You are on page 1of 460

CMYK

DRAFT RED HERRING PROSPECTUS Dated September 14, 2010 Please read section 60B of the Companies Act, 1956 (The Draft Red Herring Prospectus will be updated upon filing with the RoC) 100% Book Building Issue

LAVASA CORPORATION LIMITED


(Our Company was incorporated as Pearly Blue Lake Resorts Private Limited on February 11, 2000 under the Companies Act, 1956, in Pune. The name of our Company was changed to The Lake City Corporation Private Limited on December 12, 2000. Our Company was converted into a public limited company on March 3, 2003 and consequently, the name was changed to The Lake City Corporation Limited. The name of our Company was changed to Lavasa Corporation Limited on June 8, 2004. For details of changes in the name and registered office of our Company, please see History and Certain Corporate Matters on page 142.) Registered Office: Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Tel: (91 22) 4025 6000; Fax: (91 22) 4025 6889 Contact Person: Venkatesan Arunachalam, Company Secretary and Compliance Officer; Tel: (91 22) 4025 6104 Fax: (91 22) 4025 6889 Website: www.lavasa.com; Email: secretarial@lavasa.com
PROMOTERS OF OUR COMPANY: HINDUSTAN CONSTRUCTION COMPANY LIMITED AND HCC REAL ESTATE LIMITED PUBLIC ISSUE OF [ ] EQUITY SHARES WITH A FACE VALUE OF ` 10 EACH (EQUITY SHARES) OF LAVASA CORPORATION LIMITED (THE COMPANY OR THE ISSUER) FOR CASH AT A PRICE OF ` [ ] PER EQUITY SHARE (INCLUDING A SHARE PREMIUM OF ` [ ] PER EQUITY SHARE) AGGREGATING TO ` 20,000 MILLION (THE ISSUE OR THE IPO). THE ISSUE COMPRISES OF A NET ISSUE OF [ ] EQUITY SHARES AGGREGATING UP TO ` [ ] MILLION TO THE PUBLIC AND A RESERVATION OF [ ] EQUITY SHARES AGGREGATING UP TO ` 100 MILLION FOR ELIGIBLE EMPLOYEES (THE EMPLOYEE RESERVATION PORTION). THE ISSUE AND THE NET ISSUE WILL CONSTITUTE [ ]% AND [ ]%, RESPECTIVELY OF THE POST-ISSUE PAID-UP EQUITY SHARE CAPITAL OF OUR COMPANY. THE FACE VALUE OF THE EQUITY SHARES IS ` 10 EACH. THE PRICE BAND, ELIGIBLE EMPLOYEE DISCOUNT AND THE MINIMUM BID LOT SIZE WILL BE DECIDED BY OUR COMPANY IN CONSULTATION WITH THE BOOK RUNNING LEAD MANAGERS (THE BRLMS) AND WILL BE ADVERTISED AT LEAST TWO WORKING DAYS PRIOR TO THE BID/ ISSUE OPENING DATE.* * A discount of 10% to the Issue Price determined pursuant to completion of the Book Building Process has been offered to Eligible Employees (the Eligible Employee Discount). In case of a revision in the Price Band, the Bid/Issue Period will be extended for three additional Working Days after the revision of the Price Band, subject to the Bid/Issue Period not exceeding 10 Working Days. Any revision in the Price Band and the revised Bid/Issue Period, if applicable, will be widely disseminated by notification to the Bombay Stock Exchange Limited (BSE) and the National Stock Exchange of India Limited (NSE), by issuing a press release and also by indicating the change on the websites of the BRLMs and at the terminals of the Syndicate Members. Our Company is undertaking this Issue under Rule 19(2)(b)(ii) of the Securities Contracts (Regulations) Rules, 1957 (SCRR) and shall comply with the requirements thereunder. This being an issue for less than 25% of the post-Issue paid-up equity share capital, the Issue is being made through the 100% Book Building Process wherein at least 50% of the Net Issue shall be allocated on a proportionate basis to Qualified Institutional Buyers (QIB). 5% of the QIB Portion (excluding Anchor Investor Portion) shall be available for allocation on a proportionate basis to Mutual Funds only, and the remainder of the QIB Portion shall be available for allocation on a proportionate basis to all QIB Bidders, including Mutual Funds, subject to valid Bids being received at or above the Issue Price. Further, not less than 15% of the Net Issue shall be available for allocation on a proportionate basis to Non-Institutional Bidders and not less than 35% of the Net Issue shall be available for allocation on a proportionate basis to Retail Individual Bidders, subject to valid Bids being received at or above the Issue Price. If at least 50% of the Net Issue cannot be Allotted to QIBs, then the entire application money shall be refunded forthwith. All Bidders other than Anchor Investors may participate in this Issue through an Application Supported by Blocked Amount (ASBA) process providing details about the bank account which will be blocked by the Self Certified Syndicate Banks (SCSBs) for the same. For details, please see Issue Procedure on page 360. RISK IN RELATION TO FIRST ISSUE This being the first public issue of the Equity Shares of our Company, there has been no formal market for the Equity Shares of our Company. The face value of the Equity Shares is ` 10 each. The Floor Price is [ ] times of the face value and the Cap Price is [ ] times of the face value. The Issue Price (as has been determined and justified by our Company and the BRLMs as stated under the paragraph on Basis for Issue Price) should not be taken to be indicative of the market price of the Equity Shares after the Equity Shares are listed. No assurance can be given regarding an active and/or sustained trading in the Equity Shares or regarding the price at which the Equity Shares will be traded after listing. IPO GRADING This Issue has been graded by [ ] as [ ] (pronounced [ ]) indicating [ ]. The IPO grade is assigned on a five point scale from 1 to 5 with IPO grade 5/5 indicating strong fundamentals and IPO grade 1/5 indicating poor fundamentals. For details, please see General Information on page 29. GENERAL RISKS Investments in equity and equity-related securities involve a degree of risk and investors should not invest any funds in this Issue unless they can afford to take the risk of losing their investment. Investors are advised to read the Risk Factors carefully before taking an investment decision in this Issue. For taking an investment decision, investors must rely on their own examination of our Company and the Issue including the risks involved. The Equity Shares offered in the Issue have not been recommended or approved by the Securities and Exchange Board of India (SEBI), nor does SEBI guarantee the accuracy or adequacy of this Draft Red Herring Prospectus. Specific attention of the investors is invited to Risk Factors on page xii. ISSUERS ABSOLUTE RESPONSIBILITY Our Company, having made all reasonable inquiries, accepts responsibility for and confirms that this Draft Red Herring Prospectus contains all information with regard to our Company and the Issue, which is material in the context of the Issue, that the information contained in this Draft Red Herring Prospectus is true and correct in all material aspects and is not misleading in any material respect, that the opinions and intentions expressed herein are honestly held and that there are no other facts, the omission of which will make this Draft Red Herring Prospectus as a whole or any of such information or the expression of any such opinions or intentions misleading in any material respect. LISTING ARRANGEMENT The Equity Shares offered through this Draft Red Herring Prospectus are proposed to be listed on the BSE and the NSE. Our Company has received in-principle approvals from the BSE and the NSE for the listing of the Equity Shares pursuant to their letters dated [ ] and [ ], respectively. For the purposes of the Issue, the Designated Stock Exchange shall be the [ ].

BOOK RUNNING LEAD MANAGERS

REGISTRAR TO THE ISSUE

ICICI SECURITIES LIMITED ICICI Centre, H.T. Parekh Marg Churchgate, Mumbai 400 020 Tel : (91 22) 2288 2460 Fax : (91 22) 2282 6580 Email: lavasa.ipo@icicisecurities.com Investor Grievance Email: customercare@icicisecurities.com Website: www.icicisecurities.com Contact Person: Sumanth Rao / Mangesh Ghogle SEBI Registration No.: INM000011179

KOTAK MAHINDRA CAPITAL COMPANY LIMITED 1st Floor, Bakhtawar 229 Nariman Point, Mumbai 400 021 Tel: (91 22) 6634 1100 Fax: (91 22) 2284 0492 E-mail: lavasa.ipo@kotak.com Investor Grievance Email: kmccredressal@kotak.com Website: www.kmcc.co.in Contact Person: Chandrakant Bhole SEBI Registration. No.: INM000008704

MORGAN STANLEY INDIA COMPANY PRIVATE LIMITED 5F, 55-56, Free Press House, Free Press Journal Marg, Nariman Point, Mumbai 400 021 Tel: (91 22) 6621 0555 Fax: (91 22) 6621 0556 Email: lavasa_ipo@morganstanley.com Investor Grievance Email: investors_india@morganstanley.com Website: www.morganstanley.com/ indiaofferdocuments Contact Person: Vivek Subramanian SEBI Registration No.: INM000011203

AXIS BANK LIMITED 111, Central Office Cuffe Parade, Colaba Mumbai 400 005 Tel: (91 22) 6707 1312 Fax: (91 22) 6707 1689 Email: lavasa.ipo@axisbank.com Investor Grievance E-mail: axbmbd@axisbank.com Website: www.axisbank.com Contact Person: Dipen Kapadia SEBI Registration No.: INM000006104

KARVY COMPUTERSHARE PRIVATE LIMITED Plot No. 17-24, Vittal Rao Nagar Madhapur Hyderabad 500 081 Tel: (91 40) 2342 0815 / 2342 0816 Fax: (91 40) 2342 0859 Email: lavasa.ipo@karvy.com Website: http://karisma.karvy.com Contact Person: Murali Krishna SEBI Registration No.: INR000000221

ISSUE PROGRAMME BID/ISSUE OPENS ON : [ ]* BID/ISSUE CLOSES ON : [ ]**


* Our Company may consider participation by Anchor Investors. The Anchor Investor Bid/ Issue Period shall be one Working Day prior to the Bid/ Issue Opening Date. ** Our Company may consider closing the Bid/Issue Period for QIBs one Working Day prior to the Bid/Issue Closing Date.

CMYK

TABLE OF CONTENTS DEFINITIONS AND ABBREVIATIONS ...................... PRESENTATION OF FINANCIAL, INDUSTRY AND MARKET DATA FORWARD-LOOKING STATEMENTS . RISK FACTORS ... SUMMARY OF INDUSTRY ... SUMMARY OF BUSINESS . SUMMARY FINANCIAL INFORMATION . THE ISSUE GENERAL INFORMATION .. CAPITAL STRUCTURE . OBJECTS OF THE ISSUE .. BASIS FOR ISSUE PRICE .. STATEMENT OF TAX BENEFITS .. INDUSTRY OUR BUSINESS REGULATIONS AND POLICIES . HISTORY AND CERTAIN CORPORATE MATTERS . OUR MANAGEMENT OUR SUBSIDIARIES AND ASSOCIATES .. OUR PROMOTERS AND PROMOTER GROUP .. OUR GROUP COMPANIES .. RELATED PARTY TRANSACTIONS . DIVIDEND POLICY FINANCIAL STATEMENTS . MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND RESULTS OF OPERATIONS FINANCIAL INDEBTEDNESS . OUTSTANDING LITIGATION AND MATERIAL DEVELOPMENTS . GOVERNMENT APPROVALS . OTHER REGULATORY AND STATUTORY DISCLOSURES ... TERMS OF THE ISSUE ISSUE STRUCTURE ... ISSUE PROCEDURE . RESTRICTION ON FOREIGN OWNERSHIP OF INDIAN SECURITIES MAIN PROVISIONS OF THE ARTICLES OF ASSOCIATION .. MATERIAL CONTRACTS AND DOCUMENTS FOR INSPECTION ... DECLARATION .. 285 309 313 338 343 352 355 360 391 394 404 407 i ix xi xii 1 6 14 28 29 37 52 65 69 79 98 138 142 157 173 195 202 216 217 218

DEFINITIONS AND ABBREVIATIONS General Terms Term Associates Our Company, the Company, or the Issuer we, us, or our Subsidiaries Description The associates of our Company as disclosed in Our Subsidiaries and Associates on page 173 Unless the context otherwise requires, refers to Lavasa Corporation Limited, a company incorporated under the Companies Act, having its registered office at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Unless the context otherwise requires, means our Company and our Subsidiaries and Associates on a consolidated basis The subsidiaries of our Company as disclosed in Our Subsidiaries and Associates on page 173

Company Related Terms Term Articles of Association/Articles Auditors Board of Directors/Board Bona Sera CMS Description The articles of association of our Company The statutory auditors of our Company, M/s. K.S. Aiyar & Co, Chartered Accountants The board of directors of our Company or a duly constituted committee thereof Bona Sera Hotels Limited The Subsidiaries of our Company comprising of Whistling Thrush Facilities Services Limited, Warasgaon Power Supply Limited, Sahyadri City Management Limited and Warasgaon Infrastructure Providers Limited The corporate office of our Company, situated at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 0.001% Compulsory Convertible Preference Shares of ` 10 each issued by our Company Celebration Resorts and Hotels (India) Private Limited Deep Discount Convertible Debentures issued by our Company The director(s) of our Company, unless otherwise specified Dasve Retail Limited Full Spectrum Adventure Limited Includes those companies, firms, ventures, etc., promoted by the Promoter, irrespective of whether such entities are covered under Section 370(1B) of the Companies Act or not. For details, please see Group Companies on page 202 Hindustan Construction Company Limited, having its registered office at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 HCC Real Estate Limited, having its registered office at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Knowledge Vistas Limited The memorandum of association of our Company My City Technology Limited 6% Redeemable Preference Shares of ` 10 each issued by our Company Palmetto Hospitality Limited The promoters of our Company, Hindustan Construction Company Limited and HCC Real Estate Limited. For details, please see Our Promoters and Promoter Group on page 195

Corporate Office Compulsory Convertible Preference Shares CRH DDCDs Director(s) DRL Full Spectrum Adventure/FSAL Group Companies

HCC HREL Knowledge Vistas Memorandum/ Memorandum of Association My City Technology Redeemable Preference Shares Palmetto Hospitality Promoters

Term Promoter Group

Registered Office RHL Issue Related Terms Term Allotment/Allot/Allotted Allottee Anchor Investor Anchor Investor Allocation Notice Anchor Period Investor Bid/Issue

Description Refers to such persons and entities which constitute the Promoter Group of our Company in terms of Regulation 2 (zb) of the SEBI Regulations and a list of which is provided in Our Promoters and Promoter Group on page 195 The registered office of our Company, situated at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Reasonable Housing Limited

Anchor Investor Issue Price

Anchor Investor Portion

Application Supported by Blocked Amount/ ASBA ASBA Account

ASBA Bid cum Application Form

ASBA Bidder ASBA Revision Form Axis Banker(s) to the Issue/ Escrow Collection Bank(s) Basis of Allotment Bid

Description Unless the context otherwise requires, means the allotment of Equity Shares pursuant to this Issue to the successful Bidders A successful Bidder to whom the Equity Shares are Allotted A Qualified Institutional Buyer, applying under the Anchor Investor Portion, with a minimum Bid of ` 100 million Notice or intimation of allocation of Equity Shares sent to Anchor Investors who have been allocated Equity Shares after discovery of the Issue Price if the Issue Price is higher than the Anchor Investor Issue Price The day, one Working Day prior to the Bid/Issue Opening Date, on which Bids by Anchor Investors shall be submitted and allocation to Anchor Investors shall be completed The final price at which Equity Shares will be issued and Allotted to Anchor Investors in terms of the Red Herring Prospectus and the Prospectus, which price will be equal to or higher than the Issue Price but not higher than the Cap Price. The Anchor Investor Issue Price will be decided by our Company in consultation with the BRLMs Up to 30% of the QIB Portion which may be allocated by our Company to Anchor Investors on a discretionary basis. One-third of the Anchor Investor Portion shall be reserved for domestic Mutual Funds, subject to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is being done to Anchor Investors An application, whether physical or electronic, used by all Bidders other than Anchor Investors to make a Bid authorising an SCSB to block the Bid Amount in their ASBA account maintained with the SCSB An account maintained by the ASBA Bidders with the SCSB and specified in the ASBA Bid cum Application for blocking an amount mentioned in the ASBA Bid cum Application Form The form, whether physical or electronic, used by a Bidder (other than an Anchor Investor) to make a Bid through ASBA process, which contains an authorisation to block the Bid Amount in an ASBA Account and will be considered as the application for Allotment for the purposes of the Red Herring Prospectus and the Prospectus Prospective investors other than Anchor Investors in this Issue who intend to Bid/apply through ASBA The form used by the ASBA Bidders to modify the quantity of Equity Shares or the Bid Amount in any of their ASBA Bid cum Application Form or any previous ASBA revision form(s) Axis Bank Limited The banks which are clearing members and registered with SEBI as Bankers to the Issue and with whom the Escrow Account will be opened, in this case being [] The basis on which the Equity Shares will be Allotted to successful Bidders under the Issue and which is described in Issue Procedure Basis of Allotment on page 384 An indication to make an offer during the Bid/Issue Period by a Bidder pursuant to

ii

Term

Bid Amount Bid cum Application Form

Bidder Bid /Issue Closing Date

Bid /Issue Opening Date

Bid/Issue Period

Book Building Process BRLMs/Book Running Lead Managers CAN/Confirmation of Allotment Note Cap Price Controlling Branches Cut-off Price

Designated Branches

Designated Date

Designated Stock Exchange Draft Red Herring Prospectus

Eligible Employees

Description the submission of Bid cum Application Form, or during the Anchor Investor Bid/ Issue Period by the Anchor Investors, to subscribe to the Equity Shares of our Company at a price within the Price Band, including all revisions and modifications thereto The highest value of the optional Bids indicated in the Bid cum Application Form The form used by a Bidder (which, unless expressly provided, includes the ASBA Bid cum Application Form by an ASBA Bidder, as applicable) to make a Bid and which will be considered as the application for Allotment for the purposes of the Red Herring Prospectus and the Prospectus Any prospective investor who makes a Bid pursuant to the terms of the Red Herring Prospectus and the Bid cum Application Form Except in relation to any Bids received from Anchor Investor, the date after which the Syndicate and the SCSBs will not accept any Bids for this Issue, which shall be notified in [] edition of English national daily newspaper, [] edition of Hindi national daily newspaper and [] edition of Marathi newspaper, each with wide circulation Except in relation to any Bids received from Anchor Investors, the date on which the Syndicate and the SCSBs shall start accepting Bids for the Issue, which shall be the date notified in an English national newspaper, a Hindi national newspaper and a Marathi newspaper, each with wide circulation The period between the Bid/Issue Opening Date and the Bid/Issue Closing Date inclusive of both days, during which prospective Bidders can submit their Bids, including any revisions thereof The book building process as provided in Schedule XI of the SEBI Regulations, in terms of which the Issue is being made The Book Running Lead Managers to the Issue, in this case being ICICI Securities Limited, Kotak Mahindra Capital Company Limited, Morgan Stanley India Private Limited and Axis Bank Limited Note or advice or intimation of Allotment sent to the Bidders who have been Allotted Equity Shares after the Basis of Allotment has been approved by the Designated Stock Exchange The higher end of the Price Band, above which the Issue Price will not be finalised and above which no Bids will be accepted Such branches of the SCSBs which co-ordinate with the BRLMs, the Registrar to the Issue and the Stock Exchanges Issue Price (net of Eligible Employee Discount), finalised by our Company in consultation with the BRLMs. Only Retail Individual Bidders and Eligible Employees are entitled to Bid at the Cut-off Price, for a Bid Amount not exceeding ` 100,000 (net of Eligible Employee Discount). QIBs and Non-Institutional Bidders are not entitled to Bid at the Cut-off Price Such branches of the SCSBs which shall collect the ASBA Bid cum Application Forms used by the ASBA Bidders and a list of which is available on http://www.sebi.gov.in The date on which funds are transferred from the Escrow Account or the amount blocked by the SCSBs is transferred from the ASBA Accounts, as the case may be, to the Public Issue Account or the Refund Account, as appropriate, after the Prospectus is filed with the RoC, following which the Board of Directors shall Allot Equity Shares to successful Bidders [] The Draft Red Herring Prospectus dated September 14, 2010 issued in accordance with the SEBI Regulations which is filed with SEBI and which does not contain complete particulars of the price at which the Equity Shares are offered and the size of the Issue Permanent and full-time employees of our Company, our Promoters, our

iii

Term

Eligible Employee Discount

Eligible NRI

Employee Reservation Portion Engagement Letters Equity Shares Escrow Account

Escrow Agreement

First Bidder Floor Price ICICI Securities Issue

Issue Agreement

Issue Price

Issue Proceeds Kotak Morgan Stanley Mutual Funds Mutual Fund Portion

Net Issue Net Proceeds Non-Institutional Bidders

Non-Institutional Portion

Description Subsidiaries and material associates (entities whose financial statements are consolidated with our Companys financial statements as per AS 21) and the Directors of our Company as on [], 2010 The difference of ` [] between the Issue Price and the differential lower price, which is 10% of the Issue Price, at which our Company has decided to Allot the Equity Shares to Eligible Employees NRI(s) from jurisdictions outside India where it is not unlawful to make an issue or invitation under the Issue and in relation to whom the Red Herring Prospectus constitutes an invitation to subscribe to the Equity Shares The portion of the Issue being up to [] Equity Shares aggregating up to ` 100 million available for allocation to Eligible Employees Engagement letters dated September 11, 2010 between our Company and ICICI Securities, Kotak, Morgan Stanley and Axis respectively Equity shares of our Company of face value of ` 10 each fully paid unless otherwise specified in the context thereof Account opened with the Escrow Collection Bank(s) and in whose favour the Bidders (excluding the ASBA Bidders) will issue cheques or drafts in respect of the Bid Amount when submitting a Bid Agreement dated [], 2010 to be entered into by our Company, the Registrar to the Issue, the BRLMs, the Syndicate Members, the Escrow Collection Bank(s) and the Refund Bank(s) for collection of the Bid Amounts and where applicable, refunds of the amounts collected to the Bidders (excluding the ASBA Bidders) on the terms and conditions thereof The Bidder whose name appears first in the Bid cum Application Form or Revision Form or the ASBA Bid cum Application Form or the ASBA Revision Form The lower end of the Price Band, at or above which the Issue Price will be finalised and below which no Bids will be accepted ICICI Securities Limited Public issue of [] Equity Shares for cash at a price of ` [] per Equity Share aggregating to ` 20,000 million. It comprises a Net Issue to the public aggregating to ` [] million and a reservation for Eligible Employees aggregating up to ` 100 million The agreement entered into on September 11, 2010 between our Company and the BRLMs, pursuant to which certain arrangements are agreed to in relation to the Issue The final price at which the Equity Shares will be issued and Allotted in terms of the Red Herring Prospectus. The Issue Price will be decided by our Company in consultation with the BRLMs on the Pricing Date The proceeds of the Issue that are available to our Company Kotak Mahindra Capital Company Limited Morgan Stanley India Company Private Limited A mutual fund registered with SEBI under the SEBI (Mutual Funds) Regulations, 1996, as amended 5% of the QIB Portion (excluding the Anchor Investor Portion), or [] Equity Shares available for allocation to Mutual Funds only, out of the QIB Portion (excluding the Anchor Investor Portion) The Issue less the Employee Reservation Portion The Issue Proceeds less the Issue expenses. For further information about use of the Net Proceeds, please see Objects of the Issue on page 52 All Bidders, including sub accounts of FIIs registered with SEBI which are foreign corporates, or foreign individuals, that are not QIBs or Retail Individual Bidders and who have Bid for Equity Shares for an amount of more than ` 100,000 (but not including NRIs other than eligible NRIs) The portion of the Issue being not less than [] Equity Shares available for

iv

Term Non-Resident Price Band

Pricing Date Prospectus

Public Issue Account QIB Portion Qualified Institutional Buyers or QIBs

Description allocation to Non-Institutional Bidders A person resident outside India, as defined under FEMA and includes a Non Resident Indian Price Band of a minimum price of ` [] (Floor Price) and the maximum price of ` [] (Cap Price) and includes revisions thereof. The Price Band and the minimum Bid lot size for the Issue will be decided by our Company in consultation with the BRLMs and advertised, at least two working days prior to the Bid/ Issue Opening Date, in [] edition of English national daily, [] edition of Hindi national daily and [] edition of Marathi newspaper with wide circulation The date on which our Company, in consultation with the BRLMs, finalises the Issue Price The Prospectus to be filed with the RoC in accordance with Section 60 of the Companies Act, containing, inter alia, the Issue Price that is determined at the end of the Book Building Process, the size of the Issue and certain other information An account opened with the Bankers to the Issue to receive monies from the Escrow Account and from the SCSBs on the Designated Date The portion of the Issue being at least [] Equity Shares to be Allotted to QIBs Public financial institutions as specified in Section 4A of the Companies Act, scheduled commercial banks, mutual fund registered with SEBI, FIIs and subaccount registered with SEBI, other than a sub-account which is a foreign corporate or foreign individual, venture capital fund registered with SEBI, state industrial development corporation, insurance company registered with IRDA, provident fund with minimum corpus of ` 250 million, pension fund with minimum corpus of ` 250 million, National Investment Fund set up by the Government of India and insurance funds set up and managed by the army, navy or air force of the Union of India. FVCIs registered with SEBI and multilateral and bilateral development financial institutions are not eligible to participate in the Issue The Red Herring Prospectus issued in accordance with Section 60B of the Companies Act, which does not have complete particulars of the price at which the Equity Shares are offered and the size of the Issue. The Red Herring Prospectus will be filed with the RoC at least three days before the Bid/Issue Opening Date and will become a Prospectus upon filing with the RoC after the Pricing Date The account opened with the Escrow Collection Bank(s), from which refunds, if any, of the whole or part of the Bid Amount (excluding the ASBA Bidders) shall be made [] Refunds through NECS, Direct Credit, NEFT, RTGS, as applicable Karvy Computershare Private Limited Individual Bidders who have not Bid for Equity Shares for an amount not more than ` 100,000 in any of the bidding options in the Issue (including HUFs applying through their karta and Eligible NRIs and does not include NRIs other than eligible NRIs) The portion of the Net Issue being not less than [] Equity Shares available for allocation to Retail Individual Bidder(s) The form used by the Bidders (which, unless expressly provided, includes the ASBA revision form) to modify the quantity of Equity Shares or the Bid Amount in any of their Bid cum Application Forms or any previous Revision Form(s) Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2009, as amended from time to time A banker to the Issue registered with SEBI, which offers the facility of ASBA and a list of which is available on http://www.sebi.gov.in

Red Herring Prospectus or RHP

Refund Account(s)

Refund Bank(s) Refunds through electronic transfer of funds Registrar to the Issue Retail Individual Bidder(s)

Retail Portion Revision Form

SEBI Regulations Self Certified Syndicate Bank(s) or SCSB(s)

Term Stock Exchanges Syndicate Syndicate Agreement

Syndicate Members TRS or Transaction Registration Slip Underwriters Underwriting Agreement Working Day

Description The BSE and the NSE The BRLMs and the Syndicate Members The agreement dated [], 2010, to be entered into between the Syndicate and our Company in relation to the collection of Bids in this Issue (excluding Bids from the Bidders applying through ASBA process) [] The slip or document issued by the Syndicate or the SCSB (only on demand), as the case may be, to the Bidder, as proof of registration of the Bid The BRLMs and the Syndicate Members The agreement among the Underwriters and our Company to be entered into on or after the Pricing Date All days excluding Sundays and bank holidays in Mumbai

Technical/Industry Related Terms Term CC FSI Description Commencement Certificate Floor Space Index, which means the quotient of the ratio of the combined gross floor area of all floors, excepting areas specifically exempted, to the total area of the plot Granular Sub Base Letter of Intent litre per capita per day Real estate under construction for which an agreement for sale has been executed with a purchaser or projects for which a letter of intent/memorandum of understanding has been has been executed which are yet to commence construction Our Company being the special planning authority appointed for planning and development of Lavasa

GSB LoI Lpcd Order Book

SPA

Conventional/General Terms Term AGM AS / Accounting Standards AY BOT BPLR BSE CAGR CDSL CIN Companies Act Consolidated FDI Policy CSR Depositories Depositories Act DIN DP/Depository Participant DP ID EBITDA Description Annual General Meeting Accounting Standards issued by ICAI Assessment Year Built operate transfer Benchmark Prime Lending Rate Bombay Stock Exchange Limited Compounded Annual Growth Rate Central Depository Services (India) Limited Corporate Identity Number Companies Act, 1956, as amended from time to time The Consolidated FDI Policy issued by the Department of Industrial Policy and Promotion, Ministry of Commerce and Industry, Government of India Corporate social responsibility NSDL and CDSL The Depositories Act, 1996, as amended from time to time Director Identification Number A depository participant as defined under the Depositories Act Depository Participants Identity Earnings Before Interest, Tax, Depreciation and Amortisation

vi

Term EGM EPS

FDI FEMA FEMA Regulations FII(s) Financial Year/ Fiscal/ FY FIPB FVCI

GDP GoI/ Government HNI Hill Station Regulations HUF ICAI IFRS ILO IMO Income Tax Act IT ITeS Indian GAAP IPO JV Kv Mcft MKVDC Mn MLD MRTP Act MoEF MoU MW NAV NECS NEFT NOC NR NRE Account NRI

Description Extraordinary General Meeting Unless otherwise specified, Earnings Per Share, which is the profit after tax for a fiscal year divided by the weighted average of outstanding number of equity shares at the end of the fiscal year Foreign Direct Investment Foreign Exchange Management Act, 1999, read with rules and regulations thereunder and amendments thereto Foreign Exchange Management (Transfer or Issue of Security by a Person Resident Outside India) Regulations, 2000 and amendments thereto Foreign Institutional Investors as defined under SEBI (Foreign Institutional Investor) Regulations, 1995, registered with SEBI under applicable laws in India Period of 12 months ended March 31 of that particular year Foreign Investment Promotion Board Foreign Venture Capital Investor registered under the Securities and Exchange Board of India (Foreign Venture Capital Investor) Regulations, 2000, as amended from time to time Gross Domestic Product Government of India High Net worth Individual Special Regulation for Development of Tourist Resorts/ Holiday Homes/ Town Ships in Hill Station Type Areas, 1996 Hindu Undivided Family The Institute of Chartered Accountants of India International Financial Reporting Standards International Labour Organisation International Maritime Organisation Income Tax Act, 1961, as amended from time to time Information Technology IT enabled services Generally Accepted Accounting Principles in India Initial Public Offering Joint Venture Kilo volt Million cubic feet Maharashtra Krishna Valley Development Corporation Million Million litres per day Maharashtra Regional and Town Planning Act, 1966 Ministry of Environment and Forests Memorandum of Understanding Mega watt Net Asset Value National Electronic Clearing Service National Electronic Fund Transfer No objection certificate Non Resident Non Resident External Account Non Resident Indian, is a person resident outside India, who is a citizen of India or a person of Indian origin and shall have the same meaning as ascribed to such

vii

Term

NRO Account NSDL NSE OCB/ Overseas Corporate Body

p.a. P/E Ratio PAN PAT PBT PIO RBI Re. RoC RoNW `/ Rs./Rupees RTGS SCRA SCRR SEBI SEBI Act Securities Act SEZ SICA SPV Sq. Ft./ sq. ft. Sq. Mtrs./ sq. mtrs. State Government Takeover Code U.S./ United States US$ or USD U.S. GAAP VCFs

Description term in the Foreign Exchange Management (Deposit) Regulations, 2000, as amended from time to time Non Resident Ordinary Account National Securities Depository Limited National Stock Exchange of India Limited A company, partnership, society or other corporate body owned directly or indirectly to the extent of up to 60% by NRIs including overseas trusts in which not less than 60% of beneficial interest is irrevocably held by NRIs directly or indirectly and which was in existence on October 3, 2003 and immediately before such date was eligible to undertake transactions pursuant to the general permission granted to OCBs under the FEMA. OCBs are not allowed to invest in this Issue per annum Price/Earnings Ratio Permanent Account Number Profit After Tax Profit Before Tax Persons of Indian Origin Reserve Bank of India One Indian Rupee Registrar of Companies, Maharashtra situated at Everest, 5th Floor, 100, Marine Drive, Mumbai 400 002 Return on Net Worth Indian Rupees Real Time Gross Settlement Securities Contracts (Regulation) Act, 1956, as amended from time to time Securities Contracts (Regulation) Rules, 1957, as amended from time to time Securities and Exchange Board of India constituted under the SEBI Act, 1992 Securities and Exchange Board of India Act 1992, as amended from time to time U.S. Securities Act, 1933, as amended from time to time Special Economic Zone Sick Industrial Companies (Special Provisions) Act, 1985, as amended from time to time Special Purpose Vehicle Square feet Square metres Government of the state of Maharashtra Securities and Exchange Board of India (Substantial Acquisition of Shares and Takeovers) Regulations, 1997, as amended from time to time United States of America United States Dollars Generally Accepted Accounting Principles in the United States of America Venture Capital Funds as defined and registered with SEBI under the SEBI (Venture Capital Fund) Regulations, 1996, as amended from time to time

viii

PRESENTATION OF FINANCIAL, INDUSTRY AND MARKET DATA All references to India contained in this Draft Red Herring Prospectus are to the Republic of India and all references to the U.S. or U.S.A are to the United States of America. Financial Data Unless stated otherwise, the financial data in this Draft Red Herring Prospectus is derived from our consolidated financial statements prepared in accordance with Indian GAAP and restated in accordance with the SEBI Regulations and included in this Draft Red Herring Prospectus. Our fiscal year commences on April 1 and ends on March 31 of the following year. In this Draft Red Herring Prospectus, any discrepancies in any table, graphs or charts between the total and the sums of the amounts listed are due to rounding-off. There are significant differences between Indian GAAP, IFRS and U.S. GAAP. Accordingly, the degree to which the Indian GAAP financial statements included in this Draft Red Herring Prospectus will provide meaningful information is entirely dependent on the readers level of familiarity with Indian accounting practices. Any reliance by persons not familiar with Indian accounting practices on the financial disclosures presented in this Draft Red Herring Prospectus should accordingly be limited. We have not attempted to explain those differences or quantify their impact on the financial data included herein, and we urge you to consult your own advisors regarding such differences and their impact on our financial data. Any percentage amounts, as set forth in the sections Risk Factors, Our Business, Managements Discussion and Analysis of Financial Condition and Results of Operations on pages xii, 98 and 285 respectively and elsewhere in this Draft Red Herring Prospectus, unless otherwise indicated, have been calculated on the basis of our restated consolidated and unconsolidated summary financial statements prepared in accordance with the Indian GAAP. Currency, Units of Presentation and Exchange Rates All references to Rupees or Rs. or `are to Indian Rupees, the official currency of the Republic of India. All references to USD or US$ are to United States Dollars, the official currency of the United States of America. In this Draft Red Herring Prospectus, our Company has presented certain numerical information in million units. One million represents 1,000,000. The exchange rates of the respective foreign currencies are as stated below: March 31, 2010 (`) 1 USD or US$ 45.14 1 CHF 42.32 Source: For USD, RBI reference rate For CHF, www.oanda.com; Interbank Rate March 31, 2009 (`) 50.95 45.42 March 31, 2008 (`) 39.59 40.11

Unless otherwise stated, our Company has, in this Draft Red Herring Prospectus, used the conversion rates as on March 31, 2010, as mentioned above, for the respective currencies. Conversion table for area In this Draft Red Herring Prospectus, our Company has presented information related to land in various units. The conversion ratio of such units is as follows: 1 hectare 1 acre 1 acre 1 sq. mt. = = = = 2.47 acres 4,046.85 sq. mts. 43,560.00 sq. ft. 10.764 sq. ft.

ix

Definitions For definitions, please see Definitions and Abbreviations on page i. In Main Provisions of Articles of Association on page 394, defined terms have the meaning given to such terms in the Articles. Industry and Market Data Unless stated otherwise, the industry data used throughout this Draft Red Herring Prospectus has been obtained from industry publications. Industry publications generally state that the information contained in those publications has been obtained from sources believed to be reliable but that their accuracy and completeness are not guaranteed and their reliability cannot be assured. Although we believe that the industry data used in this Draft Red Herring Prospectus is reliable, it has not been independently verified. Further, the extent to which the industry and market data presented in this Draft Red Herring Prospectus is meaningful depends on the readers familiarity with and understanding of the methodologies used in compiling such data. There are no standard data gathering methodologies in the industry in which we conduct our business, and methodologies and assumptions may vary widely among different industry sources.

FORWARD-LOOKING STATEMENTS All statements contained in this Draft Red Herring Prospectus that are not statements of historical fact constitute forward-looking statements. All statements regarding our expected financial condition and results of operations, business, plans and prospects are forward-looking statements. These forward-looking statements include statements with respect to our business strategy, our revenue and profitability, our projects and other matters discussed in this Draft Red Herring Prospectus regarding matters that are not historical facts. Investors can generally identify forward-looking statements by terminology such as aim, anticipate, believe, expect, estimate, intend, objective, plan, project, may, will, will continue, will pursue or other words or phrases of similar import. All forward looking statements (whether made by us or any third party) are predictions and are subject to risks, uncertainties and assumptions about us that could cause actual results to differ materially from those contemplated by the relevant forward-looking statement. Forward-looking statements reflect our current views with respect to future events and are not a guarantee of future performance. These statements are based on our managements beliefs and assumptions, which in turn are based on currently available information. Although we believe the assumptions upon which these forward-looking statements are based are reasonable, any of these assumptions could prove to be inaccurate, and the forward-looking statements based on these assumptions could be incorrect. Further the actual results may differ materially from those suggested by the forward-looking statements due to risks or uncertainties associated with our expectations with respect to, but not limited to, regulatory changes pertaining to the industries in India and our ability to respond to them, our ability to successfully implement our strategy, our development plan, our growth and expansion, technological changes, our exposure to market risks, general economic and political conditions in India and overseas, which have an impact on our business activities or investments, the monetary and fiscal policies of India and other jurisdictions in which we operate, inflation, deflation, unanticipated turbulence in interest rates, foreign exchange rates, equity prices or other rates or prices, the performance of the financial markets in India and globally, changes in domestic laws, regulations and taxes, changes in competition in our industry and incidence of any natural calamities and/or acts of violence. Important factors that could cause actual results to differ materially from our expectations include, but are not limited to, the following: The diversified economy we expect may not come to fruition; Any unexpected changes or developments, as we have completed only a part of our development plan for Lavasa in terms of the area purchased and developed for infrastructure real estate; If the State Government does not approve the proposals for development of Lavasa prepared by the SPA, in a timely manner or at all, or suggests material modifications to such proposals; Inability to successfully implement our development plan; and Failure to maintain high levels of customer satisfaction.

For further discussions of factors that could cause our actual results to differ, please see Risk Factors and Managements Discussion and Analysis of Financial Condition and Results of Operations on pages xii and 285, respectively. By their nature, certain risk disclosures are only estimates and could be materially different from what actually occurs in the future. As a result, actual future gains or losses could materially differ from those that have been estimated. Our Company, our Directors, the BRLMs, the Syndicate and their respective affiliates or associates do not have any obligation to, and do not intend to, update or otherwise revise any statements reflecting circumstances arising after the date hereof or to reflect the occurrence of underlying events, even if the underlying assumptions do not come to fruition. In accordance with the SEBI requirements, our Company and the BRLMs will ensure that investors in India are informed of material developments until such time as the grant of listing and trading permissions by the Stock Exchanges.

xi

RISK FACTORS An investment in our Equity Shares involves a high degree of risk. You should carefully consider all the information in this Draft Red Herring Prospectus, including the risks and uncertainties described below, before making an investment in our Equity Shares. If any one or a combination of the following risks actually occur, our business, prospects, financial condition and results of operations could suffer, the trading price of our Equity Shares could decline and you may lose all or part of your investment. Unless specified in the relevant risk factor below, we are not in a position to quantify the financial implication of any of the risks mentioned below. Any potential investor in, and purchaser of, the Equity Shares should pay particular attention to the fact that we are governed, in India by a legal and regulatory environment which may be different from that which prevails in the United States and other countries in some material respects. In addition, the risks set out in this section may not be exhaustive and additional risks and uncertainties not presently known to us, or which we currently deem to be immaterial, may arise or may become material in the future. In making an investment decision, prospective investors must rely on their own examination of us on a consolidated basis and the terms of the Issue including the merits and the risks involved. To obtain a complete understanding of our business, you should read the sections Our Business and Management's Discussion and Analysis of Financial Condition and Result of Operations on pages 98 and 285, respectively. If our business, result of operations or financial condition suffers, the price of our Equity Shares and value of your investments in the Equity Shares could decline. This Draft Red Herring Prospectus also contains forward-looking statements that involve risks and uncertainties. Our results could differ materially from those anticipated in these forward-looking statements as a result of certain factors, including the considerations described below and elsewhere in this Draft Red Herring Prospectus. In this section, unless the context otherwise requires, a reference to our Company or to we, us and our refers to Lavasa Corporation Limited, and our Subsidiaries and Associates on a consolidated basis. Unless otherwise stated or the context otherwise requires, the financial information used in this section is derived from the audited restated consolidated and standalone financial statements of our Company. Internal Risks 1. There are outstanding legal proceedings against us, our Directors and our Promoters. There are outstanding legal proceedings involving us, our Directors and our Promoters. These proceedings are pending at different levels of adjudication before various courts, tribunals, enquiry officers, appellate tribunals and arbitrators. Litigation against us Sr. No. 1. 2. 3. 4. 5. Nature of cases Public interest litigation Civil proceedings Revenue proceedings Notice from collector Letters from gram panchayat No. of outstanding cases 3 20 30 1 1 Amount Involved (in ` million) Amount not ascertainable Amount not ascertainable Amount not ascertainable Amount not ascertainable Amount not ascertainable

Litigation against our Directors Sr. No. 1. Nature of cases Criminal proceedings No. of outstanding cases 1 Amount Involved (in ` million) Amount not ascertainable

xii

Litigation against our Promoters Sr. No. 1. 2. 3. 4. 5. 6. Nature of cases Criminal proceedings Civil proceedings Industrial and labour related proceedings Share related proceedings Tax proceedings Arbitration proceedings No. of outstanding cases 4 33 25 12 6 1 Amount Involved (in ` million) Amount not ascertainable 1,396.94 18.64 Amount not ascertainable 73.25 4.7

An adverse outcome in any of these proceedings may affect our reputation and standing and impact our future business and could have a material adverse effect on our business, prospects, financial condition and results of operations. We cannot assure you that any of these proceedings will be decided in favour of us, our Directors or our Promoters, or that no further liability will arise out of these proceedings. For further details of outstanding litigation against us, our Directors and our Promoters, please see Outstanding Litigation and Material Developments on page 313. 2. We will not be able to proceed with the Issue if there are any outstanding DDCDs or any other outstanding convertible securities. Our Company has issued DDCDs which are, at the option of the holders thereof, convertible into Equity Shares. The SEBI Regulations require that no issuer shall make an initial public offer if as on the date of registering the prospectus with the Registrar of Companies there are any outstanding convertible securities or any other right which would entitle any person any option to receive equity shares after an initial public offer. All the holders of the DDCDs, other than the United Bank of India, have either agreed to prepayment of the DDCDs, or have given their consent to convert the DDCDs held by them into Equity Shares or nonconvertible debentures of our Company, prior to the filing of the Red Herring Prospectus in connection with the Issue with the Registrar of Companies. The United Bank of India has, pursuant to a letter dated September 9, 2010, communicated to our Company that they are considering either (i) a prepayment of the DDCDs held by them with a specified penal interest, or (ii) conversion of such DDCDs into nonconvertible debentures, subject to the approval from a competent authority in the United Bank of India. We however cannot guarantee or assure you that the United Bank of India will exercise either of these two options in a timely manner or at all, in which event our Company will not be able to proceed with the Issue. 3. The Lavasa vision involves significant risk in that the diversified economy we expect may not come to fruition, which would have an impact upon the profitability of our subsidiaries and associates and would cause us to have excess real estate and infrastructure capacity. We believe that once completed Lavasa would be a city with a diversified economy offering employment opportunities and containing a wide variety of housing options, hospitality offerings, retail, office and entertainment spaces, educational institutes and health and wellness centres. In addition, we are proposing to develop complementary business opportunities in the hospitality, education, tourism and leisure, healthcare and retail sectors through investments in our subsidiaries and associates. It is possible that our vision may not come to fruition completely or in a timely manner or at all. In particular, whilst we have experienced some early successes with respect to the sale and/or lease of residential real estate and entering into various arrangements with hospitality and educational companies, it is possible that residents and visitors of Lavasa use their residential units primarily as second and/or holiday homes. If we are unable to attract adequate businesses to set up offices in Lavasa, the residents of Lavasa may possibly use their residential units as second homes. Moreover, if our vision of a diversified economy is not achieved, then the profitability of our subsidiaries and associates relating to hospitality, tourism, education and health could be adversely affected and there may be excess capacity in our residential and commercial units and

xiii

infrastructure, which, in either case, would have a material adverse effect on our business segments and results of operations. 4. As of the date of this Draft Red Herring Prospectus, we have completed only a part of our development plan for Lavasa in terms of the area purchased and developed for infrastructure real estate, which may not be a fair indication of the success of our future plans. Any unexpected changes or developments may adversely affect our future performance, financial condition and results of operation. Our development plan, which is an evolving and adaptive document, targets the development of approximately 12,553 acres out of 13,226 acres of land and is spread over four development periods. As of September 10, 2010, we have purchased approximately 9,460 acres of land and have entered into MoUs with various land aggregators in connection with the purchase of approximately 3,766 acres of land. In addition to the above, we may purchase an additional approximately 5,469 acres of land within the area declared as a hill station pursuant to the Hill Station Regulations on an opportunistic basis and though we expect, that this will generate additional sources of revenue for us, there is no certainty of the same. However, as a substantial part of the development plan still remains to be initiated, the current status of our progress cannot be construed as an indication of our future performance or our ability to successfully complete the remainder of our development plan. We may experience unforeseen problems, changes in consumer demands and preferences, changes in regulations or adverse developments which may adversely affect our ability to complete our development plan, introduce changes to our development plan or cause delays in its implementation. Any such changes may adversely affect our business, financial condition and results of operation. 5. Our ability to develop Lavasa in accordance with our proposed designs and development plan, in a timely manner or at all may be adversely affected if the State Government does not approve the proposals for development of Lavasa prepared by the SPA, in a timely manner or at all, or suggests material modifications to such proposals. Pursuant to a notification dated June 12, 2008, issued under the MRTP Act, (SPA Notification), the Government of Maharashtra has appointed us as a special planning authority in connection with land owned and proposed to be developed by us in 14 villages. In terms of the MRTP Act, the SPA is required to, from time to time, submit its proposals for the development of the land in the area as detailed in the SPA Notification, (being land either currently owned by us or land which is proposed to be purchased by us), (Statutory Proposals), to the State Government after having invited and considered suggestions and objections from the public. The State Government may in turn, after consultation with the Director of Town Planning, approve such Statutory Proposals either with or without modification. The Statutory Proposals is required to be prepared taking into consideration the provisions of any regional plan or a draft thereof, any development plan, building bye-laws and regulations, which are already in force in the area notified under the SPA Notification. Prior to the SPA Notification, pursuant to a letter dated June 7, 2008, the Office of the Collector, Revenue Department, District Pune, had approved and granted permission to our Company for our proposed development at Village Dasve and Padalghar for a total area of 636.82 hectares. Currently, the draft Statutory Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication amongst others in the official gazette and local newspapers, for public review and receipt of public suggestions. Consequently, this draft Statutory Proposals, after having considered the comments received from the public, as appropriate, shall be submitted to the State Government for its approval. For details, please see Our Business Our governance platform. If the State Government does not approve the Statutory Proposals that the SPA submits, in a timely manner or at all, or suggests any material modifications to such Statutory Proposals, our ability to develop Lavasa in accordance with our development plan and Master Plan, in a timely manner or at all could be adversely affected, which in turn could adversely affect our business, financial condition and results of operations. In

xiv

addition, such refusal of approval or modification of the development plan may adversely impact the arrangements that we have entered into with various partners for future developments, which may result in claims from these counterparties and adversely impact our results of operations and financial condition. 6. As we are not in a mature industry, we will not be aided by an established industry knowledge, which could cause us to make sub-optimal strategic or operational decisions. Lavasa will be a hill city in India when finished and, to the best of our knowledge, there are no industry competitors developing similar private cities in India as of the date of this Draft Red Herring Prospectus. Lavasa is, therefore, largely without precedent and we will not be aided by an industry knowledge that sometimes exists in more mature industries, and, accordingly, we may pursue strategies that are suboptimal for our business segments and we may, as a participant in a young industry, shift strategies frequently, which could also have a material adverse impact on our business. 7. Lavasa's location may not attract residents and businesses and the competition that may arise from neighbouring cities such as Mumbai, Pune and other corridors could adversely affect our results of operations. We are located at a distance of 216 kilometers from Mumbai via Chandni Chowk (an area on the outskirts of Pune) and 42 kilometers from Chandni Chowk. The nearest international airport from Lavasa is the Lohagaon Airport at Pune, which is approximately 72 kilometers north-east of Lavasa and another international airport is the Chhatrapati Shivaji International Airport at Mumbai, which is approximately 220 kilometers away from Lavasa. Further, the nearest railway station from Lavasa is located at Pune, at a distance of approximately 65 kilometers from Lavasa. Although international airports are currently proposed at Chakan near Pune and Panvel in Navi Mumbai, located approximately 99 kilometers and 145 kilometers, respectively, from Lavasa, we cannot assure you that these will be completed in the time expected or at all. The lack of an airport and railway stations in Lavasa and the fact that Lavasa is not an established urban centre may deter potential residents from living in Lavasa. We face the risk that potential residents may use Lavasa as a second/holiday home, which would lead to our vision for Lavasa not coming to fruition. Further, we are currently in the process of developing a tunnel at Mugaon which would reduce the distance between Lavasa and Mumbai. The completion of the Mugaon tunnel is desirable in order to ensure connectivity of Lavasa with Mumbai as the tunnel will reduce the distance to approximately 199 kilometres and the discomfort of travelling on a winding hill road that presently provides the main access to Lavasa. Any failure to complete this tunnel in the expected time or at all could affect the convenience of access to Lavasa for residents, visitors and investors and thereby adversely affect our business, financial condition and results of operations. Furthermore, our location could also prove to be a disadvantage as we may face competition from (i) the cities of Mumbai and Pune to the extent that these cities offer improved infrastructure development and facilities as compared to existing facilities; and (ii) new urban centres which are being developed or may be developed in the Mumbai Pune corridor. The aforementioned competition may impact our ability to attract potential future residents and thereby adversely affect our ability to develop and sell or lease our projects. 8. We may be unable to successfully implement our development plan. We may face various difficulties in the implementation of our development plan for Lavasa. There may be certain modifications required to suit market conditions and regulatory, contractual or other issues that may arise in the future. Additionally, as our development plan goes up to the year 2021, we may be subject to several unforeseen changes in consumer preferences, laws and regulations, including claims and defects in title, competition from new players in the market and changes in pricing for real estate and raw materials. In particular, Period 4 (2019 to 2021) of our development plan presently contemplates the development of 4,507 acres of land. There can be no assurance that we would develop all of this land as planned or at all. For instance, we may be required to change our development plan if the State Government does not approve the proposals related to development of Lavasa, as submitted by the SPA, or suggests any material

xv

modifications to such proposals. Further, we may need to change our development plan to provide for any unforeseen changes. Subject to statutory requirements, the discretion to make changes to our development plan rests solely with our management and we may depart from our current strategies relating to various elements of our development plan. Any failure to identify changing requirements could result in our development plan not catering to the requirements of future residents which may adversely affect the attractiveness of Lavasa. In our limited operating history thus far, we have adapted our strategy on account of market conditions. We cannot assure you that we will not change our development plan in the future or that any changes in our development plan in the future would be successful or that we may be able to successfully anticipate any changes requiring us to modify our strategy. At present, our development plan is dependent upon a high volume of supply of non-residential development, which we expect would drive the demand for residential units in the future. We cannot assure you that this strategy would be successful. Further, there is a risk that the decisions of the management, as viewed by the market and investor community, may be considered sub-optimal for our end-objectives. 9. Our estimates relating to permanent population, number of tourists, employment base and infrastructure standards in Lavasa as disclosed elsewhere in this Draft Red Herring Prospectus are based on our internal estimates and we cannot assure you that we will be able to achieve these; certain of the information contained in the Industry section was prepared by a company that provides consulting services to us from time to time and accordingly it may be less objective or reliable than information prepared by an independent third party. Based on the land we own or have entered into MoUs and/or agreements to purchase as of September 10, 2010 measuring 13,226 acres, we estimate that Lavasa can accommodate a permanent population of approximately 300,000 with facilities for approximately two million tourists per annum and an employment base of approximately 97,000. We aim that every square foot of non-residential asset development will lead to approximately two square feet of residential asset demand. Additionally, based on our designs and development plan we expect to achieve sewage and solid waste treatment, piped water, sewage and septic tank coverage, storm water drains and water supply at better or comparable to current best-in-class standards. For further details, please see Our Business Overview on page 98. These estimates are based on our internal estimates and have not been independently verified by an expert or at all and accordingly we cannot assure you that we will be able to achieve these. Furthermore, if we are unable to implement our development plan due to market conditions, regulatory hurdles or requirements or other issues, we will likely be unable to achieve these estimates which would further adversely affect our results of operations. In addition, certain of the information contained in the Industry section related to the Gurgaon case study is based on a report prepared for us by Feedback Ventures, a company that has provided certain consulting services to us from time to time. Accordingly, such information may be less objective or reliable than information prepared by an independent third party. 10. Our businesses operated through our subsidiaries and associates may not be synergistic and we may not be able to achieve economies of scale across all of them. Further, the success of some of the businesses is connected to the success of the other related businesses. We believe that Lavasa will offer infrastructure and city management services and, once all the towns in Lavasa are operational, it would be a city with a wide variety of housing options, hospitality offerings, retail, office and entertainment spaces, educational institutes and health and wellness centres. Accordingly, our businesses operated through our subsidiaries and associates are comprised of several diverse industries, which may not necessarily be synergistic in nature and we may not be able to achieve economies of scale across all of them. Further, the success of some of our businesses is connected to the success of other related businesses, for example, the success of convention centres planned in Lavasa depends upon the success of the hotels in Lavasa and, accordingly, if the results and revenues of one of our businesses is less than expected, our other businesses and our financial condition could be adversely affected.

xvi

11.

