You are on page 1of 3

This is a view of the study plan that we will provide you for your PMP preparation

Enter the date when you intend to start studying for the PMP Exam
Start date: 2-Jun-08 <Input: Enter the start date of your studying for PMP Exam

End date:

9-Oct-08 Days Needed

You will get the potential date for This scheduling your is the optimum date proposed by PMPChampion.com for your PMP Exam date. If you PMP Exam plan to take the PMP exam at an earlier date, you need to compress this study plan by <Output: This is our suggested PMP Exam date
changing the numbers in the 3rd column "Days Needed" What to study Chapter 1 (Introduction) PowerPoint Slides and Tests 1.1Purpose of the PMBOK Document 1.2 What is a Project? 1.3 What is Project Management? 1.4 Relationship to Other Management Disciplines 1.5 Related Endeavors What you need to know before moving to the next phase

This is the date you want to start your Study Plan (and hopefully stick to it)

Chapter

Dates 2-Jun-08

Chapter 1: Introduction 4-Jun-08 5-Jun-08 Chapter 2: Project Life Cycle 8-Jun-08 9-Jun-08 Chapter 3: Project Management Processes 14-Jun-08 15-Jun-08 Chapter 4: Integration Management 23-Jun-08 24-Jun-08

Now if you want to take the PMP Exam sooner or later than the proposed date, you Chapter 2 (Life Cycle) PowerPoint Slides and Tests can play with these numbers (Nb of days needed to study each chapter) and create INTENTIONALLY REMOVED INTENTIONALLY REMOVED your own custom-made plan. You can compact or stretch the plan based on your Chapter 3 (PM Processes) PowerPoint Slides and Tests own schedule... dates in Column B will 3.1 Project Processes adjust to your input. 3.2 Process Groups INTENTIONALLY REMOVED
3.3 Process Interactions 3.4 Customizing Process Interactions Chapter 4 (PM Integration) PowerPoint Slides and Tests

INTENTIONALLY REMOVED

Chapter 5: Scope Management

For each Chapter you will be given a start date and end date for your study plan. In this Chapter 5 (Scope Management) PowerPoint Slides and Tests example you would be reading Chapter 5 5.1 Initiation: committing the organization to begin the next phase of the project. between June 24th and July 3rd . If you 5.2 Scope Planning: developing a written scope statement as the basis for INTENTIONALLY REMOVED planned to take 3 days of vacation during that future project decisions. 5.3 Scope Definition: subdividing the major project deliverables into week, just increase the number of days (from smaller, more manageable components. 5.4 Scope Verification: formalizing acceptance of the project scope. 9 to 12). The dates and the entire plan will 5.5 Scope Change Control: controlling changes to project scope. correct itself automatically.

INTENTIONALLY LEFT BLANK

INTENTIONALLY REMOVED

3-Jul-08

Chapter

Dates 4-Jul-08

Days Needed

What to study Chapter 6 (Time) PowerPoint Slides and Tests

What you need to know before moving to the next phase What are the tools and techniques for activity duration estimating? What is the difference between CPM, GERT and PERT? What is the difference between crashing and fast tracking? What are resource leveling heuristics? What is the purpose of the schedule control process? What are some outcomes if schedule changes are not managed? INTENTIONALLY REMOVED

Chapter 6: Time Management

10

14-Jul-08 15-Jul-08

Chapter 7: Cost Management

10

The study plan gives you a clear picture of what you have to know before moving on to the next Chapter 7 (Cost) PowerPoint Slides and Tests chapter. Some of the items on this draft have been removed. INTENTIONALY REMOVED You will see them in the Members Area.
Chapter 8 (Quality) PowerPoint Slides and Tests

INTENTIONALY REMOVED

INTENTIONALY REMOVED

25-Jul-08 26-Jul-08 What are the project quality management processes and what is the purpose of each? Describe the benefits of prevention over inspection. What is a quality policy? What are the tools and techniques for quality planning? Describe each. What is a quality management plan? On what is a quality audit performed? Which organizational unit typically performs quality control? What does quality control monitor? What are the tools and techniques for quality control? Describe each. What are the outputs from quality control? Describe each.

Chapter 8: Quality Management

10

The study plan gives you a clear picture of what you have to study and a general idea about the content of each chapter.
Chapter 10 (Communication) PowerPoint Slides and Tests 10.1 Communications Planning they need it, and how will it be given to them. 10.2 Information Distribution: making needed information available to project stakeholders in a timely manner. 10.3 Performance Reporting: collecting and disseminating performance information. This includes status reporting, progress measurement, and forecasting. 10.4 Administrative Closure: generating, gathering, and disseminating information to formalize phase or project completion.

5-Aug-08 6-Aug-08

Chapter 9: Communication Management

10

INTENTIONALY REMOVED

16-Aug-08

Chapter

Dates 17-Aug-08

Days Needed

What to study Chapter 9 (HR) PowerPoint Slides and Tests

What you need to know before moving to the next phase What are the project human resource management processes and what is the purpose of each? What is a Responsibility Assignment Matrix (RAM)? What is the purpose of the staffing management plan?

Chapter 10: Human Resources Management 27-Aug-08 28-Aug-08

10
INTENTIONALY REMOVED

Chapter 11 (Risk) PowerPoint Slides and Tests

Chapter 11: Risk Management

10

INTENTIONALY REMOVED

See the content INTENTIONALY REMOVED in our Members Area

7-Sep-08 8-Sep-08

Chapter 12 (Procurement) PowerPoint Slides and Tests

Chapter 12: Procurement Management 18-Sep-08 19-Sep-08

10

INTENTIONALY REMOVED

INTENTIONALY REMOVED

Professional Responsibility and Tests

Professional Responsibility

INTENTIONALY REMOVED

Online Exam 1 Review Weak Areas Online Exam 2 Review Weak Areas TOTAL days TOTAL weeks TOTAL months

24-Sep-08 25-Sep-08 25-Sep-08 26-Sep-08 1-Oct-08 2-Oct-08 2-Oct-08 3-Oct-08 8-Oct-08

0 5 0 5
112 16.0 4.0

By default, our plan takes 4 months to prepare you for the PMP Exam. However, you can compact or Take our online Exam 1 stretch this plan by changing the number of days you will spend on Review the questions you did not answer correctly Review the topics that need more attention (your weak areas) each chapter (3rd column called Take our online Exam 2 "Days Needed")
Review the questions you did not answer correctly Review the topics that need more attention (your weak areas) Schedule your PMP Exam. Go for the win Good Luck !

INTENTIONALY REMOVED

For your online PMP Training, visit us at: Note: Only Green cells can be changed by the user.

www.pmpchampion.com

You might also like