1-2004
ASHRAEs Newest Commercial Building Standard Rocky Mountain Chapter Technical Conference May 18, 2007
1
2 Years as a General Contractor 3 Years as a Consulting Engineer 7 Years as a Sales Engineer 6 Years as a Sales Manager
2
Standard 90.1-2004
Developed jointly by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) and the Illuminating Engineering Society of North America (IESNA) Developed under American National Standards Institute (ANSI) consensus guidelines
3
Standard 90.1-2004
Developed with participation from many building and construction organizations including:
American Institute of Architects (AIA) Building Owners and Managers Association (BOMA) North American Insulation Manufacturers Association (NAIMA) Air-Conditioning and Refrigeration Institute (ARI) Gas Appliance Manufacturers Association (GAMA)
4
Standard 90.1-2001
Used as the basis of the IECC The US DOE did not issue a formal determination on this standard
5
Climate Zones
Standard 90.1-2004 uses climate zones developed for the the US on a county-bycountry basis and expressed in map form. The map is the same map used in recent versions of the IECC, and above code documents like ASHRAEs Advanced Energy Design Guide for Small Office Buildings.
11
Formal Interpretations
Formal written interpretations take time
Informal Interpretations
Quick, informal answers to questions
Standard 90.1-2004
A total of 32 addenda to Standard 90.1-2001 were processed to completion in time for inclusion in Standard 90.1-2004. See Informative Appendix F to Standard 90.12004 for details Addenda - 1 admin, 3 ECB, 7 lighting and power, 4 envelope, and 17 mechanical
14
15
Compliance
17
18
Mechanical Equipment Efficiency (Section 6.4.1) Load Calculations (Section 6.4.2) Controls (Section 6.4.3) HVAC System Construction and Insulation (Section 6.4.4) Completion Requirements (Section 6.7) Required in both Prescriptive and ECB compliance paths
20
Load Calculations
(Section 6.4.2) Determined in accordance with generally accepted engineering standards and handbooks acceptable to the adopting authority
Another difference from the 1989 standard should be noted. It allowed a load safety factor of 10%. To give designers latitude, for example when expansions are planned, there is no longer an oversizing restriction.
22
25
26
Automatic Shutdown
(Section 6.4.3.3.1)
Controls to operate on different time schedules for seven different day-types per week and retain programming and time setting during loss of power for at least 10 hrs OR
occupant sensor, OR manually-operated timer with maximum two hour duration, OR interlocked to security system
27
Setback Controls
(Section 6.4.3.3.2)
Applies when heating systems are located where heating design temperature is in Climate zone 2-8 and cooling systems located in zones 1b, 2b, and 3b.
Colorado is in climate zones 5b, 6b and 7
Heating set point adjustable down to 55F Cooling set point adjustable up to 90F or to prevent high space humidity levels Exception Radiant floor and ceiling heating systems
28
29
Shutoff Damper Controls - Exceptions (Section 6.4.3.3.3) Gravity dampers okay in buildings
< 3 stories in height any height in climate zones 1, 2 and 3 Systems with design outside air intake or exhaust capacity 300 cfm or less
32
Dampers (Section 6.4.3.3.4) Max leakage rate - Table 6.4.3.3.4 Denver climate zone 5b
10 cfm/ft2 at 1 motorized 20 cfm/ft2 at 1 non motorized Exception non motorized dampers less than 24 in either dimension is 40 cfm/ft2
Fans with motors greater than hp shall have automatic controls complying with Section 6.4.3.2.1 that are capable of shutting off fans when not required. Exception HVAC systems intended to operate continuously.
34
35
Gravity Hoods, Vents, and Ventilators (Section 6.4.3.3.2) Motorized dampers to automatically shut when spaces served are not in use Exceptions
Gravity dampers okay in buildings
< 3 stories in height of any height in climate zones 1, 2, 3 Unconditioned spaces
36
Humidifier Preheat
(Section 6.4.3.5) Automatic valve to shut off preheat when humidification isnt required
37
Freeze Protection and Snow/Ice Melting Systems (Section 6.4.3.7) Automatic controls for
Freeze protection systems
off when outside air temperatures > 40F or when conditions of protected fluid will prevent freezing
40
41
43
Duct Sealing
(Section 6.4.4.2.1) Table 6.4.4.2A min Duct Seal Level
Seal level based on duct type (supply, exhaust, return) and duct location (outdoors, unconditioned spaces, conditioned spaces)
45
Where Lmax = maximum permitted leakage in cfm/100 ft2 duct surface area
46
Piping Insulation
(Section 6.4.4.1.3)
Table 6.8.3
Minimum pipe insulation thickness based on fluid design operating temperature range, insulation conductivity, nominal pipe or tube size, and system type (Heating, SWH, Cooling)
Exceptions
Factory-installed Piping conveying fluids between 60o and 105o F. Piping conveying fluids not heated or cooled where heat gain/loss wont increase energy use Pipe unions in heating systems (steam, steam condensate, and hot water)
47
Prescriptive Path
48
49
50
53
54
Water Economizers
(Section 6.5.1.2)
Design Capacity:
Provide 100% cooling capacity at outdoor temps of 50 db/45 wb
Exception:
If dehumidification cannot be met at outdoor temps of 50/45, then you can use 45 db / 40 wb
58
59
60
If this results in the sensor being located downstream of major duct splits, install multiple sensors in each major branch
61
62
63
Individual pumps serving variable flow systems with a pump head > 100 ft and motor > 50 hp
Have controls and/or devices resulting in pump motor demand no more than 30% of design wattage at 50% of design water flow
64
65
66
Exceptions
Would result in improper operation
Watch interior constant loads
Exceptions
Heat rejection devices included as an integral part of equipment listed devices whose energy usage is included in Tables 6.2.1A-6.2.1D
68
Exceptions
69
Exceptions
Condenser fans serving multiple refrigerant circuits or flooded condensers Installations located in climate zones 1 and 2 1/3 of the fans on a multiple fan application speed controlled
70
Energy Recovery
(Section 6.5.6) Exhaust Air Energy Recovery (Section 6.5.6.1) Heat recovery for Service Water Heating (Section 6.5.6.2)
71
Bypass or control heat recovery for economizer operation Exceptions: Lots labs, un-cooled spaces heated less than 60 deg, toxic, grease kitchen hoods, if 60% of OA heat is site recovered or solar, heating in climate zone 1-3, cooling in some climate zones (Colorado), others
72
Exceptions
If 30% of heat rejection for space heating Facilities that provide 60% of their service water heating from site solar or site recovered energy
73
74
Exception
Unitary packaged systems with cooling capacities not greater than 90,000 Btu/h
76
Drawings
(Section 6.7.2) Record drawings of actual installation to building owner within 90 days of system acceptance and include, as a minimum
Location and performance data on each piece of equipment General configuration of duct and pipe distribution system including sizes Terminal air or water design flow rates
77
78
System Balancing
(Section 6.7.2.3) Balance in accordance w/generally accepted engineering standards (Appendix E) Written report for conditioned zones > 5000 ft2
79
80
System Commissioning
(Section 6.7.2.4) Control elements are calibrated, adjusted, and in proper working condition > 50,000 ft2 conditioned area
Except warehouses and semiheated spaces Requires commissioning plan provided by the designer
82
85