 120 4. Call Type = Voice 5. Timeout = 45 6. Redial Trigger = All Items are selected 7. Call Timer Reset on Redial = True 8. Delay before redials = 10 9. Max number of Redials = 5 iii. General Wait, Press Add Under 1. Equipment = MS1 2. Wait Time = 10 b. Data PS R99: i. General Loop, Press Add below 1. Loop Type = Fix no of occurrence 2. Loop Count = 99999 ii. Application Testing Data Services Session FTP FTP DL, Press Add Under, i.e. as sub-item under Loop 99999. 1. Equipment = DC2 2. Phone Number = *99# 3. Timeout = 45 4. Source File = 3M 5. Target File = C:\tems_log\3M
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] 6. PASV = False 7. Port = 21 8. Remote Address = 10.149.232.14 9. User = root 10. Password = adm1324 11. Timeout = 45 12. HangUp = 45 iii. General Wait, Press Add Under 1. Equipment = DC2 2. Wait Time = 10 c. Save the Command Sequence as a file with name 3g_voicecallandPS_r99ftpdl.xml d. The command sequence should look like followings:
3. After finish whole drive test route Wait until both UE is in UE idle mode press Stop in command sequence window.
6.2.2.1 Introductions
The Round 2 Drive Test will do two service tests HSDPA and 3G Idle mode. HSDPA FTP Get with 5MB file, inter-call wait time 10 seconds. o Note:* When perform HSDPA FTP Download DriveTest, make sure your Handset/Data card must support HSDPA o Please have see Appendix 7.2 to knowhow make a dial up connections 3G Idle mode set MS2 in 3G Idle mode.
If command sequence file is ready, then load the corresponding command sequence; a) Open DataHSDPAand3G_idlemode.xml, Please copy command sequence in Appendix 7.1 If not, then make the command sequence as follows: a) Data Downlink HSDPA: General Loop, Press Add below Loop Type = Fix no of occurrence Loop Count = 99999 Application Testing Data Services Session FTP FTP DL, Press Add Under, i.e. as sub-item under Loop 99999. Equipment = DC1 Phone Number = *99# Timeout = 45 Source File = 5M Target File = C:\tems_log\5M PASV = False Port = 21 Remote Address = 10.149.232.14 User = root Password = adm1324 Timeout = 45 HangUp = 45 General Wait, Press Add Under Equipment = DC1 Wait Time = 10 b) Create Loop for 3G Idle mode with followings: General Loop, Press Add below Loop Type = Fix no of occurrence Loop Count = 99999 Motorola VietNam Page 16
March 22, 2011 [CLUSTER DRIVETEST PROCEDURE ] General Wait, Press Add Under Equipment = MS2 Wait Time = 99999 c) Save the Command Sequence as a file with name DataHSDPAand3G_idlemode.xml d) The command sequence should look like followings:
3. After finish whole drive test route Wait until both UE is in UE idle mode press Stop in command sequence window.
7 Appendix
It is useful for your DriveTest preparation. You can get below or attachments in email.
7.3 Province ID
Province ID