Professional Documents
Culture Documents
AGENDA REPORT
TO VIA
City Council
Phil
FROM
Departments
SUBJECT
Introduction of FY2011 and FY2012 Operating Budget and FY2012 Financial Plan 12 2017 13 and Capital Improvement Program and Revised Budget for FY2010 Third Quarter Financial 11
Update
BACKGROUND
Year City of Encinitas and San Dieguito Water District adopt a Two Operating Budget and for all funds Year Six Financial Plan Improvement Program Capital City staff currently monitors a total of 62 funds the General Fund is the City largest and most discretionary fund s and pays for many general governmental activities such as law enforcement fire protection parks beaches and street maintenance The two year budget is a detailed document that outlines the proposed revenue and expenditure plans for each Department over the next two years The year six financial plan improvement program is a longer term plan developed to capital demonstrate fiscal sustainability and to plan for the construction and replacement of infrastructure and other capital assets The The
year year two budget White Binder and six financial plan and capital improvement program are attached as separate documents and can also be obtained on the City website Black Binder s
org ctyofencinitas www Meetings are scheduled to allow the Council budget and financial plan as follows April 27
2011
to receive
the
proposed
12 13 Operating Budget FY2011 and 2012 2017 Capital Plan Improvement Program FY2012
May 25
2011
Continued Review Discussion and Adoption of 12 Year Two Operating Budget FY2011 and 2012 13 Financial Plan ital Improvement Program FY2012 Ca 2017
ITEM J1
BUDGET PROCESS 07 Budgeting ZBB process in fiscal year 2006 ZBB is an contained activities are evaluated in a self approach budgeting budget year s with little or no weight given to the precedents of past years ZBB is contrasted to fashion incremental budgeting in which the budget justification is focused on the difference between the current year and the budget year In ZBB historical information may be useful for assessing trends but does not provide the justification for future expenditures
a
The
Zero Based
in which each
required to develop quarterly spending plans that anticipate expensed This process drives productivity reinforces budgeted allows for early identification of potential budget savings and allows for timely accountability or effective response to changing condition and priorities As a cost measure Department Heads are required to justify each position with the City Manager before filling a vacancy
when items will be
The
is balanced in all
years six
maintains all reserves at the target levels established in the Council Reserve Policy This has been s s accomplished by developing realistic budget assumptions while focusing on the Council highest
priorities providing
of
the
s City
core
ANALYSIS
s City largest
and most
discretionary
fund
The
projected ending
fund
12 7 by the end of the current fiscal year 14 million in FY2011 and 13 million in FY2012 Revenues are projected to increase by 2 to 52 million in FY2011 13 4 12 8 and 1 to 53 million in FY2012 Operating expenditures increase 5 to 48 million in 13 4 6 balance is 17 million
12 FY2011 and 2 to 49 million in FY2012 6 13 9
Nearly
an
expenditures
Fund
This transfer of expenditures is offset by a correlating transfer of from the Gas Tax Fund to the General Fund which as shown as a Transfer In
Factoring out this accounting change General Fund operating expenditures are increasing 3 The 12 8 General Fund is contributing 3 million to the capital program in FY2011 and 1 million in 13 FY2012 The debt service payment is 3 million in FY2011 debt ratio of 7 and 3 12 8 6 3 million in FY2012 debt ratio of 6 13 7
San The
Dieguito
Water District
proposed budget
projected
at
12 13 3 15 million in FY2011 and 16 million in FY2012 There is an unmet revenue 12 13 Overall 6 0 million in FY2011 and 1 million in FY 2012 9 requirement of are projected at 17 million in FY2011 and 17 million in FY2012 12 13 The 6 expenditures 3 12 projected combined ending fund balance is 8 million in FY2011 and 6 million in
13 FY2012
The
budget projections
a rate
include
an
operating cash
flow reserve
capital
replacement
reserve and
stabilization
reserve
ITEM J1
Attachment D
General
funds the City has 56 other funds Government Infrastructure Grant Development categories including Impact Lighting and Landscape Affordable Housing Encinitas Public Finance Authority Cardiff Sanitary Division Encinitas Sanitary Division and Internal Service Funds The set of financial plans for all funds is included in the Draft FY2011 12 through FY complete 17 2016 Financial Plan Black Binder Distributed to Council and available on the City s Website
in various
Personnel Attachment E
time E T employees is measured in full equivalent F units One F works E T hours per year a half employee working 1 hours per year counts as time time 080 2 040 5 T 0 F There are currently 236 F The proposed budget reflects a slight reduction E 9 T s E to 236 F The City position classification system is divided into three occupational 85 T s E s and each year the Human Resources Division conducts a classification categories job families maintenance review of one of the three categories full
The number of
Fee
At Council s
direction Staff has been reviewing various City fees including Development fees Building fees and the Internal Cost Allocation Plan The proposed two Processing year
operating budget
current
includes
fees items
The
is update to the assumptions of development activity but based on proposed fee changes and internal cost allocation are discussed in separate
an
agenda
Adjustments
11 City Manager has completed the Third Quarter Review of the current fiscal year 2010 the following changes to the SDWD revenue and expenditure assumptions proposing
Due to above normal regional rainfall during FY2010 the San Dieguito Water 11 District has been able to rely more heavily on its local water supply than originally
supply when possible has proven to be cheaper regional water wholesaler the San Diego County Water As a result of these favorable conditions the District has not had to purchase as much water from SDCWA as anticipated during the FY2010 budget 11 and is experiencing considerable savings related to Water Purchases Therefore the District is proposing to reduce expenditures related to Water Purchases by 1 000 000 in FY2010 as part of a 3 Quarter budget adjustment 11 d anticipated Utilizing purchasing water Authority SDCWA
than from the Another
water
11 impact of the increased regional rainfall during FY2010 has been decreased customers and a corresponding reduction in water sales by the consumption by
ITEM J1
District
water
sales the District anticipates being under its original sales projection and is proposing to reduce revenue projections in this category by
Due to decreased water
000 500
significant decrease in recycled water sales due to recent feet projected selling 700 acre AF this year based upon our take contract with the San Elijo Joint Powers Authority SEJPA Actual sales are pay or projecting to be closer to approximately 500 AF this year Therefore the District is 000 proposing a 160 reduction to its revenue projection for Recycled Water Sales
seen a
000 finally the District is returning approximately 100 in excess CIP funds to fund balance by closing out three completed projects The completed projects are the Arroyo Drive Pressure Reducing Valve Stations project the San Dieguito Water District Master Plan work project and the San Dieguito Water District Security Upgrades project
And All current year changes appear in the attached Schedule A Attachment are included in the proposed FY2012 Six Financial Plan 2017 Year
Description of Budget
A
summary of all City and District budgets including the beginning fund balance projected revenues proposed expenditures transfers to and from other funds and the projected ending fund balance is attached to this agenda report Attachment A Attachment B is a summary of the General Fund expenditures by Department and Division These budget summaries are also 12 13 included in Chapter 2 of the FY2011 and FY2012 Operating Budget Financial Summaries Graphs and Charts White Binder Attachments C and D of this agenda report discuss significant changes to General Fund Encinitas Sanitary Division Cardiff Sanitary Division and San Dieguito Water District revenue projections and expenditure proposals A s list of all revenues by fund is included in the draft budget document White Binder in Chapter 3 Revenue Detail Proposed expenditure plans for each fund and division are in Chapter 4 Expenditure Detail More detailed information about revenues and expenditures plans of the San Dieguito Water District as well as goals and accomplishments can be found in Chapter 5 San Dieguito Water District of the draft budget document
A
complete
a
Council in
copy of the proposed Capital Improvement Program is distributed to the separate binder Black Binder and is summarized in Attachment F
City
RECOMMENDATION
Provide direction
anticipation
Approve
of adoption of the
of Encinitas and
Third
proposed Operating Budgets and Capital Improvement Program in Operating Budget and Capital Improvement Program for the City the San Dieguito Water District on May 25 2011
on
the
Quarter adjustments
as
as
outlined in this
l 1 Schedule A attached
Attachment A
in FY2010
ITEM J1
ATTACHMENTS
Attachment A
Attachment B
Attachment C
Budget Summary
s City General
Discussion
on
of All
City
Schedule A
Divisions
Fund
Summary by Department
Schedule C
Attachment D
Other City Funds including the Cardiff Sanitary Division Encinitas Sanitary Division and the San Dieguito Water District
Discussion
on
Attachment E
Attachment F
Summary
of Personnel
ITEM J1
10
A
310 2 697861
367
0
0
283 73 9763 2
0
1758 19
0
4 29750 941
107 04 26801827
Atachmen
3458
570 10 1 17
0
0 0
63
930 4 240641
0 0 0
192 28
0 0
10750
0
304182 9036
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
393218
0 0
0 0 0 0 0 0 0 0 0 0 0
3062 3
0 0 0 0 0 0 0 0 0 0 0
3998 2
0 0
3905 4635 9
0
0 0 0 0 0 0 0 0 0
J1
500
0
Adjustmen
Quarte
A
15841 9132
0
1096783
367
0
9 3637 5 164 3140 3 1420 03 1034 0 597302 3451 4 2225 5 4075 3 151324 1180 1 67032
57968 ITEM
61751
5386109 8630 170 0 15841 1029 1014730 69943 693851 128 72 253418 Revnue Projectins 3rd 2010 262 119 72 32193 69507 7261 2708 3 274162 458236 53708 1943 943751 F1Y20 Adjusted Fund Balnce 17061 82
3
2
1
1521 70 1154981
0
246 7 9 16254 3541 74 824605 62207 565 3062 3 430 290641 3998 2
0 0
63
July
7 4 8 3 771 120385 20194 556 4 7641 146 705 691 52017 34 12405 25 28 26314 4508 890 93124 21780
231 234 232 233 235 236 237 238 239 241 272
Schedul
FUND
CTS
Fund
Grant
DISTRI
10
A
649723 7875 9 3669 4 1627 8 9768534 380784 2194 45 1091 94 9805 6802 2
0 0 0 0
0
184652 6135852
0 0 0
0 0
561970
Atachment
3458
178562 178562
0 0
195413 195413
393218 329318 78103 78103
0 0 0 0 0 0 0 0 0 0 0 0
125956 125956
0 0 0 0 0 0 0
560482 765482
0
0
2050
0 0 0 0
1670869 508418
0 0
1725368 1725368
0
0 0
1 37
0 0
0 0
1 37
0 0 0 0
J1
0 0 0 0
0
Quarte
3rd
Adjustmen
Aproved Expenditurs
Revnue Projectins
Adjusted Balnce July
Fund 2010
1
41368 41368 267892 308650 78403 65492 1503245 90452 24076 106018 2347876 1725368 50 0 175342 240813 240813 94612 48703 23172 160948 120 0 2706842 8645160
0
ITEM
28103 28103
0
904609 529739
F1Y20
A
Schedul
FUND
AUTHORIY
321
FUNDS
FUNDS
FUNDS
10
A
39850 107569
0
256097 52719
0
472 2 60480
162
296
7382 3 567 0
0
16237
Atachment
3458
296
32
513 87 2 649
45160
3735680 1185074
27 74 10530
2808
86940
3847516
0
374516
132094
10 0
1872 2 6490 2
128624
10523 1318085
162
4635 9
0 0 24674 17342 19862 1215 8 607294 4816 8 49602 593 100
600
J1
0 7 3428 8 173 2776 5 1327 983 59321
F1Y201
Propsed
A
Revnue Projectins 54230265 170482 174672 1325851 1670 49 62092 1731 63 2538 201 248735 1518074 521354 7261 79283 2909 256097 34692 2310 697861 Adjusted Fund Balnce 1950698
0
8605 471346
0 0
517
0 100
0 0
5 5 17687 28038 13550 47158 81315 324 1872 2 213 6574 9 6490 2
0
32
7382 3 9763 2
July
4 85 1 4 829 527 1895 2 1758 19 661 1375 0 654 510867 2392 16347 20589 213614 29750 941 104 07
231 234 232 233 235 236 237 238 239 241 272
FUND
221 222 225 226 227 228 229 261 262 263
CTS
10
A
291 7198 6385 16 14 1627 8 8973 41 39841 2574 17 1895 94 9805 6308 1 1596 74 3196 27 471385 2905 1 8927 05 30980 30980
0 0 0 0 0 0 0
492085
Atachment
Curent Year
84793 7601 7 29528 8004 6654 1 12432 2048 25 471385 910348 973870
0
0 0
3863 9 3863 9
0
6724865
158076 180576
0
12978 12978
0
0 0
52813 3825
910348
0
0
86940
607 236
0
178609 178609
0
263067
0
0
0 340
0
0 0
57235 478395
0 0
J1
Aproved Expenditurs
Revnue Projectins
Adjusted Bal nce July
Fund
1
42863 42863 281794 201 9 70450 5372 4 1593295 159016 3408 1 1230547 21030 178609 6080 10 50 1740269
18305 18305
0
856957
ITEM
4746935
5152 300 0
0
6080
0 0
129851
953042
561970
F1Y201
Propsed
A
201
FUND
AUTHORIY
321
DS 531
534
FUNDS
FUND
FUN
10
1792391 2823472
0
983 1 21697
0
256097 31490
0
634 2 62731
162
592
1671 45
