You are on page 1of 150

Note File No.

W23/AP 12 IX LB 09 /Ankamonikunta/MBNR/2010
Subject:-

Mahabubnagar Dist - PMGSY-Ph-IX- AP12 IX LB09- C/o of High level bridge on


Bollampally vagu on R/F Velidanda PWD Road to Ankamonikunta @ 6/9 to 7/2 KM Rs.217.78 lakhs - Detailed Estimate submission for technical Sanction - Req- Reg.

Submitted Sir,
Name of the District

: Mahabubnagar

Name of the Division

: Mahabubnagar

Name of the Mandal

: Veldanda

Name of the work

: Construction of Bridge on Bollampally vagu on R/F


Veldanda PWD Road to Ankamonikunta @ 6/9 to
7/2 KM

Administrative sanction Ref. No. &


date

: GO Ms No 330 dt 17.9.2010 of PR & RD (Progs II)


Dept Sl.No.294

Package No

: AP 12 IX LB 09
: Drawings given by Design section of this office

Admn sanction Cost

Rs.217.78 lakhs
( Rs 124.77 GOI + Rs.93.01 State share)

Bridge Design approval Ref

: Approved copy yet to be given

Linear water way of the proposed bridge


: 94.13

meters

MFL

: 99.1

RCL

: 101.65

Type of bridge

: High level bridge

Type of foundation

Isolated footings

No of vents proposed with span


width of the structure proposed

: 9 vents of 10.37 M effective span


: 7.50m wide

Length of the structure proposed


Back to Back of abutments
cost per m

: 94.13
: 2.31

meters

Approach road proposed if any

: Not Proposed

Whether inspection report of


SE/EE is furnished

: Not Furnished

SSR & DATA used for


preparation Estimate

: Common SSR 2010-11 & As per AP Revised


Standard DATA with 14% OH & CP excluding 4% VAT
and Seigneorage

Rates of Cement, steel


Item
Cement
Steel Fe-415
Steel MS
Provisions made in the estimate
Sl.
No

Description

:
:
:
:

Rate
4600.00
34500.00
34500.00
Quantity

Rate

Unit
MT
MT
MT
Amount

1 Bridge part (9V 10.37m


effective span)
Foundation
Earth for foundatio up to
3.00 m below water level
Earth for foundatio up to
3.00 m to 6.00 m below
water level

2217.50

62.25

138039

547.35

71.15

38944

154.22

3180.33

490461

874.58

3850.00

3367129

439.74

4040.31

1776669

25.03

4949.66

123895

1068.00

4040.31

4315051

PCC (1:3:6) levelling


course for piers ,Abutments
PCC M 15 for Foundations
of piers,Abutments
Sub structure
PCC M 15 for
piers,Abutments
RCC M 25 for bed blocks
RCC M 15 forBody walls
Super sructure

RCC M 25 for Deck slabs


RCC M 30 for Approach
slabs
RCC M 30 for Wearing
course
PCC M15 for levelling
Course below Approach
slab
RCC M25 for Railling
Steel
HYSD Reinforcement for
Deck slab
HYSD Reinforcement for
Sub structure
HYSD Reinforcement for
Foundations
Protection works
Back filling
Filter media
Weep holes

621.9

5330.63

3315119

17.1

4651.16

79535

58.75

4725.87

277635

5.25

3751.56

19696

207.68

1897.50

394074

36.70

44467.11

1631943

16.50

43720.87

721394

2.50

43622.56

109056

3660.00

314.00

1149222

157.82

950.79

150049

232.00

236.86

54951

LS

75961

Drainage sprouts,Piching of
slopes etc
Misllaneous items
Total
2 Approach road

95000
18323823
0

3 Vat @ 4%

732953

4 Seignioragre charges

500100

Provision for Logo Board


and Information Boards

6 Soil testing and DPR preparation charges


7 unforeseen items

20000
183238
2017886
21778000

PART B

8 Maintenance cost

544000
22322000

Hence if agreed the estimate may be put up for technical sanction.Subject to approval
The estimate is h/w put up for technical sanction for Rs.217.78 lakhs against the
amount of Rs.217.78 lakhs for PART A and technical approval for Rs.232.22 lakhs for
PART (A+B).

MBNR/2010

of High level bridge on


kunta @ 6/9 to 7/2 KM Sanction - Req- Reg.

Bollampally vagu on R/F


kamonikunta @ 6/9 to

of PR & RD (Progs II)

ction of this office

8 lakhs
93.01 State share)

span

per AP Revised
H & CP excluding 4% VAT

Date
Oct -2010
Oct -2010
Oct -2010

ubject to approval
s against the OAS
Rs.232.22 lakhs for

Note File No. W28/AP 10 IX LB 14 /KNL/2010


Subject:- Kurnool Dist - PMGSY-Ph-IX- AP 10 IX LB 14- C/o of bridge on road from Maddur to
Ahalyapuram - Rs.83.84 lakhs - Detailed Estimate submission for technical Sanction - Reg.
Ref:-

Lr.Rc.No.AEE/PMGSY-IX/Long Span Bridges/Ahalyapuram/10, dt.25.11.10 of SE,PR,


Kurnool received on 02.12.2010

Submitted Sir,
Please peruse the reference cited where in the SE,PR, Kurnool has submitted estimate for the
work , construction of Bridge on road from Maddur to Ahalyapuram, Est. cost Rs.83.84 lakhs for
accoridng technical sanction.
Name of the District
Name of the Division

: Kurnool
: Kurnool

Name of the sub division

: Panyam

Name of the Mandal


Name of the work

: Panyam
: Construction of Bridge on road from Maddur to
Ahalyapuram

Administrative sanction Ref. No. &


date

: GO Ms No 330 dt 17.9.2010 of PR & RD (Progs II) Dept

Package No

: AP 10 IX LB 14

Whether cleared by STA or not

: yes cleared

Admn sanction Cost

Bridge Design approval Ref

: Drawings given by Design section of this office. Approved


copy yet to be given

Habitations benefitted

: Ahalyapuram-618

Hydraulic particulars
Linear water way of the proposed
bridge
HFL

Rs.50.63 lakhs
( Rs 51.24 GOI + Rs.32.61 State share)

60m

: +98.00

RCL

: +99.625

LBL

: +96.325

Type of bridge

: High level bridge

Type of foundation

Raft foundation

No of vents proposed with span


width of the structure proposed

: 4 vents of 8.00 M clear span


: 7.50m wide

Length of the structure proposed


Back to Back of abutments

: 35.88

meters

cost per m

: 2.34

lakhs

Approach road proposed if any

: Approach road -CC proposed -length-90 m

Whether inspection report of


SE/EE is furnished

: Not Furnished

SSR & DATA used for preparation


Estimate

: Common SSR 2010-11 & As per AP Revised Standard


DATA with 14% OH & CP excluding 4% VAT and
Seigneorage

Rates of Cement, steel


Item
Cement
Steel Fe-415
Steel MS
Bitumen
Prime coat
Tack coat
Provisions made in the estimate
Description

Sl.
No
I

:
:
:
:
:
:
:

Rate
Rs
Rs
Rs
Rs
Rs
Rs
Quantity

unit

Unit
MT
MT
MT
MT
MT
MT

4600.00
34500
34500
29486.03
22128.83
22678.04
Rate

per

Date
Oct -2010
Oct -2010
Oct -2010
01-11-10
01-11-10
01-11-10
Amount

Part-A
Bridge work 2v 8m span
Foundation
1(i) Earth work excavationOrdinary soils below water
level up to 3m depth

#REF! #REF!

62.25

#REF!

#REF!

2136.54 cum

#REF!

1Cum

133000

73.50 cum

59.29

1Cum

4358

82.32 cum

206.47

1Cum

16997

58.88 cum

3375.14

1cum

198728

178.35 cum

4599.14

1Cum

820257

176.04 cum

4044.81

1Cum

712055

ii #REF!

iii Ordinary Soil above water


level
2 Filling in foundation
trenches
3 PCC (1:3:6) levelling
course for piers ,Abutments
below raft
4 M20 for Raft

5 PCC M 15 for Foundations


of piers,Abutments
Sub structure

6 PCC M 15 for
piers,Abutments

146.49 cum

4240.87

1Cum

621234

32.82 cum

5150.21

1Cum

169030

34.00 No

236.77

1Nos

8050

97.13 cum

597.92

1Cum

58075

56.96 cum

1107.99

1Cum

63111

156.71 cum

5540.76

1Cum

868270

15.21 Cum

4844.05

1Cum

73678

18.07 cum

4919.73

1Cum

88900

7 RCC M 25 for bed blocks


8 Weep holes
9 Back filling
10 Filter media
Super sructure
11 RCC M 25 for Deck slabs
12 RCC M 30 for Approach
slabs
13 RCC M 30 for Wearing
course
14 RCC M25 for Railling

87.60 Rm

1923.88

1 RM

168532

15 20mm thick premoulded


joints
16 Filling joint

27.50 Rm

256.60

1Rm

7057

27.50 Rm

22.16

1Rm

609

Steel
18 HYSD Reinforcement for
super structure (for Deck
slab 75kg/cum & for fly
wings 100kg/cum provided
as per instructions)
19 HYSD Reinforcement for
Sub structure ( as per
instructions steel for bed
blocks & backing wall
100kg/cum provided)

16.00 MT

44467.11

1 MT

711474

2.58 MT

43720.87

1MT

112669

14.10 MT

43622.56

1MT

615078

528.39 cum

949.09

1Cum

501490
#REF!

20 HYSD Reinforcement for


Foundations (as per
instruction steel for Raft
75kg/cum provided)
Protection works
21 Boulder aprons
22 Drainage sprouts,Piching of
slopes etc

LS
23 Dismantling structure
Total
II

Approach road

Ls

36143
#REF!

E/W Road way cutting


1
2
3
4
5
6

GSB
WBM Gr-II
CC road
Laying Filter media
Laying pitching on slopes

2281.13 cum

159.22 1cum

363211

129.38 cum

488.17 1cum

63159

41.35 cum

2543.95 1cum

105192

110.25 cum

4968.10 1cum

547733

22.50 cum

648.05 1cum

14581

180.00 cum

1578.45 1cum

284121

Provision for Guide stones


& Painting

L.S

18000

Unforseen items if any

L.S

262

Total

1396260

Bridge + Approach road

#REF!

III

Vat @ 4%

#REF!

IV

Seignioragre charges

Provision for Name boards & sign boards

20000

VI

Soil testing and DPR preparation charges

#VALUE!

VII

unforeseen items

210000

36743
#REF!

PART B
Maintenance cost
Grand Total

210000
#REF!

The detailed estimate submitted by SE,PR,Kurnool is scrutinised and here with placed for orders for
approval of technical sanction.It is further submitted that while scrutinying the estimate, the total
cost of estimate (i.e bridge part and approches) is worked out to Rs 113.90lakhs as against the
original sanctionof Rs.83.84 lakhs for PART A ( i.e, exceeding by Rs 30.06 Lakhs) . hence the
scrutinised estimate is here with put up for perusal & orders.

Name of Work: Construction of High Level Bridge across Kundu river at Bilakalaguduru (V)
Gadivemula
(M)
BarofBending
Schedule
S.
No.
1

Description

Foundation
s
i. Raft

No. of
Dia No of Lengt Total Weig
Struct
mm bars
h
length
ht
ures

Total
weight

Shape of
Remarks M.B.
bar

Bottom mesh

Type A
Type B

1
1

20
16

50
246

37.83 1891.500 2.469


8.15 2004.900 1.580

4670.110
3167.740

1
1

16
16

50
246

37.83 1891.500 1.580


8.15 2004.900 1.580

2988.570
3167.740

36.93+0.9
7.25+0.90

Top mesh

Type C
Type D

HYSD bar R/F in Foundations


2

Abutments
Type F

steel bars spacing @ 180 mm


2
8
36
Earth side
water side
slope rods
2
8
36

Type G

front &
backview

Type E

sloped portion

13994.1
60

6.20

450.860 0.395

178.090 Verticle rods

l=4.475+0.6-0.08+0.6+0.6

7.00

509.440 0.395

201.230

l=5.28+0.6-0.08+0.6+0.6

133.580 0.395

52.760

6.40

4
4
4
4
4
4
4
4
4
4
4

8
8
8
8
8
8
8
8
8
8
8

1
1
1
1
1
1
1
1
1
1
1

5.89
5.58
5.27
4.96
4.64
4.33
4.02
3.71
3.40
3.09
2.78

23.560
22.310
21.070
19.820
18.580
17.330
16.090
14.840
13.600
12.360
11.110

0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395

9.310
8.810
8.320
7.830
7.340
6.850
6.360
5.860
5.370
4.880
4.390

l=4.475+0.6-0.08+0.6+0.8
l=5.6/2.7*(2.7-0.18)+0.6
l=5.6/2.7*(2.7-0.36)
l=5.6/2.7*(2.7-0.54)
l=5.6/2.7*(2.7-0.72)
l=5.6/2.7*(2.7-0.9)
l=5.6/2.7*(2.7-1.08)
l=5.6/2.7*(2.7-1.26)
l=5.6/2.7*(2.7-1.44)
l=5.6/2.7*(2.7-1.62)
l=5.6/2.7*(2.7-1.8)
l=5.6/2.7*(2.7-1.98)

Type E1

Earth side

4
4
4
2

8
8
8
8

1
1
1
25

2.47
2.16
1.84
6.37

9.870
8.620
7.380
323.810

Type F1

water side
slope rods

25

6.37

Type G1

front &
backview

4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.42
3.31
3.20
3.09
2.99
2.88
2.77
2.66
2.55
2.44
2.33
2.23
2.12
1.90
1.79
1.68
1.57
1.47
1.36
1.25
1.14
1.03
0.92
0.81
0.70

323.810 0.395
13.680
13.250
12.810
12.380
11.940
11.510
11.070
10.640
10.200
9.770
9.340
8.900
8.470
7.600
7.160
6.730
6.290
5.860
5.430
4.990
4.560
4.120
3.690
3.250
2.820

0.395
0.395
0.395
0.395

0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395

3.900
3.400
2.920 Horizontal
127.900 rods

l=5.6/2.7*(2.7-2.16)
l=5.6/2.7*(2.7-2.34)
l=5.6/2.7*(2.7-2.52)

