Hydro GET Program 2011

TOPICS FOR PRESENTATION BY HYDRO GETS


Topic Description
Power scenario in global & India Types of power generation (Thermal/Hydro/Solar/Nuclear, etc.,) Statistics of the power generation by Thermal/Hydro, etc., in India & abroad (USA, Europe, Middle east, Japan, China & India) Comparison of advantages/Dis-advantages of energy sources (Thermal/Hydro/Solar/Nuclear, etc.,) Requirement, Potential & Generation of Power in India Statistics of state-wise Power generation Major Hydro power projects in India Major challenges faced by the Hydro power sector Feasibility Studies Identification & site selection Feasibility studies Arriving at the installed capacity

Group Members

Power scenario & Feasibility studies

Smita Devi Chiranjiv Gogoi Mridul Bora Sagarika Patowary Arnab Deshmukh Maharshi Singha Narang Tayo Seihk Md Rashid Himanshu Phukan

Criteria for deciding the project


Topographical Survey Why survey need to be carried out What are the components need to surveyed Types of survey (Traversing/Contouring etc.,) Fixing up of bench marks Correlation with the SOI topo-sheets Geology What is Geology Why it is carried out Geological mapping Drilling Purpose, Method & the outcome Drifting - Purpose, Method & the outcome In-situ tests Laboratory tests Interpretation of the data Preparation of the final report submitted to GSI Process of obtaining the clearance from GSI What is Hydrology Why it is carried out Methods & equipment for measuring & recording the data How the G&D / Rating curve is established Sourcing of the past data Preparation of the water availability (Design

Survey & Investigati on

Diganta Bora Melo Kadu Lakhyajyoti Chutia Nikson Dususow Pompee Deka Kaushik Kumar Sarma Suken Kumar Chakraborty

Hydrology

Aziz Ahmed Choudhury Prakash Roy Ankita Sharma Pranta Pratim Patra Odi Gyeti Bharat

Team Learning & Development --- Power for Performance For GET Program Use Only

Hydro GET Program 2011


discharge) & Flood discharge (PMF/PMP) report submitted to CWC/CEA Obtaining the clearance from CWC/CEA Power potential studies Obtaining the clearance from CWC/CEA What is environmental studies related to Hydro projects Why it is carried out & its impact for nonobtaining What are the environmental impacts in general Process/steps involved for obtaining the Environmental clearance TOR EIA/EMP Studies Property Survey R&R (Rehabilitation & Re-settlement) Public Hearing EAC recommendations Process/steps involved for obtaining the Forest clearance FAR (Forest Rights Act) Design Various stages of design (Conceptual/Basic/Detailed) Civil Design Major components Functions/importance of each component (River diversion, Dam, Power House, Intake Structure, HRT, Surge Shaft, pressure Shaft, Tail race Channel) Electro-Mechanical Design Major Components & their functions (Turbine, Generator, Transformer, Switch yard) Hydro-Mechanical Design Major Components & their functions (Types of gates, etc.,) DPR (Detailed Project Report) What is DPR? Why DPR is required? Pre-requisites / inputs required for the preparation of DPR Techno-Economic studies Process involved for the preparation & obtaining the clearance of the DPR Risks involved in executing the Hydro Power Projects Neepjyoti Deka Tarun Rajvanshi

Environme nt & Forest

Pranjal Kumar Sharma Mrinmayee Poddar Ankana Kalita Amrita Roy Mohiuddin Tapadar Souvik Debnath Abhijit Paul Madhurjya Sharma

Design & DPR

Arjun Avasthy Rishiraj Deka Nitesh Yadav Sushil Brahma Gebi Basar Pratanu Kumar Goswami Punam Bishwakarma Simanta Malakar Ishan Boro

Team Learning & Development --- Power for Performance For GET Program Use Only