Failure to maintain high levels of customer satisfaction would limit the attractiveness of Lavasa, thereby adversely affecting our business financial condition and results of operation. Given the unprecedented nature of the Lavasa development, our success depends upon our ability to maintain customer satisfaction, starting from the registration process, construction through to handover, post-sale operations and maintenance. Continued quality of services are important to help sustain the growth of sales of built-up structures and/or leases of our properties and further development. Failure to do so would limit our real estate transactions and limit the attractiveness of Lavasa. Additionally, a failure to anticipate the demands and preferences of potential future residents and businesses may lead to a failure to adequately develop Lavasa as a city. This may lead to Lavasa becoming a second home or a holiday home for potential full-time residents. Further, failure to anticipate such demand and preferences or any reduction in market off-take may also lead to a decline in interest from future potential partners and may cause our existing partners to be less willing to invest in Lavasa. This may adversely affect our business, financial condition and results of operations.

12.

Our development plan may fail to anticipate the construction/development of diverse institutions essential in the development of a city. In the course of development of Lavasa, we may realize that either by design or by over-sight, we have not undertaken the development of diverse social and economic institutions, which are necessary for the development of a city. We cannot assure you that we will be able to predict and/or cater to the future demands and requirements for community and cultural institutions of our future residents. Any failure to anticipate and cater to such demand may deter potential residents from living in Lavasa and may adversely affect resident satisfaction and our business, financial condition and results of operation.

13.

We are a company with a limited operating history, with no proven successful precedent of the same scale in the private sector space. Therefore, investors may not be able to assess our prospects on the basis of past results or in comparison with a peer industry. We were incorporated as a limited liability company under the Companies Act in 2000. Our vision of developing a privately constructed city of the scale of Lavasa with a private entity as the principal development and management authority is unprecedented in India. As we do not have significant operating and financial history, it may be difficult to evaluate our current or future prospects. Our total income on a consolidated basis for the three months ended June 30, 2010, FY 2010, FY 2009 and FY 2008 was ` 935.20 million, ` 3,089.09 million, ` 2,076.74 million and ` 0.07 million respectively. Our past performance should not be construed as an indication of our future performance. Companies in their early stages of development present substantial business and financial risks and may suffer significant losses. Additionally, neither we nor our Promoters have experience in developing integrated townships or similar real estate developments. With no comparable benchmarks, of similar nature or size, it can be difficult to compare a growth path for the development. Lavasa is still in the early stages of its development, and has demonstrated success on a small scale but the extrapolation of this track record in the future can be unreliable.

14.

We may not be able to successfully manage the growth of our operations. As a result of our short operating history and our ambitious growth strategy, our proposed expansion and diversification will place significant demands on our management as well as our financial, accounting and operating systems. Pursuant to our development plan, which is divided into four periods from 2008 to 2021, we have invested in large-scale physical infrastructure such as roads, water dams, sewage and drainage, and power transmission, housing and essential amenities early in our life-cycle, followed by a focus on the development of a diverse economic activity base, which includes commercial, hospitality, educational, healthcare, tourism and leisure and social activities. Our growth strategy carries significant risks and challenges, including that: (1) our various business initiatives may not be accepted by potential customers; (2) our marketing strategies for our business segments may be less effective than planned and may fail to effectively reach our targeted consumer base;

xvii

(3) we may incur greater costs than we currently envision as a result of the continued development and launch of our new projects; (4) we may experience a slowdown in leases/sales of certain of our real estate assets, inter alia, including built up spaces as a result of the introduction of new projects in similar locations; and (5) we may experience delays or other difficulties which impact our ability, or the ability of our third party contractors and developers, to develop and construct our projects in a timely manner. There can be no assurance that we will be able to execute our growth strategy on time and within the estimated budget, or that we will meet the expectations of our customers. In order to manage growth effectively, we must implement and improve operational systems, procedures and controls on a timely basis, which, as we grow and diversify, we may not be able to implement, manage or execute efficiently and in a timely manner or at all, which could result in delays, increased costs and diminished quality and may adversely affect our results of operations and our reputation. If we are unable to manage our growth effectively, our business, financial condition and results of operations will be adversely affected. 15. There may be delays in the completion of our development or projects at Lavasa. Our development plan is an evolving and adaptive document. Though our development plan is divided into four periods, to achieve the overall development of Lavasa in a timely manner, we are required to meet various timelines for different developments, all of which may not be within our control. To illustrate, we expect Dasve, our first town, to be substantially operational during FY 2012; the Mugaon tunnel to be operational in FY 2013; and the infrastructure for Mugaon to be substantially completed during FY 2014. Although typically we have prepared preliminary management and development plans for all of our projects in a timely manner in the past, we are yet to formulate our financing plans for certain of these projects and have not applied for any regulatory consents or approvals for some of these projects. As such our projects are subject to significant changes and modifications from our currently estimated plans and timelines as a result of factors outside our control, including, among others availability of raw materials and financing, increases in construction costs, natural disasters, reliance on third party contractors and the risk of decreased market demand during the development of a project. Such changes and modifications may have a significant impact on our projects and development plan in general and consequently, this may have a material adverse affect on our business and results of operations. 16. The success of Lavasa depends upon complying with laws, rules, regulations and notifications promulgated by the central, state and local government bodies, and to the extent there are changes in their policies or stricter or more costly regulations imposed, our results of operations could be adversely affected. Our business model depends on our compliance with laws and regulations promulgated by central, state and local governments, which are responsible for land and development, land reform implementation, land conservation and rural housing and other rural development programmes, as well as granting approvals and no objections for various activities proposed to be undertaken. For example, we are required to obtain approvals, permissions and NoCs from the MPCB, Environment Department, Government of Maharashtra, Office of the Fire Advisor, Government of Maharashtra and the Ministry of Environment and Forests, Government of India. In addition, various authorities may impose conditions or sanctions upon us. For further details, see Government Approvals on page 338. In addition, the Government of Maharashtra may amend the Hill Station Regulations which may impact the floor space index for the construction of buildings in Lavasa. If any of these entities change their policies or imposes stricter or more onerous regulations, our development plan may be adversely impacted. 17. We are required to obtain, renew and maintain statutory and regulatory permits, licenses and approvals from time to time. Any delay or inability to obtain such approvals may have an adverse impact on our business. We require certain statutory and regulatory permits, licenses and approvals to execute our projects and operate our business and applications need to be made at appropriate stages for such approvals. Additionally, we require completion/occupation certificates to be delivered to us upon completion of a project or a phase of the project. For details, please see Government Approvals on page 338. While we

xviii

have applied for a few of these approvals and permits, we cannot assure you that we will receive these approvals in time or at all in relation to execution of our construction/development activities in Lavasa. For instance, we have obtained environmental clearance from the environment department of the Government of Maharashtra for 2,000 hectares of land. We have applied for environmental clearance from the State Environment Impact Assessment Authority (SEIAA) for approximately 5,000 hectares of the project area for Lavasa. For further details, see Government Approvals on page 338. Certain special interest groups and environmental activists are campaigning against granting the clearance and are seeking a stay on the development and construction work of the project. If we fail to obtain clearance from SEIAA, we would not be able to commence development for Periods 3 and 4 of our development plan. If there is a delay in obtaining this clearance, it may disrupt the schedule of our development plan and have a material adverse impact on our business, financial condition and results of operation. Further, if we fail to obtain approval from the State Government for the Statutory Proposals of the SPA, if there is a delay in obtaining such approval, or if the Statement Government suggests material modifications to it, we may be required to change our development plan, which may adversely affect our business, financial condition and results of operation. Further, in the future we will be required to apply for fresh approvals and permits for our projects. There can be no assurance that the relevant authorities will issue any of such permits or approvals in the time frames anticipated by us or at all. Further, we make applications for renewals in relation to certain approvals or licenses that have expired but have not yet received these approvals or licenses. If we fail to obtain the necessary approvals and permits or if there is any delay in obtaining these approvals and permits, it may disrupt the schedule of development and sale or letting of our projects, impede the execution of our business plans and may materially and adversely affect our business and financial condition. Additionally, any change in applicable law or regulations in relation to our business or of any of the businesses operating within Lavasa may also adversely our business, financial condition or results of operations. 18. The breadth of our vision may distract our management who may be unable to achieve or maintain required expertise for each business segments operated through our subsidiaries and associates which may hamper our business operations. The breadth of our vision may serve to distract management who may be unable to achieve or maintain an essential level of expertise in each segment of our business due to too many competing segmental interests. If our management is unable to achieve or maintain a necessary level of expertise or if we do not realize synergies across our business segments, our results of operations would be adversely impacted. Further, given the diverse nature of our business segments, we may be unable to recruit and retain adequately qualified professionals who may instead opt for companies with narrower strategies, which may hamper the growth of our business operations. 19. Our purchase of land at Lavasa has been challenged by way of a public interest litigation. The state of Maharashtra has declared an area of 18 villages in Mulshi and Velhe Taluka in Pune as a hill station, measuring approximately 23,014 acres. As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land within this designated area. A public interest litigation (PIL) has been filed before the Bombay High Court against the state of Maharashtra, the Collector, Pune and our Company amongst others wherein it has been alleged that our Company has purchased more than 10,000 acres of land in violation of sections 9 and 10 of the Maharashtra Agricultural (Ceiling on Holdings) Act, 1961 (the Ceiling Act). Section 9 read with section 10 of the Ceiling Act states that any land acquired in excess of the ceiling area shall be forfeited and shall vest in the state government. The PIL has sought an injunction restraining our Company from developing the land and creating any third party interest in the land. We have contended in our written submissions that we do not require permission under the Ceiling Act for the land purchased and hence the purchase is not in violation of the Ceiling Act. While no interim orders have been passed, the matter is currently pending further

xix

hearing and final disposal before the Bombay High Court. For further details see Outstanding Litigation and Material Developments on page 313. Such legal proceedings can distract management time and stall or delay our development plan for Lavasa. Further, if the outcome of the PIL is not favourable to us and it is held that we did not have the requisite permissions to purchase the land or that it is required to obtain further approvals and permissions, our Development Plan at Lavasa may not be completed in a timely manner or at all. This may have a material adverse affect on our business and results of operations. 20. We have been leased approximately 348 acres of land located within the catchment area of Warasgaon dam pursuant to a 30 year lease from MKVDC. The lease is subject to certain terms and conditions and we may not be able to renew it. We have been leased approximately 348 acres of land located within the catchment area of Warasgaon dam pursuant to a 30 year lease from MKVDC by an agreement dated September 23, 2002. Out of this 348 acres of land, an area of approximately 318 acres is submerged land and approximately 30 acres is unsubmerged land. The lease is subject to certain terms and conditions and we may not be able to renew it. We are required to pay approximately ` 0.27 million per annum under this lease agreement. After expiration of the lease period, we are required to return the land to MKVDC. We may not be able to recover the costs incurred for developments on this unsubmerged land and the two dams at Dasve and Gadle on this land during the lease period. In the event that MKVDC does not renew the lease agreement or renews the lease subject to onerous conditions, our business, financial condition and results of operations could be materially and adversely affected. 21. Our inability to purchase the remaining parcels of land required for completion of Lavasa on acceptable terms in a timely manner or at all may affect our future development. We purchase parcels of land, along with development rights over parcels of land in various locations from various landholders, over a period of time, for future development. These parcels of land are subsequently consolidated to form a substantially contiguous land mass, upon which we undertake development. As of September 10, 2010, we have purchased approximately 9,460 acres of land for development, and will consider purchasing on an opportunistic basis an additional 5,469 acres within the area notified as a hill station pursuant to the Hill Station Regulations for purposes of progressing our development plan. We cannot assure you that we will be able to purchase and obtain undisputed legal title to and possession of the land best suited for our projects. In the initial stages of Lavasa, we were able to purchase land at lower costs compared to the present costs of the land in the areas covering Lavasa. However, as the project plans have gradually become public, land procurement has gradually grown more difficult and expensive. Additionally, landowners who refuse to sell their land to us may also cause difficulty in city management as they will not be governed by the policies governing Lavasa. This may also affect the contiguity of land parcels required for the development of Lavasa. Further, we sometimes enter into MoUs and similar arrangements with third parties to purchase title with respect to certain land. To facilitate the process of purchase of land, our Company has entered into (a) a MoU dated August 12, 2010 with M/s. Swastik Enterprises in connection with the purchase of an aggregate of approximately 459.82 acres of land, (b) a MoU dated August 10, 2010 with M/s. Sumeet Land Developers in connection with the purchase of an aggregate of approximately 2,436 acres of land, (c) a MoU dated August 12, 2010 with M/s. Siddhivinayak Enterprises in connection with the purchase of an aggregate of approximately 782.22 acres of land, and (d) a MoU dated August 12, 2010 with Shri Ramchandra Shripati Ubhe in connection with the purchase of an aggregate of approximately 87.35 acres of land. For further details, see section titled Objects of the Issue on page 52. Since formal transfer of title or land development rights with respect to such land is completed only after all requisite governmental consents and approvals have been obtained and all conditions precedent to such agreements have been complied with, we are subject to the risk that pending such consents and approvals sellers may transfer the land to other purchasers or that we may never obtain registration of title or land

xx

development rights with respect to such land. We also make partial payments to sellers as consideration to purchase certain land or land development rights which we may be unable to recover under certain circumstances. The failure to purchase land on acceptable terms or at all may cause us to change, delay or limit the size of development at Lavasa and materially and adversely affect our competitive position, business, financial condition and results of operation. Further, any failure to recover the partial payment made by us with respect to such land, could adversely affect our business, prospects, financial condition and results of operations. 22. The development of Lavasa is dependent upon our ability to anticipate market trends in Lavasa and the Mumbai Pune corridor in particular and in India in general. Further, we face competition from developers in the Mumbai Pune corridor and the areas between Mumbai and Pune. At present, our focus is centred around a single location, which entails a business and market risk and risks, inter-alia, relating to defects in title in the land that we purchase due to exposure to a single real estate market. It also exposes us to significant localized risks of both natural and unnatural calamities earthquakes, landslides, terrorist attacks, civil disturbances, regional conflicts, other acts of violence, outbreak of an infectious disease or any other serious public health concerns, all of which could have a long-term impact on the brand and future prospects of Lavasa. Since we commenced our operations relating to development of Lavasa, we have executed and registered lease deeds, agreements to lease, and/or have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) with various customers in connection with the lease of an aggregate of 896 apartments, 461 villas (including sale of built up area) and 399 rental housing units (including sale of built up area). As we aim to continue to purchase, develop, sell built up structures and/or lease land and/or real estate assets across products in the residential, commercial, institutional, hospitality and social sectors, it is essential that we are able to correctly anticipate market trends and release the right amount of supply at the right time, in line with market conditions, to sustain our business. The development of Lavasa may be subject to market conditions and regulatory developments that are different from the real estate, infrastructure, hospitality, education, tourism and leisure, healthcare and retail markets in other parts of India. Any failure to anticipate market trends in this regard may adversely affect our business, financial conditions and results of operation. A failure to purchase additional land will also affect our development plan and our ability to execute our operations in accordance with the development plan in a timely manner or at all. Further, our operations encompassing the development of Lavasa are significantly affected by changes in government policies, economic and other conditions, such as economic slowdown, demographic trends, employment levels, availability of financing, interest rates, or demand for real estate, performance of the hospitality, entertainment, information technology and other sectors or the public perception that changes if any of these events may occur generally in India, and in the areas between Mumbai and Pune in particular. These factors can negatively affect the demand for and pricing of our projects and, as a result, may materially and adversely affect our financial condition, results of operations and our ability to service our debts. The financial, commercial and real estate markets in Maharashtra may perform differently from, and may be subject to market conditions and regulatory developments that are different from, such markets in other parts of India. Demand for residential and commercial units in Lavasa may decrease if potential purchasers/investors do not view Lavasa as an attractive place to live in and invest. These and other factors may contribute to fluctuations in prices at which we sell residential and commercial units in Lavasa which may adversely affect our business, financial condition and results of operations. 23. The demand for real estate assets in Lavasa is subject to fluctuations in property values and rental income over time and our success may be adversely affected by poor demand for an integrated city or adverse real estate cycles as we would have excess real estate and infrastructure capacity.

xxi

Historically, the Indian real estate market has been subject to fluctuations, a phenomenon that can affect the optimal timing for both the purchase of land, the sale and/or lease of residential and commercial units and/or our ability to attract investment in the various businesses proposed to be carried out Lavasa. We cannot assure you that real estate market volatility will not continue to affect the Indian real estate market, and our various operations amongst others, including the development and sale of real estate assets, in the future. As a result, we may experience fluctuations in property values over time which in turn may materially and adversely affect our business, financial condition and results of operations. While we have not experienced market volatility significantly impacting our real estate sales of built-up structures and/or leases, as we continue to launch large volumes of units in the market, our real estate sales of built-up structures and/or leases would be less insulated from the market trends, and the pricing and phasing of supply would need to be viewed in the context of competitive developments in Pune, Mumbai and the Mumbai Pune corridor. There could be cycles of poor real estate absorption tractions in the lifecycle of the Lavasa development. Any such adverse market trends may adversely affect our business, results of operation and financial condition. 24. Our proposed commercial subsidiaries and associates bear significant market risks and in order to build sufficient market traction, may need to discount their products which would have a material adverse affect on our operations. Certain of our subsidiaries and associates would hold our commercial properties and offer them on lease to companies. Currently we have leased 106,384 sq. ft. to DRL for the purpose of setting up and operating retail, food and beverage and other such outlets. In the initial years, as it is important for the project to be recognized as a successful commercial destination, these subsidiaries and associates would face significant pricing pressures. If Lavasa is not recognised as a successful commercial destination, then residents may just use our properties as second homes which would place additional pricing pressures on our consumption businesses (for instance our hotels may need to reduce room rates) and our vision for Lavasa would not come to fruition which would have a material adverse impact on our operations. If the market underperforms our expectations in this regard, the performance of these subsidiaries and associates would be affected, thereby adversely affecting us. Firstly, the equity returns for the stakeholding in these companies would be diminished. Secondly, reduced market size could curtail the orders being placed for the development of commercial space. 25. Our inability to anticipate and respond to consumer requirements would result in a failure to appropriately anticipate demand which would lead to a shortage or excess of real estate or infrastructure capacity. Our ability to identify suitable clients and anticipate their requirements is fundamental to our business and involves certain risks including identifying and developing appropriate projects, meeting the demands of the clients for such projects, understanding and responding to the expectations and market demands. Our growth and success will therefore depend on the provision of high quality projects to attract and retain clients who are willing and able to pay rent/lease premium or purchase prices at suitable levels, and on our ability to anticipate the future needs and expansion plans of these clients. Growing disposable income of India's middle and upper income classes, together with changes in lifestyle, has resulted in a substantial change in the nature of their demands. Increasingly, consumers are seeking better housing and better amenities such as schools, retail areas, health clubs and parks in new residential developments. Our focus is to develop Lavasa as a city with a variety of housing and hospitality options, retail, office and entertainment spaces, educational institutes and health and wellness centres. As a city development of the scale of Lavasa has not been previously undertaken in the private sector, we will face challenges in, among other things, developing projects according to the differing tastes of our potential customers and obtaining the requisite approvals from local authorities. In addition, privately planned cities have historically been uncommon in India and if we fail to anticipate and respond to consumer requirements, we could lose potential customers, which in turn could materially and adversely affect our business, financial condition and results of operations.

xxii

Our growth and success will depend on the provision of quality office space to attract and retain clients who are willing and able to pay rent or purchase prices at suitable levels, and on our ability to anticipate the future needs and expansion plans of these clients. We will incur significant costs for the integration of modern fittings, contemporary architecture and landscaping. In addition, our commercial customers may choose to purchase or develop their own commercial facilities, which may reduce the demand for our commercial properties from these customers. 26. Leases of our residential and commercial units with sale of built-up area in certain instances will be affected by the ability of our prospective customers to enter into long term leases for property and availability of financing to potential customers, particularly buyers of residential properties. As a result of the prevailing conditions of the global and Indian credit markets, it is expected that buyers and lessors of property in India will remain cautious, sale prices and rentals of residential properties and rentals of commercial properties will likely continue to face downward pressure and consumer sentiment and market spending will remain cautious in the nearterm. Further, changes in interest rates affect the ability and willingness of prospective real estate customers, particularly the customers of residential properties, to obtain financing for the purchase or lease of our properties. The interest rate at which our customers may borrow funds for the purchase or lease of our properties affects the affordability of our real estate projects. In particular, a large number of our residential customers finance their purchases/rentals through thirdparty mortgage financing. The recent economic downturn has caused a greater fluctuation in the interest rates and general uncertainty in the market, which could have a negative impact on our sales. Additionally, the lack of a robust secondary market for real estate in India could also reduce the willingness of prospective buyers to purchase our properties. While we have successfully marketed our development in the past, this may not continue nor may a secondary market develop in the future. These factors may materially and adversely affect our business, financial condition and results of operations. 27. Some of the agreements with lessees and with our customers require us to pay a penalty in the event of delays in completion and handover of units or projects to them. We enter into agreements with our customers, which require us to complete the development of the unit or the project by a certain date stipulated in such agreements. The real estate lease deeds into which we have entered and propose to enter with our customers include provisions requiring us to pay a penalty for any delay in completion and delivery of the units to the customers. Further, our agreements for the lease of land and sale of villas contain penalty provisions that if we fail to deliver the possession of villas or apartments within the prescribed time for reasons that are not beyond our control, the customer shall be entitled to charge interest at the rate of 12% per annum or 2% over and above the State Bank of India cash credit rate, whichever is higher at the relevant time until the date of delivery of such possession. Accordingly, the aggregate of all penalties in the event of delays may adversely impact the overall profitability or the project and therefore adversely affects our business and financials and result of operations. We cannot assure you that we will always complete the construction or development of our properties in accordance with the timelines specified in such agreements, and as a result we may be liable for penalties in terms of such agreements. Delays in the completion of the construction of our projects will adversely affect our reputation. Further, such penalties that may become payable by us will have an adverse effect on our financial condition and results of operations. 28. Fluctuations in market conditions between the time we construct and enter into lease arrangements developed real estate assets may affect our ability to sell our real estate assets at expected prices, which could adversely affect our business, financial condition and results of operations. We are subject to potentially significant fluctuations in the market value of our land in Lavasa and constructed inventories. We could be adversely affected if market conditions deteriorate or if we have purchased land or construct inventories at higher costs during stronger economic periods and the market value of the land or the constructed inventories subsequently declines during weaker economic periods. In addition, deviations from planned times to completion could have a material adverse affect due to, among other things, changes to the national, state and local business climate and regulatory environment, local real

xxiii

estate market conditions, perceptions of prospective customers with respect to the convenience and attractiveness of Lavasa, and changes with respect to competition from other property developments. Changes to our business environment during such time may affect the costs and revenues associated with the development and can ultimately affect the profitability of the development. If such changes occur during the time it takes to complete a certain project, our return on such project may be lower than expected, which could materially and adversely affect our business, financial condition and results of operations. Moreover, real estate assets are relatively illiquid, which may limit our ability to respond to changes in economic or other conditions. If real estate prices in India generally or at Lavasa specifically fall our results of operations would be adversely affected. Further, we receive milestone or part payments on our real estate properties and if a purchaser/lessor, on account of fluctuations in the market or for other reasons, discontinues making payments, the partially constructed property would continue to show as an inventory in our financial statements and, accordingly we may have excess real estate capacity which would adversely affect our business, financial condition and results of operation. In addition, an inability to resell our real estate assets at the desired pricing levels may materially and adversely affect our financial condition, results of operations, cash flows, our ability to service our debts and the trading price of our Equity Shares. 29. Our business is subject to extensive Government regulation, including in relation to land development, which may become more stringent in the future. Our business of developing Lavasa is subject to extensive government regulation and we are required to comply with various requirements mandated by Indian real estate related laws and regulations, including policies and procedures established and implemented by local authorities. Additionally, in order to develop and complete any real estate project, developers must obtain various approvals, permits and licenses from the relevant administrative authorities at various stages of project development. We are required to obtain the permission of the SPA for any changes in the use or development of land which is a part of the area notified as a hill station pursuant to the Hill Station Regulations. Development of any new area requires us to obtain the permission of the SPA and the SPA may revoke or modify the permission granted if the change is inconsistent with the draft planning proposal which is approved by the SPA and the planning proposal that is finally approved by the State Government, pursuant to publication and receipt of public suggestions thereon. We may experience problems in obtaining the requisite approvals or licenses in fulfilling the conditions precedent to any required approvals and may not be able to adapt to new laws, regulations or policies that may come into effect from time to time. If we experience material problems in obtaining or fail to obtain the requisite governmental approvals, the schedule of development and sale could be substantially disrupted, which may affect our financial performance. Certain approvals that we have applied for are currently pending and we may need to apply for renewal of approvals which may expire from time to time, in the ordinary course of our business. For further details of the approvals required by us, see Government Approvals on page 338. Although we believe that we are in material compliance with applicable laws and regulations, regulatory authorities may allege noncompliance or may subject us to regulatory action in the future, including penalties, seizure of land and other civil or criminal proceedings. Further, the Hill Station Regulations also contain certain development related restrictions and conditions. For example, the Hill Station Regulations provide that 33% of the total area under development should be kept as open space/ gardens/parks and the minimum size of residential plots should be 500 sq. mts. Further, construction on slopes is permitted, subject to certain conditions, as part of the development. Additionally, no development is permissible in areas at height of 1,000 meters or above. Additionally we are required to comply with other requirements while undertaking construction, such as, the minimum dimension of recreational space shall not be less than 7.4 meters and in any layout or sub-division of land, 10% of the entire holding area is to be reserved as additional space for common facilities and amenities to be provided for the use of the plot holders. Currently, we believe that we are in compliance with these requirements and

xxiv

restrictions. However, in future, there may be additional requirements or restrictions applicable to our development at Lavasa. Residential property owners in India can deduct principal payments (subject to a limit) and mortgage interest from taxable income. For details of the tax benefits available to us, see Statement of Tax Benefits on page 69. If the Government were to curtail such favourable tax treatment, it could reduce the affordability of residential housing for Indian families and diminish demand for our developments. These and other governmental policies affecting our business such as payment of stamp duty, registration requirements of property documents may change from time to time at the local, state and national level in India. Any such changes may require us to modify the manner in which we do business, or may result in our not being able to carry out specific planned or future projects within Lavasa. For further details relating to Governmental policies affecting our business please see Regulations and Policies on page 138. 30. Our business and growth plan could be adversely affected by the incidence and rate of property taxes and stamp duties. We are subject to the property tax regime in Maharashtra. These taxes could increase in the future, and new types of property taxes may be levied which would increase our overall development and other costs. Property conveyances are generally subject to stamp duty. For details, please see Regulations and Policies on page 138. If these duties increase, or any new type of property tax or stamp duty is introduced, the cost of leasing properties will rise which may affect the demand for villas, apartments and plots adversely. Additionally, if stamp duties were to be levied on instruments evidencing transactions which we believe are currently not subject to such duties, such as the grant or transfer of development rights, our purchase costs and lease premium and rentals would be affected, resulting in a reduction of our profitability. Any such changes in the incidence or rates of property taxes or stamp duties could materially and adversely affect our business, financial condition and results of operations. 31. Land is subject to compulsory acquisition by the Government and compensation in lieu of such acquisition may be inadequate. The right to own property in India is subject to restrictions that may be imposed by the Government. In particular, the Government under the provisions of the Land Acquisition Act, 1894 has the right to compulsorily acquire any land if such acquisition is for a public purpose, after making payment of compensation to the owner. However, the compensation paid pursuant to such acquisition may not be adequate to compensate the owner for the loss of such property. The likelihood of such actions may increase as the central and State Governments seek to acquire land for the development of infrastructure projects such as roads, railways and airports. Any such action in respect of any of the properties in Lavasa may adversely affect our business, financial condition or results of operations. 32. Legal proceedings in relation to our land and payment of additional money for settlement of disputes, reworking of the premium or fees on land to the Government may increase the procurement cost. The 9,460 acres of land purchased by us includes Class I freehold land (i.e. land which can be transferred without government permission) as well as Class II lands which can be transferred subject to the payment of a premium to the District Collector, Pune, including ceiling surplus distributed land purchased by us with the approval of the District Collector, Pune. In spite of all the due care in procurement of land, legal proceedings in relation to title of the land and claims for additional compensation cannot be ruled out. In addition, Class II lands also involve payment of premia or fees to the Government, determination of which at times suffers from lack of clarity in interpretation of legal provisions. Hence, in the case of Class II lands too, the possibility of claims for additional compensation or premium may arise. Additionally, there may be a number of uncertainties relating to land title which may result in loss or impairment of our title in our land. Title to land is often fragmented and land may have multiple owners. Land may also have irregularities of title, such as non execution or non registration of conveyance deed and inadequate stamping, and may be subject to encumbrances which we may not be aware in spite of searches conducted

xxv

by us. We may be unable to identify disputes, unregistered encumbrances or adverse possession rights over title to the land we purchase. Prior to purchase of or entering into sale agreements with respect to any land we conduct searches in land records and assessment exercises on the land. Through an internal assessment process, we analyze information about land that we propose to purchase. However there can be no assurance that such information is accurate, complete or up to date. An inability to identify disputes, unregistered encumbrances or adverse possession rights over title may increase the procurement costs of these lands, thereby adversely affecting our business, financial condition and results of operations. 33. Some of our land may be subject to irregularities in title and some of our agreements may be inadequately stamped, as a result of which our operations may be impaired. We generally conduct in-house necessary searches in land records prior to purchase of any land for the purposes of our development activities. We may not be able to assess or identify certain risks and liabilities associated with irregularities in title. As a result, some of our land in respect of which we have title may have one or more irregularities and we may not have good and marketable title to such land, inter alia including unregistered encumbrances, adverse possession rights over title, inadequate stamping and/or nonregistration of deeds and/or agreements. If we do not derive, or are unable to obtain clear title to these lands and consequently are unable to carry out our operations in connection with such property, in a timely manner, our financial condition, profitability and results of operation may be adversely affected. 34. There are certain limitations in Indias property title registration system and other associated risks in relation to real property. In contrast to other countries, India does not have a central title registry for real property. Title registries are maintained at the state and district level and since computerisation of such records began only recently, may not be available online for inspection. In addition, because it is common practice in some parts of India (especially in villages) for transfers of title upon deaths of family members and in certain other circumstances to be made only by mutation in local revenue records, changes in the ownership of land may not be registered with the relevant land registry in a timely manner or at all. Title registries and local revenue records may not be updated or complete. As such, legal defects and irregularities may exist in the titles to the properties purchased and to be purchased by us. Our rights in respect of these properties may be compromised by improperly executed, unregistered or insufficiently stamped conveyance instruments, unregistered encumbrances in favour of third parties, rights of adverse possessors, ownership claims of family members of prior owners, or other defects that we may not be aware of. These defects may arise after land is purchased by us, and are not necessarily revealed by a title due diligence, on account of various factors including but not limited to incomplete land records, transactions without registered documents, the decentralised nature of maintenance of land registries and local revenue records, property-related litigation in India and family disputes in the sellers family. Any defects or irregularities of title may result in litigation and/or the loss of development rights over the affected property. With respect to projects on leasehold land, revocation/ expiry of the lease and any defect or irregularity in the lessors title may result in loss of our rights over affected property. For land that is in the process of being purchased, title verification is pending and there can be no assurance that such land will have clear title. 35. The development plan for Lavasa may face significant opposition from local communities and other parties, which may adversely affect our results of operations and financial condition. The development plan for Lavasa may face opposition from the local communities where Lavasa is located and from special interest groups. In particular, local communities, may oppose our land purchases and construction activities due to various reasons including the perceived negative impact such activities may have on the environment and increased demand on resources such as water from the rivers and reservoirs which may negatively impact or restrict such local communities access to resources. For instance, there are some land cases filed by the erstwhile owners of land in Lavasa alleging irregularities in the purchase of land. Opposition by local communities, non-governmental organizations and other parties to the land

xxvi

purchase process and development activities may delay the development plan for Lavasa which may adversely affect our results of operations and financial condition. 36. Our water requirements may not be met due to hydrological conditions or water flows inconsistent with our expectations and there are certain water bodies contiguous with Lavasa that we will not be able to access. Our water is proposed to be mainly sourced from the ten small dams or check dams that we plan to construct in our submergence and catchment area. Of these check dams, in order to ensure availability of water, we have constructed Dasve Dam and a 35.5-kilometer water distribution network. In addition, another dam at Gadle is under construction. These dams would create permanent water bodies in these villages enabling development of lakefront real estate. The remaining dams will likely be developed in Dasve, Dhamanohol, Gadle and Mugaon to create additional water bodies. Whilst we aim to develop additional water bodies, there can be no assurance that the water supply will be consistent with our projections or requirements, the long term historical water availability will remain unchanged in the future or no material hydrological event or drought will impact the current hydrological conditions. Additionally, we are under an obligation under our agreement with MKVDC to release water under extraordinary circumstances as determined by MKVDC from two dams in the submergence area representing 27.5% of our expected water supply requirements. On two occasions in the past two years, we have had to release water to the main Warasgaon lake. Such events may adversely affect our water requirements. 37. We may incur significant infrastructural costs if our lessees/residents default on the payment of maintenance charges. Significant infrastructural costs are attributed to the development of various projects including the establishment, construction and maintenance of services which include but are not limited to telecommunications and the internet. These infrastructural costs, maintenance charges, taxes on the property and stamp duty are generally directly borne by the Lessees/residents. Accordingly, if a lessee/resident defaults on the payment of maintenance charges or if we otherwise are unable to pass such costs to our lessee/resident, we would have to bear such costs. In the event that the number of such defaults becomes significant, our business, financial condition, results of operations and prospects could be materially and adversely affected. 38. The State Government could acquire our infrastructure assets at marginal cost which would adversely affect our business, financial condition and results of operations. We are in the business of city development, with an integrated offering of three distinct business lines real estate, infrastructure and consumption. Our infrastructure business relates to the development, ownership and management of our infrastructure assets as well as the collection of revenues in the form of management fees. Presently, there is no clarity on the structure of the local authority for the management of Lavasa as the Gram Panchayat is continuing its statutory existence along with the SPA. Should there be any conflict between the Gram Panchayat and us on the levy of local taxes or maintenance of services, the State Government may exercise its power to acquire our infrastructure at nominal cost. In such an event, one of our key revenue streams may be adversely affected leading to an adverse impact on our business, financial condition and results of operation. 39. The extent and reliability of infrastructure in and around Lavasa and any failure in our IT systems could adversely affect our results of operations and financial condition. Further, any change in technology may render our current technologies obsolete or require us to make substantial capital investments. Any congestion or disruption in rail and road networks, electricity grid, communication systems or any other infrastructure facility could disrupt our normal business activity. To reduce access time to Lavasa, we are currently constructing roads which include a tunnel and an alternative access road which are expected

xxvii

to be completed by FY 2013. Further, we are also developing infrastructure related to water treatment and distribution, power, sewerage and solid waste treatment. For details, see Our Business Our Infrastructure Business on page 120. However, these projects may not be successful in addressing some of the infrastructure issues our visitors and residents may face in travelling to and living in Lavasa. These problems could interrupt our business operations, which could adversely affect our business, prospects, financial condition and results of operations. Further, we use the geographic information system (GIS) to track the status of development of our projects. In the long term, we expect that GIS will be used for day to day operations and maintenance. The GIS will, we believe, be integrated with other IT deployments such as customer relationship management, document management systems and enterprise resource planning. For details, see Business Geographic Information Systems (GIS) on page 134. Any failure in our GIS or IT systems in general could disrupt our ability to track, record and analyze work in progress or cause loss of data and disruption to our operations, including an inability to assess the progress of our projects, process financial information or engage in normal business activities. Any such disruption could have an adverse effect on our business. Additionally, our business is subject to rapid and significant changes in technology. Although we strive to keep our technology in accordance with the latest international technological standards, the technologies currently employed may become obsolete or subject to competition from new technologies in the future. For details, see Our Business - Geographic Information Systems (GIS) and Our Business Information, Communication and Technology on pages 134 and 136 respectively. The cost of implementing new technologies or expanding capacity could be significant and could adversely affect our results of operations. 40. Any disruption in power supply to Lavasa could adversely affect its development. Our primary source of power is the 110 KV transmission line laid from Tata Power's existing grid network at Nive, which is approximately 16 kilometres from Lavasa. We expect that Tata Power and the Maharashtra State Electricity Distribution Company Limited will be the primary agencies involved in the provision of power to Lavasa from their respective grids to the MRS at Bhoini. Given Lavasa's location, there exists a possibility of natural/unnatural damage of transmission network, especially in the monsoon season. In the event the power supply to Lavasa falls below the required amount, we may be required to arrange alternate sources of power. There can be no assurance that we will be able to make such alternate arrangements on acceptable terms or at all. This could have a material adverse effect on our business, financial condition and results of operations. 41. Our vision of providing reliable civic amenities and safety and security services may not be successful and any break down in these services may adversely affect our business, financial condition and results of operation. Safety and security at Lavasa is provided through two separate levels: first, a government police force provided by the Government of Maharashtra; and second, a Lavasa-trained and recruited security force which is expected to be comprised initially of about 15 personnel for each town, plus necessary contracted security guards and traffic wardens, all under the supervision of our city management team. Lavasa safety and security personnel will, however, work closely with the state police. The bulk of day-to-day safety and security work is likely to be performed by Lavasa-employed or Lavasa-contracted personnel, but they will have to rely on state police to intervene in cases of serious crime, arrest and criminal investigation. In addition, we are constructing a fire station and fire hydrants; portions of this system are already operational. Any break-down in the above civic amenities may lead to safety and security related problems in Lavasa, which we may not be able to effectively handle. We may also face liabilities for any safety, security or fire related incidents in Lavasa, which may also adversely affect our business reputation. Any such events may adversely affect our business, financial condition and results of operation.

xxviii

42.

The government of Maharashtra may withdraw the SPA status granted to us or may modify or introduce regulations and policies that adversely impact our development plan. The Government of Maharashtra has appointed us as an SPA in connection with land owned and proposed to be developed by us in 14 villages. The SPA has the power to hold, manage and dispose of the land and other property, to carry out buildings and other operations, to provide water, electricity, gas, sewerage and other services, amenities and facilities and generally do anything which is necessary and expedient to give effect to the development of the area as planned, subject to the directions of the Government of Maharashtra. However, the SPA does not have the right to grant any relaxation in the development control regulations that are currently applicable to the area and is required to follow the sanctioned regional plan. Any violations in development control regulations and provision of the regional plan is liable for legal action by the District Collector, Pune. There is a risk that the Government of Maharashtra could modify/introduce regulations and policies that could adversely impact our development plan and certain benefits such as the SPA status may be withdrawn. These changes could adversely affect our business, results of operation and financial condition.

43.

We have entered into management agreements for certain of our hotels, which may not be renewed on terms acceptable to us or at all, thereby affecting our business, financial condition and results of operation. We have entered into management agreements for certain of our hotels as we do not have the expertise to operate the hotels on our own. For example, we have entered into management agreements with AAPC Singapore Pte Limited for management of Mercure Lavasa, Novotel Lavasa, Pullman Lavasa and Lavasa International Convention Centre. The term of these agreements is usually 20 years and is subject to renewal. In the event that we are unable to renew these agreements on acceptable terms or at all, our subsidiaries and associates may no longer be able to operate these hotels under the existing arrangements. If this were to occur, our business and results of operations could be adversely affected. Additionally, we may be unable to negotiate new management agreements that we may require in the future on acceptable terms or at all, which may adversely affect our business, financial conditions and results of operation.

44.

Seasonality of tourist inflows poses threat to the profitability of the proposed hospitality projects. A large number of hospitality projects are currently proposed to be developed in Lavasa. For details of these hospitality projects in Lavasa, see section titled Business Our consumption business Our hospitality consumption business on page 125. Revenues and cash flows in the tourism industry are affected by seasonality depending on the location and categories of hotels. We expect that Lavasa would attract a higher number of tourists in specific months of the year (from August to May). Accordingly, we expect that our revenues may generally be higher during these months of each fiscal year compared to the other months of the fiscal year. Any disruptions of our operation or adverse external factors affecting business during these key seasons may lead to a reduction in our revenues and may have a material adverse effect on our business, financial condition and results of operations. In addition, competition amongst the various proposed hospitality projects in Lavasa could lead to reduced profitability if hotels in Lavasa compete for the same clientele.

45.

