SCRUM and TFS

Presented by Jamie Phillips

Picis, Inc. All rights reserved.

Who is Jamie Phillips

Senior Software Engineer with over 10 years experience in the Telecomm, e Commerce, Finance and Healthcare industries. Passionate about working with the .NET framework and related technologies (C# 3.5, WCF, Entity Framework, etc.) Natural ability to adapt to change has lead to becoming a practicing SCRUM Master and evangelist. Blog: http://devblog.petrellyn.com
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Who is Picis

Global provider of innovative information solutions that enable rapid and sustained delivery of clinical, financial and operational results in the acute care areas of the hospital the emergency department (ED), operating rooms (ORs), post-anesthesia care units (PACUs) and intensive care units (ICUs). Locations include
Wakefield, MA Rosemont, IL London, United Kingdom Barcelona, Spain

Website: http://www.picis.com
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

The SCRUM framework Roles Product owner Scrum Master Team Which contributes to these Ceremonies TFS facilitates these

And helps them

Release planning Sprint planning Daily scrum meeting Sprint review Sprint retrospective Artifacts Product backlog Sprint backlog Burndown charts

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

The SCRUM Framework

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Product Backlog
Requirements / Defects A list of all desired work on the project
(Product Backlog Item = Story)

Ideally expressed such that each item has value to the users or customers of the product Prioritized by the product owner in collaboration with team.
Product Backlog Product Backlog

Reprioritized on an ad-hoc basis (typically done prior to Sprint Planning and does not affect current Sprint)
SCRUM and TFS Picis, Inc. All rights reserved.

October 2009

Product Backlog Item (PBI)

Represents a user story that has a business value. Could also represent a Defect (which implicitly has business value)

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Sprint Backlog
Individuals sign up for work of their own choosing Work is never assigned by any individual Estimated work remaining is updated daily. If Product Backlog item is unclear, define an investigative story that will generate more tasks/stories in later sprints (known as a spike).

Sprint Backlog Sprint Backlog

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Sprint Backlog Item (SBI)

Represents a task that a team member will perform to assist the team in completing a story. Should always be related to a Product Backlog Item (PBI); otherwise, what value is it adding to the project?
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Product Owner

Represents Stakeholders Define the features of the product Be responsible for the value added to the product Prioritize features according to market value Adjust features and priority every iteration, as needed Decide on release date and content Accept or reject work results

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

SCRUM Master

Represents the project to management Responsible for enforcing Scrum values and practices
Protects the team by making sure they do not over-commit themselves to what they can achieve during a sprint

Coaches rather than command and control

Acts as a facilitator to remove impediments Ensure that the team is fully functional and productive Enable close cooperation across all roles and functions Shield the team from external interferences (interruptions)

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

The Team

Typically 5-9 people Cross-functional (representation of different skill sets):


Developers, testers, documentation, requirements analyst, etc. Members should be full-time May be exceptions (e.g., database administrator)

Teams are self-organizing


A sense of ownership / responsibility exists amongst the team members Free flowing communication across all functions

Membership should change only between sprints


October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

What is the role of a Manager in SCRUM? Creates business model that works Provides all resources that a team needs Removes impediments that the Team / Scrum Master cannot remove themselves
(typically taken from the Impediments backlog)

Encourages the team to move beyond mediocrity Can be seen as


Invisible hand Oil in the enterprise engine Firefighter

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Roles are not the same as Positions In SCRUM, roles are intended to serve as the definition of the interaction of particular individual(s) within the SCRUM framework. They are not intended to represent / replace the Positions defined in an organization. Theoretically a Scrum Master could be a Lead Developer or a Manager; just as a Product Owner could also be a Business Analyst. However; a Product Owner should never be a Scrum Master as it would lead to a conflict of interest for the team and the project.
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Release Planning

Stories are created in QC using the Requirements functionality Story description is of the format As a <role> I want <feature> so that <benefit> Conditions of acceptance contains sufficient detail for the team to create tasks to deliver story feature. Stories that cannot provide sufficient detail in the conditions of acceptance will need to be broken down in to smaller stories
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Release Planning (cont)

Sizing of stories takes place with involvement from Product Owners and the Team (or at a minimum, technical expertise from Development and Software Quality with sufficient knowledge/experience to be able to size the associated stories). Meeting minutes take note of sizing results for each story and serve as a record for decisions made on story sizing.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Release Planning Tools

Quality Center utilizing Requirements Functionality for story creation and sizing.

