You are on page 1of 2

Cost of Drilling

Minimum to be Paid
Addl. To Pay

Dharwar Drilling Society

50
20 =M
10 =C

0.6
Successful

TreePlan Academic

2000
2000

2000

No Soil Test Drill 200ft


0.9
Ord Subs

2
0

464
0.4

4400

Failure

4400

4400

1
0

4160

0.1
Spec. Subs
2000
2000

2000

0.6
Successful
2000
2000

2000
0.9
Ord Subs

No Soil Test Drill 200ft & More


7
0
362.4

0.8

4400

Bad

4400

4400

3
0

4160

0.1
Spec Subs

0.4

2000

Failure

2000

2000

6
0

3906

0.3
Successful
2500
0.2

2500

2500

Good
0.9
Ord. Subs.

5
0

2890
0.7

5500

Failure

5500

573.16

5500

4
0

5200

0.1
Spec. Subs
2500
2500

2500

0.3
Not Recommended
0
0

Soil Test + 200ft & More

0.8
Successful

10
0

537.6

2000
0.7
Recommended

2000

2000
0.9
Ord Subs

9
0

768
0.2

4400

Failure

4400

4400

8
0

4160

0.1
Spec.Subs
2000
2000

2000

0.3
Not Recommended
0
0

0
0.8
Successful

Soil Test & Drill 200ft & Further


16
0
573.16

2000
2000

2000
0.9
Ord Subs

0.7
Recommended

0.8

4400

Bad

15
0

4400

818.8

4400

11
0

4160

0.1
Spec Subs

0.2

2000

Failure

2000

2000

14
0

3906

0.3
Successful
2500
0.2

2500

2500

Good
0.9
Ord Subs.

13
0

2890
0.7

5500

Failure

5500

5500

12
0

5200

0.1
Spec. Subs
2500
2500

2500

TreePlan Academic

You might also like