Failure to create an adequate tourism market in Lavasa poses a threat to the viability of the proposed hospitality business. The success of the proposed hospitality projects will depend on our ability to forecast and respond to demands in the hospitality industry. More generally, the hospitality industry entails additional risks that are distinct, including the supply of hotel rooms exceeding demand, the failure to attract and retain business and leisure travellers as well as adverse international, national or regional travel or security conditions. If we fail to successfully develop and market projects in our hospitality business, we may be unable to fully develop all of our land or fully utilize development rights over such land, which could materially and

xxix

adversely affect our business, financial condition and results of operations. Our failure or inability to successfully develop proposed tourism and leisure offerings may also affect the business of our hospitality segment. Any adverse developments in the growth of commercial activity in Lavasa could adversely affect the hospitality industry in Lavasa. 46. A shortage of skilled personnel could adversely affect our proposed hospitality business. The success of the proposed hospitality projects in Lavasa depends on our ability to attract and recruit talented and skilled personnel having relevant experience in the hospitality industry. We face strong competition to recruit and retain skilled and professionally qualified staff. The future performance of our proposed hospitality business will depend upon the continued services of these persons. A shortage of personnel having the requisite skills for the hospitality business could adversely affect our business, financial condition and results of operation. 47. The hotel industry is subject to significant regulation and any failure to comply with the relevant regulations may adversely affect our business, results of operation and financial conditions. Our hospitality business is subject to numerous laws and regulations, including those relating to the preparation and sale of food and beverages, such as health and liquor licensing laws. Our Subsidiaries or Associates engaged in the hospitality business are also subject to laws and regulations governing relationships with employees in such areas as minimum wage and maximum working hours, overtime, working conditions, hiring and terminating of employees and work permits. If we are held to be in violation of the relevant regulatory requirements, we may have to pay fines, modify or discontinue our operations, incur additional operating costs or make capital expenditures. 48. Our education business requires upfront investment and we rely upon our partners for the success of our education consumption business. We have tied up with international and national educational institutions to establish an education infrastructure traversing primary, secondary, tertiary and continuing education. Our education business requires upfront investment, for instance, for the construction of school buildings and other infrastructure. We cannot assure you that we will be able to generate the necessary funds required for our education business on acceptable terms or at all. If we are unable to raise the capital needed for our education business or experience delays in raising such funds, it may adversely affect our business, financial condition and results of operation. Further, we intend to have primary, secondary, tertiary, continuing and training educational institutions located at Lavasa and we will have a share in the ongoing revenue of these institutions through (i) lease premiums or (ii) potential dividend payments from our Subsidiaries or Associates. For details, see Our Business Our education consumption business on page 129. The success of our education consumption business depends upon our ability to attract suitable partners with whom we will either form Subsidiaries or Associates or our ability to attract educational institutions to whom we would lease land for them to commence their operations in Lavasa. We may be unable to identify such partners or institutions, which may adversely affect our education consumption business, thereby adversely affecting our business, financial condition and results of operation. 49. Changes in government education policies could adversely affect our business, results of operations and financial conditions. Our educational facilities can be broadly categorised as primary, secondary, tertiary and continuing education. We are dependent upon maintaining compliance with the Government's education policies for our primary and secondary schools. Any changes in the Government and/or its literacy programmes and policies may adversely affect our business, results of operations and financial condition. For instance in August 2009, the Government of India enacted the Right of Children to Free and Compulsory Education Act, 2009 which mandates that any primary school not receiving any kind of aid or grants from the

xxx

government shall reserve 25% seats for students of weaker section and disadvantaged group and provide them with free and compulsory elementary education. Our educational facilities are required to comply with this and any other Governmental policies introduced in the future. There can be no assurance that such policies and/or programmes of the Government will not adversely affect our business and results of operations. 50. The success of our education business is dependent on our ability to attract suitably qualified and experienced professionals. The educational facilities present at Lavasa can be broadly categorised as primary, secondary, tertiary and continuing education. Within the formal education category are schools, degree colleges and institutes for professional courses. For more information related to our education business see Our Business on page 98. The success of the above categories within our education business segment depends upon our ability to attract suitably qualified professionals such as professors, teachers and instructors. There is significant competition for such professionals from other more established educational institutions. In addition, our remote location may make it more difficult to attract such professionals. Given our short operating history and Lavasa's location, we cannot assure you that we will be able to attract such professionals. Any failure to attract, train and retain such professionals may adversely affect the viability of our education business segment and have an adverse affect on our business, results of operation and financial condition. 51. We are required to obtain certain licenses, registrations and other approvals and renewals for our healthcare business, and the failure to obtain these approvals in a timely manner or at all may materially adversely affect our operations. We have exclusive arrangements in place with Apollo Hospitals Enterprise Limited, a recognised Indian healthcare providers, to develop a healthcare and wellness centre at Lavasa, spread across 200 acres. We are required to obtain certain licenses, registrations and other approvals and renewals for our healthcare business. If we do not receive such approvals, we may be unable to offer certain of our services or may be required to discontinue operation of our hospitals and other health and wellness centres, and this may have a material adverse effect on our business, financial conditions and results of operation. 52. Compliance with applicable safety, health, environmental and other governmental regulations may be costly and adversely affect our competitive position and results of operations. We are subject to central and local laws, rules and regulations governing, among other things, the: conduct of our operations; additions to facilities and services; adequacy of medical care; quality of medical equipment and services; discharge of pollutants to air and water and handling and disposal of bio-medical, radioactive and other hazardous waste; qualifications of medical and support personnel; confidentiality, maintenance and security issues associated with health-related information and medical records; and screening, stabilization and transfer of patients who have emergency medical conditions.

Safety, health and environmental laws and regulations in India are stringent and it is possible that they will become significantly more stringent in the future. If we are held to be in violation of such regulatory requirements, including conditions in the permits required for our operations, by courts or governmental agencies, we may have to pay fines, modify or discontinue our operations, incur additional operating costs or make capital expenditures. Any public interest or class action legal proceedings related to such safety, health or environmental matters could also result in the imposition of financial or other obligations on us.

xxxi

Any such costs could adversely affect our competitive position and results of operations. For more information on the regulations applicable to us, please see Regulations and Policies on page 138. 53. Our inability to keep up with rapid technological advances and meet the challenges related to our healthcare operations could adversely affect our business. The healthcare industry is subject to rapid and significant changes in technology. Our inability to keep up with rapid technological advances could have a material adverse effect on our financial results. Further, medical equipment typically needs to be replaced frequently as innovation can rapidly make existing equipment obsolete. Replacement of equipment may involve significant costs, as well as foreign currency risks, since some equipment is imported from other countries. In addition, because of the high costs of medical equipment, we may not maintain back-up equipment, and, therefore, if such equipment is damaged or breaks down, our ability to provide services to our patients may be impaired. 54. Challenges that affect the healthcare industry may also have an effect on our operations. We are impacted by the challenges currently facing the healthcare industry. We believe that the key ongoing industry-wide challenges are providing quality patient care in a competitive environment and managing costs. In addition, our business and results of operations may also be affected by other factors that affect the entire industry, including us, such as: technological and pharmaceutical improvements that increase the cost of providing, or reduce the demand for, healthcare; general economic and business conditions, both nationally and regionally; demographic changes; and changes in the distribution process or other factors that increase the cost of supplies.

In particular, the patient volumes and operating income at our hospitals are subject to economic and seasonal variations caused by a number of factors, including, but not limited to: unemployment levels; the business environment of local communities; the number of uninsured and underinsured patients in local communities; seasonal cycles of illness; climate and weather conditions; and physician recruitment, retention and attrition.

Any failure by us to effectively face these challenges could have a material adverse effect on our results of operations. 55. Our location may deter patients from availing themselves of the medical facilities in the hospitals located in Lavasa. We have entered into exclusive arrangements with Apollo Hospitals Enterprise Limited for health and wellness development at Lavasa, covering hospitals, wellness research development and medical education. However, our location, at a distance of 216 kilometres from Mumbai and 42 kilometres from Pune, and the lack of an airport and railway stations at Lavasa may deter patients from availing the medical facilities in Lavasa. In addition, we do not expect to benefit from the population density of large Indian cities such as Mumbai. If the proposed hospital developed pursuant to the aforementioned arrangements is not able to maintain sufficient patient volume, our business, financial condition and results of operation may be adversely affected.

xxxii

56.

Our healthcare business is dependent on doctors, nurses and other healthcare professionals and the loss of, or inability to attract or retain, such persons could adversely affect our business and results of operations. Our performance and the execution of our growth strategy depend substantially on our ability to attract and retain leading doctors and other healthcare professionals in the fields and regions relevant to our growth plans. We compete for these personnel with other healthcare services providers, including providers located overseas. In addition, our remote location may make it more difficult to attract such professionals. If we are unable to attract or retain skilled consultants, the number of our patients and our income from our health and wellness related subsidiary may decrease, as the quality of consultants is an important factor in patients' choices of hospitals. Given our short operating history and Lavasa's location, we cannot assure you that we would be able to attract and retain skilled consultants and other medical personnel. Our inability to attract and retain consultants and other medical personnel could result in a decrease in the quality of our services and we could be forced to admit fewer patients to our hospitals and could have a material adverse effect on our results of operations.

57.

We have not obtained certain registrations in relation to protection of our intellectual property, including inter alia trademarks. We have applied for registration of trademarks of our logos and of those of our subsidiaries and associates. Until we receive registration, these trademarks enjoy limited legal protection and if our application is rejected, we may be unable to use such trademarks. Currently, we have not obtained certain registrations in connection with the protection of our intellectual property. Such failure to protect our intellectual property rights may adversely affect our competitive business position, financial condition and profitability. If any of our unregistered trademark or propriety rights are registered by a third party, we may not be able to make use of such trademark or propriety rights in connection with our business and consequently, we may be unable to capitalize on our brand recognition. Until such time that we receive registered trademarks, we can only seek relief against passing off. Accordingly, we may be required to invest significant resources in developing a new brand. Further, the intellectual property protection obtained by us may be inadequate and/or we may be unable to detect any unauthorized use and/or we may need to undertake expensive and time-consuming litigation to protect our intellectual property rights and this may have an adverse effect on our profitability. As of the date of this Draft Red Herring Prospectus, we have applied for the registration of our logos and those of our Subsidiaries and Associates under different classes. Pending our application for registration, our trademarks and trade names and the trademarks and trade names of our Subsidiaries and Associates will have limited legal protection. We may therefore incur significant legal costs to protect our trademarks and trade names and the trademarks and trade names of our subsidiaries and associates from any unauthorized use, or to defend any proceedings brought by third parties who allege that our or our subsidiaries' or associates' trademarks or trade names or our use of them is in infringement of their intellectual property rights. In addition, if our application for registration of our subsidiaries and/or associates' trademarks or trade names as well as our trademarks and trade names, is not approved, we may not be able to use such trademarks or trade names in connection with our different projects, which could require us to incur additional costs and therefore adversely affect our brand name and trade name recognition.

58.

Our experience at Lavasa may not be relatable to future city development opportunities and may not help us win such opportunities. We will consider undertaking future city development projects on an opportunistic basis and we would aim to apply our Lavasa related industry and market knowledge to such opportunities. It is possible that our experience with Lavasa may not prove relatable with future city development opportunities because such projects may be significantly different from Lavasa in terms of location and natural setting, accessibility, local regulatory framework, government policies, economic drivers and customer preferences. Further, we do not have any intellectual property rights over material parts of our business and may not enjoy a competitive advantage over our competitors, who may be able to replicate or improve upon our business

xxxiii

model and if a future opportunity is located in a different state, we may be unable to leverage our competitive advantage due to lack of familiarity with local conditions. In addition, if our vision of creating a city with a diversified economy is not achieved, our brand and image will suffer and, accordingly, we may not have a competitive advantage with respect to winning future projects. If Lavasa does not prove to be relatable to future city development opportunities or if we are unsuccessful in leveraging our Lavasa experience in terms of winning potential opportunities, our results of operations would be adversely affected. 59. We may not be able to ensure that we are able to participate in the development of future cities along with our Promoters HCC and/or HREL, and/or their affiliates. Further, our Promoters, HCC and/or HREL may have a conflict of interest with us in connection with future city development opportunities. We may consider undertaking future integrated city projects on an opportunistic basis and applying our Lavasa related industry and market knowledge and/or intellectual property to such opportunities. However, our Promoters HCC and HREL may either themselves or through their respective subsidiaries and affiliates also seek to develop such future cities. HREL is a real estate development company and HCC and HREL both have subsidiaries and affiliates whose main objects permit them to undertake such future city development projects. Pursuant to a consultancy agreement dated September 9, 2010 with our Company, HCC and HREL have agreed that the intellectual property, whether registered or not, pertaining to the development, operations, management, planning and maintenance of any future new cities shall vest exclusively with us. If we propose to develop such new cities either by itself or through any of our subsidiaries, neither HCC, HREL or any of their affiliates shall develop such a new city. In the event that the development of any such new city is not proposed to be carried out by us or any of our subsidiaries, HCC and/or HREL have agreed to appoint us as a consultant to HCC, HREL, and/or any of their respective affiliates which propose to undertake to develop such new cities. The consummation of any such future transactions would however be subject to the execution of additional agreements as may be mutually agreed by us and the entities undertaking such city development at the appropriate point of time. As such, if these additional agreements are not executed in a timely manner or at all, we may not be able to ensure that the rights as contemplated in the consultancy agreement do in fact accrue to us. Further, in light of the potential conflict of interests between HCC/HREL/their affiliates and our Company, you will not have the opportunity to evaluate the manner in which these conflicts, if any, are resolved. For more information on these potential conflicts of interest, please see Related Party Transactions on page 216. 60. We receive a high amount of annual rainfall, which may lead to flooding, thereby causing a halt in construction and development activities, which may delay the completion of Lavasa. Further, the high annual rainfall may also deter potential residents from living in Lavasa. Lavasa normally receives a high amount of annual rainfall, especially in the monsoon months of June to September. In particular, Dhamanohol, on account of its location and elevation, receives more rainfall than the other planned towns in Lavasa. A high amount of rainfall may lead to floods which may delay and disrupt the construction/development activities in Lavasa, thereby adversely affecting our business, financial condition and results of operation. Further, potential residents may be deterred from living in Lavasa on account of the high amount of rainfall received in the monsoon months, which may lead to failure of our vision to have a strong economy at Lavasa and adversely affect our business plans. 61. Certain of our Group Companies have incurred losses or have had negative net worth in the three FYs ended March 31, 2010. We have 26 Group Companies and, as set forth below, 18 of our Group Companies have incurred losses or have had negative net worth during the three FYs ended March 31, 2008, March 31, 2009 and March 31,

xxxiv

2010 (as per their respective standalone financial statements). They may continue to incur losses in future periods, which may have an adverse effect on our results of operations. The details of the Group Companies which have incurred losses during the three FYs ended March 31, 2008, March 31, 2009 and March 31, 2010 is provided in the following table: (` in Million) Profit/(Loss) after tax for the year ended FY 2010 FY 2009 FY 2008 (7.83) 0.00 0.00 (46.55) (39.00) (127.53) (75.67) (1.82) (104.54) (103.20) (8.73) (25.19) (8,460) (7,470) (0.24) (0.26) (0.25) (0.32) 0.67 (0.01) (16.36) (0.03) (0.03) (14.99) (15,220) (10,576) (0.28) (0.22) (0.96) (0.75) 0.65 (2.69) (0.66) (2.57) (0.35) (0.81) (0.65) (0.17) (0.95) -

Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

Name of the Group Company Nirmal BOT Limited HCC Aviation Limited HCC Infrastructure Limited Highbar Technologies Limited Pune-Paud Toll Road Company Limited Panchkutir Developers Limited HCC Singapore Enterprises Pte. Ltd. (Amount in USD) HCC Mauritius Enterprises Ltd. (Amount in USD) HRL Township Developers Limited HRL (Thane) Real Estate Ltd Nashik Township Developers Ltd Maan Township Developers Limited Western Securities Limited HCC Construction Limited Charosa Wineries Limited Powai Real Estate Developers Limited HCC Realty Limited

Additionally, our Group Company Karl Steiner AG, Switzerland has incurred losses in the years ended 31 December 2009 and 2008, as set out below. (CHF in Million) Profit/(Loss) after tax for the year ended 31.12.2009 31.12.2008 31.12.2007 (84.27) (76.97) 18.61

Sr. No. 1. 62.

Name of the Group Company Karl Steiner AG, Switzerland

Our Promoters have given corporate guarantees in relation to certain debt facilities provided to us, which if revoked may require alternative guarantees, repayment of amounts due or termination of the facilities. Our Promoters have given corporate guarantees in relation to certain debt facilities availed by us aggregating to approximately ` 4,915.77 million as of June 30, 2010. In the event that any of the guarantees are revoked, the lenders for such facilities may require alternate guarantees, repayment of amounts outstanding under such facilities, or even terminate such facilities. We may not be successful in procuring guarantees satisfactory to the lenders, and as a result may need to repay outstanding amounts under such facilities or seek additional sources of capital, which could affect our financial condition and cash flows.

63.

Our business is capital intensive and our success depends upon our ability to find funding on acceptable terms. Our business is highly capital intensive, requiring substantial capital to develop and market Lavasa. Among

xxxv

other things, working capital is required to finance the purchase of materials and engineering and construction work on our projects. The actual amount and timing of our future capital requirements may differ from estimates as a result of, among other things, unforeseen delays or cost overruns in developing our projects, unanticipated expenses, regulatory changes and engineering design changes. To the extent our capital expenditure requirements exceed our available resources, we will be required to seek additional debt or equity financing. Additional debt financing could increase our interest cost and require us to comply with additional restrictive covenants in our financing agreements. Additional equity financing could dilute our earnings per share and the value of your investment in our Equity Shares could be adversely affected. Our ability to obtain additional financing on favourable commercial terms, if at all, will depend on a number of factors, including: our future financial condition, results of operations and cash flows; the amount and terms of our existing indebtedness; general market conditions for financing activities by integrated city development companies; and economic, political and other conditions in the markets where we operate.

Additionally, stricter provisioning and risk weightage norms imposed by the RBI in relation to real estate loans by banks and housing finance companies could reduce the attractiveness and availability of property or developer financing and the RBI or the Government of India may take further measures designed to reduce or have the effect of reducing credit to the real estate sector. If the demand for, or supply of, real estate financing at attractive rates or terms were to diminish or cease to exist our business, financial condition and results of operations could be materially and adversely affected. Further, a development of the scale of Lavasa requires large upfront investments and includes long periods of time before revenues are realized. Our revenue realisation is on a phased manner. However, significant capital expenditure is expected to be incurred in the initial years, largely on account of purchase of land and infrastructure development. As there are gaps in time between our initial investments in projects and revenue recognition, our funding requirements are substantial. The financing is planned through multiple sources including, but not limited to, equity, term loans, securitized debt, quasi-equity, funding, etc. We cannot assure you that we will be able to raise additional financing on acceptable terms in a timely manner or at all. Our failure to renew existing funding or to obtain additional financing on acceptable terms and in a timely manner could materially and adversely impact our planned capital expenditure, which, in turn, could materially and adversely affect our business, financial condition and results of operations. 64. We recognise revenue on the percentage of completion method on the basis of our management's estimates of the project cost, which may prove to be inaccurate. We recognise the revenue from our construction projects on the percentage completion method of accounting in accordance with Indian GAAP. Revenue from such sale of under-construction properties is recognised on the basis of the percentage of completion method by reference to the physical percentage of the work completed, as certified by our technical personnel, in relation to a contract or a group of contracts within a project. This revenue recognition policy is applicable to developments for which we have entered into an agreement prior to completion of construction. The revision to projected costs is recognised in the financial statements of the period/year in which such revisions are determined and this may lead to fluctuations in our revenues in that accounting period/year. Amounts received from customers are accounted as advances from customers as part of the current liabilities till the sale agreement executed. In the event of any change in law or Indian GAAP, which results in a change to the method of revenue recognition, the financial results of our operations may be adversely affected. 65. We are subject to restrictive covenants in debt facilities provided to us by our lenders which may limit our strategic decisions and operations and thereby potentially harming our results of operations.

xxxvi

Our consolidated debt June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008 was ` 18,532.10 million, ` 18,235.96 million, ` 9,797.82 million and ` 4,970.00 million respectively. For more information related to our loan arrangements, please see Financial Indebtedness on page 309. There are restrictive covenants in certain of the agreements we have entered into with banks and financial institutions for secured loans amounting to ` 17,531.10 million as of June 30, 2010. These restrictive covenants require us to obtain either the prior permission of such banks or financial institutions or require us to inform them of various activities, including, among others, changes in our development plan, alteration of our capital structure, creating any security interest with respect to any property raising of fresh capital or debt, undertaking new projects or undertaking any merger, amalgamation, restructuring or change in management and further permit the concerned lenders to seek early repayments of, or recall the said loans. Although we have received consents from all our lenders for this Issue, these restrictive covenants may affect some of the rights of our shareholders, including receiving dividends. Any additional financing that we require to fund our capital expenditure, if met by way of additional debt financing, may place restrictions on us which may, among other things, increase our vulnerability to general adverse economic and industry conditions; limit our ability to pursue our growth plans; require us to dedicate a substantial portion of our cash flow from operations to make payments on our debt, thereby reducing the availability of our cash flow to fund capital expenditures, meet working capital requirements and use for other general corporate purposes; and limit our flexibility in planning for, or reacting to changes in our business and our industry, either through the imposition of restrictive financial or operational covenants or otherwise. 66. Our Promoters may dilute their holding in us. Under certain of our loan agreements with lenders, our Promoters are required to maintain 51% shareholding in us. However, we may re-negotiate these loan agreements to allow us to reduce the Promoters shareholding. We cannot assure you that our Promoters would continue to have majority shareholding in us and would continue to exercise any control over our affairs. Any reduction in control over our affairs by our Promoters may adversely affect our reputation and business, results of operation and financial condition. 67. Labour unrest, protest or strikes can bring operations to a standstill and affect market sentiments. Our manpower requirements are very large and includes 447 permanent employees (at a stand-alone level) and 5,536 contract labourers as of June 30, 2010. Any unrest in the workforce, protests or strikes by our employees or labour from sub-contractors can bring the operations of the project to a standstill. In the event of a labour dispute, if our contractors are unable to successfully negotiate with workmen, it could result in work stoppages or increased operating costs as a result of higher than anticipated wages or benefits. This would have a significant impact on customer sentiment, and also impact the market perception and brand value of the development. Additionally, given Lavasa's locations, we may find it difficult to find labour willing to move to Lavasa or have to incur inordinate costs for such labour which may delay the progress of our developments or increase our costs excessively. We enter into contracts with independent contractors to complete specified assignments and these contractors are required to source the labour necessary to complete such assignments. Further, our results of operations could be adversely affected by any statutory and/or regulatory requirements pertaining to labour, strikes, work stoppages or increased wage demands by our employees and/or contract labour availed by us or any other kind of disputes with our employees and/or contract labour availed by us. 68. Increased raw material, labour and other costs, may adversely affect our results of operation and feasibility of the Lavasa development. As there is a significant amount of construction activity in Lavasa planned in the short and medium term, our business would be affected by the availability cost and quality of raw materials and labour. The prices and supply of raw materials and labour depend on factors not under our control, including general

xxxvii

economic conditions, competition, production levels, transportation costs and import duties. In particular, on account of Lavasa's location, transportation and supply costs of labour and raw materials to Lavasa are high. Additionally, inflation would play a critical role in the cost of construction, and could directly impact the profitability of the development and the peak funding requirements. We cannot assure you that we will be able to procure quality raw materials at competitive prices or at all which may adversely affect our business. In addition, during periods of significant increases in the price of building materials, we may not be able to pass price increases through to our customers, which could reduce or eliminate our profits with respect to such development. Our principal raw materials include steel and cement. Any increase in the costs of our principal raw materials may adversely affect our business, financial condition and results of operation. 69. The successful completion of Lavasa requires the services of third parties, including service providers, suppliers and independent contractors. The failure of a third party to perform its obligations could impose additional financial and performance obligations resulting in reduced profits or, in some cases, significant losses. The successful completion of Lavasa requires the services of third parties including architects, engineers, contractors and suppliers of labour and materials. The timing and quality of construction of the various projects within Lavasa depends on the availability and skill of these third parties, as well as contingencies affecting them, including labour and raw material shortages and industrial action such as strikes and lockouts. We may not be able to identify appropriately experienced third parties and cannot assure you that skilled third parties will continue to be available at reasonable rates and in the areas in which we undertake our projects, or at all. As a result, we may be required to make additional investments or provide additional services to ensure the adequate performance and delivery of contracted services. Any consequent delay in project execution could materially and adversely affect our business, financial condition and results of operations. We contract with independent contractors for construction. If a contractor fails to perform its obligations satisfactorily with regard to a project, we may be unable to develop the project within the intended timeframe, at the intended cost, or at all. In such circumstance, we may be required to incur additional cost or time to develop the property to the appropriate standard of quality and in a manner consistent with our development objective, which could result in reduced profits or in some cases, significant losses. We may also not be able to recover compensation for any resulting defective works or materials. We cannot assure you that the services rendered by any of our independent construction contractors will always be satisfactory or match our requirements for quality. 70. We rely on our partners for the success of our businesses being operated by our subsidiaries and associates. We have entered into tie-ups with companies and other entities and, in many instances, have formed subsidiaries or associates with these companies. Arrangements governing our subsidiaries and associates may provide us with only partial control over the operations of the subsidiary or associate under certain circumstances. Where we are a minority participant in an associate, the partner may make significant decisions without our consent that affect our interests, such as delaying project execution timetables. In addition, it may be necessary for us to obtain consent from a partner before we can cause the subsidiary or associate to distribute profits to us or there may be disputes between us and our partners. These and other factors may cause our partners to act in a way contrary or conflicting to our interests, or otherwise be unwilling to fulfil their obligations under our arrangements, which could have a material adverse effect on our business, financial condition and results of operation. Further, even when our arrangements provide us with majority control in our subsidiaries, we may disagree with our partners on key issues, which may affect the overall success of the relevant subsidiary. Further, certain of our arrangements with our partners are subject to us entering into definitive agreements with them, such as our arrangements with Manchester City Football Club Limited, Hockey Australia, Birla Edutech Limited and Rachvan Singh and Associates. We may be unable to enter into such definitive

xxxviii

agreements and even if we are successful in entering into definitive arrangements such arrangements may be adverse as compared to terms in the non-binding term sheets. 71. Delays in the completion of our development or projects or complying with our construction contract schedules may impact our business. Property developments typically require substantial capital outlay during the construction period which may take an extended period of time to complete, and before a potential return can be generated. The time and costs required to complete a property development may be subject to substantial increases due to many factors, including shortages of, or price increases with respect to, construction materials (which may prove defective), equipment, technical skills and labor, purchase of land, construction delays, unanticipated cost increases, changes in the regulatory environment, adverse weather conditions, third party performance risks, environmental risks, changes in market conditions, delays in obtaining the requisite approvals and permits from the relevant authorities and other unforeseeable problems and circumstances. Any of these factors may lead to delays in, or prevent the completion of, a project and result in costs substantially exceeding those originally budgeted for. The cost overruns may not be adequately compensated by contractual indemnities, which may affect our business, financial condition and results of operations. In addition, any delays in completing our projects as scheduled could result in dissatisfaction among our customers, resulting in negative publicity and lack of confidence among investors and potential residents. Additionally, we may not achieve the economic benefits expected of our development and failure to obtain expected economic benefits could adversely affect our business, financial condition and results of operations. In the event there are any delays in the completion of our development our business, financial condition and results of operations would be adversely impacted. 72. Our operations and our work force may be exposed to various hazards and we may be exposed to risks arising from construction related activities that could result in material liabilities, increased expenses and diminished revenues. There are certain unanticipated or unforeseen risks that may arise in the course of property development due to adverse weather and geological conditions such as storm, hurricane, lightning, flood, landslide and earthquake. Additionally, our operations may be subject to hazards inherent in providing architectural and construction services, such as risk of equipment failure, impact from falling objects, collision, work accidents, fire or explosion, including hazards that may cause injury and loss of life, severe damage to and destruction of property and equipment, and environmental damage. 73. Our insurance may be insufficient to cover liabilities relating to inclement weather and natural disasters and risks that may cause significant interruption of operations. Procurement and construction works carried out in respect of our projects involve a number of hazards including earthquakes, flooding, tsunamis and landslides. While we insure against loss due to the occurrence of accidents in the conduct of our business, subject to, in our view, customary exclusions and deductibles, there can be no assurance that all risks are adequately insured against, that a particular claim will be paid or that we will be able to procure adequate insurance coverage at commercially reasonable rates in the future. Natural disasters in the future may cause significant interruption to our operations, disruption to our properties and damage to the environment that could have a material adverse impact on us. Additionally, we may not be able to renew insurance policies in a timely manner or at all and/or may be required to make higher premium payments. 74. Some of our subsidiaries and associates are likely to require a considerable amount of time before they can break even. Some of our business lines will be carried out by our subsidiaries and associates. These companies have a fairly large gestation cycle, before they break even and start yielding returns on the equity stake held by us. In particular, to our knowledge, it generally takes healthcare companies between five to seven years and infrastructure companies about eight to 10 years to commence making profits from their initial operations.

xxxix

In this long gestation cycle, we may need to use our working capital to fund the growth of the operations of our subsidiaries and associates, which may lead to a shortage of funds for our general corporate and working capital purposes. We may also require additional financing during this gestation period which may be unable to procure on acceptable terms or at all. Further, our partners in these subsidiaries and associates may be unwilling or unable to endure a long gestation period which would impact their appetite to invest in such projects. We may also face pressures from equity shareholders during the gestation cycle. All of these events may adversely affect our business, financial condition and results of operation. 75. We may encounter problems with our subsidiaries and associates that may adversely affect our business. We have, and expect in the future to have, interests in subsidiaries and associates in connection with our development plans for Lavasa. If there are disagreements between us and our partners regarding our business and operations of our subsidiaries and associates, we cannot assure you that we will be able to resolve them in a manner that will be in our best interests or which will maintain our business relationship with our partners. Over time, we expect to hold minority stakes in certain of our associates and subsidiaries and, accordingly, if for whatever reason a partner in our associate or subsidiary chooses to forego investing in or maintaining the associate or subsidiary, we may not be in a position to require investments by them or the maintenance of certain standards. In addition, our partners may (i) have economic or business interests or goals that are inconsistent with ours; (ii) take actions contrary to our instructions, requests, policies or objectives; (iii) be unable or unwilling to fulfil their obligations; (iv) have financial difficulties; or (v) have disputes with us as to the scope of their responsibilities and obligations. Any of these and other factors may materially and adversely affect our business relationships with our partners, which may in turn materially and adversely affect the performance of our subsidiaries and associates, which may in turn materially and adversely affect our financial condition and results of operations. 76. Restrictions on foreign investment in the real estate sector may hamper our ability to raise additional capital. The Consolidated FDI Policy (the Policy) imposes certain conditions on investment in real estate sector in India. It permits foreign direct investment of up to 100% subject to the project fulfilling certain specified conditions. The Policy, however, is subject to differing interpretations. For example, foreign direct investment is subject to the condition that for joint ventures with Indian partners the minimum capitalisation should be US$ 5 million. However, there is some ambiguity on what is meant by minimum capitalisation. In addition, although the Policy stipulates that funds have to be brought in within six months of commencement of business of the Company, the term commencement of business of the Company has not been defined or explained and may also be subject to differing interpretations. There can be no assurance as to the position the Government of India will take in interpreting the provisions of the Policy. Further, while the Government of India has permitted FDI of up to 100% without prior regulatory approval in townships, housing, built-up infrastructure and construction and development projects, the same is subjects such investment to certain restrictions. Our Companys inability to raise additional capital as a result of these and other restrictions may adversely affect the business and prospects of our Company. Further, under the foreign exchange regulations currently in force in India, transfers of shares between nonresidents and residents are freely permitted (subject to certain restrictions) if they comply with the pricing guidelines and reporting requirements specified by the RBI. If the transfer of shares is not in compliance with such pricing guidelines or reporting requirements or fall under any of the exceptions referred to above, then the prior approval of the RBI will be required. Additionally, shareholders who seek to convert the Rupee proceeds from a sale of shares in India into foreign currency and repatriate that foreign currency from India will require a no objection/ tax clearance certificate from the income tax authority. We cannot assure investors that any required approval from the RBI or any other Government agency can be obtained on any particular terms or at all.

xl

77.

If we fail to comply with existing or future environmental, employee-related or health and safety laws and regulations or any other local laws or regulations, our business and results of operations may be adversely affected. In the normal course of our business operations, we are required to comply with various laws and regulations relating to the environment. Although we believe that we comply in all material respects with all applicable statutes and with the regulations, we may incur substantial costs to comply with requirements of environmental laws and regulations in the future. Environmental laws in India have been increasing in stringency and it is possible that they will become significantly more stringent in the future. These regulations may require us to investigate and clean-up hazardous or toxic substances and materials and be liable for the costs of removal or remediation of such substances and materials. Such liability may be imposed irrespective of whether we knew of, or were responsible for, any environmental damage or pollution or the presence of such substances and materials. The cost of investigation, remediation or removal of these substances and materials may be substantial. Environmental laws may also impose compliance obligations on owners and operators of property with respect to the management of hazardous materials and other regulated substances. Failure to comply with these laws can result in penalties or other sanctions and we cannot assure you that we will be at all times in full compliance with these regulatory requirements. In addition, future laws, ordinances or regulations and future interpretations of existing laws, ordinances or regulations may impose additional environmental liability. We may therefore be subject to costs, liabilities or penalties relating to environmental matters which could materially and adversely affect our business, financial condition and results of operations. Some parts of the land surrounding the notified area where Lavasa is being developed are categorised as forest land. Any development on such land requires us to obtain certain approvals and permission from the relevant governmental authorities. For example, we have obtained permission from the MoEF for the construction of a tunnel through forest land at Mugaon. There may be instances in the future that require us to undertake development on the forest land. In the event we are unable to obtain relevant approvals or permissions, we may not be able to execute our plans, which we have an adverse impact on our business operations. If any part/aspect of Lavasa is shut down, we will continue to incur costs in complying with regulations, appealing any decision to stop construction, continuing to pay labour and other costs which continue even if construction has ceased. As a result, our overall operating expenses may increase, adversely affecting our business and results of operations. We are also subject to health and safety laws and regulations as well as laws and regulations governing our relationship with our employees in areas such as minimum wages, maximum working hours, overtime, working conditions, hiring and terminating employees, contract labour and work permits. The success of our strategy to modernise and optimise our existing operations is contingent upon, among other factors, receipt of all required licenses, permits and authorisations, including local land use permits, building and zoning permits, environmental, and health and safety permits. As a result of change in laws or regulations in India, we may incur significant costs in order to maintain compliance with such laws and regulations and this may delay or prevent project completion. Our operations are subject to various regulatory requirements. There can be no assurance that a failure to comply with any such regulations would not result in penalties, revocation of permits or licenses for our operations or litigation that may adversely affect our business, financial condition and results of operations. With increasing awareness and pressure for ecological protection, several regulatory reforms may be introduced in the future, directed towards making environmental protection more stringent. These could lead to restrictions on the developable area or the nature of development, which may affect our development plan. For details of the environmental laws and policies relevant to our business, see Regulations and Policies on page 138.

78.

Our ability to receive dividends and/or other payments from our Subsidiaries and Associates may be limited.

xli

We rely upon dividends and other payments from our Subsidiaries and Associates to generate the funds necessary to meet its obligations under our financing arrangements. Our Subsidiaries and Associates are legally distinct from us and have no obligation to pay amounts to us with respect to our obligations, or to make funds available to us for payments in relation to our obligations. Our Subsidiaries and Associates do not guarantee our obligations. The ability of our Subsidiaries and Associates to make such payments to us will be subject to, among other things, the availability of funds, the terms of each Subsidiaries and each Associates indebtedness and applicable local laws. 79. Improper or questionable conduct or practices may delay the development of Lavasa and affect the results of our operations. The construction and real estate industries are not immune to the risks of improper or questionable practices. Large construction projects in all parts of the world provide opportunities for corruption. Such corruption may include bribery, deliberate poor workmanship or the deliberate supply of low quality materials. If we, or any other person involved in Lavasa is the victim of or involved in any such corruption, our ability to complete the various business segments in Lavasa as planned may be disrupted thereby materially affecting our business, financial condition and results of operations. 80. Our success depends largely upon our highly-skilled professionals and our ability to attract and retain these professionals. Our ability to successfully complete projects and to attract new clients depends largely on our ability to attract, train, motivate and retain highly-skilled professionals, particularly project managers and other professionals, including engineers, architects and design consultants and skilled workers. If we cannot hire and retain highly-skilled personnel, our ability to execute new projects and to continue to expand our business, will be impaired and consequently, our revenues could decline. We may not be able to re-deploy and retrain our professionals to keep pace with continuing changes in technology, evolving standards and changing needs of our clients. As a result of the recent growth in the construction industry in India and the expected future growth, the demand for highly-skilled professionals and workers has significantly increased in recent years. In addition, a significant increase in the wages paid by competing employers could result in a reduction of our skilled workforce, increases in the wage rates that we pay or both. If we are unable to attract and retain professionals and skilled workers, our business, results of operations and financial condition may be adversely affected. 81. We have entered into related party transactions but may have been able to obtain more favourable terms if such transactions had been entered into with unrelated parties. We have entered into, and may in the future enter into, certain transactions with our Promoters and Promoter Group companies, Group Companies, Subsidiaries, Associates and Directors. For details of our related party transactions, please see Related Party Transactions page 216. These transactions were primarily made in the ordinary course of business but we may have been able to obtain more favourable terms had such transactions been entered into with unrelated parties. It is likely that we will continue to enter into further related party transactions in the future. 82. Our Promoters will continue to retain majority control in us after the Issue, which will enable them to control our business, influence the material policies and outcome of matters submitted to shareholders for approval in circumstances where Promoters' interests may not align with or may be adverse to other shareholders' or our interests. Upon completion of the Issue, our Promoters will beneficially own []% of our post-Issue equity share capital. As a result, our Promoters will have the ability to exercise significant influence our business, policies and affairs including matters requiring shareholders' approval, including approval of mergers, strategic acquisitions or joint ventures or sale of all or substantially all of our assets, the timing and distribution of dividends and the election or termination of appointment of our officers and Directors, policies for lending, investment and capital expenditures. This control could delay, defer or prevent a

xlii

change in control of us, impede a merger, consolidation, takeover or other business combination involving us, without the support of our Promoters, or discourage a potential acquirer from making a tender offer or otherwise attempting to obtain control of us even if it is in our best interest. In addition, for so long as our Promoters continue to exercise significant control over us, they may influence our material policies in a manner that could conflict with the interests of our other shareholders. Our Promoters may have interests that are adverse to the interests of our other shareholders and may take positions with which our other shareholders do not agree. Any of the foregoing factors could have a material adverse effect on our business, financial condition and results of operations. 83. Our Promoters and Directors may have interests in us other than reimbursement of expenses incurred or normal remuneration or benefits. Our Promoters are interested in us to the extent of any transactions entered into or their shareholding and dividend entitlement in us. Our Directors are also interested in us to the extent of remuneration paid to them for services rendered as our Directors and reimbursement of expenses payable to them. Our Directors may also be interested to the extent of any transaction entered into by us with any other company or firm in which they are directors or partners. For further information, please see Our Management and Our Promoter and Promoter Group on pages 157 and 195 respectively. 84. Our manager, Rajgopal Nogja, is a permanent employee of our Promoter, HCC. All of our key managerial personnel are in our permanent employment. However, our manager, Rajgopal Nogja, is employed and is paid remuneration by our Promoter, HCC. By virtue of his relationship with us and our Promoter, HCC, there may be situations of inherent potential conflicts of interests between us and our Promoter, HCC. Further, our growth and future success is influenced, in part, by our continued relationship with our Promoter, HCC. If we lose our relationship with our Promoter, HCC, for any reason, we may also lose the services of Rajgopal Nogja. As such our business and growth prospects may decline and our financial condition and results of operations may be adversely affected. 85. We do not own our registered office and other premises from which we operate. We do not own the premises at which our registered office is located in Mumbai. Pursuant to a letter dated November 2, 2009, our Promoter, HCC has permitted us to share the premises located at 247 Park licensed to our Promoter HCC by Vikhroli Corporate Park Private Limited and pay Vikhroli Corporate Park ` 14.57 million annually for the use of such premises. If there is any change in the control of our Company or if we cease to be a subsidiary of HCC, we may no longer be entitled to make use of the premises in which our Registered Office is currently situated. 86. We have availed unsecured loans which, subject to the terms and conditions of relevant agreements, may be recalled at any time. Further, our Group Companies and/or associates may have availed of unsecured loans which can be recalled by the relevant lenders at any time. We have availed unsecured loans which subject to the terms and conditions of relevant agreements may be recalled at any time. For further details please see Financial Statements on page 218. In the event the aforementioned loans are recalled by the lenders our financial condition and profitability could be adversely affected. Further, our Group Companies and/or associates may have availed of unsecured loans which could be recalled by the relevant lenders at any time, which in turn could adversely affect the value of our investments or the investments of our Promoter in such Group Companies and/or associates, as the case may be. 87. We have experienced negative cash flows in prior periods. Any negative cash flows in the future would adversely affect our results of operations and financial condition.

xliii

We have in the past, and may in the future, experience negative cash flows. For further details in connection with negative cash flows, please see Financial Statements on page 218. Negative cash flows over extended periods, or significant negative cash flows in the short term, could materially impact our ability to operate our business and implement our growth plans. As a result, our business, financial condition and results of operations could be materially and adversely affected. 88. Our ability to pay dividends in the future will depend upon future earnings, financial condition, cash flows, working capital requirements and capital expenditures. The amount of future dividend payments, if any, will depend upon our future earnings, financial condition, cash flows, working capital requirements, terms and conditions of our indebtedness and capital expenditures. There can be no assurance that we will be able to pay dividends in the future. External Risks 89. Our performance and growth are dependent on the performance of the Indian economy and, more generally, the global economy. A protracted global recession would have a material adverse effect on us. Our activities and results are affected by international, national and regional economic conditions. Starting in September 2008, a steep downturn in the global economy, sparked by uncertainty in credit markets and deteriorating consumer confidence, has sharply reduced global growth, credit and risk appetite. If global macroeconomic conditions deteriorate, due to, for instance, the recent economic turmoil caused by fears related to the ability of European sovereign debt issuers to repay their debt or refinance it at acceptable rates, our outlook and growth prospects will weaken and financial weakness among our potential customers and partners may exacerbate the negative trend in market conditions, which could have a material adverse effect on demand for our projects and on our business, financial condition and results of operations. The economy could also be adversely affected by various factors such as political or regulatory action, including adverse changes in liberalisation policies, social disturbances, terrorist attacks and other acts of violence or war, natural calamities, changes in interest rates, commodity and energy prices and various other factors. General economic conditions may affect the financial stability of our customers and prospective customers and/or the demand for our residential and commercial real estate. Any further slowdown in either the Indian economy or the global economy may materially and adversely affect our business, financial condition, results of operations and the price of our Equity Shares. 90. Rights of shareholders under Indian law may be more limited than under the laws of other jurisdictions and investors may have more difficulty in asserting their rights under Indian law than under the laws of other countries or jurisdictions. Our Articles of Association and Indian law govern our corporate affairs. Legal principles related to these matters and the validity of corporate procedures, directors fiduciary duties and liabilities and shareholders' rights may differ from those that would apply to a company in another jurisdiction. Shareholders rights under Indian law may not be as extensive as shareholders rights under the laws of other countries or jurisdictions. Investors may have more difficulty in asserting their rights under Indian law than under the laws of other countries or jurisdictions. 91. Natural disasters, terrorist attacks, civil disturbances, regional conflicts and other acts of violence in India and abroad may disrupt or otherwise adversely affect the Indian economy, the health of which our business depends on. The occurrence of natural disasters, including hurricanes, earthquakes, tornadoes, fires, explosions, pandemic diseases, the H1N1 swine flu virus, and man-made disasters, including acts of terrorism and military actions, could adversely affect our results of operations or financial condition. Although constructed and maintained to withstand certain natural events, our developments and projects in Lavasa

xliv

may not survive such catastrophic events, or may experience substantial damage. This may result in losses with regard to our works in progress and expose us to claims from our customers. Certain events that are beyond our control, such as terrorist attacks and other acts of violence or war, may adversely affect worldwide financial markets and could potentially lead to a severe economic recession, which could adversely affect our business, results of operations, financial condition and cash flows, and more generally, any of these events could lower confidence in India's economy. Southern Asia has, from time to time, experienced instances of civil unrest and political tensions and hostilities among neighbouring countries. Political tensions could create a perception that there is a risk of disruption of services provided by India-based companies, which could have an adverse effect on our business, future financial performance and price of our Equity Shares. Furthermore, if India were to become engaged in armed hostilities, particularly hostilities that are protracted or involve the threat or use of nuclear weapons, our operations might be significantly affected. India has from time to time experienced social and civil unrest and hostilities, including riots, regional conflicts and other acts of violence. Events of this nature in the future could have a material adverse effect on our ability to develop our business. As a result, our business, results of operations and financial condition may be adversely affected. 92. Political instability or a change in economic liberalisation and deregulation policies could seriously harm business and economic conditions in India generally and our business in particular. The Government of India has traditionally exercised and continues to exercise influence over many aspects of the economy. Our business and the market price and liquidity of our Equity Shares may be affected by interest rates, changes in Government policy, taxation, social and civil unrest and other political, economic or other developments in or affecting India. The Government of India has in recent years sought to implement economic reforms and the current government has implemented policies and undertaken initiatives that continue the economic liberalisation policies pursued by previous governments. There can be no assurance that liberalisation policies will continue in the future. The rate of economic liberalisation could change, and specific laws and policies affecting the real estate sector, foreign investment and other matters affecting investment in our securities could change as well. Any significant change in such liberalisation and deregulation policies could adversely affect business and economic conditions in India, generally, and our business, prospects, financial condition and results of operations, in particular. 93. Any downgrading of India's debt rating by an international rating agency could have a negative impact on our business. Any adverse revision to the rating of India's domestic or international debt by international rating agencies may adversely impact our ability to raise additional financing and the interest rates and other commercial terms at which such funding is available. This could have an adverse effect on our business and future financial performance, our ability to obtain financing for capital expenditures and the trading price of our Equity Shares. 94. A decline in India's foreign exchange reserves may affect liquidity and interest rates in the Indian economy, which may adversely affect our business, results of operations or financial condition. According to an annual report released by the RBI, India's foreign exchange reserves totalled US$ 226.10 billion as of June 2009. A decline in this reserve could impact the valuation of the local currency and could result in reduced liquidity and higher interest rates which may adversely affect our business, results of operations or financial condition and the market price of our Equity Shares. 95. An outbreak of an infectious disease or any other serious public health concerns could have a material adverse effect on our business and results of operations. The outbreak of an infectious disease or any other serious public health concern such as swine influenza around the world could have a negative impact on economies, financial markets and business activities worldwide, which could have a material adverse effect on our business. Although, we have not been adversely affected by such outbreaks, we can give no assurance that a future outbreak of an infectious

xlv

disease among humans or animals or any other serious public health concern will not adversely affect our business, prospects, financial condition and results of operations or damage our brand. 96. Significant differences exist between Indian GAAP and other accounting principles, such as IFRS, which may be material to investors' assessments of our financial condition. Our financial statements, including the financial statements provided in this Draft Red Herring Prospectus, are prepared in accordance with Indian GAAP. We have not attempted to quantify the impact of IFRS on the financial data included in this Draft Red Herring Prospectus, nor do we provide a reconciliation of our financial statements to those of IFRS. IFRS differs in significant respects from Indian GAAP. For details, see section titled Presentation of Financial and Other Information. Accordingly, the degree to which the Indian GAAP financial statements included in this Draft Red Herring Prospectus will provide meaningful information is entirely dependent on the reader's level of familiarity with Indian accounting practices. Any reliance by persons not familiar with Indian accounting practices on the financial disclosures presented in this Draft Red Herring Prospectus should accordingly be limited. ICAI, the accounting body that regulates the accounting firms in India, has announced a road map for the adoption of, and convergence with, the International Financial Reporting Standards, or IFRS, pursuant to which all companies in India, such as our Company, will be required to prepare their annual and interim financial statements under IFRS, based on certain criteria beginning with fiscal period commencing April 1, 2011 in three phases. Based on the said criteria, our Company is required to adopt IFRS from the fiscal year beginning April 2013. Because there is significant lack of clarity on the adoption of and convergence with IFRS and there is not yet a significant body of established practice on which to draw in forming judgments regarding its implementation and application, we have not determined with any degree of certainty the impact that such adoption will have on our financial reporting. There can be no assurance that our financial condition, results of operations, cash flows or changes in shareholders' equity will not appear materially worse under IFRS than under Indian GAAP. As we transition to IFRS reporting, we may encounter difficulties in the ongoing process of implementing and enhancing our management information systems. There can be no assurance that our adoption of IFRS will not adversely affect our reported results of operations or financial condition could have a material adverse effect on our stock price. 97. The market value of an investor's investment may fluctuate due to the volatility of the Indian securities markets. Stock exchanges in India have in the past experienced substantial fluctuations in the prices of listed securities. The SENSEX, BSE's benchmark index, reduced by more than 50%, representing approximately 10,700 points, in the calendar year 2008 and subsequently increased by more than 75%, representing approximately 7,561 points in the calendar 2009. The stock exchanges in India, in line with global developments, have witnessed substantial volatility in 2008 and 2009. The year to date percentage increase in Sensex as of September 3, 2010 stood at 3.77%, as compared to a decrease of 1.29% for Dow Jones Industrial Average, a decrease of 3.90% for Hang Seng Index, and an increase of 3.73% for Strait Times Index (Singapore). However, as of September 3, 2010, 200 day volatility of the Sensex as per Bloomberg data stood at a comparable figure of 16.15 relative to 17.54 for Dow Jones Industrial Average, 19.74 for the Hang Seng Index and 14.15 for Strait Times Index (Singapore). The Stock Exchanges have experienced temporary exchange closures, broker defaults, settlement delays and strikes by brokerage firm employees. In addition, the governing bodies of the Stock Exchanges have from time to time imposed restrictions on trading in certain securities, limitations on price movements and margin requirements. Furthermore, from time to time, disputes have occurred between listed companies and stock exchanges and other regulatory bodies, which in some cases may have had a negative effect on market sentiment. 98. A third party could be prevented from acquiring control of us because of the anti-takeover provisions under Indian law.

