Breaks Training & Education Preventive maintenance Productive time/day Avg working days/month Productive/month Total productive time Production & assembly Setup Full compensation/month (other than engineers) Total compensation Cost/hour Machines NR of machines Hours/shift Total nr of hours Operating expense Total per hour Receiving & production control NR of people Time per batch Total compensation/month Productive time/shift Total productive time Cost/hour Packing & shiping Time per shipment Bubble wrap & pack Total nr of people Total compensation/month Productive time/shift Total productive time Cost/hour Engineers NR of engineers Cost/month Productive work/shift Total compensation/month Total productive time Cost/hour
0.25 2 7.5 45 15 0.5 0.5 0.5 6 20 120 14400 10800 3600 3900 468000 32.5
Materials / unit Components/unit Nr of comp 1 Price of comp 1 Nr of comp 2 Price of comp 2 Nr of comp 3 Price of comp 3 Materials cost/unit Direct labor/unit Machine hours/unit Setup hours/run Production (units) Machine hours Production runs Setup hours Nr of shipments Hours of engineering work Direct labour Total nr of hours Total direct labour cost Setup hours Total nr of setup hours Total setup cost Assembly & setup workers
Machine hours Total nr of hours Total nr of setup hours Total machine hour cost Receiving & production control Batches Total nr of hours used Total receiv & prod cost Packing & shiping Nr of shipments Production (units) Cost per shipment Cost per product Total nr of hours used Total shipment cost Engineers Hours of engineering work Total cost of engineering work Product P&L/unit Actual selling price Direct material cost Total direct labour cost Contribution margin Total setup cost Total machine hour cost Total receiv & prod cost Total shipment cost Total cost of engineering work Manufacturing overhead Profit per unit (pre-tax) Gross margin (%) Product P&L Total Revenue Direct material cost Total direct labour cost Contribution margin Total setup cost Total machine hour cost
Total receiv & prod cost Total shipment cost Total cost of engineering work Manufacturing overhead Gross margin Gross margin (%) Costs of overcapacity Total setup cost Total machine hour cost Total receiv & prod cost Total shipment cost Total cost of engineering work Total cost of overcapacity SG&A Operating income before tax
Valves 4 2 2 2 6
Pumps 5 3 2 2 7
Flow controllers 10 4 1 5 2 1 8 22 0.4 0.3 12 4000 1200 225 2700 200 600
Time used
Excess capacity
2850 92625
6250 203125
1600 52000
10700
100 3250
600 19500
2700 87750
3400
14100
300
14600
280
20 25 750
431.25
88.75
3483
157
60 4875
240 19500
600 48750
900
60
79.00 16.00 12.35 50.65 0.43 11.55 0.10 4.13 0.65 16.87 33.78 43%
70.00 20.00 16.25 33.75 1.56 12.33 0.30 4.20 1.56 19.95 13.80 20%
95.00 22.00 13.00 60.00 21.94 21.94 2.11 5.25 12.19 63.42 -3.42 -4%
12938 104500 73125 629563 412188 22% 9750 6300 2662.5 4700 4875 28288 350000 33900
m(
2.1%
1.9%
17.1%
4.3%
6.3%