I.
To ensure its normal operation, please refer to Fig. 1 and keep enough space for clinical use within its safe movement stroke.
Attention: it will generate a weight of 450 kg in its fixed mount position (Include the load limit). II. Equipment installation
1. Preparation before installation According to the layout of consulting room, the lighting conditions and the convenience for use, confirm the position of the ground box and the position of the whole equipment in accordance with Fig. 2 and the form of ground box.
1
J1184INST, V03.00.00
J1184INST, V03.00.00
J1184INST, V03.00.00
Within 200200mm around the position of the ground box, preset the gas inlet pipe, the water inlet pipe and 1.5mm2 3-core shielded wires, and connect the ground protection. See Fig.3.
D ai nage pi pe r 1- 1/ 2" P er suppl y ow
Drai nage pi pe
water i nl et pi pe
w er i nl et pi pe at
A r i nl et pi pe i
Power suppl y
Ai r i nl et pi pe
Specification and above ground level of water pipe, air pipe and power cord pipe: Name Specification Above ground level 30mm Remark Orifice screw-threadG1/2 Orifice screw-threadG1/2
Water inlet pipe Air inlet pipe Drainpipe Power cord pipe
15mm(1/2)PPR pipe 15mm(1/2) aluminum plastic pipe 40mm(11/2)PPR pipe 15mm(1/2)PPR pipe