10
Atachmen
3458
9131 8
21309 2487 9
296
32
513 2 103819
79326 171064
25091 2652 0
2808
3460591 36491
0
354961
398173
10 0
1872 2 3985 4
1045271
18578 143 14
4635 9
0 000 26087 17342 128710 1516 72 2105 4816 8 40672 593 10
300 1
32
J1
3557 2 1761 2 290 1623 39 987 53974 9 7
50386791 ITEM
18578 1325851
0
0
1973507 104173
0
162
5 272 5 0 187 284138 8605 37901 171 3 2105 13792 40 60 100 76 28038 4872 5 20 48 1318 5 324 18 213 13829 3985 4 3313 9 2167 4 3943 3 1712815 1130 9 6471
296
0 0
0 0
517
6371452
F1Y230
Propsed
A
39850 107569
256097 52719
472 2 60480
283 007 73 56
July
12637
FUND
221 222 225 226 227 228 229 261 262 263
231 234 232 233 235 236 237 238 239 241 272
CTS
10
1627 8 7439 39841 265369 2609 94 9805 5493 73 2018 27 204 95 37 85 21643 650 483956 483956 61
0 0
4183620
11
Atachmen
3458
0
1429362 14974
0
5152
0 8 848 8004 484 1453 1092732 800 15642 176 5 3618 6 3618 6
0 0
0
10 30 10 0 10 80 10 50
0
27085
3460591
0
160795 160795
0
126785 126785
0 0
0
2472 2 123782
15642
0 0
3694 1 39461
0
74105 74105
0 0
171530 171530
0
2070 2070
0
0
0 450
0 450
0 0 0 0
J1
Aproved Expenditurs
Revnue Projectins
Adjusted Bal nce July
Fund
1
414061 401461 2794 05 293507 7405 6014 62 185 24 163570 2914630 158236 180 50 171530 70 0 10250 1568716 19763 19763 98547 5128 10760 7500 30 0 201649 9018402
10450 10450
0 0
ITEM
451870
255 0 51 300
0
464215 2582782 8040 2963782 10561 5000 70 0 190651 27389 27389 98547 5128 7300 10850 60780 24109 970698
0 0
F1Y230
Propsed
A
2012
291 7198 6385 16 14 1627 8 8973 41 39841 2574 17 1895 94 9805 6308 1
492085
FUND
AUTHORIY
321
561
FUNDS
FUNDS
12
11
Column change
10
2 2
22212
0401212
17 2 2 1 0 1 2 0 0
0
320
01
142
1501
20
Atachment
Column F1Y21
9
idencrfom
Budget
500
4 0 1 886 6 277 2 22914 226 243 320 2293 5 367 83 145046 450 38 722 801 1 438 4284 6
Column
8
13 12
FY
Propsed
9a
2761 69 778690 90615 23912 2198691 4870612 2705 609867 41820 73540 740642 8050 531631 93269
1 2822 12 0
0 100 5637 0 750 378501 70826 13506 15802 912504 145412 632805 547905 32 3508 15 23491 272652 935172 824728 714519 600 579 418540 98279 346315
19 2 7 7 11
8
Column change
7
15 3 9 5 6 2
16 4 2
10
64
29 22 4
4 76 0 6 0
Column F11Y10
6
idencrfom
Budget
8 681 6 419 5 26407 5105 7 56280 19 500 2564 9 943214 455 8818 4 193452 7082 0 39 400 150836
8 1 534 0 0 221 2047 2217 2 11 320 170 61 19045 5907 31497 4783 2 2932 9 1905 159 2857 4 468 2907 6
328726 268764 706829 92429 26805 213729 4961536 54230265 F1Y230 Column F1Y10 Revisd Budget 4210 7 3018265 253765 703412 95268 2080 2184560 492872 14905 528723 403123 8030 70381 7500 5386109 Transfe F1Y201 Column 1011 cycle Aproved Propsed Column 1011 Year Revise 21601 3018265 253765 703412 95268 2080 2184560 492872 14905 528723 403123 8030 70381 7500 5386109 Expenditurs Securd Taxes Revnues Adjustmen Revnue Curent
Column
12 11
FY
Propsed
0 0 640 36718 736037 1489 15802 91439 1843 4 6210 50682 100 3508 1852 30 25461 239176 97637 863278 7802 600 572 429521 94871 395828 J1
0 540 3278 751637 163895 2106 834693 182901 63423 5168 3201 25901 1540 29 354056 2876 43 927963 729406 71321 2505 547346 46937 93823 3651293
0
ITEM
Prior
and
FY Off
and
FY
Mid
0 4136 0 5236 0 110 0 567 540 3278 713 163895 2106 849736 182901 63423 5168 3201 25901 194683 354056 237042 9179653 729406 71321 2505 547346 46937 93823 3651293
Fund Quarte
Date
Tax
Column
Adopti n
Flip
Triple
REVNUS
Projects Council
Services
SAedrmvicn
13
11
Column change
10
5 0 5 1 2 2 79 2 2
21243222
2 01 2
14 1 0 1 0 0 4 3
0
Atachment
Column
9
idencrfom
FY
Budget
1 12
FYI
483
1947 172185
121785 32534
752319 365491 96802 3974120
13 Column 12
8
Propsed 1249625 8350 13976295 50786 906312 6902 14697 9386 19742 2845 16179 37268 1791 28130 24821 64254 19275 371098 251741 76157 7631 404519 592170 130825 42952 16294 6205 1127342 354085 4617913 4807295 49780295 341821
4
Column change
7
44
6 64 0 8 6
235 12 15 2 4 2 8 50
725
34
23 9 1 0 3 5
Budget
9 0 952 138 4 907 40970 30 40940 3070 1 58160 2769 3 426 6489 4 643592 11 1412073 3427 8 2412 8 412 1061 4 1201 1121 5 1029 97 281602 5683 1524 8 196092 1861 3 32 2016 5 2237 5 4953 17 100 1232 2130 72 2130 72
12161
6
Propsed 17560 8350 18040 5692 947273 605317 195874 961542 1702318 23458 16452 3282 14870 240735 21795 6929 102947 362405 2641 3 73142 74632 398416 5120 102 7 459214 1524 68253 112695 354085 44076 46808 46808 38365 F1Y230 Column F11Y10 Revisd Budget 412701 1125603 8650 13050 53291 89103 602734 14580 86498 105816 2431 520359 25874 12632 159683 20635 6042 12352 243 08 225621 76289 70514 379 14 52380 112754 49709 99807 57268 11527 394095 438534 428368 428368 5059361
12 Column 11
4
FY
4f
8 8 191 191 19 10 10 101 Transfe F1Y201 Column 1011 cycle Prior Aproved 3000 3000 309 309 17000 1700 807 Propsed Column2 1011 Year Revise 21601 1162503 8350 130470 53291 897124 602734 14580 86498 103895 2431 42839 25874 12632 159683 20635 60529 12352 243 08 225621 76289 70514 379 14 52380 112754 49709 99 57268 11527 394095 438534 426763 4672643 517026 Funds 3568 3 192 98 51360 0412 18
3
and
FY Off
Expenditurs
and
FY
Mid
City
Revnues Adjustmen
Fund Quarte
Date
Column
Staions Yard
Other
Adoptin
Prepadns
Services
Control
Flo d
Control
Aproiatns
Transfer
GF
of
Out
tD
In to to
Debt Capital
Attachment C
Expenditures
assumes a
over
the
slow economic recovery for the next year following four years of the six plan and
analyzed independently
projected according
to
the
source
Property
Taxes
Current Secured
12 FY2011
13 FY2012
the
s City largest revenue source represents 62 of the total General Fund City merged with the Fire District in 1996 the City has seen an increase in year although the rate of growth has varied widely Under the current
seen a
City
has
reassessment of
slowdown of sales an increase in defaults and foreclosures and a property values Conversely the market value of
homes in Encinitas is still above the assessed value and adds value to the tax rolls when sold In addition the assessed value of homes assessed below market value but not sold
increases each year by 2 or the CPI whichever is less Normally a 2 CPI increase prevails 237 For next year the County however this year the index applied was a negative 753 s Assessor office will apply a 0 increase This combined with some modest increases due
to
large commercial properties is anticipated to result in a Staff is projecting a modest 2 revenue revenue for FYI 1 12 property slow recovery The City will receive the preliminary increase in FYI 2 assuming continued 13 s 1 FYI 12 property tax figures from the County Assessor Office in May prior to final adoption
development
and reassessment of
tax
92 increase in
of the
operating budget
12 FY2011
13 FY2012
Property Tax
May 2004 then Governor Schwarzenegger proposed a swap of local VLF revenues for local property tax revenues as part of a state budget agreement The City 0 which is projected at 5 a less than 1 receives this budget estimate from the County 397 143 12 13 increase for FYI 1 and 5 a 2 increase for FY12 265 246
In
additional shares of
ITEM J1
14
Attachment C
Triple Flip
Sales Tax the second largest revenue source represents approximately 19 of overall General Fund revenues The City received sales tax revenue in two ways Most of the sales tax revenue local is received directly from State Additionally as part of the May 2004 state government
agreement and pursuant to Proposition 57 of 2004 a portion of the local sales and use tax revenue is used to repay state fiscal recovery bonds Cities and counties are reimbursed for the
from a shift of property tax revenue referred to as Sales Tax Triple Flip Thus receives property tax in lieu of sales tax but treats the revenue as though it was sales City Sales and Use tax was originally tax since sales transactions are the underlying exchange
lost
revenue
the
projected
This
recover
year but
was
at
year mid
revenue
source continues to reflect slow but modest growth as the economy begins to and large commercial vacant properties are filled Staff is recommending a 6 increase
a
12 in FYI 1 and
on
quarterly
newsletter
sales tax
revenues
tax
the
discusses
sales
revenue
City Council and interested community groups This newsletter by business category by geographical area and provides
comparative
Transient
Occupancy
Tax
TOT
12 FY2011
250 942
Management
revenues
s City
are
expected
to meet
projections predictions
for the current fiscal year of approximately 922 in the 500 are increased to approximately 942 and 961 in FYI 1 000 000
on a
quarterly
Term basis from registered Short Vacation Rentals The total TOT collections for Short Term
Rentals
are
surpassing predictions
12 FY2011 12 FY2011
Documentary Transfer
Tax
Real estate transfer taxes are collected at the time ownership of a property is transferred usually by sale The tax is set at a percentage of the sale price The law allows a county to impose a tax of 1 per 1 of value on every real estate transaction If a city also chooses to impose 10 000 the then the 1 rate is split between the city and county The real property transfer tax is 10
tax
administered by the county which collects the tax on behalf of cities and remits any funds due Revenue trending over the last several years reflects better than projected receipts Staff is
recommending
revenue
ITEM J1
15
Attachment C
Franchise Fees
The
City
revenue
for the
use
of its
way of right
from
to
Utility companies City expects 850 146 2 for the current fiscal year Revenue predictions are increased 13 000 172 2 and 2 in FY I 1 12 and FY 12 000 190
The
to meet its
predictions of approximately
registration permits short term vacation rental permits and a total proposed budget of 200 255 Fees for the City s
1992 and were last increased in 2009 Under the this program is projected to generate 128 in revenue for each fiscal 000 The cost to administer the program is 138 currently this program is subsidized by 000 year the General Fund in the amount of 10 000
were
established in
12 FY2011
984 169
over
years due to a decline in the total VLF revenue collections an increase in DMV charges since 1 the VLF swap in 2004 and a statutory formula that take the DMV share entirely from the 25
city
share
As
recently
as
FY2007 this
revenue was
more
receives
revenues
All Other
Intergovernmental
12 FY2011
103 471
recovery from
the Cities of Solana Beach and Del Mar and provided under the Inter Fire Agency
838 722 1
The Internal Cost Allocation Plan allocates all citywide support costs including administrative department costs such as Finance and Information Technology as well as a number of fixed
costs
such
as
to all other
the costs to operate and maintain City Hall rent and charges these support costs City and Agency Funds that benefit from these services The General Fund receives
benefiting
funds for
ITEM J1
16
Attachment C
Charges
for Services
12 FY2011
417 425 2
982 419 2
13 FY2012
Categories in the Charges for Services section include planning building engineering and other development related fees In a separate agenda report staff is presenting the results of a fee study to update the City Development Fees for Planning and Building Engineering and Fire s s Prevention Services per Council direction The draft budget is based on the current fee schedule with updated volumes Proposed fees are projected to bring in the following revenues
Department
Planning
Projected
12 FYII
Projected
13 FY12
950 303
950 303
Building
Engineering
Fire
000 206 1
550 709
125 53
Use of
962 477
earnings are expected to remain at historically low levels for at least another year s possibly longer For the foreseeable future none of the City funds or programs can expect a significant contribution from investment earnings Investment earnings which are the 670 670 largest portion of this category were adjusted downward from 510 to 310 at mid and staff is recommending an additional reduction of 65 for each fiscal year 100 year
Investment
and
This
revenue
category includes
revenues
light
of
camera
vehicle abatement
to
citations
administrative citations
a
parking penalties
Revenues
are
anticipated
decrease
slightly
budget
000 800
13 12 The in the current year to approximately 730 in FYI 1 and FY12 000 in the area of vehicle code citations which is difficult to predict decrease is primarily
proposed
State Mandates
SB90 Reimbursements The SB90 Program was established to reimburse local agencies in part for unfunded State mandates Each year the State authorizes funding for various State mandated programs including but not limited to the Open Meetings Act Peace Officers Bill of Rights Absentee Ballot requirements elder abuse training sexual harassment training domestic violence requirements misdemeanor bookings and fingerprinting and stolen 000 vehicle notification The City has approximately 472 dating back several years in claims and is projecting revenues of 30 for each of the next two fiscal years 000 outstanding
Other Revenue
Other
revenue
donations contributions
ITEM J1
17
Attachment C
Chapter
Summary
Overall General Fund