xlvi

There are provisions in Indian law that may delay, deter or prevent a future takeover or change in control of our Company. These provisions may discourage or prevent certain types of transactions involving actual or threatened change in control of us. Under the takeover regulations an acquirer has been defined as any person who, directly or indirectly, acquires or agrees to acquire shares or voting rights or control over a company, whether individually or acting in concert with others. Although these provisions have been formulated to ensure that interests of investors/shareholders are protected, these provisions may also discourage a third party from attempting to take control of our Company. Consequently, even if a potential takeover of our Company would result in the purchase of the Equity Shares at a premium to their market price or would otherwise be beneficial to our stakeholders, it is possible that such a takeover would not be attempted or consummated because of Indian takeover regulations. 99. We may not be able to deploy all or a part of the proceeds of the Issue earmarked for the purchase of land as detailed in the section Objects of the Issue. The deployment of funds as described in the section Objects of the Issue" on page 52 is at the discretion of our board of directors, though it is subject to monitoring by an independent agency. Our Company intends to deploy the proceeds of the Issue to purchase land through land aggregators and/or otherwise. To further facilitate the process of purchase land, our Company has entered into (a) a MoU dated August 12, 2010 with M/s. Swastik Enterprises in connection with the purchase of an aggregate of approximately 459.82 acres of land, (b) a MoU dated August 10, 2010 with M/s. Sumeet Land Developers in connection with the purchase of an aggregate of approximately 2,436 acres of land, (c) a MoU dated August 12, 2010 with M/s. Siddhivinayak Enterprises in connection with the purchase of an aggregate of approximately 782.22 acres of land and (d) a MoU dated August 12, 2010 with Shri Ramchandra Shripati Ubhe in connection with the purchase of an aggregate of approximately 87.35 acres of land. However, there is no assurance that the third party aggregators who are parties to the aforementioned MoUs will be able to agglomerate and/or procure the entire or a part of the area of the land as detailed in the aforementioned MoUs in a timely manner, on favourable terms, or at all. Further, we may not be able to execute and register such sales on terms anticipated by us, or at all. As a result, we may not be able to deploy all or a part of the proceeds of the Issue earmarked for the purchase of land as detailed in the section Objects of the Issue, and subject to applicable statutory and/or regulatory requirements may deploy such proceeds for other purposes. 100. Any delay and/or other adverse events and circumstances in connection with the activities for which we propose to deploy the proceeds of the Issue could adversely affect our financial condition, business plan and operations. We propose to deploy the net proceeds of the Issue inter-alia (a) to finance the construction and development of infrastructure components in Lavasa, and (b) to finance certain construction and development activities at Lavasa. The aforementioned activities are subject to a number of variables, including possible cost overruns and changes in our management's views of the desirability of current plans. Any unanticipated increase in the costs in connection with the aforementioned activities could adversely affect our estimates of the cost and our ability to implement our development plan. In addition, the aforementioned activities could be delayed and/or adversely affected as a result of failure to receive statutory and/or regulatory approvals in a timely manner or at all, technical difficulties, human resource, technological or other resource constraints, or for other unforeseen reasons, events or circumstances. Such delays and/or adverse events and/or circumstances could in turn adversely affect our financial condition, our business plan and operations. 101. After this Issue, our Equity Shares may experience price and volume fluctuations or an active trading market for our Equity Shares may not develop. The price of the Equity Shares may fluctuate after this Issue as a result of several factors, including, among other things, volatility in the Indian and global securities markets, the results of our operations and performance, the performance of our competitors, developments in the Indian real estate sector and changing perceptions in the market about investments in the Indian real estate sector, adverse media reports

xlvii

on us or the Indian real estate sector, changes in the estimates of our performance or recommendations by financial analysts, significant developments in India's economic liberalisation and deregulation policies and significant developments in India's fiscal regulations. In addition, only []% of our postIssue paidup capital is being offered to the public pursuant to the Issue. An active trading market for the Equity Shares may not develop or be sustained after this Issue. Further, the price at which the Equity Shares are initially traded may not correspond to the Issue Price. 102. There may be less information available about the companies listed on the Indian securities markets compared to information that would be available if we were listed on securities markets in developed countries. There may be differences between the level of regulation and monitoring of the Indian securities markets and the activities of investors, brokers and other participants and that of the markets in the United States and other more developed countries. The SEBI is responsible for approving and improving disclosure and other regulatory standards for the Indian securities markets. SEBI has issued regulations and guidelines on disclosure requirements, insider trading and other matters. There may, however, be less publicly available information about companies listed on an Indian stock exchange compared with information that would be available if that company was listed on a securities market in a developed country. 103. There are restrictions on daily movements in the price of our Equity Shares, which may adversely affect a shareholder's ability to sell, or the price at which it can sell, Equity Shares at a particular point in time. Subsequent to listing, we will be subject to a daily circuit breaker imposed on listed companies by all stock exchanges in India which does not allow transactions beyond certain volatility in the price of our Equity Shares. This circuit breaker operates independently of the index-based market-wide circuit breakers generally imposed by SEBI on Indian stock exchanges. The percentage limit on our circuit breaker is set by the stock exchanges based on the historical volatility in the price and trading volume of the Equity Shares. The stock exchanges are not required to inform us of the percentage limit of the circuit breaker, and may change it without our knowledge. This circuit breaker would effectively limit the upward and downward movements in the price of the Equity Shares. As a result of this circuit breaker, there can be no assurance regarding the ability of shareholders to sell the Equity Shares or the price at which shareholders may be able to sell their Equity Shares. 104. Future issuances or sales of the Equity Shares could significantly affect the trading price of our Equity Shares. To fund future growth plans, we may raise further capital by way of a subsequent issue of equity shares in either the domestic or overseas market. Any such issuance of equity shares would dilute current investors' shareholdings in us. Further, the public's perception of any such further issue may also affect the value of our Equity Shares. A sale by the major shareholders of all or a portion of their shareholding or issuance of stock options under our existing or future employee stock option plans may affect the value of our Equity Shares, as well. There can be no assurance that we will not issue further equity shares or that the major shareholders will not dispose of, pledge or otherwise encumber their Equity Shares. 105. After the completion of the Issue, our Promoters will own, directly and indirectly, approximately []% of our outstanding Equity Shares and a sale or the anticipated sale by them could adversely affect the price of the Equity Shares. After the completion of the Issue, our Promoters will own, directly and indirectly, approximately []% of our outstanding Equity Shares. Sale of large number of our Equity Shares by our Promoters could adversely affect the market price of our Equity Shares. Similarly, the perception that any such primary or secondary sale may occur could adversely affect the market price of our Equity Shares. Upon completion of the Issue, 20.00% of our post-Issue paid-up capital held by certain of our Promoters will be locked up for a period of three years from the date of allotment of Equity Shares in the Issue. For further information relating to such Equity Shares that will be locked up, please see Capital Structure on page 37. All other remaining Equity

xlviii

Shares that are outstanding prior to the Issue will be locked up for a period of one year from the date of allotment of Equity Shares in the Issue. 106. There is no guarantee that the Equity Shares will be listed on the BSE and the NSE in a timely manner or at all. In accordance with Indian law and practice, permission for listing of the Equity Shares will not be granted until after those Equity Shares have been issued and allotted. Approval for listing and trading requires all other relevant documents authorizing the issuing of Equity Shares to be submitted. There could be a failure or delay in listing the Equity Shares on the BSE and the NSE. Any failure or delay in obtaining the approval would restrict investors' ability to dispose of their Equity Shares. 107. You may be subject to Indian taxes arising out of capital gains on the sale of our Equity Shares. Sale of Equity Shares by any shareholder may give rise to tax liability in India, as discussed in the section Statement of Tax Benefits on page 69. 108. Foreign investors are subject to foreign investment restrictions under Indian law that limit our ability to attract foreign investors, which may adversely impact the market price of our Equity Shares. Under the foreign exchange regulations currently in force in India, transfers of shares between nonresidents and residents are freely permitted (subject to certain restrictions) if they comply with the pricing guidelines and reporting requirements specified by the RBI. If the transfer or shares, which are sought to be transferred is not in compliance with such pricing guidelines or reporting requirements or fall under any of the exceptions referred to above, then the prior approval of the RBI will be required. Additionally, shareholders who seek to convert the Rupee proceeds from a sale of shares in India into foreign currency and repatriate that foreign currency from India will require a no objection/tax clearance certificate from the income tax authority. We cannot assure investors that any required approval from the RBI or any other Government agency can be obtained on any particular terms or at all. 109. You will not be able to immediately sell any of our Equity Shares you purchase in the Issue on an Indian Stock Exchange. Under the SEBI Regulations, we are permitted to allot our Equity Shares within 12 Working Days of the closure of the Issue. Consequently, the Equity Shares you purchase in this Issue may not be credited to your demat account with Depository Participants within 12 Working Days of the closure of the Issue. You can start trading in our Equity Shares only after they have been credited to your demat account and listing and trading permissions are received from the Stock Exchanges. If the permission to deal in and for an official quotation of our Equity Shares is not granted by any of the Stock Exchanges, we are required to repay, without interest, all moneys received from bidders in connection with this Issue. If such moneys are not repaid within eight days after we become liable to repay it (i.e., from the date of refusal or within 15 days from the date of Bid/Issue Closing Date, whichever is earlier), then we will, on and from the expiry of eight days, be liable to repay the moneys, with interest at the rate of 15% per annum on the application money, as prescribed under Section 73 of the Companies Act. The Equity Shares will be listed on the NSE and the BSE. Pursuant to Indian regulations, certain actions must be completed before the Equity Shares can be listed and trading may commence. Investors' book entry, or demat, accounts with depository participants in India are expected to be credited within two working days of the date on which the basis of allotment is approved by NSE and BSE. Thereafter, upon receipt of final approval from the NSE and the BSE, trading in the Equity Shares is expected to commence within seven working days of the date on which the basis of allotment is approved by the Designated Stock Exchange. We cannot assure you that the Equity Shares will be credited to investors' demat accounts, or that trading in the Equity Shares will commence, within the time periods specified above.

xlix

Prominent Notes: 1. Public issue of [] Equity Shares for cash at a price of ` [] per Equity Share aggregating to ` 20,000 million. It comprises a Net Issue to the public aggregating to ` [] million and a reservation for Eligible Employees aggregating up to ` 100 million. Our Company was incorporated as Pearly Blue Lake Resorts Private Limited on February 11, 2000 under the Companies Act. The name of our Company was changed to The Lake City Corporation Private Limited on December 12, 2000. Our Company was converted into a public limited company on March 3, 2003 and consequently, the name was changed to The Lake City Corporation Limited. The name of our Company was changed to Lavasa Corporation Limited on June 8, 2004. For details of changes in the name and registered office of our Company, please see History and Certain Corporate Matters on page 142. Our Companys net worth on a consolidated basis as at March 31, 2010 and June 30, 2010 was ` 3,847.35 million and ` 3,702.64 million respectively. The average cost of acquisition per Equity Share by our Promoters, HCC and HREL is ` 43.13 and ` 5.91, respectively. The net asset value per Equity Share was ` 9.05 and ` 8.71 as at March 31, 2010 and June 30, 2010 respectively, as per our Companys restated audited consolidated financial statements. For details of the related party transactions entered into by our Company with our Subsidiaries and our Group Companies, please see Related Party Transactions on page 216. For details of Group Companies having business interests or other interests in our Company, please see Group Companies and Related Party Transactions on pages 202 and 216. There has been no financing arrangement whereby the Promoter Group, the directors of our Promoters, our Directors and their relatives have financed the purchase by any other person of securities of our Company other than in normal course of the business of the financing entity during the period of six months immediately preceding the date of filing of the Draft Red Herring Prospectus. Investors may contact any of the BRLMs for complaints, information, clarifications or complaints pertaining to the Issue.

2.

3.

4.

5.

6.

7.

8.

9.

SUMMARY OF INDUSTRY The information in this section is derived from various government publications and industry sources. Neither we nor any other person connected with the Issue has verified this information. Industry sources and publications generally state that the information contained therein has been obtained from sources generally believed to be reliable, but that their accuracy, completeness and underlying assumptions are not guaranteed and that their reliability cannot be assured and, accordingly, investment decisions should not be based on such information. Urbanization in India Urban India has attracted investment on the back of strong growth, but India's cities fall short of delivering a high standard of living for their residents. According to McKinsey Global Institute (MGI), urbanization in India requires US$1.2 trillion of additional capital investment by 2030. India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. Although building new cities is generally more expensive (on a per capita basis) than renewing existing cities, such an effort could act as a benchmark and a model for well-planned, environmentally sustainable world-class cities while helping ease some of the strains of rapid urbanization. The graphs below show the current performance of India's cities as compared with best in class standards across indicators of quality of life:

Surging growth and employment in cities will prove a powerful magnet for such new cities. India's urban population grew from the 290 million reported in the 2001 Census to an estimated 340 million in 2008, and MGI projects that it could soar further to 590 million by 2030. In terms of both population and GDP, many Indian cities will become larger than many countries today. Consequently, as the urban population and their incomes increase, demand for every key service will increase in cities of every size and type. Unlike many countries that are grappling with aging populations and rising dependency ratios, India has a young and rapidly growing population. We estimate that 180 million new job seekers will enter India's workforce over the next two decades a potential demographic dividend. But India needs thriving cities if that dividend is to pay out. As India's cities expand, its economic makeup will also likely change. In 1995, India's GDP split almost evenly between its urban and rural economies. In 2009, urban GDP accounted for 58% of overall GDP and by 2030, MGI estimates that urban India will generate nearly 70% of India's GDP. For the first time in India's history, the nation will have five large states (Tamil Nadu, Gujarat, Maharashtra, Karnataka, and Punjab) that will have more of their population living in cities than in villages. These economic trends are expected to help support sectors, such as urban construction, real estate, infrastructure, transportation, healthcare, education, hospitality and recreation. For instance, MGI projects that the economy will have to build between 700 million and 900 million square metres of residential and commercial space a year equivalent to adding more than two Mumbais every year. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, McKinsey Global Institute, April 2010) Urbanisation in the Mumbai-Pune Economic Corridor The Mumbai-Pune corridor is the largest economic corridor in India. It caters to a population of 29.6 million and contributed ` 2,908 billion to India's GDP in 2007 (Source: Economic Survey of Maharashtra, 2009-10). The growth potential of the Mumbai-Pune corridor is supported by the large number of projects (existing and upcoming) in the region such as the Navi Mumbai SEZ and the Dhirubhai Ambani Knowledge Centre, both located in Navi Mumbai. The Components of Urbanisation New cities and integrated townships are typically comprised of the following sectors / sub-sectors of economic activity: Real estate development Construction is distributed across hundreds of developers operating in geographies with low entry barriers. Infrastructure creation Multiple developers, EPC companies and sub-contractors operate in the sector with both municipal and private presence. Operations and maintenance Multiple municipal and development bodies operate in the sector with multiple private operators. Governance and regulation Multiple municipal and development bodies operate in the sector with limited private presence. City economy and consumption basket The consumption aspect of the industry is distributed over hundreds of businesses operating in any city with limited integrated presence and primarily includes hospitality, tourism and leisure, education, healthcare and retail.

As is evident, all these industry sectors/sub-sectors are fragmented between various industry players and integrating them under one management could bring in economies of scale. The Real Estate Sector in India

The real estate sector in India is mainly comprised of the development of residential housing, commercial buildings, hotels, restaurants, cinemas, retail outlets and the purchase and sale of land and development rights. The Indian real estate sector has traditionally been dominated by a number of small regional players with relatively low levels of expertise or financial resources. Historically, the sector has not benefited from institutional capital and has instead utilised high net-worth individuals and other informal sources of financing as its major source of funding, leading to low levels of transparency. Key characteristics of the Indian real estate sector are: Highly fragmented market dominated by regional players; Local knowledge is critical to successful development; High transaction costs; Enhanced role of mortgage financing; Lack of clarity in land title; Availability of land; and Sector governance issues.

The Hospitality and Tourism Industries in India With the increase of disposable income in the hands of middle class Indians, the propensity for spending a larger portion of income on travel and leisure has been steadily increasing. This factor, coupled with the changing lifestyle of the urban population and an increase in business travel, has created demand for mid-tier as well as high-end hotels and serviced apartments across the country. India is emerging as a destination for global tourism, increasing the demand for hotels and tourism across India. (Source: http://tourism.gov.in/) Further, given the growing number of foreign tourists, the hospitality sector in India is expected to rise to US$275 billion in the next 10 years. The sector is also expected to see investments of over US$11 billion in the next two to three years. (Source: Cushman & Wakefield India Report Almanac, April 2010) The performance of the hospitality sector is dependent upon the continued growth of the Indian economy. The hotel and tourism industry in recent years has generally been performing well in terms of foreign tourist arrivals, foreign exchange earnings, average rental rates and occupancy, supported by liberalisation of the aviation sector in India and efforts to improve the national tourist infrastructure. Government initiatives such as the Incredible India marketing campaign and quicker delivery of visas are also helping the industry. Foreign tourist arrivals in India increased from 2.03 million in the period from January to May 2009 to 2.26 million during the corresponding period in 2010. (Source: http://tourism.gov.in/) Maharashtra Maharashtra offers a variety of attractions for tourists including hill stations, pilgrimage spots, heritage, eco-tourism attractions and beaches. Recognizing the overall benefits of tourism, the government of Maharashtra formulated a 20 year perspective plan for development of sustainable tourism in 2003, which stresses private participation and gives importance to environmental and socio-economic concerns. It envisaged a total investment of ` 7.98 billion to develop road conditions, means of transport, communication, eating places, signage and public amenities. It also identified themes to promote tourism which included nature tourism, ethnic tourism, leisure tourism, corporate tourism, health tourism etc. (Source: Department of Tourism Maharashtra, 2003). The Healthcare Industry in India

Although the state of Indian healthcare is changing rapidly, healthcare infrastructure remains largely inadequate. The healthcare delivery market in India is expected to grow at a CAGR of 12 percent over the next five years to reach ` 2,977 billion by 2013, driven by an increase in the number of treatments as well as the cost per treatment. However, investments in healthcare infrastructure have been low in the past, and hence, the prevailing infrastructure in the sector is not robust enough to cater to the needs of the population. Apart from physical infrastructure, India has also been facing a shortage of physicians, and especially, nurses. CRISIL Research expects the healthcare sector to witness investments worth ` 873 billion over the next five years. According to CRISIL Research, India currently needs 1,238,604 beds. Its calculations further suggest that to the current requirement of 1,238,604 beds, India will need to add another 0.81 million beds during the period 2009-2018). Thus, India will need investments to the tune of ` 2,113 billion during 2009 to 2018. (Source: CRISIL Research Hospitals Annual Review, August 2009) Over the last two decades, the majority of tertiary care institutions in the public sector have been facing a shortage of resources and have not been able to obtain funds for the maintenance of equipment, the supply of consumables and infrastructure upgrades that are required to meet the growing demand for complex diagnostic and therapeutic treatments. As a result, private hospitals are becoming more popular in spite of higher costs. (Source: CRISIL Research, Hospitals Annual Review-State of the Industry, August 2009) The private sector accounts for 75-85% of total healthcare expenditure in India, which is among the highest proportions for private healthcare spending in the world. The sector has grown substantially in the past 15 years, making India one of the largest private healthcare sectors in the world. (Source: CRISIL Research, Hospitals Annual Review-State of the Industry, August 2009) The Education Industry in India The Indian education system comprises of formal and informal education. Formal education comprises of primary and secondary schools and higher education. This segment is highly regulated by various statutory bodies formed by central and state governments. K-12 Education Pre-schooling offers a lucrative opportunity for investors as this segment is not regulated at present, and hence, private players can determine their own fees and earn profits. As there are few organised players, the market is very fragmented; however, brand consciousness is increasing gradually and well established companies can now charge a premium for their services. CRISIL Research expects the pre schooling segment to witness faster growth in the medium term on the back of rising affordability levels amongst the target population. (Source: CRISIL Research, June 2009) Higher and Technical Education CRISIL Research expects demand for higher education to register steady growth in the medium term, driven by rising disposable income levels and favourable age demographics. Enrolments in higher education are forecast to increase at a CAGR of 6.5 percent from an estimated 16 million in 2007-08 to around 21 million by 2012-13. However, this would necessitate the setting up of nearly 9,000 institutions, which in turn, entails investments worth ` 1,000 billion over the next 5 years. (Source: CRISIL Research, Educational Services Annual Review, June 2009) The growth drivers in the Indian education sector are: Increasing population and lower literacy rate; Increasing per capita income; and Urbanisation.

The Retail Industry in India As in many nations, retail consumption in India was severely impacted as a result of the global economic downturn. Now that the nation's economic recovery is well under way, it is becoming apparent that the underlying factors which propelled India's consumerism in the past remain true today: Demographics are still favourable with two- thirds of the nation's population below age 35.

Urbanization is still rapidly occurring, and at a greater depth with many Tier III an Tier IV cities providing concentrations of retailing potential. India's economy seems strong, suffering only a slowdown in the rate of growth during the global economic crisis while others contracting. India's middle-class is still growing as are per capita incomes and the availability of credit. The depth and breadth of organized retail penetration beyond India's major metros is still continuing into markets which offer favourable opportunities for retailers and property developers.

The Indian retail market stood at US$330 billion in 2007 with little more than 4% of it being attributed to the organized retail sector. By the end of 2010 the organized segment is expected to grow to 10% of total retail within the country. This rapid growth of organized retail is partially attributed to the phenomenal burst of new shopping malls built over the last 3 years, an increasing number of which are located in the nation's smaller, underserved markets. However, organized retail is also being driven throughout India by resilient consumers who are typically young, urbanized and brand-conscious shoppers with changing preferences towards consumerism and the means to pursue it. (Source: Jones Lang Lasalle Meghraj, Advance Retail: Off the Beaten Track, 2010)

SUMMARY OF BUSINESS This Draft Red Herring Prospectus contains forward-looking statements that involve risks and uncertainties. Our estimates are based on our internal management plans, independent studies and research and are subject to various contingencies. Our future plans would also require certain government approvals, which, if not received, may adversely impact our development plan. There are certain events which may or may not happen, which may have an adverse impact on our development plan. Our results could differ materially from those anticipated in these forward-looking statements as a result of certain factors, including the considerations described below and elsewhere in this Draft Red Herring Prospectus. For details of such risks, see Risk Factors on page xii. In this section, unless the context otherwise requires, a reference to our Company or to we, us and our refers to Lavasa Corporation Limited, and our Subsidiaries and Associates on a consolidated basis. Unless otherwise stated or the context otherwise requires, the financial information used in this section is derived from our audited restated consolidated and unconsolidated financial statements. This section should be read together with Risk Factors on page xii and Industry on page 79. Overview We are a city development and management company engaged in the development, construction and management of Lavasa, a hill city development in India. The state of Maharashtra has declared an area of 18 villages in Mulshi and Velhe Tehasil in the district of Pune as a hill station, measuring approximately 23,014 acres (based on our internal estimates pursuant to review of available land records). As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land within this designated area. We were granted an in-principle approval by the state of Maharashtra to develop this land which was separately notified as a hill station pursuant to which we maintain exclusive development rights over the land owned by us. Our vision is to develop Lavasa as a city which provides avenues for its residents and visitors to live, work, learn and play in harmony with nature. The area declared as a hill station is almost one-fifth of the land area of Municipal Corporation of Greater Mumbai (MCGM) and includes submerged land of 4,320 acres (Source: www.mcgm.gov.in and internal project report prepared by our planning department). Based on the land we own or have entered into MoUs and/or agreements to purchase as of September 10, 2010 measuring 13,226 acres, we estimate that Lavasa can accommodate a permanent population of approximately 300,000 with facilities for approximately two million tourists per annum. Cities comprise a myriad of businesses that are typically provided by multiple private and public entities and are governed by diverse regulatory frameworks. At Lavasa, we are developing businesses which, we believe, will over time facilitate and sustain the economy of Lavasa in a complementary fashion. We aim to develop a 365 day economy meaning that Lavasa will not simply be a weekend or tourist destination; instead, we aim to develop an economy at Lavasa where we expect to share in the revenue streams related to our ongoing consumption and infrastructure businesses. We expect that our initial real estate development and early stage investments in core infrastructure assets such as roads, dams, bridges, water and sewage network may lead to real estate revenues in the short term and ongoing consumption driven revenues from businesses located within Lavasa in the long term. Through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities in the hospitality, education, tourism and leisure, healthcare and retail sectors. We are consciously cultivating these interlinked and co-dependent businesses within the framework of our governance platform which we believe will significantly contribute to this economic integration. Driven by our focus on integration, we are organised as follows: Real estate. Our real estate business aims to continue to purchase, develop, sell built up structures and/or lease land and/or real estate assets across the residential, commercial, institutional, hospitality and social sectors. Our revenues are primarily derived from real estate sales and leases of built up structures and/or land leases, grant of long term leasehold interests in the underlying lands and, to a lesser extent, the lease of certain assets and our consolidated revenue from this business was ` 3,063.71 million for FY 2010 and ` 2,071.04 million for FY 2009. Governance. Pursuant to a notification dated June 12, 2008, issued under the MRTP Act, (SPA Notification), the Government of Maharashtra has appointed our Company as a special planning authority in connection with land owned and proposed to be developed by us. The SPA is our governance platform,

which aims to ensure an optimum quality of life for our residents and visitors and benefits from exclusive development rights. In terms of the MRTP Act, the SPA is required to, from time to time, submit its proposals for the developments of the land in the area as detailed in the SPA Notification, (being land either currently owned by us or land which is proposed to be purchased by us), (Statutory Proposals), to the State Government after having invited and considered suggestions and objections from the public. The State Government may in turn, after consultation with the Director of Town Planning, approve such Statutory Proposals either with or without modification. The Statutory Proposals are required to be prepared taking into consideration the provisions of any regional plan or a draft thereof, any development plan, building bye-laws and regulations, which are already in force in the area notified under the SPA Notification. Prior to the SPA Notification, pursuant to a letter dated June 7, 2008, the Office of the Collector, Revenue Department, District Pune, has approved and granted permission to our Company for our proposed development at Dasve and Padalghar for a total area of 636.82 hectares. Currently, the draft Statutory Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication amongst others in the official gazette and local newspapers, for public review and receipt of public suggestions and objections thereon. Consequently, this draft Statutory Proposals, after having considered the objections and suggestions received from the public, as appropriate, shall be submitted to the State Government for its approval. The SPA also approves certain draft development control regulations applicable to the land under the control and jurisdiction of the SPA (the Lavasa DCRs), which are required to be subsequently approved by the State Government. The Lavasa DCRs are required to be within the framework of the regional plan, which includes the Hill Station Regulations and the development control rules, regulations, and notifications issued by the State Government of Maharashtra, as applicable to the notified area in the Pune district (the Pune Region DCRs). Thus, the SPA prepares the Statutory Proposals and the Lavasa DCRs and supervises and ensures that all development within the city is in accordance with the Statutory Plan, the Lavasa DCRs, the master plan designed by our Company with HOK International Limited and applicable statutory, regulatory and other requirements. Infrastructure. We construct and own assets related to dams, water and sewage, drainage, solid waste management, power, roads, street lighting, landscaping, public utilities and information, communication and technology. We expect that our information, communication and technology infrastructure will include telephone, mobile and broadband networks, e-governance and a data centre. In addition, we also construct, develop and maintain social infrastructure such as townhalls, parks and gardens, post offices and police and fire stations. In addition, our city management team enforces our public health and welfare, public safety and regulations and will maintain our infrastructure and civic amenities once these become operational. We aim to provide better services than those available in the average Indian city and to achieve economies of scale given the size of Lavasa's expected population and the scale of Lavasa. Based on our engineer certificate dated August 11, 2010, on the land that we own and have developed as of the date of this Draft Red Herring Prospectus, we expect to treat 100% sewage and solid waste generated, we expect to have 100% piped water, sewage and septic tank coverage, our storm water drains are expected to cover 120% of our road network and we have designed our water supply to deliver 216 litres per capita per day, all of which, according to McKinsey Global Institute (MGI), are better than or comparable to current best-inclass standards. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Consumption. Our consumption business comprises businesses in the hospitality, education, tourism and leisure, healthcare and retail sectors and aims to achieve ongoing annuity revenues through tie-ups with corporate and other institutions in the relevant sectors. o Hospitality. Our hospitality business comprises of hotels, a convention centre and clubs. Together with our partners, we aim to offer hotels of various categories ranging from budget to high-end hotels. We have been granted mega status by the Tourism and Cultural Affairs

Department, Government of Maharashtra under the Tourism Policy 2006 of the Government of Maharashtra in connection with our proposed tourism project at Lavasa Hill Station at Taluka Mulshi and Velhe falling under 'C' zone. Fortune Select Dasve and Mercure Lavasa, two hotels developed by us, are currently operational and we have also developed an international convention centre in Dasve with a plenary capacity of 1,500 people, which commenced operations in April 2010. Further, Dasvino, our town and country club, has also started its operations in April 2010. o Education. We have tied up with international and national educational institutions to establish an education infrastructure traversing primary, secondary, tertiary and continuing education aimed at providing quality education centred around recognised national and international curricula. Our revenue from the education business is derived from lease income from the educational institutions and, in some instances, ongoing revenue pursuant to our shareholdings in these businesses. As of the date of this Draft Red Herring Prospectus, we have entered into arrangements with institutions, such as Educomp Infrastructure and School Management Limited, Birla Edutech Limited and Ecole Hoteliere de Lausanne whereby we will develop educational institutions jointly with these entities. Tourism and leisure. We intend to offer various tourism and leisure amenities such as golf training, boating, nature trails, water sports, outdoor sports, adventure sports and theme based entertainment parks with an intention to draw visitors to Lavasa. We have arrangements in place with Space Investment Corporation LLC to set up a space themed entertainment park, Nick Faldo Designs Overseas Limited for designing the golf course at Dhamanohol, Faldo Academies Limited for golf training academy at Mugaon, a licence agreement with Golden Five Limited for rowing and training activities with Sir Steve Redgrave and have signed term sheets with Hockey Australia, Manchester City Football Club Limited and I Dream Productions Private Limited. Healthcare. We have entered into arrangements with Apollo Hospitals Enterprise Limited for health and wellness development at Lavasa, covering primary hospitals, wellness research development and medical education and have developed a hospital with a capacity of 60 beds at Dasve through a subsidiary. Retail. We are developing commercial retail spaces with an intention to lease such spaces and in some cases lease land on a long term basis for the lessee to set up diverse retail businesses. We are developing retail spaces ranging from single brand flagship stores to retail squares concentrated in the town centre. In addition, we are developing retail spaces attached to a space themed entertainment park.

We view Lavasa as a replicable model for the development of future cities and we will, in our view, have a competitive advantage with respect to bidding for and efficiently developing and executing such future cities. We will, on an opportunistic basis, evaluate options for developing future cities and marketing our city management expertise to other developers of new cities. We are jointly promoted by HCC, a recognised engineering, construction and infrastructure development company in India, through its wholly-owned subsidiary company HREL. HCC holds a 64.99% stake in Lavasa, through its subsidiary, HREL. The following chart shows Lavasa together with its various projects in the hospitality, healthcare, tourism and leisure, education, retail and city management and infrastructure businesses:

Lavasa Corporation Limited (Subsidiaries and Associates) Structure Chart

Lavasa Corporation Limited

Hospitality

Healthcare

Tourism & Leisure

Education

Retail

City Management and Infrastructure

100%

Lavasa Hotel Limited

93.22%

Apollo Lavasa Health Corporation Limited (2)

100%

Lakeshore Watersports Company Limited

100%

Dasve Hospitality Institutes Limited

100%

Dasve Retail Limited

100%

Whistling Thrush Facilities Services Limited

100%

Warasgaon Lake View Hotels Limited

100%

Full Spectrum Adventure Limited

49% Knowledge Vistas Limited

100%

Nature Lovers Retail Limited

100%

Warasgaon Power Supply Limited

26%

Ecomotel Hotel Limited

100%

Valley View Entertainment Limited

74%

Spotless Laundry Services Limited Lavasa Bamboocrafts Limited

100%

Sahyadri City Management Limited

100%

Dasve Convention Center Limited

100%

Warasgaon Tourism Limited

100%

100%

Warasgaon Infrastructure Providers Limited

100%

Dasve Business Hotel Limited

100% 19%

Kart Racers Limited

81% My City Technology Limited


(3)

100% Lakeview Clubs Limited 26% Palmetto Hospitality Limited 26% Bona Sera Hotels Limited 26% SOL Hospitality Limited 100% Verzon Hospitality Limited 100% Rhapsody Hospitality Limited 100%

Space Theme Park India Limited

Andromeda Hotels Limited (1)

100% Sirrah Palace Hotels Limited 100% Our Home Service Apartments Limited 100% Hill City Service Apartments Limited (1) 60% Green Hill Residences Limited 100% Reasonable Housing Limited (1)

(2)

To reduce to 26% pursuant to the terms of the termsheet dated April 26, 2010 with Rachvan Singh and Associates. To reduce to 49 % pursuant to an allotment of shares and a further infusion by Apollo Hospitals Enterprise Limited in accordance with the shareholders agreement dated September 21, 2007.

(3)

Space Theme Park India Limited is currently not an Associate of our Company. The shareholding of our Company in Space Theme Park India Limited shall increase to 40% pursuant to the addendum to the shareholders joint venture agreement dated June 23, 2010.

Our Strengths We believe our principal competitive strengths are as follows: Market opportunity and our market position According to the MGI, India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. MGI also notes that urbanisation requires US$ 1.2 trillion of additional capital investments by the year 2030. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Primary drivers of this demand are the expected increase in the proportion of the Indian population living in cities and expected Indian GDP growth. We believe that barriers to entry will prevent competitors from capturing some of this market opportunity, as a development of the scale of Lavasa requires significant upfront investments and revenue starts accruing after long periods of time. For instance, while we commenced real estate development and sales of built up structures and/or leasing arrangements in 2007, we started the purchase of land in 2002 and have been developing infrastructure for the last five years. Special regulatory approvals and consents are required to purchase land for the purpose of establishing and developing a city and a successful city development requires expertise and partnerships across various sectors of the economy, including infrastructure, education, hospitality, tourism and city management services. Accordingly, there are barriers to entry into the city development industry and we believe that we are aptly positioned to participate in any opportunities of a similar scale that may arise in India. Our location and size advantage Lavasa is located 42 kilometres from Chandni Chowk, an area on the outskirts of Pune and 216 kilometres from Mumbai (via Chandni Chowk), and, accordingly, Lavasa lies in close proximity to the Mumbai Pune corridor. We believe that the Mumbai Pune corridor, with an estimated population of 29.6 million and a contribution of ` 2,908 billion to India's GDP in FY 2010, is India's largest economic corridor, with higher population and GDP than the Delhi-Jaipur corridor located in north India and the Bengaluru-Mysore corridor located in the south. For further details, see Industry Overview on page 79. As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land near the Mumbai Pune corridor. In light of the scarcity of land in Mumbai and Pune, the pressure of economic activities and residential developments are spreading along the transportation links, namely expressway, highway and railway lines between the two cities, leading to the emergence of a strong corridor of economic development. We expect that Lavasa, because of its location and size, will benefit from this economic activity. Our integrated business model We believe that the various businesses that comprise the development and management of Indian cities (such as real estate, infrastructure, consumption and governance) are currently fragmented in most Indian cities. We expect that our initial real estate development and early stage investments in core infrastructure assets such as roads and water dams may lead to real estate development revenues in the short term and ongoing consumption driven revenues from businesses located within Lavasa in the long term. Through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities in the hospitality, education, tourism and leisure, health and wellness and retail sectors. We are consciously cultivating these interlinked and dependent businesses within the framework of our governance platform, which, we believe, will significantly contribute to this economic integration. We believe our business model will provide us with an optimal mix of revenue streams which are lease premiums, project management consultancy fees, returns on equity infusion, sales and/or leases of retail built up area, lease rentals from rental housing, lease rentals linked to revenues of retail outlets and fees for design and construction on the leased land. In addition, we will typically pursue a new business project after indentifying a partner with adequate knowledge of operations in the relevant sector. Such industry participant is typically required to contribute equity in the related subsidiary or associate. This allows us to (i) share the risk of any new venture with specialists, (ii) avail of their expertise in their respective fields and (iii) provide us with an additional source of funds for growth. Our governance platform

10

Our governance platform allows us exclusive development and management rights through the SPA. The SPA framework permits us to enforce our rights and coordinate the approvals, permissions and certificates required in order to implement our development plan. Our governance platform facilitates the development of Lavasa in a thoughtful, coordinated and efficient manner. We believe that the governance platform will be a key attraction to potential residents and business partners. Our promoters HCC has been involved in the development of Lavasa since 2004 and the professionals who worked at HCC on Lavasa have in many instances become our employees. They have through their work at HCC developed expertise in infrastructure related projects which are important aspects of the development of Lavasa. We expect to benefit from the project management expertise and guidance of HCC, as well as its established business relationships and its brand recognition throughout India. Our employee base Our senior management includes experienced professionals who head our different functional units. For details of our Board of Directors and senior management, please see Our Management on page 157. As of June 30, 2010, Lavasa Corporation Limited had over 447 employees on its rolls and we expect to selectively expand the employee base incrementally as the size of our operations increases. The majority of these employees are engineers, architects, management graduates and chartered accountants. We also employ a city manager, Scot Wrighton, with over 20 years of international experience in city management in the states of Illinois, Kansas and Missouri in the U.S.A. Tie-ups with recognised industry participants in diverse businesses We have arrangements in place with recognised partners, such as AAPC Singapore PTE Limited for the management and operation of hotels, Langham Hospitality Limited for providing technical advisory services to our hotel, Faldo Academies Limited for developing a golf training academy, Educomp Infrastructure and School Management Limited for developing educational institutions, Christel House India, a trust set up for the benefit of under privileged children, Career Launcher for conducting courses and training programs and Ecole Hoteliere de Lausanne for providing consultancy services to us in connection with the development of a hospitality learning institute. In addition, we have entered into a technical audit, pre-opening, operating and marketing services agreement with Fortune Park Hotels Limited and a shareholders' agreement with Space Investment Co LLC, UAE relating to a space themed entertainment park. In the healthcare sector we have arrangements in place with Apollo Hospitals Enterprise Limited. Our arrangements, which we expect will provide us with diverse revenue sources and requisite industrial and operational knowledge, are key aspects of our marketing and branding strategies and we will continue to target key strategic partners. For most of our tie-ups, we set up a subsidiary or an associate with our counterparty with relevant expertise to align our interests and leverage such expertise. Our track record As of June 30, 2010, we have executed and registered lease deeds, agreements to lease, and/or have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) with various customers in connection with the lease of an aggregate of 896 apartments, 461 villas (including sale of built up area), 127 villa plots and 399 rental housing units (including sale of built up area). Further, we have entered into MoUs and signed term sheets for lease on a long term basis of 90.54 acres of land to various customers in the commercial, institutional, hospitality and social (including education) sectors. We have leased 106,384 sq. ft. of retail space to our subsidiary, DRL for the purpose of setting up and operating retail, food and beverage and other such outlets. As of June 30, 2010, DRL has leased out 28,249 sq. ft. to various brands through leave and licence agreements and has also signed term sheets for the lease of a further 11,757 sq. ft. We have also leased on a long term basis 197,462 sq. ft. of developable area for providing hostel facilities to educational institutions, which we expect to be completed by FY 2012. For further details related to our real estate track record and real estate projects under construction, please see Our real estate business on page 114.

11

Several key infrastructure projects have already been completed, such as the Dasve Dam, a 35.5-kilometre water distribution network, 51.5 kilometres of sewerage collection network, 12.5 kilometres of transmission network and 36.5 kilometres of distribution line network. Several other key infrastructure projects are under design and development, such as the Gadle Dam, Mugaon tunnel, 22.9 MLD of water treatment and 20 MLD of sewage treatment capacity, 51 MW of power capacity and an extensive network of internal and external roads. In addition, we have entered into agreements with various service providers to provide city wide network infrastructure, telecommunications and wireless internet services to residents, tourists and corporates. Our Strategy We aim to develop Lavasa as a planned city which provides avenues to its residents and visitors to live, work, learn and play in harmony with nature. We aim to achieve this through: Diverse demographic model We believe that economic diversity is required for a thriving city. We intend to continue to cultivate a diverse economy where we participate in most sectors through investments with our partners who are shareholders in our subsidiaries or associates. By making early and strategic investments in our core competencies, including real estate and infrastructure development, we were able to generate considerable real estate revenues thereby further facilitating tie-ups with such partners and positioning us, together with our partners, to capture the consumption opportunities at Lavasa. Furthermore, we intend to continue to design and price our real estate lease arrangements at Lavasa to appeal to a diverse demography. We believe that such an approach, which is diversified across sectors of the economy, will lead to sustainable demand from potential residents and visitors and will contribute to the growth of Lavasa. Optimal revenue mix In FY 2010, 99.17% of our revenue related to lease arrangements which included sale of built up structures. As of September 10, 2010, we own approximately 9,460 acres of land and have entered into MoUs in relation to the purchase of approximately 3,765 acres. In addition to the above, we may purchase an additional approximately 5,469 acres of land within the area declared as a hill station pursuant to the Hill Station Regulations on an opportunistic basis which, we expect, will generate additional sources of revenue for us. Over time and on an opportunistic basis, we expect to shift our revenue strategy such that an increasing proportion of our revenues will be derived from revenues from businesses, visitors and residents located at Lavasa. We believe that the growth in the economy of Lavasa will allow our subsidiaries and associates to generate higher revenues. We have already entered into arrangements with such institutions and companies which in our view are recognised in their respective industries. We intend to continue to explore additional tie-ups across Lavasa with a view to expand our reach in the economy of Lavasa for the long term. Continuing to target recognised companies as partners We will typically only pursue a new business project at Lavasa after identifying a company with the appropriate expertise in the relevant sector. We are selective with respect to our potential partners. We expect that our stringent standards will only increase following the initial completion of Dasve which, we believe, will serve as a showcase that will attract additional participants to our other planned towns and contribute to Lavasa's economy in the long term. Non-residential development aimed at driving residential demand We aim to achieve an optimal mix of development at Lavasa with over two-thirds of the real estate developments planned for Period 1. We expect that this may lead to generation of residential demand in future periods. Attractive commercial and social institutions are organic drivers of residential real estate demand and our early focus on nonresidential real estate development such as hospitality and retail real estate together with our tie-ups with recognised companies may, in our view, drive our residential real estate market.

12

Front-end infrastructure components For each stage of our development, our strategy includes early investments in key infrastructure assets which we believe may drive real estate development revenues. At Dasve, several key infrastructure assets such as the road between Warasgaon and Dasve, Dasve Dam, water treatment plant, sewage treatment plant, drainage and distribution network, power transmission and distribution network and an enhanced fibre optic network have been completed and through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities. With Dasve expected to be substantially operational during FY 2012, the infrastructure of our second town is under development with substantial commencement of operations expected during FY 2014 and in particular the Mugaon tunnel will be operational by FY 2013. Leveraging our intellectual property According to the McKinsey Global Institute, India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). We will consider undertaking such projects on an opportunistic basis and applying our Lavasa related industry and market knowledge to such opportunities. We believe that our experience in designing and developing the infrastructure, town planning and management at Lavasa, on the one hand, as well as our existing relationships with industry leaders in the infrastructure, education, hospitality, tourism and town planning and management sectors, on the other hand, will give us a competitive advantage in winning and efficiently executing such future projects. We have entered into a consultancy agreement dated September 9, 2010 with our Promoters, pursuant to the terms of which, HCC/HREL and/or its affiliates conferred exclusively upon our Company, in relation to undertaking development of new cities, the right to develop, operate, manage and maintain such new cities and/or act as a consultant in relation thereto. In the event we propose to develop any new cities either by ourselves or through any of our Subsidiaries, neither our Promoters nor any of their affiliates shall have the right to develop such new city. In the event that the development of any new city is not proposed to be carried out by our Company or any of our Subsidiaries, our Promoters have agreed to appoint us as consultants to HCC, HREL, and/or any of their respective affiliates which propose to undertake such development. Any intellectual property, whether registered or not, pertaining to the development, operations, management, planning and maintenance of any future new cities shall vest exclusively with our Company. We are considering developing one such city in the Dholera Special Investment Region (SIR) in Gujarat in association with HCC Real Estate Limited. This potential development has a different concept and platform from Lavasa, but would be built on the foundations of our intellectual property.

13

SUMMARY FINANCIAL INFORMATION The following tables set forth summary financial information derived from our restated consolidated financial statements as of and for the three months ended June 30, 2010 and the years ended March 31, 2010, 2009 and 2008 and from our restated unconsolidated financial statements as of and for the three months ended June 30, 2010 and the years ended March 31, 2010, 2009, 2008, 2007 and 2006. These financial statements have been prepared in accordance with Indian GAAP, the Companies Act and the SEBI Regulations and presented under the sections titled Financial Statements on page 218. The summary financial information presented below should be read in conjunction with our restated unconsolidated and consolidated financial statements, the notes thereto and the section titled Managements Discussion and Analysis of Financial Conditions and Results of Operations on page 285.

