An introduction to Aggreko

Brand
aggregaten + koopman = AGGREKO

Company facts

Aggreko is the world leader in the supply of temporary power and temperature control solutions. We have approximately 3,800 highly skilled and experienced permanent employees operating from over 148 locations based in over 34 countries. Our fleet comprises of 13,600 generators ranging in size from 15 kW to 2MW, which in aggregate amount to over 6,700 MW of generating capacity In 2010, Aggreko had revenues of approximately 1.2bn (USD$1.9bn) and operating profit of 317m (USD$491m) Aggreko plc is listed on the London Stock Exchange (AGK.L), is a member of the FTSE-100 index

Brief history of Aggreko

1962 - Aggreko founded in the Netherlands 1973 - UK business established in Scotland 1986 - Entry into North America 1989 - Entry into Asia Pacific Region 1991 Entry into the Middle East 1997 - De-merger from Christian Salvesen 1999 - Established Aggreko International Power Projects (AIPP) in Dubai to execute multi-megawatt power projects around the world.

Brief history of Aggreko

2002

FIFA World Cup Japan 200 MW in Sri Lanka First depot in Brazil First utility contract in South America First utility contract in Philippines ME network extends to Baku First power project, India

2003

2004

Brief history of Aggreko


2006

Tanzania 40 MW natural gas project Shanghai depot opened Acquisition of GE-ER Major contracts continue:Yemen 225 MW , Uganda 100 MW, Kenya 100 MW Cricket World Cup Mining contract in Yunan, China Beijing Olympics 40 MW Khulna, Bangladesh First utility project in Argentina Over 1 billion US$ revenue in Aggreko International Entry into India with the opening of the Pune Depot South Africa depot opening

2007

2008

2009

Brief history of Aggreko


2010

100 MW in Panama 21 MW for the opening ceremony - Shanghai Expo First temperature control project in Mexico 56 MW of Power 2010 FIFA World Cup South Africa 200 MW of utility power in Bangladesh 70 MW of natural-gas fuelled power in Cote dIvoire 142 MVA of power for theGuangzhou 2010 Asian Games 53 MW of power for Refinery in Bina, India

The Aggreko International Network

Glasgow
Paris

Cannock
Beijing Dalian Shanghai Pune Sri Lanka

Houston
Mexico City Caracas

Dubai
Nigeria Manaus

Panama

Singapore
Maceio Sao Paolo Santiago Antofagasta Campinas Argentina Puerto Montt

Rio de Janeiro

Johannesburg

Melbourne

Power Equipment
Generators Generators from 250 kVA up to 500 kVA are housed in robust steel canopies and contain fork pockets, lifting eyes Generators from 500 kVA up to 1250 kVA are housed in 20 ISO standard containers Suitable for low / high ambient temperatures and harsh environments Dual frequency capable 50 Hz or 60 Hz cycles Power plants tailored to 200 MW & above

Loadbanks & Transformers


Loadbanks

A.C. Load banks (Resistive only) 300 / 1266kW A.C. Load banks (Resistive /Inductive): Up to 6MVA Resistive and reactive with variable power factor control Purpose-built in ISO standard 10 and 20 foot containers for easy handling and transportation Automatic load test program capability Remote control and monitoring (up to 3 Km) D.C. Load Banks

Transformers
Multi-tap, multi-voltage for range of common utility voltages from 3.3 kV to 132 kV, 50 Hz or 60 Hz. Self-contained modules with switchgear and built-in protection. Upto 6,300 KVA capacity in single unit.

Power Generation Equipment

Distribution - LV cables supplied as part of service - HV cables can also be supplied - All cables are EFR/CSP sheathed & conform to BS 6007 specifications - Highly resistant to abrasion, fuel, oil & water

Power Generation Equipment

Control Room - Large installations have a central control room - Monitoring, metering & control of all gensets from a single location - Fully integrated system Switchgear - Switchgear for large power evacuations - High level of safety - Multi-compartment housing - Interlocking schemes - Facility for energy metering

Temperature Control
Aggrekos temperature control equipment is used for a variety of applications across many industries from Oil & Gas through to mining, manufacturing and events etc.
Air conditioners Chillers Cooling Towers

- Upto 80 tonnes in single unit - Industrial/Commercial use

- Up to 10,000 KW capacity - Discharge water treatment

Heat Exchangers

- Up to 1500 KW in single units - Multi-MW cooling capacity

Air Handling Units (AHUs)

Equipment
Save-ALL containment base prevents spillage of engine fluids or fuel and avoids the need for temporary bunds Sound attenuated, weatherproof enclosures are standard Noise levels well below those specified by latest EC directives

QHSE
Aggreko processes are ISO 9001:2000 compliant Environmental Health and Safety ( EH&S) system implemented at all sites EH&S kits delivered to every site with initial mobilisation EH&S training provided to employees in

Basic first aid Fire fighting Crane & forklift operation High voltage operation Defensive driving

All sites audited by trained auditors covers ISO 9001 and EH&S procedures EH&S key performance indicators (KPIs) monitored and reported to the Aggreko Senior Management

Industries Served

Utility Mining & Quarrying


Construction

Oil & Gas Event Services

Industrial Peace Support Services


Manufacturing

Shipping

Sector: Manufacturing

Location: Uttarakhand, India

7 MW Power for base load operation to Polyplex Corporation

Sector: Manufacturing

Location: Chennai, India

Amara Raja Batteries Ltd- 7 x 1250kVA, 5 x 1000, 1 x 500kVA - 415V at 3 locations

Sector: Power

Location: Chennai, India

6.6 MW HV Job in Kaveri Gas Power Limited

Sector: Manufacturing

Location: Rajasthan, India

1.1 MW Gas Based Power to Samtel Glass Ltd., Kota.

Sector: Utility

Location: Bangladesh

Situation: Load shedding leading to power shortages from utility grid Solution : 200 MW base load power plant supplied to support local grid

Sector: Mining

Location: Australia

Situation: Cooling required for underground gold mining operations to combat health and safety risks and increase productivity Solution : 600 Tonne chilling package provided to cool and support mining operations

Sector: Event Services

Location: Beijing Olympics

Situation: 100% guaranteed power supply for broadcast & media facilities Solution : 128 MW of uninterrupted power supplied designed and installed at 37 Olympic venues

Sector: Event Services

Location: Shanghai

Situation: Power supply needed at 13 different location for the opening and closing ceremony of the Shanghai Expo Solution : 16.8 MW of uninterrupted power supplied designed and installed

Advantages of Aggreko temporary power services

No Capital Expenditure

Click to edit Master text styles (f32) Rapid availability Second level (f28) Third level (f24) Guaranteed power supply Fourth level (f20) Fifth level (f18) Complete power solution including Arial (headings) typef Arial (body) typeface transformers, switchgear, fuel tanks, etc Flexible packages, tailored to individual situations Cost management Engineering design & technical support