127.900

l=6.45-0.08

5.400
5.230
5.060
4.890
4.720
4.550
4.370
4.200
4.030
3.860
3.690
3.520
3.350
3.000
2.830
2.660
2.480
2.310
2.140
1.970
1.800
1.630
1.460
1.280
1.110

l=0.72+2.7/4.475*(4.475-0)
l=0.72+2.7/4.475*(4.475-.18)
l=0.72+2.7/4.475*(4.475-0.36)
l=0.72+2.7/4.475*(4.475-0.54)
l=0.72+2.7/4.475*(4.475-0.72)
l=0.72+2.7/4.475*(4.475-0.9)
l=0.72+2.7/4.475*(4.475-1.08)
l=0.72+2.7/4.475*(4.475-1.26)
l=0.72+2.7/4.475*(4.475-1.44)
l=0.72+2.7/4.475*(4.475-1.62)
l=0.72+2.7/4.475*(4.475-1.8)
l=0.72+2.7/4.475*(4.475-1.98)
l=0.72+2.7/4.475*(4.475-2.16)
l=0.72+2.7/4.475*(4.475-2.52)
l=0.72+2.7/4.475*(4.475-2.7)
l=0.72+2.7/4.475*(4.475-2.88)
l=0.72+2.7/4.475*(4.475-3.06)
l=0.72+2.7/4.475*(4.475-3.24)
l=0.72+2.7/4.475*(4.475-3.42)
l=0.72+2.7/4.475*(4.475-3.6)
l=0.72+2.7/4.475*(4.475-3.78)
l=0.72+2.7/4.475*(4.475-3.96)
l=0.72+2.7/4.475*(4.475-4.14)
l=0.72+2.7/4.475*(4.475-4.32)
l=0.72+2.7/4.475*(4.475-4.5)

Piers
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type
Type

A
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

steel bars spacing @ 150 mm


3
8
46
Verticle
rods
Horizontal
3
8
1
rods
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1
3
8
1

854.960
12.04 1654.300 0.395
17.28
51.840 0.395
17.21
51.630 0.395
17.14
51.420 0.395
17.07
51.210 0.395
17.00
51.000 0.395
16.93
50.790 0.395
16.86
50.580 0.395
16.79
50.370 0.395
16.72
50.160 0.395
16.65
49.950 0.395
16.58
49.740 0.395
16.51
49.530 0.395
16.44
49.320 0.395
16.37
49.110 0.395
16.30
48.900 0.395
16.23
48.690 0.395
16.16
48.480 0.395
16.10
48.300 0.395
16.04
48.120 0.395
15.98
47.940 0.395
15.92
47.760 0.395
15.86
47.580 0.395
15.80
47.400 0.395
15.74
47.220 0.395
15.68
47.040 0.395
15.62
46.860 0.395
15.56
46.680 0.395
15.50
46.500 0.395
15.44
46.320 0.395

653.450
20.480
20.390
20.310
20.230
20.150
20.060
19.980
19.900
19.810
19.730
19.650
19.560
19.480
19.400
19.320
19.230
19.150
19.080
19.010
18.940
18.870
18.790
18.720
18.650
18.580
18.510
18.440
18.370
18.300

l=0.6+0.6+4.48+0.68+4.48+1
l26=6.72+6.72+.68+.68+0.32
l1=6.72+6.72+1.22+1.22+0.7
17.28
30

1214.54
0

Fly wings

Earth side
other side
Top rods
Stirupps

Joints B.Wall &


FW

Haunch bars
Beam V. rods
Beam V. rods
Stirupps

Bed Blocks

over
Abutments
Stirupps
over Piers
Stirupps

4
4
4
4

20
10
16
10

27
27
4
28

4.32
4.32
3.72
7.68

472.780
472.780
59.520
871.220

2.469
0.617
1.580
0.617

1167.290
291.710
94.040
537.540

4
4
4
4

16
20
16
10

28
8
8
24

1.20
3.42
3.42
2.54

136.130
109.440
109.440
241.810

1.580
2.469
1.580
0.617

215.090
270.210
172.920
149.200

2
2
3
3

12
10
12
10

16
65
16
65

6.37
2.13
6.37
2.20

203.840
275.620
305.760
427.020

0.889
0.617
0.889
0.617

181.210
170.060
271.820
263.470

length into the backing wall

2898.00
0

886.560

Dirt Wall

Deck slab

Z rods

2
2

16
12

43
43

1.52
1.00

132.140 1.580
86.930 0.889

208.780
77.280

H. rods Earth
side

12

43

6.37

553.770 0.889

492.300

H. rods Deck
slab side

12

43

6.37

553.770 0.889

492.300

4
4

25
12

54
88

10.35 2249.400 3.858


6.40 2252.800 0.889

8678.190
2002.740

4
4

10
10

28
30

9.70 1073.470 0.617


6.40 768.000 0.617

662.330
473.860

8
8

8
8

4
30

8.70
2.20

109.970
208.560

C rods

Bottom Main
rods

4 spans Distributors
Top Main rods
Distributors

Top inverted
beam Beam rods
Stirupps

278.400 0.395
528.000 0.395

l=0.25+0.65-0.08+0.7

1270.66
0

12135.6
50

Approach
slab

on both
sides of
Bridge

Bottom mesh

12

44

4.20

366.800 0.889

326.090

Top mesh

2
2

12
12

26
44

6.80
4.20

358.130 0.889
366.800 0.889

318.380
326.090

12

26

6.80

358.130 0.889

318.380

Wearing
course
mesh

1288.940

Y 8 dia
@300 mm
c/c
1

147

19

5.40

793.800 0.395

313.550

42.80

813.200 0.395

321.210

634.760

Super- Structure Total


1288.940 Kg

0.6-0.08+0.6+0.6

.6-0.08+0.6+0.6

0.6-0.08+0.6+0.8

*(2.7-0.18)+0.6
*(2.7-0.36)
*(2.7-0.54)
*(2.7-0.72)

*(2.7-1.08)
*(2.7-1.26)
*(2.7-1.44)
*(2.7-1.62)

*(2.7-1.98)

*(2.7-2.16)
*(2.7-2.34)
*(2.7-2.52)

.7/4.475*(4.475-0) 25
.7/4.475*(4.475-.18)
.7/4.475*(4.475-0.36)
.7/4.475*(4.475-0.54)
.7/4.475*(4.475-0.72)
.7/4.475*(4.475-0.9)
.7/4.475*(4.475-1.08)
.7/4.475*(4.475-1.26)
.7/4.475*(4.475-1.44)
.7/4.475*(4.475-1.62)
.7/4.475*(4.475-1.8)
.7/4.475*(4.475-1.98)
.7/4.475*(4.475-2.16)
.7/4.475*(4.475-2.52)
.7/4.475*(4.475-2.7)
.7/4.475*(4.475-2.88)
.7/4.475*(4.475-3.06)
.7/4.475*(4.475-3.24)
.7/4.475*(4.475-3.42)
.7/4.475*(4.475-3.6)
.7/4.475*(4.475-3.78)
.7/4.475*(4.475-3.96)
.7/4.475*(4.475-4.14)
.7/4.475*(4.475-4.32)
.7/4.475*(4.475-4.5)

6+4.48+0.68+4.48+1.2
+6.72+.68+.68+0.32+0.32
6.72+1.22+1.22+0.7+0.7

o the backing wall

.65-0.08+0.7

:: GENERAL ABSTRACT ::
Name of Work : Construction of High level Bridge on road from
Maddur to Ahalyapuram
Part-A
Description

S.No.

Amount (Rs.)

Bridge work

5998795

For approaches

1669000

SUB TOTAL

7667795

Add VAT @ 4%

306712

Add Seigniorage charges as per statement

210000

Provision for sub soil investigation and test results (


as per bill)

97463

Add DPR charges @ 1%

76300

Provision for Name boards & sign boards

20000

LS for unforeseen items

36743

Part- A TOTAL

(Rs.)

8415013

PART - B (Maintenance)
S.No.

Description

Provision for Routine Maintenance cost for 5 years


Part- B TOTAL

Amount (Rs.)

(Rs.)

Grand Total Part (A+B)

Superintending Engineer
P.R. Kurnool.

210000

Dy. Executive Engineer


Executive Engineer
P.I.U.(P.R), Panyam.
P.I.U.(P.R) Division, Kurnool.

8625013

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

COMPARATIVE STATEMENT (Road work)


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Sl.
No

Description of item

No

Measurement

B D

As per Original Estimate


AMOUNT
QTY RATE

As per Working Estimate


Qty

Rate

Amount

10

11

12

Excess

Less

13

14

Bridge work

5500000.00

5998795.00

498795.00

0.00

For approaches

2130000.00

1669000.00

0.00

461000.00

7630000.00

7667795.00

Add VAT @ 4%

305200.00

306712.00

1512.00

0.00

Add Seigniorage charges as per statement

243500.00

210000.00

0.00

33500.00

Provision for sub soil investigation and test results ( as


per bill)

97463.00

97463.00

0.00

0.00

Add DPR charges @ 1%

76300.00

76300.00

0.00

0.00

Provision for Name boards & sign boards

20000.00

20000.00

0.00

0.00

LS for unforeseen items

11537.00

36743.00

25206.00

0.00

8384000.00

8415013.00

525513.00

494500.00

Total

As per Original Estimate


As per Working Estimate
Difference

Superintending Engineer
P.R. Kurnool.

Executive Engineer
P.I.U.(P.R) Division, Kurnool.

8384000.00 Excess
8415013.00 Less
31013.00

Dy. Executive Engineer


P.I.U.(P.R), Panyam.

525513.00
494500.00
-31013.00

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

Detailied Cum Abstract Estimate For Bridge


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Estt.Cost:- Rs.
Sl.
No

Description of Item

No

Length
(m)

Width(m)

Depth
(m)

59.99 Lakhs

Quantity / unit

Rate (Rs)

unit
per

Amount
(Rs)

10

2
3
4
5
6
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material
and disposal up to a lead of 50 m, dressing of sides and bottom and
1 backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH ,including overhead
charges & Contractors profit but excluding VAT & Seigniorage charges.

Ordinary Soil below water


i. level up to 3m depth
Below bed level (Raft area)

37.08

7.40

2.50

685.98

For Approns U/s

37.08

7.00

1.80

467.21

For Approns D/s

37.08

12.00

1.80

800.93

Cut off walls U/s


Cut off walls D/s

1
1

37.08
37.08

0.60
0.60

0.85
1.35

18.91
30.03
2136.54

cum

62.25

1Cum

133000

73.50

cum

59.29

1Cum

4358

82.32
82.32

cum

206.47

1Cum

16997

cum

3375.14

1Cum

198728

Ordinary Soil above water


ii level
Fly wings portion

3.50

3.50

1.50

73.50

Filling in foundation trenches as per drawing and technical specification


Clause 305.3.9 MORD & 304 MORTH ,including overhead charges &
2 Contractors profit but excluding VAT & Seigniorage charges.

Sand cushion
Below Raft

37.08

7.40

0.30

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including
curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
3
2100 MORTH ,including overhead charges & Contractors profit but
excluding VAT& Seigniorage charges for Leveling Coarse below
Foundation

Below Raft

35.88

7.40

0.20

53.10

Bottom of approach slab

3.50

5.50

0.15

5.78
58.88

Providing concrete for reinforced concrete M 20 grade (Design Mix) in


open foundations using 20 & 10 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings and
4 technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges,Cost of
Steel
Raft

37.08

7.40

0.65

178.35
178.35

cum

4,599.14 1Cum

820257

cum

4,044.81 1Cum

712055

cum

4,240.87 1Cum

621234

Providing concrete for plain concrete M15 ( Desigen mix) in open


foundations using 40,20 & 10mm size Graded hard stone aggregate,
mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical
5 specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,including overhead charges & Contractors profit but
excluding VAT& Seigniorage charges for Foundations

Abutments 1st footing

6.45

3.80

0.30

14.71

Abutments 2nd footing

6.45

3.50

0.30

13.55

Abutments 3rd footing

6.45

3.20

0.30

12.38

Piers 1st footing

6.80

3.10

0.30

18.97

Piers 2nd footing

6.80

2.50

0.30

15.30

Piers 3 rd footing

6.80

1.90

0.30

11.63

Abutments below bed level

6.45

2.60+2.37

0.450

14.43

Piers below bed level

6.80

1.30+1.24

0.450

3.89

Cut off wall U/s

37.08

0.60

1.35

30.03

Cut off walls D/s

37.08

0.60

1.85

41.16
176.04

Plain cement concrete M15 grade (desigen mix) using 40,20 & 10mm
metal mechanically mixed in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
6 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT & Seigniorage charges.

Abutments

6.45

2.39+0.80

3.575

73.56

Piers

6.80

1.24+0.76

3.575

72.93
146.49

Providing concrete for reinforced concrete M 25 grade (Design Mix) in


open foundations using 20 & 10 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings and
7 technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges,Cost of
Steel
R.C.C grade M 25 (Design Mix) using 20 mm Graded Metal -For
Bed Blocks,Backing wall, fly wings
Height upto 5 mts
Bed block over Abutments

6.45

0.875

0.30

3.39

Backing wall

6.45

0.40

0.35

1.81

Bed block over Piers

6.80

0.91

0.30

5.57

Fly wings

3.50

0.45

3.50

22.05
32.82

cum

5,150.21 1Cum

169030

Providing weep holes in brick masonry/stone masonry, plain/reinforced


concrete abutment, wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures with slope of
1(V):20(H) towards drawing face complete as per drawing and
8 technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 &
2200 MORTH.,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges.

To Abutments (Sill Level)

2x9

18.00

1.50m level

2x8

16.00
34.00

No

236.77

1Nos

8050

Providing and laying reinforced cement concrete M25 grade (Design


Mix) using 20 & 10mm metal mechanically mixed in superstructure as
per drawing and technical specifications Clauses 800, 1205.4 and
1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including
9
overhead charges & Contractors profit but excluding VAT &
Seigniorage charges,Cost of Steel

Deck Slab

Kerbs

2x4

8.80
8.80

6.50
0.45+0.375

0.65

148.72

0.275

7.99
156.71

cum

5,540.76 1Cum

868270

cum

4,919.73 1Cum

88900

Cum

4844.05

73678

Providing and laying cement concrete wearing course M 30 grade


excluding reinforcement complete as per drawing and technical
specifications Clauses 800 and 1206.3 MORD and 2702 MORTH
10 ,including overhead charges and contractors profit but excluding VAT
& Seigniorage charges

over Deck Slab & Approach


Slab

43.80

5.50

0.075

18.07
18.07

Reinforced cement concrete approach slab including formwork


complete as per drawing and Technical specification Clause 800, 1211
11 MORD / 1500, 1600, 1700 & 2704 MORTH ,including overhead
charges and contractors profit but excluding VAT & Seigniorage
charges ,Cost of Steel
Approach Slab to be rested
on fly Wings

3.90

6.50

0.30

15.21
15.21

12 Supplying, fitting, and placing HYSD bar reinforcement in foundation


complete as per drawing and technical specifications Clauses 1002,
1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia
including over laps and wastage, where they are not welded ,including
overhead charges & Contractors profit but excluding VAT
or say
For Raft

(178.35x75Kgs)

13376.25

Skin reinforcement for piers & Abutments footings


Perimeter
Height
2(l+b)

Suface Area of

(h)

Surface Area

Abutments 1st footing

20.50

0.30

12.30

Abutments 2nd footing

19.90

0.30

11.94

13400

1Cum

Abutments 3rd footing

19.30

0.30

11.58

Piers 1st footing

19.80

0.30

17.82

Piers 2nd footing

18.60

0.30

16.74

Piers 3 rd footing

17.40

0.30

15.66

Abutments below bed level

17.90

0.45

16.11

Piers below bed level

16.14

0.45

21.79
123.94

R/F @ 5 kg /sqm

619.70
say

700.00
14.10

MT

43622.56

1MT

615078

MT

43720.87

1MT

112669

MT

44467.11 1 MT

Supplying, fitting, and placing HYSD bar reinforcement in sub structure


complete as per drawing and technical specifications Clauses 1002,
1010 and 1202,1005MORD / 1600 &2200 MORTH, for Bars below 36
13 mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding VAT

Bed blocks & Backing wall (32.9-22.05)x100Kgs

1077.00

Skin reinforcement for piers & Abutments


Abutments

16.10

3.575

115.12

pier

15.60

3.575

167.31
282.43

.@5kg/sqm

1,412.13
say

1500.00
2.58

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below
14 36 mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding VAT

For Deck slab & Kerb

(158.95x80Kgs)

12536.48

fly wings ( 22.05x100kgs)

2205.00

Approach slab

LS

400.00

Round off

LS

150.00
15291.48

say

16000.00
16.00

Providing and laying filter media with granular crushed aggregates as


per specification to a thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the wall and providing
over the entire surface behind abutment, wing wall, return wall to the
full height, compacted to firm condition complete as per drawing and
15 technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 &
2200 MORTH ,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges.