14

RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF ASSETS AND LIABILITIES (` in Millions) As at As at March March 31, 2007 31, 2006

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

SOURCES OF FUNDS Share Capital Share Warrant Reserves & Surplus Total Shareholders' Funds Loan Funds (a) Secured Loans (b) Unsecured Loans Total Loans Deferred Tax Liability (Net) 17,154.04 1,000.00 18,154.04 15,759.50 2,000.00 17,759.50 9,797.82 9,797.82 4,970.00 4,970.00 3,213.28 20.08 3,233.36 2,012.56 207.22 2,219.78 4,774.51 81.25 1,071.92 994.94 81.25 4,357.35 994.95 81.25 2,974.58 1,624.18 1,237.81 591.07 625.90 512.26 330.00

5,927.68

5,433.54

4,050.78

2,250.08

1,750.07

921.07

1,055.10

808.43

115.73

TOTAL APPLICATION OF FUNDS Fixed Assets (a) Gross Block (b) Less : Depreciation (c) Net Block (d) Capital Work In Progress

25,136.82

24,001.47

13,964.33

7,220.08

4,983.43

3,140.85

4,317.10 354.80 3,962.30 8,765.75 12,728.05

3,533.90 302.77 3,231.13 8,573.30 11,804.43

2,752.38 128.98 2,623.40 5,942.33 8,565.73

318.30 80.15 238.15 24.27 262.42

208.61 53.02 155.59 4.35 159.94

161.06 29.76 131.30 5.73 137.03

Investments Current Assets, Loans & Advances

2,344.56

3,795.94

842.33

7.99

51.39

8.47

15

A) Current Assets (a) Inventories (b) Sundry Debtors (c) Cash and Bank Balances (d) Other Current Assets 6,567.45 3,992.74 853.60 117.08 11,530.87 B) Loans and Advances Total Current Assets, Loans and Advances Less: Current Liabilities & Provisions (a) Current Liabilities (b) Provisions 6,286.49 3,153.93 609.29 72.93 10,122.64 4,302.23 1,007.87 236.38 46.63 5,593.11 7,251.49 236.11 7,487.60 4,671.45 255.56 4,927.01 3,075.18 103.45 3,178.63

3,281.20 14,812.07

3,098.04 13,220.68

1,099.80 6,692.91

411.65 7,899.25

192.67 5,119.68

77.09 3,255.72

4,713.89 33.97 4,747.86

4,768.77 50.81 4,819.58

2,004.64 132.00 2,136.64

1,094.81 6.78 1,101.59

435.51 2.81 438.32

325.95 2.31 328.26

Net Current Assets Miscellaneoues Expenditure (To the extent not written off) Profit and Loss Account

10,064.21

8,401.10

4,556.27

6,797.66

4,681.36

2,927.46

0.51

152.01

90.74

67.38

TOTAL Note :

25,136.82

24,001.47

13,964.33

7,220.08

4,983.43

3,140.85

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV

16

RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF PROFITS AND LOSSES (` in Millions) Particulars For the Period ended June 30, 2010 INCOME Income From Operations Other Income For the Year ended March 31, 2010 For the Year ended March 31, 2009 For the Year ended March 31, 2008 For the Year ended March 31, 2007 For the Year ended March 31, 2006

1,799.11 10.21

4,786.30 29.25

2,120.42 0.48

0.07

0.38

0.09

TOTAL EXPENDITURE Land and Construction Expenses Employee's Remuneration and Benefits Office and Site Establishment Expenses Finance Charges (net) Depreciation

1,809.32

4,815.55

2,120.90

0.07

0.38

0.09

934.28

3,189.47

6,047.11

188.96 320.42 587.55 8.32 2,039.53

486.60 548.89 1,814.94 36.27 6,076.17

487.81 413.67 2,132.25 6.84 9,087.68

13.83 40.54 3.37 57.74

7.22 12.72 1.97 21.91

7.65 20.61 1.51 29.77

Less : Transferred to Fixed Asset / Capital Work in Progress

971.03 1,068.50

3,355.22 2,720.95

8,317.70 769.98

57.74

21.91

29.77

Profit/(Loss) before Tax Less: Provision for taxation: Income Tax Deferred Tax Wealth Tax Fringe Benefit Tax

740.82

2,094.60

1,350.92

(57.67)

(21.53)

(29.68)

147.64 246.67 0.01 -

355.97 692.69 0.06 -

152.33 115.74 0.03 2.19 0.06 3.54 0.05 1.78 0.04 1.09

17

MAT Credit Entitlement Profit/(Loss) after Tax Add: Balance brought forward from last year Amount available for appropriation Less : Appropriations a) Proposed Preference Share Dividend b) Tax on Proposed Dividend c) Capital Redemption Reserve

(147.64)

(355.97)

(152.33)

494.14

1,401.85

1,232.95

(61.27)

(23.36)

(30.81)

2,136.08

753.32

(152.01)

(90.74)

(67.38)

(36.57)

2,630.22

2,155.17

1,080.94

(152.01)

(90.74)

(67.38)

16.37 2.72 19.09 2,136.08

95.33 16.20 216.11 327.64 753.30

(152.01)

(90.74)

(67.38)

Balance carried to Balance Sheet Note :

2,630.22

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV

18

RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF CASH FLOWS (` in Millions) Particulars For the Period ended June 30, 2010 Cash Flow From Operating Activities Net Profit Before Taxation Adjustments For : Depreciation (Profit)/Loss On Sale/Disposal Of Fixed Assets (Profit) / Loss on Investments Sale of Inventory (land) for consideration other than cash Preliminary/Miscellane ous Expenditure Written off Interest/Dividend Income Interest Expenses Operating Profit Before Working Capital Changes Decrease / (Increase) In Sundry Debtors Decrease / (Increase) In Other Current Assets Decrease /( Increase ) In Land Inventory Decrease /( Increase ) In Construction and Development Expenses Decrease /( Increase) In Loans & Advances (Decrease) / Increase In Current Liabilities and Provisions Cash Generated from Operations Income Tax Paid For the Year ended March 31, 2010 For the Year ended March 31, 2009 For the Year ended March 31, 2008 For the Year ended March 31, 2007 For the Year ended March 31, 2006

740.82

2,094.60

1,350.92

(57.67)

(21.53)

(29.69)

8.32

36.27

6.84

3.37

1.98

1.51

(0.31) -

(0.15) (66.71)

0.08 -

(588.30)

(53.48) 641.03

(123.70) 1,938.64

(169.78) 2,368.74

0.52 -

0.94 -

1,336.69 (823.60) (44.15) (254.64)

3,357.20 (2,171.61) (26.29) (471.55)

3,489.86 (1,007.87) (46.62) (807.15)

(54.30) -

(19.03) -

(27.16) -

(480.21)

(91.89)

(35.40)

17.39 (118.91)

(1,512.70) (1,553.01)

(4,517.56) (779.80)

(1,551.53) (218.40)

(1,170.35) (113.14)

(1,099.68) 21.06

(52.63) 60.15 (79.45)

2,775.36 397.40 (419.72)

1,090.18 (2,578.96) (77.22)

662.69 (1,641.75) (3.61)

110.13 (1,284.28) (3.53)

117.59 (1,023.59) (1.86)

19

Net Cash Generated from Operations Cash Flows From Investing Activities Interest/Dividend Received Sale/(Purchase) Of Investments Decrease/(Increase) in Capital Work in Progress Sale Of Fixed Assets Purchase Of Fixed Assets Net Cash flows from Investing Activities ( B ) Cash Flow From Financing Activities : Issue Of Shares On Premium Issue of Share Warrants Proceeds from Long Term and Other Borrowings Dividend Paid Interest & Finance Expenses Net Cash Generated From Financing Activities (C ) Net Increase In Cash And Cash Equivalents (A+B+C) Cash And Cash Equivalents Cash And Cash Equivalents At Beginning Of Period Cash And Cash Equivalents At End Of Period

(19.30)

(22.32)

(2,656.18)

(1,645.36)

(1,287.81)

(1,025.45)

53.48 1,451.38

123.70 (2,365.32)

169.78 (767.62)

30.76 43.40

15.37 (42.92)

7.14 42.00

(192.46) (783.20)

(2,491.80) 0.84 (783.70)

1.10 (37.16)

(129.59)

0.04 (46.23)

0.04 (92.06)

529.20

(5,516.28)

(633.90)

(55.43)

(73.74)

(42.88)

750.02 81.25

500.00 -

829.00 -

394.54 (19.10) (641.03)

7,961.68 (111.53) (1,938.64)

4,827.82 (2,368.74)

1,736.63 (555.29)

1,012.21 (327.55)

1,031.32 (156.09)

(265.59)

5,911.51

3,290.35

1,681.34

1,513.66

875.23

244.31

372.91

0.27

(19.45)

152.11

(193.10)

609.29

236.38

236.11

255.56

103.45

296.55

853.60 103.45

609.29 255.56

236.38 236.11

236.11 236.38

255.56 609.29

103.45

Note :

20

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV The Cash Flow Statement has been prepared under the indirect method as set out in Accounting Standard - 3 on Cash Flow Statements of the Companies ( Accounting Standard ) Rules, 2006 Negative figures represents Cash Outflows. Proceeds from Long Term and Other Borrowings are shown net of repayments.

21

RESTATED CONSOLIDATED SUMMARY STATEMENT OF ASSETS AND LIABILITIES (` in Millions) Particulars As At June 30, 2010 As At March 31, 2010 As At March 31, 2009 As At March 31, 2008

SOURCES OF FUNDS Share Capital Share Warrant Reserves & Surplus 4,774.52 81.25 417.19 994.95 81.25 2,771.15 994.94 81.25 2,884.71 625.90 1,624.17

Total Shareholders' Funds Minority Interest Loan Funds (a) Secured Loans (b) Unsecured Loans Total Loans

5,272.96 366.27

3,847.35 361.16

3,960.90 183.76

2,250.07 35.00

17,531.10 1,001.00 18,532.10

16,235.96 2,000.00 18,235.96

9,797.82 9,797.82

4,970.00 4,970.00

Deferred Tax Liability (Net)

1,058.87

811.26

115.74

TOTAL APPLICATION OF FUNDS Fixed Assets (a) Gross Block (b) Less : Depreciation (c) Net Block (d) Capital Work In Progress

25,230.20

23,255.73

14,058.22

7,255.07

5,733.36 409.25 5,324.11 8,923.21 14,247.32

4,240.05 339.23 3,900.82 9,765.83 13,666.65

2,842.50 133.50 2,709.00 6,205.84 8,914.84

318.29 80.15 238.14 24.27 262.41

Investments

1,465.58

2,797.86

815.79

6.49

22

Current Assets, Loans & Advances A) Current Assets (a) Inventories (b) Sundry Debtors (c) Cash and Bank Balances (d) Other Current Assets 6,586.42 2,926.20 1,027.44 117.08 10,657.14 6,316.62 2,173.90 951.56 76.50 9,518.58 4,302.68 928.56 291.64 46.63 5,569.51 7,251.48 297.61 7,549.09

B) Loans and Advances Total Current Assets, Loans and Advances Less: Current Liabilities & Provisions (a) Current Liabilities (b) Provisions

2,155.72 12,812.86

2,182.43 11,701.01

929.26 6,498.77

385.94 7,935.03

4,829.71 36.17 4,865.88

4,857.73 52.06 4,909.79

2,039.18 132.00 2,171.18

1,094.89 6.78 1,101.67

Net Current Assets

7,946.98

6,791.22

4,327.59

6,833.36

Miscellaneoues Expenditure (To the extent not written off)

Profit and Loss Account

1,570.32

152.81

TOTAL Note :

25,230.20

23,255.73

14,058.22

7,255.07

The above statement should be read with the Notes to the Restated Consolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI

23

RESTATED CONSOLIDATED SUMMARY STATEMENT OF PROFITS AND LOSSES (` in Millions) Particulars As At June 30, 2010 As At March 31, 2010 As At March 31, 2009 As At March 31, 2008

INCOME Income From Operations Other Income 923.73 11.47 3,063.71 25.38 2,071.04 5.70 0.07

TOTAL EXPENDITURE Land and Construction Expenses Employee's Remuneration and Benefits Office and Site Establishment Expenses Finance Charges (net) Depreciation

935.20

3,089.09

2,076.74

0.07

530.47 215.93 431.60 608.48 26.32 1,812.80

2,737.90 538.84 640.19 1,865.34 68.46 5,850.73

6,047.11 487.81 436.02 2,148.54 11.35 9,130.83

13.83 41.33 3.37 58.53

Less : Transferred to Fixed Asset / Capital Work in Progress

971.03 841.77

3,355.22 2,495.51

8,317.70 813.13

58.53

Profit/(Loss) before Tax Less: Provision for taxation: Income Tax Deferred Tax Wealth Tax Fringe Benefit Tax MAT Credit Entitlement

93.43

593.58

1,263.61

(58.46)

147.89 247.42 0.01 (147.74)

355.97 695.53 0.06 (355.97)

153.49 115.74 0.03 2.19 (152.31)

0.06 3.55 -

24

Profit/(Loss) after Tax Less : Minority Adjustments Add : Share in Profit/(Loss) of Associates Add: Balance brought forward from last year Amount available for appropriation Less : Appropriations a) Proposed Preference Share Dividend b) Tax on Proposed Dividend c) Capital Redemption Reserve

(154.15)

(102.01)

1,144.47

(62.07)

(10.47) (1.03) 549.87

(10.08) (2.55) 663.45

0.57 (152.81)

(90.74)

405.16

568.97

991.09

(152.81)

16.38 2.72 19.10 549.87

95.33 16.20 216.11 327.64 663.45

(152.81)

Balance carried to Balance Sheet Note :

405.16

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI

25

RESTATED CONSOLIDATED SUMMARY STATEMENT OF CASH FLOWS (`in Millions) Particulars As At June 30, 2010 As At March 31, 2010 As At March 31, 2009 As At March 31, 2008

A.

Cash Flow From Operating Activities Net Profit Before Taxation Adjustments For : Depreciation Profit/Loss On Sale Of Fixed Assets (Profit) / Loss on Investments Preliminary/Miscellaneous Expenditure Written off Interest/Dividend Income Interest & Finance Expenses Operating Profit Before Working Capital Changes Decrease / (Increase) In Sundry Debtors Decrease / (Increase) In Other Current Assets Decrease /( Increase ) In Land Inventory Decrease /( Increase ) In Construction and Development Expenses Decrease /( Increase) In Loans & Advances (Decrease) / Increase In Current Liabilities and Provisions Cash Generated Used In Operations Income Tax Paid Cash Flow after Extra Ordinary Items (A) Cash Flows From Investing Activities Interest/Dividend Received Sale/(Purchase) Of Investments 36.00 1,331.25 95.50 (1,984.62) 160.19 (742.58) 30.76 44.90 93.42 593.59 1,263.60 (58.46)

26.34 (36.00) 644.48 728.24 (748.73) (44.15) (254.64)

68.24 (0.31) (95.50) 1,960.84 2,526.86 (1,202.28) (26.29) (471.55)

11.36 (0.15) (66.71) (160.19) 2,375.44 3,423.35 (928.58) (46.62) (807.15)

3.37 (55.09) -

(480.21)

(15.16) 105.44

(1,542.39) (877.54)

(4,518.00) (637.31)

(1,551.53) (192.70)

(24.81) (253.81) (78.72) (332.53)

2,831.04 1,237.85 (422.30) 815.55

1,287.98 (2,226.33) (77.19) (2,303.52)

662.78 (1,616.75) (3.61) (1,620.36)

B.

26

Sale Of Fixed Assets Decrease/(Increase) in Fixed Asstes/Capital Work in Progress Net Cash Used In Investing Activities ( B ) Cash Flow From Financing Activities : Application Money Received For Issue Of Shares/Warrants Issue Of Shares On Premium Issue of Share Warrants Increase in Minority Interest Increase In Long Term Borrowings (Net) Dividend Paid Interest & Finance Expenses Net Cash Generated From Financing Activities (C ) Net Increase In Cash And Cash Equivalents (A+B+C) Cash And Cash Equivalents Cash And Cash Equivalents At Beginning Of Period Cash And Cash Equivalents At End Of Period

26.75

0.84

1.09

(633.73) 760.27

(4,820.59) (6,708.87)

(390.77) (972.07)

(129.59) (53.93)

C.

15.00 0.57 296.15 (19.10) (644.48) (351.86)

100.37 87.10 8,438.14 (111.53) (1,960.84) 6,553.24

98.07 750.02 81.25 (0.57) 4,827.82 (111.53) (2,375.44) 3,269.62

35.00 500.00 1,736.63 (555.29) 1,716.34

D.

75.88

659.92

(5.97)

42.05

951.56 1,027.44

291.64 951.56

297.61 291.64

255.56 297.61

The above statement should be read with the Notes to the Restated Consolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI The Cash Flow Statement has been prepared under the indirect method as set out in Accounting Standard - 3 on Cash Flow Statements of the Companies ( Accounting Standard ) Rules, 2006 Negative figures represents Cash Outflows. Proceeds from Long Term and Other Borrowings are shown net of repayments.

27

THE ISSUE Issue of Equity Shares Employee Reservation Portion1 Net Issue to the public Of which A) QIB portion2 Of which Anchor Investor Portion3 Balance available for allocation to QIBs other than the Anchor Investor Portion (assuming the Anchor Investor Portion is fully subscribed) Of which: Available for allocation to Mutual Funds only (5% of the QIB Portion (excluding the Anchor Investor Portion)) Balance for all QIBs including Mutual Funds B) Non-Institutional Portion2 C) Retail Portion2 ` 20,000 million Up to ` 100 million ` [] million At least ` [] million Up to ` [] million ` [] million ` [] million ` [] million Not less than ` [] million Not less than ` [] million

Equity Shares outstanding as on date of this Draft Red 485,944,363 Equity Shares Herring Prospectus Equity Shares outstanding prior to the Issue [] Equity Shares assuming conversion of the warrant, Redeemable Preference Shares, Compulsory Convertible Preference Shares and DDCDs4 Equity Shares outstanding after the Issue Use of Net Proceeds [] Equity Shares Please see Objects of the Issue on page 52 for information about the use of the Net Proceeds.

Allocation to all categories (including the Employee Reservation Portion), except the Anchor Investor Portion, if any, shall be made on a proportionate basis.
1

A discount of 10% to the Issue Price determined pursuant to completion of the Book Building Process has been offered to Eligible Employees. Under subscription, if any, in any category, except in the QIB Portion, would be allowed to be met with spill over from any other category or combination of categories at the discretion of our Company, in consultation with the BRLMs and the Designated Stock Exchange. Under subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue Portion at the discretion of the BRLMs and our Company. In case of under subscription in the Net Issue, spill over to the extent of under subscription shall be permitted from the Employee Reservation Portion subject to the Net Issue constituting 10% of the post Issue capital of our Company. If at least 50% of the Net Issue cannot be allocated to QIBs, the entire application money shall be refunded. Our Company may allocate up to 30% of the QIB Portion to Anchor Investors on a discretionary basis. One-third of the Anchor Investor Portion shall be reserved for domestic Mutual Funds, subject to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is being done to other Anchor Investors. For further details, please see Issue Procedure on page 360. Bennett, Coleman & Co. Limited and Axis Bank Limited have consented to convert the one warrant and one Compulsory Convertible Preference Share held by them respectively into Equity Shares prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to the consents received from certain DDCD holders, out of the 16 DDCDs currently outstanding, seven DDCDs shall be converted into Equity Shares, five DDCDs shall be converted into non-convertible debentures, two DDCDs shall either be converted into Equity Shares or non-convertible debentures or any other debt instrument or prepaid prior to the filing of the Red Herring Prospectus with the RoC and 40% of the subscription amount towards one DDCD shall be repaid and 60% of the subscription amount shall be converted into Equity Shares prior to the filing of the Red Herring Prospectus with the RoC. One DDCD holder communicated in writing to our Company that it is considering either (i) a prepayment of the DDCD held by it with a specified penal interest, or (ii) conversion of such DDCD into nonconvertible debentures, subject to the approval from a competent authority of the said DDCD holder. For further details, please see History and Certain Corporate Matters - Summary of Key Agreements /Scheme of Amalgamation on page 148.

28

GENERAL INFORMATION Our Company was incorporated as Pearly Blue Lake Resorts Private Limited on February 11, 2000 under the Companies Act. The name of our Company was changed to The Lake City Corporation Private Limited on December 12, 2000. Our Company was converted into a public limited company on March 3, 2003 and consequently, the name was changed to The Lake City Corporation Limited. The name of our Company was changed to Lavasa Corporation Limited on June 8, 2004. For details of changes in the name and registered office of our Company, please see History and Certain Corporate Matters on page 142. We are a city development and management company engaged in the development, construction and management of Lavasa, a private hill city development in India. For further details of the business of the Company, please see Our Business on page 98. Registered and Corporate Office and Registration Number of our Company Hincon House Lal Bahadur Shastri Marg Vikhroli (West) Mumbai 400 083 Tel: (91 22) 4025 6000 Fax: (91 22) 4025 6889 CIN and Registration Number: U55101MH2000PLC187834 Website: www.lavasa.com Address of the RoC Our Company is registered with the RoC situated at Everest, 100, Marine Drive, Mumbai 400 002. Our Board of Directors Our Board of Directors consists of: Name of the Director Ajit Gulabchand Gautam Thapar Anuradha Jitendra Desai Vithal Maniar Shalaka Gulabchand Dhawan Sharad M. Kulkarni Sam Bhadha His Highness Gaj Singh Ajay B. Shirke Ram P. Gandhi Designation Chairman, Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Independent Director Independent Director Independent Director Independent Director Independent Director

For further details of our Directors, please see Our Management on page 157. Company Secretary and Compliance Officer Venkatesan Arunachalam is the Company Secretary and the Compliance Officer of our Company. His contact details are as follows: Venkatesan Arunachalam Lavasa Corporation Limited Hincon House Lal Bahadur Shastri Marg Vikhroli (West) Mumbai 400 083

29

Tel: (91 22) 4025 6104 Fax: (91 22) 4025 6889 Email: secretarial@lavasa.com Investors can contact the Compliance Officer or the Registrar to the Issue in case of any pre-Issue or postIssue related problems such as non-receipt of letters of allocation, credit of Allotted Equity Shares in the respective beneficiary account and refund orders. In case of ASBA Bids submitted with the Designated Branches of the SCSBs, Bidders can contact the Designated Branches of the SCSBs. Book Running Lead Managers ICICI Securities Limited ICICI Centre, H.T. Parekh Marg Churchgate Mumbai 400 020 Tel : (91 22) 2288 2460 Fax : (91 22) 2282 6580 Email: lavasa.ipo@icicisecurities.com Investor Grievance Email: customercare@icicisecurities.com Website: www.icicisecurities.com Contact Person: Sumanth Rao / Mangesh Ghogle SEBI Registration No.: INM000011179 Morgan Stanley India Private Limited 5F, 55-56, Free Press House Free Press Journal Marg Nariman Point Mumbai 400 021 Tel: (91 22) 6621 0555 Fax: (91 22) 6621 0556 Email: lavasa_ipo@morganstanley.com Investor Grievance Email: investors_india@morganstanley.com Website: www.morganstanley.com/indiaofferdocuments Contact Person: Vivek Subramanian SEBI Registration No.: INM000011203 Kotak Mahindra Capital Company Limited 1st Floor, Bakhtawar 229 Nariman Point Mumbai 400 021 Tel: (91 22) 6634 1100 Fax: (91 22) 2284 0492 E-mail: lavasa.ipo@kotak.com Investor Grievance Email: kmccredressal@kotak.com Website: www.kmcc.co.in Contact Person: Chandrakant Bhole SEBI Registration No.: INM000008704

Axis Bank Limited 111, Central Office Cuffe Parade, Colaba Mumbai 400 005 Tel: (91 22) 6707 1312 Fax: (91 22) 6707 1689 Email: lavasa.ipo@axisbank.com Investor Grievance E-mail: axbmbd@axisbank.com Website: www.axisbank.com Contact Person: Dipen Kapadia SEBI Registration No.: INM000006104

For all Issue related queries and for referral of complaints, investors may also write to the BRLMs. All complaints, queries or comments received by SEBI shall be forwarded to the BRLMs, who shall respond to the same. Syndicate Members [] Legal Advisors to the Issue Domestic Legal Counsel to the Company Amarchand & Mangaldas & Suresh A. Shroff & Co. 5th Floor, Peninsula Chambers Peninsula Corporate Park Ganpatrao Kadam Marg, Lower Parel Mumbai 400 013 Tel: (91 22) 2496 4455 Fax: (91 22) 2496 3666

30

Domestic Legal Counsel to the Underwriters J Sagar Associates Vakils House, 18, Sprott Road, Ballard Estate Mumbai 400 001 Tel: (91 22) 4341 8600 Fax: (91 22) 4341 8617 International Legal Counsel to the Underwriters Clifford Chance CC Asia Limited One George Street 19th Floor Singapore 049145 Tel: (00 65) 6410 2200 Fax: (00 65) 6410 2288 Auditors to our Company M/s. K.S. Aiyar & Co Chartered Accountants No. F-7 Laxmi Mills, Shakti Mills Lane (Off Dr. E. Moses Road) Mahalaxmi Mumbai 400 011 Tel: (91 22) 2493 2502 / 6655 1770 Fax: (91 22) 6655 1774 Email: Mail@KSAiyar.com Firm Registration No.: 100186W Registrar to the Issue Karvy Computershare Private Limited Plot No. 17-24, Vittal Rao Nagar Madhapur Hyderabad 500 081 Tel: (91 40) 2342 0815-28 Fax: (91 40) 2343 1551 Email: lavasa.ipo@karvy.com Website: http://karisma.karvy.com Contact Person: Murali Krishna SEBI Registration No.: INR000000221 Bankers to the Issue and Escrow Collection Banks [] Self Certified Syndicate Banks The list of banks that have been notified by SEBI to act as SCSBs for the ASBA process is provided on www.sebi.gov.in. For details on Designated Branches of SCSBs collecting the ASBA Bid cum Application Forms, please refer to the above mentioned link.

31

Bankers to our Company Oriental Bank of Commerce Satkartar Society, Flat 1 Plot No.101, S.V.Road Mumbai 400 052 Tel: (91 22) 2648 1190 Fax: (91 22)2648 1074 Email: bm0958@obc.co.in Website: www.obcindia.co.in Bank of Baroda Corporate Financial Services Fort Branch, 10/12, 4th Floor, Mumbai Samachar Marg Fort, Mumbai 400 023 Tel: (91 22) 2202 1441 Fax: (91 22)2202 1445 Email: cfsfrt@bankofbaroda.co.in Website: www.bankofbaroda.com Bank of India Bank of India Building, 4th Floor, 70/80, M.G. Road Fort, Mumbai 400 023 Tel: (91 22) 2262 3656 Fax: (91 22) 2267 1718 Email: mumbai.lcbb@bankofindia.co.in Website: www.bankofindia.com Corporation Bank Overseas Branch Earnest House, 1st Floor, N.C.P.A. Marg, Nariman Point Mumbai 400 021 Tel: (91 22) 2282 2878 Fax: (91 22) 2285 1837 Email: cb444@corpbank.co.in Website: www.corpbank.com Union Bank of India Industrial Finance Branch, Union Bank Bhavan 1st Floor, 239, Vidhan Bhavan Marg, Nariman Point, Mumbai 400 021 Tel: (91 22) 2202 4742 Fax: (91 22) 2204 0023 Email: amghosalkar@unionbankofindia.com Website: www.unionbankofindia.co.in Monitoring Agency Our Company will appoint a Monitoring Agency and update the details thereof, prior to filing the Red Herring Prospectus with the RoC. Statement of inter se allocation of Responsibilities for the Issue The following table sets forth the distribution of responsibility and co-ordination for various activities amongst the Central Bank of India Corporate Finance Branch 1st Floor, MMO Building, Fort Mumbai 400 023 Tel: (91 22) 2265 3010 Fax: (91 22) 4078 5840 Email: cfbcbi@rediffmail.com Website: www.centralbankofindia.co.in Axis Bank Limited Central Office, Maker Towers F, 13th Floor, Cuffe Parade Colaba, Mumbai 400 005 Tel: (91 22) 6707 4407 Fax: (91 22) 2218 1429 Email: rajesh.shah@axisbank.com Website: www.axisbank.com Punjab National Bank Large Corporate Branch Maker Tower E, Cuffe Parade Mumbai 400 005 Tel: (91 22)2218 5994 Fax: (91 22) 2218 0402 Email: pnbifb@vsnl.com Website: www.pnbindia.in Karnataka Bank Limited Overseas Branch 104-106, Embassy Centre Jamnalal Bajaj Marg, Nariman Point Mumbai 400 021 Tel: (91 22) 2202 0273 Fax: (91 22) 2202 0463 Email: bom.overseas@ktkbank.com Website: www.karnatakabank.com State Bank of Hyderabad Overseas Branch Ashok Mahal, 1204, Tulloch Road Colaba, Mumbai 400 039 Tel: (91 22) 2282 0177 Fax: (91 22) 2202 4857 Email: overseas_mum@sbhyd.co.in Website: www.sbhyd.com

32

BRLMs: Sr. No 1. 2. 3. Capital structuring Positioning Strategy Due diligence of the Company including its operations/ management/business plans/legal etc. Drafting and design of the Draft Red Herring Prospectus and of statutory advertisements including a memorandum containing salient features of the Prospectus. The BRLMs shall ensure compliance with stipulated requirements and completion of prescribed formalities with the Stock Exchanges, RoC and SEBI including finalisation of Prospectus and RoC filing Drafting and approval of all statutory advertisement Drafting and approval of all publicity material other than statutory advertisement as mentioned above including corporate advertising, brochure, etc. Appointment of Registrar to the Issue and Printers Appointment of Advertising Agency Appointment of Banker(s) to the Issue Marketing and road-show presentation Non-Institutional and retail marketing of the Issue, which will cover, inter alia, Finalising media, marketing and public relations strategy; Finalising centres for holding conferences for brokers, etc; Follow-up on distribution of publicity and Issue material including form, the Prospectus and deciding on the quantum of the Issue material; and Finalising collection centres Institutional marketing of the Issue, which will cover, inter alia: Institutional marketing strategy Preparation of frequently asked questions for the road show team Finalizing the list and division of investors for one-to-one meetings Finalizing road show schedule and investor meeting schedule Coordination with Stock-Exchanges for book building software, bidding terminals and mock trading Managing the book and finalization of pricing in consultation with the Company Post-bidding activities, including management of escrow accounts, co-ordination of non-institutional allocation, announcement of allocation and dispatch of refunds to Bidders, etc. The post-Issue activities will involve essential follow-up steps, including finalisation of trading, dealing of instruments and demat of delivery of shares with the various agencies connected with the work such as the Registrars to the Issue, the Bankers to the Issue, the bank handling refund business and the SCSBs. The BRLMs shall be responsible for ensuring that these agencies fulfill their functions and discharge this responsibility through suitable agreements with the Company Activity Responsibility BRLMs BRLMs BRLMs Co-ordinator ICICI Securities Kotak ICICI Securities

4. 5.

BRLMs BRLMs

ICICI Securities Axis

6. 7. 8. 9. 10.

BRLMs BRLMs BRLMs BRLMs BRLMs

ICICI Securities Axis Kotak Kotak ICICI Securities

11.

BRLMs

Kotak

12. 13. 14.

BRLMs BRLMs BRLMs

Morgan Stanley ICICI Securities Kotak

If any of these activities are handled by other intermediaries, the designated BRLMs shall be responsible for

33

ensuring that these agencies fulfil their functions and enable them to discharge this responsibilities through suitable agreements with our Company. Credit Rating As this is an Issue of Equity Shares, there is no credit rating for this Issue. IPO Grading This Issue has been graded by [] as [] (pronounced []) indicating []. The rationale/description furnished by the IPO grading agency will be updated at the time of filing the Red Herring Prospectus with the RoC. Experts Our Company has obtained a master title certificate dated September 10, 2010 from Mahesh J. Sheguri in relation to land held by us. Mahesh J. Sheguri has given his written consent to be named as an expert to our Company for the Issue in relation to the land and/or rights in respect thereof that we own and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus. Our Company has obtained an architects certificate dated September 10, 2010 from Sadashiv Nargundkar & Associates in relation to the property developed/ to be developed by us. Sadashiv Nargundkar & Associates have given their written consent to be named as an expert to our Company for the Issue in relation the property developed/ to be developed by us and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus. Our Company has obtained an engineers certificate dated August 11, 2010 from Taamra Engineering Consultants Private Limited in relation to the infrastructure construction and development activities in Lavasa. Taamra Engineering Consultants Private Limited have given their consent to be named as an expert to our Company for the Issue in relation to the existing, under construction and planned infrastructure construction and development activities in Lavasa and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus. Trustees As this is an Issue of Equity Shares, the appointment of trustees is not required. Book Building Process The Book Building Process, with reference to the Issue, refers to the process of collection of Bids on the basis of the Red Herring Prospectus within the Price Band. The Issue Price is finalised after the Bid/ Issue Closing Date. The principal parties involved in the Book Building Process are: 1. 2. 3. our Company; the BRLMs; the Syndicate Members who are intermediaries registered with SEBI or registered as brokers with BSE/NSE and eligible to act as Underwriters. The Syndicate Members are appointed by the BRLMs; the SCSBs; the Escrow Collection Bank(s); and the Registrar to the Issue.

4. 5. 6.

Our Company is undertaking this Issue under Rule 19(2)(b)(ii) of the SCRR and shall comply with the requirements

34

there under. This being an issue for less than 25% of post-Issue paid-up equity share capital of our Company, the SEBI Regulations read with Rule 19(2)(b) of the SCRR, permit an issue of securities to the public through the 100% Book Building Process, wherein at least 50% of the Net Issue shall be allocated on a proportionate basis to QIBs. 5% of the QIB Portion (excluding Anchor Investor Portion) shall be available for allocation on a proportionate basis to Mutual Funds only. The remainder shall be available for allocation on a proportionate basis to QIBs including the Mutual Funds subject to valid Bids being received at or above the Issue Price. If at least 50% of the Net Issue cannot be allocated to QIBs, then the entire application money will be refunded forthwith. Further, not less than 15% of the Net Issue shall be available for allocation on a proportionate basis to Non Institutional Bidders and not less than 35% of the Net Issue shall be available for allocation on a proportionate basis to Retail Individual Bidders, subject to valid Bids being received at or above the Issue Price. Our Company will comply with the SEBI Regulations and any other ancillary directions issued by SEBI for this Issue. In this regard, our Company has appointed the BRLMs to manage the Issue and to procure subscriptions to the Issue. QIB Bidders are not allowed to withdraw their Bids after the Bid /Issue Closing Date. For further details, please see Terms of the Issue on page 352. The Book Building Process under the SEBI Regulations is subject to change from time to time and investors are advised to make their own judgment about investment through this process prior to making a Bid in the Issue. Illustration of the Book Building Process and price discovery process Investors should note that this example is solely for illustrative purposes and is not specific to the Issue; it also excludes Bidding by Anchor Investors. Bidders can bid at any price within the price band. For instance, assume a price band of ` 20 to ` 24 per equity share, offer size of 3,000 equity shares and receipt of five bids from bidders out which one bidder has bid for 500 equity shares at ` 24 per equity share while another has bid for 1,500 equity shares at ` 22 per equity share. A graphical representation of consolidated demand and price would be made available at the bidding centers during the bidding period. The illustrative book given below shows the demand for the shares of a company at various prices and is collated from bids from various investors. Bid Quantity 500 1,000 1,500 2,000 2,500 Bid Price (`) 24 23 22 21 20 Cumulative Quantity 500 1,500 3,000 5,000 7,500 Subscription 16.67% 50.00% 100.00% 166.67% 250.00%

The price discovery is a function of demand at various prices. The highest price at which the company is able to offer the desired number of shares is the price at which the book cuts off i.e. ` 22 in the above example. The company in consultation with the BRLMs will finalise the issue price at or below such cut-off price, i.e. at or below ` 22. All bids at or above the issue price and cut-off price are valid bids and are considered for allocation in the respective categories. Steps to be taken by the Bidders for bidding: Check eligibility for bidding (please see Issue Procedure - Who Can Bid? on page 361); Ensure that you have an active demat account and the demat account details are correctly mentioned in the Bid cum Application Form; Except for Bids on behalf of the Central or State Governments and the officials appointed by the courts, for

35

Bids of all values. Ensure that you have mentioned your PAN allotted under the IT Act in the Bid cum Application Form or the ASBA Bid cum Application Form. In accordance with the SEBI Regulations, the PAN would be the sole identification number for participants transacting in the securities market, irrespective of the amount of transaction (please see Issue Procedure on page 360); Ensure that the Bid cum Application Form or ASBA Bid cum Application Form is duly completed as per the instructions given in this Draft Red Herring Prospectus and in the Bid Cum Application Form or ASBA Bid cum Application Form; Bids by QIBs shall be submitted only to the BRLMs, other than Bids by QIBs who Bid through the ASBA process, who shall submit the Bids to the Designated Branch of the SCSBs; and Bids by ASBA Bidders will have to be admitted to the Designated Branches. ASBA Bidders should ensure that their bank accounts have adequate credit balance at the time of submission to the SCSB to ensure that the ASBA Bid cum Application Form is not rejected.

Underwriting Agreement After the determination of the Issue Price and allocation of the Equity Shares, but prior to the filing of the Prospectus with the RoC, our Company will enter into an Underwriting Agreement with the Underwriters for the Equity Shares proposed to be offered through this Issue. It is proposed that, pursuant to the terms of the Underwriting Agreement, the BRLMs shall be responsible for bringing in the amount devolved in the event that their respective Syndicate Members do not fulfil their underwriting obligations. The Underwriting Agreement is dated []. Pursuant to the terms of the Underwriting Agreement, the obligations of the Underwriters are several and are subject to certain conditions specified therein. The Underwriters have indicated their intention to underwrite the following number of Equity Shares: (This portion has been intentionally left blank and will be filled in before the filing of the Prospectus with the RoC) Name and Address of the Underwriter [] [] Indicative Number of Equity Shares to be Underwritten [] [] Amount Underwritten (In ` million) [] []

The above mentioned amount is indicative underwriting and this would be finalised after determination of the Issue Price and actual allocation. In the opinion of our Board of Directors (based on the certificates given by the Underwriters), the resources of the above mentioned Underwriters are sufficient to enable them to discharge their respective underwriting obligations in full. Our above-mentioned Underwriters are registered with SEBI or registered as brokers with the Stock Exchanges. The Board of Directors, at its meeting held on [], has accepted and entered into the Underwriting Agreement mentioned above on behalf of our Company. Allocation among the Underwriters may not necessarily be in proportion to their underwriting commitments. Notwithstanding the table above, the BRLMs and the Syndicate Members shall be responsible for ensuring payment with respect to the Equity Shares allocated to the investors procured by them. Notwithstanding the foregoing, the Issue is also subject to obtaining (i) final listing and trading approvals of the Stock Exchanges, which our Company shall apply for after Allotment; and (ii) the final approval of the RoC after the Prospectus is filed with the RoC.

36

CAPITAL STRUCTURE The share capital of our Company as at the date of this Draft Red Herring Prospectus is set forth below: (In ` except share data) Aggregate Value at Issue Price

Aggregate Value at Face Value A AUTHORISED SHARE CAPITAL 800,000,000 Equity Shares 40,000,000 Redeemable Preference Shares of ` 10 each 25,000,000 Compulsory Convertible Preference Shares of ` 10 each Total B ISSUED CAPITAL BEFORE THE ISSUE 485,944,363 Equity Shares 28,000,000 Redeemable Preference Shares of ` 10 each 25,000,000 Compulsory Convertible Preference Shares of ` 10 each Total SUBSCRIBED AND PAID UP CAPITAL BEFORE THE ISSUE 485,944,363 Equity Shares 27,250,000 Redeemable Preference Shares of ` 10 each 25,000,000 Compulsory Convertible Preference Shares of ` 10 each Total PRESENT ISSUE IN TERMS OF THIS DRAFT RED HERRING PROSPECTUS [] Equity Shares of which Employee Reservation of [] Equity Shares Net Issue to the Public of [] Equity Shares EQUITY CAPITAL AFTER THE ISSUE [] Equity Shares assuming conversion of the warrant, Redeemable Preference Shares, Compulsory Convertible Preference Shares and DDCDs1 SECURITIES PREMIUM ACCOUNT Before the Issue After the Issue 8,000,000,000 400,000,000 250,000,000

8,650,000,000

4,859,443,630 280,000,000 250,000,000 5,389,443,630

4,859,443,630 272,500,000 250,000,000 5,381,943,630

[] 100,000,000 []

[] [] []

[]

[]

F
1

[]

Bennett, Coleman & Co. Limited and Axis Bank Limited have consented to convert the one warrant and one Compulsory Convertible Preference Share held by them respectively into Equity Shares prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to the consents received from certain DDCD holders, out of the 16 DDCDs currently outstanding, seven DDCDs shall be converted into Equity Shares, five DDCDs shall be converted into non-convertible debentures, two DDCDs shall either be converted into Equity Shares or non-convertible debentures or any other debt instrument or prepaid prior to the filing of the Red Herring Prospectus with the RoC and 40% of the subscription amount towards one DDCD shall be repaid and 60% of the subscription amount shall be converted into Equity Shares prior to the filing of the Red Herring Prospectus with the RoC. One DDCD holder communicated in writing to our Company that it is considering either (i) a prepayment of the DDCD held by it with a specified penal interest, or (ii) conversion of such DDCD into nonconvertible debentures, subject to the approval from a competent authority of the said DDCD holder.. For further details, please see History and Certain Corporate Matters - Summary of Key Agreements /Scheme of Amalgamation on page 148.

37

The present Issue has been authorised by our Board of Directors, pursuant to its resolutions dated June 7, 2010, July 16, 2010 and July 30, 2010 and by our shareholders pursuant to their resolution dated July 30, 2010. Changes in the Authorised Capital (1) The initial authorised share capital of ` 20,000,000 divided into 2,000,000 Equity Shares was increased to ` 50,000,000 divided into 5,000,000 Equity Shares, pursuant to a resolution of our shareholders dated November 20, 2000. The authorised share capital of ` 50,000,000 divided into 5,000,000 Equity Shares was increased to ` 300,000,000 divided into 9,000,000 Equity Shares and 21,000,000 Redeemable Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated December 24, 2001. The authorised share capital of ` 300,000,000 divided into 9,000,000 Equity Shares and 21,000,000 Redeemable Preference Shares of ` 10 each increased to ` 400,000,000 divided into 9,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated December 5, 2003. The authorised share capital of ` 400,000,000 divided into 9,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares of ` 10 each increased to ` 650,000,000 divided into 34,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated March 13, 2006. The authorised share capital of ` 650,000,000 divided into 34,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares of ` 10 each increased to ` 1,000,000,000 divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated January 15, 2007. The authorised share capital of ` 1,000,000,000 divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each increased to ` 1,250,000,000 divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each and 25,000,000 Compulsory Convertible Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated June 25, 2008. The authorised share capital of ` 1,250,000,000 divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each and 25,000,000 Compulsory Convertible Preference Shares of ` 10 each increased to ` 6,250,000,000 divided into 560,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each and 25,000,000 Compulsory Convertible Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated June 7, 2010. The authorised share capital of ` 6,250,000,000 divided into 560,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each and 25,000,000 Compulsory Convertible Preference Shares of ` 10 each increased to ` 8,650,000,000 divided into 800,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares of ` 10 each and 25,000,000 Compulsory Convertible Preference Shares of ` 10 each, pursuant to a resolution of our shareholders dated July 30, 2010.

(2)

(3)

(4)

(5)

(6)

(7)

(8)

Notes to the Capital Structure 1. (a) Share Capital History of our Company The following is the history of the equity share capital and securities premium account of our Company:
No. of Equity Shares Face value (`) Issue Price (`) Consideration (cash, other than cash etc) Cumulative No. of Equity Shares Cumulative paid-up Equity Capital (`) Cumulative securities Premium (`)

Date of allotment of the Equity Shares

38

Date of allotment of the Equity Shares February 16, 2000 May 20, 2000 June 3, 2000 September 10, 2001 October 15, 2001 December 30, 2001 December 30, 2001 October 3, 2002 April 14, 2006 February 27, 2007 March 27, 2007 June 5, 2008 June 26, 2008 March 31, 2009 June 8, 2010 July 30, 2010
1

No. of Equity Shares 300 100 100 100 100 1,499,800 749,800 3,750,000 6,612,245 21,375,805 1,351,468 11,904,762 1 10 377,956,728 60,743,044

Face value (`) 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10

Issue Price (`) 10 10 10 10 10 58.34 73.35 10 49 44 44 42 10 2,117 -

Consideration (cash, other than cash etc) Cash Cash Cash Cash Cash Cash Cash Other than Cash1 Cash Cash Cash Cash Cash Cash Bonus issue in the ratio of 8 :1 Bonus issue in the ratio of 1:7

Cumulative No. of Equity Shares 300 400 500 600 700 1,500,500 2,250,300 6,000,300 12,612,545 33,988,350 35,339,818 47,244,580 47,244,581 47,244,591 425,201,319 485,944,363

Cumulative paid-up Equity Capital (`) 3,000 4,000 5,000 6,000 7,000 15,005,000 22,503,000 60,003,000 126,125,450 339,883,500 353,398,180 472,445,800 472,445,810 472,445,910 4,252,013,190 4,859,443,630

Cumulative securities Premium (`) 72,500,000 120,000,000 120,000,000 377,877,555 1,104,654,925 1,150,604,837 1,531,557,221 1,531,557,221 1,531,578,291 -

Pursuant to the merger of Yashomala Leasing and Finance Private Limited with our Company 1,248,750 Equity Shares were issued to Sadanand B. Sule jointly with Supriya Sule, 1,248,750 Equity Shares were issued to Aniruddha P. Deshpande jointly with Sona Deshpande, 1,248,750 Equity Shares were issued to Vinay V. Maniar jointly with Ruchira Maniar, 2,250 Equity Shares were issued to Jyoti A. Bhale jointly with Arvind V. Bhale and 1,500 Equity Shares were issued to Arvind V. Bhale jointly with Jyoti A. Bhale. For details, please see, History and Certain Corporate Matters on page 142.

(b)

The following is the history of the redeemable preference share capital and share premium account of our Company:
No. of Preference Shares Face value (`) Issue Price (`) Consideration (cash, other than cash etc) Cumulative No. of Preference Shares Cumulative paid-up Preference Capital (`) Cumulative Preference Share Premium (`) 80,000,000 121,250,000 136,250,000 188,750,000 200,000,000 230,000,000 250,000,000 252,500,000

Date of allotment of the Preference Shares

Redeemable Preference Shares


October 3, 2002 October 3, 2002 March 29, 2003 August 4, 2003 September 17, 2003 December 9, 2003 March 10, 2004 October 19, 2004 8,000,000 4,125,000 1,500,000 5,250,000 1,125,000 3,000,000 2,000,000 250,000 10 10 10 10 10 10 10 10 20 20 20 20 20 20 20 20 Other than cash1 Cash Cash Cash Cash Cash Cash Cash 8,000,000 12,125,000 13,625,000 18,875,000 20,000,000 23,000,000 25,000,000 25,250,000 80,000,000 121,250,000 136,250,000 188,750,000 200,000,000 230,000,000 250,000,000 252,500,000

39

Date of allotment of the Preference Shares January 19, 2005 June 6, 2006

No. of Preference Shares

Face value (`)

Issue Price (`)

Consideration (cash, other than cash etc)

Cumulative No. of Preference Shares 27,000,000 27,250,000 25,000,000

Cumulative paid-up Preference Capital (`) 270,000,000 272,500,000 250,000,000

1,750,000 250,000

10 10

20 20

Cash Cash Cash

Cumulative Preference Share Premium (`) 270,000,000 272,500,000 Nil

Compulsory Convertible Preference Shares July 3, 2008 10 10 25,000,000


1

Pursuant to the merger of Yashomala Leasing and Finance Private Limited with our Company, 2,664,000 Redeemable Preference Shares were issued to Sadanand B. Sule jointly with Supriya Sule, 2,664,000 Redeemable Preference Shares were issued to Aniruddha P. Deshpande jointly with Sona Deshpande, 2,664,000 Redeemable Preference Shares were issued to Vinay V. Maniar jointly with Ruchira Maniar,4,800 Redeemable Preference Shares were issued to Jyoti A. Bhale jointly with Arvind V. Bhale and 3,200 Redeemable Preference Shares were issued to Arvind V. Bhale jointly with Jyoti A. Bhale . For details, please see, History and Certain Corporate Matters on page 142.

(c)

The following are the details of the shares allotted by our Company for consideration other than cash: No. of shares Face Value (`) Issue Price (`) 10 Details of the issue and consideration Equity Shares issued to the holders of equity shares of Yashomala Leasing and Finance Private Limited pursuant to the merger of Yashomala Leasing and Finance Private Limited with our Company. Redeemable Preference Shares issued to the holders of equity shares of Yashomala Leasing and Finance Private Limited pursuant to the merger of Yashomala Leasing and Finance Private Limited with our Company

Date of allotment of the shares October 3, 2002

3,750,000 Equity Shares

10

October 3 2002

8,000,000 Redeemable Preference Shares

10

20

(d)

Other than the issue of bonus shares to all shareholders of our Company in proportion to their equity shareholding in our Company, our Company has not issued Equity Shares at a price lower than the Issue Price during a period of one year preceding the date of this Draft Red Herring Prospectus. History of the Equity Share Capital held by the Promoters Details of the build-up of our Promoters shareholding in our Company:

2. (a)

Date of Allotment/ Transfer HCC September 26, 2003 September 26,

No. of Equity Shares allotted/ transferred

Face Value (` )

Issue/ Acquisition Price (`)

Nature of consideration (Cash, gift, etc.)