12 840 600 operating expenditures are proposed at 48 in FYI 1 and Schedule C Attachment B depicts the proposed budget for each 025 879 49 department by Department Overall the proposed budget represents a 5 increase Division 11 In FY11 the proposed budget over the approved budget of 46 million in FY10 12 6 increases 1 million or 2 The strategic process followed in developing the next two 3 year annual budget is included in the following narrative
in FY12 13
Approved
Proposed
12 FYll
Proposed
13 FY12
Expenditures by Categories
Salaries and Benefits
Materials and
11 FY10
464 421 23
658 711
022 699 25
444 864
Supplies
Leases
430 68
000 54 647 273 46
054 72
000 64
000 75
025 879 49
840 600 48
Approved Adjustments
191 10
838 283 46
840 600 48
025 879 49
000 The Off Prior Approved Adjustments includes off appropriations of 3 for Parking cycle Cycle 809 Enforcement a reduction of 3 for the matching share of a Federal grant for Fire turnouts which transferred to a project budget WFC10C and 11 for a franchise fee audit continuing appropriations for a total net 000 increase to the current year budget of 10 191
Personnel
largely a contract city personnel costs represent approximately 50 of the effective s City General Fund expenditures As a cost measure Department Heads are required to justify each position with the City Manager before filling a vacancy After consulting with the City Manager Department Heads determined that they will not actively recruit for the following positions therefore the positions are unfunded but will remain in the total FTE count
While the
City
is
ITEM J1
18
Attachment C
Positions That
Represent
Potential For
Vacancy Savings
Department osition
0 1 FTE 0 1 FTE
12 FY11
13 FY12
371 179
780 180
298 89
615 78 581 104
Deputy
076 89
Recreation 413 78
0 1 FTE
Building
315 104
Planners Planning
Building
Building
486 86
296 31 957 568
647 88
893 9
25 6 Total Vacancies
approximate savings
814 551
groups Encinitas Firefighters Association and Service Employees International Union SEIU Changes to the terms and conditions of City future employee agreements require approval by the Council prior to enactment Salaries and benefits for safety employees fire safety reflect terms of current bargaining agreements with the employees through December 31 2011 when the Firefighters Memorandum of s Understanding MOU expires The City MOU with employees in the bargaining unit safety represented by SEIU non personnel and marine safety also expires December 31 2011 12 MOU provisions are included in the FYI 1 budget until January 2012 Proposed budgets and financial plans were developed with no intention to predict or establish parameters term long
The
City negotiates
for future
negotiations
with
employee bargaining
groups
City also contracts with California Public Employee Retirement System CalPERS to provide retirement benefits to all represented and unrepresented employees Employer 0 contributions for safety employees under a 3 at 55 Plan are budgeted at 23 of payroll of 9 of payroll 0 The City also pays the employee required contribution Employer s 8 7 contributions for non members under a 2 at 55 Plan are budgeted at 17 of safety covered payroll The miscellaneous employees pay a negotiated portion of the employee s 0 required contribution of the 8 of payroll up to 5
The The first PERS rates for the City reflecting stock market losses from two years ago arrived in The actuarial valuations received in November impact employer late November 2010 a year in which 12 contribution rates for FYI 1 and are based on data as of June 30 2009
year in drop in investment returns A three phase of PERS rate increases to cover the losses will begin in this next budget cycle In addition last April PERS approved new actuarial assumptions based on changing demographic trends which also The budget factors in all known rate increases increased employer rates
PERS
experienced
4 23
ITEM J
19
Attachment C
Employer
Rate
11 FY10
Employer
Rate
12 FY11
Employer
Rate
13 FY12
Employee
Rate
Fixed
8 8
Miscellaneous
Miscellaneous
City employees
SDWD
7 15 8 11
8 17 8 14
1 18 2 15
employees
Public
Safety
Fire
2 18
0 23
0 24 2 22
9 9
Public
Safety Lifeguards
4 16
5 of the
3 21
Kate
Employee
75 7
Continued strong
returns
prior market losses Beating market on investments in FY09 The assumed rate of return 10 lower future employer contributions may recovering
from
13 12 expected to increase approximately 8 in FYI 1 and 5 in FY12 and subsequent years Unemployment costs are expected to increase during the recessionary of 5 4 period and rates have been increased from 0 to 0 of payroll Three categories increase during the next two year period See workers compensation rates are also projected to discussion on the Self Insurance Fund of this agenda report for current and new rates There are year no other assumptions for increased projections during the next two period for life insurance or long disability rates term
Attachment personnel see E A list of City for the City of Encinitas and the San Dieguito Water Council approved positions and pay ranges District is included in the appendix of the draft budget document White Binder
on
proposed changes
to
Materials and
Supplies
Materials and
Supplies represent
are are
budgeted projected
at to
contract
ITEM J1
20
Attachment C
more
s category
costs
projected
to increase
by
projected
to
Expenses
replacement
costs
Previously
This category includes fleet maintenance and annual this category included an expense for Civic Center
Center Improvement Fund Fund 152 in order to make the debt services payments on the Civic Center Due to an accounting change which consolidates the Civic Center Improvement Fund with the General Fund this payment is now Service out shown directly as an equity transfer to the Debt Fund Fund 321 and is no longer classified as a General Fund expense This is an accounting change only there is no economic
Those funds
were
or
fiscal
impact
Capital Outlay
This
category
includes
lease
payments
for
office
equipment
such
as
networked
proposal
12 General Fund In fiscal year 11 there are three programs at 13 cost for proposed programs in FY12 is 212 307
total cost
Human Resources is proposing the addition of a temporary half time contract employee to backfill for existing staff during the Tyler Technologies ERP system implementation The cost
of this program is
017 15 in
proposing
programs PCI
Compliant
Property
PCI
Compliant
In November 2009 the City received notice from the Payment Card Industry Security Standards Council PCI that online credit card payment systems would need to become compliant with newly established industry standards to better safeguard against theft and misuse or they may
heavy penalties for security breaches All major credit card companies participate on the Security Council and prescribe to the established standards In May 2010 the IT Division completed an analysis of credit card payment systems citywide and found the Parks and Recreation Department online registration payment server must come in to compliance s
risk
research the Parks and Recreation Department and IT Division have found a PCI compliant solution for online registration Active Network ActiveNet is an online recreational meet both the PCI standards and program registration and payment processing platform that will
After extensive
ITEM J1
21
Attachment C
program registration
time City One start up first year maintenance costs and annual fees are estimated at 35 The annual maintenance and fees are estimated to cost 000 000 25 annually beyond the first year There are no additional staff impacts Upon budget approval staff will enter in to an agreement with Active Network for compliance
needs of the
Property Park Maintenance are currently being prepared for phase 1 development of the park project Phase 1 generally consists of parking lots buffer areas both passive and active turf areas restroom facilities picnic facilities a skate park and a dog park
Hall
Construction documents
development will begin in the late summer 2011 and be completed by the late summer 2012 The City will assume all maintenance responsibilities within 60 days from up completion Maintenance activities consist of tree maintenance trash pick restroom cleaning lot sweeping weeding litter removal electricity pest control landscape maintenance parking water sewer irrigation maintenance and repairs and plant replacement Consistent with other park maintenance practices all work will be accomplished through the use of private contractors The work to be completed will be bid to ensure the best possible pricing
Construction of phase 1
13 Maintenance for approximately six months of FY12 is estimated to 14 full year of maintenance will begin in FY13 and is estimated to
cost
cost
increase based
of the
Diego County Supervision of maintenance activities will three current Park Supervisor positions
on
Planning and Building is proposing the addition of a temporary contract employee to assist in 12 005 purging of the Planning case files The cost of this program is 10 in FYI 1 only
Based Departments develop their budgets under a rigorous Zero Budgeting ZBB process Each year a Department assumed starting budget is zero and every requested expenditure s must be justified In addition Departments are required to develop Quarterly Spending Plans which are reviewed quarterly with the City Manager This process has been in place since 08 FY07 and has been instrumental in containing costs and driving productivity No fiscal proper realignments from the prior budget have been reinstated with out consideration and justification
ITEM J1
22
Attachment C
year Proposed expenditures for the next two budget following table See also Schedule C Attachment B
are
identified
by Department
in the
Mid Year
Proposed
12 FY11
Proposed
13 FY12
Expenditures by Department
General Government
11 FY10
963 715 9
123 569 3
000 347 11
172 532 9
Planning
Public
and
Building
Enforcement
315 641 3
965 379 12
Law Safety
Public
395 085 11 328 430 2 994 771 3 844 353 4 647 273 46
722 944 11
Public Works
199 708 3
459 001 4
193 671 4 025 879 49
Engineering
896 941 3
076 477 4
840 600 48
Approved Adjustments
191 10
Total
The
838 283 46
a
840 600 48
025 879 49
Cycle Off
Enforcement
a
project
Prior Approved Adjustments includes off appropriations of 3 for Parking 000 cycle 809 3 for the matching share of a Federal grant for Fire turnouts which transferred to 000 budget WFC10C and 11 for a franchise fee audit continuing appropriations for a total net
reduction of
191 budget of 10
New Highlights of Proposed Changes Program the draft budget document White Binder
to
Operating Expenditures
Chapter 4 of
safety
s was developed to meet the Council three infrastructure maintenance and critical customer service
General Government
Departments
000 Community Grant Program Staff is proposing a budget of 64 in support for various civic 10 and arts projects and programs Beginning in FY09 the Mizel Family Foundation made a 10 000 s year five commitment to match up to 75 of the City allocation In FY09 the budget was decreased from 60 to 54 during the budget realignment process With the current 000 000 for grant funding as demonstrated by the economy the City has experienced a greater demand 12 000 increase in grant requests submitted to the City The proposed FYI 1 budget of 75 the matching dollar commitment by the Mize Family Foundation thereby meeting the leverages s community greater need for support ITEM J1 23
Attachment
The
s s City Council budget includes decreases to training and special event costs The Council San Diego Association budget includes memberships to several regional organizations including of Governments SANDAG the League of California Cities Local Agency Formation Commission LAFCO and California Coastal Coalition CalCoast The overall membership 12 fees are lower than previous years Staff has projected a 2 decrease in the budget for FYI 1
The City Attorney operates under contract approved by City Council by resolution Legal Services Division does not assume any contract adjustments In the future any negotiated contract change would appear before Council and the budget would be adjusted at that time
For FY11 outside consultant attorney and miscellaneous 12 expenses have increased
by
000 17
time s City Manager Department a vacant intern position was restored to half an increase Auto allowance was added to cover the new City Manager and to cover the Deputy 7 500 000 600 Meetings was also restored by 2 City Manager an increase of 9 Travel the anticipating the needs of the new City Manager The balance of 7 increase was due to salary and benefits adjustments
In the
of
s implement the City Arts Master Plan a robust partnership with Encinitas artists and organizations In collaboration with the through Commission for the Arts the division implements the annual Civic Arts Program for the s community with 32 exhibits 12 concerts 4 arts education workshops 3 reader theatre productions and maintains the Public Art collection The division produces and publishes the com monthly Encinitas Arts and Events Calendar maintains the EncinitasLive website and 12 The FYI 1 budget represents a 7 pursues grant funding for City projects and programming increase which is attributed to increased costs in personnel and a modest increase in programming