Behind abutments

5.55

0.60

4.100

27.31

711474

Behind fly Wings

3.50

0.60

3.530

29.65
56.96

cum

1,107.99 1Cum

63111

Rm

1,923.88 1 RM

168532

Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm


nominal size aggregate, true to line and grade, tolerance of vertical
railing post not to exceed 1 in 500, centre-to-centre spacing between
vertical posts not to exceed 2000 mm as per drawing and technical
16 specifications Clauses 800, 900 and 1208.3 MORD.
,including
overhead charges and contractors profit but excluding VAT &
Seigniorage charges
2

43.80

87.60
87.60

Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of
17 IRC, 78 & 2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT & Seigniorage charges.
2

5.55

3.50

2.500

97.13
97.13

cum

597.92

1Cum

58075

528.39

cum

949.09

1Cum

501490

27.50
27.50

Rm

256.60

1Rm

7057

27.50
27.50

Rm

22.16

1Rm

609

Providing and laying boulder apron for bed protection with stone
boulders of minimum size and weight as per Table 1300.1, no fragment
weighing less than 25 / 40 kg laid dry complete as per drawing and
18 technical specifications Clause 1301 MORD / 2503 MORTH ,including
overhead charges and contractors profit but excluding VAT &
Seigniorage charges
For Approns U/S

37.08

7.00

0.60+0.90

194.67

For Approns D/S

37.08

12.00

0.60+0.90

333.72

Providing and fixing in position 20 mm thick premoulded joint filler in


expansion joint for fixed ends of simply supported spans, covered with
sealant complete as per drawing and technical specifications MORD
19 ,including overhead charges and contractors profit but excluding VAT

5.50

Providing and filling joint sealing compound as per drawings and


technical specifications with coarse sand and 6 per cent bitumen by
20 weight MORD ,including overhead charges and contractors profit but
excluding VAT
5

5.50

Drainage spouts complete as per drawing and technical specifications


21 Clause 1209 MORD & 2705 MORTH

LS

10000

22 Provision for diversion of traffic

LS

36143
Total Rs.

Superintending Engineer
P.R. Kurnool.

Executive Engineer
P.I.U.(P.R) Division, Kurnool.

Dy. Executive Engineer


P.I.U.(P.R), Panyam.

5998795

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

COMPARATIVE STATEMENT (Bridge work)


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Sl.
No
1

Description of item
2

No
3

Measurement
L

B D

As per Original Estimate

QTY

RATE

AMOUNT
9

As per Working Estimate

Qty

Rate

Amount

10

11

12

Excess

Less

13

14

Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal up to a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305
MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges.

Ordinary soils above Water Level


91.15
Ordinary soils below Water Level upto 3 m depth 1483.31
Ordinary soils below Water Level 3-6 m depth
47.25
Filling in foundation trenches as per drawing and technical
specification Clause 305.3.9 MORD & 304 MORTH ,including
overhead charges & Contractors profit but excluding VAT &
Seigniorage charges.
Hard rock (requiring blasting) without dewatering
Providing concrete for plain concrete M 10 grade in open
foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete
as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Leveling Coarse below Foundation

59.29
62.25
67.76

5404.00
92336.00
3202.00

73.50
2136.54

59.29
62.25

4358.00
133000.00

0.00
40664.00
0.00

1046.00
0.00
3202.00

110.63

206.47

22842.00

82.32

206.47

16997.00

0.00

5845.00

50.03

3375.14

168858.00

58.88

3,375.14

198728.00

29870.00

0.00

Providing concrete for reinforced concrete M 20 grade (Design


Mix) in open foundations using 20 & 10 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14
days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100
MORTH ,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges,Cost of Steel

173.06

4599.14

795927.00 178.35

4599.14

820257.00

24330.00

0.00

156.25

4044.81

632002 176.04

4044.81

712055

80053.00

0.00

83.58

4240.87

354452.00 146.49

4240.87

621234.00

266782.00

0.00

Providing concrete for plain concrete M15 ( Desigen mix) in


open foundations using 40,20 & 10mm size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete
as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Foundations

Plain cement concrete M15 grade (desigen mix) using 40,20 &
10mm metal mechanically mixed in substructure complete as
per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH ,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges.

Providing concrete for reinforced concrete M 25 grade (Design


Mix) in open foundations using 20 & 10 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14
days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100
MORTH ,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges,Cost of Steel

21.71

5150.21

111811.00

32.82

5150.21

169030.00

57219.00

0.00

34.00

236.77

8050.00

34.00

236.77

8050.00

0.00

0.00

158.95

5540.76

880704.00

156.71

5540.76

868270.00

0.00

12434.00

Providing weep holes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.,including
overhead charges & Contractors profit but excluding VAT &
Seigniorage charges.

Providing and laying reinforced cement concrete M25 grade


(Design Mix) using 20 & 10mm metal mechanically mixed in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600
& 1700 MORTH ,including overhead charges & Contractors
profit but excluding VAT & Seigniorage charges,Cost of Steel

10 Providing and laying cement concrete wearing course M 30


grade excluding reinforcement complete as per drawing and
technical specifications Clauses 800 and 1206.3 MORD and
2702 MORTH ,including overhead charges and contractors
profit but excluding VAT & Seigniorage charges
18.07

4919.73

88900

18.07

4919.73

88900.00

0.00

0.00

12.87

4844.05

62343.00

15.21

4844.05

73678.00

11335.00

0.00

13.42

43622.56

585415.00

14.10

43622.56

615078.00

29663.00

0.00

1.93

43720.87

84381.00

2.58

43720.87

112669.00

28288.00

0.00

11 Reinforced cement concrete approach slab including formwork


complete as per drawing and Technical specification Clause
800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH
,including overhead charges and contractors profit but
excluding VAT & Seigniorage charges ,Cost of Steel

12 Supplying, fitting, and placing HYSD bar reinforcement in


foundation complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202 MORD / 1600
MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT

13 Supplying, fitting, and placing HYSD bar reinforcement in sub


structure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202,1005MORD / 1600 &2200
MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT

14 Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202 MORD / 1600
MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT
14.40

44467.11

640326.00

16.00

44467.11

711474.00

71148.00

0.00

39.64

1107.99

43921

56.96

1107.99

63111.00

19190.00

0.00

87.60

1923.88

168532.00

87.60

1923.88

168532.00

0.00

0.00

99.75

597.92

59642.00

97.13

597.92

58075.00

0.00

1567.00

15 Providing and laying filter media with granular crushed


aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to
firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 &
2200 MORTH ,including overhead charges & Contractors profit
but excluding VAT & Seigniorage charges.

16 Construction of R.C.C. railing of M 25 grade in cast-in-situ with


20 mm nominal size aggregate, true to line and grade,
tolerance of vertical railing post not to exceed 1 in 500, centreto-centre spacing between vertical posts not to exceed 2000
mm as per drawing and technical specifications Clauses 800,
900 and 1208.3 MORD. ,including overhead charges and
contractors profit but excluding VAT & Seigniorage charges

17 Backfilling behind abutment, wing wall and return wall complete


as per drawings & technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT & Seigniorage
charges.

18 Providing and laying boulder apron for bed protection with


stone boulders of minimum size and weight as per Table
1300.1, no fragment weighing less than 25 / 40 kg laid dry
complete as per drawing and technical specifications Clause
1301 MORD / 2503 MORTH ,including overhead charges and
contractors profit but excluding VAT & Seigniorage charges

701.25

949.09

665549.00

528.39

949.09

501490.00

0.00

164059.00

27.50

256.60

7057.00

27.50

256.60

7057.00

0.00

0.00

27.50

22.16

609.00

27.50

22.16

609.00

0.00

0.00

16000.00

10000.00

0.00

6000.00

1737.00

36143.00

34406.00

0.00

5500000.00

5998795.00

692948.00

194153.00

19 Providing and fixing in position 20 mm thick premoulded joint


filler in expansion joint for fixed ends of simply supported
spans, covered with sealant complete as per drawing and
technical specifications MORD ,including overhead charges
and contractors profit but excluding VAT

20 Providing and filling joint sealing compound as per drawings


and technical specifications with coarse sand and 6 per cent
bitumen by weight MORD ,including overhead charges and
contractors profit but excluding VAT

21 Drainage spouts complete as per drawing and technical


specifications Clause 1209 MORD & 2705 MORTH
22 Provision for Unforseen items

Total

As per Original Estimate


As per Working Estimate
Difference

Superintending Engineer
P.R. Kurnool.

Executive Engineer
P.I.U(P.R) Division, Kurnool

5500000.00
5998795.00
498795.00

Dy. Executive Engineer


P.I.U(P.R), Panyam.

Excess
Less

692948.00
194153.00
-498795.00

Assistant Executive Engineer


P.I.U(P.R), Panyam.

COST ESTIMATE FOR APPROACH ROAD CONSTRUCTION


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Estt.Cost :Rs:
Sl. Description of
Length
No
No
Item
(m)
1

Width
(m)
5

Thinkness
(m)

16.69 Lakhs

Quantity

Rate (Rs)

Amount
(Rs)

Cum

159.22

363211

Cum

488.17

63159

Cum

2543.95

105192

Construction of embankment with approved material obtained


from borrow pits with all lifts, transporting to site, spreading,
grading to required slope and compacting to meet requirement
of Tables 300.1 and 300.2 with a lead upto 2 Km as per
1 Technical Specification Clause 301.5 MORD including overhead
charges & Contractor profit, But excluding VAT & Seigniorage
charges

for Approaches

70.00

((17.0+7.50)/2
+ 7.50)/2

(3.00+0.3)/2

2281.13
2281.13

Construction of granular sub-base / shoulders by providing well


graded material / Close graded material, spreading in uniform
layers with motor grader on prepared surface mixing by mixing
place method with rotavator at OMC and compacting with
vibratory roller to achieve the desired density, complete as per
2 Technical Specification clause 401 MORD/MORTH , including
overhead charges & Contractor profit, But excluding VAT &
Seigniorage charges

Sub base

15.00

(5.50+4.0)/2

0.15

21.38

Sub base

55.00

4.00

0.15

66.00

Shoulders

70.00

1.00

0.15

42.00
129.38

WBM Grading 2 (using Graded Metal) - Hand Broken


Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with vibratory roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density grading 2 as per
Technical Specification Clause 405 MORD. For compacted
thickness of 75 mm including overhead charges & Contractor
profit, but excluding VAT & Seigniorage charges for Gr-II ( Hand
Broken metal )

WBM Gr.II

15.00

(5.50+3.75)/2

0.075

10.41

WBM Gr.II

55.00

3.75

0.075

30.94
41.35

4 Cement Concrete Pavement

Construction of un-reinforced, dowel jointed at expansion and


construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30
(Grade), coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2 cum capacity
and appropeiate weigh batcher using approved mix design, laid
in approved fixed side formwork (steel channel, laying and fixing
of 125 mictron thick polythene film, wedges, steel plates
including levelling the formwork as per drawing), spreading the
concrete with sholvels, rakes, compacted using needle, scareed
and plate vibrators and finished in continuous operation
including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars,
near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines
and grade as per drawing and Technical Specification Clause
1501 MORD including overhead charges & Contractors profit
but excluding VAT & Seigniorage charges.

2
2

15.00
55.00

(5.50+3.75)/2
3.75

0.20
0.20

27.75
82.50
110.25

Cum

4,968.10

547733

22.50
22.50

Cum

648.05

14581

Cum

1,578.45

284121

Providing and laying filter media underneath pitching in slope


complete as per drawing and Technical specification of
embankment complete as per Technical specifications 2504 of
5 MORTH. ,including overhead charges and contractors profit but
excluding VAT & Seigniorage charges

40.00

(7.50+0)/2

0.15

Providing and laying pitching on slopes laid over prepared filter


media including boulder appron laid with CC (1:4:8) in front of
toe of embankment complete as per Technical specifications
2504 of MORTH. ,including overhead charges and contractors
6 profit but excluding VAT & Seigniorage charges

40.00

(7.50+0)/2

0.30

180.00
180.00

Toe wall
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal up to a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
7 excavated suitable material as per Technical Specification 305
MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges.

40.00

0.75

0.60

72.00
72.00

Cum

59.29

4269

Cum

206.47

4955

Cum

58.88

1413

Cum

4,044.81

262104
18000
262
1669000

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH ,including
8 overhead charges & Contractors profit but excluding VAT &
Seigniorage charges.
4

40.00

0.75

0.20

24.00
24.00

Providing concrete for plain concrete M 10 grade in open


foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete
as per drawings and technical specifications Clause 802, 803,
9 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Leveling Coarse below Foundation

40.00

0.75

0.20

24.00
24.00

Providing concrete for plain concrete M15 ( Desigen mix) in


open foundations using 40,20 & 10mm size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete
as per drawings and technical specifications Clause 802, 803,
10 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Foundations

40.00

(0.6+0.30)
2

0.90

64.80
64.80

11 Provision for Guide stones & Painting


12 Unforseen items if any

Superintending Engineer
P.R. Kurnool.

Dy. Executive Engineer


Executive Engineer
P.I.U.(P.R), Panyam.
P.I.U.(P.R) Division, Kurnool.