Nature of transaction

% of preIssue Capital

% of postIssue Capital [] []

250,000 250,000

10 10

106.67 106.67

Cash Cash

Transfer Transfer

0.05 0.05

40

Date of Allotment/ Transfer 2003 September 27, 2003 September 29, 2003 March 31, 2004 September 30, 2004 November 4, 2004 September 27, 2005 April 21, 2008 June 5, 2008 June 8, 2010 July 30, 2010 Total (A) HREL September 27, 2005 April 14, 2006 February 27, 2007 March 27, 2007 April 20, 2008 April 21, 2008 April 21, 2008 April 21, 2008 April 21, 2008 June 5, 2008 June 8, 2010 July 30, 2010 Total (B)

No. of Equity Shares allotted/ transferred

Face Value (` )

Issue/ Acquisition Price (`)

Nature of consideration (Cash, gift, etc.) Cash Cash Cash Cash Cash Cash Cash Cash Other than cash Other than cash

Nature of transaction

% of preIssue Capital 0.15 0.05 0.08 0.08 0.15 (0.62) 0.00 0.00 0.00 0.00

% of postIssue Capital [] [] [] [] [] [] [] [] [] [] []

750,000 250,000 375,000 375,000 749,000 (2,999,000) 100 34 1,072 172 1,378

10 10 10 10 10 10 10 10 10 10

106.67 106.67 106.67 106.67 120.68 120.68 580 42 -

Transfer Transfer Transfer Transfer Transfer Transfer Transfer Allotment Bonus issue Bonus issue

2,999,000 4,627,327 13,742,319 1,081,186 518,227 100 100 (100) (100) 7,737,144 245,641,624 39,478,118 315,824,945

10 10 10 10 10 10 10 10 10 10 10 10

120.68 49 44 44 580 580 580 580 580 42 -

Cash Cash Cash Cash Cash Cash Cash Cash Cash Cash Other than cash Other than cash

Transfer Allotment Allotment Allotment Transfer Transfer Transfer Transfer Transfer Allotment Bonus issue Bonus issue

0.62 0.95 2.83 0.22 0.11 0.00 0.00 0.00 0.00 1.59 50.55 8.12 64.99

[] [] [] [] [] [] [] [] [] [] [] []

Total Promoter Holding (A+B)

315,826,323

None of the Equity Shares held by our Promoters are pledged. (b) Details of Promoters contribution and Lock-in:
Nature of Allotment/Transfer Nature of Consideration (Cash) Number of Equity Shares locked in Face Value (`) Issue/Acquisiti on Price per Equity Share (` ) [] [] [] Percentage of post-Issue paid-up equity share capital [] [] [] []

Date of Allotment/Ac quisition and when made fully paid-up HCC [] [] HREL []

[] [] []

[] [] [] Total

[] [] [] []

[] [] []

The minimum Promoters contribution has been brought to the extent of not less than the specified minimum lot and

41

from the persons defined as Promoter under the SEBI Regulations. The Promoters contribution constituting not less than 20% post-Issue paid-up equity share capital shall be locked-in for a period of three years from the date of Allotment in the Issue. The Equity Shares that are being locked-in are not ineligible for computation of Promoters contribution. Our Company has obtained specific written consent from our Promoters for inclusion of the Equity Shares held by them in the minimum Promoters contribution subject to lock-in. Further, our Promoters have given an undertaking to the effect that they shall not sell/transfer/dispose of in any manner, Equity Shares forming part of the minimum Promoters contribution from the date of filing this Draft Red Herring Prospectus till the date of commencement of lock-in in accordance with SEBI Regulations. (c) Details of pre-Issue Equity Share capital locked-in for one year:

In addition to the 20% of the post-Issue paid-up equity shareholding of our Company held by our Promoters and locked-in for three years as specified above, the entire pre-Issue equity share capital will be locked-in for a period of one year from the date of Allotment of the Equity Shares in this Issue. (d) Other requirements in respect of lock-in:

The Equity Shares held by our Promoters which are locked-in for a period of three years can be pledged only with any scheduled commercial bank or public financial institution as collateral security for loans granted by such banks or financial institution. Further, such pledge can be created only if the loan has been granted by such scheduled commercial bank or public financial institution for financing one or more of the objects of the Issue and the pledge of the Equity Shares is one of the terms of sanction of the loan. The Equity Shares held by our Promoters which are locked-in for a period of one year can be pledged with any scheduled commercial bank or public financial institution as collateral security for loans granted by such bank or financial institution, provided that the pledge of the Equity Shares is one of the terms of sanction of the loan. The Equity Shares held by our Promoters and locked-in may be transferred to and amongst the Promoter Group or to a new promoter or persons in control of our Company, subject to the continuation of the lock-in in the hands of the transferees for the remaining period and compliance with the Takeover Code, as applicable. The Equity Shares held by persons other than our Promoters and locked-in for a period of one year from the date of allotment in the Issue may be transferred to any other person holding Equity Shares which are locked-in, subject to the continuation of the lock-in in the hands of transferees for the remaining period and compliance with the Takeover Code. (e) Lock-in of Equity Shares to be issued, if any, to the Anchor Investor:

Any Equity Shares Allotted to Anchor Investors shall be locked-in for a period of 30 days from the date of Allotment of Equity Shares in the Issue. 3. (i) Shareholding Pattern of our Company The table below presents the shareholding pattern of our Equity Shares before the proposed Issue and as adjusted for the Issue:

42

Category of Shareholders

No. of share holde rs

Pre-Issue

Post-Issue

Total No. of Equity Shares

No. of Equity Shares in dematerialis ed form

Total Equity Shareholding as a % of total No. of Equity Shares

Total No. of Equity Shares

No. of Equity Shares in demateri alised form

Total Equity Shareholding as a % of total No. of Equity Shares As a % of (A+B) As a % of (A+ B+ C)

Shares pledged or otherwise encumbered Numb As a % er of of total Equity numbe Shares r of Equity Shares

As a % of (A+B)

As a % of (A+B+C)

(A) Shareholding of Promoter and Promoter Group (I) Indian Individuals / Hindu Undivided Family Central Government / State Government(s ) Bodies Corporate Financial Institutions / Banks Any Other (specify) Sub-Total (A) (1) (2) Foreign Individual (Non-Resident Individuals / Foreign Individuals) Bodies Corporate Institutions Any Other (Specify) Sub-Total (A) (2) Total Shareholding of Promoter and Promoter Group (A) = (A)(1)+(A)(2) (B) Public Shareholding (1) Institutions Mutual Funds / UTI 0 0 0 0 0 [] [] [] [] 0 0.00

[]

[]

[]

[]

0.00

4 0

315,924,880 0

315,924,880 0

65.01 0

65.01 0

[] []

[] []

[] []

[] []

0 0

0.00 0.00

0 4

0 315,924,880

0 315,924,880

0 65.01

0 65.01

[] []

[] []

[] []

[] []

0 0 0

0.00 0.00 0.00 0.00

0.00

[]

[]

[]

[]

0 0 0 0 4

0 0 0 0 315,924,880

0 0 0 0 315,924,880

0.00 0.00 0.00 0.00 65.01

0 0 0 0 65.01

[] [] [] [] []

[] [] [] [] []

[] [] [] [] []

[] [] [] [] []

0 0 0 0 0

0.00 0.00 0.00 0.00 0.00

[]

[]

[]

[]

0.00

43

Category of Shareholders

No. of share holde rs

Pre-Issue

Post-Issue

Total No. of Equity Shares

No. of Equity Shares in dematerialis ed form

Total Equity Shareholding as a % of total No. of Equity Shares

Total No. of Equity Shares

No. of Equity Shares in demateri alised form

Total Equity Shareholding as a % of total No. of Equity Shares As a % of (A+B) As a % of (A+ B+ C) []

Shares pledged or otherwise encumbered Numb As a % er of of total Equity numbe Shares r of Equity Shares

As a % of (A+B)

As a % of (A+B+C)

Financial Institutions / Banks Central Government / State Government(s ) Venture Capital Funds Insurance Companies Foreign Institutional Investors Foreign Venture Capital Investors Any Other (Specify) Sub-Total (B) (1) (2) NonInstitutions Bodies Corporate Individuals Individual shareholders holding nominal share capital upto `1 lakh Individual shareholders holding nominal share capital in excess of `1 lakh Any Other (specify) Sub-Total (B) (2) Total Public Shareholding (B) = (B)(1)+(B)(2)

10

10

[]

[]

[]

0.00

[]

[]

[]

[]

0.00

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

[] [] []

[] [] []

[] [] []

[] [] []

0 0 0

0.00 0.00 0.00

[]

[]

[]

[]

0.00

0 1

0 10

0 10

0 0

0 0

[] []

[] []

[] []

[] []

0 0 0

0.00 0.00 0.00 0.00 0.00 0.00

3 0 1

141,119,146 0 3,847

141,119,146 0 3,847

29.04 0 0

29.04 0 0

[] [] []

[] [] []

[] [] []

[] [] []

0 0 0

28,896,480

28,896,480

5.95

5.95

[]

[]

[]

[]

0.00

0 5 6

0 170,019,473 170,019,483

0 170,019,473 170,019,483

0 34.99 34.99

0 34.99 34.99

[] [] []

[] [] []

[] [] []

[] [] []

0.00

0.00

44

Category of Shareholders

No. of share holde rs

Pre-Issue

Post-Issue

Total No. of Equity Shares

No. of Equity Shares in dematerialis ed form

Total Equity Shareholding as a % of total No. of Equity Shares

Total No. of Equity Shares

No. of Equity Shares in demateri alised form

Total Equity Shareholding as a % of total No. of Equity Shares As a % of (A+B) As a % of (A+ B+ C) [] []

Shares pledged or otherwise encumbered Numb As a % er of of total Equity numbe Shares r of Equity Shares

As a % of (A+B)

As a % of (A+B+C)

TOTAL (A)+(B) (C) Shares held by Custodians and against which Depository Receipts have been issued GRAND TOTAL (A)+(B)+(C)

10 0

485,944,363 0

485,944,363 0

100 0

100 0

[] []

[] []

[] []

0 0

0.00 0.00

10

485,944,363

485,944,363

100.00

100.00

[]

[]

[]

[]

0.00

4. (a)

The list of top 10 shareholders of our Company and the number of Equity Shares held by them is as under: As of the date of the Draft Red Herring Prospectus:
Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Name of the shareholder HREL Avantha Realty Limited (earlier known as Janpath Investments and Holdings Limited) Venkateshwara Hatcheries Private Limited Vinay V. Maniar Hincon Finance Limited Vithal Maniar HCC Hincon Holdings Limited Bennett Coleman & Co. Limited Axis Bank Limited TOTAL No. of Equity Shares held 315,824,945 78,976,851 62,142,192 28,896,480 97,179 3,847 1,378 1,378 103 10 485,944,363 Percentage 64.99 16.25 12.79 5.95 0.02 0.00 0.00 0.00 0.00 0.00 100.00

(b)

As of 10 days prior to the date of the Draft Red Herring Prospectus: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder
HREL Avantha Realty Limited (earlier known as Janpath Investments and Holdings Limited) Venkateshwara Hatcheries Private Limited Vinay V. Maniar Hincon Finance Limited HCC Hincon Holdings Limited

No. of Equity Shares held


315,824,945 78,976,851

Percentage
64.99 16.25

62,142,192 28,896,480 97,179 1,378 1,378

12.79 5.95 0.02 0.00 0.00

45

Sr. No. 8. 9. 10.

Name of the shareholder


Vithal Maniar Bennett Coleman & Co. Limited Axis Bank Limited

No. of Equity Shares held


3,847 103 10 485,944,363

Percentage
0.00 0.00 0.00 100.00

TOTAL (c)

As of two years prior to the date of the Draft Red Herring Prospectus: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Name of the shareholder
HREL Avantha Realty Limited (earlier known as Janpath Investments and Holdings Limited) Venkateshwara Hatcheries Private Limited Vinay V. Maniar Hincon Finance Limited Vithal Maniar HCC Hincon Holdings Limited Axis Bank Limited

No. of Equity Shares held


30,705,203 7,678,305

Percentage
64.99 16.25

TOTAL 5. Employee Stock Option Plan (ESOP)

6,041,602 2,809,380 9,448 374 134 134 1 47,244,581

12.79 5.95 0.02 0.00 0.00 0.00 0.00 100.00

Our Company instituted the ESOP on April 21, 2008, pursuant to our Board and shareholders resolutions dated October 22, 2007 and November 20, 2007, respectively. The objective of the ESOP is to motivate the employees to contribute to the growth and profitability of our Company and to attract and retain talent in the organisation. Our Company has granted 1,949,866 options (net of cancelled options) convertible into 1,949,866 Equity Shares, which represents 0.401% of the pre-Issue paid-up equity capital of our Company. The following table sets forth the particulars of the options granted under the ESOP as of the date of filing of this Draft Red Herring Prospectus:
Particulars Options granted The pricing formula Details 1,963,496 (i) The exercise price for options granted on April 21, 2008 was equal to the fair value of the shares as determined on that date. (ii)The exercise price, for options issued on October 20, 2009 as an adjustment for the rights issue, was determined at same price at which the options were originally granted on April 21, 2008. ` 51.97 per Equity Share Nil NA 1,949,866 13,630 Our Company has varied the terms of options in the following manner: (i) Pursuant to shareholders resolution dated June 9, 2008, in partial modification, the terms of the existing ESOP scheme were amended and consent was accorded to Board to create, offer, issue and allot options under the ESOP scheme at any time for the benefit of the Non-Executive Directors of HCC in addition to the classes of employees approved, provided that the aggregate

Exercise price of options (as adjusted on allocation of bonus options) Total options vested Options exercised Total number of Equity Shares that would arise as a result of full exercise of options already granted Options forfeited/lapsed/cancelled Variation in terms of options

46

Particulars (ii)

Details of options that may be granted shall not exceed 700,000; Pursuant to shareholders resolution dated June 7, 2010, in partial modification, the terms of the existing ESOP scheme were amended and consent was accorded to Board to create, offer, issue and allot options under the ESOP scheme at any time provided that the aggregate of options that may be granted shall not exceed 8,500,000 NA 1,949,866

Money realised by exercise of options Options outstanding (in force) Person wise details of options granted to (i) Directors and key managerial employees (ii) Any other employee who received a grant in any one year of options amounting to 5% or more of the options granted during the year (iii) Identified employees who are granted options, during any one year equal to exceeding 1% of the issued capital (excluding outstanding warrants and conversions) of our Company at the time of grant Fully diluted EPS on a pre-Issue basis on exercise of options calculated in accordance with Accounting Standard (AS) 20 Earning Per Share Difference between employee compensation cost using the intrinsic value method and the employee compensation cost that shall have been recognised if our Company has used fair value of options and impact of this difference on profits and EPS of our Company

Please see Note 1 below Nil

Nil

Please see the column below The difference is ` 26,450,272 which has been arrived at as under: Method Intrinsic value of stock* Fair value of options (net)*
*

Amount (In `) Nil 26,450,272

Based on the certificate of independent chartered accountant.

The impact of the difference on the standalone profits / losses and earnings per share, had the fair value method been adopted is presented below:
For the year ended March March March 31, 2008 31, 2009 31, 2010 (61.27) Nil 1,232.95 Nil 1,401.85 Nil (In ` Million) For the three month period ended June 30, 2010 494.14 Nil

Profits after tax (Standalone) As reported Add: Intrinsic value compensation cost Less: Fair value compensation cost As proforma adjusted profit

Nil

5.37

8.82

1.77

(61.27)

1,227.58

1,393.03

492.37 (In `) For the three month period ended June 30, 2010 1.15 1.15

Basic EPS (Standalone) As reported As Proforma adjusted

For the Year ended March March March 31, 31, 31, 2008 2009 2010 (0.25) 2.96 3.25 (0.25) 2.95 3.23

Diluted EPS

March

March

March

(In `) For the three

47

Particulars
(standalone) 31, 2008

Details
31, 2009 31, 2010 3.21 3.19 month period ended June 30, 2010 1.13 1.14

As reported As proforma adjusted

(0.25) (0.25)

2.93 2.92

The impact of the difference on the restated consolidated profits / losses and earnings per share, had the fair value method been adopted, is presented below: (In ` million) For the three month period ended June 30, 2010 (144.71) Nil

Profits after tax (Consolidated) As reported Add : Compensation cost under Intrinsic Value method Less: Compensation cost under Fair value method As Proforma Adjusted profit

For the year ended March March March 31, 31, 2009 31, 2010 2008 (62.07) 1,143.90 (94.48) Nil Nil Nil

Nil

5.37

8.82

1.77

(62.07)

1,138.53

(103.30)

(146.48) (In `) For the three month period ended June 30, 2010 (0.35) (0.36)

Basic EPS (consolidated)

March 31, 2008

March 31, 2009 2.74 2.72

March 31, 2010

As reported As proforma adjusted

(0.26) (0.26)

(0.27) (0.29)

Diluted EPS (consolidated) As reported As proforma adjusted

March 31, 2008 (0.26) (0.26)

March 31, 2009 2.71 2.70

March 31, 2010 (0.27) (0.29)

(In `) For the three month period ended June 30, 2010 (0.35) (0.36)

Weighted-average exercise prices and weightedaverage fair values of options shall be disclosed separately for options whose exercise price either equals or exceeds or is less than the market price of the stock Description of the method and significant assumptions used during the year to estimate the fair values of options, including weighted-average information, namely, (i) risk-free interest rate (ii) expected life (iii) expected volatility (iv) expected dividends (v) the price of underlying share in market at the time of grant of option

The exercise price equals the fair value of stock. There is no market price as our Company is unlisted

The exercise price is arrived at on the basis of the valuation determined by an independent chartered accountant.

Between 7.67% and 8.00% on continuous compounded basis On an average 2 years being midway between vesting date and maturity date 35% pa Dividend yield: 0.0007% April 21, 2008: ` 534.52 (fair value) October 20, 2009: `534.52 (fair value)

48

Particulars Vesting schedule


Schedule

Details
Percentage of the options which shall vest At the end of one year from the Nil date of grant At the end of two years from the Nil date of the grant At the end of three years from the 40% of the aggregate number of date of the grant options granted At the end of four years from the 30% of the aggregate number of date of the grant options granted At the end of five years from the 30% of the aggregate number of date of the grant options granted

Lock-in Impact on profits of the last three years Intention of the holders of Equity Shares allotted on exercise of options to sell their shares within three months after the listing of Equity Shares pursuant to the Issue Intention to sell Equity Shares arising out of the exercise of shares granted under ESOP within three months after the listing of Equity Shares by directors, senior managerial personnel and employees amounting to more than 1% of the issued capital (excluding outstanding warrants and conversions)

There is no lock-in period pursuant to exercise of option Nil NA

NA

Note 1: Details regarding options granted to our Directors and key management personnel are set forth below: Name of director/ key management personnel Rajgopal Nogja Ambuj Jain Arun Bodupali Anuradha Paraskar Nathan Andrews Sureshkumar Prabhakar Pendharkar Vinayak Jadhav 6. Total No. of options granted 403,303 224,126 224,126 224,126 224,126 224,126 224,126 No. of options exercised Nil Nil Nil Nil Nil Nil Nil Total No. of options outstanding 403,303 224,126 224,126 224,126 224,126 224,126 224,126 No. of Equity Shares held Nil Nil Nil Nil Nil Nil Nil

Our Company, our Directors, the BRLMs have not entered into any buy-back arrangement and/or safety net facility for the purchase of Equity Shares from any person. On August 1, 2002, the Bombay High Court approved the scheme for the merger of Yashomala Leasing and Finance Private Limited with our Company. For details, please see, History and Certain Corporate Matters Summary of Key Agreements / Scheme of Amalgamation on page 148. Except as stated in Our Management on page 157, none of our Directors or key management personnel hold any Equity Shares in our Company. None of the directors of our Promoters hold any Equity Shares in our Company. The aggregate shareholding of our Promoter Group in our Company, as on the date of this Draft Red Herring Prospectus is provided below: Sr. No. 1. 2. Name of the shareholder Hincon Finance Limited Hincon Holdings Limited Number of equity shares 97,179 1,378 Percentage of shareholding 0.02 0.00

7.

8.

49

9.

None of our Promoters, directors of the Promoters, Promoter Group, our Directors and their immediate relatives have purchased or sold any Equity Shares during a period of six months preceding the date on which this Draft Red Herring Prospectus is filed with SEBI. No person connected with the Issue shall offer any incentive, whether direct or indirect, in any manner, whether in cash, kind, services or otherwise, to any Bidder. At least 50% of the Net Issue shall be allocated to QIBs on a proportionate basis. 5% of the QIB Portion (excluding Anchor Investor Portion) shall be available for allocation to Mutual Funds only and the remaining QIB Portion shall be available for allocation to the QIB Bidders including Mutual Funds subject to valid Bids being received at or above the Issue Price. Further, not less than 15% of the Net Issue will be available for allocation on a proportionate basis to Non-Institutional Bidders and not less than 35% of the Net Issue will be available for allocation to Retail Individual Bidders, subject to valid Bids being received from them at or above the Issue Price. Under-subscription, if any, in the Non-Institutional and Retail Individual categories would be allowed to be met with spill over from any other category at the discretion of our Company, the BRLMs, in consultation with the Designated Stock Exchange. Under subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue Portion at the discretion of the BRLMs and our Company. A total of up to [] Equity Shares aggregating to ` 100 million, have been reserved for allocation to Eligible Employees, subject to valid Bids being received at or above the Issue Price and subject to the maximum Bid in this portion being ` 100,000. Only Eligible Employees would be eligible to apply in this Issue under the Employee Reservation Portion. Eligible Employees may Bid in the Net Issue as well and such Bids shall not be treated as multiple Bids. A Bidder cannot make a Bid for more than the number of Equity Shares offered through the Issue, subject to the maximum limit of investment prescribed under relevant laws applicable to each category of investor. An oversubscription to the extent of 10% of the Issue can be retained for the purposes of rounding off to the nearer multiple of minimum allotment lot. Other than the 1,949,866 options granted under the ESOP convertible into 1,949,866 Equity Shares, 16 DDCDs issued to various banks, one warrant issued to Bennett Coleman & Co. Limited, one CCPS issued to Axis Bank Limited, there are no outstanding warrants, options or rights to convert debentures, loans or other instruments convertible into the Equity Shares. For details in relation to the DDCDs, warrant and CCPS and their conversion, please see Capital Structure and History and Certain Corporate Matters on pages 37 and 142. There will be no further issue of Equity Shares, whether by way of issue of bonus shares, preferential allotment, rights issue or in any other manner during the period commencing from submission of this Draft Red Herring Prospectus with SEBI until the Equity Shares have been listed. Subject to the grant of options pursuant to the ESOP and any conversion of options, the outstanding DDCDs, one Compulsory Convertible Preference Share and one Warrant into Equity Shares, our Company presently does not intend or propose to alter the capital structure for a period of six months from the Bid/Issue Opening Date, by way of split or consolidation of the denomination of Equity Shares or further issue of Equity Shares (including issue of securities convertible into or exchangeable, directly or indirectly for Equity Shares) whether on a preferential basis or issue of bonus or rights or further public issue of specified securities or qualified institutions placement or otherwise. However, if our Company enters into acquisitions, joint ventures or other arrangements, our Company may, subject to necessary approvals, consider raising additional capital to fund such activity or use Equity Shares as currency for acquisitions or participation in such joint ventures. There shall be only one denomination of the Equity Shares, unless otherwise permitted by law. Our Company shall comply with such disclosure and accounting norms as may be specified by SEBI from time to time.

10.

11.

12.

13.

14.

15.

16.

17.

18.

50

19. 20. 21. 22.

Our Company has 10 members as of the date of filing of this Draft Red Herring Prospectus. Our Company has not issued any Equity Shares out of revaluation reserves. All Equity Shares will be fully paid-up at the time of Allotment failing which no Allotment shall be made. There have been no financial arrangements whereby the Promoter Group, our Directors, their relatives and directors of our Promoters have financed the purchase by any other person of securities of our Company, other than in the normal course of the business of the financing entity during a period of six months preceding the date of filing of this Draft Red Herring Prospectus.

51

OBJECTS OF THE ISSUE Our Company intends to utilise the Net Proceeds for the following objects: 1. 2. 3. 4. 5. To finance the construction and development of infrastructure components in Lavasa; To finance certain construction and development activities at Lavasa; To finance purchase of land; To fund the repayment of unsecured loan taken by our Company; and General corporate purposes. (In ` million) Particulars Proceeds from the Issue Issue related expenses Net Proceeds* * To be finalised upon the completion of the Issue. Amount [] [] []

The details of the Net Proceeds are summarised in the table below:

The main objects and objects incidental and ancillary to the main objects set out in our Memorandum of Association enable us to undertake our existing activities and the activities for which funds are being raised by our Company through this Issue. We may have to revise our expenditure and fund requirements as a result of variations in cost estimates on account of a variety of factors including and not limited to changes in the economy, changes to our development plan, changes in the real estate sector, interest rate fluctuations, increase in costs of construction materials and labour costs, and/or external factors which may not be within the control of our management and may entail rescheduling and revising the planned expenditure and funding requirement and increasing or decreasing the expenditure for a particular purpose from the planned expenditure at the discretion of our management. For additional risks related to our expected expenditure and fund requirement see Risk Factors on page xii. We have not entered into any definitive agreement to use a substantial portion of the net proceeds and may invest or may spend the net proceeds in the ways which you may not agree. In case of any surplus after utilization of the Net Proceeds for the stated objects, we may use such surplus towards general corporate purposes. In the event of a shortfall in raising the requisite capital from the Net Proceeds towards meeting the objects of the Issue, the extent of the shortfall may be met by way of such means available to our Company, including by way of incremental debt or internal accruals. Utilisation of the Net Proceeds The following table summarises the intended use of the Net Proceeds: (In ` Millions) Estimated schedule of deployment FY 2011 FY 2012 FY 2013 FY 2014

Particulars*

Total estimated cost* 5,418.49 6,000.81 4,213.79 1,000.00 [] []

Infrastructure Construction and development Land purchase Debt repayment General corporate purposes Total

Amount payable from the Net Proceeds* 5,418.49 6,000.81 4,213.79 1000.0 [] []

241.03 256.14 400.00 1,000.00 [] []

1677.84 2,227.44 2,008.20 [] []

2031.40 2,456.42 1,591.80 [] []

1,468.22 1,060.81 213.79 [] []

* As of August 31, 2010, our Company has not deployed any amount towards the stated objects.

The above fund requirements are based on internal management estimates and have not been appraised by any bank or financial institution. These are based on current conditions and are subject to revisions in light of changes in

52

external circumstances or costs, or other financial condition, business or strategy, as discussed further below. Please refer to the risk factors titled Any delay and/or other adverse events and circumstances in connection with the activities for which we propose to deploy the proceeds of the Issue could adversely affect our financial condition, business plan and operations and We may not be able to deploy all or a part of the proceeds of the Issue earmarked for the purchase of land as detailed in the section Objects of the Issue in the section titled Risk Factors on page xii. In case of any variation in the actual utilisation of funds earmarked for the purposes set forth above, increased fund requirements for a particular purpose may be financed by surplus funds, if any, available in respect of the other purposes for which funds are being raised in this Issue. Our Company operates in a highly competitive and dynamic market, and may have to revise its estimates from time to time on account of various factors. Consequently, the fund requirements may also change. Details of the Objects 1. Infrastructure

Our Company proposes to deploy a part of the Net Proceeds towards the construction and development of infrastructure in Lavasa as provided below: Particulars* Total estimated cost 865.54 2,726.67 384.80 532.83 908.65 5,418.49 Amount payable from the Net Proceeds 865.54 2,726.67 384.80 532.83 908.65 5,418.49 (In ` Million) Estimated schedule of deployment FY 2011 FY 2012 FY 2013 FY 2014 32.21 78.75 130.07 241.03 321.40 900.23 97.80 358.41 1,677.84 416.63 878.89 133.80 228.71 373.37 2,031.40 95.30 868.80 153.20 304.12 46.8 1,468.22

Dasve - infrastructure Mugaon infrastructure Bhoini infrastructure Dhamanohol infrastructure Common infrastructure Total (a)

*As of August 31, 2010, our Company has not deployed any funds towards the above projects.

Infrastructure - Dasve

Our Company proposes to deploy part of the Net Proceeds towards the construction and development of the following infrastructure facilities at Dasve: (In ` Million) Particulars Total Amount Estimated schedule of deployment estimated payable FY 2011 FY 2012 FY 2013 FY 2014 cost from the Net Proceeds Reservoirs 190.50 190.50 95.20 95.30 Bridges 41.97 41.97 21.80 20.17 Internal /external roads 171.47 171.47 87.30 84.17 Sewage treatment plant and 64.10 64.10 4.71 27.30 32.09 Main Lines Power transmission and 397.50 397.50 27.50 185.00 185.00 distribution TOTAL 865.54 865.54 32.21 321.40 416.63 95.30 The details of the expenses for constructing and developing the above mentioned infrastructure facilities at Dasve is provided below:

53

Infrastructure - Dasve Reservoir Foundation and excavation Col-grouting Spillway Bridges, roads and gates Bridges Substructure Super structure Carriageway Internal / External roads Earthwork in excavation Sub base, soiling and GSB Water bound macadam and wet mix macadam Cross drainage works Sewage treatment plant and main lines Civil works excavation and laying of bed Electro mechanical works Construction of manholes Power transmission and distribution Civil works Transmission line Distribution line Total
* The entire estimated costs are proposed to be financed from the Net Proceeds.

Total estimated cost* (In ` Million) 190.50 38.10 57.15 57.15 38.10 41.97 12.59 16.79 12.59 171.47 42.87 25.72 34.29 68.59 64.10 32.05 25.64 6.41 397.50 238.50 119.25 39.75 865.54

The capacities of various infrastructure activities that are proposed to be financed at Dasve are provided below: Infrastructure Internal / External roads Sewage treatment plant and main lines Sewage collection network Storm drainage work Sewage treatment plant Power, transmission and distribution Connected load Transmission line Distribution length Bridges Reservoirs (b) Infrastructure Mugaon Capacity 5.25 Kms 5.5 Km 6.6 Km 1.6 MLD 17 MW 10.5 Kms 15.5 Kms Two Bridges One reservoir of capacity 2.2 million cubic meters

Our Company proposes to deploy part of the Net Proceeds towards the construction and development of the following infrastructure facilities at Mugaon: (In ` Million) Estimated schedule of deployment FY 2011 3.31 1.69 FY 2012 32.70 13.60 FY 2013 32.70 13.60 FY 2014 16.40 13.60

Particulars

Total estimated cost 85.11 42.49

Amount payable from the Net Proceeds 85.1 1 42.49

Labour camps Nallah bunding and intersecting

54

Particulars

Total estimated cost

Amount payable from the Net Proceeds 496.54 77.22 1,021.41 245.52 283.60 407.13 67.65 2,726.67

Estimated schedule of deployment FY 2011 0 0 30.00 9.32 9.20 25.23 0 78.75 FY 2012 191.00 40.92 327.36 81.80 92.80 109.10 10.95 900.23 FY 2013 163.64 36.30 327.15 81.80 92.80 109.10 21.80 878.89 FY 2014 141.90 0 336.90 72.60 88.80 163.70 34.90 868.80

drains Mugaon dam Reservoirs Internal/external roads Water treatment plant and main lines Sewage treatment plant and main lines Power transmission and distribution Promenade and lake edge Total

496.54 77.22 1,021.41 245.52 283.60 407.13 67.65 2,726.67

The details of the expenses for constructing and developing the above mentioned infrastructure facilities at Mugaon are provided below: Infrastructure - Mugaon Labour camps Preparation of plinth Civil works Mechanical, electrical and plumbing works Nallah bunding and intersecting drains Mugaon dam Foundation and excavation Col-grouting Spillway Bridges, roads and gates Reservoirs Foundation and excavation Col-grouting Spillway Bridges, roads and gates Internal / External roads Earthwork in excavation Sub base, soiling and GSB Water bound macadamand wet mix macadam Cross drainage works Water treatment plant and main lines Civil works excavation and laying of bed Electro mechanical works Construction of manholes Sewage treatment plant and main lines Civil works excavation and laying of bed Electro mechanical works Total Estimated Costs (In ` Million) 85.11 17.02 55.32 12.77 42.49 496.54 99.31 148.96 148.96 99.31 77.22 15.44 23.17 23.17 15.44 1,021.41 255.42 153.00 204.33 408.66 245.52 122.76 98.21 24.55 283.60 141.80 113.44

55

Infrastructure - Mugaon Construction of manholes Power transmission and distribution Civil works Transmission line Distribution line Promenade and lake edge Lake edge retaining wall Earthwork in excavation Finishes Total

Total Estimated Costs (In ` Million) 28.36 407.13 244.28 122.14 40.71 67.65 16.91 10.15 40.59 2,726.67

The capacities of various infrastructure activities that are proposed to be financed in Mugaon are provided below: Infrastructure Internal / External roads Water treatment plant and main lines Water treatment plant Distribution length Sewage treatment plant and main lines Collection network Storm drainage work Sewage treatment plant Power transmission and distribution Connected load Transmission line Distribution length Labour camps Mugaon dam Reservoirs Promenade and lake edge (c) Infrastructure Bhoini Capacity 31 Kms 14.5 MLD 8.29Km 6.25 Km 10 Km 10.0 MLD 25 MW 6 Kms 14 Kms 600,000 square feet One Dam of 4,476,000 cubic meters One Reservoir of capacity 150,000 cubic meters 1,353,000 square feet

Our Company proposes to deploy part of the Net Proceeds towards construction and development of the following infrastructure facilities at Bhioni: (In ` Million) Estimated schedule of deployment FY 2011 FY 2012 32.73 21.76 21.90 21.41 FY 2013 21.80 24.70 27.30 32.70 27.30 FY 2014 40.50 29.50 47.60 35.60

Particulars

Total estimated cost 62.30 57.43 78.56 102.20 84.31

Amount payable from the Net Proceeds 62.30 57.43 78.56 102.20 84.31

Reservoirs Internal / external roads Water treatment plant and main lines Sewage treatment plant and main lines Power transmission and distribution

56

Particulars

Total estimated cost 384.80

Amount payable from the Net Proceeds 384.80

Estimated schedule of deployment FY 2011 FY 2012 97.80 FY 2013 133.80 FY 2014 153.20

Total

The details of the expenses for constructing and developing the above mentioned infrastructure facilities at Bhioni are provided below: Particulars Reservoirs Foundation and excavation Col-grouting Spillway Bridges roads and gates Internal/ external roads Earthwork in excavation Sub base, soiling and GSB Water bound macadam and wet mix macadam Cross drainage works Water treatment plant and main lines Civil works Electro mechanical works Chemicals Sewage treatment plant & main lines Civil works excavation and laying of bed Electro mechanical works Construction of manholes Power transmission and distribution Civil works Transmission lines Distribution lines Total Total estimated costs (In ` Million) 62.30 12.46 18.69 18.69 12.46 57.43 14.36 8.61 11.49 22.97 78.56 39.28 31.42 7.86 102.20 51.10 40.88 10.22 84.31 50.84 25.00 8.47 384.80

The capacities of the various infrastructure activities that are proposed to be financed at Bhoini are provided below: Infrastructure Internal / External roads Water treatment plant and main lines Water treatment plant Distribution length Number of dams Sewage treatment plant and main lines Collection network Storm drainage work Sewage treatment plant Power transmission and distribution Connected load Capacity 1.75 Kms 3.4 MLD 12.5 Km 1 No 8 Km 14.0 Km 2.4 MLD 4 MW

57

Infrastructure Transmission line Distribution line Reservoirs Infrastructure Dhamanohol

Capacity 1.5 Km 4.5 Km One reservoir of capacity 81,000 cubic meters

(d)

Our Company proposes to deploy part of the Net Proceeds towards the construction and development of the following infrastructure facilities at Dhamanohol: (In ` Million) Estimated schedule of deployment
FY2011 FY2012 FY2013 FY2014

Particulars

Total estimated cost 54.54 43.66 141.58 52.80 120.22 10.91 109.12 532.83

Amount payable from the Net Proceeds

Reservoirs Bridges Internal/ external roads Water treatment plant and main lines Sewage treatment plant and main lines Solid waste facility Power transmission and distribution Total

54.54 43.66 141.58 52.80 120.22 10.91 109.12 532.83

27.24 21.86 54.28 32.70 32.70 5.41 54.52 228.71

27.30 21.80 87.30 20.10 87.52 5.50 54.60 304.12

The details of the expenses for constructing and developing the above mentioned infrastructure facilities at Dhamanohol are provided below: Infrastructure - Dhamanohol Reservoirs Foundation and excavation Col-grouting Spillway Bridges, roads and gates Bridges Sub structure Super structure Carriageway Internal/ external roads Earthwork in excavation Sub-base, soiling and GSB Water bound macadam and wet mix macadam Cross drainage works Water treatment plant and main lines Civil works excavation and laying of bed Electro mechanical works Chemicals Total estimated cost (In ` Million) 54.54 13.64 16.36 16.36 8.18 43.66 13.10 17.46 13.10 141.58 35.47 21.00 28.37 56.74 52.80 26.40 21.12 5.28

58

Infrastructure - Dhamanohol Sewage treatment plant and main lines Civil works excavation and laying of bed Electro mechanical works Construction of manholes Solid waste facility Power transmission and distribution Civil works Transmission line Distribution line TOTAL

Total estimated cost (In ` Million) 120.22 60.02 48.16 12.04 10.91 109.12 65.47 32.74 10.91 532.83

The capacities of the various infrastructure activities that are proposed to be financed at Dhamanohol are provided below: Infrastructure Internal/ external roads Water treatment plant and main lines Water treatment plant Distribution length Number of dams Sewage treatment plant and main lines Collection network Storm drainage work Sewage treatment plant Power Connected load Transmission line Distribution length Bridges Reservoirs (e) Infrastructure Common Capacity 4.5 Kms

3.4 MLD 9.0 Km 1 No

8.5 KM 9.0 Km 6.0 MLD 5 MW 1.79 Kms 5 Kms 3 Bridges Two Reservoirs of 4,916,177 Cubic Meter of cumulative capacity

Our Company proposes to deploy part of the Net Proceeds towards construction and development of the following infrastructure facilities at Lavasa: (In ` Million) Estimated schedule of deployment FY 2011 2.03 98.24 2.20 27.60 FY 2012 3.05 207.30 43.46 104.60 FY 2013 225.40 43.37 104.60 FY 2014 46.80 -

Particulars

Total estimated cost 5.08 530.94 135.83 236.80

Amount payable from the Net Proceeds 5.08 530.94 135.83 236.80

Helipads Mugaon tunnel and access road Inter village roads Power transmission and distribution

59

Particulars

Total estimated cost 908.65

Amount payable from the Net Proceeds 908.65

Estimated schedule of deployment FY 2011 130.07 FY 2012 358.41 FY 2013 373.37 FY 2014 46.80

Total

The details of the expenses for constructing and developing the above mentioned infrastructure facilities Infrastructure expenses at Lavasa are provided below: Total Estimated Cost (In ` Million) 5.08 2.03 3.05 530.94 212.38 159.28 53.09 106.19 135.83 34.07 20.00 27.25 54.51 236.80 142.08 71.04 23.68 908.65

Infrastructure Common Helipad Earthwork and leveling Blacktop and finishing Mugaon tunnel and access road Earthwork Lining Mechanical work Road Inter village roads Earthwork in excavation Subbase, soiling and GSB Water bound macadam Cross drainage works Power transmission and distribution Civil works Transmission lines Distribution lines TOTAL

Specifications of the various infrastructure development activities at Dasve, Mugaon, Bhoini and Dhamanohol are provided below: 1. Road network: Internal/external roads are the roads that connect the main inter village roads to the various residential and commercial establishments. Inter village roads are roads that connect the internal villages within Lavasa. They are currently owned, built and maintained by Lavasa. All roads are built as per relevant statutory and/or regulatory requirements including the guidelines issued by the Indian Road Congress and have lighting and signages on them throughout. All roads are water bound macadam roads. Water treatment: The water treatment plants at Lavasa are designed to meet the standards of the Maharashtra Pollution Control Board. The major components include aeration fountain, flow channel, tube settler, flocculator, pre-chlorination tank, filter house and the post chlorination tank. Post these processes water is taken to the master balancing reservoir. Water is then pumped to ground service reservoirs and finally distributed to individual households. Sewage treatment: The sewage treatment system in Lavasa is designed, as per standard norms, to handle throughput of 85% of the water consumption demand. Lavasa existing and planned sewerage treatment plants and collection networks use or are designed to use an extended anaerobic process with tertiary treatment. The sewage collection network collects sewerage collected from each of the zones and it feeds into a pumping station from where it is pumped to sewage treatment plant. The treated effluent is recycled and used for irrigation and other purposes.

2.

3.

60

4.

Power transmission and distribution: The primary source of power at Lavasa is the 110 KV transmission line laid from Tata Power's existing grid network at Nive, which is approximately 16 kilometres from Lavasa. A main receiving station was established at Bhoini, one of the villages falling within the notified hill station area which has an installed capacity of 50 MW. Construction and Development of Assets:

2.

Our Company proposes to deploy a part of the Net Proceeds towards the construction and development of several assets at Lavasa as mentioned below: (In ` Million) Estimated schedule of deployment FY 2011 50.00 0.00 61.26 37.08 19.60 19.20 24.00 45.00 0.00 256.14 FY 2012 217.00 137.00 581.87 348.96 91.00 182.40 42.00 285.00 342.21 2,227.44 FY 2013 255.19 137.00 581.87 348.96 91.00 182.40 60.00 285.00 515.00 2,456.42 FY 2014 254.81 68.00 0.00 0.00 0.00 0.00 24.00 285.00 429.00 1,060.81

Particulars*

Total estimated cost 777.00 342.00 1225.00 735.00 201.60 384.00 150.00 900.00 1286.21 6,000.81

Amount payable from the Net Proceeds 777.00 342 1,225 735.00 201.60 384 150 900 1,286.21 6,000.81

Commercial Business Park, Dasve Rental Housing, Dasve Centre for Performing Arts, Dasve Retail cum Hostel Phase II, Dasve Dasve Corporate Training Centre I and II Dasve Centre of Excellence Dasve Sports Complex Bhoini Rental Housing Mugaon Rental Housing Total

*As of August 31, 2010 the Company has not deployed any funds towards the above projects.

The details of the expenses for constructing and developing the above mentioned assets at Lavasa are provided below: (` per Sq. Ft)
Developable area (in sq ft) Dasve Commercial Business Park Dasve Rental Housing Dasve Performing Art Centre Dasve Retail cum Hostel Phase II Dasve Corporate Training Centre Dasve - Centre of Excellence Dasve Sports Civil Finishes and interiors Mechanical, electrical, plumbing Grading, levelling, landscaping and external development 120.00 Architect's fees Escalation and contingencies Furniture, fixtures, equipments Total cost

370,000.00

960.00

437.00

371.00

83.00

129.00

2,100.00

190,000.00 350,000.00

850.00 1,150.00

310.00 825.00

315.00 750.00

175.00 250.00

50.00 100.00

100.00 125.00

300.00

1,800.00 3,500.00

350,000.00

960.00

437.00

371.00

120.00

83.00

129.00

2,100.00

84,000.00

960.00

400.00

465.00

250.00

50.00

125.00

150.00

2,400.00

160,000.00 50,000.00

960.00 950.00

400.00 700.00

465.00 750.00

250.00 150.00

50.00 100.00

125.00 150.00

150.00 200.00

2,400.00 3,000.00

61

Developable area (in sq ft)

Civil

Finishes and interiors

Mechanical, electrical, plumbing

Grading, levelling, landscaping and external development 175.00 175.00

Architect's fees

Escalation and contingencies

Furniture, fixtures, equipments

Total cost

Complex Bhoini Rental Housing Mugaon Rental Housing 500,000.00 714,562.00 850.00 850.00 310.00 310.00 315.00 315.00 50.00 50.00 100.00 100.00 1,800.00 1,800.00

3.

Land Purchase

Our Company intends to purchase land through land agglomorators and/or otherwise. To further facilitate the process of purchase of land, our Company has entered into (a) a memorandum of understanding dated August 12, 2010 with M/s. Swastik Enterprises in connection with the purchase of an aggregate of approximately 459.82 acres of land, (b) a memorandum of understanding dated August 10, 2010 with M/s. Sumeet Land Developers in connection with the purchase of an aggregate of approximately 2,436 acres of land, (c) a memorandum of understanding dated August 12, 2010 with M/s. Siddhivinayak Enterprises in connection with the purchase of an aggregate of approximately 782.22 acres of land, and (d) a memorandum of understanding dated August 12, 2010 with Ramchandra Shripathi Ubhe in connection with the purchase of an aggregate of approximately 87.35 acres of land. Particulars of the land proposed to be purchased and funded from the Net Proceeds of the Issue are as follows: (` in Millions) Amount payable from Net Proceeds 249.22 139.20 220.91 398.93 341.38 119.66 242.70 2,436.00 24.47 14.27 27.05 4,213.79

Village Saiv budruck Mose budruck Mugaon Dhamanohol Bhoini Admal Gadle Bhode Koloshi Ugavali Dasve Total 4.

Area to be bought (In acres) 249.22 198.86 122.73 234.66 227.59 99.72 161.80 2,436.00 16.31 9.52 9.02 3,765.43

Estimated cost per acre 1.00 0.70 1.80 1.70 1.50 1.20 1.50 1.00 1.50 1.50 3.00 1.12

Total estimated cost 249.22 139.20 220.91 398.93 341.38 119.66 242.70 2,436.00 24.47 14.27 27.05 4,213.79

Debt Repayment

Our Company has obtained a short term debt of ` 1,000.00 million from L&T Infrastructure Finance Company Limited and our Company intends to repay it in full out of the Net Proceeds.
Sr. No. Name of the Lender(/s) Loan Agreement Purpose Amount Sanctioned (In ` Million) Total Amount Outstanding as on June 30,2010 (In ` Million)* Interest (p.a.) Repayment

1.

L&T Infrastructure Finance Company Limited

Facility agreement dated September 17, 2009

For township development project

1,000

1,000

L&T Infrastructure PLR plus / minus spread

14 equal quarterly installments after moratorium of 18 months from date of first disbursement

62

* As per certificate from M/s. K.S. Aiyar & Co., Chartered Accountants dated September 8, 2010. 5. General Corporate Purposes

Our Company intends to deploy the balance Net Proceeds aggregating ` [] million for general corporate purposes, including but not restricted to, meeting working capital requirements and meeting exigencies, which our Company in the ordinary course of business may face, or any other purposes as approved by our Board. Our management, in accordance with the policies of our Board, will have flexibility in utilizing any surplus amounts. We operate in a competitive and dynamic market. We may have to revise our estimates from time to time on account of modifications in existing plans, planned developments and the initiatives which we may pursue. Our funding requirements for the Objects and the deployment schedule of the Net Proceeds are based on current conditions and are subject to change in light of external circumstances such as geological assessments, exchange or interest rate fluctuations, increase in costs of steel and cement, other construction materials and labour costs and other external factors which may not be in our control. This may also include rescheduling the proposed utilization of Net Proceeds at the discretion of the management of our Company. Bridge Financing Facilities Our Company has not raised any bridge loans from any bank or financial institution as on the date of this Draft Red Herring Prospectus, which are proposed to be repaid from the Net Proceeds. Interim use of Net Proceeds Our Company, in accordance with the policies formulated by the Board from time to time, will have flexibility in deploying the proceeds received from the Issue. The particular composition, timing and schedule of deployment of the Net Proceeds will be determined by our Company based on the development of the projects. Pending utilization of the proceeds out of the Issue for the purposes described above, our Company intends to temporarily invest the funds in interest bearing liquid instruments including deposits with banks and investments in money market mutual funds and other financial products and investment grade interest bearing securities as may be approved by the Board. Issue Expenses The Issue related expenses consist of underwriting fees, fees payable to the BRLMs, legal counsels, Bankers to the Issue, Escrow Bankers and Registrars to the Issue, printing and stationery expenses, advertising and marketing expenses and all other incidental and miscellaneous expenses for listing the Equity Shares on the Stock Exchanges. We intend to use about ` [] million towards these expenses for the Issue. All expenses with respect to the Issue will be borne out of Issue proceeds. The break up for the Issue expenses is as follows: Activity Expenses* (In ` million) [] [] [] [] [] [] [] Percentage of the Issue Expenses* [] [] [] [] [] [] [] Percentage of the Issue size* [] [] [] [] [] [] []

Lead Management, Underwriting and Selling Commission SCSB Commission Advertising and marketing expenses Printing and stationery (including courier, transportation charges) Others (Registrar fees, legal fees, listing costs etc) Fees paid to rating agency Total
*

Will be incorporated after finalisation of the Issue Price.