The Arts Administration Division will continue to
Development Division was created to evaluate plan and implement development priority projects and support existing services that promote citywide
The Economic
economic economic
continues to support the Highway 101 Corridor Coordinator the Downtown Encinitas Mainstreet Association DEMA Leucadia 101 Mainstreet Association the Cardiff 101 Mainstreet Association the San Diego Botanic Garden and the San Diego The Division will continue to support the Cardiff and Economic
improvement
The current
budget
Development Corporation
to
facilitate
responsible for providing a human resources management system to support Managers and City Council in the delivery of public services while assuring that the City is able to recruit and retain talented and skilled employees Costs in this division the are increasing approximately 8 due in part to additional contract work to assist with implementation of the new Enterprise Resource Planning ERP System
The Human Resources Division is
Information Technology IT includes the Information Technology Division the Geographic Educational Information Systems GIS Division and oversight of the Governmental Access Fund 228 Attachment D IT helps staff meet City business needs by leveraging technology to provide better services to the public to promote increased citizen participation in government and to enhance
productivity
of the
s City
lptJ q1
24
Attachment C
Technology Division is responsible for strategic planning implementation and s support of the City government business applications Finance Human Resources utility document billing management permitting and other systems websites and e online government applications The division is also responsible for the security and reliability of the City technical infrastructure The division implements supports and maintains the City s s communications network data centers technology equipment information storage and retrieval software e operating systems office productivity database and other systems mail webcasting broadcasting systems telephones and mobile phone program and other technology used throughout the City
The Information
mostly related to a transfer of funds from Finance to IT for printer lease payments ongoing maintenance copier The hardware maintenance amount increased slightly due to maintenance requirements for a new house Finance system Several projects will be addressed by in staff such as the implementation of an Enterprise Resource Planning ERP System upgrading the City email system upgrades s based to the City website and implementing a new web Parks and Recreation application IT s division personnel will continue to concentrate on information security disaster recovery
The IT Division s
budget
has
an
Geographic
Information Systems GIS Division manages maintains and captures spatially City and disseminates that data to City staff and citizens GIS is also for implementing upgrading and supporting enterprise business applications
and web
applications
and the
s City
asset
inventory
work order
Cityworks
has
an
12 712 approximately 4 in FYI 1 of 22 a significant reduction in contract personnel category including mainly time hour employee funding 60 reduction to one 1000 contract position from 2 full contract positions and a decrease to FTE funding based on a proposal to fill a vacant position at a mid grade grade Analyst I level rather than a high Analyst II level
budget
overall decrease of
The GIS Division continues to support enterprise business applications such Cityworks and is currently involved in developing and supporting several internal
as
GIS and
and external
GIS web applications GIS also continues with data capture data maintenance data review and quality control QC for all departments and assists departments with business process reengineering by helping them take full advantage of newly implemented applications and
technology
to increase
12 in FY11 largely due to normal personnel cost increases A total of 000 in reductions were made to various 9 office supplies of 2 legal advertising of 3 and printing and line items including 000 000
net increase of 2
duplicating expenses
The Finance
of
000 4
is
Department
responsible
for
managing
the
City
resources in order to protect and enhance the financial position and assure that adequate The Finance budget is increasing resources are available for City and District services 000 approximately 61 This increase is attributed to the filling of a finance analyst vacancy
600 58
and
slight
increase in
banking
fees
400 2
ITEM J1
25
Attachment C
budget accounts
for
are
not attributable to
specific department and are used to support the entire City and certain district operations They include citywide telephone expenses postage and office and copier supplies Up until this fiscal lease year this division covered the multifunctional devices MFDs or copiers maintenance and of the computers to these networked costs With the increased technology and integration printers the maintenance and lease costs of the MFDs have been transferred to the IT Division
The result is The
a
decrease of
000 101
to Central Services
division
Departmental Non Division was created to appropriate funds for those activities that provide The costs a citywide benefit and are not directly attributable to any one department or division retiree health care contributions OPEB and the fleet and included in this division are equipment maintenance and the vehicle and equipment replacement costs Based on the Fire the General Apparatus long term financing plan approved by the City Council in March of 2010 its contributions of 378 per year to the Fire Apparatus Fund 695 in Fund begins making 000 FYI 1 This scheduled increase is offset by the change in accounting for the Civic Center 12 facility charge This cost is now reflected directly as a transfer to the Debt Service Fund 321
to pay
changes
is
net
Planning
The
and
Building Department
in
to
11 829 598 123 569 s Department overall budget is increasing from 3 in FY10 to 3 13 12 1 and 3 in FY12 Inspection activity has increased and is predicted FYI 315 641 continue to do so over the next two year cycle In addition increases are due to a shifting this shift assignments over the next two year period and the related training needs to facilitate
of
5 Planning Department currently has vacancies in the Planner 2 FTE and Program 12 Assistant 75 FTE in FYI 1 and 25 in FY12 Staff is proposing to keep the positions 13 in the Department year positions vacant during the next two period Should the activity to reinstate funding to the positions In accelerate staff will return to City Council with a request the meantime remaining staff has been reassigned to work on current projects including the 13 12 General Plan Update which has been fully funded in the proposed FYI 1 and FY12 budget
The
The Customer Service and Administration Division is
responsible
for
reviewing
land
use
and
development applications to ensure compliance with City standards The Division provides direct assistance to the public responds to inquiries regarding land use and zoning issues handles directions This special projects such as code amendments and implements various city policies
Division is also
the
responsible for developing and monitoring the budget for the entire Department the City on coordinating the Citizen Participation Plan and Mills Act programs and representing
Downtown
Encinitas
Committees In the
13 FY12
Association and North 101 Corridor Facade Grant will be shifted from the Management Analyst position to the duties Assistant position which is currently vacant to allow more time for
MainStreet
will also require specialized Management Analyst to work on budget demands This needs as the transition takes place Housing Budget training
ITEM J1
26
Attachment C
The
Current Plannina Division is responsible for reviewing land use and development applications to ensure compliance with all General Plan and Local Coastal Program goals and
policies development and use regulations of the Municipal Code and applicable specific plans and adherence to design criteria contained in the City adopted Design Review Guidelines s The Division also recommends and implements changes to the above This Division provides staff support to the Planning Commission and oversees the operation of the Staff Advisory Committee which meets with prospective applicants on a weekly basis to familiarize them with year City standards and provide early input in the design process During the next two budget staff will be assisting on Municipal Code Amendments and the General Plan update process
The Applicant
Deposit
amendments specific plan amendments zoning changes extended studies environmental impact reviews geotechnical reviews and wireless third party reviews Revenues are collected
applicants to reimburse the City via contracts for its cost of providing these reviews Staff has reduced the budget based on fewer requests for amendments Staff has reduced the budget based on fewer requests for amendments as well as a shift from a deposit based to a fee 500 based payment structure The overall budget for this division was reduced from 25 in
from the
11 FY10
to
13 FY I 1 12 and FY 12
range responsible for addressing long planning addressing regional planning issues s City issues monitoring updating environmental review in compliance affecting Encinitas and coordinating and implementing This Division also provides with the California Environmental Quality Act CEQA and administrative support to the City affordable housing Community s management Development Block Grant CDBG Section 8 and Home Investment Partnerships HOME Due to a predicted decrease in funding of the Section 8 program the training budget for the two Section 8 staff members has been shifted from the Housing Division to the Advanced Planning
Housing
the
Division is
and
General Plan
Division
Municipal Code and initiates administrative local regulations The compliance with state criminal and civil basis with priority given to health and safety Division operates both on a proactive and complaint issues Code Enforcement is also responsible for the administration of the Private Property up Clean Assistance program contested parking citations review and graffiti removal The Private Property Clean Assistance program will be taking on more of a proactive approach in up an effort to up and maintain privately owned open space throughout the City keep
Code Enforcement
investigates violations
of the
plan checking building permits and inspection Corporation Clerical support and services that are provided coordination of this contract is handled by Planning and Building personnel Building services to this 13 12 setting are increased to 987 in FYI 1 and 987 in FY12 The off revenue 929 491 expenditure has also been increased
responsible
for under contract with the ESGIL
Safety Law Enforcement The City of Encinitas contracts for Law Enforcement Services with the San Diego County s Sheriff Department including patrol traffic detective and special purpose officers As part of the County law enforcement network Encinitas Sheriff Station also has access to countywide s an increase of 497 or 4 12 000 resources The proposed FYI 1 budget o27
Public
140 M760
Attachment C
the
adjusted
11 FYI 0
budget
and
budget
of
500 296 12
an
increase of
000 536
or
6 4 in
13 FY12
year budget was adjusted at mid to add a traffic deputy for rail accident reimbursed by North County Transit District Also during FYI 0 San 11 investigation fully a cost agreement with the City for one Dieguito Union High School District cancelled sharing assigned special services officer school resources officer and the position was re as a narcotics
11 The FY10
budget
assumes a
Supplemental funding reductions to the County may require the City to pick up a portion of a partial year of 12 arrestee booking fees estimated at 110 for FYI 1 DEMA will no longer be required to 000 in reimbursement for parking enforcement thereby making a community services 300 pay 23 officer available for citywide enforcement
7 budget again assumes a 3 contract services increase although this will be the first year in a yet negotiated multi contract The additional incremental increase year be to assumes a full year of City booking fees estimated at 220 due to the anticipated 000 paid continuation of State funding reductions The FY12 13
Safety Fire and Marine Safety The Fire Administration Division provides management and administrative support to the overall
Public
Department There
The Fire
are no
significant changes
to the Division
Operations Division is charged with maintaining an emergency response system that the life and property of the citizens of Encinitas from fire and other disasters The protects Division budget includes expenditures for fire safety personnel training dispatching through a With the exception of increases in contract station supplies and emergency equipment
