You are on page 1of 159

February 3, 2012

Owner
District Of cOlumbia
Office Of the Deputy mayOr fOr
planning anD ecOnOmic DevelOpment
parcel 11 Owner
st. augustines episcOpal church
MASTER DEVELOPER
HOFFMAN - MADISON WATERFRONT
ARcHITEcTS
PERkINS EASTMAN
BBG - BBGM
HANDEL ARcHITEcTS
cUNNINGHAM | QUILL ARcHITEcTS
Sk&I ARcHITEcTURAL DESIGN GROUP
MTFA ARcHITEcTURE
ROckWELL GROUP
LANDScAPE ARcHITEcTS
NELSON BYRD WOLTZ L. A.
MIcHAEL VERGASON L. A.
LEE & ASSOcIATES
LAND USE cOUNSEL
HOLLAND & kNIGHT, LLP
MARINE ENGINEER
MOFFAT & NIcHOL
cIVIL ENGINEER AND SURVEYOR
AMT cONSULTING ENGINEERS, LLc
TRAFFIc AND TRANSPORTATION
GOROVE / SLADE ASSOcIATES
SUSTAINABILITY cONSULTANT
SUSTAINABLE DESIGN cONSULTING, LLc
GREENING URBAN
STRUcTURAL ENGINEER
Sk & A / THORNTON TOMASETTI JV PLLc
MEP ENGINEER
SOUTHWEST WATERFRONT ENGINEERING GROUP
JOINT VENTURE
VISUALIZATION
INTERFAcE MULTIMEDIA
Stage two PUD aPPli cati on - VolUme i i
Volume i
Cover Sheet
Sheet index
Diagrams & Development Data
Context AeriAl PhotogrAPh
extent of StAge 2 PUd SUbmiSSion
PhASe 1 SUmmAry
AeriAl view of ProPoSed develoPment
illUStrAtive fUll Site PlAn
AeriAl view of ProPoSed develoPment
AeriAl view of ProPoSed develoPment
Segment A - StAge 2 PUd lAnd USe & bldg heightS
Segment b - StAge 2 PUd lAnd USe & bldg heightS
Segment d - StAge 2 PUd lAnd USe & bldg heightS
StAge 2 PUd - ProjeCt dAtA
StAge 2 PUd - ProjeCt dAtA
Site CirCUlAtion: vehiCUlAr
Site CirCUlAtion: PedeStriAn
Site CirCUlAtion: biCyCle
Site CirCUlAtion: trAnSit
Site leed SCoreCArd

open space perspective views & plans
overAll oPen SPACe PlAn
whArf loCAtion PlAn
whArf illUStrAtive PlAn
whArf PArtiAl PlAn/SeCtion
whArf SeCtionS
whArf view: At PArCel 2
whArf PreCedentS
trAnSit Pier loCAtion PlAn
trAnSit Pier illUStrAtive PlAn
trAnSit Pier PArtiAl SeCtion/PreCedentS
trAnSit Pier view
diStriCt Pier loCAtion PlAn
diStriCt Pier illUStrAtive PlAn
diStriCt Pier SeCtionS
diStriCt Pier PArtiAl PlAn:
wAter CoUrt & CiviC CommonS
diStriCt Pier PArt PlAn/SeCtion: exhibition AreA 2406.11 (e)(7)
diStriCt Pier view: wAter CoUrt 2406.11 (e)(7)
diStriCt Pier view: CiviC CommonS 2406.11 (e)(7)
diStriCt Pier view: exhibition AreA 2406.11 (e)(7)
diStriCt Pier PreCedentS 2406.11 (e)(7)
yACht ClUb PiAzzA loCAtion PlAn 2406.11 (e)(7)
yACht ClUb PiAzzA illUStrAtive PlAn 2406.11 (e)(7)
yACht ClUb PiAzzA elevAtion/PreCedentS 2406.11(e)(7)
yACht ClUb PiAzzA view 2406.11 (e)(7)
mewS loCAtion PlAn 2406.11 (e)(7)
mewS illUStrAtive PlAn 2406.11 (e)(7)
mewS PArt PlAn/SeCtionS 2406.11 (e)(7)
mewS PArt PlAn/SeCtionS 2406.11 (e)(7)
mewS view: PiAzzA mewS 2406.11 (e)(7)
mewS view: jAzz Alley 2406.11 (e)(7)
mewS PreCedentS 2406.11 (e)(7)
7th Street PArk loCAtion PlAn 2406.11 (e)(7)
7th Street PArk PArt PlAn 2406.11 (e)(7)
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
Drawing inDex
no. title
Drawing inDex
no. title
Drawing inDex
no. title
drawi ng i ndex
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
7th Street PArk SeCtionS 2406.11 (e)(7)
7th Street PArk view 2406.11 (e)(7)
7th Street PArk PreCedentS 2406.11 (e)(7)
wAterfront PArk loCAtion PlAn 2406.11 (e)(7)
wAterfront PArk illUStrAtive PlAn 2406.11 (e)(7)
wAterfront PArk PArt PlAnS 2406.11 (e)(7)
wAterfront PArk PArt SeCtion 2406.11 (e)(7)
wAterfront PArk view 2406.11 (e)(7)
wAterfront PArk PreCedentS 2406.11 (e)(7)
mAine AvenUe loCAtion PlAn 2406.11 (e)(7)
mAine AvenUe illUStrAtive PlAnS: PArCel 2 & 3 2406.11 (e)(7)
mAine AvenUe illUStrAtive PlAnS: PArCel 4 & 5 2406.11 (e)(7)
mAine AvenUe: PArt PlAn 2406.11 (e)(7)
mAine AvenUe: PArt SeCtion 2406.11 (e)(7)
mAine AvenUe view 2406.11 (e)(7)
mAine AvenUe PreCedentS 2406.11 (e)(7)
temPorAry PArking 2406.11 (e)(7)
Storefront deSign gUidelineS 2406.11 (e)(7)
StorefrontS: the whArf 2406.11 (e)(7)
StorefrontS: diStriCt Pier 2406.11 (e)(7)
StorefrontS: mAine AvenUe 2406.11 (e)(7)
SignAge: identity 2406.11 (e)(7)
SignAge: tyPogrAPhy 2406.11 (e)(7)
SignAge: wAyfinding 2406.11 (e)(7)
SignAge: Pier bAnnerS 2406.11 (e)(7)
SignAge: mASt bAnnerS 2406.11 (e)(7)
SignAge:infrAStrUCtUre 2406.11 (e)(7)
SignAge:benCh mArkerS 2406.11 (e)(7)
SignAge: interPretive 2406.11 (e)(7)
SignAge: interPretive 2406.11 (e)(7)
site Diagrams
Site SUrvey: AreA 1 2406.11 (e)(7)
Site SUrvey: AreA 2 2406.11 (e)(7)
Site SUrvey: AreA 3 2406.11 (e)(7)
Site SUrvey: AreA 4 2406.11 (e)(7)
Site SUrvey: AreA 5 2406.11 (e)(7)
grAding PlAn: AreA 1 2406.11 (e)(7)
grAding PlAn: AreA 2 2406.11 (e)(7)
grAding PlAn: AreA 3 2406.11 (e)(7)
grAding PlAn: AreA 4 2406.11 (e)(7)
grAding PlAn: AreA 5 2406.11 (e)(7)
Site Utility PlAn: AreA 1 2406.11 (e)(7)
Site Utility PlAn: AreA 2 2406.11 (e)(7)
Site Utility PlAn: AreA 3 2406.11 (e)(7)
Site Utility PlAn: AreA 4 2406.11 (e)(7)
Site Utility PlAn: AreA 5 2406.11 (e)(7)
StormwAter mAnAgement PlAn: AreA 1 2406.11 (e)(7)
StormwAter mAnAgement PlAn: AreA 2 2406.11 (e)(7)
StormwAter mAnAgement PlAn: AreA 3 2406.11 (e)(7)
StormwAter mAnAgement PlAn: AreA 4 2406.11 (e)(7)
StormwAter mAnAgement PlAn: AreA 5 2406.11 (e)(7)
StormwAter mAnAgement CAlCUlAtionS 2406.11 (e)(7)
Sediment & eroSion Control PlAn: AreA 1 2406.11 (e)(7)
Sediment & eroSion Control PlAn: AreA 2 2406.11 (e)(7)
Sediment & eroSion Control PlAn: AreA 3 2406.11 (e)(7)
Sediment & eroSion Control PlAn: AreA 4 2406.11 (e)(7)
Sediment & eroSion Control PlAn: AreA 5 2406.11 (e)(7)
Sediment & eroSion Control methodS 2406.11 (e)(7)
trUCk mAneUvering diAgrAm: eASt 2406.11 (e)(7)
trUCk mAneUvering diAgrAm: weSt 2406.11 (e)(7)
bACk Cover
3.28
3.29
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
Filing requirement
11 dCmr SeCtion
Drawing inDex
no. title
Drawing inDex
no. title
Drawing inDex
no. title
drawi ng i ndex
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.1 1
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7.19
7.20
7.21
7.22
7.23
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
8.11
9.1
9.2
9.3
Volume ii
Cover Sheet
Sheet index
parcel 2
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from diStriCt Pier wAterSide 2406.11 (e)(7)
PerSPeCtive view from trAnSit Pier wAterSide 2406.11 (e)(7)
PerSPeCtive view from bAnneker overlook 2406.11 (e)(7)
PerSPeCtive view from mAine Ave. & 9th Street 2406.11 (e)(7)
PerSPeCtive view from trAnSit Pier PlAzA 2406.11 (e)(7)
north elevAtion fACing mAine Ave. Sw 2406.11 (e)(7)
eASt elevAtion fACing diStriCt Pier 2406.11 (e)(7)
SoUth elevAtion fACing the whArf 2406.11 (e)(7)
weSt elevAtion fACing PArCel 1 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
3rd floor PlAn 2406.11 (e)(7)
4th floor PlAn 2406.11 (e)(7)
5th floor PlAn 2406.11 (e)(7)
tyPiCAl reSidentiAl level PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)
parcel 3a
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from mAine Ave 2406.11 (e)(7)
PerSPeCtive view from diStriCt Pier entry CoUrt 2406.11 (e)(7)
north elevAtion fACing mAine Ave. Sw 2406.11 (e)(7)
weSt elevAtion fACing diStriCt Pier 2406.11 (e)(7)
SoUth elevAtion fACing the whArf 2406.11 (e)(7)
eASt elevAtion fACing PArCel 4 2406.11 (e)(7)
groUnd & 2nd floor PlAn 2406.11 (e)(7)
3rd & 4th floor PlAn 2406.11 (e)(7)
5-9th & 10-11th floor PlAn 2406.11 (e)(7)
PenthoUSe & roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)

