Project. Vineet Agarwal, lnterceptor GM Sewer Kind Attn:Mr. SupplementaryShahdara & drainsfor SeweralongNajafgarh, Sub.:Layingof lnterceptor Dwarka. YamunaGomments Elec{rical submissionsNPS, of of in abatementpollution river Dear Sir, you 19.01.2012 wherein dated letter VISPUEIUDJB/|C-Sewe/2011-2UACO|146 no. This inreference is toyour SLD, Layout, Mechanical drawings GA forTransformer cable sizing, sizing, Earthing hadsubmitted calculations have reviewed lt that and Pumping Station Dwarka.isto beinformed thedocuments been at andlayout New of for are below:commentsthesame given Sizinq: Gomments Transformer on provision2 incomer lt be that shall of supply.may noted thetwoincomers beterminated 1)Asproposed inSOR, provision nos, outgoing betaken from panel. panel be HT LT shall and of shall in HTpanel buscoupler with per ofSLD available intender document. ACB 1600 with DG as scheme charged independentlyindependentsets is for LT asprovided connectingpanels notrequired. in for factor taken calculation? 2)What thebasis demand of0.6 is motor which loads stand loads? by Consider starting biggest of load, 3) Which continuous intermittent and are parallel sizing short circuit calculation. have operationtransformer and for philosophytransformer, operation, panel incase for D.G APFC etc. of and 4))Describelistcontrol operation & mains failure. sizinq calculations: Cable factor? 1)What basis derating is for during starting condition. forvoltage ofmotor drop 2)Furnish calculation value & 3)Please thedesign ofinitial finaltemperature. check for of HT considered. 4)Submit documentAmpacityLTand cables Submit circuit short cunent considered transformer is notO.K. for sizing short current 5) Symmetrical circuit for KVA calculation1000 transformer. for conductor provided. tobe 6) Source 'K'value Aluminum of
ISO 9mt : 2ll00 BY1RQS APPRO!'ED tt! t

vqETr 6'r
tatq/Phone 01244794337

PEOPLE DEUVERINGEXCETLENCE THROUGH 6w / Fax: 0'124-239'1410

6\ qJN-

IRQS

q-ft'q-d6Tqtd-q: FfrFrqd EBqt q-e-{.1. ftorcff am +, q-{ frd-rro 06o IndiaBhawan,1, BhikaljlCamaPlace,NewDelhi-100 066 Regd.Office: Engineers Visit us as httpJ/www.engineersindia.com

fr=* t$ ot \r6dro1o-.S t t

7) Earth loop fault impedance calculation submitted thecable isnot with selection. submit Please it. Earthinq Calculation: 1) Submit potential stop detailed calculationearthingcross for potentials, & check mesh w,r.t and Please also provide length earthing provided ESS adjoining orperimeter. the of conductor for and area 2)How earth willbeinstalled FFL. Gl Bus above (Show typical arrangement). source 'K'for Submit of steel. panel 142, panel142, tray 3)Please earthing show connectionMCC for no capacitor cable etc. D.G Panel Transformer to & Secondarv side: 1)Asconfirmedyou, secondary by the oftransformer beconnected panel bus and cable. shall toL.T by duct not Sinqle Diaqram: Line 1)Submit load the mnsidered sizing PDB LDB. LDB shall considered onminimum for of and The load be based per luxlevel bemaintained clause 4.15 GS4, to as No of technical specification Vol-ll. panel nottaken consideration 2) APFC is into forAMFpanel/PlC panel locking DG synchronization inter for operation/Mains operation. 3) Confirm whether auxiliary like MGV, shall loads for phase three MSG operate single phase on or supply. 4) Provision DCsupply notshown documents it willbe required operation flowmeters, of is in as for of transmitters etc. 5)List relays beprovided D.G the lo by manufacturersD.G protection Reverse with sets. following The phase like protection, power Loss excitation, Under/over voltage/frequency/fluxing, flow, Low of negative sequencing, Earth fault up, back tripping trip and circuit supervision Transformer relay, restricted fault shall provided. earth etc. be 6) Instantaneouscurrent shall provided motors over relay be for above KW. 50 Relay N ( Instantaneous 50 earth fault relay),51G(Backup relay), current (50) transformer earth fault Over relay and auxiliary shall provided relay be panel. inC/R/metering 7)Additional spare 10% feeder to beprovided contractor each are by for rating. 8)10nos. MGV beprovided of shall insteadg nos. shown you. of as by 9)Add for51G 64Rwith panel. CT's & Diesel Generator add forAPFC and CT (HFD GADrawinq Lavout Pumpinq & of Station: andProcess document notsubmitted is vet) 1)The level pump beinvert ofterminal start of shall level sewer. Revise levels the accordingly. 2)Two screens shown plan drawing. are in of Please clarify.

sqwr
PEOPLE

irT qrErR-EqR 6.fr

DELIVERING EXCELLENCE THROUGH

Visit us as http://www.engineersindia.com

R t$ +t go-or o-9 t t of

shall be The to etc.shall of 3) Thelength Dl fittings/Valves/Reducer beselected suittherequirement. same and of sheets valves fittings. with reviewed theData approach pumps screens. Accordingly and of grit and for road 4) Access required removal replacement trailer, three to roads beprovidedallthese locations' shall diesel sets' for required emergency gen storage of the 5) Show locationthediesel plan layouts & GAdrawings. with does match overall grid shown pump station not for 6)N&E line is room difficult near in out as to of car 7) Orientation parking bechanged going and of theentrance theguard parking for2 wheelers. provision space of Also, layout. include with current the (Pylons)' tower of the 8)Show locationHTtransmission footings drain. near rising of for details crossingdischarge mains theexisting 9)Provide North. Plant True 10) Show and (v)' pipe. PS flap NRV Provide type ontheoverflow (Refer 3'3'3 11) ladders. with opening access grabs and rails vertical bars guard forallthe Provide 12) of and for platforms the valvechamber accessing maintenancepipeworkand in access 13) Provide instrumentation drain towards pit. chamber slope 14) Provide onthevalve chamber. in valve pit foul from well liquid at 15) Provide trap thedrain toavoid gas wet entrap the with are adaptors provided tierods' all 16)Confirm flanges block. and of calculation size thrust Show and for Provide calculationreview approval. location, surge 17) mains. release on valve/vacuum valve pumping of locationairrelease Show 18) atthe documents earliest. the and comments submit revised with tocomply above are You requested You, Thanking

(Sanjbyukhe lr,tt rjee)' (lnf re-P rastructu roject-07) DGM No, Telephone 01244794337