personnel expenditures
remains flat
13 projected increase in the cost of dispatch services in FY12 the The division continue to leave a Deputy Chief will years budget position vacant This position will remain in the total FTE count but remain unfunded Expenditures for fire management services provided through an agreement with the City of Solana Beach and the Rancho Santa Fe Fire Protection District are completely offset by revenue collected in Intergovernmental Revenue
and
a
over
The Loss Prevention and Planning Division enforces the International Fire Code Building Code Life Safety Code and other fire safety related codes and ordinances The Division staff conducts
inspection and weed abatement programs processes plan checks and performs inspections for development and other annual State mandated inspections Additional plan check and inspection services are provided by contract The Division will continue to leave a Deputy Fire Marshal II position vacant This position will 165 remain in the total FTE count but remain unfunded Salary and benefits totaling 108 for the returned to the General Fund in the current fiscal year Staff is proposing slight position were reductions in non expenditures over the next two years personnel
fire
investigations
ITEM J1
28
Attachment C
Preparedness Division develops emergency procedures and citywide disaster s operations plans The budget includes the City membership in the Hazardous Incident Response Team HIRT and provides community training programs including the Community Emergency Response Team CERT There are no significant changes to the Division budget in 13 12 FY11 Staff anticipates an increase in the City share of the cost for HIRT in FYI 2 s
The Disaster
5 Safety Division provides ocean beach safety services for 3 miles of coastline of Encinitas beaches Expenditures for fuel and public education are expected to increase slightly The Marine 13 in FYI 1 and FY12 12 Public Works As part of the Public Works Department continuing efforts to better communicate financial s information about our various operations the Department is recommending that all Street costs be accounted for in one division the General Fund Street Maintenance
operational
12 Maintenance division beginning in FYI 1 Currently expenses for Street Maintenance are accounted for both in that division and in the Highway User Tax Account HUTA Fund
the expenses by funding This has made it more difficult to record and monitor street maintenance expenses The expenses formerly accounted for in the HUTA Fund in will now be reported as General Fund expense but their funding source will be a transfer from the HUTA Fund formally the State Gasoline Taxes Fund 210 HUTA is expected to bring in
essentially splitting
expected spending
for General
The Public Works Administrative Division provides management direction and administrative support to the divisions comprising the Public Works Department and the San Dieguito Water District The Division also coordinates the Department accreditation efforts The Division s will The
Tax
help manage
Street
assessment
the
over
years
additional
Maintenance the
through
General
Fund with
previously Highway supplementation by budget is now included in the Street Maintenance Division General Fund budget The 13 12 197 679 442 652 budget proposed is 1 in FYI 1 and 1 in FY12 Services performed street tree maintenance litter and graffiti removal utilizing both the County Probation include Department work crews and maintenance contractors and various maintenance tasks assigned to house a non group Partners with Industry In crews maintain the City rights s of way profit sidewalks and asphalt berms City crews install and including streets shoulders curbs maintain traffic signage and provide after hour emergency responses The Division oversees contract services for pavement surfacing street sweeping traffic striping and pavement
User Tax
revenue as
discussed
markings
The Public Works
responsible
oversees the Stormwater Maintenance Division This Division is for the maintenance of the City storm drain conveyance system to ensure s
Department
compliance with the National Pollutant Discharge Elimination System NPDES permit NPDES maintenance is provided by Street Maintenance personnel for the above ground system channels ditches and basins and Wastewater Collection personnel for the below ground system There are no significant changes to this Division The Divisions proposed budget is 11 12 100 922 629 in FYI1 which is a reduction of 4 or 12 from FY10
ITEM J1
29
Attachment C
is responsible for the maintenance and repair is s City drainage conveyance system Drainage provided by Street Maintenance personnel for the above ground system and Wastewater Collection personnel for the below ground system In addition contractual services are utilized when large scale or specialized repairs are needed The reduction is related to the reduction of a
The Flood Control Division is funded maintenance of the
by
time full
employee
to a half time
employee in
the Division
Facility
Maintenance is
comprised
of four Divisions
including
s City
Fire
Stations and
022 74 conditioning HVAC maintenance contract costs at the Civic Center and planned maintenance at multiple facilities and increased energy costs at Fire
Engineering
Services
1 Lifeguard Towers the Public Works Yard and the Library An increase of 8 is projected primarily due to increased heating ventilation and air expenditures in
two Fire
Stations
Stations
Department portion of the Engineering Department budget is proposed to increase by 5 13 12 11 from 3 in FY10 to 3 in FYI 1 and by 2 to 4 in FY12 459 001 896 941 994 771 three divisions General Engineering The Engineering Services Department budget consists of Traffic Engineering and Stormwater Management
The General Fund The General Engineering Division supports four functional areas Capital Improvements Development Review and Field Operations
including Administration
applications
analytical and clerical support to the public improvement financing processes s City Landscape and Lighting District
other
sewer
Engineering
annexation
Capital Improvement staff plan design and administer contracts for the City and District capital 12 improvement projects Capital Projects anticipated to be underway in FYI 1 include a CDBG 5 to install sidewalks on Balour Drive Encinitas Creek Channel Improvements 1 project Encinitas Boulevard improvements to Santa Fe Drive including sidewalks and Interchange at drainage improvements pipeline improvements for the Encinitas Sanitation Division and Cardiff Sanitation Division and alignment studies for Santa Fe Drive Manchester Avenue and Encinitas
Boulevard
The
Development Review
staff
responds
to citizen
related issues involved in public and private developments review approve and issue grading and encroachment permits as well as maintain City maps and records The division reviews and
places conditions on all private development projects to in compliance with the City standards and regulations s
The Field
proposed development
is
s Operations staff inspect the City capital improvement projects inspect private the construction of public improvements and grading operations construction projects involving way of inspect subdivision construction monitor and inspect right permits and utility permits and investigate right code violations and grading ordinance violations that occur without way of 12 the benefit of a permit Capital Projects anticipated to be under construction in FYI 1 include Coast to the railroad crossing at the intersection of Leucadia Boulevard improvements Vulcan Highway Avenue Balour Drive Sidewalks Olivenhain Pump Station Upgrade Hall Traffic Calming Annual Property Park Encinitas Creek Channel
ICardiff J
Stre80
Attachment C
Overlay
Pedestrian
Safe Route to
Sidewalk
McKinnon
Birmingham
Overall
an
Fire Station
12 increase of 210 is proposed for the General Engineering Division in FYI 1 862
The increase is predominantly related to adjustments to personnel costs and contracts Personnel costs account for 60 of the increase in General Engineering A Senior Engineer vacancy in 11 Capital Improvements was funded for only part of the fiscal year in FY10 but has 12 been filled full time effective March 2011 and will be fully funded in FYI 1 A subsequently
by a corresponding 743 time savings of 35 in Personnel costs for temporary part coverage of a permanent employee on military leave Additionally as a result of increased inspection activity over the last currently twelve months the Department proposes to augment Contract Inspection by 48 to allow for 000 adequate response to increasing needs for grading and public improvement inspections In s 13 FY12 the Division operating costs for materials and contracts decrease services supplies 56 3 by 29
time one increase of
550 22
Engineering Division is responsible for traffic safety and transportation planning goal is to maintain a safe and efficient transportation system The division is for review of plans and specifications for all traffic control devices roadway and responsible intersection projects and issues traffic control permits and truck permits Traffic Engineering periodically conducts traffic studies including speed surveys and traffic counts at intersections
The Traffic
issues Their
12 calming projects and in FYII will be coordinating the construction of a pilot traffic calming project in the vicinity of Rubenstein Summit and Westminster A second traffic calming project in the Gardendale Road area will be under design and two potential projects at Willowspring and MacKinnon will be in the evaluation stage to determine eligibility for traffic calming treatments pursuant to the Encinitas Neighborhood Traffic Management Program ENTMP The division is also taking the lead on an American s Recovery and Reinvestment Act project to replace 20 of the City street lights with energy E efficient LED lights Staff will be working with SDG to secure eligible rebates for this E project and to update SDG billing databases to reduce monthly electricity charges associated with the energy efficient lighting The division will continue to work with Planning Department on the General Plan Update of the Circulation Element and on the development of the North 5 Highway 101 Streetscape Plan and with Caltrans on the I Freeway Interchange evaluation
The division is the lead
on
traffic
comprehensively
addresses
pollutant loading
into the
s City stormwater drainage system local waterways and beaches through an extensive program including water quality monitoring facility inspection enforcement and complaint response agency multi watershed management public and private development standards application training and community outreach and education activities Further the Division supports the maintenance functions including coordination and oversight of
Stormwate
otuind t
stmt
Attachment C
sweeping
storm
Public Works
In the
core
waste
forthcoming fiscal year the Stormwater Management Division will continue to conduct programmatic activities and engage in strategic organizational and regionally significant projects and programs including the Citywide Channel Maintenance Environmental Permitting Project Bacterial Indicator Total Maximum Daily Load TMDL compliance planning and implementation San Diego County Municipal Stormwater Permit reissuance process and the Cottonwood Creek Watershed interpretive display project
12 941 Staff has reduced contractual Stormwater costs in FYI 1 to realize a savings of 7 to the 12 Overall FYI 1 costs are increasing a modest 2 which is attributable to division budget
are no
significant changes
s to the Division
budget
in
Department
General Fund
departmental
operating budget
is
of
or
responsible for directing and supervising all divisions of the Department and providing a variety of administrative services including leases and operating of capital agreements contract management grant procurement and administration design financial planning accounts receivable projects advanced park and facility planning budgeting and payable special project management concession management program registration special operations permits processing management of the contract for animal services including dead animal removal and sitting on the board of the Encinitas Ranch Golf Authority This Division also provides administration of the Sister City Program and provides support for the Parks and
The Administration Division is
Recreation Senior and Youth Commissions This Division will maintain a vacancy in the 0 000 authorized Management Analyst 1 FTE position at an annual savings of over 78 Staff is insurance premiums 000 proposing a 5 increase to the budget for special operations permit There is offsetting revenue for the insurance paid by event producers so there is no net impact to the City General Fund as a result of this increase s