parcel 3b
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from mAine Ave. Sw 2406.11 (e)(7)
PerSPeCtive view from the whArf 2406.11 (e)(7)
SoUth elevAtion fACing whArf 2406.11 (e)(7)
weSt elevAtion fACing diStriCt Pier 2406.11 (e)(7)
north elevAtion fACing PArCel 3A 2406.11 (e)(7)
eASt elevAtion fACing PiAzzA 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
3rd floor PlAn 2406.11 (e)(7)
4th floor PlAn 2406.11 (e)(7)
5-9th floor PlAn 2406.11 (e)(7)
10th floor PlAn 2406.11 (e)(7)
11th floor PlAn 2406.11 (e)(7)
12th floor PlAn 2406.11 (e)(7)
PenthoUSe PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)
parcel 4
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from whArf 2406.11 (e)(7)
PerSPeCtive view from whArf 2406.11 (e)(7)
PerSPeCtive view from mAine Ave. Sw 2406.11 (e)(7)
SoUth elevAtion fACing whArf 2406.11 (e)(7)
north elevAtion fACing mAine Ave. Sw 2406.11 (e)(7)
weSt elevAtion fACing PArCel 3 2406.11 (e)(7)
eASt elevAtion fACing PArCel 5 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
3rd floor PlAn 2406.11 (e)(7)
tyPiCAl reSidentiAl floor PlAn 2406.11 (e)(7)
11th floor PlAn 2406.11 (e)(7)
12th floor PlAn 2406.11 (e)(7)
PenthoUSe PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(5)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)
parcel 11 a
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from m St. 2406.11 (e)(7)
PerSPeCtive view from mAine Ave. Sw 2406.11 (e)(7)
north elevAtion fACing 2406.11 (e)(7)
weSt elevAtion fACing 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
parcel 11 b
Site SUrvey PlAn 2406.11 (e)(7)
PerSPeCtive view from wAter Street 2406.11 (e)(7)
eASt elevAtion fACing 6th Street 2406.11 (e)(7)
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
12.10
12.11
weSt elevAtion fACing wAter Street 2406.11 (e)(7)
SoUth elevAtion fACing m PlACe Street 2406.11 (e)(7)
PArking PlAn 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
3rd floor PlAn 2406.11 (e)(7)
4th floor PlAn 2406.11 (e)(7)
5th floor PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
e-w SeCtion 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
detAilS & mAteriAlS 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)

capital yacht club
PerSPeCtive view from PiAzzA 2406.11 (e)(7)
PerSPeCtive view from wAterSide 2406.11 (e)(7)
north & eASt elevAtionS 2406.11 (e)(7)
SoUth & weSt elevAtionS 2406.11 (e)(7)
groUnd floor PlAn 2406.11 (e)(7)
2nd floor PlAn 2406.11 (e)(7)
roof PlAn 2406.11 (e)(7)
n-S SeCtion 2406.11 (e)(7)
leed SCoreCArd 2406.11 (e)(7)
parking, pier house & lanDsiDe pavilion
Pier hoUSe: elevAtionS 2406.11 (e)(7)
Pier hoUSe: groUnd level PlAn 2406.11 (e)(7)
Pier hoUSe: lower roof PlAn 2406.11 (e)(7)
Pier hoUSe: roof PlAn 2406.11 (e)(7)
Pier hoUSe: SeCtionS 2406.11 (e)(7)
tyPiCAl whArf kioSk : PlAnS & SeCtion 2406.11 (e)(7)
tyPiCAl whArf kioSk: PerSPeCtive viewS 2406.11 (e)(7)
PArking g1 level PlAn 2406.11 (e)(7)
PArking g2 level PlAn 2406.11 (e)(7)
watersiDe pavilions
trAnSit PAvilion: PerSPeCtive view from trAnSit Pier
trAnSit PAvilion: PerSPeCtive view from town SQUAr
trAnSit PAvilion: elevAtionS
trAnSit PAvilion: groUnd floor & roof PlAnS 2406.11 (e)(7)
trAnSit PAvilion: e-w SeCtion 2406.11 (e)(7)
doCk mASter: north & SoUth elevAtionS 2406.11 (e)(7)
doCk mASter: weSt elevAtion 2406.11 (e)(7)
doCk mASter: 1St, 2nd floor PlAnS 2406.11 (e)(7)
doCk mASter: roof PlAn 2406.11 (e)(7)
doCk mASter: e-w SeCtion 2406.11 (e)(7)
doCk mASter: n-S SeCtion 2406.11 (e)(7)
bACk Cover
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 2
P
a
r
c
e
l

2
4
5 Floor Base with 7 Floor tower
130 Building height
RETAIL 38,606 GSf
RESIDENTIAL 357,526 GSf
292 EAST TOWER APARTMENT UNITS
202 WEST TOWER APARTMENT UNITS
MULTI-USE MUSIC & CULTURAL VENUE 134,886 GSf
CO-GEN PLANT 17,217 GSf
TOTAL: 548,235 GSF
PA RCEL 2: si tE suRvEy PL A n
4.1
0 50 25
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: PERSPECTI VE VI EW
4.2
PERSPECTIVE VIEW FROM DISTRICT PIER WATERSIDE
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: PERSPECTI VE VI EW
4.3
PERSPECTIVE VIEW FROM TRANSIT PIER WATERSIDE
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: PERSPECTI VE VI EW
4.4
PERSPECTIVE VIEW FROM BANNEKER OVERLOOK
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: PERSPECTI VE VI EW
4.5
PERSPECTIVE VIEW FROM MAINE AVE. & 9TH STREET
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: PERSPECTI VE VI EW
4.6
PERSPECTIVE VIEW FROM TRANSIT PIER PLAZA
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: NORTH EL EVATI ON FACI NG MA I NE AVENUE SW
4.7
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
+200-0
T. O. TOwer
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: EAST EL EVATI ON FACI NG dI STRI CT PI ER
4.8
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
+200-0
T. O. TOwer
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: SOUTH EL EVATI ON FACI NG THE WHA RF
4.9
0 32 16
+148-6
T. O. PenThOuse
+200-0
T. O. TOwer
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: WEST EL EVATI ON FACI NG PA RCEL 1
4.10
0 32 16
+200-0
T. O. TOwer
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
D-8
C-8
B-9
C-10
1
9
9
'
-

0
"
100'-6"
273' - 0"
C
L
239'-10" 39'-6"
2
5
1
'-
2
"
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
0 32 16
PA RCEL 2: GROUND FL OOR PL A N
4.11
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: 2ND FL OOR PL A N
4.12
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
C-10
2
5
1
'-
2
"
273'-0"
5
7
'
-

0
"
1
9
9
'
-

0
"
C
L
100'-6"
228'-9" 51'-0"
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.13
PA RCEL 2: 3RD FL OOR PL A N
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
D-8
C-8
B-9
C-10
C
L
273' - 0"
1
9
9
'
-

0
"
5
7
'
-

0
"
231'-9" 51'-0"
2
3
6
'-
2
"
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.14
PA RCEL 2: 4TH FL OOR PL A N
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
C-10
C
L
1
9
9
'
-

