You are on page 1of 38

TRANSMISSION LINE PROTECTION

20 December 2010 Protection Courses 1

TUTORIAL SCOPE
1. FUNDAMENTALS 2. CHARACTERISTICS 3. POLARIZATION 4. ZONES SETTING CRITERIA 5. MHO VS QUADRILATERAL 6. SWITCH ON TO FAULT 7. POWER SWING BLOCKING/TRIPPING
20 December 2010 Protection Courses 2

TUTORIAL SCOPE
8. LOAD ENCROACHMENT 9. LOSS OF POTENTIAL 10. UNIT PROTECTION 11. PERMISSIVE UNDER REACH 12. PERMISSIVE OVER REACH 13. CARRIER BLOCKING 14. CURRENT REVERSAL
20 December EXTENSION Protection Courses 15. ZONE 1 2010 3

TUTORIAL SCOPE
16. WEAK IN-FEED 17. SERIES COMPENSATION 18. MUTUAL COMPENSATION 19. AUTO RECLOSER 20. STUB PROTECTION 21. CCVT TRANSIENT 22. DIRECTIONAL EARTH FAULT
20 December 2010 Protection Courses 4

MHO

MHO CHARACTERISTICS
20 December 2010 Protection Courses 5

MHO CHARACTERISTICS

20 December 2010

Protection Courses

Quadrilateral

QUADRILATERAL CHARACTERISTICS
20 December 2010 Protection Courses 7

OFFSET MHO CHARACTERISTICS

20 December 2010

Protection Courses

20 December 2010

Protection Courses

POLARIZATION METHODS
SELF POLARIZATION Terminal faults will not cover CROSS POLARIZATION Use other healthy phase voltages Terminal three phase fault will not cover MEMORY POLARIZATION Covers all type of faults
20 December 2010 Protection Courses 10

VRB VB VBY VY VYR VR

POLARIZATION METHODS

20 December 2010

Protection Courses

11

ZONES SETTING CRITERIA


S/Stn 1 S/Stn 2 S/Stn 3

Time

Relay A

Relay B

Relay C

Relay D

Zone 3R

Zone 1

Zone 2

Zone 3F

Zone 2

Zone 3R Zone 1

Zone 3R

Zone 1

Zone 2

Zone 3

Zone 2

Zone 1

Zone 3R

20 December 2010

Protection Courses

12

ZONES SETTING CRITERIA

X
A B C

Zone 4 Zone 1 Zone 2 Zone 3

20 December 2010

Protection Courses

13

SWITCH ON TO FAULT
SWITCH ON TO FAULT. Failure to remove Earth Clamps after CB Maintenance Practically Zero Impedance in fault path. Fault Point is at the Origin - Boundary condition for Zones 1 & 2 For a 3-Phase fault, cross-polarising will have no effect

SOTF Fault Point

20 December 2010

Protection Courses

14

SOTF ALGORITHMS
AC SOTF - Used where VT is on LINE SIDE of the CB IF Current and Voltage have been Dead for 10 Secs AND the Current Rises ABOVE 30% of Nominal AND Voltage remains BELOW 20% of Nominal THEN Remove the Time Delay from Zone 3 AND Allow tripping on Overcurrent only FOR 200ms DC SOTF - Used where VT is on BUSBAR SIDE of the CB When Circuit Breaker Manual Close Handle is Operated Remove the Time Delay from Zone 3 FOR 400ms (Longer delay allows for CB Closing time)
20 December 2010 Protection Courses 15

Power Swing Outer boundary If the System Impedance Remains in the Power Swing Detection Zone for longer than the PSD Transit Time (Nominally 50 ms) POWER SWING ALARM will Operate Power Swing Inner
Zone 3

boundary Power swing locus


Transit time

Zone 2

Zone 1

20 December 2010

POWER SWING DETECTION & BLOCKING


Protection Courses

16

POWER SWING DETECTION & BLOCKING

20 December 2010

Protection Courses

17

LOAD ENCROACHMENT

20 December 2010

Protection Courses

18

LOSS OF POTENTIAL

20 December 2010

Protection Courses

19

Operation of Zone 1 sends signal to remote end Instantaneous trip if Zone 1 Operation Zone 2 + Signal from Remote end
S/Stn 1

SIGNALLING CHANNEL REQUIRED BETWEEN ENDS

PERMISSIVE UNDER REACH


S/Stn 2

Relay A

Signalling Channel
Zone 2 Carrier Aided Trip

Relay B

Relay C

Time

Zone 2 Time Delayed Trip

Distance

Zone 1 (No Operation)

Zone 2

Zone 1

Distance

ALLOWS INSTANTANEOUS TRIPPING OVER 100% OF THE LINE LENGTH


20 December 2010 Protection Courses 20

Instantaneous Operation of Zone 2 sends signal to remote end Instantaneous trip if Zone 1 Operation Zone 2 + Signal from Remote end
SIGNALLING CHANNEL REQUIRED BETWEEN ENDS