The Park Maintenance Division is
landscape maintenance and repair of park 55 63 facilities 10 miles of streetscapes 86 acres of open space and 334 acres of developed and this Division is responsible for administration of park capital undeveloped parkland In addition improvement projects which include bidding process contract preparation and construction oversight The Division also provides staff support to the Parks and Recreation Commission Staff is proposing a 26 increase to the budget to replace aging monument signs and for 900 13 000 increased tree and plant replacement and irrigation repairs For FY12 170 has been included for approximately six months of maintenance on the Hall property park site
responsible
for
responsible
acres
of
beaches and
Jsl appropfff p r
and
32
Attachment C
Staff is proposing a 16 000 process contract administration and construction oversight increase to the budget to replace aging monument signs for increased tree and plant replacement and
irrigation repairs
and to
perform
beach
access
stairway structural
audits
responsible for a variety of recreational trail maintenance 4 activities for 40 miles of developed recreational trails and all City trail related projects This Division is used to track direct costs associated with implementation of the Recreational Trails Master Plan approved by City Council in April of 2002 Division responsibilities also include trail development trash pick brush clearing erosion control signage and sign maintenance up 500 and other maintenance activities as required Staff is proposing a 21 increase to the budget materials to include fencing decomposed granite and for new trail maintenance and associated
The Recreational Trails Division is
and
administering recreation
services and programming for youth teens adults and senior citizens In addition the Division is for planning and implementing citywide special events such as the Holiday Parade
concerts the Easter Egg Hunt Pet Health Expo Senior Information Fair and the Encinitas 5K Other tasks include field use scheduling providing staff support for the Youth and
summer
responsible
family enrichment programs teen expos and open gym The Division also administers the Recreation Program Division Fund 146 which programs provides recreational educational and sports activities on a fee for use basis Staff is proposing a due to become Payment Industry PCI compliant with the increase to the Card
Parks and Recreation Commissions
cost includes
000 35 budget The s line City on program registration and payment processing platform for the Department
annual maintenance and transaction fees
Operations and Maintenance Division is responsible for the operations Community and Senior Center at Oakcrest Park The facility provides recreational educational social and civic opportunities to the residents of Encinitas A wide include concerts variety of activities and events are available to people of all ages Activities recitals seminars and workshops instructional classes wedding receptions community group and clinics meetings teen special programs festivals indoor youth and adult sports leagues citizen outreach services family preschool activities senior citizen activities and events senior enrichment nights children and teen after school activities and community special events The Division also provides staff support for the Senior Commission The budget in this division increased slightly in both years due to normal personnel cost increases Staff is also proposing an 800 increase to the budget due to increased fuel costs
The Community Center and maintenance of the
Department
also
oversees
County
of San
Diego
Animal Services Service includes dog licensing emergency medical care for Department of lost licensed dogs public stray injured dogs and cats adoption services owner notification rabies prevention enforcement of local and state animal education and informational programs from laws spay rebate and referral programs and kennel licensing Dead animal removal neuter contract with a private way of public streets property and right is provided through a separate in funding for the annual Pet Health Expo from this firm Staff is proposing moving 1 400 Division to the Recreation Services Division as this event is now produced by the Recreation
Division
ITEM J1
33
Attachment D
provides the City of Encinitas with coverage for liability workers compensation unemployment property damage vehicles separation pay and other miscellaneous exposures City Departments are charged and premiums based on employee payroll as a means for funding the workers compensation
The Self Insurance Fund functions
as
unemployment
Revenue
charged
target
reserves
The fund revenue consists of workers compensation and unemployment premiums s to each City Department and insurance dividends To meet expense obligations and the the fund also receives an Interfund Transfer from General Fund The transfer
is calculated
annually
The
reserve
000 675
time 12 193 615 Expenditures The overall expenditure plan is projected at 1 in FYII a one increase of 61 over the prior year due to an anticipated increase in costs in workers 385 13 is 1 which 077 536 compensation and unemployment The proposed budget for FY12 The decrease in budget is due in part to 116 represents a decrease of 79 over the prior year 12 reduction in workers compensation unemployment and liability premium Beginning FYI 1 a liability self insured retention SIR of 500 in place of the previous 000 the City will assume 000 150 SIR which in turn reduces the overall liability premium costs There is adequate funding in the Self Insured Fund for the assumption of the higher SIR The projected ending 13 837 12 242 833 625 balance of the Self Insured Fund for FYI 1 is 2 and FY12 2
12 Beginning FYI 1 the workers compensation premiums and unemployment premiums been adjusted as follows and are reflected in all citywide expenditure plans
have
City
District Workers
as a
Unemployment
11 FY10
12 FY11
13 FY12
Premiums
percentage of payroll
City
Workers
Comp Classification
11 FY10
12 FY11
13 FY12
80 5
00 1 55 1
25 7 25 1
Employee
Municipal Employee
75 1
Municipal Employee
30 4
50 5
ITEM J1
34
Attachment D
The Water District is insured with the Association of California Water Agencies Joint Powers Insurance Authority ACWA and is not part of the City Self Fund Water s Insurance JPIA
District
premiums as
year percentage of payroll will increase during the next two period
as
follows
District Workers
Comp Classification
11 FY10
12 FY11
13 FY12
Employee
60 4
10 5
A N 01 1
03 1
90 0
Employee
Programs Fund provides for a variety of recreational educational and sports activities community on a fee for use basis Fees are designed to cover all direct program costs such as contractual staff services supplies and other related expenses Programs ranging from Pitter Patter Painter and Toddler Time to Ballroom Dance and Yoga are provided through
the
this division
000 to bring 000 proposing increasing revenues 136 and increasing expenditures 146 10 10 revenues and expenditures in line with FY09 actuals Since FY09 staff has implemented new programs including Beach Kids Super Movers Team Challenge Camps several successful 12 000 and Wonders Science For FYI1 staff is projecting a positive net of 91 for the fund and a positive ending fund balance as well
Staff is
Improvement Fund 152 After careful analysis and consultation with the City external auditors it has been determined s that the use of this fund as a separate tracking device is no longer needed It has been used as for funds a 1 a pass through for debt services payments on the Civic Center and 2 depository earmarked for Civic Center improvements Both of these items can be accomplished through the General Fund at this point Over the years this Fund has built up an unappropriated balance of about 330 These excess funds are scheduled to be transferred to the General Fund 000
Civic Center effective June 30 2011
Senior Nutrition Program Fund 221 The Parks and Recreation department tracks expenditures associated with the senior nutrition for local seniors and is funded through a grant from the program The program provides lunches efforts and a City Council County of San Diego donations from seniors other fundraising to 46 transfer from the General Fund of 539 Staff is proposing reducing both
approved
revenues
up
500 5
and
796 expenditures 5
Block Grant
based
on
prior
year actuals
Community Development
Funds 222 and 227
CDBG
Partnership
CDBG and
HOME funds
are
Housing
and Urban
Development
Attachment D
activities
The
City
conducts
an
to
will receive
funding
CDBG 12 771 390 is anticipated in both FY11 and 13 FY12 In addition to the annual funds staff recommends the reallocation of funds from 965 previous years totaling approximately 23 The City will utilize the funds on its Residential Rehabilitation program and Capital Improvement Projects specifically the Santa Fe Sidewalk Improvements
For the CDBG
program
HUD
funding
of
HOME
12 HOME program HUD funding of 205 is anticipated in both FYI 1 and 150 In addition to the annual funds staff recommends the reallocation of funds from 874 previous years totaling approximately 473 The City will utilize the funds on its Residential Rehabilitation program
For the
13 FY12
874 additional information on the reallocation of the 23 for CDBG and the 473 for 965 dated March 16 2011 Public hearing and funding see HOME please agenda report 12 recommendations for the FYI 1 Community Development Block Grant CDBG and HOME Investment Partnership HOME programs
For
or public access educational and government franchise agreements This fund supports provider PEG access to governmental and educational programming through the acquisition and maintenance of technical infrastructure This includes audio equipment in City Council Chambers visual in the video control room and the City Institutional Network I Net broadcast equipment s
revenues
and
expenditures
for the
infrastructure
Revenue The
are
T City collects PEG fees from Time Warner Cable and AT The PEG payments and revenues are projected to remain stable T received quarterly from Time Warner and AT
two years
Expenditures
11 FY10
to
Annual
operating expenditures
are
expected
to
decrease
slightly
from
428 49
in
618 48
ITEM J1
36
Attachment D
Development Impact
Staff has based
13
Fee Funds
revenue
estimates
on an
assumption
Development Impact
Funds
Fee
11 FY10
11 FY10
Year Mid Review
12 FY11
13 FY12
Approved
projections
Projections
Park 231
Improvement
Fees
Fund
694 59
246 74 470 494
821 159
187 76
150 35 758 145
Mitigation
Fees Fund
Acquisition Fees
Fund 235
Fund
838 203
815 13 524 3 272 18
092 64
234
Open Space
Community Facilities
237
Fund
395892
Landscape District ELLD Fund 295 The City ELLD assesses property owners for the operation and maintenance of roadway wide ways of landscaping street lighting and traffic signals located within the street right of the City Revenues include a share of the 1 property tax assessment fees and investment earnings Some of the larger expenditures include contract services for traffic signal maintenance street light maintenance property maintenance landscape and tree maintenance and utilities such as electricity and water
wide City
Encinitas
Lighting
and
Revenue
FYI 1 and 12
1
are
growth
flat
in
property
no
taxes for
There is
change
to
assessment fee
Expenditures
in FY10 to 11
Annual
operating expenditures are expected to decrease slightly 13 12 369 263 723 233 1 in FYI 1 and increase to 1 in FY12
a
from
014 240 1
The reduction is
mainly
due to
decrease
in
the Internal
Cost Allocation
Increases to Traffic
to
Signal
12 Significant electricity savings are anticipated in FY2011 from a s replace 20 of the City street light fittings with energy efficient LED lighting The project should be completed by Summer 2011 The budget also includes the last two years of a four in the next two year program to replace red and green LED lights in traffic signals Included of the battery replacement program 25 a year for four years for year budget is a continuation the Uninterrupted Power Supply UPS system to keep traffic signals operational during power
outages
ITEM J 1
37
Attachment D
The fund balance in the
citywide
zones
has been continually declining over the past number of have a positive year end fund balance during the next two
fiscal years future revenue projections indicate that the Citywide zones will have expenditure insufficient revenues and fund balance to offset expenditures beginning in FY13 this will 14 either require an increase in assessments reduction in services or other financial subsidy of the
zone An assessment rate
ballot
measure as
outlined
by Proposition
218