0
"
5
7
'
-

0
"
273' - 0"
100'-6"
231'-9" 51'-0"
2
3
6
'-
2
"
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.15
PA RCEL 2: 5TH FL OOR PL A N
1 2 3
4
5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
C-10
C
L
100'-6"
231'-7" 51'-0"
273'-0"
2
0
1
'-
0
"
5
7
'-
0
"
2
3
6
'-
0
"
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.16
PA RCEL 2: TYPI CA L RESI DENTI A L FL OOR PL A N
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
C-10
227'-6"
2
3
0
'-
1
"
52'-6"
2
4
8
'-
2
"
124' - 3"
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.17
PA RCEL 2: ROOF PL A N
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RH
RG
RF
RE
RD
RC
RB
RA
J
L
N
O
P
R
C-10
2
2
1
'-
9
"
2
4
8
'-
2
"
227'-7"
124'-11"
65'-0"
0 32 16
NOTE: THE INTERIOR PAR-
TITION LOCATIONS, THE
NUMBER, SIZE, AND LOCA-
TIONS Of UNITS, STAIRS
AND ELEVATORS ARE PRE-
LIMINARY AND SHOWN fOR
ILLUSTRATIVE PURPOSES
ONLY. THE fINAL LAYOUTS
MAY VARY.
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
Level 1
0"
Level 2
22' - 0"
Level 3
31' - 8"
Level 4
41' - 4"
Level 5
51' - 0"
Level 6
60' - 8"
Level 7
70' - 4"
Level 8
80' - 0"
Level 9
89' - 8"
Level 10
99' - 4"
Level 11
109' - 0"
Level 12
118' - 8"
Roof
130' - 0"
D E F G H I
Level 3.1
35' - 0"
Level G1
-13' - 6"
J
G2
-23' - 0"
SITE
-2' - 0"
Level Mezz
12' - 8"
Penthouse
139' - 0"
A B C L
HOFFMAN-MADISON WATERFRONT
PARCEL 2
SECTION
01/18/2012
SOUTHWEST WATERFRONT
PROGRESS SET
A11
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
4.18
PA RCEL 2: N- S SECTI ON
0 32 16
Level 1
0"
Level 2
22' - 0"
Level 3
31' - 8"
Level 4
41' - 4"
Level 5
51' - 0"
Level 6
60' - 8"
Level 7
70' - 4"
Level 8
80' - 0"
Level 9
89' - 8"
Level 10
99' - 4"
Level 11
109' - 0"
Level 12
118' - 8"
Roof
130' - 0"
D E F G H I
Level 3.1
35' - 0"
Level G1
-13' - 6"
J
G2
-23' - 0"
SITE
-2' - 0"
Level Mezz
12' - 8"
Penthouse
139' - 0"
A B C L
HOFFMAN-MADISON WATERFRONT
PARCEL 2 SECTION
01/18/2012
SOUTHWESTWATERFRONT
PROGRESSSET
A11
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
4.19
PA RCEL 2: E- W SECTI ON
Level 1
0"
Level 2
22' - 0"
2 3 4 5 6 7 8 9 10
Level 3
31' - 8"
Level 4
41' - 4"
Level 5
51' - 0"
Level 6
60' - 8"
Level 7
70' - 4"
Level 8
80' - 0"
Level 9
89' - 8"
Level 10
99' - 4"
Level 11
109' - 0"
Level 12
118' - 8"
Roof
130' - 0"
Level 3.1
35' - 0"
Level G1
-13' - 6"
G2
-23' - 0"
Level Mezz
12' - 8"
Penthouse
139' - 0"
N O P
HOFFMAN-MADISON WATERFRONT
PARCEL 2
SECTION
01/18/2012
SOUTHWEST WATERFRONT
PROGRESS SET
A10
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
0 32 16
Level 1
0"
Level 2
22' - 0"
2 3 4 5 6 7 8 9 10
Level 3
31' - 8"
Level 4
41' - 4"
Level 5
51' - 0"
Level 6
60' - 8"
Level 7
70' - 4"
Level 8
80' - 0"
Level 9
89' - 8"
Level 10
99' - 4"
Level 11
109' - 0"
Level 12
118' - 8"
Roof
130' - 0"
Level 3.1
35' - 0"
Level G1
-13' - 6"
G2
-23' - 0"
Level Mezz
12' - 8"
Penthouse
139' - 0"
N O P
HOFFMAN-MADISON WATERFRONT
PARCEL 2 SECTION
01/18/2012
SOUTHWESTWATERFRONT
PROGRESSSET
A10
SCALE : 1/32" = 1'-0"
0' 96' 64' 16' 32'
retail
residential
MULTI-USE MUSIC &
CULTURAL VENUE
SERVICE / CORE
ROOfSCAPE / TERRACE
green rooF
WATER (POOL)
OPEN TO BELOW
rooF Below
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: DETA I L s & MATERI A L s
4.20
Painted Aluminum Guardrail
With Glass Infill Panels
Interface Shot
Painted Aluminum Guardrail
Edge Cover
4 Face Brick Spandrel
6 Thermally Broken,Painted
Aluminum Curtain Wall System
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: DETA I L s & MATERI A L s
4.21
6 Thermally Broken Aluminum
Curtain Wall System
1 Insulating Glass Spandrel Unit
Painted Aluminum
Slab Edge Cover
Interface Shot
S o u t h w e S t w a t e r f r o n t
J a n u a r y 1 8 , 2 0 1 2 h o f f m a n - m a D I S o n w a t e r f r o n t
1 1
E x t e r i o r C o n c e p t P e r s p e c t i v e | T h e a t e r A l l e y D e t a i l s
W H A R F H A L L A P A R T M E N T S
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: DETA I L s & MATERI A L s
4.22
SouthweSt waterfront
Stage two pud appli cati on F e brua ry 1 , 2 0 1 2 hoffman - maDISon waterfront
Parcel 2: DeTaI ls & MaTerI als
6.18
Legend
1 2 3
4 7 5
8
9
6
1. Brick 1
2. Brick 2
3. Stone Cladding
4. Precast Concrete
5. Composite Metal- Dark
6. Composite Metal - Light
7. Painted Aluminum
Curtain Wall System
8. Painted Aluminum Guardrail
With Glass Inflls
9. Metal & Glass Canopy
10. Glass
1. Brick 1
2. Brick 2
3. Stone Cladding 5. Composite Metal - Dark
6. Composite Metal - Light
7. Painted Aluminum
Curtain Wall System
10. Glass 4. Precast Concrete
10
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 2: L EEd sCoRECA Rd
4.23
Southwest Waterfront Parcel 2
EE&K a Perkins Eastman Company
January 24, 2012 DRAFT
17 7 1 1 Possible Points 26
Y ?Y ?N N Y ?Y ?N N
Y Prereq 1 Construction Activity Pollution Prevention 2 Credit 4 2
1 Credit 1 1 2 Credit 5 2
5 Credit 2 5 1 Credit 6 1
1 Credit 3 1 1 Credit 7 1
6 Credit 4.1 Alternative Transportation: Public Transportation Access 6
1 Credit 4.2 1 8 5 1 1 Possible Points 15
3 Credit 4.3 3 Y ?Y ?N N
2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 1 Y Prereq 2
1 Credit 5.2 1 1 Credit 1 1
1 Credit 6.1 1 1 Credit 2 1
1 Credit 6.2 1 1 Credit 3.1 1
1 Credit 7.1 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1
1 Credit 8 1 1 Credit 4.2 1
1 Credit 4.3 1
4 5 1 Possible Points 10 1 Credit 4.4 1
Y ?Y ?N N 1 Credit 5 1
Y Prereq 1 1 Credit 6.1 1
2 2 Credit 1 4 1 Credit 6.2 1
LEED 2009 for New Construction and Major Renovation
Project Checklist
Stormwater Design: Quantity Control
Stormwater Design: Quality Control
Site Development: Maximize Open Space
Sustainable Sites
Heat Island Effect: Non-Roof
Water Use Reduction: 20% Reduction
Water Efficient Landscaping
Materials & Resources, Cont.
Site Selection
Environmental Tobacco Smoke (ETS) Control
Minimum IAQ Performance
Indoor Environmental Quality
Rapidly Renewable Materials: 2.5%
Certified Wood: 50%
Alternative Transportation: Low Emitting & Fuel Efficient Vehic
Alternative Transportation: Parking Capacity
Alternative Transportation: Bicycle Storage & Changing Rooms
Development Density & Community Connectivity
Brownfield Redevelopment
Site Development: Protect or Restore Habitat
Recycled Content: 10%/ 20%
Regional Materials: 10%/ 20%
Outdoor Air Delivery Monitoring
Construction IAQ Management Plan: Before Occupancy
Increased Ventilation: 30%
Construction IAQ Management Plan: During Construction
Low-Emitting Materials: Adhesives & Sealants
Controllability of Systems: Thermal Comfort
Low-Emitting Materials: Paints
Low-Emitting Materials: Carpet
Water Efficiency
Heat Island Effect: Roof
Light Pollution Reduction
Low-Emitting Materials: Composite Wood & Agrifiber Products
Indoor Chemical & Pollutant Source Control
Controllability of Systems: Lighting
2 Credit 2 2 1 Credit 7.1 1
2 1 1 Credit 3 4 1 Credit 7.2 1
1 Credit 8.1 1
10 17 8 Possible Points 35 1 Credit 8.2 1
Y ?Y ?N N
Y Prereq 1 5 1 Possible Points 6
Y Prereq 2 Y ?Y ?N N
Y Prereq 3 1 Credit 1.1 Exemplary Performance: Maximize Public Transportation Acc 1
8 7 4 Credit 1 19 1 Credit 1.2 Innovation in Design: Co-gen Plant 1
3 4 Credit 2 7 1 Credit 1.3 Innovation in Design: Acoustical Isolation 1
2 Credit 3 2 1 Credit 1.4 Innovation in Design: 7.1 exemplary100% of parking undergro 1
2 Credit 4 2 1 Credit 1.5 Innovation in Design:Green Power 1
3 Credit 5 3 1 Credit 2 1
2 Credit 6 2
1 2 1 Possible Points 4
6 1 2 5 Possible Points 14 Y ?Y ?N N
Y ?Y ?N N 1 Credit 1.1 EAc2 - On-Site Renewable Energy (1%) 1
Y Prereq 1 1 Credit 1.2 SSc6.1 - Stormwater Management: Quantity Control 1
3 Credit 1.1 3 1 Credit 1.3 WEc2 - Innovative Wastewater Technologies 1
1 Credit 1.2 1 1 Credit 1.4 EAc1 - Optimize Energy Performance (40%/36%) 1
2 Credit 2 Construction Waste Management: 50%/ 75% 2 1 SSc5.1, MRC 5.1
1 1 Credit 3 2 51 37 6 16 Possible Points 110
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 points
On-Site Renewable Energy: 1%-13%
Fundamental Commissioning of Building Energy Systems
Minimum Energy Performance
Optimize Energy Performance: 8% and up
Fundamental Refrigerant Management
Energy & Atmosphere
p g
Innovative Wastewater Technologies
LEED Accredited Professional
Regional Priority Credits
Total
Innovation & Design Process
y y
Daylight & Views: Views for 90% of Spaces
Building Reuse: Maintain 50% of Interior Non-Structural Elemen
Materials Reuse: 5%/ 10%
Materials & Resources
Storage & Collection of Recyclables
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
Green Power
Building Reuse: Maintain Existing Walls, Floors, and Roof
Water Use Reduction: 30%/ 35%/ 40%
Thermal Comfort: Design
Thermal Comfort: Verification
Daylight & Views: Daylight 75% of Spaces
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 3A
P
a
r
c
e
l

3
A
5
3 fLOOR BASE WITH 8 fLOOR TOWER
130 Building height
RETAIL 15,169 GSf
OffICE 218,210 GSf
TOTAL: 233,379 GSF
PA RCEL 3A: si tE suRvEy PL A n
5.1
0 50 25
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.2
PA RCEL 3A: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM MAINE AVE. SW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.3
PA RCEL 3A: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM DISTRICTPIER ENTRY COURT
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.4
PA RCEL 3A: NORTH EL EvATi ON/ fACi Ng MA i NE AvENUE sw
0 32 16
+148-6
T. O. PenThOuse
+170-0
T. O. TOWER
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.5
PA RCEL 3A: WEST EL EvATi on fACi ng di STRi CT Pi ER
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
+170-0
T. O. TOWER
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.6
PA RCEL 3A: SOUTH EL EvATi On fACi ng THE WHA Rf
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
+170-0
T. O. TOWER
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.7
PA RCEL 3A: EAST EL EvATi on fACi ng PA RCEL 4
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
+170-0
T. O. TOWER
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3A: GRound & 2nd fL ooR PL A n
5.8
14 15 16 17 18 19 20 21 22
0
A
B
C
D
"
0-'
0
1
"
4-'
9
"
0-'
0
3
"
0-'
0
3
"
0-'
0
3

6

-'
3
" 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 6 - ' 0 2 6 - ' 2 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3
6'-4" 65'-2"
1
1
2
'-1
0
"
217'-7
1
1
2
'-5