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

COMPARATIVE STATEMENT (Road work)


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Sl.
No
1

Description of item
2

No
3

Measurement
L

B D

As per Original Estimate

QTY

RATE

AMOUNT
9

As per Working Estimate

Qty

Rate

Amount

10

11

12

Excess

Less

13

14

Construction of embankment with approved material


obtained from borrow pits with all lifts, transporting to site,
spreading, grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2 with a lead
upto 2 Km as per Technical Specification Clause 301.5
MORD including overhead charges & Contractor profit,
But excluding VAT & Seigniorage charges

3216.35

159.22

132.19

488.17

512121.00

2281.13

159.22

363211.00

0.00

148910.00

488.17

63159.00

0.00

1372.00

Construction of granular sub-base / shoulders by


providing well graded material / Close graded material,
spreading in uniform layers with motor grader on prepared
surface mixing by mixing place method with rotavator at
OMC and compacting with vibratory roller to achieve the
desired density, complete as per Technical Specification
clause 401 MORD/MORTH , including overhead charges
& Contractor profit, But excluding VAT & Seigniorage
charges

64531.00 129.38

Providing, laying, spreading and compacting stone


aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with vibratory roller 80-100 kN in
stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting
to the required density grading 2 as per Technical
Specification Clause 405 MORD. For compacted
thickness of 75 mm including overhead charges &
Contractor profit, but excluding VAT & Seigniorage
charges for Gr-II ( Hand Broken metal )

72.29

2543.95

183902.00

41.35

2,543.95

105192.00

0.00

78710.00

Construction of un-reinforced, dowel jointed at expansion


and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per
Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a
concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design,
laid in approved fixed side formwork (steel channel, laying
and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and
finished in continuous operation including provision of
contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near
approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14days, curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical
Specification Clause 1501 MORD including overhead
charges & Contractors profit but excluding VAT &
Seigniorage charges.

140.25

4968.10

50.63

648.05

696776.00 110.25

4,968.10

547733.00

0.00

149043.00

648.05

14581.00

0.00

18230.00

Providing and laying filter media underneath pitching in


slope complete as per drawing and Technical specification
of embankment complete as per Technical specifications
2504 of MORTH.
,including overhead charges and
contractors profit but excluding VAT & Seigniorage
charges
32811.00

22.50

Providing and laying pitching on slopes laid


over
prepared filter media including boulder appron laid with
CC (1:4:8) in front of toe of embankment complete as per
Technical specifications 2504 of MORTH. ,including
overhead charges and contractors profit but excluding
VAT & Seigniorage charges

Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal up to a lead of
50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH
,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges.
Filling in foundation trenches as per drawing and technical
specification Clause 305.3.9 MORD & 304 MORTH
,including overhead charges & Contractors profit but
excluding VAT & Seigniorage charges.

405.00

Providing concrete for plain concrete M 10 grade in open


foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days
complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,including overhead charges & Contractors
profit but excluding VAT& Seigniorage charges for
Leveling Coarse below Foundation

1578.45

639272.00 180.00

1578.45

284121.00

0.00

355151.00

72.00

59.29

4269.00

4269.00

0.00

24.00

206.47

4955.00

4955.00

0.00

24.00

58.88

1413.00

1413.00

0.00

10 Providing concrete for plain concrete M15 ( Desigen mix)


in open foundations using 40,20 & 10mm size Graded
hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for
14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges
& Contractors profit but excluding VAT& Seigniorage
charges for Foundations

64.80

11 Provision for Guide stones & Painting

587

12 Provision for Unforseen items

Total

As per Original Estimate


As per Working Estimate
Difference

Superintending Engineer
P.R. Kurnool.

Executive Engineer
P.I.U(P.R) Division, Kurnool

2130000.00

2130000.00
1669000.00
-461000.00

Dy. Executive Engineer


P.I.U(P.R), Panyam.

Excess
Less

4044.81

262104.00 262104.00

0.00

18000

17413.00

0.00

262.00

262.00

0.00

1669000.00 290416.00

751416.00

290416.00
751416.00
461000.00

Assistant Executive Engineer


P.I.U(P.R), Panyam.

Seigniorage Charges Statement


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
S.N
o

Item

Quantity

Unit

Seigniorage Charges
Qty

Rate

Amount

Bridge Work
1 Earth Work

2210.04

Cum

2210.04

22.00

48620.88

2 Sand Filling

82.32

Cum

82.32

40.00

3292.80

3 PCC (M10)

58.88

Cum

Metal

58.88

0.90

50.00

2649.60

Sand

58.88

0.45

40.00

1059.84

4 VCC (M20) For Raft

178.35
Metal

178.35

0.90

50.00

8025.75

Sand

178.35

0.45

40.00

3210.30

VCC (M15) For


5 Abutments & Piers & Cut
off walls

Cum

322.53

Cum

Metal

322.53

0.80

50.00

12901.16

Sand

322.53

0.48

40.00

6192.56

VCC (M25) For Backing


Wall & Bed Block

32.82

Cum

Metal

32.82

0.90

50.00

1476.90

Sand

32.82

0.45

40.00

590.76

VCC (M25) For Deck


Slab & Kerb

156.71

Cum

Metal

156.71

0.90

50.00

7051.77

Sand

156.71

0.45

40.00

2820.71

VRCC (M30) For


Wearing Coat

18.07

Cum

Metal

18.07

0.9

50.00

813.15

Sand

18.07

0.45

40.00

325.26

VCC (M25) For Approach


Slab

15.21

Metal

15.21

0.9

50.00

684.45

Sand

15.21

0.45

40.00

273.78

1.2

22.00

2564.23

1.2

50.00

3417.60

1.2

50.00

31703.40

10 Back Filling

97.13
Gravel

11 Filter Media

Cum

Cum

97.13
56.96

Cum

56.96
12

boulder apron for bed


protection

528.39

Stone boulders

528.39

For Approaches

Cum

13 Earth Work

2353.13

Cum

1.00

22.00

51768.86

14 Sand Filling

24.00

Cum

24.00

40.00

960.00

15

16

17

GSB

129.38 Cum
Gravel

129.38

0.85

22.00

2419.41

Sand

129.38

0.43

40.00

2225.34

1.21

50.00

2501.68

Grading II metal Layer

41.35

Metal

41.35

Cement concrete
pavement

110.25 Cum
Metal

110.25

0.9

50.00

4961.25

Sand

110.25

0.45

40.00

1984.50

18 PCC (M10)

24.00
Metal

24.00

0.90

50.00

1080.00

Sand

24.00

0.45

40.00

432.00

19 VCC (M15) For Toe wall

Superintending Engineer
P.R. Kurnool.

Cum

64.80

Cum

Metal

64.80

0.80

50.00

2592.00

Sand

64.80

0.48

40.00

1244.16

Dy. Executive Engineer


Executive Engineer
P.I.U.(P.R), Panyam.
P.I.U.(P.R) Division, Kurnool.

Total Rs.

209844.09

or say Rs.

210000.00

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

Page 47 of 150
RATE ANALYSIS (ROAD WORK) - SSR 2010-11
Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
S.
No.
1

Index
Description of item
Code
RBR- Construction of Embankment with Material Obtained from
EECD-4 Borrow pits by Machinery
Construction of embankment with approved material obtained
from borrow pits with all lifts, transporting to site, spreading,
grading to required slope and compacting to meet requirement
of Tables 300.1 and 300.2 with a lead upto 2 Km as per
Technical Specification Clause 301.5 MORD including
overhead charges & Contractor profit, But excluding VAT &
Seigniorage charges

a)
b)

c)

d)

e)

Unit

Unit = cum
Taking output = 100 cum
Labour
Mazdoor (Unskilled)
day
Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour
hour
Tipper 5.5cum with 10T capacity
hour
Dozer D50 for spreading @ 200 cum per hour
hour
Motor grader for grading @ 200cum per hour
hour
Water tanker 6 KL capacity
hour
Vibratory Roller 80-100 KN @100cum per hour
hour
Material
Cost of water
Kl
Basic rate of formation of road with borrow soils per
100Cum
Conveyance of earth for extra 1 Km
Basic rate of formation of road with borrow soils per 1
Cum
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

Qty

Rate

Amount

1.04

196.00

203.84

1.670

1808.50

3020.20

4.5*2
0.50
0.50
2.00
1.00

629.80
1081.19
2,600.00
345.00
1704.60

5668.20
540.60
1300.00
690.00
1704.60

12.00

70.00

840.00
13967.44

139.67

Rate per cum


2

14%

19.55

Rs.

159.22

RBR- WBM Grading 2 (using Graded Metal) - Hand Broken


SBBS-9
Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with vibratory roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density grading 2 as
per Technical Specification Clause 405 MORD. For
compacted thickness of 75 mm including overhead charges &
Contractor profit, but excluding VAT & Seigniorage charges
for Gr-II ( Hand Broken metal )

By Manual means
Taking out put = 360 cum
a)

Labour
Mazdoor (Skilled)

day

12.08

196.00

2367.68

Mazdoor (unskilled)

day

250.00

196.00

49000.00

Page 48 of 150
S.
No.

Index
Code
b)

c)

Description of item

Unit

Qty

Rate

Vibratory Roller 80-100 KN @60cum per hour

hour

6.00

1704.60

10227.60

Water tanker 6kl capacity

hour

24.00

345.00

8280.00

60-63 mm IRC HBG Metal (50% of 435.60 cum)

Cum

217.80

430.00

93654.00

40-45 mm IRC HBG Metal (46% of 435.60 cum)

Cum

200.38

570.00

114216.60

19-22 mm IRC HBG Metal (4% of 435.60 cum)

Cum

17.42

1020.00

17768.40

Machinery

Material (Total Qty 435.60 Cum)

Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18cum/10sqm
rate of 5-7 mm chips & 2.36 -5mm chips )

d)

225639.00
(Avg.

cum

86.40

501.25

43308.00

Binding Material @ 0.06 cum per 10 sqm for Grading 2


material size 2.36mm & below having PI value 2-6% ( 66%
stone dust +34% Gravel )-> Stone dust 66% -->

cum

19.01

236.00

4486.36

Gravel

33%

cum

9.79

50.50

494.40

Cost of water
Basic rate for 360 Cum

Kl

144.00

70.00

10080.00
579522.04

Rate per Cum


Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

1609.78
14%

Rate per cum

225.37
1835.15

Add Manual Loading & Mech.Unloading for Hand broken


Metal
Add for conveyance for Hand broken Metal

cum

1.21

89.80

108.66

cum

1.21

394.80

477.71

Add for conveyance for Metal (m/c)

cum

0.29

394.80

114.49

Add for conveyance for Gravel

cum

0.027

294.00

7.94

Rate per cum


3

Amount

Rs.

2543.95

RBR- Granular Sub-base coarse Graded material(Table:400.2)


SBBS-1
Construction of granular sub-base / shoulders by providing
well graded material / Close graded material, spreading in
uniform layers with motor grader on prepared surface mixing
by mixing place method with rotavator at OMC and
compacting with vibratory roller to achieve the desired density,
complete as per Technical Specification clause 401
MORD/MORTH , including overhead charges & Contractor
profit, But excluding VAT & Seigniorage charges

For Grading III Material ( CBR Value min 20)

a)
b)

c)

Taking out put = 300 cum


Labour
Mazdoor (Skilled)
Mazdoor (Un-Skilled)
Machinery
Motor grader for grading 110 HP @ 50cum per hour
Vibratory Roller 80-100 KN @10cum per hour
Tractor with rotavator @ 25 cum per hour
Water tanker 6kl capacity
Material
Well graded granular sub-base material as per table 400.2

Cost of materials

day
day

2.40
8.00

196.00
196.00

470.40
1568.00

hour
hour
hour
hour

6.00
6.00
12.00
3.00

2,600.00
1704.60
345.00
345.00

15600.00
10227.60
4140.00
1035.00

Page 49 of 150
S.
No.

Index
Code

a)
c)

RBRCCPV-5

Description of item

Unit

9.5 mm to 4.75 mm @ 66% (Gravel)


cum
2.36 mm below @ 34% (Sand)
cum
Cost of water
Kl
Basic rate of Granular sub base for 300 cum
Basic rate of Granular sub base cum
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Add for conveyance for Gravel
Add for conveyance for blindage sand
Rate per cum
Cement Concrete Pavement

Qty

Rate

Amount

255.00
129.00
18.00

50.50
70.00
70.00

cum
cum

0.85
0.43

294.00
57.40
Rs.

12877.50
9030.00
1260.00
56208.50
187.36
26.23
213.59
249.90
24.68
488.17

day
day
day
day
day
day
day

5.00
5.00
150.00
6.00
2.00
6.00
1.00

258.00
237.00
196.00
196.00
237.00
196.00
237.00

1,290.00
1,185.00
29,400.00
1,176.00
474.00
1,176.00
237.00

14%

Construction of un-reinforced, dowel jointed at expansion and


construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30
(Grade), coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix
design, laid in approved fixed side formwork (steel channel,
laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using
needle, scareed and plate vibrators and finished in continuous
operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant,
dowel bars, near approaches to bridge / culvert and
construction joints, admixtures as approved, curing of
concrete slabs for 14- days, curing compound (where
specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501 MORD
including overhead charges & Contractors profit but excluding
VAT & Seigniorage charges.

a)

Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (unskilled)
Mazdoor(skilled)
Surveyor
Mazdoor (semi-skilled)
Black smith for cutting of dowel bars including removal of
burrs, fabrications & fixing of dowel bars

34938.00
b)

Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with weight
batcher and suitable capacity calibrated water tank

Hour

36.00

Needle vibrator
Screed vibrator
Plate vibrator
Water tanker 6 Kl. Capacity
Air compressor ( 1hour initial + 1 hour final)

Hour
Hour
Hour
Hour
Hour

9.00
9.00
9.00
5.00
2.00

345.00

345.00
370.00

12,420.00

0.00
0.00
1,725.00
740.00
14,885.00

Page 50 of 150
S.
No.

Index
Code
c)
(I)

(ii)
(iii)
(iv)
(v)

Description of item

20mm
10mm
Sand as per IS:383 and conforming to clause 1500.2.4.2. @
0.45 cum of concrete
Cement @ 350 Kg/cum of concrete
Polythene sheet 125 micron
Mild steel dowel bar 25mm dia of grade S 240.500 mm long
20 Nos. at culvert/bridge slab and at construction joint
including 5 percent wastage

Polythene sheathing, covering 2/3rd dowel bars (20x23) and


tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement
Curing compound (if used) @ 0.33 liter per sqm
Joint filler board 20mm thick as per IS:1838 (4x3.75x0.200 = 3
sqm)
Cost of water

(e)

Rate

Cum
Cum
cum

44.55
22.95
33.75

1125.00
770.00
220.00

50,118.75
17,671.50
7,425.00

t
sqm

26.25
412.5

4600.00
15.00

120,750.00
6,187.50

Kg

117.6

34.50

4057.2

t
Liter
m
m

0.01
19.00
90.00
90.00

24483.98
26.00
5.00
9.00

122.42
494.00
450.00
810.00

No

483.00

0.50

241.50

Liter
Liter
sqm

122.00
131.25
3.00

57.00
57.00
732.00

6954.00
7481.25
2196.00

Kl

18.00

70.00

Amount

cum
cum

0.90
0.45

394.80
646.80
Rs.