Landscape and Lighting Act the Engineering Services Department prepares and files an Annual Report also referred to as an Engineer Report that outlines the s proposed operating budgets projected revenues assessments and methodology for apportioning assessments for each of the City landscape and lighting zones After the preliminary Annual s adopt Report is filed the 1972 Landscape and Lighting Act requires the Council to a resolution the intent of the Council to levy and collect assessments for the ELLD and set a date declaring for a public hearing This Resolution of Intention must then be posted at least 15 days prior to the public hearing This process is held separately but concurrently with the budgeting process
Pursuant
to the 1972
Funds 290 291 292 and 296 provide funding from levied assessments for localized landscaping and park improvements that were approved as development or subdivision map conditions Fund 297 provides funding from levied assessments for street lights traffic signals and for
maintenance of Las Verdes Park and Leo Mullen Sports Park within the Encinitas Ranch specific plan area No major projects are proposed for any of these funds in the next two year budget
Village Park MID Fund 290 A 1 reduction to water costs 555 expenditures
Villanitas MID Fund 291
is
being proposed
resulting
in
savings
to
proposing a 495 increase to the budget due to increased tree maintenance cost Revenue projections are reduced by 5 due to lower than anticipated investments earnings There are no other significant changes being proposed for this fund
Staff is
368 proposing a 3 reduction to expenditures due to reduced water costs Revenue 656 projections have been decreased by 1 due to lower than anticipated investment earnings and lower supplemental property taxes
Staff is Wiro Park MID Fund 296
A 647 reduction to
Allocation There
are no
expenditures is proposed due to reduced water costs significant changes to revenue projections
214 39 reduction
to
expenditures
is
are no
being proposed due to reduced water costs significant changes to revenue projections
and lower
Engineering Services Division will be holding a public hearing to adopt projected revenues expenditures plans for all Citywide Lighting and Landscape Districts per the provisions of the Landscaping and Landscape Act of 1972 This process is held separately but concurrently with the budgeting process 38
ITEM J1
Attachment D
Sanitary Divisions
See
Budget
Summaries
Attachment A
Sanitary Divisions provide wastewater collection and treatment majority City A Master Plan update which included a condition and a recommended Capital Improvement Plan was completed for assessment system mapping both of these Divisions in April 2011 A rate study and financial plan providing for the financial resources necessary to fund long operations and capital needs of each Division will be term FY 11 12 completed during
The Cardiff and Encinitas services to the of the
Sanitary Division Funds 501 through 506 600 Sanitary Division CSD serves a population of approximately 19 residents in the southern and easterly portions of the City including most of Cardiff and Olivenhain There are approximately 84 miles of sewer mains in the Division The annual sewer service charge for customers is based on a percentage of each customer water consumption The rate structure has s four different classifications under which customers are grouped
Cardiff The Cardiff
Sewage
The treatment
Facility SEWRF located at managed by the San Elijo Joint Powers plant of Solana Beach each owning 50 interest in the City Elijo
Water Reclamation
is
5 Services related to water usage are projected to increase 2 from 12 11 FY10 to 4 in FYI 1 and by 4 in FY12 to 4 Investment earnings 13 301 475 626 658 are expected to remain at historically low levels for at least another year and possibly longer and
Charges
for
have been flat lined for the remainder of the six year
plan
Expenditures Sewer treatment costs at the San Elijo Joint Powers Authority pump station operating and maintenance costs and city line maintenance costs are expected to remain stable during the next two year cycle Increases in insurance premiums are expected in both years 12 There are 2 of Capital Projects proposed in FYI 1 and 2 in FY12 507 390 13 119 100
Sanitary Division Funds 521 through 524 500 Sanitary Division ESD serves a population of approximately 16 residents in the westerly portion of the City There are approximately 39 miles of sewer mains in the central Division The annual sewer service charge for customers is based on a percentage of each s customer water consumption The rate structure has four different classifications under which customers are grouped
Encinitas The Encinitas
Sewage
Authority EWA
treatment
facility in
Carlsbad
plant
ESD
EWA treatment
pays plant
agencies manages the treatment Authority 4 maintenance approximately 84 of the operating and capital costs of the
six member
ITEM J1
39
Attachment D
Revenues s ESD
revenue
very
slight
to
reduction in
expected
decrease
anticipated reduced flows due to water conservation 13 Charges for Services in FY12 Connection fees in Similar to the CSD investment earnings are substantially
low levels for the foreseeable future
expected to
remain at
ESD
historically
Expenditures
expenditures have projected contract cost increases for sewer treatment at the Encina Wastewater Authority insurance premiums and city line maintenance costs There 13 Projects 12 are 1 of Capital Projects proposed for FYI 1 and 1 in FYI 2 576 360 956 501 are related to the Division share of capital projects at Encina Plant and Batiquitos Pump s owned Station which is co by the ESD and the Leucadia Wastewater District
Chapter
5 in
Budget
Document
White Binder
Budget Summary
The San
9 Dieguito Water District District services an area of approximately 8 square miles water to the western areas of the City The District serves approximately and provides potable 500 400 11 connections or a total population of 38 The District was originally formed for the of developing an adequate water supply for landowners and residents of the area In purpose 1948 the District Board of Directors voted to become a permanent member of the San Diego County Water Authority SDCWA the regional water supplier and the Metropolitan Water District of Southern California MWD to become eligible to purchase water transported into San Diego County via the infrastructure of the two agencies The District also partners with the E Santa Fe Irrigation District SFID in ownership of the R Badger Water Treatment Facility in order to take advantage of a local raw water supply from Lake Hodges
primarily adjustments increasing cost of purchasing water from SDCWA and increased water treatment costs For this and year two budget cycle the District is estimating purchasing 60 of its water from SDCWA utilizing its local water supply for the remaining 40 of its supply needs SDCWA estimates 12 that untreated water costs could increase anywhere from 8 to 18 in FYI 1 and from 5 to 8 in FY12 Given these estimates the District is budgeting for a 15 increase in SDCWA 13 13 5 12 water purchase costs in FYI 1 and a 7 increase in FY12 Furthermore it is anticipated 12 13 300 AF more water in FY12 than in FYI 1 and see a small that the District will purchase
increase in water treatment costs
The District last conducted a Water Rate Study in 2009 which determined water rates for calendar years 2010 and 2011 A new Water Rate Study is anticipated to be completed late in calendar year 2011 which will determine the next series of water rate adjustments if needed are needed to generate additional revenue to account for the Water rate
12 FY11 the District is reflecting a reorganization to consolidate functions and increase efficiency A new Division titled Customer Services 5313 has been created to house the utility billing water conservation and other administrative functions leaving the Administration Division 5311 to capture District costs and services The reorganization also includes the wide 0 0 elimination of 1 FTE Engineer II the addition of 1 FTE Program Coordinator as well as the
In
ITEM J1
40
Attachment D
Superintendent to Superintendent and the Management Analyst impact of these personnel changes is zero change in the
12 The District has created a new Fleet Replacement Fund 539 in FYI 1 to separate its Vehicle time and Equipment Replacement funding from that of the General Fund A one transfer from s to 12 FY11 transfer the District share of deposits funds 693 and 694 into fund 539 will occur in
Replacement Fund to the District Replacement develop its own fleet replacement schedule Deposits Replacement Fund will be made according to this schedule
Fund
into and
12 000 130 000 815 budget includes 2 and 1 in capital and work projects for FYI 1 and 12 New projects for FYI 1 include updating of the Districts Recycled 13 FY12 respectively s Water Rules and Regulations replacement of the District Utility Billing System and an update 13 of the District Rate Study No new projects are scheduled for FY12
supplies recycled water obtained from the San Elijo Joint Powers Authority s SEJPA for landscaping and government use along the District recycled water infrastructure 12 The District is anticipating slight increases in recycled water purchases and sales in FYI 1 and
The District also
13 FY12
Debt Service
figures
Budget
ITEM J1
41
Attachment E
Summary of Personnel
E T time The number of employees is measured in full equivalent F units One F works E T full time 2080 hours per year For fiscal year 2010 the City and Water District total 11 9 s E T authorized full equivalents is 236 The F are allocated by department as follows time
11 FY10 00 5 35 27
90 11
12 FY11 00 5
35 27
90 11
75 26 00 63 25 54 42 27
Planning
Marine Fire Safety Public Works
75 26 00 63 25 54 47 27
18 21
Engineering
Recreation Parks Total
18 21
85 236
90 236
The
City provides
number of services
by
but
does not dictate the number of persons required to implement the service Where the number of persons providing the service is known we have provided the information below
Law Enforcement
provided through
Patrol
Deputies Deputies Motorcycle Deputies Special Purpose Officers Community Service Officers Sergeants
Traffic Detectives Detective Total
59 25 90 5 00 4 80 5
50 3
67 4
00 6 60
Sergeant
06 56
50 1 40 3
Total
ITEM J1
42
Attachment E
Engineering Inspection
Services
provided by Geopacifica
89
Clean Water
69 1 45 03 3
Sabine
Morrison
as
needed
Community
Operations
contractual time 13 Part staff at any given time to assist the public with facility rentals and events and also provide general customer services and support for center operations staff serve on an as needed basis and typically do not
maintain a permanent work Recreation Services
9 fart contractual staff at any time contractual time staff serve on an
given
as
permanent
work
schedule
hazardous
lifeguards contract employees for summer beach coverage conditions coverage and Jr Lifeguard program instruction
season off
Custodial Services Blue Moon Community Center Senior T Janitorial Park Restrooms PW Yard and Library T
Busy
s B
Civic Center
City parks and beaches parking lot cleaning Canon Pacific Landscape Maintenance Excel Landscaping City Parks Beaches and Streetscapes Blue Skies City Parks Beaches and Streetscapes Pinnacle Landscaping City Parks Beaches and Streetscapes K Landscaping PW Yard R
Tree Maintenance
County of San Diego excluding dead animal removal Dead Animal Removal D Disposal Cannon Pacific Street Sweeping and Sidewalk Power Washing Maintenance Southwest Signal Street Light and Traffic Signal Vegetation Management County of San Diego Probation Crews Traffic Striping and Legend Painting Orange County Striping Services Inc
Animal Services
Concrete
Repair
Victor Concrete
ITEM J1
43
Attachment E
City Manager Department is responsible for conducting routine maintenance on the City of Encinitas position classification system Human Resources has divided the City position classification system into 3 different occupational categories job s families and each year conducts a Classification Maintenance Project which reviews one of the three categories This enables Human Resources HR to maintain the City position s on a 3 year cycle The schedule for the Classification Maintenance Project classification system is intended to coincide with the City budget cycle Below are findings from the results of the s FYI 0 Classification Maintenance Project 11
The Human Resources Division of the
As part of the
Project
following
results
Fire
Marine
Pa Current Classification
Grade
Grade 44 HR did find the Marine Safety Captain classification level of duties to more accurately reflect management category criteria This management category of employment is Will considered an At employment position The current incumbent will retain his current employment property rights but upon vacancy of the position the classification
Will will be considered At status Other will
apply
Fire Marshal
Pa Current Classification
Fire Marshal
Grade
Grade 61
HR did find for
Chiefi
Grade 61
changing
Fire
Prevention Battalion
Chief
the
Grade 61 to reflect
or
job
some
title
change Marshal but rather to provide honorary the management hierarchy of the Fire Department This position will continue
identified level
nature of work for the Encinitas identification for the Fire Marshal within