233'-0"
0 32 16
14 15 16 17 18 19 20 21 22
0
A
B
C
D
9
'-4
"
3
0
'-0
"
3
0
'-0
"
3
0
'-0
"
" 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 2 2 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3
65'-2" 152'-5"
3
0
'-2
"
8
2
'-8
"
GROUND FLOOR PLAN
2ND FLOOR PLAN
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
noTE: THE InTERIoR pARTITIon LocATIonS, THE
nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS
AnD ELEvAToRS ARE pRELIMInARY AnD SHoWn FoR
ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS
MAY vARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3A: 3Rd & 4TH fL ooR PL A n
5.9
14 15 16 17 18 19 20 21 22
0
A
B
C
D
" 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 2 2 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3
9
'-4
"
3
0
'-0
"
3
0
'-0
"
3
0
'-0
"
8
2
'-8
"
" 0 - ' 4 1 " 0 1 - ' 2 6 156'-2"
152'-5" 65'-2"
3
0
'-2
"
14 15 16 17 18 19 20 21 22
0
A
B
C
D
" 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 6 - ' 2 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 22'-0"
3RD FLOOR PLAN
4TH FLOOR PLAN
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
noTE: THE InTERIoR pARTITIon LocATIonS, THE
nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS
AnD ELEvAToRS ARE pRELIMInARY AnD SHoWn FoR
ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS
MAY vARY.
0 32 16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3A: 5 - 9th & 10th fL ooR PL A n
5.10
14 15 16 17 18 19 20 21 22
0
A
B
C
D
" 2 - ' 5 6 " 0 1 - ' 4 2 " 2 - ' 6 9 " 0 - ' 9 2
2
8
'-8
"
2
'-6
"
7
4
'-6
"
9'-9" 45'-0" 14'-0" 156'-2"
7
6
'-8
"
1
0
'-2
"
2
0
'-0
"
14 15 16 17 18 19 20 21 22
0
A
B
C
D
9
'-4
"
3
0
'-0
"
3
0
'-0
"
- ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3 " 0
7
5
'-7
"
2
0
'-0
"
1
0
'-2
"
3
0
'-2
"
64'-2" 125'-2" 24'-10"
45'-0" 169'-1"
5-9TH FLOOR PLAN
10TH FLOOR PLAN
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
noTE: THE InTERIoR pARTITIon LocATIonS, THE
nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS
AnD ELEvAToRS ARE pRELIMInARY AnD SHoWn FoR
ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS
MAY vARY.
0 32 16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.11
PA RCEL 3A: PENTHOUSE & ROOF PL A N
15 16 17 18 19 20 21 22
0
A
B
C
D
" 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 6 " 0 - ' 0 3 " 0 - ' 0 3 " 0 - ' 0 3
9
'-4
"
3
0
'-0
"
3
0
'-0
"
3
0
'-0
"
2
0
'-0
"
10'-0"
1
6
'-0
"
7
'-6
"
14
D
15 16 17 18 19 20 21 22
0
A
B
C
PENTHOUSE PLAN
ROOF PLAN
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
noTE: THE InTERIoR pARTITIon LocATIonS, THE
nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS
AnD ELEvAToRS ARE pRELIMInARY AnD SHoWn FoR
ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS
MAY vARY.
0 32 16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.12
PA RCEL 3A: N- S SECti oN
Level 1
0' - 0"
Level G1
-13' - 6"
Level G2
-23' - 0"
Level 2
16' - 0"
Level 3
27' - 3 1/2"
Level 4
38' - 6 1/2"
Level 5
49' - 10"
Level 6
61' - 1 1/2"
Level 7
72' - 4 1/2"
Level 8
83' - 8"
Level 9
94' - 11 1/2"
Level 10
106' - 2 1/2"
Level 11
117' - 6"
0 A B C D
PENTHOUSE
130' - 0"
ROOF PLAN
146' - 6"
1
3
0
'-
0
"
MAINE
AVENUE
ALLEY 1
3
'-
6
"
0 32 16
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
Level 1
0' - 0"
Level 2
16' - 0"
Level 3
27' - 3 1/2"
Level 4
38' - 6 1/2"
Level 5
49' - 10"
Level 6
61' - 1 1/2"
Level 7
72' - 4 1/2"
Level 8
83' - 8"
Level 9
94' - 11 1/2"
Level 10
106' - 2 1/2"
Level 11
117' - 6"
14 15 16 17 18 19 20 21 22
PENTHOUSE
130' - 0"
ROOF PLAN
146' - 6"
1
3
0
'-
0
"
CITY PIER 1
3
'-
6
"
Level G1
Level G2
-13' - 6"
-23' - 0"
5.13
PA RCEL 3A: E- W SECTI ON
0 32 16
RETAIL
SERvIcE / coRE / EgRESS
oFFIcE
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.14
PA RCEL 3A: DEtA i L s & MAtERi A L s
Metal Glazing System With
Insulated Glass Panels
Architectural Cast
Stone Parapet
Stone Cladding Beyond
Metal Glazing System
With Insulated Glass
Metal Glazing System With
Insulated Glass Panels
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.15
PA RCEL 3A: DEtA i L s & MAtERi A L s
Brick Beyond
Architectural Cast
Stone Parapet
Brick Over Metal Stud
Metal Glazing System With
Insulated Glass Panels
Metal Glazing System With
Insulated Glass Panels
Interface Shot
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
5.16
PA RCEL 3A: DEtA i L s & MAtERi A L s
SouthweSt waterfront
Stage two pud appli cati on F e brua ry 1 , 2 0 1 2 hoffman - maDISon waterfront
Parcel 3a: DeTaI ls & MaTerI als
6.18
Legend
1 5
3 6 2
4
1. Brick 1
2. Limestone 1
3. Limestone 2
4. Composite Metal - Dark
5. Composite Metal - Light
6. Painted Aluminum
Curtain Wall System
7. Metal & Glass Canopy
8. Glass
9. Spandrel
1. Brick 1
2. Limestone 1 4. Composite Metal - Dark
5. Composite Metal - Light
6. Painted Aluminum Curtain
Wall System
8. Glass 3. Limestone 2
9. Spandrel
7
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3A: L EEd sCoRECA Rd
5.17
Southwest Waterfront Parcel 3a
EE&K a Perkins Eastman Company
January 24, 2012 DRAFT
17 7 1 1 Possible Points 26
Y ?Y ?N N Y ?Y ?N N
Y Prereq 1 Construction Activity Pollution Prevention 2 Credit 4 2
1 Credit 1 1 2 Credit 5 2
5 Credit 2 5 1 Credit 6 1
1 Credit 3 1 1 Credit 7 1
6 Credit 4.1 Alternative Transportation: Public Transportation Access 6
1 Credit 4.2 1 8 6 1 Possible Points 15
3 Credit 4.3 3 Y ?Y ?N N
2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 1 Y Prereq 2
1 Credit 5.2 1 1 Credit 1 1
1 Credit 6.1 1 1 Credit 2 1
1 Credit 6.2 1 1 Credit 3.1 1
1 Credit 7.1 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1
1 Credit 8 1 1 Credit 4.2 1
1 Credit 4.3 1
4 5 1 Possible Points 10 1 Credit 4.4 1
Y ?Y ?N N 1 Credit 5 1
Y Prereq 1 1 Credit 6.1 1
2 2 Credit 1 4 1 Credit 6.2 1
LEED 2009 for New Construction and Major Renovation
Project Checklist
Stormwater Design: Quantity Control
Stormwater Design: Quality Control
Site Development: Maximize Open Space
Sustainable Sites
Heat Island Effect: Non-Roof
Water Use Reduction: 20% Reduction
Water Efficient Landscaping
Materials & Resources, Cont.
Site Selection
Environmental Tobacco Smoke (ETS) Control
Minimum IAQ Performance
Indoor Environmental Quality
Rapidly Renewable Materials: 2.5%
Certified Wood: 50%
Alternative Transportation: Low Emitting & Fuel Efficient Vehic
Alternative Transportation: Parking Capacity
Alternative Transportation: Bicycle Storage & Changing Rooms
Development Density & Community Connectivity
Brownfield Redevelopment
Site Development: Protect or Restore Habitat
Recycled Content: 10%/ 20%
Regional Materials: 10%/ 20%
Outdoor Air Delivery Monitoring
Construction IAQ Management Plan: Before Occupancy
Increased Ventilation: 30%
Construction IAQ Management Plan: During Construction
Low-Emitting Materials: Adhesives & Sealants
Controllability of Systems: Thermal Comfort
Low-Emitting Materials: Paints
Low-Emitting Materials: Carpet
Water Efficiency
Heat Island Effect: Roof
Light Pollution Reduction
Low-Emitting Materials: Composite Wood & Agrifiber Products
Indoor Chemical & Pollutant Source Control
Controllability of Systems: Lighting
2 Credit 2 2 1 Credit 7.1 1
2 1 1 Credit 3 4 1 Credit 7.2 1
1 Credit 8.1 1
10 15 10 Possible Points 35 1 Credit 8.2 1
Y ?Y ?N N
Y Prereq 1 6 Possible Points 6
Y Prereq 2 Y ?Y ?N N
Y Prereq 3 1 Credit 1.1 Exemplary Performance: Maximize Public Transportation Acc 1
8 5 6 Credit 1 19 1 Credit 1.2 Innovation in Design: SS 7.1 - 100% of parking 1
3 4 Credit 2 7 1 Credit 1.3 Innovation in Design: Green Cleaning 1
2 Credit 3 2 1 Credit 1.4 Innovation in Design: Comprehensive recycling program 1
2 Credit 4 2 1 Credit 1.5 Innovation in Design: Low mercury bulbs 1
3 Credit 5 3 1 Credit 2 1
2 Credit 6 2
1 2 1 Possible Points 4
6 1 7 Possible Points 14 Y ?Y ?N N
Y ?Y ?N N 1 Credit 1.1 EAc2 - On-Site Renewable Energy (1%) 1
Y Prereq 1 1 Credit 1.2 SSc6.1 - Stormwater Management: Quantity Control 1
3 Credit 1.1 3 1 Credit 1.3 WEc2 - Innovative Wastewater Technologies 1
1 Credit 1.2 1 1 Credit 1.4 EAc1 - Optimize Energy Performance (40%/36%) 1
2 Credit 2 Construction Waste Management: 50%/ 75% 2 SSc5.1,
2 Credit 3 2 52 36 3 19 Possible Points 110
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 points
On-Site Renewable Energy: 1%-13%
Fundamental Commissioning of Building Energy Systems
Minimum Energy Performance
Optimize Energy Performance: 8% and up
Fundamental Refrigerant Management
Energy & Atmosphere
p g
Innovative Wastewater Technologies
LEED Accredited Professional
Regional Priority Credits
Total
Innovation & Design Process
y y
Daylight & Views: Views for 90% of Spaces
Building Reuse: Maintain 50% of Interior Non-Structural Elemen
Materials Reuse: 5%/ 10%
Materials & Resources
Storage & Collection of Recyclables
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
Green Power
Building Reuse: Maintain Existing Walls, Floors, and Roof
Water Use Reduction: 30%/ 35%/ 40%
Thermal Comfort: Design
Thermal Comfort: Verification
Daylight & Views: Daylight 75% of Spaces
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 3B
P
a
r
c
e
l