1260.00
226219.12
276042.12
8281.26
284323.38
3790.98
530.74
4321.72
355.32
291.06
4968.10

t
cum
cum
kl

0.16
0.45
0.9
1.2

4600.00
220.00
695.00
70.00

736.00
99.00
625.50
84.00

day
day
day

0.10
1.39

258.00
196.00

25.80
272.44

Total ( a+b+c)
Form work @ 3% on (a+b+c)
Cost for 75 cum = a+b+c+d
Rate per Cum = (a+b+c+d+e)/75
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Add for conveyance for Metal
Add for conveyance for Sand
Rate per cum

Qty

Material
Crushed stone coarse aggregates, grading will be as per
clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
Cum/cum of concrete

(4x20x0.500) + 5 per cent wastage = 42m @ 2.80 Kg per m =


117.6 kg.
Bitumen primer @ 200ml.Per joint for 23 joints(SS-1)
Bituminous sealant 800 ml. Per joint for 23 joints
Jute rope 12mm dia including 5 per cent wastage
Debonding strips 3.75m. (length) x 10mm (width) x 5 mm
(thick) cut-out of rubber filter board of similar material including
5 per cent wastage

(d)

Unit

14%

RBR- Providing concrete for plain concrete M 7.50 grade in open


FNDN-3 foundations using 40 mm nominal size Graded hard stone

aggregate, mechanically mixed, placed in foundation and compacted


by vibration including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 MORD
and 800 & 1200 MORTH ,including overhead charges & Contractors
profit but excluding VAT& Seigniorage charges for Leveling Coarse
below Foundation

P.C.C grade M 10
Nominal mix 1:4:8
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery

Page 51 of 150
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring
device and preferably also with load cell.

hour

0.40

345.00

138.00

Water tanker 6 kl capacity

hour

0.13

196.00

25.48
2006.22
80.25

(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)

f).

26

4.00%

e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f

0.90
0.45

14%
394.80
646.80
Rs

2086.47
292.11
355.32
291.06
3024.96

165.00
34.10
2086.47

165.00
6.82
521.62

RBR- Providing and laying pitching on slopes laid over prepared filter
PTWK-1 media including boulder appron laid with CC (1:4:8) in front of toe of
embankment complete as per Technical specifications 2504 of
MORTH. ,including overhead charges and contractors profit but
excluding VAT & Seigniorage charges

Unit = cum
(a) Material
Stone boulder (25 kg / 40 Kg minimum)
Stone spalls

Add for cement concrete grouting (1:4:8)


(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)

cum

1.00

cum

0.20

cum

0.25

day

0.00

day

0.35

day

0.79

c).

Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

d).

Add for conveyance of metal


Rate per cum = a+b+c+d

Superintending Engineer
P.R. Kurnool.

Dy. Executive Engineer


Executive Engineer
P.I.U.(P.R), Panyam.
P.I.U.(P.R) Division, Kurnool.

345.00
196.00
14%

1.200

394.80
Rs

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

0.00
120.75
154.84
969.03
135.66
1104.69
473.76
1578.45

Page 52 of 150

RATE ANALYSIS ( CD WORK) - ASPER SSR 2010-11


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
S. No. Index
Description of item
Code
1
RBR- Excavation for Structures
FNDN1

Unit

Amount

Qty

Rate

8.32

196.00

1630.72

6.00

1808.50

Rs.

10851.00
12481.72
1747.44
14229.16
59.29

Excavation of structures:
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal up to a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305
MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges.

Note : Classifications of Earth Work Specification are as per 302.2.1(a)


of MORD and 301.2.1 of MORT&H

ii

Ordinary soil above water Level Mechanical Means Up to 3 m depth


Unit = cum
Taking output = 240 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
hour
c).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Cost for 240 cum = a+b+c
Rate per cum = (a+b+c) /240
Ordinary soil below water Level
Mechanical Means
Up to 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

day
day

8.32

196.00

1630.72

hour

6.00

1808.50

5%

12481.72

Rs.

10851.00
12481.72
624.09
13105.81
1834.81
14940.62
62.25

Add Dewatering charges @5% on (a+b)


c).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Cost for 240 cum = a+b+c
Rate per cum = (a+b+c) /240
iii

3 m to 6 m depth below water Level


Mechanical Means
Unit = cum
Taking output = 210 cum
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity

14%

14%

day
day

8.32

196.00

1630.72

hour

6.00

1808.50

10851.00
12481.72
12481.72
1747.44
14229.16
67.76

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Cost for 210 cum = a+b+c
Rate per cum = (a+b+c)/210
RBR- Filling in foundation trenches as per drawing and
FNDN- technical specification Clause 305.3.9 MORD & 304
2
MORTH ,including overhead charges & Contractors profit
but excluding VAT & Seigniorage charges.
Sand filling
Unit = cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Sand for filling
cum
c).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Add for conveyance for filling Sand
cum
Rate per cum = a+b+c

14%
Rs.

0.31

196.00

60.76

1.00

70.00

1.00

14%
57.40
Rs.

70.00
130.76
18.31
57.40
206.47

Page 53 of 150
S. No. Index
Description of item
Code
3
RBR- Providing concrete for plain concrete M 10 grade in open
FNDN- foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
4

Amount

Unit

Qty

Rate

t
cum
cum
kl

0.22
0.45
0.9
1.2

4600.00
220.00
695.00
70.00

1012.00
99.00
625.50
84.00

day
day
day

0.10
1.39

258.00
196.00

25.80
272.44

Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water


measuring device and preferably also with load cell.

hour

0.40

345.00

138.00

Water tanker 6 kl capacity

hour

0.13

345.00

44.85
2301.59
92.06

compacted by vibration including curing for 14 days complete


as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Leveling Coarse below Foundation

P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery

4.00%

(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)

e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
f). Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f
RBR- Providing and Laying Reinforced Cement Concrete
PCVT- Pipe NP3 as per design.
3

0.90
0.45

14%
394.80
646.80
Rs

2393.65
335.11
355.32
291.06
3375.14

258.00
196.00

64.50
409.64

220.00
4600.00
5230.70
866.00

646.80
Rs.

8.80
138.00
39230.25
1732.00
41583.19
5821.65
47404.84
6320.65
3.45
6324.10

Providing and laying reinforced cement concrete pipe NP3 for culverts
on first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head wall and parapets.
Tech Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT & Seigniorage charges

i)

Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
1000 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
Laying & fixing of Pipes with colors in position including lifting, aligning etc.,

day
day
day
rm

0.25
2.09

b) Material
Sand at site
cum
0.04
Cement at site
t
0.03
RCC pipe NP3 pipe
m
7.50
RCC pipe NP3 collar at site
nos
2
c).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Add for conveyance for Sand for 1 m length
cum 0.0053
Rate per m
RBR- Providing concrete for reinforced concrete M 20 grade
FNDN- (Design Mix) in open foundations using 20 & 10 mm
4
nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT
& Seigniorage charges,Cost of Steel

14%

R.C.C grade M 20 (Design Mix) using 20 mm Graded


Metal (MORTH) -For Raft, ramps Foundations
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity

t
cum
cum
cum
kl

0.35
0.45
0.54
0.36
1.2

4600.00
220.00
1125.00
770.00
70.00

1596.20
99.00
607.50
277.20
84.00

day
day
day

0.1
1.39

258.00
196.00

25.80
272.44

hr / cum

0.4

345.00

138.00

Page 54 of 150
S. No. Index
Description of item
Code
7
RBR- Providing concrete for plain concrete M15 ( Desigen mix) in
FNDN- open foundations using 40,20 & 10mm size Graded hard
stone aggregate, mechanically mixed, placed in foundation and
4

Amount

Unit

Qty

Rate

t
cum
cum
cum
cum
kl

0.275
0.450
0.540
0.270
0.090
1.2

4600.00
220.00
695.00
1125.00
770.00
70.00

1265.00
99.00
375.30
303.75
69.30
84.00

day
day
day

0.100
1.390

258.00
196.00

25.80
272.44

hour
hour

0.400
0.400

345.00
584.57

138.00
233.83
2866.42
114.66

compacted by vibration including curing for 14 days complete


as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT&
Seigniorage charges for Foundations

Note : Water for concrete : A provision for cost of water may be


added at 1.2 kl / 1 cum (including curing purpose) keeping the
site conditions
Coarse Aggregate : Single grade nominal size can also be
used instead of graded metal, keeping the site conditions in
view

Unit = cum
P.C.C grade M 15 ( Desigen mix ) MORTH ( for
Abutments, Piers, cut-off walls below Bed Level
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

4.00%

(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)

e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
f). Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f
RBR- Plain cement concrete M15 grade (desigen mix) using
SBST- 40,20 & 10mm metal mechanically mixed in substructure
5
complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD
and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT &
Seigniorage charges.

0.90
0.45

14%
394.80
646.80
Rs

2981.08
417.35
355.32
291.06
4044.81

Note : Water for concrete : A provision for cost of water may be


added at 1.2 kl / 1 cum (including curing purpose) keeping the
site conditions
Coarse Aggregate : Single grade nominal size can also be
used instead of graded metal, keeping the site conditions in
view

For height up to 5 m
Unit = cum
P.C.C grade M15 (desigen mix)
MORTH
for
Abutments, Piers, cut-off walls above Bed Level
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

t
cum
cum
cum
cum
kl

0.275
0.450
0.540
0.270
0.090
1.2

4600.00
220.00
695.00
1125.00
770.00
70.00

1265.00
99.00
375.30
303.75
69.30
84.00

day
day
day

0.100
1.390

258.00
196.00

25.80
272.44

hour
hour

0.400
0.400

345.00
584.57

138.00
233.83
2866.42
286.64

(d) Formwork @ 10% on cost of material, labour and machinery (a+b+c)

e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
f). Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f
For height 5-10 m (below appraoch slab)
Unit = cum
P.C.C grade M15 (desigen mix)
appraoch slab
Unit = cum

MORTH

Below

10.00%

0.90
0.45

14%
394.80
646.80
Rs

3153.06
441.43
355.32
291.06
4240.87

Page 55 of 150
S. No. Index
Code

Description of item
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

Qty

Rate

t
cum
cum
cum
cum
kl

0.275
0.450
0.540
0.270
0.090
1.2

4600.00
220.00
695.00
1125.00
770.00
70.00

1265.00
99.00
375.30
303.75
69.30
84.00

day
day
day

0.100
1.390

258.00
196.00

25.80
272.44

hour
hour

0.400
0.400

345.00
584.57

138.00
233.83
2866.42
401.30

14.00%

(d) Formwork @ 14% on cost of material, labour and machinery (a+b+c)

e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
f). Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f
9 RBR- Supplying, fitting, and placing HYSD bar reinforcement in
SBST- sub structure complete as per drawing and technical
6
specifications Clauses 1002, 1010 and 1202,1005MORD
/ 1600 &2200 MORTH, for Bars below 36 mm dia
including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit
but excluding VAT

Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage Fe
415
Binding wire

Amount

Unit

0.90
0.45

14%
394.80
646.80
Rs

3267.72
457.48
355.32
291.06
4371.58

1.05

kg

6.00

52.00

312.00

2.00
6.84

237.00
196.00
14%
Rs

474.00
1340.64
38351.64
5369.23
43720.87

34500.00

36225.00

(b) Labour for cutting, bending, tying and placing in position

Mate
day
Blacksmith/ Rod Binder
day
Mazdoor (Unskilled)
day
c).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Rate per t = a+b+c
10

RBR- Providing concrete for reinforced concrete M 25 grade


SBST- (Design Mix) in open foundations using 20 & 10 mm
5
nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT
& Seigniorage charges,Cost of Steel

R.C.C grade M 25 (Design Mix) using 20 mm Graded


Metal -For Bed Blocks
CASE I : Using Concrete Mixer
Unit = cum
(i)

Height up to 5m

(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

t
cum
cum
cum
kl

0.4
0.45
0.54
0.36
1.2

4600.00
220.00
1125.00
770.00
70.00

1853.80
99.00
607.50
277.20
84.00

day
day
day

0
0.1
1.39

196.00
258.00
196.00

0.00
25.80
272.44

hr / cum

0.4
0.4

345.00
584.57

138.00
233.83
3591.57
359.16
3950.73
553.10
355.32
291.06
5150.21

hour

(d) Formwork @ 10% on (a+b+c)


10.00%
e).
Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
f). Add for conveyance for Metal
cum
0.90
Add for conveyance for Sand
cum
0.45
Rate per cum = a+b+c+d+e+f

14%
394.80
646.80
Rs

Page 56 of 150
S. No. Index
Description of item
Code
11
RBR- Providing weep holes in brick masonry/stone masonry,
SBST- plain/reinforced concrete abutment, wing wall, return wall
9
with 100 mm dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 MORD / 2706
& 2200 MORTH.,including overhead charges &
Contractors profit but excluding VAT & Seigniorage
charges.

Unit

Qty

Rate

Cum

1.050

mt

0.480

day

0.200

220.00
4600.00
196.00

AC pipe 100 mm dia including wastage @ 5 per cent.


Average length of weep hole is taken as one metre for
the purpose of estimating

31.500

MS clamps
Collar for AC pipe (average taking 10% of above pipe
rate)
Cement mortar 1:3 (For rate refer to item 11.5 I)
(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)

Nos.

Unit = Nos
Taking output = 30 Nos
CM (1:3)
Sand for mortar
Cement
Mazdoor (Unskilled)

Amount

231.00
2208.00
39.20
2478.20

(a) Material

5575.50
177.00

30
10.00%

10.00
177.00

300.00
17.70

cum

0.050

2478.20

123.91

day
day
day

0.500
0.280

258.00
196.00

0.053

646.80
Rs

129.00
54.88
6200.99
6200.99
868.14
7069.13
33.96
236.77

12.000

50.50

606.00

Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
d). Add for conveyance of sand
Rate per Each = a+b+c+d

14%

Note in MORTH : 1. In case of stone masonry, the size of the


weep hole shall be 150 mm x 80 mm or circular with 150 mm
diameter.
2. For structure in stone masonry, the weep holes shall be
deemed to be included in the item of stone masonry work and
shall not be paid separately.

12

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification Clause
RBR1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH
SBST,including overhead charges & Contractors profit but
10
excluding VAT & Seigniorage charges.
Unit = cum
Taking output = 10 cum
Granular material
(a) Material
Granular material
(b) Labour
Mate
Mazdoor (Unskilled)
(c) Machinery
Plate compactor / power rammer
Water Tanker of 6 KL capacity

cum
day

day

7.280

196.00

1426.88

hour

2.500

hour

0.050

40.00
345.00

100.00
17.25
2150.13
301.02
2451.15

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Rate per 10 cum = a+b+c+d

14%

Rate per 1 cum =


e). Add for conveyance for Gravel
13

245.12
cum

1.20

Rate per cum = (a+b+c+d+e )


Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less
than 600 mm with smaller size towards the soil and
bigger size towards the wall and providing over the entire
surface behind abutment, wing wall, return wall to the full
RBR- height, compacted to firm condition complete as per
SBST- drawing and technical specification Clause 1204.3.8
11 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including
overhead charges & Contractors profit but excluding VAT
& Seigniorage charges.