to be
excluded from the provisions of the Firefighters Procedural Bill of Rights and Labor Code Section 4850 after the title change becomes effective Jul 1 2011
ITEM J1
44
Attachment E
Pa Current Classification
Proposed
Grade 43
Pa Classification
Grade
Project Manager
Information Technology
Information Grade 44
Project Manager
Technology Supervisor
did find in its review for 2 of existing positions of the Information Technology Project Manager II Grade 44 be reclassified to an Information Technology Supervisor classification at Grade 44 The new Information Technology Supervisor classification is responsible for the administration of separate fields within the Information Technology Division Operations Applications and Geographical Information Systems The 44 Information Technology Project Manager I Grade 43 is recommended to become a II level classification of Information Technology Project Manager Grade 43 One single existing position of the Information Technology Project Manager I Grade 43 to remain in the single level classification at the current Grade 43
HR
Proposed Reorganization
The
Technology IT Department requested HR to include their proposed organization departmental re in the annual Classification Maintenance Project IT submitted their for proposed changes in structure and classification duties to HR review
Information
s If the IT Division
the
budget authority
HR
findings
are
as follows
Information
Technology Analyst
III II I
Pa Current Classification
Grade III
Grade
Information Technology
Grade 42
Analyst
Information
Grade 44
Technology Supervisor
s organization HR did find in its review of Information Technology Division proposed re for reclassification of 1 of the 4 current Information Technology Analysts III Grade 42 to Information Technology Supervisor Grade 44 The new title will more
position
accurately
reflect the
proposed
duties
required
of the
position
and the
proposed
organizational
structure
Public Works
Proposed Reorganization
The Public Works
Department
organization
changes
in the annual
PW Department requested HR to include their proposed departmental re Classification Maintenance Project PW submitted their proposed
ITEM J1
45
Attachment E
If the Public Works
approved by
the
follows
Superintendent
Grade
Current Classification Pa
Assistant
Superintendent
Superintendent
Grade 45
Grade 42
HR did find in its review of the Public Works proposed re for a reallocation organization of one of the 2 existing positions of the Assistant Superintendent Grade 42 be reallocated
to
management proposed addition of the mid duties of overall water system infrastructure operations to the already established day to day administration of San Dieguito Water District water distribution system operations
Superintendent
Grade 45 due to the
Management Analyst
42 25 Grade 24
III II I
organization proposed re for a reallocation of 1 of the 2 existing positions of the Management Analyst III Grade 42 be reallocated to Program Administrator Grade 43 due to the nature of the duties including utility billing district budgeting and supervisory responsibility for water conservation programs and technical staff Rather than create a unique classification at the utility billing finance 41 or 42 for the mixed duties assigned to this position it is supervisor pay grade consistent with the City of Encinitas use of the consultant designed broad classification of Program system to align the occupational definitions used for the existing broad class Administrator to accommodate the budget requirements managing the rate setting process and utility billing function duties assigned to this position upon reorganization
HR did find in its review of the Public Works
Engineer
II I Grade
Current Classification Pa
Engineer
II I
Grade
45 Grade 44
HR did find in its review of the Public Works proposed re for a reallocation organization 45 of the existing position of the Engineer I Grade 44 to Program Coordinator Grade II
Proposed reorganization duties to be assigned to this position will require technical administrative leadership and unique water district administrative knowledge necessary to resolve procedural ambiguities and advance program operations in unusual situations
22
ITEM J1
46
Attachment F
Summary
Each year City Management
This list is then of
prioritizes all existing and proposed capital projects against a set of criteria presented to the City Council at their Strategic Goal Setting Session Projects prioritized are divided among four categories Core Infrastructure Projects Projects Substantially Underway or With Restricted Funding Projects Beyond Six Years and All Other Projects The first three categories are exempted from the prioritization process Core Infrastructure Projects are automatically considered highest priority for funding and are therefore exempted from the prioritization process They include the following projects Annual Street Overlay Program Storm Drain Repairs Traffic Signal Upgrades IT System Replacement including replacement of the City mainframe system H E T s that are substantially underway or have restricted funding are also exempt from the process Projects because their funding is not available to be redirected to other projects Projects beyond six years fall outside of the timeframe of the six program and therefore are not competing for funding year remaining projects are subject to the rigorous prioritization process submitted to Council and s then groups into Priority Tiers Once endorsed by Council staff then works to fund Council highest priority projects Below are the Priority Tiers endorsed by Council at their most recent Strategic Goal Setting Session Total Proposed Project Additional Estimate Appropriations Project
All other
TIER I
Hall Property Park Development Site Hall Property Park Off Improvements Safe Routes to Schools
Phase I
Ongoing Crossing
Santa Fe Drive
Grade
Separated
Pedestrian Rail
Improvements
754 287 12 000 200 481 989 3 769 604 6 290 501 1
013 561
Recreational Trails
Development
Streetsca
e
Ongoing
TBD
000 90
0
Moonlight
N Coast Earl
Beach
Hwy 10 1
000 150 5
TBD
000 907 1
TBD
Warning System
3 Additional Grade
Separated
Pedestrian Rail
Crossings
TBD
Facade Improvement Program Playground Equipment Replacement Cottonwood Creek Outfall Replacement Open Habitat Space Acquisition Traffic Safety and Calming
Arroyo
Drive Storm Drain
Ongoing
000 155
0
0
000 15
000 450
0
Ongoing
000 700 Ongoing Ongoing
000 690
0
Facilities
Capital Replacement
Master Plan
Study
ITEM J1
47
Attachment F
TIER 3
Leucadia Boulevard
Housing
Element
0 0
000 50
0 0 0 0
Widening
000 20
0
000 425 5
000 800
000 3000 2 000 150 000 50
Plan Review
Update
Leucadia Specific
000 150
000 50
000 50
0
000 50
Mailing Notification
Application
000 15
NOT RATED
Citizen Satisfaction Survey
Ongoing
000 66
Priority Tiers as a guideline staff has made several modifications to the Capital Improvement Program It is important to note that the Capital Improvement Program is a planning document and only includes those projects for which funding is proposed in the six timeframe Projects that are already year Using
fullv fielded
is
a or
the
do not have
any
not aaaear in
the document
Below
summary of all
proposed projects
12 proposed funding for FY2011 and any changes information A detailed discussion of each pertinent in the FY2012 Financial Plan and Capital Improvement Program Black Binder 2017 project is included
comprehensive status report of all active projects was presented to Projects that are highlighted have been modified or have been newly adopted Council Capital Improvement Program
A
CONSULTANT S ERVICES STUDIES
Council in
February
2011
Project
FY2012
Community Satisfaction
This is other
newly
to
Survey NEW
Facade Improvement
Incentive Program Finance Studies Fees and
0
year
proposed program that is to be conducted every obtain public opinion and feed back on City provided
rogratnmed in FYI 1 13 and 15 16 12 14 is
services Funding is
No
No
programmed
ever other
year
000 60
Liabilities
Traffic
and
800 28
proposed changes Proposed funding every other year for Fee Update No proposed changes This project is a four year program to replace red and green LED lights in traffic signals FYI1 is the third 12
Studies and GASB 45 Actuarial
year
the of four
year
program
600 62
grarn
No
proposed changes
a
Zoning
Code
Update
0
0
This is
newl
NEW
Downtown Encinitas
Specific
NEW
proposed project City Council goal is to evaluate the Specific Plans following the General Plan consistency Funding
is
in
Housing
Cycle
proposed
in FY 14 15
A 0
ru
NEW
j rr
Attachment F
North 101 Corridor
Newly
City Council
goal
is to evaluate the
Funding
with
for
Non Management Attorney Representative for Union Negotiations with the ERA
and SEIU NEW SDWD Rate
560 35
This is
employee
expected
to
begin
in
Studv
000 125
000 40
12 000 Updates programmed for FYI 1 125 1 000 000 150 and FY15 100 Newly proposed project to review and update the Districts Recvcled Water Rules and Regulations along with the Districts
14 FY13
000 150
Newly
Utilitv
proposed project for soffivare and implementation of a Billing System to ensure integration with the City s new hiring a consultant to complete the Management Plan UWMP that is required Funding is proposed in FY 14 15
for
ERP system
This
project provides
five
vears
Project
FY2012
Pertinent Changes
Information
Now includes
plat
maps and City Clerk records Additional 13 16 proposed from FY12 until FY15
funding
600 163
ongoing
prograrn to
replace
outdated
technologN
equipment
0
Additional
A
permitting
Replacement Project
Educational Governmental Access
000 73
Project
Equipment Update
broadcast
Institutional
DRAINAGE PROJECTS
Project
FY2012
Pertinent Changes
Information
Proposed Funding
Storm Drain
Storm Drain
Repair
Fund
000 250
000 257 1
No
proposed changes Additional funding to repair provide drainage course improvements and re of new channel improvements vegetation
This is
a
Improvements Repairs
Arroyo Drive Storm Drain
Tier 2
project
and additional
funding
is scheduled in
Phase II NEW
Bevond 6
years
ITEM J1
49
Attachment F
WASTEWATER PROJECTS
Project
FY2012
Pertinent Changes
Information
Capital
updated
figures
Improvements Elijo Water Reclarnation Facility SEWRF ESD Share of Capital Improvements at Batiquitos Pump Station ESD Share of Capital Improvements at Enema
CSD Master Plan
at the San
000 50
No
proposed changes
to this
project
Capital
updated
figures
Implementation
ESD Master Plan
Implementation
Figures are updated annually operational priorities Figures are updated annually operational priorities
PUBLIC FACILITIES
Project
FY2012
Pertinent Changes
Information
Civic Center
Improvements
Funding temporarily
New
reduced
pending completion
of proposed
project
project
to
NEW
Secondary EOC
maintenance and
provide finding for a study to determine capital need for City owned facilities
emer
g
Setup
000 184
New
to fund installation of an
ency
NEW
Library HVAC
Upgrade
000 130
Additional
funding
for
upgrades
to the
existing
HVAC System
NEW
PA RKS
BEACHES PROJECTS
Project
FY2012
Proposed
Fundin6
Hall
Property Park
299 062 1
Funding
this
anticipated
construction
000 115
000 30 0
proposed Site Property Off Improvements see Streets and Rail Projects Categoiv Funding proposed in out five years is slightly modified but consistent with prior capital program Amount per year varies due to projected revenue in Open Space Acquisition Fee fund Habitat contributions Overall the amount of fiulding is paid Developer lower than previously programmed No proposed changes No proposed changes
to be transferred from
project
and
000 150
Funding
is
proposed
to
replace
play
year
ITEM J1
50
Attachment F
STREETS
RAIL PROJECTS
Project
FY2012
Pertinent Changes
Information
Proposed Funding
Annual Street Overlav
N Coast Hive 101
000 200 1
000 650
No
proposed
changes
FYI 1 FY12 12 13
Streetscape
14 FY13
incorporated
into La Costa
Improvement Project
Safe Routes to
Pathways Schools Program Traffic
000 200
000 50
No
No
proposed changes
proposed changes
for this
Signal
705 962
Funding
address
project
Quiet
Zone dy
000 300
Chesterfield Avenue
Property Park Improvements mitigation measures required in EIR Newly funded project for design engineering permitting and implementation of a Federal Rail Administration Quiet Zone
NEW
La Costa Avenue
000 200
Funding
for
design
Design Improvements
Downtown Sidewalk
project will
this
of Carlsbad
000 375 0
Additional
Newly
finding
to
complete
project
proposed project to provide design and construction improvements to this bus stop and intersection Funding is funding
for
NEW
Wav Side Horn
000 150
design
in FYI 1 12
funding
in
13 FY12
Project
FY2012
Water Infrastructure
Improvements NEW
000 40
projects previously called Water Distribution Line Upgrades Replacement have been merged into this one beginning in FYI 1 12 roject No proposed changes to this project
and Water Valve This No
No
The
000 975
000 100
project
is modified based
to this
on
priorities
identified in the
Replacement
and
project project
000 100
to this
Transmission Lines
ITEM J1
51