3
B
6
3 FLooR BASE WITH 9 FLooR ToWER
130 BUILDIng HEIgHT
RETAIL 7,381 GSf
HOTEL (278 KEYS) 245,830 GSf
TOTAL: 253,211 GSF
PA RCEL 3B: si tE suRvEy PL A n
6.1
0 50 25
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.2
PA RCEL 3B: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM MAINE AVENUE SW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.3
PA RCEL 3B: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM THE WHARF
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.4
PA RCEL 3B: SOUTH EL EvATi On fACi ng WHA Rf
0 32 16
+159-3 13/16
T. O. clOck TOwer
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.5
PA RCEL 3B: WEST EL EvATi on fACi ng Di STRi CT Pi ER
0 32 16
+159-3 13/16
T. O. clOck TOwer
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.6
PA RCEL 3B: NORTH EL EvATi ON fACi Ng PA RCEL 3A
0 32 16
+159-3 13/16
T. O. clOck TOwer
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.7
PA RCEL 3B: EAST EL EvATi on fACi ng Pi A zzA
0 32 16
+159-3 13/16
T. O. clOck TOwer
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: GRound fL ooR PL A n
6.8
0 32 16
noTE: THE InTERIoR pARTITIon LocATIonS, THE nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS AnD ELEvAToRS ARE pRELIMInARY AnD
SHoWn FoR ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS MAY vARY.
RETAIL
HoTEL
SERvIcE / coRE / EgRESS
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.9
PA RCEL 3B: 2nd fL ooR PL A n
0 32 16
noTE: THE InTERIoR pARTITIon LocATIonS, THE nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS AnD ELEvAToRS ARE pRELIMInARY AnD
SHoWn FoR ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS MAY vARY.
RETAIL
HoTEL
SERvIcE / coRE / EgRESS
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: 3RD FL OOR PL A N
6.10
0 32 16
noTE: THE InTERIoR pARTITIon LocATIonS, THE nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS AnD ELEvAToRS ARE pRELIMInARY AnD
SHoWn FoR ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS MAY vARY.
RETAIL
HoTEL
SERvIcE / coRE / EgRESS
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.11
PA RCEL 3B: 4th fL ooR PL A N
0 32 16
noTE: THE InTERIoR pARTITIon LocATIonS, THE nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS AnD ELEvAToRS ARE pRELIMInARY AnD
SHoWn FoR ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS MAY vARY.
RETAIL
HoTEL
SERvIcE / coRE / EgRESS
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: 5 - 9th FL OOR PL A N
6.12
0 32 16
noTE: THE InTERIoR pARTITIon LocATIonS, THE nUMBER, SIZE, AnD LocATIonS oF UnITS, STAIRS AnD ELEvAToRS ARE pRELIMInARY AnD
SHoWn FoR ILLUSTRATIvE pURpoSES onLY. THE FInAL LAYoUTS MAY vARY.
RETAIL
HoTEL
SERvIcE / coRE / EgRESS
RooFScApE / TERRAcE
gREEn RooF
WATER (pooL)
opEn To BELoW
RooF BELoW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.13
PA RCEL 3B: 10th fL ooR PL A N
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
HOTEL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: 11th fL ooR PL A n
6.14
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
HOTEL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.15
PA RCEL 3B: 12th fL ooR PL A N
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
HOTEL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: PEnthousE PL A n
6.16
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
HOTEL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.17
PA RCEL 3B: Roof PL A n
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
HOTEL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.18
PA RCEL 3B: N- S SECti oN
0 32 16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
6.19
PA RCEL 3B: E- W SECTI ON
0 32 16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: dEtA i L s & mAtERi A L s
6.20
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: dEtA i L s & mAtERi A L s
6.21
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: dEtA i L s & mAtERi A L s
6.22
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: dEtA i L s & mAtERi A L s
6.23
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: dEtA i L s & mAtERi A L s
6.24
February 1st, 2012
/ EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS
1
STAGE TWO PUD APPLICATION
MATERIALS - WEST ELEVATION
5. Cushwa - Potomac
Valley Brick. Random
Blend Recycled brick/
burnt brick
7. Precast concrete sills,
coping or trim - Lime-
stone fnish. Located
within or on top of
brick walls.
2. Cushwa - Potomac
Valley Brick. Random
Blend - Dark
1. Cushwa - Potomac
Valley Brick. Random
Blend - Light
4. Aluminum extrusions with two coats Kynar
(70%). Charcoal Black.
3. Break metal aluminum panels: 1/8
reinforced, L/120, painted sheet alu-
minum with two coats Kynar (70%).
Charcoal Black
8. 2 x 2 Precast Con-
crete Pavers Lime-
stone fnish. Located on
terraces.
6. Low-E, Clear Glass
2
1
4 2 3 3
6
5
4
7
8
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 3B: L EEd sCoRECA Rd
6.25
Wharf Intercontinental Hotel
BBG/ BBMG
1/24/12
19 5 1 1 Possible Points 26
Y ?Y ?N N Y ?Y ?N N
Y Prereq 1 Construction Activity Pollution Prevention 2 Credit 4 2
1 Credit 1 1 2 Credit 5 2
5 Credit 2 5 1 Credit 6 1
1 Credit 3 1 1 Credit 7 1
6 Credit 4.1 Alternative Transportation: Public Transportation Access 6
1 Credit 4.2 1 7 5 3 Possible Points 15
3 Credit 4.3 3 Y ?Y ?N N
2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 1 Y Prereq 2
1 Credit 5.2 1 1 Credit 1 1
1 Credit 6.1 1 1 Credit 2 1
1 Credit 6.2 1 1 Credit 3.1 1
1 Credit 7.1 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1
1 Credit 8 1 1 Credit 4.2 1
1 Credit 4.3 1
4 3 3 Possible Points 10 1 Credit 4.4 1
Y ?Y ?N N 1 Credit 5 1
Y Prereq 1 1 Credit 6.1 1
2 2 Credit 1 4 1 Credit 6.2 1
Heat Island Effect: Roof
Light Pollution Reduction
Low-Emitting Materials: Composite Wood & Agrifiber Products
Indoor Chemical & Pollutant Source Control
Controllability of Systems: Lighting
Water Efficiency
Outdoor Air Delivery Monitoring
Construction IAQ Management Plan: Before Occupancy
Increased Ventilation: 30%
Construction IAQ Management Plan: During Construction
Low-Emitting Materials: Adhesives & Sealants
Controllability of Systems: Thermal Comfort
Low-Emitting Materials: Paints
Low-Emitting Materials: Carpet
Materials & Resources, Cont.
Site Selection
Environmental Tobacco Smoke (ETS) Control
Minimum IAQ Performance
Indoor Environmental Quality
Rapidly Renewable Materials: 2.5%
Certified Wood: 50%
Alternative Transportation: Low Emitting & Fuel Efficient Vehic
Alternative Transportation: Parking Capacity
Alternative Transportation: Bicycle Storage & Changing Rooms
Development Density & Community Connectivity
Brownfield Redevelopment
Site Development: Protect or Restore Habitat
Recycled Content: 10%/ 20%
Regional Materials: 10%/ 20%
LEED 2009 for New Construction and Major Renovation
Project Checklist
Stormwater Design: Quantity Control
Stormwater Design: Quality Control
Site Development: Maximize Open Space
Sustainable Sites
Heat Island Effect: Non-Roof
Water Use Reduction: 20% Reduction
Water Efficient Landscaping
2 Credit 2 2 1 Credit 7.1 1
2 1 1 Credit 3 4 1 Credit 7.2 1
1 Credit 8.1 1
7 13 7 8 Possible Points 35 1 Credit 8.2 1
Y ?Y ?N N
Y Prereq 1 6 Possible Points 6
Y Prereq 2 Y ?Y ?N N
Y Prereq 3 1 Credit 1.1 Exemplary Performance: Maximize Public Transportation Acc 1
5 5 5 4 Credit 1 19 1 Credit 1.2 Exemplary Performance: Comprehensive Recycling Program 1
1 2 4 Credit 2 7 1 Credit 1.3 Innovation in Design: Green Cleaning 1
2 Credit 3 2 1 Credit 1.4 Innovation in Design: Green Education 1
2 Credit 4 2 1 Credit 1.5 Innovation in Design: Process Energy Savings Elevator 1
3 Credit 5 3 1 Credit 2 1
2 Credit 6 2
1 2 1 Possible Points 4
6 1 7 Possible Points 14 Y ?Y ?N N
Y ?Y ?N N 1 Credit 1.1 SSc6.1 - Stormwater Management: Quantity Control 1
Y Prereq 1 1 Credit 1.2 EAc2 - On-Site Renewable Energy (1%) 1
3 Credit 1.1 3 1 Credit 1.3 SSc5.1 -Protect or Restore Habitat 1
1 Credit 1.2 1 1 Credit 1.4 Wec2-Innovative Wastewater technologies 1
2 Credit 2 Construction Waste Management: 50%/ 75% 2 EAc1(40% New); MRc1.1( 55% Building reuse)
2 Credit 3 2 50 27 16 17 Possible Points 110
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 points
Water Use Reduction: 30%/ 35%/ 40%
Thermal Comfort: Design
Thermal Comfort: Verification
Daylight & Views: Daylight 75% of Spaces
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
Green Power
Building Reuse: Maintain Existing Walls, Floors, and Roof
Building Reuse: Maintain 50% of Interior Non-Structural Elemen
Materials Reuse: 5%/ 10%
Materials & Resources
Storage & Collection of Recyclables
LEED Accredited Professional
Regional Priority Credits
Total
Innovation & Design Process
y y
Daylight & Views: Views for 90% of Spaces
On-Site Renewable Energy: 1%-13%
Fundamental Commissioning of Building Energy Systems
Minimum Energy Performance
Optimize Energy Performance: 8% and up
Fundamental Refrigerant Management
Energy & Atmosphere
p g
Innovative Wastewater Technologies
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 4
P
a
r
c
e
l