Planning Poker (as needed) online version available (free): http://www.planningpo ker.com

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Sprint Planning

Product Owner is present to motivate and discuss Sprint goals at the beginning of the meeting. Team capacity is taken. High priority Defects take precedence over new functionality. Stories or Defects are taken from QC and entered into TFS. Tasks are created in TFS by the team using the Done, Done list in order to prevent missing story tasks. Tasks are created as Sprint Backlog Items and are related to a particular story.
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Sprint Planning (cont)

Team estimates the tasks together, however task estimates may be changed by the task assignee. Capacity is continually updated. Items are pulled from backlog in order of importance/priority. Other team members can, and are encouraged to, facilitate meetings (Sprint Planning, Daily SCRUM). Product Owner is available for questions during planning. Be conservative when estimating tasks.
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Sprint Planning (cont)

Tasks for shared resources (Doc, RE) are created and estimated by the team. Scrum Master follows up with resource at a later time. When Sprint Capacity is reached, Sprint Planning is complete. Scrum Master needs to be aware of each members capacity to be sure that no one on the team over commits to tasks in a sprint capacity is continually updated.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Sprint Planning Tools

Quality Center for both Stories and Defects

Team Foundation System for creation of Product Backlog items (Stories) and Sprint Backlog Items (Tasks)

Excel for team capacity

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Example of Sprint Planning In Release Defects High priority In Release Defects are brought in to TFS from Bug reporting system, representing the teams commitment to fixing the defect.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Example of Sprint Planning Feature Story User Stories are brought in to TFS from Requirements repository, representing the teams commitment to producing a functional solution to the Story.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Daily SCRUM (Stand-up)

SCRUM Master discusses current status of Sprint Remote team members participate via phone and Web-Ex. Typically they speak first. Electronic task board is utilized for the display of tasks, team members point to their tasks Other team members can, and are encouraged to, facilitate meetings (Sprint Planning, Daily SCRUM) No Laptops (except for facilitator)

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Daily SCRUM (Stand-up)

In-depth discussions must be deferred to another time, time is agreed on. Each team members estimated work remaining (statistics) is reviewed to determine if action is needed The team decides whether a new build should be taken Product Owner is involved, comes to the Daily SCRUM however is not directly part of the Daily SCRUM

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Daily Standup Tools

Team Foundation System for Sprint Burndown and Product Burndown Charts.

Conchango TaskBoard for identifying tasks associated with each team member. Excel spreadsheet showing remaining hours (using custom Excel Add-In)

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Example of Daily SCRUM

Teams progress through the Sprint Backlog is viewed and issues are highlighted.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

The Sprint Review

Team presents what it accomplished during the sprint to the Product Owner and Stakeholders Typically takes the form of a demo of new features or underlying architecture Informal Whole team participates

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

The Sprint Retrospective

Typically 30-60 minutes Done after every sprint Whole team participates
Scrum Master Product owner Team

Team discusses:
What we did right? What we did wrong? How can we improve? (Select a few items to correct do not try to commit to all)
October 2009 SCRUM and TFS Picis, Inc. All rights reserved.

Sprint Retrospective Tools

Team Foundation System for Sprint Reports, Sprint Burndown Charts and Sprint Retrospective Work Item.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

The TFS Process Template

Process template is an integral part of Team Foundation Server

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Team System Process Templates

PBI and SBI are TFS Work Items with a range of fields that can be used for reporting and record keeping. Linking between Work Items is the strength of TFS a PBI can be linked to a SBI, which can be linked to a number of ChangeSets (each check-in creates a ChangeSet)

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Working with a Process Template

TFS 2008 comes with two pre-configured Process Templates:


Microsoft Solutions Framework (MSF) for Agile Software Development Microsoft Solutions Framework (MSF) for CMMI Process Improvement.

Templates can be loaded in the Process Editor of Visual Studio (Team Foundation Power Tools).
Add / Remove fields in the Work Item of choice. Upload the template to TFS server (for new projects) Inject the changes in to an existing project.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Example of working with Process Template

Changes can be made to a Process Template or to an individual Work Item definition.

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Questions and Answers

October 2009

SCRUM and TFS

Picis, Inc. All rights reserved.

Resources

SCRUM for Team System & Task Board (Conchango): http://scrumforteamsystem.com/en/default.aspx Team Foundation Power Tools (Microsoft): http://msdn.microsoft.com/enus/teamsystem/bb980963.aspx How Do I? Videos for Team System (Microsoft): http://msdn.microsoft.com/enus/teamsystem/bb507749.aspx

October 2009

SCRUM and TFS