RFI
To:
Amanda Gorning Harley Ellis Devereaux 26913 Northwestern Ste 200 Southfield, MI 48033-3476 Ph: (248)262-1500 Fax: (248)262-1515
RFI #: 1 Date: 1/25/2012 Job: 9008 Oak Park City Hall Public Safe Phone:
Request:
In the specifications the architect has mentioned the finish for the exposed precast concrete to match Kerkstra 711-411. In order to determine if this color is obtained by aggregates or pigments please provide the concrete mix, photograph or other means to establish the required finish for the Kerkstra 711-411.
Requested by:
Response:
A. Gorning
Answered by Company
HED
01/26/2012
Date
Page 1 of 1
333 East Second Street Rochester, MI 48307 Ph : (248) 651-7242 Fax: (248) 651-5174
RFI
To:
Amanda Gorning Harley Ellis Devereaux 26913 Northwestern Ste 200 Southfield, MI 48033-3476 Ph: (248)262-1500 Fax: (248)262-1515
RFI #: 2 Date: 1/30/2012 Job: 9008 Oak Park City Hall Public Safe Phone:
Cost Impact:
Request:
Need additional section cuts for 5 locations which have been marked on the attached drawings. See room 190 (Council Chambers), along the North, East and West walls. Also see room 127 (Evidence Room) along the South and East walls. One issue is weather there is embedded brick in these locations.
Requested by:
Response:
A. Gorning
Answered by Company
HED
Date
01/30/2012
Page 1 of 1
See 7/S5-13
See 11/S5-13
See 12/S5-14
See 10/S5-14
333 East Second Street Rochester, MI 48307 Ph : (248) 651-7242 Fax: (248) 651-5174
RFI
To:
Amanda Gorning Harley Ellis Devereaux 26913 Northwestern Ste 200 Southfield, MI 48033-3476 Ph: (248)262-1500 Fax: (248)262-1515
RFI #: Prebid RFI 4 Date: 2/7/2012 Job: 9008 Oak Park City Hall Public Safe Phone:
CC:
McGee, Barbara (Harley Ellis Devereaux), Welch, Sue (Rewold and Son, Inc.) Ductwork sizes MH-01d for example
Spec Section: Schedule Impact:
Subject: Drawing:
Cost Impact:
Request:
See attached sketch. Are the proposed ductwork sizes a correct interpretation of Note 2 on the MH-01 sheets? If not please clarify duct sizing instructions
Requested by:
Response:
The main duct size downstream of the heat pump is correct. For the branch taps off of that duct refer to Note 1 on the MH-01 sheets. The branch ducts shall match the diffuser neck size as shown on Typical Air Terminal Device Detail on sht. M5-01. The boxed note on the MH-01 sheets reference the reflected ceiling plans for diffuser sizes. The five branch ducts on the sketch should all be 8" per sht. AR-1d.
Carl Williams
Answered by
HED
Company Date
2/8/12
Page 1 of 1
8"
8"
8"
8"