4
7
2 FLOOR BASE WITH 10 FLOOR TOWER
130 BUILDINg HEIgHT
RETAIL 77,067 GSf
RESIDENTIAL, 168 RENTAL UNITS 123,962 GSf
RESIDENTIAL, 130 CONDO UNITS 179,548 GSf
TOTAL: 380,577 GSF
PA RCEL 4: si tE suRvEy PL A n
7.1
0 50 25
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.2
PA RCEL 4: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM WHARF
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.3
PA RCEL 4: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM WHARF
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PERSPECTIVE VIEW FROM MAINE AVENUE SW
7.4
PA RCEL 4: PERsPECti vE vi Ew
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.5
PA RCEL 4: SOUTH EL EvATi On fACi ng WHA Rf
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 32 16
7.6
PA RCEL 4: NORTH EL EvATi ON fACi Ng MA i NE AvENUE SW
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.7
PA RCEL 4: WEST EL EvATi on fACi ng PA RCEL 3
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.8
PA RCEL 4: EAST EL EvATi on fACi ng PA RCEL 5
0 32 16
+148-6
T. O. PenThOuse
+130-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 4: GRound fL ooR PL A n
7.9
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 32 16
7.10
PA RCEL 4: 2nd fL ooRL PL A n
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 4: 3RD FL OOR PL A N
7.11
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.12
PA RCEL 4: TYPI CA L RESI DENTI A L L EVEL PL A N
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.13
PA RCEL 4: 11th fL ooR PL A n
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.14
PA RCEL 4: 12th fL ooRL PL A N
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.15
PA RCEL 4: PEnthousE L EvEL PL A n
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.16
PA RCEL 4: Roof PL A n
0 32 16
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.17
PA RCEL 4: N- S SECti oN
0 32 16
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.18
PA RCEL 4: E- W SECti on
0 32 16
RETAIL
RESIDENTIAL : APARTMENT
RESIDENTIAL : CONDO
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.19
PA RCEL 4: dEtA i L s & mAtERi A L s
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.20
PA RCEL 4: dEtA i L s & mAtERi A L s
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.21
PA RCEL 4: dEtA i L s & mAtERi A L s
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
7.22
PA RCEL 4: dEtA i L s & mAtERi A L s
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 4: L EEd sCoRECA Rd
7.23
LEED 2009 f or New Const ruct i on and Maj or Renovat ions Pr oj ect Name
Pr oj ect Checkl i st Dat e
16 9 1 Possi bl e Poi nt s: 26
Y ? N Y ? N
Y Pr er eq 1 2 Cr edi t 4 1 t o 2
1 Cr edi t 1 1 2 Cr edi t 5 1 t o 2
5 Cr edi t 2 5 1 Cr edi t 6 Rapi dl y Renewabl e Mat er i al s 1
1 Cr edi t 3 Br ownf i el d Redevel opment 1 1 Cr edi t 7 1
6 Cr edi t 4. 1 6
1 Cr edi t 4. 2 1 11 4 Possi bl e Poi nt s: 15
3 Cr edi t 4. 3 Al t er nat i ve Tr anspor t at i onLow-Emi t t i ng and Fuel -Ef f i ci ent Vehi cl es 3
2 Cr edi t 4. 4 2 Y Pr er eq 1
1 Cr edi t 5. 1 Si t e Devel opment Pr ot ect or Rest or e Habi t at 1 Y Pr er eq 2
1 Cr edi t 5. 2 Si t e Devel opment Maxi mi ze Open Space 1 1 Cr edi t 1 1
1 Cr edi t 6. 1 St or mwat er Desi gnQuant i t y Cont r ol 1 1 Cr edi t 2 1
1 Cr edi t 6. 2 St or mwat er Desi gnQual i t y Cont r ol 1 1 Cr edi t 3. 1 1
1 Cr edi t 7. 1 Heat Isl and Ef f ect Non-r oof 1 1 Cr edi t 3. 2 1
1 Cr edi t 7. 2 1 1 Cr edi t 4. 1 1
1 Cr edi t 8 Li ght Pol l ut i on Reduct i on 1 1 Cr edi t 4. 2 1
1 Cr edi t 4. 3 1
4 6 Possi bl e Poi nt s: 10 1 Cr edi t 4. 4 1
1 Cr edi t 5 1
Y Pr er eq 1 1 Cr edi t 6. 1 Cont r ol l abi l i t y of Syst emsLi ght i ng 1
2 2 Cr edi t 1 Wat er Ef f i ci ent Landscapi ng 2 t o 4 1 Cr edi t 6. 2 1
2 Cr edi t 2 Innovat i ve Wast ewat er Technol ogi es 2 1 Cr edi t 7. 1 1
2 2 Cr edi t 3 2 t o 4 1 Cr edi t 7. 2 Ther mal Comf or t Ver i f i cat i on 1
1 Cr edi t 8. 1 1
14 4 17 Possi bl e Poi nt s: 35 1 Cr edi t 8. 2 1
Y Pr er eq 1 3 Possi bl e Poi nt s: 6
Y Pr er eq 2
Y Pr er eq 3 1 Cr edi t 1. 1 1
5 4 10 Cr edi t 1 1 t o 19 1 Cr edi t 1. 2 1
7 Cr edi t 2 1 t o 7 Cr edi t 1. 3 1
2 Cr edi t 3 2 Cr edi t 1. 4 1
2 Cr edi t 4 2 Cr edi t 1. 5 1
3 Cr edi t 5 3 1 Cr edi t 2 1
2 Cr edi t 6 2
Possi bl e Poi nt s: 4
7 3 4 Possi bl e Poi nt s: 14
Cr edi t 1. 1 1
Y Pr er eq 1 Cr edi t 1. 2 1
3 Cr edi t 1. 1 1 t o 3 Cr edi t 1. 3 1
1 Cr edi t 1. 2 Bui l di ng ReuseMai nt ai n 50%of Int er i or Non- St r uct ur al El ement s 1 Cr edi t 1. 4 1
2 Cr edi t 2 1 t o 2
2 Cr edi t 3 1 t o 2 55 26 22 Possi bl e Poi nt s: 110
Regi onal Pr i or i t y: Speci f i c Cr edi t
Regi onal Pr i or i t y: Speci f i c Cr edi t
Regi onal Pr i or i t y: Speci f i c Cr edi t
Regi onal Pr i or i t y: Speci f i c Cr edi t
Measur ement and Ver i f i cat i on
Innovat i on i n Desi gn: Cogener at i on Pl ant
Innovat i on i n Desi gn: Hi gh Vol ume Fl y Ash
Innovat i on i n Desi gn: Speci f i c Ti t l e
Innovat i on i n Desi gn: Speci f i c Ti t l e
Innovat i on i n Desi gn: Speci f i c Ti t l e
Mat er i al s Reuse
St or age and Col l ect i on of Recycl abl es
Mat eri al s and Resources
Fundament al Commi ssi oni ng of Bui l di ng Ener gy Syst ems
Tot al
Const r uct i on Wast e Management
Enhanced Commi ssi oni ng
On-Si t e Renewabl e Ener gy
Enhanced Ref r i ger ant Management
Const r uct i on IAQ Management Pl anBef or e Occupancy
Mat eri al s and Resources, Cont i nued
Wat er Ef f i ci ency
Bui l di ng ReuseMai nt ai n Exi st i ng Wal l s, Fl oor s, and Roof
Al t er nat i ve Tr anspor t at i onPar ki ng Capaci t y
Heat Isl and Ef f ect Roof
Recycl ed Cont ent
Regi onal Mat er i al s
Cer t i f i ed Wood
Al t er nat i ve Tr anspor t at i onBi cycl e St or age and Changi ng Rooms
Sust ai nabl e Si t es
Al t er nat i ve Tr anspor t at i onPubl i c Tr anspor t at i on Access
Si t e Sel ect i on
Devel opment Densi t y and Communi t y Connect i vi t y
Const r uct i on Act i vi t y Pol l ut i on Prevent i on
Low-Emi t t i ng Mat er i al sAdhesi ves and Seal ant s
Low-Emi t t i ng Mat er i al sPai nt s and Coat i ngs
Opt i mi ze Ener gy Per f or mance
Energy and At mosphere
Wat er Use Reduct i on20%Reduct i on
Low-Emi t t i ng Mat er i al sComposi t e Wood and Agr i f i ber Pr oduct s
Low- Emi t t i ng Mat eri al sFl oor i ng Syst ems
Indoor Chemi cal and Pol l ut ant Sour ce Cont r ol
Ther mal Comf or t Desi gn
Cont r ol l abi l i t y of Syst emsTher mal Comf or t
Gr een Power
Wat er Use Reduct i on
Mi ni mum Ener gy Per f or mance
Fundament al Ref r i ger ant Management
Dayl i ght and Vi ewsVi ews
LEED Accr edi t ed Pr of essi onal
Dayl i ght and Vi ewsDayl i ght
Cer t if ied 40 t o 49 point s Silver 50 t o 59 poi nt s Gol d 60 t o 79 point s Plat inum 80 t o 110
Const r uct i on IAQ Management Pl anDur i ng Const r uct i on
Out door Ai r Del i ver y Moni t or i ng
Indoor Envi ronment al Quali t y
Mi ni mum Indoor Ai r Qual i t y Per f or mance
Envi r onment al Tobacco Smoke ( ETS) Cont r ol
Incr eased Vent i l at i on
Regi onal Pri ori t y Credi t s
Innovat i on and Desi gn Process
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 11A
P
a
r
c
e
l

1
1
A
8
2 FLOORS
49 BUILDINg HEIgHT
CHURCH 15,500 gSF
PA RCEL 11A: si tE suRvEy PL A n
0 50 25
8.1
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.2
PA RCEL 11A: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM M STREET
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PERSPECTIVE VIEW FROM MAINE AVENUE
8.3
PA RCEL 11A: PERsPECti vE vi Ew
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.4
PA RCEL 11A: noRth EL EvAti on
0 16 8
+49-0
t.o. roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.5
PA RCEL 11A: EAst & wEst EL EvAti ons
0 16 8
WEST ELEVATION EAST ELEVATION
+49-0
t.o. roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.6
PA RCEL 11A: gRound fL ooR PL A n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
CULTURAL / CIVIC
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.7
PA RCEL 11A: 2nd fL ooR PL A n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
CULTURAL / CIVIC
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.8
PA RCEL 11A: Roof PL A n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
CULTURAL / CIVIC
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 16 8
8.9
PA RCEL 11A: E- W SECTI ON
CULTURAL / CIVIC
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
8.10
PA RCEL 11A: MATERI A L S
3 - Cast Stone
1- Blue glass
2 - gray glass
Material Legend
1 - Blue glass
2 - gray glass
3 - Cast Stone
4 - Mill Finish Aluminum Screen
5 - White Aluminum Storefront
4 - Mill Finish Aluminum Screen
5 - White Aluminum Storefront
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARCEL 11B
P
a
r
c
e
l