294.00

352.80

Rs

597.92

Unit = cum
Taking output = 10 cum
Granular material
(a) Material
Filtermedia ( 50% sSoling stone +50% 40mm metal
Soling stone of 150 mm size of granite, trap and Dolamite varieties.

cum

6.000

82.00

492.00

40-45mm HBG metal


(b) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (skilled)

cum

6.000

570.00

3420.00

196.00
196.00

1434.72
196.00

day

day

7.320

day

1.000

Page 57 of 150
S. No. Index
Code

Description of item
(c) Machinery
Water Tanker of 6 KL capacity

14

Unit

Qty

Rate

hour

0.060

345.00

0.60
0.60

394.80
394.80
Rs

20.70
5563.42
778.88
6342.30
634.23
236.88
236.88
1107.99

t
cum
cum
cum
kl

0.40
0.45
0.54
0.36
1.2

4600.00
220.00
1125.00
770.00
70.00

1840.00
99.00
607.50
277.20
84.00

day
day
day

0.10
1.39

258.00
196.00

25.80
272.44

H/cum

0.40
0.40

345.00
584.57

138.00
233.83
3577.77

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Rate per 10 cum = a+b+c+d
Rate per 1 cum =
e). Add for conveyance for Stone spalls
cum
Add for conveyance for Metal
cum
Rate per cum = (a+b+c+d+e )
RBR- Providing and laying reinforced cement concrete M25
SPST- grade (Design Mix) using 20 & 10mm metal mechanically
1
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including
overhead charges & Contractors profit but excluding VAT
& Seigniorage charges,Cost of Steel

R.C.C M 25 Grade (Design Mix) For Deck Slabs, guide


stones
Unit =cum
(i) Height up to 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

Amount

hour

14%

d) For formwork and staging refer to sub-item I (B) case I above

e) Formwork and staging of (a+b+c)

15

20.00%

f). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
g). Add for conveyance for Metal
cum
Add for conveyance for Sand
cum
Rate per cum = a+b+c+d+e+f+g
RBR- Supplying, fitting, and placing HYSD bar reinforcement in
SPST- superstructure complete as per drawing and technical
2
specifications Clauses 1002, 1010 and 1202 MORD /
1600 MORTH, for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including
overhead charges & Contractors profit but excluding VAT

0.90
0.45

14%
394.80
646.80
Rs

715.55
4293.32
601.06
355.32
291.06
5540.76

36225.00

Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage
Binding wire

1.05

34500.00

kg

8.00

52.00

416.00

711.00

(b) Labour for cutting, bending, tying and placing in position

Mate

day

Blacksmith/ Rod Binder

day

3.00

237.00

Mazdoor (Unskilled)

day

8.44

196.00

1654.24

c).

45.00

39006.24

Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

14%

39006.24
5460.87

Rate per t = a+b+c


16

Rs

44467.11

RBR- Providing and laying cement concrete wearing course M


SPST- 30 grade excluding reinforcement complete as per
5
drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead
charges and contractors profit but excluding VAT &
Seigniorage charges

Unit = cum

For Wearing coarse over Deck slab

(a) Material
Cement
Sand
20 mm aggregate
10 mm aggregate
HYSD bar reinforcement including binding wire (Rate as per item 13.2) except OH
& CP

Water
(b) Labour
Mate
Mason (1st Class)

t
cum
cum
cum
t

0.407
0.45
0.54
0.36
0.075

4600.00
220.00
1125.00
770.00
0.00

1872.20
99.00
607.50
277.20
0.00

kl

1.2

70.00

84.00

day
day

0.10

258.00

25.80

Page 58 of 150
S. No. Index
Code

Description of item

Qty

Rate

Mazdoor (Unskilled) for cleaning deck slab concrete surface

day
day

1.39
0.15

196.00
196.00

272.44
29.40

c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA.

hour
hour

0.40
0.40

345.00
584.57

394.80
646.80
Rs

138.00
233.83
3639.37
109.18
3748.55
524.80
4273.35
355.32
291.06
4919.73

Mazdoor (Unskilled)

(d) Formwork @ 3% of cost of concrete

3.00%

e). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

14%

f). Add for conveyance of metal


Add for conveyance of sand
Rate per cum = a+b+c+d+e+f
17

Amount

Unit

0.900
0.450

RBR- Construction of R.C.C. railing of M 25 grade in cast-in-situ with


SPST- 20 mm nominal size aggregate, true to line and grade,
tolerance of vertical railing post not to exceed 1 in 500, centre7

to-centre spacing between vertical posts not to exceed 2000


mm as per drawing and technical specifications Clauses 800,
900 and 1208.3 MORD. ,including overhead charges and
contractors profit but excluding VAT & Seigniorage charges

Unit = Running m
Taking output = 4x12 m
Span = 48 m
(a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 = 0.069 sqm

Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum


Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
cum

6.252

4471.66

27956.82

1.36

39006.24

53048.49

14%

11340.74

Cost for 48 m = (a+b+c )

92346.05

Rate per m = (a+b+c )/48

Rs

1923.88

1840.00

Total concrete = 1.932+4.32 = 6.252 cum


(b) HYSD bar reinforcement (Rate as per item 13.2)

81005.31

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

Sub Analysis for Rate of Concrete


(a) Material
t

0.40

4600.00

Coarse sand

cum

0.45

220.00

99.00

20 mm aggregate

cum

0.54

1125.00

607.50

10 mm aggregate

cum

0.36

770.00

277.20

kl

1.2

70.00

84.00

Cement

Water
(b) Labour
Mate

day

Mason (1st Class)

day

0.12

258.00

30.96

Mazdoor (Unskilled)

day

2.09

196.00

409.64

hour

0.40

345.00

c) Machinery
Concrete mixer 0.4/0.28 cum capacity

138.00
3486.30

d). Formwork @ 12%


Total (a+b+c+d)

12.00%

f). Add for conveyance for Metal

cum

0.90

346.32

Add for conveyance for Sand

cum

0.45

567.37

Rate per cum = a+b+c+d+e+f


18

Rs

418.36
3904.66
311.68
255.32
4471.66

P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below


approach slab complete as per drawing and technical
RBR- specifications Clauses 800 and 1211 MORD & 2700 MORTH
SPST- ,including overhead charges and contractors profit but
12 excluding VAT & Seigniorage charges

(i)

Nominal mix (1:2.5:5) / PCC M 15 using Concrete


Mixture leveling course below approach slab
Unit = cum
(a) Material
t

0.275

4600.00

1265.00

Coarse sand

cum

0.48

220.00

105.60

40 mm aggregate

cum

0.54

695.00

375.30

20 mm aggregate

cum

0.27

1125.00

303.75

10 mm aggregate

cum

0.09

770.00

69.30

Cement

Page 59 of 150
S. No. Index
Code

Description of item
Water

Unit

Qty

Rate

kl

1.2

70.00

Amount
84.00

(b) Labour
Mate

day

Mason (1st Class0

day

0.10

258.00

25.80

Mazdoor (Unskilled)

day

1.39

196.00

272.44

Concrete mixer 0.4/0.28 cum capacity

hour

0.40

345.00

138.00

Generator 33 KVA.

hour

0.40

584.57

c) Machinery

233.83
2873.02

14%

402.22

g). Add for conveyance for Metal

f). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
cum

0.90

394.80

355.32

Add for conveyance for Sand

cum

0.48

646.80

310.46

Rs

3941.02

Rate per cum = a+b+c+d+e+f+g


19

Reinforced cement concrete approach slab including formwork


complete as per drawing and Technical specification Clause

RBR- 800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH
SPST- ,including overhead charges and contractors profit but
13 excluding VAT & Seigniorage charges ,Cost of Steel

Unit = 1 cum For Approach Slab


Taking output = 1 cum
a) Material
Cement concrete M30 Grade Refer relevant item of concrete in
item 1(III) by using batching plant, excluding steel formwork i.e.
per cum basic cost (a+b+c) (Excluding OH & CP, steel
cost,deck slab cleaning ) asper Item no : 16

cum

1.00

3609.97

3609.97

b). Form Work : Refer relevant item of concrete in item No. 1(III)

cum

2.00%

3609.97

72.20

c). HYSD bar reinforcement Rate as per item No:15


(Excluding OH&CP)

0.05

0.00

except that form work may be added at the rate of 2 per cent
of cost against 3.5 per cent provided in the foundation
concrete.

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

20

e). Add for conveyance of metal


Add for conveyance of sand
Rate per cum = a+b+c+d+e
RBR- Filler Joint
SPST17
(III)
Providing and fixing in position 20 mm thick premoulded
(A) joint filler in expansion joint for fixed ends of simply
supported spans, covered with sealant complete as per
drawing and technical specifications MORD ,including
overhead charges and contractors profit but excluding
VAT
Unit = Running m
Taking output = 7.5 m
(a) Material
Premoulded joint filler 20 mm thick and 300 mm deep
(b) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)

sqm

14%

3682.17
515.50
4197.67
355.32
291.06
4844.05

0.900
0.450

394.80
646.80
Rs

2.25

732.00
q

1647.00

196.00
196.00

27.44
13.72
1688.16
236.34
256.60

day

day

0.14

day

0.07

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
21

0.00

14%
Rs

Cost for 7.5 m = a+b+c


RBR- Filler Joint

SPST17
(IV)
Providing and filling joint sealing compound as per
(A) drawings and technical specifications with coarse sand
and 6 per cent bitumen by weight MORD ,including
overhead charges and contractors profit but excluding
VAT
Unit = Running m
Taking output = 7.5 m
100 mm wide x 10 mm deep recess
(a) Material
Sand
Volume = 7.5 x 0.1 x 0.01 = 0.008 cum
Weight = 0.008 x 1400 = 11.2 kg
Bitumen-11.2 x 0.06 = 0.672 kg 60/70 (cost+convy)
(b) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)

cum

0.008

220.00

1.76

0.0007

32,135.47

22.49

196.00
196.00

101.92
19.60
145.77
20.41
22.16

day

day

0.52

day

0.10

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
Cost for 7.5 m = a+b+c

14%
Rs

Page 60 of 150
S. No. Index
Description of item
Code
22
RBR- Providing and laying boulder apron for bed protection with stone
PTWK- boulders of minimum size and weight as per Table 1300.1, no
fragment weighing less than 25 / 40 kg laid dry complete as per
1

Unit

Qty

Rate

cum

1.00

cum

0.20

165.00
34.10

day

0.00

day

0.35

day

0.79

Amount

drawing and technical specifications Clause 1301 MORD / 2503


MORTH ,including overhead charges and contractors profit but
excluding VAT & Seigniorage charges

Unit = cum
(a) Material
Stone boulder (25 kg / 40 Kg minimum)
Stone spalls
(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)

1.200

394.80
Rs

0.00
90.30
154.84
416.96
58.37
475.33
473.76
949.09

cum

1.20

156.00

187.20

day

0.00

day

0.35

day

1.05

0.00
258.00
196.00

0.00
90.30
205.80
483.30
67.66
550.96
473.76
1024.72

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

23

165.00
6.82

d). Add for conveyance of metal


Rate per cum = a+b+c+d
RBR- Jeddy Stone Dry Packing for Aprons and Revetments
PTWK- Section 1300 MORD ,including overhead charges and
contractors profit but excluding VAT & Seigniorage
1

258.00
196.00
14%

charges

Unit = cum
(a) Material
Jeddy Stone (Including small stone for wedging)
(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT )
d). Add for conveyance of metal
Rate per cum = a+b+c+d
25

14%
1.200

394.80
Rs

Providing and laying filter media underneath pitching in slope


complete as per drawing and Technical specification of
embankment complete as per Technical specifications 2504 of
MORTH. ,including overhead charges and contractors profit
but excluding VAT & Seigniorage charges

Taking output = 10 cum


(a) Material

c)

Granular material(gravel)

cum

12.00

0.00

(b) Labour
Mazdoor (Unskilled)

day

7.28

196.00

1426.88

40.00
40.00

100.00
2.00
1528.88
214.04
1742.92
4737.60
6480.52
648.05

Machinary
plate compactor/power rammer
Water tanker

hour
hour

d).

Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

e).

Add for conveyance of metal


Rate per cum = a+b+c+d+e/10

Superintending Engineer
P.R. Kurnool.

Dy. Executive Engineer


Executive Engineer
P.I.U.(P.R), Panyam.
P.I.U.(P.R) Division, Kurnool.

2.50
0.05

14%
12.000

394.80
Rs

Assistant Executive Engineer


P.I.U.(P.R), Panyam.

0.00

LEAD STATEMENT -SSR - 2010-11


Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Sl
No.

Description in Material

1
1 Gravel

Name of the Quarry

Lead in Km

3
Thammarajupalli

4
33.00

2 Sand for Blindage

Local

3 60 to 63 mm HBT Metal

Conveyance
charges including
OH,CP@14%

Initial cost of
Material

Blasting
Charges

Machine
Crushing
Charges 25%
extra on Initial
cost

Total Cost
material (6+
7+ 8)

Unit

10

294.00

50.50

50.50 1Cum

5.00

57.40

70.00

70.00 1Cum

Veldurthi road

47.00

394.80

360.00

70.00

430.00 1Cum

4 50 to 55 mm HBT Metal

Veldurthi road

47.00

394.80

390.00

70.00

460.00 1Cum

5 40 to 45 mm HBT Metal

Veldurthi road

47.00

394.80

500.00

70.00

570.00 1Cum

6 25-27mm HBT Metal

Veldurthi road

47.00

394.80

830.00

70.00

900.00 1Cum

7 19 - 22mm HBT metal

Veldurthi road

47.00

394.80

950.00

70.00

1020.00 1Cum

8 40-45mm HBG M/C Metal

Thammarajupalli

47.00

394.80

500.00

70.00

125.00

695.00 1Cum

9 25-27mm HBG M/C Metal

Thammarajupalli

47.00

394.80

830.00

70.00

207.50

1107.50 1Cum
891.88 WMM2
714.75 OGPC
66% 12-14,

3-Avg

1020.00 WMM1

4-Avg

10 19 - 22mm HBG M/C metal

Thammarajupalli

47.00

394.80

950.00

70.00

237.50

1257.50 1Cum

11 12-14 mm HBG M/C Metal

Thammarajupalli

47.00

394.80

690.00

70.00

172.50

932.50 1Cum

34% 5-

7mm

12 9.5-11.2 mm HBG M/C Metal

Thammarajupalli

47.00

394.80

560.00

70.00

140.00

770.00 1Cum

Scr.100%
607.50 Type-A
5-7mm

13 5-7 mm HBG M/C Metal

Thammarajupalli

47.00

394.80

430.00

70.00

107.50

607.50 1Cum

Scre- Avg.
501.25 Type-B
of 5-7 mm & 2.36-

14 2.36 -5 mm HBG M/C Metal

Thammarajupalli

47.00

394.80

260.00

70.00

65.00

395.00 1Cum

15 Sand for Mortor

Kurnool

82.00

646.80

220.00

16 40 mm HBG M/C Metal-SS5

Thammarajupalli

47.00

394.80

500.00

70.00

125.00

695.00 1Cum

17 20 mm HBG M/C Chips-SS5

Thammarajupalli

47.00

394.80

844.00

70.00

211.00

1125.00 1Cum

18 12 mm HBG M/C Chips-SS5

Thammarajupalli

47.00

394.80

688.00

70.00

172.00

930.00 1Cum

19 10 mm HBG M/C Metal-SS5

Thammarajupalli

47.00

394.80

560.00

70.00

140.00

770.00 1Cum

5mm

220.00 1Cum

1
2
20 2.36 mm Below Metal

3
Thammarajupalli

4
47.00

21 Jeddy stone above 450 to 600mm

6
236.00

394.80

Veldurthi road

47.00

394.80

156.00

0.00

0.00

156.00 1Cum

22 For SS revetement 300mm thick

Veldurthi road

47.00

394.80

95.00

70.00

0.00

165.00 1Cum

23 Stone spalls ( 25 to 80mm size Veldurthi road


(SS 5))
24 Soling stone of 150 mm size of granite, Veldurthi road

47.00

394.80

34.10

0.00

0.00

34.10 1Cum

47.00

394.80

82.00

0.00

0.00

82.00 1Cum

for approns

trap and Dolamite varieties.