PERMISSIVE OVER REACH


S/Stn 1 S/Stn 2
Relay A

Signalling Channel
Zone 2 Carrier Aided Trip

Relay B

Relay C

Time

Zone 2 Time Delayed Trip

Distance

Zone 1 (No Operation) Zone 2 Instantaneous Zone 1

Zone 2

Distance

ALLOWS INSTANTANEOUS TRIPPING OVER 100% OF THE LINE LENGTH


20 December 2010 Protection Courses 21

Operation of Zone 4 sends blocking signal to remote end Instantaneous trip if Zone 1 Operation Zone 2 + No blocking Signal from Remote end WITHIN the Permissive Trip Time
S/Stn 1

BLOCKING SCHEME
SIGNALLING CHANNEL REQUIRED BETWEEN ENDS

S/Stn 2

Relay A

Signalling Channel
Zone 2 Carrier Aided Trip

Relay B

Relay C

Time

Distance

Zone 1 (No Operation)

Zone 2

Zone 1

Zone 4 - Blocking

Distance

ALLOWS INSTANTANEOUS TRIPPING OVER 100% OF THE LINE LENGTH


20 December 2010 Protection Courses 22

Operation of Zone 4 sends blocking signal to remote end Instantaneous trip if Zone 1 Operation Zone 2 + NO BLOCKING SIGNAL from Remote End WITHIN the Permissive Trip Time
S/Stn 1

SIGNALLING CHANNEL REQUIRED BETWEEN ENDS

BLOCKING SCHEME
Signalling Channel
Zone 2 Carrier Aided Trip

S/Stn 2

Relay A

Relay B

Relay C

Time

Distance

Zone 1 (No Operation)

Zone 2

Zone 1

Distance

Zone 4 - Blocking (No Operation)

ALLOWS INSTANTANEOUS TRIPPING OVER 100% OF THE LINE LENGTH


20 December 2010 Protection Courses 23

CURRENT REVERSAL

20 December 2010

Protection Courses

24

CURRENT REVERSAL

20 December 2010

Protection Courses

25

CURRENT REVERSAL

20 December 2010

Protection Courses

26

No Signalling used between ends Used with Auto-Recloser only Results in More Breaker Operations
S/Stn 1
Gives improved fault clearance time for fault @ this position

S/Stn 2

Will trip CB @ 'A' for fault @ this position

S/Stn 3

Relay A

Relay B

Relay C

Relay C

Time

Trip Reclose

Zone 1 Ext
Distance

Zone 1

Zone 2

Zone 3F
Distance

ZONE 1 EXTENSION SCHEME


20 December 2010 Protection Courses 27

WEAK IN FEED LOGIC

20 December 2010

Protection Courses

28

SERIES COMPENSATION
Used to increase load capacity Improve power system stability Improve load division on parallel paths Reduce transmission losses

20 December 2010

Protection Courses

29

Voltage reversal

SERIES COMPENSATION

20 December 2010

Protection Courses

30

Ia Double Circuit Line ZMO Fault

Ib

COUPLINGBETWEENLONGLINESCANHAVEASIGNIFICANTEFFECTONDISTANCE PROTECTIONMEASUREMENT ONLYAFFECTSZEROSEQUENCECOMPONENT(PPSANDNPSCOMPONENTSARE BALANCEDANDTHEREFORESUMTOZERO)

IFRELAYNOTCOMPENSATEDFOREARTHRETURNANDMUTUALEFFECTSZ1 WILLBEOVER ESTIMATEDANDTHERELAYWILLUNDERREACH

MUTUAL COMPENSATION 1
20 December 2010 Protection Courses 31

MUTUAL COMPENSATION 2

When one of the lines is out of service and earthed at both ends Energise a Status Input SWITCH TO ALTERNATE SETTINGS group

ALTERNATE SETTING GROUP uses Increased Earth Fault Compensation Factor to take account of the Zero Sequence Mutual Coupling due to the parallel line

20 December 2010

Protection Courses

32

CCVT TRANSIENT

20 December 2010

Protection Courses

33

Distance element may over reach CCVT Trans. Reduce the fundamental component of the fault voltage results in decrease in the calculated impedance High capacitance reduced transient effect Passive Ferro-resonance reduced transient effect

CCVT TRANSIENT

20 December 2010

Protection Courses

34

CCVT TRANSIENT
20 December 2010 Protection Courses 35

Unrestricted Characteristic Operates for any fault current above setting in selected direction

X
Detects high impedance earth faults Operate quantity - residual current Polarising quantity - residual voltage Line Angle

DIRECTIONAL EARTH FAULT 1


20 December 2010 Protection Courses 36

DUAL DIRECTIONAL EARTH FAULT


X
TWO Unrestricted Characteristics Common Line Angle Setting Different Operating Current Settings Forward DEF Operates on Current above FWD setting in FORWARD direction Reverse DEF Operates on Current above REV setting in REVERSE direction Forward DEF

Line Angle

Reverse DEF

20 December 2010

Protection Courses

37

DIRECTIONAL EARTH FAULT 2


Discrimination using DTL or IDMTL Time Grading (DEF Direct Trip) OR High Speed operation using a Signalling Channel (DEF POR)

Operation of both DEF elements allows instantaneous tripping

If no Signalling Channel is available OR Signalling Channel fails RELAY CAN OPERATE AS BACK-UP TIME GRADED OVER CURRENT
20 December 2010 Protection Courses 38