1
1
B
9
4 Floors
45 Building HeigHt WitH oCCuPiABle
PentHouse to 57
109 CondoMiniuM units 116,137 gsF

PA RCEL 11B: si tE suRvEy PL A n
0 50 25
9.1
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.2
PA RCEL 11B: PERsPECti vE vi Ew
PERSPECTIVE VIEW FROM WATER STREET
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.3
PA RCEL 11B: EAST EL EvATi on fACi ng 6TH STREET
0 30 15
+57-0
T. O. PenThOuse
+45-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: WEST EL EvATi on fACi ng WATER STREET
9.4
0 30 15
+57-0
T. O. PenThOuse
+45-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.5
PA RCEL 11B: SOUTH EL EvATi On fACi ng M PL ACE STREET
0 30 15
+57-0
T. O. PenThOuse
+45-0
Main roof
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.6
PA RCEL 11B: PA RK I NG PL A N
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: GRound fL ooR PL A n
9.7
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.8
PA RCEL 11B: 2nd fL ooR PL A n
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: 3RD FL OOR PL A N
9.9
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.10
PA RCEL 11B: 4th fL ooR PL A n
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: 5th FL OOR PL A N
9.11
0 30 15
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 30 15
9.12
PA RCEL 11B: Roof PL A n
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 30 15
9.13
PA RCEL 11B: N- S SECti oN
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
9.14
PA RCEL 11B: E- W SECTI ON
0 30 15
RESIDENTIAL
SERVICE / CORE / EgRESS
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: dEtA i L s & mAtERi A L s
9.15
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: dEtA i L s & mAtERi A L s
9.16
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: dEtA i L s & mAtERi A L s
9.17
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: dEtA i L s & mAtERi A L s
9.18
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RCEL 11B: L EEd sCoRE CA Rd
9.19
LEED 2009 f or New Const ruct i on and Maj or Renovat i ons SW Wat er f r ont - Par cel 11- Resi d_01/ 24/ 2012
Pr oj ect Checkl i st
24 2 Possi bl e Poi nt s: 26
Y ? N Y ? N
Y Pr er eq 1 1 1 Cr edi t 4 1 t o 2
1 Cr edi t 1 1 2 Cr edi t 5 1 t o 2
5 Cr edi t 2 5 1 Cr edi t 6 Rapi dl y Renewabl e Mat er i al s 1
1 Cr edi t 3 Br ownf i el d Redevel opment 1 1 Cr edi t 7 1
6 Cr edi t 4. 1 6
1 Cr edi t 4. 2 1 10 1 4 Possi bl e Poi nt s: 15
3 Cr edi t 4. 3 Al t er nat i ve Tr anspor t at i onLow- Emi t t i ng and Fuel - Ef f i ci ent Vehi cl es 3
2 Cr edi t 4. 4 2 Y Pr er eq 1
1 Cr edi t 5. 1 Si t e Devel opment Pr ot ect or Rest or e Habi t at 1 Y Pr er eq 2
1 Cr edi t 5. 2 Si t e Devel opment Maxi mi ze Open Space 1 1 Cr edi t 1 1
1 Cr edi t 6. 1 St or mwat er Desi gnQuant i t y Cont r ol 1 1 Cr edi t 2 1
1 Cr edi t 6. 2 St or mwat er Desi gnQual i t y Cont r ol 1 1 Cr edi t 3. 1 1
1 Cr edi t 7. 1 Heat Isl and Ef f ect Non- r oof 1 1 Cr edi t 3. 2 1
1 Cr edi t 7. 2 1 1 Cr edi t 4. 1 1
1 Cr edi t 8 Li ght Pol l ut i on Reduct i on 1 1 Cr edi t 4. 2 1
1 Cr edi t 4. 3 1
3 3 4 Possi bl e Poi nt s: 10 1 Cr edi t 4. 4 1
1 Cr edi t 5 1
Y Pr er eq 1 1 Cr edi t 6. 1 Cont r ol l abi l i t y of Syst emsLi ght i ng 1
2 2 Cr edi t 1 Wat er Ef f i ci ent Landscapi ng 2 t o 4 1 Cr edi t 6. 2 1
2 Cr edi t 2 Innovat i ve Wast ewat er Technol ogi es 2 1 Cr edi t 7. 1 1
1 1 2 Cr edi t 3 2 t o 4 1 Cr edi t 7. 2 Ther mal Comf or t Ver i f i cat i on 1
1 Cr edi t 8. 1 1
5 30 Possi bl e Poi nt s: 35 1 Cr edi t 8. 2 1
Y Pr er eq 1 3 3 Possi bl e Poi nt s: 6
Y Pr er eq 2
Y Pr er eq 3 1 Cr edi t 1. 1 1
3 16 Cr edi t 1 1 t o 19 1 Cr edi t 1. 2 1
7 Cr edi t 2 1 t o 7 1 Cr edi t 1. 3 1
2 Cr edi t 3 2 1 Cr edi t 1. 4 1
2 Cr edi t 4 2 1 Cr edi t 1. 5 1
3 Cr edi t 5 3 1 Cr edi t 2 1
2 Cr edi t 6 2
2 1 1 Possi bl e Poi nt s: 4
5 3 6 Possi bl e Poi nt s: 14
1 Cr edi t 1. 1 1
Y Pr er eq 1 1 Cr edi t 1. 2 1
3 Cr edi t 1. 1 1 t o 3 1 Cr edi t 1. 3 1
1 Cr edi t 1. 2 Bui l di ng ReuseMai nt ai n 50%of Int er i or Non- St r uct ur al El ement s 1 1 Cr edi t 1. 4 1
2 Cr edi t 2 1 t o 2
2 Cr edi t 3 1 t o 2 52 11 47 Possi bl e Poi nt s: 110
Regi onal Pr i or i t y: EAc2
Regi onal Pr i or i t y: SSc5. 1
Regi onal Pr i or i t y: SSc6. 1
Regi onal Pr i or i t y: Speci f i c Cr edi t
Measur ement and Ver i f i cat i on
Innovat i on i n Desi gn: Exempl ar y Per f or mance MR. c5
Innovat i on i n Desi gn: Low Mer cur y Li ght i ng
Innovat i on i n Desi gn: Bui l di ng educat i on
Innovat i on i n Desi gn: MR- Li pt us wood i n f aade
Innovat i on i n Desi gn: Compr ehensi ve Tr anspor t at i on Pl an
Mat er i al s Reuse
St or age and Col l ect i on of Recycl abl es
Mat eri al s and Resources
Fundament al Commi ssi oni ng of Bui l di ng Ener gy Syst ems
Tot al
Const r uct i on Wast e Management
Enhanced Commi ssi oni ng
On- Si t e Renewabl e Ener gy
Enhanced Ref r i ger ant Management
Const r uct i on IAQ Management Pl anBef or e Occupancy
Mat eri al s and Resources, Cont i nued
Wat er Ef f i ci ency
Bui l di ng ReuseMai nt ai n Exi st i ng Wal l s, Fl oor s, and Roof
Al t er nat i ve Tr anspor t at i onPar ki ng Capaci t y
Heat Isl and Ef f ect Roof
Recycl ed Cont ent
Regi onal Mat er i al s
Cer t i f i ed Wood
Al t er nat i ve Tr anspor t at i onBi cycl e St or age and Changi ng Rooms
Sust ai nabl e Si t es
Al t er nat i ve Tr anspor t at i onPubl i c Tr anspor t at i on Access
Si t e Sel ect i on
Devel opment Densi t y and Communi t y Connect i vi t y
Const r uct i on Act i vi t y Pol l ut i on Pr event i on
Low- Emi t t i ng Mat er i al sAdhesi ves and Seal ant s
Low- Emi t t i ng Mat er i al sPai nt s and Coat i ngs
Opt i mi ze Ener gy Per f or mance
Energy and At mosphere
Wat er Use Reduct i on20%Reduct i on
Low- Emi t t i ng Mat er i al sComposi t e Wood and Agr i f i ber Pr oduct s
Low- Emi t t i ng Mat er i al sFl oor i ng Syst ems
Indoor Chemi cal and Pol l ut ant Sour ce Cont r ol
Ther mal Comf or t Desi gn
Cont r ol l abi l i t y of Syst emsTher mal Comf or t
Gr een Power
Wat er Use Reduct i on
Mi ni mum Ener gy Per f or mance
Fundament al Ref r i ger ant Management
Dayl i ght and Vi ewsVi ews
LEED Accr edi t ed Pr of essi onal
Dayl i ght and Vi ewsDayl i ght
Cer t i f i ed 40 t o 49 poi nt s Si l ver 50 t o 59 poi nt s Gol d 60 t o 79 poi nt s Pl at i num 80 t o 110
Const r uct i on IAQ Management Pl anDur i ng Const r uct i on
Out door Ai r Del i ver y Moni t or i ng
Indoor Envi ronment al Qual i t y
Mi ni mum Indoor Ai r Qual i t y Per f or mance
Envi r onment al Tobacco Smoke ( ETS) Cont r ol
Incr eased Vent i l at i on
Regi onal Pri ori t y Credi t s
Innovat i on and Desi gn Process
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
CAPITAL YACHT CLUB
C
A
P
I
T
A
L