9
10
236.00 1Cum

24

Loading manual & Unloading by


mechanical means -Metal (68.30+10.90)

89.80

89.80 1Cum

25

Loading manual & Unloading charges by


mechanical means - Gravel, Sand, earth
(34.30+10.90)

79.20

79.20 1Cum

26

Emulsion (SS-1) including 4% CST as on


1-11-2010

Chennai

490.00

1470.00

22128.83 Add4%CST

885.15

24483.98 1 MT

27

Emulsion (RS-1) including 4% CST

Chennai

490.00

1470.00

22678.04

907.12

25055.16 1 MT

28

Bitumen 60/70 grade including 4% CST

Chennai

490.00

1470.00

29486.03

1179.44

32135.47 1 MT

40.00

345.70

4885.00

0.00

866.00

183.20

2370.00

0.00

466.00

158.90

1915.00

29 1000mm Dia NP3 Class


30 1000mm Dia Collar
31 700mm Dia NP3 Class

40.00

32 700mm Dia Collar


33 600mm Dia NP3 Class
34
26
27
28

40.00

600mm Dia Collar


0.00
349.00
Rate
approved
by
GOAP
oct-10
Cement
4600.00
Steel - Fe-415
- do 34,500.00
Mild Steel
- do 34,500.00
1):- Certified that the leads provided above are true and nearest to the best of my knowledge and belief
2):- Certified that the HBG materials are procured after blasting.
3):- Water Cost Provision required for Road work and CD works ( Y/ N )
Y
Superintending Engineer,
PR,Kurnool

Executive Engineer
P.I.U(PR), Kurnool

Dy. Exe. Engineer,


P.I.U(PR),Panyam.

SC 100%
236.00 Type-B
2.36mm below

5230.70 Rm
866.00 Each
2553.20 Rm
466.00 Each
2073.90 Rm
349.00 Each
4,600.00 1 MT
34,500.00 1 MT
34,500.00 1 MT

70
Asst. Exe. Engineer,
P.I.U(PR),Panyam.

WATER COST REQUIREMENT CERTIFICATE


Name of Work : Construction of High level Bridge on road from Maddur to
Ahalyapuram
This is to certify that there is no suitable water available at work site
for construction purpose and also for curing purpose of the cement concrete work and
also for road work .Hence the water cost provision is required in this work accordingly
water cost provision is made in the data's of road work and CD work.

Superintending Engineer,
PR,Kurnool

Executive Engineer
P.I.U(PR), Kurnool

Dy. Exe. Engineer,


P.I.U(PR),Panyam.

Asst. Exe. Engineer,


P.I.U(PR),Panyam.

Lead Chart 2010-11


Lead
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

SS rate for 2010-11


Earth, Sand, Gravel
21.50
30.20
40.20
48.80
57.40
66.00
74.60
83.20
91.80
100.40
109.00
117.60
126.20
134.80
143.40
152.00
160.60
169.20
177.80
186.40
195.00
203.60
212.20
220.80
229.40
238.00
246.60
255.20
263.80
272.40
279.60
286.80
294.00
301.20
308.40
315.60
322.80
330.00
337.20
344.40
351.60
358.80
366.00
373.20
380.40

Metal, Stone
19.10
26.70
40.20
48.80
57.40
66.00
74.60
83.20
91.80
100.40
109.00
117.60
126.20
134.80
143.40
152.00
160.60
169.20
177.80
186.40
195.00
203.60
212.20
220.80
229.40
238.00
246.60
255.20
263.80
272.40
279.60
286.80
294.00
301.20
308.40
315.60
322.80
330.00
337.20
344.40
351.60
358.80
366.00
373.20
380.40

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40
639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20
704.40
711.60
718.80
726.00
733.20
740.40

387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40
639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20
704.40
711.60
718.80
726.00
733.20
740.40

96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145

747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00
1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40

747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00
1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40

146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

1107.60
1114.80
1122.00
1129.20
1136.40
1143.60
1150.80
1158.00
1165.20
1172.40
1179.60
1186.80
1194.00
1201.20
1208.40
1215.60
1222.80
1230.00
1237.20
1244.40
1251.60
1258.80
1266.00
1273.20
1280.40
1287.60
1294.80
1302.00
1309.20
1316.40
1323.60
1330.80
1338.00
1345.20
1352.40
1359.60
1366.80
1374.00
1381.20
1388.40
1395.60
1402.80
1410.00
1417.20
1424.40
1431.60
1438.80
1446.00
1453.20
1460.40

1107.60
1114.80
1122.00
1129.20
1136.40
1143.60
1150.80
1158.00
1165.20
1172.40
1179.60
1186.80
1194.00
1201.20
1208.40
1215.60
1222.80
1230.00
1237.20
1244.40
1251.60
1258.80
1266.00
1273.20
1280.40
1287.60
1294.80
1302.00
1309.20
1316.40
1323.60
1330.80
1338.00
1345.20
1352.40
1359.60
1366.80
1374.00
1381.20
1388.40
1395.60
1402.80
1410.00
1417.20
1424.40
1431.60
1438.80
1446.00
1453.20
1460.40

196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245

1467.60
1474.80
1482.00
1489.20
1496.40
1503.60
1510.80
1518.00
1525.20
1532.40
1539.60
1546.80
1554.00
1561.20
1568.40
1575.60
1582.80
1590.00
1597.20
1604.40
1611.60
1618.80
1626.00
1633.20
1640.40
1647.60
1654.80
1662.00
1669.20
1676.40
1683.60
1690.80
1698.00
1705.20
1712.40
1719.60
1726.80
1734.00
1741.20
1748.40
1755.60
1762.80
1770.00
1777.20
1784.40
1791.60
1798.80
1806.00
1813.20
1820.40

1467.60
1474.80
1482.00
1489.20
1496.40
1503.60
1510.80
1518.00
1525.20
1532.40
1539.60
1546.80
1554.00
1561.20
1568.40
1575.60
1582.80
1590.00
1597.20
1604.40
1611.60
1618.80
1626.00
1633.20
1640.40
1647.60
1654.80
1662.00
1669.20
1676.40
1683.60
1690.80
1698.00
1705.20
1712.40
1719.60
1726.80
1734.00
1741.20
1748.40
1755.60
1762.80
1770.00
1777.20
1784.40
1791.60
1798.80
1806.00
1813.20
1820.40

246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295

1827.60
1834.80
1842.00
1849.20
1856.40
1863.60
1870.80
1878.00
1885.20
1892.40
1899.60
1906.80
1914.00
1921.20
1928.40
1935.60
1942.80
1950.00
1957.20
1964.40
1971.60
1978.80
1986.00
1993.20
2000.40
2007.60
2014.80
2022.00
2029.20
2036.40
2043.60
2050.80
2058.00
2065.20
2072.40
2079.60
2086.80
2094.00
2101.20
2108.40
2115.60
2122.80
2130.00
2137.20
2144.40
2151.60
2158.80
2166.00
2173.20
2180.40

1827.60
1834.80
1842.00
1849.20
1856.40
1863.60
1870.80
1878.00
1885.20
1892.40
1899.60
1906.80
1914.00
1921.20
1928.40
1935.60
1942.80
1950.00
1957.20
1964.40
1971.60
1978.80
1986.00
1993.20
2000.40
2007.60
2014.80
2022.00
2029.20
2036.40
2043.60
2050.80
2058.00
2065.20
2072.40
2079.60
2086.80
2094.00
2101.20
2108.40
2115.60
2122.80
2130.00
2137.20
2144.40
2151.60
2158.80
2166.00
2173.20
2180.40

296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345

2187.60
2194.80
2202.00
2209.20
2216.40
2223.60
2230.80
2238.00
2245.20
2252.40
2259.60
2266.80
2274.00
2281.20
2288.40
2295.60
2302.80
2310.00
2317.20
2324.40
2331.60
2338.80
2346.00
2353.20
2360.40
2367.60
2374.80
2382.00
2389.20
2396.40
2403.60
2410.80
2418.00
2425.20
2432.40
2439.60
2446.80
2454.00
2461.20
2468.40
2475.60
2482.80
2490.00
2497.20
2504.40
2511.60
2518.80
2526.00
2533.20
2540.40

2187.60
2194.80
2202.00
2209.20
2216.40
2223.60
2230.80
2238.00
2245.20
2252.40
2259.60
2266.80
2274.00
2281.20
2288.40
2295.60
2302.80
2310.00
2317.20
2324.40
2331.60
2338.80
2346.00
2353.20
2360.40
2367.60
2374.80
2382.00
2389.20
2396.40
2403.60
2410.80
2418.00
2425.20
2432.40
2439.60
2446.80
2454.00
2461.20
2468.40
2475.60
2482.80
2490.00
2497.20
2504.40
2511.60
2518.80
2526.00
2533.20
2540.40

346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395

2547.60
2554.80
2562.00
2569.20
2576.40
2583.60
2590.80
2598.00
2605.20
2612.40
2619.60
2626.80
2634.00
2641.20
2648.40
2655.60
2662.80
2670.00
2677.20
2684.40
2691.60
2698.80
2706.00
2713.20
2720.40
2727.60
2734.80
2742.00
2749.20
2756.40
2763.60
2770.80
2778.00
2785.20
2792.40
2799.60
2806.80
2814.00
2821.20
2828.40
2835.60
2842.80
2850.00
2857.20
2864.40
2871.60
2878.80
2886.00
2893.20
2900.40

2547.60
2554.80
2562.00
2569.20
2576.40
2583.60
2590.80
2598.00
2605.20
2612.40
2619.60
2626.80
2634.00
2641.20
2648.40
2655.60
2662.80
2670.00
2677.20
2684.40
2691.60
2698.80
2706.00
2713.20
2720.40
2727.60
2734.80
2742.00
2749.20
2756.40
2763.60
2770.80
2778.00
2785.20
2792.40
2799.60
2806.80
2814.00
2821.20
2828.40
2835.60
2842.80
2850.00
2857.20
2864.40
2871.60
2878.80
2886.00
2893.20
2900.40

396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445

2907.60
2914.80
2922.00
2929.20
2936.40
2943.60
2950.80
2958.00
2965.20
2972.40
2979.60
2986.80
2994.00
3001.20
3008.40
3015.60
3022.80
3030.00
3037.20
3044.40
3051.60
3058.80
3066.00
3073.20
3080.40
3087.60
3094.80
3102.00
3109.20
3116.40
3123.60
3130.80
3138.00
3145.20
3152.40
3159.60
3166.80
3174.00
3181.20
3188.40
3195.60
3202.80
3210.00
3217.20
3224.40
3231.60
3238.80
3246.00
3253.20
3260.40

2907.60
2914.80
2922.00
2929.20
2936.40
2943.60
2950.80
2958.00
2965.20
2972.40
2979.60
2986.80
2994.00
3001.20
3008.40
3015.60
3022.80
3030.00
3037.20
3044.40
3051.60
3058.80
3066.00
3073.20
3080.40
3087.60
3094.80
3102.00
3109.20
3116.40
3123.60
3130.80
3138.00
3145.20
3152.40
3159.60
3166.80
3174.00
3181.20
3188.40
3195.60
3202.80
3210.00
3217.20
3224.40
3231.60
3238.80
3246.00
3253.20
3260.40

446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495

3267.60
3274.80
3282.00
3289.20
3296.40
3303.60
3310.80
3318.00
3325.20
3332.40
3339.60
3346.80
3354.00
3361.20
3368.40
3375.60
3382.80
3390.00
3397.20
3404.40
3411.60
3418.80
3426.00
3433.20
3440.40
3447.60
3454.80
3462.00
3469.20
3476.40
3483.60
3490.80
3498.00
3505.20
3512.40
3519.60
3526.80
3534.00
3541.20
3548.40
3555.60
3562.80
3570.00
3577.20
3584.40
3591.60
3598.80
3606.00
3613.20
3620.40

3267.60
3274.80
3282.00
3289.20
3296.40
3303.60
3310.80
3318.00
3325.20
3332.40
3339.60
3346.80
3354.00
3361.20
3368.40
3375.60
3382.80
3390.00
3397.20
3404.40
3411.60
3418.80
3426.00
3433.20
3440.40
3447.60
3454.80
3462.00
3469.20
3476.40
3483.60
3490.80
3498.00
3505.20
3512.40
3519.60
3526.80
3534.00
3541.20
3548.40
3555.60
3562.80
3570.00
3577.20
3584.40
3591.60
3598.80
3606.00
3613.20
3620.40

496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545

3627.60
3634.80
3642.00
3649.20
3656.40
3663.60
3670.80
3678.00
3685.20
3692.40
3699.60
3706.80
3714.00
3721.20
3728.40
3735.60
3742.80
3750.00
3757.20
3764.40
3771.60
3778.80
3786.00
3793.20
3800.40
3807.60
3814.80
3822.00
3829.20
3836.40
3843.60
3850.80
3858.00
3865.20
3872.40
3879.60
3886.80
3894.00
3901.20
3908.40
3915.60
3922.80
3930.00
3937.20
3944.40
3951.60
3958.80
3966.00
3973.20
3980.40

3627.60
3634.80
3642.00
3649.20
3656.40
3663.60
3670.80
3678.00
3685.20
3692.40
3699.60
3706.80
3714.00
3721.20
3728.40
3735.60
3742.80
3750.00
3757.20
3764.40
3771.60
3778.80
3786.00
3793.20
3800.40
3807.60
3814.80
3822.00
3829.20
3836.40
3843.60
3850.80
3858.00
3865.20
3872.40
3879.60
3886.80
3894.00
3901.20
3908.40
3915.60
3922.80
3930.00
3937.20
3944.40
3951.60
3958.80
3966.00
3973.20
3980.40

