You are on page 1of 23
HUAWEI UMG8900 Universal Media Gateway ROO7&Later Quick Installation Guide HUAWEI UMG8900 J FRRA I ~ROO7&Later ik Seis HUAWE! TECHNOLOGIES CO.,LTD. HUAWEI Contents Hx Procedure for Connecting Cables BTL pene ee sees eece eee ee cere tee ee cence 1 Connecting PGND Gables and Power Gables for Cabinets 2 RAYLABADORIRRER ANIA ED TERAA Connecting Trunk Cables RRP A ao Setting DIP Switches of the £32 Board RESORT Setting Impedance Mode of the E63/T63 Board ___ iGRESS TEAR LAtESt Connecting E1 Trunk Cables SRE ER Installing and removing s! 2 SFR Connecting Trunk Cables to the SIWF Frame. SERLEUSIWF rhe - Connecting Clock Cables ST . Connecting Clock Distribution Cables, RRP HD eR Connecting & kHz Clock Cable: RAK ER Connecting External Clock Cables RINGER, Connecting Cascading Cables RERRG ~ Laying out and Binding the Cascading Network Cables, 8 SURAT EAL, Laying out and Binding the Cascading Optical Fibers 8 DEE LS SEL, ‘Connecting SFP High-speed Transmission Cables 10 RRSPRBTmES ocowQocx»@oaacc Connecting Network Cables to SIWF Frame Bl SIWF A ence Connecting External Network Cables 12 AB mmm nnremrminmimennnmneneeeeeeeees Connecting External Optical Fibers 13 BRIMBKF annem enneeneeeeeeeeeees Checklist for Cable Connections 14 BRB mmm nn nnmnnnmnneeenenneeeneesees Appendix Logical Relations of Cascading BRS: TTS FC vnserannensnnaamnensunntennnaunntennnaenaed 14 Usage of the Network Cables with Two Terminals at One End SROMRRREBIM scccsssssssssssesssscssssssassnssassensenesnceeneen. 14 ‘SSM-256 Central Switching Frame Cascading the SSM-32 Frame by Using UGO2MNET SSM-256 "pi: 28 48HE18 UGOZMNETSIXSSM-324)48 .------------ SSM-256 Central Switching Frame Cascading the SSM-32 Frame by Using UGO2MBLU_vc SSM-256 "his 1K SUGO2MBLU_VC4RIKSSM-32H142 --.------------------- 16 Self-cascading of the SSM-32 Frames SSM-32H12 BB -----------------------------------------------n nnn nn eee 17 Self-cascading of the SSM-160 Fram: SSM-1 60HE BH

You might also like