Y
A
C
H
T

C
L
U
B
10
Capital Yacht Club
(CYC)
2 FLOORS/ 27-4 BUILDINg HEIgHT
RecReational 7,080 GSf
10.1
cyc: PersPecti ve vi ew
PERSPECTIVE VIEW FROM PIAZZA
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.2
cyc: perspecti ve vi ew FrOM wAtersi De
PERSPECTIVE VIEW FROM WATERSIDE
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.3
cyc: el evati onS
0 8 4
EAST ELEVATION
NORTH ELEVATION FACING WHARF
WHARF
+30-0
T. O. rOOf
+30-0
T. O. rOOf
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.4
cyc: el evati on/ secti on faci ng WateRsi De
0 8 4
WEST ELEVATION
SOUTH ELEVATION FACING WATER
WHARF
+30-0
T. O. rOOf
+30-0
T. O. rOOf
WHARF
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
cyc: Ground fl oor pl a n
10.5
0 8 4
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.6
cyc: 2nd fl oor pl a n
0 8 4
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.7
cyc: roof pl a n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.8
cyc: N- S Secti oN
0 8 4
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
WATER (POOL)
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
10.9
cyc: L EED ScOREcA RD
LEE0 200 for New ConstructIon and hajor PenovatIons CapItal Yacht Club
Project ChecklIst #######
17 8 1 PossIble PoInts: 26
Y : N Y : N
Y Prereq 1 1 CredIt 4 1 to 2
1 CredIt 1 1 1 CredIt 5 1 to 2
5 CredIt 2 5 1 CredIt 6 FapIdly Fenewable |aterIals 1
1 CredIt J 8rownfIeld Fedevelopment 1 1 CredIt 7 1
6 CredIt 4.1 6
1 CredIt 4.2 1 13 2 PossIble PoInts: 15
3 CredIt 4.J AlternatIve TransportatIon-LowEmIttIng and FuelEffIcIent 7ehIcles J
2 CredIt 4.4 2 Y Prereq 1
1 CredIt 5.1 SIte 0evelopment-Protect or Festore HabItat 1 Y Prereq 2
1 CredIt 5.2 SIte 0evelopment-|axImIze Dpen Space 1 1 CredIt 1 1
1 CredIt 6.1 Stormwater 0esIgn-QuantIty Control 1 1 CredIt 2 1
1 CredIt 6.2 Stormwater 0esIgn-QualIty Control 1 1 CredIt J.1 1
1 CredIt 7.1 Heat sland Effect-Nonroof 1 1 CredIt J.2 1
1 CredIt 7.2 1 1 CredIt 4.1 1
1 CredIt 8 LIght PollutIon FeductIon 1 1 CredIt 4.2 1
1 CredIt 4.J 1
4 2 PossIble PoInts: 10 1 CredIt 4.4 1
1 CredIt 5 1
Y Prereq 1 1 CredIt 6.1 ControllabIlIty of Systems-LIghtIng 1
2 CredIt 1 Water EffIcIent LandscapIng 2 to 4 1 CredIt 6.2 1
2 CredIt 2 nnovatIve Wastewater TechnologIes 2 1 CredIt 7.1 1
2 CredIt J 2 to 4 1 CredIt 7.2 Thermal Comfort-7erIfIcatIon 1
1 CredIt 8.1 1
12 4 PossIble PoInts: 35 1 CredIt 8.2 1
Y Prereq 1 1 5 PossIble PoInts: 6
Y Prereq 2
Y Prereq J 1 CredIt 1.1 1
5 CredIt 1 1 to 19 1 CredIt 1.2 1
2 CredIt 2 1 to 7 1 CredIt 1.J 1
2 CredIt J 2 1 CredIt 1.4 1
2 CredIt 4 2 1 CredIt 1.5 1
3 CredIt 5 J 1 CredIt 2 1
2 CredIt 6 2
4 PossIble PoInts: 4
4 2 2 PossIble PoInts: 14
1 CredIt 1.1 1
Y Prereq 1 1 CredIt 1.2 1
1 CredIt 1.1 1 to J 1 CredIt 1.J 1
1 CredIt 1.2 8uIldIng Feuse-|aIntaIn 50 of nterIor NonStructural Elements 1 1 CredIt 1.4 1
1 CredIt 2 1 to 2
1 CredIt J 1 to 2 51 27 J PossIble PoInts: 110
CertIfIed 40 to 4 poInts SIIver 50 to 5 poInts CoId 60 to 7 poInts PIatInum 80 to 110
ConstructIon AQ |anagement Plan-0urIng ConstructIon
Dutdoor AIr 0elIvery |onItorIng
Indoor EnvIronmentaI uaIIty
|InImum ndoor AIr QualIty Performance
EnvIronmental Tobacco Smoke (ETS) Control
ncreased 7entIlatIon
PegIonaI PrIorIty CredIts
InnovatIon and 0esIgn Process
Water Use FeductIon
|InImum Energy Performance
Fundamental FefrIgerant |anagement
0aylIght and 7Iews-7Iews
0aylIght and 7Iews-0aylIght
LowEmIttIng |aterIals-AdhesIves and Sealants
LowEmIttIng |aterIals-PaInts and CoatIngs
DptImIze Energy Performance
Energy and Atmosphere
Water Use FeductIon-20 FeductIon
LowEmIttIng |aterIals-ComposIte Wood and AgrIfIber Products
LowEmIttIng |aterIals-FloorIng Systems
ndoor ChemIcal and Pollutant Source Control
Thermal Comfort-0esIgn
ControllabIlIty of Systems-Thermal Comfort
SustaInabIe SItes
AlternatIve TransportatIon-PublIc TransportatIon Access
SIte SelectIon
0evelopment 0ensIty and CommunIty ConnectIvIty
ConstructIon ActIvIty PollutIon PreventIon
ConstructIon AQ |anagement Plan-8efore Dccupancy
haterIaIs and Pesources, ContInued
Water EffIcIency
8uIldIng Feuse-|aIntaIn ExIstIng Walls, Floors, and Foof
AlternatIve TransportatIon-ParkIng CapacIty
Heat sland Effect-Foof
Fecycled Content
FegIonal |aterIals
CertIfIed Wood
AlternatIve TransportatIon-8Icycle Storage and ChangIng Fooms
Fundamental CommIssIonIng of 8uIldIng Energy Systems
TotaI
ConstructIon Waste |anagement
Enhanced CommIssIonIng
DnSIte Fenewable Energy
Enhanced FefrIgerant |anagement
Creen Power
LEE0 AccredIted ProfessIonal
|aterIals Feuse
Storage and CollectIon of Fecyclables
haterIaIs and Pesources
|easurement and 7erIfIcatIon
nnovatIon In 0esIgn: SpecIfIc TItle
nnovatIon In 0esIgn: SpecIfIc TItle
nnovatIon In 0esIgn: SpecIfIc TItle
nnovatIon In 0esIgn: SpecIfIc TItle
nnovatIon In 0esIgn: SpecIfIc TItle
FegIonal PrIorIty: SpecIfIc CredIt
FegIonal PrIorIty: SpecIfIc CredIt
FegIonal PrIorIty: SpecIfIc CredIt
FegIonal PrIorIty: SpecIfIc CredIt
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PARKING, PIER HOUSE &
LANDSIDE PAVILIONS
P
a
r
k
i
n
g
,

P
i
e
r

H
o
u
s
e

&

L
a
n
d
s
i
d
e

P
a
v
i
l
i
o
n
s
11
pi er house: el evati ons
0 16 8
11.1
NORTH ELEVATION WEST ELEVATION
+35-0
T. O. CANOPY
+35 -0
T. O. CANOPY
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
11.2
pi er house: ground fl oor pl a n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
11.3
pi er house: L oWer rooF pL a n
0 16 8
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 16 8
11.4
pi er house: roof pl a n
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
pi er house: e- W secti on
11.5
0 16 8
N-S SECTION E-W SECTION
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
11.6
typi ca l wha rf k i osk: pl a Ns & sEcti oN
0 4 2
ROOF PLAN GROUND LEVEL PLAN N-S SECTION
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
11.7
typi ca l wha rf k i osk: pErspEcti VE Vi Ews
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RK I NG G1 L EVEL PL A N
11.8
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
PA RK I NG G2 L EVEL PL A N
11.9
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
WATERSIDE
PAVILLIONS
W
a
t
e
r
s
i
d
e

P
a
v
i
l
l
i
o
n
s
12
Transit Pavilion
Dock Master Building
12.1
TRA NSI T PAVI L I ON: PeRSPecTI Ve VI ew
PERSPECTIVE VIEW FROM TRANSIT PIER
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.2
TRA NSI T PAVI L I ON: PeRSPecTI Ve VI ew
PERSPECTIVE VIEW FROM TOWN SQUARE
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.3
TRA NSI T PAVI L I ON: eL eVATI ONS
0 8 4
NORTH ELEVATION SOUTH ELEVATION
WEST ELEVATION
+25-8
T. O. rOOf
+25-8
T. O. rOOf
+25-8
T. O. rOOf
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
TRA NSI T PAVI L I ON: PL A NS
12.4
0 16 8
GROUND FLOOR PLAN ROOF PLAN
NOTE: THE INTERIOR PARTITION LOCATIONS, THE NUMBER, SIZE, AND LOCATIONS OF UNITS, STAIRS AND ELEVATORS ARE PRELIMINARY AND
SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL LAYOUTS MAY VARY.
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.5
TRA NSI T PAVI L I ON: E- W SEcTI ON
0 4 2
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.6
dock master: el evati ons
0 16 8
NORTH ELEVATION FACING DISTRICT PIER SOUTH ELEVATION FACING WATER
+27-0
T. O. rOOf
+27-0
T. O. rOOf
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
0 16 8
WEST ELEVATION
12.7
dock master: el evati ons
+27-0
T. O. rOOf
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.8
dock master: pl a ns
0 16 8
1ST FLOOR PLAN 2ND FLOOR PLAN
NOTE: THE INTERIOR PARTITION
LOCATIONS, THE NUMBER, SIZE,
AND LOCATIONS OF UNITS,
STAIRS AND ELEVATORS ARE
PRELIMINARY AND SHOWN FOR
ILLUSTRATIVE PURPOSES ONLY.
THE FINAL LAYOUTS MAY VARY.
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.9
dock master: pl a ns
0 16 8
ROOF PLAN
NOTE: THE INTERIOR PARTITION
LOCATIONS, THE NUMBER, SIZE,
AND LOCATIONS OF UNITS,
STAIRS AND ELEVATORS ARE
PRELIMINARY AND SHOWN FOR
ILLUSTRATIVE PURPOSES ONLY.
THE FINAL LAYOUTS MAY VARY.
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.10
dock master: e- W secti on
0 12 6
RETAIL
SERVICE / CORE / EgRESS
OFFICE
ROOFSCAPE / TERRACE
gREEN ROOF
OPEN TO BELOW
ROOF BELOW
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
12.11
dock master: N- s sectI oN
0 12 6
Stage tWO pud appli cati On F e brua ry 3 , 2 0 1 2
February 3, 2012
Stage two PUD aPPli cati on - VolUme i i

You might also like