546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595

3987.60
3994.80
4002.00
4009.20
4016.40
4023.60
4030.80
4038.00
4045.20
4052.40
4059.60
4066.80
4074.00
4081.20
4088.40
4095.60
4102.80
4110.00
4117.20
4124.40
4131.60
4138.80
4146.00
4153.20
4160.40
4167.60
4174.80
4182.00
4189.20
4196.40
4203.60
4210.80
4218.00
4225.20
4232.40
4239.60
4246.80
4254.00
4261.20
4268.40
4275.60
4282.80
4290.00
4297.20
4304.40
4311.60
4318.80
4326.00
4333.20
4340.40

3987.60
3994.80
4002.00
4009.20
4016.40
4023.60
4030.80
4038.00
4045.20
4052.40
4059.60
4066.80
4074.00
4081.20
4088.40
4095.60
4102.80
4110.00
4117.20
4124.40
4131.60
4138.80
4146.00
4153.20
4160.40
4167.60
4174.80
4182.00
4189.20
4196.40
4203.60
4210.80
4218.00
4225.20
4232.40
4239.60
4246.80
4254.00
4261.20
4268.40
4275.60
4282.80
4290.00
4297.20
4304.40
4311.60
4318.80
4326.00
4333.20
4340.40

596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645

4347.60
4354.80
4362.00
4369.20
4376.40
4383.60
4390.80
4398.00
4405.20
4412.40
4419.60
4426.80
4434.00
4441.20
4448.40
4455.60
4462.80
4470.00
4477.20
4484.40
4491.60
4498.80
4506.00
4513.20
4520.40
4527.60
4534.80
4542.00
4549.20
4556.40
4563.60
4570.80
4578.00
4585.20
4592.40
4599.60
4606.80
4614.00
4621.20
4628.40
4635.60
4642.80
4650.00
4657.20
4664.40
4671.60
4678.80
4686.00
4693.20
4700.40

4347.60
4354.80
4362.00
4369.20
4376.40
4383.60
4390.80
4398.00
4405.20
4412.40
4419.60
4426.80
4434.00
4441.20
4448.40
4455.60
4462.80
4470.00
4477.20
4484.40
4491.60
4498.80
4506.00
4513.20
4520.40
4527.60
4534.80
4542.00
4549.20
4556.40
4563.60
4570.80
4578.00
4585.20
4592.40
4599.60
4606.80
4614.00
4621.20
4628.40
4635.60
4642.80
4650.00
4657.20
4664.40
4671.60
4678.80
4686.00
4693.20
4700.40

646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695

4707.60
4714.80
4722.00
4729.20
4736.40
4743.60
4750.80
4758.00
4765.20
4772.40
4779.60
4786.80
4794.00
4801.20
4808.40
4815.60
4822.80
4830.00
4837.20
4844.40
4851.60
4858.80
4866.00
4873.20
4880.40
4887.60
4894.80
4902.00
4909.20
4916.40
4923.60
4930.80
4938.00
4945.20
4952.40
4959.60
4966.80
4974.00
4981.20
4988.40
4995.60
5002.80
5010.00
5017.20
5024.40
5031.60
5038.80
5046.00
5053.20
5060.40

4707.60
4714.80
4722.00
4729.20
4736.40
4743.60
4750.80
4758.00
4765.20
4772.40
4779.60
4786.80
4794.00
4801.20
4808.40
4815.60
4822.80
4830.00
4837.20
4844.40
4851.60
4858.80
4866.00
4873.20
4880.40
4887.60
4894.80
4902.00
4909.20
4916.40
4923.60
4930.80
4938.00
4945.20
4952.40
4959.60
4966.80
4974.00
4981.20
4988.40
4995.60
5002.80
5010.00
5017.20
5024.40
5031.60
5038.80
5046.00
5053.20
5060.40

696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745

5067.60
5074.80
5082.00
5089.20
5096.40
5103.60
5110.80
5118.00
5125.20
5132.40
5139.60
5146.80
5154.00
5161.20
5168.40
5175.60
5182.80
5190.00
5197.20
5204.40
5211.60
5218.80
5226.00
5233.20
5240.40
5247.60
5254.80
5262.00
5269.20
5276.40
5283.60
5290.80
5298.00
5305.20
5312.40
5319.60
5326.80
5334.00
5341.20
5348.40
5355.60
5362.80
5370.00
5377.20
5384.40
5391.60
5398.80
5406.00
5413.20
5420.40

5067.60
5074.80
5082.00
5089.20
5096.40
5103.60
5110.80
5118.00
5125.20
5132.40
5139.60
5146.80
5154.00
5161.20
5168.40
5175.60
5182.80
5190.00
5197.20
5204.40
5211.60
5218.80
5226.00
5233.20
5240.40
5247.60
5254.80
5262.00
5269.20
5276.40
5283.60
5290.80
5298.00
5305.20
5312.40
5319.60
5326.80
5334.00
5341.20
5348.40
5355.60
5362.80
5370.00
5377.20
5384.40
5391.60
5398.80
5406.00
5413.20
5420.40

746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795

5427.60
5434.80
5442.00
5449.20
5456.40
5463.60
5470.80
5478.00
5485.20
5492.40
5499.60
5506.80
5514.00
5521.20
5528.40
5535.60
5542.80
5550.00
5557.20
5564.40
5571.60
5578.80
5586.00
5593.20
5600.40
5607.60
5614.80
5622.00
5629.20
5636.40
5643.60
5650.80
5658.00
5665.20
5672.40
5679.60
5686.80
5694.00
5701.20
5708.40
5715.60
5722.80
5730.00
5737.20
5744.40
5751.60
5758.80
5766.00
5773.20
5780.40

5427.60
5434.80
5442.00
5449.20
5456.40
5463.60
5470.80
5478.00
5485.20
5492.40
5499.60
5506.80
5514.00
5521.20
5528.40
5535.60
5542.80
5550.00
5557.20
5564.40
5571.60
5578.80
5586.00
5593.20
5600.40
5607.60
5614.80
5622.00
5629.20
5636.40
5643.60
5650.80
5658.00
5665.20
5672.40
5679.60
5686.80
5694.00
5701.20
5708.40
5715.60
5722.80
5730.00
5737.20
5744.40
5751.60
5758.80
5766.00
5773.20
5780.40

796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845

5787.60
5794.80
5802.00
5809.20
5816.40
5823.60
5830.80
5838.00
5845.20
5852.40
5859.60
5866.80
5874.00
5881.20
5888.40
5895.60
5902.80
5910.00
5917.20
5924.40
5931.60
5938.80
5946.00
5953.20
5960.40
5967.60
5974.80
5982.00
5989.20
5996.40
6003.60
6010.80
6018.00
6025.20
6032.40
6039.60
6046.80
6054.00
6061.20
6068.40
6075.60
6082.80
6090.00
6097.20
6104.40
6111.60
6118.80
6126.00
6133.20
6140.40

5787.60
5794.80
5802.00
5809.20
5816.40
5823.60
5830.80
5838.00
5845.20
5852.40
5859.60
5866.80
5874.00
5881.20
5888.40
5895.60
5902.80
5910.00
5917.20
5924.40
5931.60
5938.80
5946.00
5953.20
5960.40
5967.60
5974.80
5982.00
5989.20
5996.40
6003.60
6010.80
6018.00
6025.20
6032.40
6039.60
6046.80
6054.00
6061.20
6068.40
6075.60
6082.80
6090.00
6097.20
6104.40
6111.60
6118.80
6126.00
6133.20
6140.40

846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895

6147.60
6154.80
6162.00
6169.20
6176.40
6183.60
6190.80
6198.00
6205.20
6212.40
6219.60
6226.80
6234.00
6241.20
6248.40
6255.60
6262.80
6270.00
6277.20
6284.40
6291.60
6298.80
6306.00
6313.20
6320.40
6327.60
6334.80
6342.00
6349.20
6356.40
6363.60
6370.80
6378.00
6385.20
6392.40
6399.60
6406.80
6414.00
6421.20
6428.40
6435.60
6442.80
6450.00
6457.20
6464.40
6471.60
6478.80
6486.00
6493.20
6500.40

6147.60
6154.80
6162.00
6169.20
6176.40
6183.60
6190.80
6198.00
6205.20
6212.40
6219.60
6226.80
6234.00
6241.20
6248.40
6255.60
6262.80
6270.00
6277.20
6284.40
6291.60
6298.80
6306.00
6313.20
6320.40
6327.60
6334.80
6342.00
6349.20
6356.40
6363.60
6370.80
6378.00
6385.20
6392.40
6399.60
6406.80
6414.00
6421.20
6428.40
6435.60
6442.80
6450.00
6457.20
6464.40
6471.60
6478.80
6486.00
6493.20
6500.40

896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945

6507.60
6514.80
6522.00
6529.20
6536.40
6543.60
6550.80
6558.00
6565.20
6572.40
6579.60
6586.80
6594.00
6601.20
6608.40
6615.60
6622.80
6630.00
6637.20
6644.40
6651.60
6658.80
6666.00
6673.20
6680.40
6687.60
6694.80
6702.00
6709.20
6716.40
6723.60
6730.80
6738.00
6745.20
6752.40
6759.60
6766.80
6774.00
6781.20
6788.40
6795.60
6802.80
6810.00
6817.20
6824.40
6831.60
6838.80
6846.00
6853.20
6860.40

6507.60
6514.80
6522.00
6529.20
6536.40
6543.60
6550.80
6558.00
6565.20
6572.40
6579.60
6586.80
6594.00
6601.20
6608.40
6615.60
6622.80
6630.00
6637.20
6644.40
6651.60
6658.80
6666.00
6673.20
6680.40
6687.60
6694.80
6702.00
6709.20
6716.40
6723.60
6730.80
6738.00
6745.20
6752.40
6759.60
6766.80
6774.00
6781.20
6788.40
6795.60
6802.80
6810.00
6817.20
6824.40
6831.60
6838.80
6846.00
6853.20
6860.40

946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995

6867.60
6874.80
6882.00
6889.20
6896.40
6903.60
6910.80
6918.00
6925.20
6932.40
6939.60
6946.80
6954.00
6961.20
6968.40
6975.60
6982.80
6990.00
6997.20
7004.40
7011.60
7018.80
7026.00
7033.20
7040.40
7047.60
7054.80
7062.00
7069.20
7076.40
7083.60
7090.80
7098.00
7105.20
7112.40
7119.60
7126.80
7134.00
7141.20
7148.40
7155.60
7162.80
7170.00
7177.20
7184.40
7191.60
7198.80
7206.00
7213.20
7220.40

6867.60
6874.80
6882.00
6889.20
6896.40
6903.60
6910.80
6918.00
6925.20
6932.40
6939.60
6946.80
6954.00
6961.20
6968.40
6975.60
6982.80
6990.00
6997.20
7004.40
7011.60
7018.80
7026.00
7033.20
7040.40
7047.60
7054.80
7062.00
7069.20
7076.40
7083.60
7090.80
7098.00
7105.20
7112.40
7119.60
7126.80
7134.00
7141.20
7148.40
7155.60
7162.80
7170.00
7177.20
7184.40
7191.60
7198.80
7206.00
7213.20
7220.40

996
997
998
999
1000

Loading
Unloading

7227.60
7234.80
7242.00
7249.20
7256.40

7227.60
7234.80
7242.00
7249.20
7256.40

34.30
10.90

68.30
10.90

COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS


Name of the work

Name of Work : Construction of High level Bridge


on road from Maddur to Ahalyapuram

1 Vent RCC NP3 pipe culvert (1000mm dia)


Type of Cross Drainage work:
Estt.Cost.Rs.
Sl.
No.

Description of Item

No

Length (m) Width(m)


4

Thinkness(
Quantity Rate (Rs) unit per
m)

Head Walls

8.00

1.40

1.500

33.600

Bedding for pipes

17.30

1.40

1.200

29.064
62.664

Amount
(Rs)
10

59.29

1 cum

3715.00

3375.14

1 cum

41482.00

4044.81

1 cum

142863.00

Providing concrete for plain concrete M 10 grade in open


foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as
per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead
charges & Contractors profit but excluding VAT.
Head Walls

8.00

1.40

0.300

6.720

Bedding for pipes

17.30

1.40

0.230

5.571

NET :
3

Lakhs

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material
as per Technical Specification 305 MORD / 304 MORTH ,including
overhead charges & Contractors profit but excluding VAT.

NET :
2

3.15

12.291

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT.
2

8.00

(1.3+0.4)/2

2.500

34.000

Head Walls parapet wall 2


Deductions:

8.00

0.40

0.450

2.880

1000 MM Dia vent PC

3.14 X (1.15X1.15) X 0.75 / 4

Head Walls Sloped

NET :

-1.560
35.320

Providing and laying reinforced cement concrete pipe NP3 for


culverts on first class bedding of granular material including fixing
collar with cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head wall and
parapets. Tech Specification Clause 1106 MORD ,including
overhead charges & Contractors profit but excluding VAT.
1 - VENT- 1000MM PC

20.00

20.000

6324.10

1 cum

126482.00

Rs

458.00
315000.00

Unforseen items
TOTAL :

Superintending Engineer,
PR,Kurnool

Executive Engineer
P.I.U(PR), Kurnool

Dy. Exe. Engineer,


P.I.U(PR),Panyam.

Asst. Exe. Engineer,


P.I.U(PR),Panyam.

DESIGN CALCULATIONS OF RCC PIPE CULVERT.


CONSTRUCTION OF 1 VENT 1000 mm

DIA RCC PIPE CULVERT

(FOR ABOVE DIA C.D.WORKS - AVERAGE AREA OF FLOW IS WORKED OUT AT STREAM LOCATION FOR DESIGN )

Name of Work : Construction of High level Bridge on road from Maddur to Ahalyapuram
Discharge ( Qf ) through the stream considering the Velocity ( Vf ) and area of the stream
Area of the Stream ( Af )

Velocity of flow in Stream ( Vf )

Discharge( Qf )
Discharge( Qf )

=
=

Velocity through RCC Pipes ( Vp )

Area of flow ( Af )
Area of flow ( Af )

=
=

Qf
1.701

/
/

Area of the

0.79

1.000 X

0.567

0.785

1000 mm dia pipes( Ad )

No. of Vents required ( Nos )

( 4.20

1.20 )1/

Af
1.22

X
X

Dia of pipe
1.000

=
=

Vf
1.40

Superintending Engineer, Executive Engineer


PR,Kurnool
P.I.U(PR), Kurnool

1.7

Cum/s
ec

Vp
3.00

0.57

Sqm

1.000

Nos
Vent.

Ht of filling above pipe (Minimum=0.45m)

2.000

( 2H ) + ( dia X No. of vents ) + ( 0.30 )


=
=

0.79

= 0.72
Nos -

3.000

= 2(
=

Sqm

VENT of 1000 mm dia pipe for pipe culvert.

Length of the body wall ( L )

= 1.22

3.00 m/sec.

Height of banking above Bed Level ( H )

0.45

1.40 m/sec.

or say
Hence provide ,

3.000 ) + (
(

1.000

1 ) + ( 0.300

6 ) + ( 1.000 ) + (
0.300 )
7.300
Or say Provide
8.00 m (minimum length)

Dy. Exe. Engineer,