63

Monitoring of Utilization of Funds The Company has appointed [] as the monitoring agency in relation to the Issue. The Board will monitor the utilization of the Net Proceeds. Our Company will disclose the utilization of the Net Proceeds under a separate head along with details, for all such Net Proceeds that have not been utilized. Our Company will indicate investments, if any, of unutilized Net Proceeds in the Balance Sheet of our Company for the relevant Fiscals subsequent to the Issue. Pursuant to Clause 49 of the listing agreement, our Company shall, on a quarterly basis, disclose to the Audit Committee the uses and applications of the Net Proceeds. On an annual basis, our Company shall prepare a statement of funds utilised for purposes other than those stated in this Draft Red Herring Prospectus and place it before the Audit Committee. Such disclosure shall be made only until such time that all the Net Proceeds have been utilised in full. The statement shall be certified by the statutory auditors of our Company. Furthermore, in accordance with clause 43A of the listing agreement our Company shall furnish to the Stock Exchanges on a quarterly basis, a statement including material deviations if any, in the utilisation of the Net Proceeds from the objects of the Issue as stated above. This information will also be published newspapers simultaneously with the interim or annual financial results, after placing the same before the Audit Committee. No part of the Net Proceeds will be paid by our Company as consideration to our Promoters, our Directors, our Companys key management personnel or companies promoted by our Promoters except in the usual course of business.

64

BASIS FOR ISSUE PRICE The Issue Price will be determined by our Company in consultation with the BRLMs on the basis of the assessment of market demand for the Equity Shares through the book building process. The face value of the Equity Shares of our Company is ` 10 each and the Issue Price is [] times of the face value at the lower end of the Price Band and [] times the face value at the higher end of the Price Band. Qualitative Factors We are a city development and management company engaged in the development, construction and management of Lavasa, a private hill city development in India. We believe the following are our strengths: 1. 2. 3. 4. 5. 6. 7. 8. The market opportunity and our market position; Our location and size advantage; Our integrated business model; Our governance platform; Our Promoters; Our employee base; Our tie-ups with recognised industry participants in diverse businesses; and Our track record.

Quantitative Factors The information presented below is based on the restated unconsolidated summary statements for the financial years 2008, 2009 and 2010 and for the three months ended June 30, 2010 for our Company and the restated consolidated summary statements for financial years 2008, 2009 and 2010 and for the three months ended June 30, 2010 for our Company prepared in accordance with Indian GAAP. Some of the quantitative factors that may form the basis for computing the Issue Price are as follows: 1. Earnings Per Share (EPS) (as adjusted for change in capital)* As per our restated unconsolidated summary statements: Year Ended March 31, 2008 March 31, 2009 March 31, 2010 Weighted Average Basic EPS (in `)* (0.22) 2.59 2.85 2.25 Diluted EPS (in `)* (0.22) 2.57 2.83 2.24 Weight 1 2 3

The basic EPS and the diluted EPS for the three months period (not annualised) ended June 30, 2010 are ` 1.01 and ` 1.00 respectively. As per our restated consolidated summary statements:

65

Year Ended March 31, 2008 March 31, 2009 March 31, 2010 Weighted Average

Basic EPS (in `)* (0.23) 2.39 (0.23) 0.64

Diluted EPS (in `)* (0.23) 2.37 (0.23) 0.64

Weight 1 2 3

The basic EPS (in `) and the diluted EPS (in `) for the three months period (not annualised) ended June 30, 2010 are (0.31) and (0.31) respectively. * Please note that post June, 30, 2010, our Company has on July 30, 2010 pursuant to a bonus, issued and allotted
60,743,044 Equity Shares to the existing Equity Shareholders of our Company as on July 30, 2010 in a ratio of one bonus Equity Share for every seven Equity Shares held by the existing Equity Shareholders of our Company as on the relevant record date.

2.

Price/Earning (P/E) ratio in relation to the Price Band Particulars Based on basic EPS of [] as per the restated unconsolidated financial statements for FY 2010 Based on basic EPS of [] as per the restated consolidated financial statements for FY 2010 Based on diluted EPS of [] as per the restated unconsolidated financial statements for FY 2010 Based on diluted EPS of [] as per the restated consolidated financial statements for FY 2010 P/E ratio for the Industry is as follows: We are in the business of city development and management. There are no comparable listed companies in India, hence a comparison with industry peers is not applicable. P/E at the lower end of Price band (no. of times) [] [] [] [] P/E at the higher end of Price band (no. of times) [] [] [] []

3.

Return on Net Worth (RoNW) As per restated unconsolidated financial statements: Particulars Year ended March 31, 2008 Year ended March 31, 2009 Year ended March 31, 2010 Weighted Average Three Months period ended June 30, 2010 (not annualised) As per restated consolidated financial statements: RoNW % (2.92) 30.44 25.80 22.56 8.34 Weight 1 2 3

Particulars Year ended March 31, 2008

RoNW % (2.96)

Weight 1

66

Particulars Year ended March 31, 2009 Year ended March 31, 2010 Weighted Average Three Months period ended June 30, 2010 (not annualised)

RoNW % 28.89 (2.65) 7.81 (4.16)

Weight 2 3

Note: The return on net worth has been computed by dividing profit after tax by net worth at the end of the year/period. The weighted average of RoNW for these fiscal years have been computed by giving weights of 1, 2 and 3 for fiscal years ending March 31, 2008, 2009 and 2010. 4. Minimum RoNW after the Issue needed to maintain Pre-Issue EPS for the year ended March 31, 2010: To maintain pre-Issue basic EPS i. Based on restated unconsolidated summary statements: 1. At the Floor Price - []% 2. At the Cap Price - []% ii. Based on restated consolidated summary statements: 1. At the Floor Price - []% 2. At the Cap Price - []% To maintain pre-Issue diluted EPS i. Based on restated unconsolidated summary statements: 1. At the Floor Price - []% 2. At the Cap Price - []% ii. Based on restated consolidated summary statements: 1. At the Floor Price - []% 2. At the Cap Price - []% 5. Net Asset Value per Equity Share of face value of ` 10 each (i) Net asset value per Equity Share as on March 31, 2010 as per restated unconsolidated summary statements is ` 11.18 Net asset value per Equity Share as on March 31, 2010 as per restated consolidated summary statements is ` 7.92 After the Issue as per restated unconsolidated financial statements: a. b. (iv) At the Floor Price: ` [] At the Cap Price: ` []

(ii)

(iii)

After the Issue as per restated consolidated financial statements: a. At the Floor Price: ` [] b. At the Cap Price: ` [] Issue Price: ` []

(v)

Issue Price per Equity Share will be determined on conclusion of Book Building Process.

67

NAV per Equity Share has been calculated as networth as divided by the closing number of shares at the end of Fiscal 2010. 6. Comparison with Industry Peers

There are no comparable listed companies in India, hence a comparison with industry peers is not applicable. The Issue Price of ` [] has been determined by our Company in consultation with the BRLMs on the basis of the demand from investors for the Equity Shares through the Book Building Process. The BRLMs believe that the Issue Price of ` [] is justified in view of the above qualitative and quantitative parameters. Investors should read the above mentioned information along with the sections titled Risk Factors, Our Business and Financial Statements on pages xii, 98 and 218 respectively, to have a more informed view. The trading price of the Equity Shares of our Company could decline due to the factors mentioned in Risk Factors on page xii and you may lose all or part of your investments.

68

STATEMENT OF TAX BENEFITS The Board of Directors, Lavasa Corporation Limited, Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai - 400083 Dear Sirs, Re: Possible Direct Tax Benefits available under the existing tax laws to the Company and its Shareholders As desired by you, we enclose an Annexure giving the details of possible Direct Tax Benefit available to Lavasa Corporation Limited and its Shareholders under the current Direct Tax Laws, in India. Several of these benefits are dependent on the Company or its Shareholders fulfilling the conditions prescribed under the relevant tax laws and their interpretations. Hence, the ability of the Company or its Shareholders to derive the tax benefits is dependent upon fulfilling such conditions which, based on the business imperatives it faces in the future, the Company / its Shareholders may or may not choose to fulfill. The benefits discussed in the enclosed Annexure are not exhaustive. This statement is only intended to provide general information to the investors and is neither designed nor intended to be a substitute for professional tax advice. In view of the individual nature of the tax consequences and the changing tax laws, each investor is advised to consult his or her own tax consultant with respect to the specific tax implications arising out of their participation in the issue and we are absolved of any liability to the shareholder for placing reliance upon the contents of this material. We do not express any opinion or provide any assurance as to whether: The Company or its Shareholders will continue to obtain these benefits in future; or The conditions prescribed for availing the benefit have been / would be met with; or The revenue authorities / courts will concur with the views expressed herein.

Our views are based on the existing provisions of law and its interpretation, which are subject to change from time to time. We do not assume responsibility to up-date the views consequent to such changes. The contents of this Annexure are based on information, explanations and representations obtained from the Company and on the basis of our understanding of the business activities and operations of the Company and the interpretation of current tax laws. While all reasonable care has been taken in the preparation of this opinion, we accept no responsibility for any errors or omissions therein or for any loss sustained by any person who relies on it. This report is intended solely for information and for the inclusion in the Offer Document in connection with the proposed Issue of Equity Shares of the Company as per SEBI Regulations and is not to be used, referred to or distributed for any other purpose without our prior written consent. Thanking you, Yours faithfully,
For K. S. Aiyar & Co, Chartered Accountants Registration No: 100186W

69

Place: Mumbai Date: September 8, 2010

Raghuvir M. Aiyar Partner Membership No.: 38128

70

ANNEXURE TO STATEMENT OF POSSIBLE DIRECT TAX BENEFITS AVAILABLE TO THE COMPANY AND ITS SHAREHOLDERS I. SPECIAL TAX BENEFITS AVAILABLE TO THE COMPANY AND ITS SHAREHOLDERS

There are no special tax benefits available to Company and its shareholders. II. A) 1. GENERAL TAX BENEFITS AVAILABLE TO THE COMPANY AND ITS SHAREHOLDERS: To the Company Subject to Compliance of certain conditions laid down in Section 32 of the Income Tax Act, 1961 (I. T. Act) the Company will be entitled to a deduction for depreciation in respect of tangible assets and intangible assets being in the nature of know-how, patents, copyrights, trademarks, licenses, franchises or any other business or commercial rights of similar nature acquired on or after 1st day of April, 1998 at the rates prescribed under the Income Tax Rules, 1962; Dividend income from shares, is exempt from income tax in accordance with and subject to the provisions of section 10(34) read with Section 115-O or section 10(35), respectively, of the I. T. Act. As per the provisions of Section 14A of the I. T. Act, no deduction is allowed in respect of any expenditure incurred in relation to such dividend income to be computed in accordance with the provisions contained therein. Also, Section 94(7) of the I. T. Act provides that losses arising from the sale/transfer of shares purchased within a period of three months prior to the record date and sold/transferred within three months after such date, will be disallowed to the extent dividend income on such shares are claimed as tax exempt. Under section 10(38) of the I. T. Act, the long-term capital gains arising on transfer of securities, which are chargeable to Securities Transaction Tax (STT), are exempt from tax in the hands of the company. The STT will be levied on purchase or sale of Equity Shares entered into in a recognised stock exchange in India. However, such long term capital gain shall be taken into account in computing the book profit and income tax payable under section 115JB. The Company will be entitled to amortise preliminary expenditure, being expenditure incurred on public issue of shares under section 35D of the I. T. Act, subject to the limit specified therein. As per the provisions of Section 112 of the I. T. Act, other long-term capital gains arising to the company are subject to tax at the rate of 20% (plus applicable surcharge, education cess and secondary & higher education cess). However, as per the Proviso to that section, the long term capital gains resulting from transfer of listed securities (not covered by section 10(36) and 10(38) of the I. T. Act), are subject to tax at the rate of 20% on long-term capital gains worked out after considering indexation benefit (plus applicable surcharge, education cess and secondary & higher education cess), which would be restricted to 10% of long-term capital gains worked out without considering indexation benefit (plus applicable surcharge, education cess and secondary & higher education cess). As per the provisions of section 111A of the I. T. Act, short-term capital gains arising to the company from transfer of Equity Shares in any other company through a recognized Stock Exchange is subject to tax at the rate of 15% (plus applicable surcharge, education cess and secondary & higher education cess), if such a transaction is subjected to STT. In accordance with and subject to the conditions specified in Section 54EC of the I. T. Act, the company would be entitled to exemption from tax on long-term capital gain (not covered by Section 10(36) and Section 10(38) of the I. T. Act) if such capital gain is invested in any of the longterm specified assets (herein the manner prescribed in the said section) for investment made on or after 1st day of April 2007, the exemption would be restricted to the amount which does not exceed Rupees Fifty Lacs during the financial year. If the new asset is transferred or converted into money at any time within a period of three years from the date of its acquisition, the amount of Capital Gains for which exemption is availed earlier would become chargeable to tax as long-term capital gains in the year in which such new asset is transferred or converted into money. If only a portion of capital gain is so invested, the exemption

2.

3.

4.

5.

6.

71

is available proportionately. The bonds presently specified within this section are bonds issued by National Highway Authority of India (NHAI) and Rural Electrification Corporation Ltd (REC). 7. The Corporate Tax Rate for the Assessment Year 2011 2012 shall be 30% (plus applicable surcharge, education cess and secondary & higher education cess). As provided under section 115JB, the Company is liable to pay income tax at the rate of 18% (plus applicable surcharge, education cess and secondary & higher education cess) on the Book Profit as per the provisions of section 115JB if the total tax payable as computed under the I. T. Act is less than 18% of its Book Profit as computed under the said section. Under Section 115JAA, credit shall be allowed of any Minimum Alternate Tax (MAT) paid under Section 115JB of the I. T. Act. Credit eligible for carry forward is the difference between MAT paid and the tax computed as per the normal provisions of the I. T. Act. However no interest shall be payable on the tax credit under this sub-section. Such MAT credit shall be available for set-off up to 10 years succeeding the year in which the MAT credit initially arose. Under Section 115O, the domestic company will be allowed to set-off the dividend received from its subsidiary company during the financial year against the dividend distributed by it, while computing the Dividend Distribution Tax (DDT) if: - the dividend is received from its subsidiary - the subsidiary has paid the DDT on the dividend distributed - the domestic company is not a subsidiary of any other company Provided that the same amount of dividend shall not be taken into account for reduction more than once. For the purpose of this sub-section a company shall be a subsidiary of another company, if such other company holds more than half in nominal value of the equity share capital of the company. 11. In accordance with and subject to the conditions specified under Section 80-IB(10) of the I. T. Act, the Company is eligible for hundred percent deduction of the profits derived from development and building of housing projects approved before 31 March, 2008, by a local authority subject to fulfillment of conditions mentioned therein. Under section 24(a) of the I. T. Act, the Company is eligible for deduction of thirty percent of the annual value of the property (i.e. actual rent received or receivable on the property or any part of the property which is let out). Under section 24(b) of the I. T. Act, where the property has been acquired, constructed, repaired, renewed or reconstructed with borrowed capital, the amount of interest payable on such capital shall be allowed as a deduction in computing the income from house property. In respect of property acquired or constructed with borrowed capital, the amount of interest payable for the period prior to the year in which the property has been acquired or constructed shall be allowed as deduction in computing the income from house property in five equal installments beginning with the year of acquisition or construction. To the Shareholders of the Company

8.

9.

10.

12.

13.

B)

Resident Members: 1) Dividend income of shareholders is exempt from income tax under section 10(34) read with Section 115-O of the I. T. Act. As per the provisions of Section 14A of the I. T. Act, no deduction is allowed in respect of any expenditure incurred in relation to such dividend income to be computed in accordance with the provisions contained therein. Also, Section 94(7) of the I. T. Act provides that losses arising from the sale/transfer of shares purchased up to three months prior to the record date and sold or transferred within

72

three months after such date, will be disallowed to the extent dividend income on such shares are claimed as tax exempt by the shareholders. Any income arising from the transfer of Equity Share held for the period of 12 months or more and held as Capital Asset is exempt under section 10(38), where the transaction of sale of such equity share is entered through recognized Stock Exchange on or after 1-10-2004 and such transaction is chargeable to STT. 2) Under section 54EC of the I. T. Act, 1961 and subject to the conditions and to the extent specified therein, long term capital gain (in case not covered under section 10(38) of the I. T. Act) arising on the transfer of shares of the Company will be exempt from capital gains tax if the capital gain is invested within a period of 6 months after the date of such transfer for a period of at least 3 years in bonds issued by a. National Highway Authority of India constituted under Section 3 of The National Highway Authority of India Act, 1988; Rural Electrification Corporation Limited, the Company formed and registered under the Companies Act, 1956;

b.

If only part of the capital gain is so reinvested, the exemption shall be proportionately reduced. The amount so exempted shall be chargeable to tax subsequently, if the specified assets are transferred or converted within three years from the date of their acquisition. For Investment made on or after 1st day of April 2007, the exemption would be restricted to the amount which does not exceed Rupees Fifty Lacs during the financial year. 3) Under Section 54F of the I. T. Act and subject to the conditions and to the extent specified therein, long term capital gains (in cases not covered under section 10(38) of the I. T. Act) arising to an individual or Hindu Undivided Family (HUF) on transfer of shares of the Company will be exempt from capital gains tax subject to other conditions, if the net sales consideration from such shares are used for purchase of residential house property within a period of one year before or two year after the date on which the transfer took place or for construction of residential house property within a period of three years after the date of transfer. Such benefit will not be available if the individual or HUF a) owns more than one residential house, other than the new residential house, on the date of transfer of the shares; or purchases another residential house within a period of one year after the date of transfer of the shares; or constructs another residential house within a period of three years after the date of transfer of the shares; and the income from such residential house, other than the one residential house owned on the date of transfer of the original asset, is chargeable under the head Income from house property.

b)

c)

d)

If only a part of the net consideration is so invested, so much of the capital gains as bears to the whole of the capital gain the same proportion as the cost of the new residential house bears to the net consideration shall be exempt. If the new residential house is transferred within a period of three years from the date of purchase or construction, the amount of capital gains on which tax was not charged earlier, shall be deemed to be income chargeable under the head Capital Gains of the year in which the residential house is transferred. 4) As per section 74 of the I. T. Act, short term capital loss suffered during the year is allowed to be set-off against short-term as well as long term capital gain of the said year. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years short - term as well as long-term

73

capital gains. Long term capital loss suffered during the year is allowed to be set-off against long term capital gains. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years long-term capital gains. 5) Under section 111A of the I. T. Act, capital gains arising to a shareholder from transfer of short terms capital assets, being an equity share in the company, entered into in a recognized stock exchange in India will be subject to tax at the rate of 15% (plus applicable surcharge, education cess and secondary & higher education cess). Under Section 112 of the I. T. Act and other relevant provisions of the I. T. Act, long term capital gains (not covered under section 10(38) of the I. T. Act) arising on transfer of shares in the Company, if shares are held for a period exceeding 12 months, shall be taxed at a rate of 20% (plus applicable surcharge, education cess and secondary & higher education cess) after indexation as provided in the second proviso to Section 48 or at 10% (plus applicable surcharge, education cess and secondary & higher education cess) (without indexation), at the option of the Shareholders.

6)

Non Resident Indians/Members other than FIIs and Foreign Venture Capital Investors: 1. Dividend income of shareholders is exempt from income tax under section 10(34) read with Section 115-O of the I. T. Act. As per the provisions of Section 14A of the I. T. Act, no deduction is allowed in respect of any expenditure incurred in relation to such income which does not form part of total income under the Income Tax Act, 1961. Also, Section 94(7) of the I. T. Act provides that losses arising from the sale/transfer of shares purchased up to three months prior to the record date and sold or transferred within three months after such date, will be disallowed to the extent dividend income on such shares are claimed as tax exempt by the shareholders. Any income arising from the transfer of a long term capital asset (i.e. capital asset held for the period of 12 months or more) being an Equity Share in a company is exempt under section 10(38), where the transaction of sale of such equity share is entered through recognized Stock Exchange on or after 1-10-2004 and such transaction is chargeable to STT. Tax on income from investment and long term capital gains (other than those exempt under section 10(38): A non-resident Indian (i.e. an individual being a citizen of India or person of Indian Origin) has an option to be governed by the provisions of Chapter XIIA of the I. T. Act Provisions Relating to certain incomes of Non-Residents a) Under section 115E of the I. T. Act, where shares in the company are subscribed for in convertible Foreign Exchange by a non-resident Indian, capital gains arising to the non resident on transfer of shares held for a period exceeding 12 months shall (in cases not covered under section 10(38) of the I. T. Act) be concessionally taxed at a flat rate of 10% (plus applicable surcharge, education cess and secondary & higher education cess) without indexation benefit but with protection against foreign exchange fluctuation under the first proviso to section 48 of the I. T. Act. Capital gain on transfer of Foreign Exchange Assets, not to be charged in certain cases Under provisions of section 115F of the I. T. Act, long term capital gains (not covered under section 10(38) of the I. T. Act) arising to a non-resident Indian from the transfer of shares of the company subscribed to in convertible Foreign Exchange shall be exempt from income tax if the net consideration is reinvested in specified assets within six months of the date of transfer. If only part of the net consideration is so reinvested, the exemption shall be proportionately reduced. The amount so exempted shall be chargeable to tax subsequently, if the specified assets are transferred or converted within three years from the date of their acquisition. c) Return of income not to be filed in certain cases

2.

3.

b)

74

Under provisions of section 115-G of the I. T. Act, it shall not be necessary for a nonresident Indian to furnish his return of income if his only source of income is investment income or long term capital gains or both arising out of assets acquired, purchased or subscribed in convertible foreign exchange and tax deductible at source has been deducted there from. d) Under section 115-I of the I. T. Act, a non-resident Indian may elect not to be governed by the provisions of Chapter XII-A for any assessment year by furnishing his return of income under section 139 of the I. T. Act declaring therein that the provisions of this Chapter shall not apply to him for that assessment year and if he does so the provisions of this Chapter shall not apply to him, instead the other provisions of the I. T. Act shall apply.

Other Provisions 4. Under proviso to section 48 of the I. T. Act, in case of a non resident, in computing the capital gains arising from transfer of shares of the company acquired in convertible foreign exchange (as per exchange control regulations), protection is provided from fluctuations in the value of rupee in terms of foreign currency in which the original investment was made. Cost indexation benefits will not be available in such a case. Under section 54EC of the I. T. Act and subject to the conditions and to the extent specified therein, long term capital gain (in case not covered under section 10(38) of the I.T. Act) arising on the transfer of shares of the Company will be exempt from capital gains tax if the capital gain are invested within a period of 6 months after the date of such transfer for a period of at least 3 years in bonds issued by a. National Highway Authority of India constituted under Section 3 of The National Highway Authority of India Act, 1988; Rural Electrification Corporation Limited, the Company formed and registered under the Companies Act, 1956;

5.

b.

If only part of the capital gain is so reinvested, the exemption shall be proportionately reduced. The amount so exempted shall be chargeable to tax subsequently, if the specified assets are transferred or converted within three years from the date of their acquisition. For Investment made on or after 1st day of April 2007, the exemption would be restricted to the amount, which does not exceed Rupees Fifty Lacs during the financial year. 6. Under Section 54F of the I. T. Act and subject to the conditions and to the extent specified therein, long term capital gains (in cases not covered under section 10(38) of the I. T. Act) arising to an individual or Hindu Undivided Family (HUF) on transfer of shares of the Company will be exempt from capital gains tax subject to other conditions, if the sale proceeds from such shares are used for purchase of residential house property within a period of one year before or two year after the date on which the transfer took place or for construction of residential house property within a period of three years after the date of transfer. Such benefit will not be available if the individual or Hindu Undivided Family a) owns more than one residential house, other than the new residential house, on the date of transfer of the shares; or purchases another residential house within a period of one year after the date of transfer of the shares; or constructs another residential house within a period of three years after the date of transfer of the shares; and the income from such residential house, other than the one residential house owned on the date of transfer of the original asset, is chargeable under the head Income from house property.

b)

c)

d)

75

If only a part of the net consideration is so invested, so much of the capital gains as bears to the whole of the capital gain the same proportion as the cost of the new residential house bears to the net consideration shall be exempt. If the new residential house is transferred within a period of three years from the date of purchase or construction, the amount of capital gains on which tax was not charged earlier, shall be deemed to be income chargeable under the head Capital Gains of the year in which the residential house is transferred. 7. As per section 74 of the I. T. Act, short term capital loss suffered during the year is allowed to be set-off against short-term as well as long term capital gain of the said year. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years short- term as well as long-term capital gains. Long term capital loss suffered during the year is allowed to be set-off against long term capital gains. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years long term capital gains. Under section 111A of the I. T. Act, capital gains arising to a shareholder from transfer of short terms capital assets, being an equity share in the company, entered into in a recognized stock exchange in India will be subject to tax at the rate of 15% (plus applicable surcharge, education cess and secondary & higher education cess). Under section 112 of the I. T. Act and other relevant provisions of the I. T. Act, long term capital gains (not covered under section 10(38) of the I. T. Act) arising on transfer of shares in the company, if shares are held for a period exceeding 12 months shall be taxed at a rate of 20% (plus applicable surcharge & education cess and secondary & higher education cess) after indexation as provided in the second proviso to section 48. However, indexation will not be available if the investment is made in foreign currency as per the first proviso to section 48 stated above, or it can be taxed at 10% (plus applicable surcharge & education cess and secondary & higher education cess on income tax) (without indexation), at the option of assessee. As per section 90(2) of the I. T. Act, the provisions of the I. T. Act would prevail over the provisions of the tax treaty to the extent they are more beneficial to the Non Resident shareholder. Thus a non-resident shareholder can opt to be governed by the beneficial provisions of an applicable tax treaty.

8.

9.

10.

Foreign Institutional Investors (FIIs) 1. By virtue of section 10(34) of the I. T. Act, income earned by way of dividend income from domestic company referred to in section 115O of the I. T. Act, are exempt from tax in the hands of the institutional investor. In terms of section 10(38) of the I. T. Act, any long term capital gains arising to an investor from transfer of long-term capital asset being an equity shares in a company would not be liable to tax in the hands of the investor if the transaction is chargeable to STT. Under section 111A of the I. T. Act, capital gains arising to FIIs from transfer of short terms capital assets, being an equity share in the company, entered into in a recognized stock exchange in India will be taxed at the rate of 15% (plus applicable surcharge, educational cess & secondary & higher education cess on income tax) as per section 115AD of the I. T. Act. The income by way of short term capital gains (not referred to in section 111A of the I. T. Act) or long term capital gains (not covered under section 10(38) of the I. T. Act) realized by FIIs on sale of shares in the company would be taxed at the following rates as per section 115AD of the I. T. Act.: Short term capital gains 30% (plus applicable surcharge, education cess & secondary & higher education cess on income tax) Long term capital gains 10% (without cost indexation) plus applicable surcharge, education cess and secondary & higher education cess on income tax)

2.

3.

4.

76

(Shares held in a company would be considered as a long-term capital asset provided they are held for a period exceeding 12 months). 5. Under section 54EC of the I. T. Act and subject to the conditions and to the extent specified therein, long term capital gain (in case not covered under section 10(38) of the I. T. Act) arising on the transfer of shares of the Company will be exempt from capital gains tax if the capital gain are invested within a period of 6 months after the date of such transfer for a period of at least 3 years in bonds issued by a. b. National Highway Authority of India constituted under Section 3 of The National Highway Authority of India Act, 1988; Rural Electrification Corporation Limited, the Company formed and registered under the Companies Act, 1956;

If only part of the capital gain is so reinvested, the exemption shall be proportionately reduced. The amount so exempted shall be chargeable to tax subsequently, if the specified assets are transferred or converted within three years from the date of their acquisition. For Investment made on or after the 1st Day of April 2007, the exemption would be restricted to the amount, which does not exceed Rupees Fifty Lacs during the financial year. 6. As per section 74 of the I. T. Act, short term capital loss suffered during the year is allowed to be set-off against short-term as well as long term capital gain of the said year. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years short- term as well as long-term capital gains. Long term capital loss suffered during the year is allowed to be set-off against long term capital gains. Balance loss, if any, could be carried forward for eight years for claiming set off against subsequent years long term capital gains. As per section 90 of the I. T. Act, the provisions of the I. T. Act would prevail over the provisions of the tax treaty to the extent they are more beneficial to the Non Resident shareholder. Thus a non-resident shareholder can opt to be governed by the beneficial provisions of an applicable tax treaty. Under section 196D (2) of the Act, no deduction of tax at source will be made in respect of income by way of capital gain arising from the transfer of securities referred to in section 115AD.

7.

8.

Persons carrying on business in shares and securities. In accordance with the insertion of new Section 36(1) (xv) in the Finance Act 2008, STT paid in respect of taxable securities transaction entered during the course of business will be available as deduction while computing the taxable business income. Mutual Funds In accordance with section 10(23D), any income of: (i) a Mutual Fund registered under the Securities and Exchange Board of India Act 1992 or regulations made there under; such other Mutual Fund set up by a public sector bank or a public financial institution or authorised by the Reserve Bank of India subject to such conditions as the Central Government may, by notification in the Official Gazette, specify in this behalf, - will be exempt from income-tax.

(ii)

77

Under the Wealth-tax Act, 1957 Shares of the company held by the shareholder will not be treated as an asset within the meaning of section 2(ea) of Wealth-tax Act, hence Wealth-tax Act will not be applicable. Notes: 1. All the above benefits are as per the current tax laws as amended by the Finance Act (No.2), 2009.However benefits proposed by Direct Taxes Code Bill, 2009 (which becomes law only in 2011, if passed in the Parliament) have not been considered. The above Statement of possible tax benefits sets out the provisions of law in a summary manner only and is not a complete analysis or list of all potential tax consequences. In respect of non-residents, the tax rates and the consequent taxation mentioned above shall be further subject to any benefits available under the Double Taxation Avoidance Agreements (DTAA), if any, between India and the country in which the non-resident has fiscal domicile. The stated benefit will be available only to the sole/first named holder in case the shares are held by Joint holders. In view of the individual nature of tax consequence, each investor is advised to consult his/her own tax advisor with respect to specific tax consequences of his/her participation in this issue and we are absolved of any liability to the shareholder for placing reliance upon the contents of this material.

2.

3.

4.

5.

78

INDUSTRY The information in this section is derived from various government publications and industry sources. Neither we nor any other person connected with the Issue has verified this information. Industry sources and publications generally state that the information contained therein has been obtained from sources generally believed to be reliable, but that their accuracy, completeness and underlying assumptions are not guaranteed and that their reliability cannot be assured and, accordingly, investment decisions should not be based on such information. The Indian Economy India is the world's largest democracy in terms of population (approximately 1.16 billion people) as at July 2009 with a GDP (by purchasing powering parity) of approximately US$3.56 trillion in 2009. This makes it the fifth largest economy in the world in terms of GDP after the European Union, the United States of America, China and Japan. (Source: CIA World Factbook) Despite the global economic decline in fiscal 2008, India continues to be one of the fastest growing countries in the world and is showing positive signs of recovery following the global financial downturn. The graph below is a comparison between Indias expected GDP growth during calendar years 2009 and 2010, as compared to advanced economies, developing economies and the world. As can be seen from the graph, all of the countries are expected to see positive growth in calendar year 2010.This is due to the fact that economic conditions have improved more than expected, owing mainly to Government intervention. Further, Indias growth is expected to outperform advanced and developing economies. Recent data suggests that the rate of decline in economic activity is moderating, although this is occurring to varying degrees across different regions.
World Emerging & Developing
10% 8% 6% 4% 2.5% 2% 0% -0.6% -2% -4% -3.2% Jan'09 Dec'09 Dec'10 (E) Jan'10 2.6% 5.7% 4.6% 6.5%

Advanced Countries India


9.4%

Source: International Monetary Fund, World Economic Outlook Update, July 2009 and July 2010 (Calendar Year Growth Rates) The following table sets forth the key indicators of the Indian economy for the past five Fiscal years. (Annual percentage change, except for foreign exchange reserves) As at and for the year ended March 31 2006 2007 2008 2009 2010 9.5 9.7 9.2 6.7 7.2 8.2 11.6 8.5 2.6 n/a 4.4 5.4 4.7 8.4 1.61 151.6 199.2 309.7 252 283.52

GDP growth Index of Industrial Production Inflation Wholesale Price Index Foreign Exchange Reserves (in US$ billion)
2
2

Average for April to December, 2009 As of December 31, 2009

(Source: Economic Survey 2009-2010, RBI, Central Statistical Organization, Ministry of Statistics and Programme Implementation (Indian Economic Survey))

79

As shown in the above table, India has experienced rapid economic growth over the past five Fiscal years. However, economic activity in India slowed down in Fiscal 2009 as compared with over 9% growth in the previous three years. Growth decelerated sharply in third quarter of FY 2009 following the failure of Lehman Brothers in midSeptember 2008 and adverse effects of the global financial crisis on the Indian economy. However, the turnaround in the Indian economy came in the second quarter of 2009-10, when the economy grew by 7.9% (see the below table, which reflects real GDP growth rates at constant 2004-05 prices). The advance estimates of the Central Statistical Organization released in February 2010 have placed the real GDP growth for 2009-10 at 7.2%. (Source: Indian Economic Survey). Since 1991, successive Indian governments have implemented comprehensive reforms in the areas of fiscal and industrial policy, trade and finance. Some of the key reform measures include: Industrial policy reforms: In 1991, the Indian Government formulated the Industrial Policy, which, as amended from time to time, contains the policies relating to FDI in Indian companies engaged in business in various sectors of Indian industry. The Indian Government, pursuant to its liberalisation policy, set up the Foreign Investment Promotion Board (FIPB), to regulate together with the RBI all foreign direct investment into India. The Department of Industrial Policy and Promotion (DIPP), Ministry of Commerce and Industry, Government of India makes policy pronouncements on FDI. In the beginning of 2009, the government of India relaxed the norms for foreign direct investment (FDI) in various sectors. As per new norms, various sectors such as commodity exchanges, credit information and aircraft maintenance are opened for overseas investors while hiking the ceiling for investment in public sector oil refineries. Revised FDI policy would now permit 100 percent foreign investment in maintenance, repair and overhauling (MRO) facilities for aircraft as also aviation training units. In 2009, the Indian Government issued two press notes setting out guidelines for foreign investment in India. Press Note 2 of 2009 prescribes the guidelines for the calculation of total foreign investment (direct and indirect) in Indian companies, whereas Press Note 4 of 2009 clarifies the guidelines on downstream investments by Indian companies. On 31 March 2010, the DIPP issued a Consolidated FDI Circular with the stated purpose of consolidating into one document all the prior policies/regulations on FDI and reflects the current policy framework on FDI. During April-November 2009-10, total FDI equity inflows stood at ` 93,354 crore (US$19,379 million) as against ` 85,700 crore (US$19,791 million) during the corresponding period in 2008-09, signifying a growth of 9 percent in rupee terms and a decline of 2 percent in US dollar terms. During 2008-09, total FDI equity inflows stood at ` 1,22,919 crore (US$27,309 million) as against ` 98,664 crore (US$24,579 million) during 2007-08, signifying a growth of 25 percent in rupee terms and 11 percent in US dollar terms. The developments in terms of policy responses during the last few years were to an extent shaped by the effects of the global financial crisis on Indian industry. Measures taken specifically for the industrial sector included fiscal measures and measures to ensure availability of credit. Broadly, the effort in this regard was to mitigate the sharp impact of the global recession on industry, especially the export-oriented sectors that were the most directly affected. (Source: Economic Survey 2009-2010, Ministry of Finance, Government of India) Trade policy reforms: Select measures taken by the Government of India in recent years in connection with promotion of trade amongst others include the following:

80

Interest rate ceiling of 250 basis points p.a. below the benchmark prime lending rate (BPLR) for pre-shipment rupee export credit up to 270 days and post-shipment rupee export credit up to 180 days has been extended to the end of April 30, 2010. The ceiling rate on export credit in foreign currency increased to LIBOR plus 350 basis points. The all-in-cost ceiling for raising trade credit was revised to 200 basis points over six months of LIBOR. The prescribed interest rate as applicable to postshipment rupee export credit was extended to overdue bills up to 180 days. The period of entitlement has been extended by 90 days for the first slab of pre-shipment and postshipment.

o o o o

(Source: Economic Survey 2009-2010, Ministry of Finance, Government of India) Monetary Policy and Financial Sector Reforms: The Government of India through the RBI has adopted an accommodative monetary policy stance post-September 2008, in response to the global financial crisis, which continued during the financial year 2009-10. The monetary policy formulated by the RBI focused on maintaining a market environment conducive to the flow of credit to the productive sectors of the economy. The Reserve Bank constituted the Working Group on Benchmark Prime Lending Rates, (BPLR), in its Annual Policy Statement of 2009-10 to review the system and suggest changes to make credit pricing more transparent. The Working Group has recommended replacing the existing BPLR system with a base rate system. With the proposed base rate system, banks will not need to lend below the base rate as it would represent the bare minimum rate below which it would not be viable for them to lend. Further, various policy initiatives taken by the Government of India and RBI have helped ease the pressure on trade financing. This is further corroborated by the increase in share of short-term trade credit (both inflows and outflows) in the overall gross capital flows with share in inflows increasing from 10.9 percent in 2007-08 to 13.4 percent in 2008-09 and share in outflows increasing from 9.6 percent to 14.3 percent (Source: Economic Survey 2009-2010, Ministry of Finance, Government of India)

It is expected that Indian economic growth would continue and that the growth over the next few years would accelerate to a CAGR growth of approximately 8.1%. (Source: IMF)

Urbanisation in India The state of urbanisation in India and the pain in the market Urban India has attracted investment on the back of strong growth, but India's cities fall short of delivering a high standard of living for their residents. As the urban population and their incomes increase, demand for every key service will increase in cities of every size and type. If India continues to invest in urban infrastructure at its current rate which is very low by international comparison in 20 years' time the urban infrastructure will likely be unable

81

to sustain existing cities. The major challenges facing existing cities are deteriorating quality of life, uncertain economic growth given infrastructure and governance constraints, chronically low investment in civic infrastructure, amenities and governance platforms and low levels of spending by state and central governments in urban areas. The graphs below show the current performance of India's cities as compared with best in class standards across indicators of quality of life:

Water supply, for instance, for the average citizen could drop with a large section of the population having no access to potable water at all. Moreover, India's cities could leave most of their sewage untreated. While private car ownership would increase, shortcomings in the transportation infrastructure have the potential to create an urban gridlock. In addition, affordable housing is a critical concern for low-income groups and in the absence of a viable model that caters to their needs, India will see the continued proliferation of slums across the country. In 2030, India's largest cities will be bigger than many major countries today. But India's governance of cities is not yet ready to face this challenge. As an example, some of India's large cities are still governed by bureaucrats who can be transferred out of office at short notice. This arrangement is in sharp contrast to large cities elsewhere that have empowered mayors with long tenures and clear accountability for the city's performance. There are good examples within India, too. Delhi has quasi-statehood status. Kolkata's modified mayor-commissioner model

82

provides a good starting point for reforming municipal structures in India with its combination of an empowered political executive and administrative support from a technocrat. India needs to clearly define the relative roles of its metropolitan and municipal structures. Very few cities in the country have functioning metropolitan authorities. With cities growing beyond municipal boundaries, having fully formed metropolitan authorities with clearly defined roles is important for the successful management of cities. Currently, cities deliver services through archaic and bureaucratic departments. India has urban plans but they are sometimes not followed due to various reasons. No city in India has a proper 2030 transportation master plan, nor have any of them allocated enough space and appropriate zoning for affordable houses. India faces the task of providing affordable homes to an estimated 38 million households by 2030 who will not be able to afford a market-priced house. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, McKinsey Global Institute, April 2010) Market appetite for new cities Every major industrialized country in the world has experienced a shift over time from a largely rural, agrariandwelling population to one that lives in urban, non-agricultural centres. India will be no different. However, India's urbanization will be on a scale that, outside of China, is unprecedented. By 2030, the McKinsey Global Institute (MGI) expects 250 million more people to live in India's cities, the fastest addition to an urban population of any country in history outside of China. New research by MGI concludes that urbanization in India requires US$1.2 trillion of additional capital investment by 2030. India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. Although building new cities is generally more expensive (on a per capita basis) than renewing existing cities, such an effort could act as a benchmark and a model for well-planned, environmentally sustainable worldclass cities while helping ease some of the strains of rapid urbanisation. Surging growth and employment in cities will prove a powerful magnet for such new cities. India's urban population grew from the 290 million reported in the 2001 Census to an estimated 340 million in 2008, and MGI projects that it could soar further to 590 million by 2030. In terms of both population and GDP, many Indian cities will become larger than many countries today. For instance, the Mumbai metropolitan region's GDP is projected to reach $265 billion by 2030 with an expected population of 33 million. As set out in the following three graphs, India is expected to see strong growth in population including the working population relative to other countries as well as a migration towards a more service oriented industry.
Population Growth Rate
Working Population
61%
(Population 20 - 60)

60% 56% 53.3% 50.5% 52% 48% 2000 2010 2030 57% 54% 53.1%

CAGR 2007-2025

1.5% 1.0% 0.5% 0.0%

(1.2 - 1.4) (0.3 - 0.4)

(6.7 - 8.0)

1.2% (1.3 - 1.4) 0.8% (.73 - .72) 1.0% 0.5% -0.1%

India

China

Europe

World

USA

-0.5%

45%

India

China

World

Source: United Nations DESA Figures in bracket indicate population in bn

Source: United Nations DESA

83

Growing Indian Services Industry

(Services as % of GDP)

80% 60% 40% 2,535

30,861

65% 20% 0% 1996-97 2009 - 10 44%

Source: RBI Absolute figures indicate Indian Services GDP in Rs bn

Unlike many countries that are grappling with aging populations and rising dependency ratios, India has a young and rapidly growing population. We estimate that 180 million new job seekers will enter India's workforce over the next two decades a potential demographic dividend. But India needs thriving cities if that dividend is to pay out. As India's cities expand, its economic makeup will also likely change. In 1995, India's GDP split almost evenly between its urban and rural economies. In 2009, urban GDP accounted for 58% of overall GDP and by 2030, MGI estimates that urban India will generate nearly 70% of India's GDP. For the first time in India's history, the nation will have five large states (Tamil Nadu, Gujarat, Maharashtra, Karnataka, and Punjab) that will have more of their population living in cities than in villages.
Increasing Indian Prosperity
100% 36% 80% 60% 74% 85%

Growing Urbanization
(Urban % of Total Population)

590 40% 35% 30% 25% 20% 15% 10% 5% 0% 1991 2008 2030 220 26% 40% 340 30%

40% 64% 20% 26% 0% 2000 2020 Annual Income < Rs. 90,000 > Rs. 90,000 2030 15%

Absolute figures indicate urban population in mn Source: India's urban awakening: Building inclusive cities, sustaining economic growth, McKinsey Global Institute, April 2010

These economic trends are expected to help support sectors, such as urban construction, real estate, infrastructure, transportation, healthcare, education, hospitality and recreation. For instance, MGI projects that the economy will have to build between 700 million and 900 million square metres of residential and commercial space a year equivalent to adding more than two Mumbais every year. Cities and villages are interdependent and symbiotic. The urban economy will provide the more productive nonagricultural jobs that are important for an eventual increase in agricultural productivity and income. The urban economy will also provide 85 percent of total tax revenue, benefit 200 million rural Indians who live in proximity of the 70 largest cities in the country, and be perhaps the most cost-effective vehicle to expand access to basic services. The fate of India's villages and its cities are closely intertwined.

84

Economics aside, cities offer the promise of a higher quality of life for a larger number of Indians. This is because the scale benefits provided by cities offer the opportunity to significantly lower the cost of delivering services such as water and sanitation. In short, as set out in the following three charts, urbanisation in India is expected to lead to increasing prosperity and accordingly robust GDP growth. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, McKinsey Global Institute, April 2010) Corridors and Clusters India's top-tier cities would likely be more productive if communication and transport links between them were stronger. MGI recommends facilitating the emergence of economic clusters of top-tier cities by providing rapid transport systems (such as eight to ten lane expressways) to connect them. MGI has identified 19 such clusters of two or more big cities together with their surrounding towns that account for 55 percent of the urban population and can seed the next wave of urbanization in India even beyond 2030. Such transportation corridors cost around US$50 per capita to build, and offer a low-cost seeding mechanism for India's ongoing urbanization. Tier 1 cities include Mumbai, New Delhi and Chennai and Tier 2 cities include Patna, Coimbatore and Cuttack. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, McKinsey Global Institute, April 2010) Cities as Economic Drivers

(Source: see endnote (i)) The graphic above lists the area and population of some of the major cities of India, and of the world. It also shows the GDP of these cities as of Fiscal 2007. These city GDPs are significant components of the overall economy of the country. For instance, New Delhi and Mumbai together contributed ` 2741 billion to the nation, which was 6% of India's GDP in 2007. The cities of Singapore and Hong Kong are by themselves large economies, ranked 43rd and 38th in the world (Source: see endnote (i)) The Components of Urbanisation

85

New cities and integrated townships are typically comprised of the following sectors / sub-sectors of economic activity: Real estate development Construction is distributed across hundreds of developers operating in geographies with low entry barriers. Infrastructure creation Multiple developers, EPC companies and sub-contractors operate in the sector with both municipal and private presence. Operations and maintenance Multiple municipal and development bodies operate in the sector with multiple private operators. Governance and regulation Multiple municipal and development bodies operate in the sector with limited private presence. City economy and consumption basket The consumption aspect of the industry is distributed over hundreds of businesses operating in any city with limited integrated presence and primarily includes hospitality, tourism and leisure, education, healthcare and retail.

As is evident, all these industry sectors / sub-sectors are fragmented between various industry players and integrating them under one management could bring in economies of scale. The Gurgaon Case Study Gurgaon is an example of a new satellite city benefitting from increased economic activity and urbanisation in the National Capital Region of India located in and around New Delhi. In 1995, the population of Gurgaon was 136,000 with residential spaces totalling just 1.1 million square feet. There was very little commercial and retail space (0.5 million square feet and 80 thousand square feet respectively). Since then however, Gurgaon has seen tremendous development over the last 15 years. The population grew to 229,000 in 2001, registering a decadal growth rate of 68.39%. (Source: Statistical Abstract of Haryana, 2007-08).

86

(Source: Statistical Abstract of Haryana) Commensurate with the rapid growth in population, Gurgaon witnessed extensive city building activity creating residential spaces, commercial spaces, retail spaces and hospitality spaces. Commercial office and retail spaces grew at a CAGR of 35% and 37% to 40 million square feet and 8.7 million square feet respectively by 2010. On the back of the economic activity generated by these commercial spaces, the total residential stock available in Gurgaon also increased at a CAGR of 35% to 98 million square feet in 2010 and the number of hotel rooms available increased from 180 in 2000 to 2100 in 2010, a CAGR of 27%, creating a city serving an estimated population of 370 (estimated based on decadal growth rate) thousand in 2010 in just 15 years. The growth in economic activity was faster between 2005 and 2010 (which is in line with the increase in the rate of GDP growth of the Indian economy from 6.5% between 1995 and 2005 and 9.4% between 2005 and 2010) and has not subsided yet. New residential projects totalling 41 million square feet, commercial projects totalling 20 million square feet and retail projects totalling six million square feet are in the pipeline and will likely be available in the next few years. The 2021 plan for Gurgaon-Manesar urban complex, which covers an area of 99 square kilometres has been developed for a projected population of 3.7 million (Gurgaon-Manesar Development Plan 2021). (Source: Feedback Ventures, Gurgaon - Exponential Growth, May 2010) The Mumbai-Pune Economic Corridor The Mumbai-Pune corridor (encompassing the districts of Mumbai city, Mumbai suburban, Thane, Raigad and Pune) is the largest economic corridor in India. It caters to a population of 29.6 million and contributed ` 2,908 billion to India's GDP in 2007 (Source: Economic Survey of Maharashtra, 2009-10). In comparison, the DelhiJaipur corridor (encompassing the districts of New Delhi, Gurgaon, Rewari and Jaipur) caters to a population of 20.7 million while contributing ` 1,937 billion to India's GDP in 2007. The District GDP of Gurgaon and Rewari districts is estimated on the basis of value added tax collections. (Source: Economic Survey of Delhi 2007-08; Delhi Budget 2009-10; Directorate of Economics and Statistics, Rajasthan; Haryana Statistical Abstract, 2009-10). The Bengaluru Mysore corridor (encompassing the districts of Bengaluru, Bengaluru (Rural), Mandva and Mysore) caters to a population of 11.8 million and contributed ` 997 billion to India's GDP in 2007 (Economic Survey of Karnataka, 2009-10). The comparison is starker when comparing tax collections. The Mumbai-Pune corridor paid ` 797 billion as income and corporate taxes, greater than the combined tax collections from Delhi-Jaipur and

87

Bengaluru-Mysore corridors (` 446 billion and ` 184 billion respectively, totalling ` 630 billion) (Lok Sabha starred question, 2008). The following tables set forth the population, GDP, taxes, investment and percentage of IT sector share for each corridor as of FY2007.

88

89

(Source: see endnote (i)) The growth potential of the Mumbai-Pune corridor is supported by the large number of projects (existing and upcoming) in the region. The following is a brief description of these projects: Navi Mumbai SEZ Located at Navi Mumbai, this 2,140 acre region is a multi product SEZ which is expected to provide commercial and trade facilities to various industries including the IT/ITES and gems and jewellery sectors. It is being developed by Navi Mumbai SEZ Private Limited, a special purpose company formed by City & Industrial Development Corporation in association with Dronagiri Infrastructure Private Limited. (Source: NMSEZ http://www.nmsez.com/) District GDP of Gurgaon and Rewari districts estimated on the basis of value added tax collections. This proposed industrial township is a 10,000 hectare development at Navi Mumbai, being developed by SKIL Infrastructure Limited. and Reliance Industries Limited. (SKIL Group http://www.skilgroup.co.in/MumbaiSEZ.asp) Dhirubhai Ambani Knowledge Centre Located in Navi Mumbai, this 140 acre centre serves occupants like Reliance (national headquarters), internet data centres, call centres, application development laboratories and the national network operations centre. (Source: Reliance BPO http://www.reliancebpo.net/public/exploredakc.html) Rewas Port This port at Rewas, with a potential to develop 70 berths, is being developed through a public-private partnership between the Maharashtra Maritime Board and the Reliance Group. It would encompass an area of 1033 hectares in the first phase, with nine berths. (Source: Rewas Ports http://www.rewasports.com/project.html) Jawaharlal Nehru Port Trust

90

This port, which handles 58% of India's total container traffic, is located at Nhava Sheva. It encompasses a total area of 2,584 hectares and has five berths which were developed through a public private partnership. (Source: JNPT Business Plan Vol 1; http://jnport.gov.in) Blue Ridge SEZ This integrated township covering 138 acres is located at Hinjewadi. It was developed by Paranjape Schemes (Construction) Limited. (Source: Blue Ridge E-Brochure http://www.blueridge.in/pdf/Blue%20Ridge-low.pdf) Kharadi Knowledge Park This 30 acre knowledge park is located near Pune-Nagar Road, developed by the Maharashtra Industrial Development Corporation. (Source: MIDC http://www.midcindia.org/Pages/default.aspx) SEZ/Industrial Area near Kolad This proposed SEZ consists of a 100 hectare plastic processing SEZ to be built by Supreme Petrochem Limited in Roha and an IT/ITES SEZ to be built over 17.227 hectares by Rameshwar Vaibhav Development Private Limited in Sudhagadh. (Source: SEZ India www.rohaonline.com) Aamby Valley This 10,000 acre planned city was developed by the Sahara India Pariwar, and includes high end villas, condominiums, hospitals, an 18 holed golf course and other amenities. (Aamby Valley City http://www.aambyvalleycity.com/) Khed SEZ This proposed SEZ in Khed is being developed by Khed Economic Infrastructure Private Limited, a special purpose company formed by Bharat Forge Limited and Maharashtra Industrial Development Corporation. (Source: MIDC http://www.seztimes.com/newsdetails.asp?newsCode=116) Megapolis This 150 acre premium residential property is located at Hinjewadi and was developed by Pegasus, a joint venture between Kumar Properties, Maharashtra Industrial Development Corporation and the Avinash Bhosale group (Source: Megapolis http://www.megapolis.co.in/). Rajiv Gandhi Infotech Park This IT/ITES and Biotech Park was developed by Maharashtra Industrial Development Corporation and is still expanding, with four phases planned covering a total area of 1,055 hectares (Source: MIDC http://www.punecorporation.org/pmcwebn/informpdf/CMP/Chapter%203%20formatting%20-3%20July.pdf). Magarpatta City This integrated township spread over 400 acres in Pune and was developed by Magarpatta Township Development and Construction Company Limited (Source: Magarpatta City http://www.magarpattacity.com/) The Real Estate Sector in India The real estate sector in India is mainly comprised of the development of residential housing, commercial buildings, hotels, restaurants, cinemas, retail outlets and the purchase and sale of land and development rights. Key characteristics of the real estate sector

91

The Indian real estate sector has traditionally been dominated by a number of small regional players with relatively low levels of expertise or financial resources. Historically, the sector has not benefited from institutional capital and has instead utilised high net-worth individuals and other informal sources of financing as its major source of funding, leading to low levels of transparency. Some of the key characteristics of the Indian real estate sector are: Highly fragmented market dominated by regional players: Rapid growth in the last decade has contributed to the emergence of larger players that have been able to capitalise on their early mover advantage to build high market shares, though generally they remain confined to local or regional markets. While the larger regional players are now initiating efforts to develop a broader geographic presence, their home markets continue to generate a majority of their profitability. The new cities and integrated township industry is similarly fragmented along the following lines: Local knowledge is critical to successful development: The property sector is generally regulated at the state level. As a result, the rules and regulations that impact, among other things, approval processes and transaction costs, vary from state to state. Also, real estate is affected by the geographic area surrounding the property which makes local knowledge essential for development. High transaction costs: The real estate sector has traditionally been burdened with high transaction costs as a result of stamp duty payable on transfers of title to property, the amount of which varies from state to state. Although the range and availability of financing products has been improving in recent years (see below), transaction costs are often increased further by limited access to formal funding and the corresponding dependence on informal, high-cost sources for funding. Enhanced role of mortgage financing: Over the past few years, a significant portion of new real estate purchases in India, particularly in the larger cities, have been financed through banks and financial institutions. This has been aided by a decline in interest rates and the broader availability of financing products, generally due to aggressive marketing and product development by financial institutions. Lack of clarity in land title: A significant number of land plots in India do not have clear title because of disorganised land registries and judicial delays in resolving ownership issues. Moreover, the transfer of land is subject to caveat emptor rules, which place the burden on the buyer to insure there are no defects in title prior to purchase. Finally, most land is held by individuals and families, which further obscures title to land. Availability of land: Real estate developers in India face challenges in connection with the purchase of land in India. The availability of land, as well as its use and development, is subject to regulations by various central, state and local authorities. Such restrictions could lead to a further shortage of developable land. For example, if a specific parcel of land has been deemed as agricultural land, no residential or commercial development is permitted without the prior approval of the local authorities. In addition, as large greenfield cities need a threshold size of between 5,000 acres and 10,000 acres to be sustainable, such greenfield opportunities are difficult and time-consuming. Sector governance issues: As a result of high transaction costs, real estate transactions in India often require large amounts of cash and lead to efforts to avoid taxes by using inefficient business structuring.

The Hospitality and Tourism Industries in India General With the increase of disposable income in the hands of middle class Indians, the propensity for spending a larger portion of income on travel and leisure has been steadily increasing. This factor, coupled with the changing lifestyle of the urban population and an increase in business travel, has created demand for mid-tier as well as high-end hotels and serviced apartments across the country. India is emerging as a destination for global tourism, increasing the demand for hotels and tourism across India. (Source: http://tourism.gov.in/)

92

Given the growing number of foreign tourists, the hospitality sector in India is expected to rise to US$275 billion in the next 10 years. The sector is also expected to see investments of over US$11 billion in the next two to three years. A number of international operators have been scouting in the country, identifying the locations best suited for their brand(s) and by the year 2011, about 40 international brands are likely to be present in the country. A number of new international operators are anticipated to enter the country, although, the mode of entry will be more conservative as compared to what it was three years ago, with a focus on opportunities that provide sufficient comfort levels on the proposed hotel's viability. (Source: Cushman & Wakefield India Report Almanac, April 2010) The performance of the hospitality sector is dependent upon the continued growth of the Indian economy. The hotel and tourism industry in recent years has generally been performing well in terms of foreign tourist arrivals, foreign exchange earnings, average rental rates and occupancy, supported by liberalisation of the aviation sector in India and efforts to improve the national tourist infrastructure. Government initiatives such as the Incredible India marketing campaign and quicker delivery of visas are also helping the industry. Foreign tourist arrivals in India increased from 2.03 million in the period from January to May 2009 to 2.26 million during the corresponding period in 2010. Foreign exchange earnings decreased from approximately ` 266.88 billion in the period from January to May 2009 to approximately ` 208.92 billion during the corresponding period in 2010. In May 2010, foreign exchange earnings were approximately ` 43.58 billion compared to ` 32.49 billion in May 2009. (Source: http://tourism.gov.in/) Further growth is expected in the industry, fuelled by increasing brand awareness of India and rising disposable incomes, easier availability of travel related information and relatively more convenient modes of transport. The World Travel and Tourism Council ranked the Indian travel and tourism industry 4th in long term growth (10 years). The demand is expected to grow at a real rate of 8.5%, increasing to ` 24 trillion (nominal) by 2020, with the direct contribution of the industry to GDP rising to ` 6.2 trillion (Source: World Travel and Tourism Council, 2010). The table below shows the components of the expected demand for travel and tourism. Business and leisure related travel is expected to increase, though personal travel is expected to continue its dominance. (in ` billion) 2020F 12,459 2,146 62 1,886 16,553 142 6,137 1,421 24,252

Component Personal Travel & Tourism Business Travel & Tourism Government Expenditures - Individual Visitor Exports Travel & Tourism Consumption Government Expenditures - Collective Capital Investment Other Exports Travel & Tourism Demand (Source: World Travel and Tourism Council, 2010) Maharashtra

2008 2,998 569 17 541 4,124 39 1,742 277 6,182

2009E 3,233 560 19 489 4,301 44 1,455 207 6,008

2010F 3,729 593 23 520 4,864 52 1,628 234 6,778

Maharashtra offers a variety of attractions for tourists including hill stations, pilgrimage spots, heritage, eco-tourism attractions and beaches. Recognizing the overall benefits of tourism, the government of Maharashtra formulated a 20 year perspective plan for development of sustainable tourism in 2003, which stresses private participation and gives importance to environmental and socio-economic concerns. It envisaged a total investment of ` 7.98 billion to develop road conditions, means of transport, communication, eating places, signage and public amenities. It also identified themes to promote tourism which included nature tourism, ethnic tourism, leisure tourism, corporate tourism, health tourism etc. (Source: Department of Tourism Maharashtra, 2003). The Healthcare Industry in India Healthcare services are critical to society and the economy, as they play an important role in reducing mortality rates and enhancing the quality of life. Although the state of Indian healthcare is changing rapidly, healthcare

93

infrastructure remains largely inadequate. The healthcare delivery market in India is expected to grow at a CAGR of 12 percent over the next five years to reach ` 2,977 billion by 2013, driven by an increase in the number of treatments as well as the cost per treatment. However, investments in healthcare infrastructure have been low in the past, and hence, the prevailing infrastructure in the sector is not robust enough to cater to the needs of the population. The country has only 0.9 hospital beds per 1,000 population as against the global average of 3.0 3.5 beds per 1,000 population. Apart from physical infrastructure, India has also been facing a shortage of physicians, and especially, nurses. The scarcity of beds coupled with a fast growing market represents a huge investment opportunity for players in this industry. CRISIL Research expects the healthcare sector to witness investments worth ` 873 billion over the next five years. According to CRISIL Research, India currently needs 1,238,604 beds. Its calculations further suggest that to the current requirement of 1,238,604 beds, India will need to add another 0.81 million beds during the period 2009-2018). Thus, India will need investments to the tune of ` 2,113 billion during 2009 to 2018. (Source: CRISIL Research Hospitals Annual Review, August 2009) Over the last two decades, the majority of tertiary care institutions in the public sector have been facing a shortage of resources and have not been able to obtain funds for the maintenance of equipment, the supply of consumables and infrastructure upgrades that are required to meet the growing demand for complex diagnostic and therapeutic treatments. As a result, private hospitals are becoming more popular in spite of higher costs. (Source: CRISIL Research, Hospitals Annual Review-State of the Industry, August 2009) The private sector accounts for 75-85% of total healthcare expenditure in India, which is among the highest proportions for private healthcare spending in the world. The sector has grown substantially in the past 15 years, making India one of the largest private healthcare sectors in the world. (Source: CRISIL Research, Hospitals Annual Review-State of the Industry, August 2009) In India, 100% FDI is permitted in the sector, and approval is through the automatic approval route. (Source: Master Circular - Foreign Investments in India Master Circular No. / 6/2004-05 dated July 1, 2004) The Education Industry in India The Indian education system comprises of formal and informal education. Formal Education Formal education comprises of primary and secondary schools and higher education. This segment is highly regulated by various statutory bodies formed by central and state governments. K-12 Education Pre-schooling offers a lucrative opportunity for investors as this segment is not regulated at present, and hence, private players can determine their own fees and earn profits. As there are few organised players, the market is very fragmented; however, brand consciousness is increasing gradually and well established companies can now charge a premium for their services. CRISIL Research expects the pre schooling segment to witness faster growth in the medium term on the back of rising affordability levels amongst the target population. (Source: CRISIL Research, June 2009) Various schools that are affiliated with CBSE, ICSE, state boards and other international boards deliver K-12 education in India. These schools are either run by central or state government or by the private sector. (Source: MHRD Annual Report 2008-09) Higher and Technical Education Higher education is governed by UGC, comprising graduate/medical/engineering courses. As on March 31, 2009, there are 471 universities comprising of 268 state universities, 40 central universities, 125 deemed universities, 5 institutions established under state legislations and 33 institutes of national importance established by central legislation. In addition, there are 22,064 colleges including around 2,260 colleges for women. At the beginning of the academic year 2008-09, the total number of students enrolled in universities and colleges has been reported to be

94

12.38 millions. Apart from above, as on December 11, 2009, there are 53 private universities established under various states. The technical education system in India can be broadly classified into three categories: central government funded institutions, state funded institutions & self-financed institutions. In 2008-09, there were 63 centrally funded institutions of technical and science education besides two Apex level Councils, namely, All India Council for Technical Education (AICTE) and the Council for Architecture. (Source: MHRD Annual Report 2008-09 and website of UGC) CRISIL Research expects demand for higher education to register steady growth in the medium term, driven by rising disposable income levels and favourable age demographics. Enrolments in higher education are forecast to increase at a CAGR of 6.5 percent from an estimated 16 million in 2007-08 to around 21 million by 2012-13. However, this would necessitate the setting up of nearly 9,000 institutions, which in turn, entails investments worth ` 1,000 billion over the next 5 years. (Source: CRISIL Research, Educational Services Annual Review, June 2009) Growth Drivers in Education Sector: Increasing population and lower literacy rate: Increasing population and constitution of 32.6% of population in the age group of 0 to 14 years will likely lead to increase in number of schools, colleges and universities. (Source: UNESCO) Increasing per capita income: Per capita income at current prices during 2009-10 is estimated to be ` 43,749 as compared to ` 40,141 during 2008-09, indicating a rise of 9%. This will likely contribute to an increase in the spending on education. (Source: Central Statistical Organisation) Urbanisation: India is migrating towards a services driven economy with the contribution of service and industry sectors to GDP increasing year on year. The lateral shift to a services economy is resulting in migration of people to cities and towns leading to mass urbanisation. Increasing urban population and demand for skilled workforce creates the need for better quality education.

The Retail Industry in India As in many nations, retail consumption in India was severely impacted as a result of the global economic downturn. Now that the nation's economic recovery is well under way, it is becoming apparent that the underlying factors which propelled India's consumerism in the past remain true today: Demographics are still favourable with two- thirds of the nations population below age 35 Urbanization is still rapidly occurring, and at a greater depth with many Tier III an Tier IV cities providing concentrations of retailing potential India's economy seems strong, suffering only a slowdown in the rate of growth during the global economic crisis while others contracting India's middle-class is still growing as are per capita incomes and the availability of credit The depth and breadth of organized retail penetration beyond India's major metros is still continuing into markets which offer favourable opportunities for retailers and property developers

The Indian retail market stood at US$330 billion in 2007 with little more than 4% of it being attributed to the organized retail sector. By the end of 2010 the organized segment is expected to grow to 10% of total retail within the country. This rapid growth of organized retail is partially attributed to the phenomenal burst of new shopping malls built over the last 3 years, an increasing number of which are located in the nation's smaller, underserved markets. However, organized retail is also being driven throughout India by resilient consumers who are typically

95

young, urbanized and brand-conscious shoppers with changing preferences towards consumerism and the means to pursue it. (Source: Jones Lang Lasalle Meghraj, Advance Retail: Off the Beaten Track, 2010)

(i) Tax Collection: http://www.indiastat.com/table/economy/8/corporatetax/18673/445080/data.aspx% IT Sector Share: Software Technology Parks of India (STPI) Annual Report 2008-09 Delhi Jaipur Corridor data Delhi : Population- Economic Survey of Delhi 2007-08, Demographic Profile GDP: Delhi Budget 2009-10 Highlights Investments: http://delhi.gov.in/wps/wcm/connect/lib_finance/Finance/Home/Budget/Budget+at+a+Glance+200809/Receipts%2C+Expenditure+and+Fiscal+Deficit Jaipur: Population: Statistical Abstract 2009, Directorate of Economics and Statistics, Rajasthan GDP: Estimate of District Domestic Product of Rajasthan, 1999-00 to 2005-06, Directorate of Economics and Statistics, Rajasthan Investments: Jaipur City Budget 2009-10 (Non Recurring Payments) Gurgaon and Rewari: Population: Statistical Abstract 2007-08, Directorate of Economics and Statistics, Haryana GDP: Statistical Abstract 2007-08, Directorate of Economics and Statistics, Haryana Gurgaon Investments : http://www.indianexpress.com/news/gurgaonsfirstcivicbudgetnewtaxes-foc/595387/, 21/06/2010 Mumbai - Pune Corridor Data Mumbai, Pune, Thane and Raigad Districts GDP and Population: Economic Survey of Maharashtra 2009-10, Directorate of Economics and Statistics, Maharashtra Investments: Mumbai = Greater Mumbai + Navi Mumbai Greater Mumbai: Consolidated Budget Summary 2008-09, Municipal Corporation Greater Mumbai Navi Mumbai: Navi Mumbai Municipal Corporation, Budget 2008-09, Cpital Budget summary Pune: Budget 2008-09, Pune Municipal Corporation Bengaluru - Mysore Corridor Data Bengaluru, Bengaluru (Rural), Mandya, Mysore Districts Population: http://des.kar.nic.in/ptc/KAGAreaPopulation.pdf GDP: Economic Survey 2009-10, Directorate of Economics and Statistics, Karnataka Investments: Bengaluru: Bruhat Benguluru Mahanagara Palike (BBMP) Budget Estimates 2009-10, Mysore: http://www.mysorecity.gov.in/ Delhi : Population & Area- Economic Survey of Delhi 2007-08, Demographic Profile GDP: Delhi Budget 2009-10 Highlights

Chandigarh: Population & Area: http://chandigarh.gov.in/knowchd_general.htm GDP: http://chandigarh.gov.in/stat07/SDP2007/SDP_tab1.pdf Gurgaon :

Population & Area: Evaluation Study of Delhi Metropolitan Area (DMA) Towns in National Capital Region (NCR), Town and Country
Planning Organization, Ministry of Urban Development, September 2007

GDP: Statistical Abstract 2007-08, Directorate of Economics and Statistics, Haryana


Greater Mumbai & Pune Districts

GDP, Population & Area: Economic Survey of Maharashtra 2009-10, Directorate of Economics and Statistics, Maharashtra
Pune Urban :

Population & Area Pimpri Chinchwad: Jawaharlal Nehru National Urban Renewal Mission City Development Plan 2006-12, Pimpri Chinchwad
Municipal Corporation, Volume 1, April 2006

Pune City: Jawaharlal Nehru National Urban Renewal Mission City Development Plan 2006-12, Pune Municipal Corporation,
Volume 1, April 2006

96

Mumbai Metropolitan Region:

Population & Area- Greater Mumbai City Development Plan 2005-2025


Singapore & Hong Kong :

Population & GDP


http://www.imf.org/external/pubs/ft/weo/2010/01/weodata/weorept.aspx?sy=2007&ey=2009&scsm=1&ssd=1&sort=country&ds=.&br= 1&c=576%2C532&s=NGDP%2CLP&grp=0&a=&pr.x=51&pr.y=11 Area: https://www.cia.gov/library/publications/the-worldfactbook/rankorder/2147rank.html?countryName=Singapore&countryCode=sn&regionCode=eas&rank=192#sn

HKD (Hong Kong Dollar) and SGD (Singapore Dollar) to INR (Indian Rupee) Conversion rate on 31/12/2007 was taken for GDP
Conversion: http://www.xe.com/ict/?basecur=INR&historical=true&month=12&day=31&year=2007&sort_by=name&image.x=32&image.y=13&i mage=Submit Population Gurgaon: Statistical Abstract 2007-08, Directorate of Economics and Statistics, Haryana (Extrapolated based on past growth rates) Hotel Rooms Gurgaon: Ministry of Tourism, Govt. of India; (for 2010) List of hotels and hotel rooms from Federation of Hotels and Restaurants Association of India (FHRAI)

97

OUR BUSINESS This Draft Red Herring Prospectus contains forward-looking statements that involve risks and uncertainties. Our estimates are based on our internal management plans, independent studies and research and are subject to various contingencies. Our future plans would also require certain government approvals, which, if not received, may adversely impact our development plan. There are certain events which may or may not happen, which may have an adverse impact on our development plan. Our results could differ materially from those anticipated in these forward-looking statements as a result of certain factors, including the considerations described below and elsewhere in this Draft Red Herring Prospectus. For details of such risks, see Risk Factors on page xii. In this section, unless the context otherwise requires, a reference to our Company or to we, us and our refers to Lavasa Corporation Limited, and our Subsidiaries and Associates on a consolidated basis. Unless otherwise stated or the context otherwise requires, the financial information used in this section is derived from our audited restated consolidated and unconsolidated financial statements. This section should be read together with Risk Factors on page xii and Industry on page 79. Overview We are a city development and management company engaged in the development, construction and management of Lavasa, a hill city development in India. The state of Maharashtra has declared an area of 18 villages in Mulshi and Velhe Tehasil in the district of Pune as a hill station, measuring approximately 23,014 acres (based on our internal estimates pursuant to review of available land records). As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land within this designated area. We were granted an in-principle approval by the state of Maharashtra to develop this land which was separately notified as a hill station pursuant to which we maintain exclusive development rights over the land owned by us. Our vision is to develop Lavasa as a city which provides avenues for its residents and visitors to live, work, learn and play in harmony with nature. The area declared as a hill station is almost one-fifth of the land area of Municipal Corporation of Greater Mumbai ( MCGM) and includes submerged land of 4,320 acres (Source: www.mcgm.gov.in and internal project report prepared by our planning department). Based on the land we own or have entered into MoUs and/or agreements to purchase as of September 10, 2010 measuring 13,226 acres, we estimate that Lavasa can accommodate a permanent population of approximately 300,000 with facilities for approximately two million tourists per annum. Cities comprise a myriad of businesses that are typically provided by multiple private and public entities and are governed by diverse regulatory frameworks. At Lavasa, we are developing businesses which, we believe, will over time facilitate and sustain the economy of Lavasa in a complementary fashion. We aim to develop a 365 day economy meaning that Lavasa will not simply be a weekend or tourist destination; instead, we aim to develop an economy at Lavasa where we expect to share in the revenue streams related to our ongoing consumption and infrastructure businesses. We expect that our initial real estate development and early stage investments in core infrastructure assets such as roads, dams, bridges, water and sewage network may lead to real estate revenues in the short term and ongoing consumption driven revenues from businesses located within Lavasa in the long term. Through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities in the hospitality, education, tourism and leisure, healthcare and retail sectors. We are consciously cultivating these interlinked and co-dependent businesses within the framework of our governance platform which we believe will significantly contribute to this economic integration. Driven by our focus on integration, we are organised as follows: Real estate. Our real estate business aims to continue to purchase, develop, sell built up structures and/or lease land and/or real estate assets across the residential, commercial, institutional, hospitality and social sectors. Our revenues are primarily derived from real estate sales and leases of built up structures and/or land leases, grant of long term leasehold interests in the underlying lands and, to a lesser extent, the lease of certain assets and our consolidated revenue from this business was ` 3,063.71 million for FY 2010 and ` 2,071.04 million for FY 2009. Governance. Pursuant to a notification dated June 12, 2008, issued under the MRTP Act, (SPA Notification), the Government of Maharashtra has appointed our Company as a special planning authority in connection with land owned and proposed to be developed by us. The SPA is our governance platform,

98

which aims to ensure an optimum quality of life for our residents and visitors and benefits from exclusive development rights. In terms of the MRTP Act, the SPA is required to, from time to time, submit its proposals for the developments of the land in the area as detailed in the SPA Notification, (being land either currently owned by us or land which is proposed to be purchased by us), (Statutory Proposals), to the State Government after having invited and considered suggestions and objections from the public. The State Government may in turn, after consultation with the Director of Town Planning, approve such Statutory Proposals either with or without modification. The Statutory Proposals are required to be prepared taking into consideration the provisions of any regional plan or a draft thereof, any development plan, building bye-laws and regulations, which are already in force in the area notified under the SPA Notification. Prior to the SPA Notification, pursuant to a letter dated June 7, 2008, the Office of the Collector, Revenue Department, District Pune, has approved and granted permission to our Company for our proposed development at Dasve and Padalghar for a total area of 636.82 hectares. Currently, the draft Statutory Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication amongst others in the official gazette and local newspapers, for public review and receipt of public suggestions and objections thereon. Consequently, this draft Statutory Proposals, after having considered the objections and suggestions received from the public, as appropriate, shall be submitted to the State Government for its approval. The SPA also approves certain draft development control regulations applicable to the land under the control and jurisdiction of the SPA (the Lavasa DCRs), which are required to be subsequently approved by the State Government. The Lavasa DCRs are required to be within the framework of the regional plan, which includes the Hill Station Regulations and the development control rules, regulations, and notifications issued by the State Government of Maharashtra, as applicable to the notified area in the Pune district (the Pune Region DCRs). Thus, the SPA prepares the Statutory Proposals and the Lavasa DCRs and supervises and ensures that all development within the city is in accordance with the Statutory Plan, the Lavasa DCRs, the master plan designed by our Company with HOK International Limited and applicable statutory, regulatory and other requirements. Infrastructure. We construct and own assets related to dams, water and sewage, drainage, solid waste management, power, roads, street lighting, landscaping, public utilities and information, communication and technology. We expect that our information, communication and technology infrastructure will include telephone, mobile and broadband networks, e-governance and a data centre. In addition, we also construct, develop and maintain social infrastructure such as townhalls, parks and gardens, post offices and police and fire stations. In addition, our city management team enforces our public health and welfare, public safety and regulations and will maintain our infrastructure and civic amenities once these become operational. We aim to provide better services than those available in the average Indian city and to achieve economies of scale given the size of Lavasa's expected population and the scale of Lavasa. Based on our engineer certificate dated August 11, 2010, on the land that we own and have developed as of the date of this Draft Red Herring Prospectus, we expect to treat 100% sewage and solid waste generated, we expect to have 100% piped water, sewage and septic tank coverage, our storm water drains are expected to cover 120% of our road network and we have designed our water supply to deliver 216 litres per capita per day, all of which, according to McKinsey Global Institute (MGI), are better than or comparable to current best-inclass standards. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Consumption. Our consumption business comprises businesses in the hospitality, education, tourism and leisure, healthcare and retail sectors and aims to achieve ongoing annuity revenues through tie-ups with corporate and other institutions in the relevant sectors. o Hospitality. Our hospitality business comprises of hotels, a convention centre and clubs. Together with our partners, we aim to offer hotels of various categories ranging from budget to high-end hotels. We have been granted mega status by the Tourism and Cultural Affairs

99

Department, Government of Maharashtra under the Tourism Policy 2006 of the Government of Maharashtra in connection with our proposed tourism project at Lavasa Hill Station at Taluka Mulshi and Velhe falling under 'C' zone. Fortune Select Dasve and Mercure Lavasa, two hotels developed by us, are currently operational and we have also developed an international convention centre in Dasve with a plenary capacity of 1,500 people, which commenced operations in April 2010. Further, Dasvino, our town and country club, has also started its operations in April 2010. o Education. We have tied up with international and national educational institutions to establish an education infrastructure traversing primary, secondary, tertiary and continuing education aimed at providing quality education centred around recognised national and international curricula. Our revenue from the education business is derived from lease income from the educational institutions and, in some instances, ongoing revenue pursuant to our shareholdings in these businesses. As of the date of this Draft Red Herring Prospectus, we have entered into arrangements with institutions, such as Educomp Infrastructure and School Management Limited, Birla Edutech Limited and Ecole Hoteliere de Lausanne whereby we will develop educational institutions jointly with these entities. Tourism and leisure. We intend to offer various tourism and leisure amenities such as golf training, boating, nature trails, water sports, outdoor sports, adventure sports and theme based entertainment parks with an intention to draw visitors to Lavasa. We have arrangements in place with Space Investment Corporation LLC to set up a space themed entertainment park, Nick Faldo Designs Overseas Limited for designing the golf course at Dhamanohol, Faldo Academies Limited for golf training academy at Mugaon, a licence agreement with Golden Five Limited for rowing and training activities with Sir Steve Redgrave and have signed term sheets with Hockey Australia, Manchester City Football Club Limited and I Dream Productions Private Limited. Healthcare. We have entered into arrangements with Apollo Hospitals Enterprise Limited for health and wellness development at Lavasa, covering primary hospitals, wellness research development and medical education and have developed a hospital with a capacity of 60 beds at Dasve through a subsidiary. Retail. We are developing commercial retail spaces with an intention to lease such spaces and in some cases lease land on a long term basis for the lessee to set up diverse retail businesses. We are developing retail spaces ranging from single brand flagship stores to retail squares concentrated in the town centre. In addition, we are developing retail spaces attached to a space themed entertainment park.

We view Lavasa as a replicable model for the development of future cities and we will, in our view, have a competitive advantage with respect to bidding for and efficiently developing and executing such future cities. We will, on an opportunistic basis, evaluate options for developing future cities and marketing our city management expertise to other developers of new cities. We are jointly promoted by HCC, a recognised engineering, construction and infrastructure development company in India, through its wholly-owned subsidiary company HREL. HCC holds a 64.99% stake in Lavasa, through its subsidiary, HREL. The following chart shows Lavasa together with its various projects in the hospitality, healthcare, tourism and leisure, education, retail and city management and infrastructure businesses:

100

Lavasa Corporation Limited (Subsidiaries and Associates) Structure Chart

Lavasa Corporation Limited

Hospitality

Healthcare

Tourism & Leisure

Education

Retail

City Management and Infrastructure

100%

Lavasa Hotel Limited

93.22%

Apollo Lavasa Health Corporation (2) Limited

100%

Lakeshore Watersports Company Limited

100%

Dasve Hospitality Institutes Limited

100%

Dasve Retail Limited

100%

Whistling Thrush Facilities Services Limited

100%

Warasgaon Lake View Hotels Limited

100%

Full Spectrum Adventure Limited

49% Knowledge Vistas Limited

100%

Nature Lovers Retail Limited

100%

Warasgaon Power Supply Limited

26%

Ecomotel Hotel Limited

100%

Valley View Entertainment Limited

74%

Spotless Laundry Services Limited Lavasa Bamboocrafts Limited

100%

Sahyadri City Management Limited

100%

Dasve Convention Center Limited

100%

Warasgaon Tourism Limited

100%

100%

Warasgaon Infrastructure Providers Limited

100%

Dasve Business Hotel Limited

100% 19%

Kart Racers Limited

81% My City Technology Limited


(3)

100% Lakeview Clubs Limited 26% Palmetto Hospitality Limited 26% Bona Sera Hotels Limited 26% SOL Hospitality Limited 100% Verzon Hospitality Limited 100% Rhapsody Hospitality Limited 100%

Space Theme Park India Limited

Andromeda Hotels Limited (1)

100% Sirrah Palace Hotels Limited 100% Our Home Service Apartments Limited 100% Hill City Service Apartments Limited (1) 60% Green Hill Residences Limited 100% Reasonable Housing Limited (1)

(2)

To reduce to 26% pursuant to the terms of the termsheet dated April 26, 2010 with Rachvan Singh and Associates. To reduce to 49 % pursuant to an allotment of shares and a further infusion by Apollo Hospitals Enterprise Limited in accordance with the shareholders agreement dated September 21, 2007.

(3)

101

Space Theme Park India Limited is currently not an Associate of our Company. The shareholding of our Company in Space Theme Park India Limited shall increase to 40% pursuant to the addendum to the shareholders joint venture agreement dated June 23, 2010.

Our Strengths We believe our principal competitive strengths are as follows: Market opportunity and our market position According to the MGI, India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. MGI also notes that urbanisation requires US$ 1.2 trillion of additional capital investments by the year 2030. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Primary drivers of this demand are the expected increase in the proportion of the Indian population living in cities and expected Indian GDP growth. We believe that barriers to entry will prevent competitors from capturing some of this market opportunity, as a development of the scale of Lavasa requires significant upfront investments and revenue starts accruing after long periods of time. For instance, while we commenced real estate development and sales of built up structures and/or leasing arrangements in 2007, we started the purchase of land in 2002 and have been developing infrastructure for the last five years. Special regulatory approvals and consents are required to purchase land for the purpose of establishing and developing a city and a successful city development requires expertise and partnerships across various sectors of the economy, including infrastructure, education, hospitality, tourism and city management services. Accordingly, there are barriers to entry into the city development industry and we believe that we are aptly positioned to participate in any opportunities of a similar scale that may arise in India. Our location and size advantage Lavasa is located 42 kilometres from Chandni Chowk, an area on the outskirts of Pune and 216 kilometres from Mumbai (via Chandni Chowk), and, accordingly, Lavasa lies in close proximity to the Mumbai Pune corridor. We believe that the Mumbai Pune corridor, with an estimated population of 29.6 million and a contribution of ` 2,908 billion to India's GDP in FY 2010, is India's largest economic corridor, with higher population and GDP than the Delhi-Jaipur corridor located in north India and the Bengaluru-Mysore corridor located in the south. For further details, see Industry Overview on page 79. As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land near the Mumbai Pune corridor. In light of the scarcity of land in Mumbai and Pune, the pressure of economic activities and residential developments are spreading along the transportation links, namely expressway, highway and railway lines between the two cities, leading to the emergence of a strong corridor of economic development. We expect that Lavasa, because of its location and size, will benefit from this economic activity. Our integrated business model We believe that the various businesses that comprise the development and management of Indian cities (such as real estate, infrastructure, consumption and governance) are currently fragmented in most Indian cities. We expect that our initial real estate development and early stage investments in core infrastructure assets such as roads and water dams may lead to real estate development revenues in the short term and ongoing consumption driven revenues from businesses located within Lavasa in the long term. Through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities in the hospitality, education, tourism and leisure, health and wellness and retail sectors. We are consciously cultivating these interlinked and dependent businesses within the framework of our governance platform, which, we believe, will significantly contribute to this economic integration. We believe our business model will provide us with an optimal mix of revenue streams which are lease premiums, project management consultancy fees, returns on equity infusion, sales and/or leases of retail built up area, lease rentals from rental housing, lease rentals linked to revenues of retail outlets and fees for design and construction on the leased land. In addition, we will typically pursue a new business project after identifying a partner with adequate knowledge of operations in the relevant sector. Such industry participant is typically required to contribute equity in the related subsidiary or associate. This allows us to (i) share the risk of any new venture with specialists, (ii) avail of their expertise in their respective fields and (iii) provide us with an additional source of funds for growth.

Our governance platform

102

Our governance platform allows us exclusive development and management rights through the SPA. The SPA framework permits us to enforce our rights and coordinate the approvals, permissions and certificates required in order to implement our development plan. Our governance platform facilitates the development of Lavasa in a thoughtful, coordinated and efficient manner. We believe that the governance platform will be a key attraction to potential residents and business partners. Our promoters HCC has been involved in the development of Lavasa since 2004 and the professionals who worked at HCC on Lavasa have in many instances become our employees. They have through their work at HCC developed expertise in infrastructure related projects which are important aspects of the development of Lavasa. We expect to benefit from the project management expertise and guidance of HCC, as well as its established business relationships and its brand recognition throughout India. Our employee base Our senior management includes experienced professionals who head our different functional units. For details of our Board of Directors and senior management, please see Our Management on page 157. As of June 30, 2010, Lavasa Corporation Limited had over 447 employees on its rolls and we expect to selectively expand the employee base incrementally as the size of our operations increases. The majority of these employees are engineers, architects, management graduates and chartered accountants. We also employ a city manager, Scot Wrighton, with over 20 years of international experience in city management in the states of Illinois, Kansas and Missouri in the U.S.A. Tie-ups with recognised industry participants in diverse businesses We have arrangements in place with recognised partners, such as AAPC Singapore PTE Limited for the management and operation of hotels, Langham Hospitality Limited for providing technical advisory services to our hotel, Faldo Academies Limited for developing a golf training academy, Educomp Infrastructure and School Management Limited for developing educational institutions, Christel House India, a trust set up for the benefit of under privileged children, Career Launcher for conducting courses and training programs and Ecole Hoteliere de Lausanne for providing consultancy services to us in connection with the development of a hospitality learning institute. In addition, we have entered into a technical audit, pre-opening, operating and marketing services agreement with Fortune Park Hotels Limited and a shareholders' agreement with Space Investment Co LLC, UAE relating to a space themed entertainment park. In the healthcare sector we have arrangements in place with Apollo Hospitals Enterprise Limited. Our arrangements, which we expect will provide us with diverse revenue sources and requisite industrial and operational knowledge, are key aspects of our marketing and branding strategies and we will continue to target key strategic partners. For most of our tie-ups, we set up a subsidiary or an associate with our counterparty with relevant expertise to align our interests and leverage such expertise. Our track record As of June 30, 2010, we have executed and registered lease deeds, agreements to lease, and/or have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) with various customers in connection with the lease of an aggregate of 896 apartments, 461 villas (including sale of built up area), 127 villa plots and 399 rental housing units (including sale of built up area). Further, we have entered into MoUs and signed term sheets for lease on a long term basis of 90.54 acres of land to various customers in the commercial, institutional, hospitality and social (including education) sectors. We have leased 106,384 sq. ft. of retail space to our subsidiary, DRL for the purpose of setting up and operating retail, food and beverage and other such outlets. As of June 30, 2010, DRL has leased out 28,249 sq. ft. to various brands through leave and licence agreements and has also signed term sheets for the lease of a further 11,757 sq. ft. We have also leased on a long term basis 197,462 sq. ft. of developable area for providing hostel facilities to educational institutions, which we expect to be completed by FY 2012. For further details related to our real estate track record and real estate projects under construction, please see Our real estate business on page 114.

103

Several key infrastructure projects have already been completed, such as the Dasve Dam, a 35.5-kilometre water distribution network, 51.5 kilometres of sewerage collection network, 12.5 kilometres of transmission network and 36.5 kilometres of distribution line network. Several other key infrastructure projects are under design and development, such as the Gadle Dam, Mugaon tunnel, 22.9 MLD of water treatment and 20 MLD of sewage treatment capacity, 51 MW of power capacity and an extensive network of internal and external roads. In addition, we have entered into agreements with various service providers to provide city wide network infrastructure, telecommunications and wireless internet services to residents, tourists and corporates. Our Strategy We aim to develop Lavasa as a planned city which provides avenues to its residents and visitors to live, work, learn and play in harmony with nature. We aim to achieve this through: Diverse demographic model We believe that economic diversity is required for a thriving city. We intend to continue to cultivate a diverse economy where we participate in most sectors through investments with our partners who are shareholders in our subsidiaries or associates. By making early and strategic investments in our core competencies, including real estate and infrastructure development, we were able to generate considerable real estate revenues thereby further facilitating tie-ups with such partners and positioning us, together with our partners, to capture the consumption opportunities at Lavasa. Furthermore, we intend to continue to design and price our real estate lease arrangements at Lavasa to appeal to a diverse demography. We believe that such an approach, which is diversified across sectors of the economy, will lead to sustainable demand from potential residents and visitors and will contribute to the growth of Lavasa. Optimal revenue mix In FY 2010, 99.17% of our revenue related to lease arrangements which included sale of built up structures. As of September 10, 2010, we own approximately 9,460 acres of land and have entered into MoUs in relation to the purchase of approximately 3,766 acres. We expect to purchase an additional approximately 5,469 acres of land within the hill station notified area on an opportunistic basis which, we expect, will generate additional sources of revenue for us. Over time and on an opportunistic basis, we expect to shift our revenue strategy such that an increasing proportion of our revenues will be derived from revenues from businesses, visitors and residents located at Lavasa. We believe that the growth in the economy of Lavasa will allow our subsidiaries and associates to generate higher revenues. We have already entered into arrangements with such institutions and companies which in our view are recognised in their respective industries. We intend to continue to explore additional tie-ups across Lavasa with a view to expand our reach in the economy of Lavasa for the long term. Continuing to target recognised companies as partners We will typically only pursue a new business project at Lavasa after indentifying a company with the appropriate expertise in the relevant sector. We are selective with respect to our potential partners. We expect that our stringent standards will only increase following the initial completion of Dasve which, we believe, will serve as a showcase that will attract additional participants to our other planned towns and contribute to Lavasa's economy in the long term. Non-residential development aimed at driving residential demand We aim to achieve an optimal mix of development at Lavasa with over two-thirds of the real estate developments planned for Period 1. We expect that this may lead to generation of residential demand in future periods. Attractive commercial and social institutions are organic drivers of residential real estate demand and our early focus on nonresidential real estate development such as hospitality and retail real estate together with our tie-ups with recognised companies may, in our view, drive our residential real estate market.

Front-end infrastructure components

104

For each stage of our development, our strategy includes early investments in key infrastructure assets which we believe may drive real estate development revenues. At Dasve, several key infrastructure assets such as the road between Warasgaon and Dasve, Dasve Dam, water treatment plant, sewage treatment plant, drainage and distribution network, power transmission and distribution network and an enhanced fibre optic network have been completed and through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities. With Dasve expected to be substantially operational during FY 2012, the infrastructure of our second town is under development with substantial commencement of operations expected during FY 2014 and in particular the Mugaon tunnel will be operational by FY 2013. Leveraging our intellectual property According to the McKinsey Global Institute, India should build at least 25 new satellite cities to accommodate populations in each of up to one million people. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). We will consider undertaking such projects on an opportunistic basis and applying our Lavasa related industry and market knowledge to such opportunities. We believe that our experience in designing and developing the infrastructure, town planning and management at Lavasa, on the one hand, as well as our existing relationships with industry leaders in the infrastructure, education, hospitality, tourism and town planning and management sectors, on the other hand, will give us a competitive advantage in winning and efficiently executing such future projects. We have entered into a consultancy agreement dated September 9, 2010 with our Promoters, pursuant to the terms of which, HCC/HREL and/or its affiliates conferred exclusively upon our Company, in relation to undertaking development of new cities, the right to develop, operate, manage and maintain such new cities and/or act as a consultant in relation thereto. In the event we propose to develop any new cities either by ourselves or through any of our Subsidiaries, neither our Promoters nor any of their affiliates shall have the right to develop such new city. In the event that the development of any new city is not proposed to be carried out by our Company or any of our Subsidiaries, our Promoters have agreed to appoint us as consultants to HCC, HREL, and/or any of their respective affiliates which propose to undertake such development. Any intellectual property, whether registered or not, pertaining to the development, operations, management, planning and maintenance of any future new cities shall vest exclusively with our Company. We are considering developing one such city in the Dholera Special Investment Region (SIR) in Gujarat in association with HCC Real Estate Limited. This potential development has a different concept and platform from Lavasa, but would be built on the foundations of our intellectual property. Our Master Plan and Development Plan The state of Maharashtra has declared an area of 18 villages in Mulshi and Velhe Tehasil in the district of Pune as a hill station, measuring approximately 23,014 acres (based on our internal estimates pursuant to review of available land records). As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land within this designated area. Pursuant to the master plan which we designed in conjunction with HOK International Limited (the Master Plan), we purchased land required for development activities and constructing basic infrastructure and invested in infrastructure and essential amenities early in our life cycle, followed by a focus on development of an economic activity base, and phased development and occupancy growth. Our development plan, which is an evolving and adaptive document, targets the development of 12,553 acres of land over five towns comprising of 14 villages and is spread over four development periods. As of September 10, 2010, Lavasa is comprised of 9,460 acres. We have entered into MoUs in connection with the purchase of an additional 3,766 acres. We will consider opportunistically purchasing an additional 5,469 acres of developable land within the hill station for purposes of progressing our development plan which is organised into the following four periods. Period 1 (pre 2008 - FY 2011) Our focus has been and will likely continue to be holistically developing a major part of Dasve, our first town (hereafter referred to as Town 1), which is spread over 1,416 acres. We commenced the development of Dasve by first investing in core infrastructure and real estate development. We also initiated development of projects in the education, hospitality, tourism and leisure (including sports) and healthcare sectors. These economic drivers, we

105

believe, will generate significant residential demand in Period 2. Our aim is that every square foot of non-residential asset development will lead to approximately two square feet of residential asset demand. Figure 1 below reflects the land we intend to develop in Town 1 on a standalone basis and whether such land is submerged, forest or available for development and the status of purchase of the land. Figure 2A below reflects our estimated total planned land development during Period 1 on a standalone basis across the residential, commercial, hospitality, institutional and social real estate markets, as measured by square feet constructed. Figure 2B reflects the developable area which we expect to lease on a long-term basis to subsidiaries and associates during Period 1. Figure 2C reflects the developable area which we expect to lease on a long-term basis to third parties during Period 1. Figures 1, 2A, 2B and 2C reflect expected real estate development relating to and contained on land we own or with respect to which we have entered into MoUs in connection with purchase on the date of this Draft Red Herring Prospectus. We may be unable to develop or sell the built up structures and/or lease the underlying land referred to in Figures 1 and 2A below and lessees of the developable area do not necessarily intend to develop the land referred to in Figures 2B and 2C during Period 1 and they may be unable or unwilling to develop the land at all. In addition, with respect to the developable area in Figure 2C leased to third parties, we will have no recourse or rights with respect to the revenues relating to the developable area. For additional risks relating to our development plan, please see Risk Factors We may be unable to successfully implement our development plan on page xv.

Figure 1 Town 1 Land Type (acres) Total land area 2,424.57 Submerged (198.12) Forest * (560.02) Developable area 1,666.43 Area already purchased 1544.25 Area under MoU 9.01 Balance area to be purchased 113.17 Land above 1000 m * (137.65) Land under water body 0.00 Contingency 0.00 Net Area available for development** 1,415.61 * The hill station notification and the development plan excludes forest area and any development requires consent of applicable regulatory authorities. The in-principle sanction from the Urban Development Department permits no development over 1,000 meters. ** Includes the aggregate of total land available which we have developed and/or propose to develop ourselves and which we have leased and/or expect to lease on a long-term basis to subsidiaries and associates net of the submerged and forest land.

Figure 2A Period 1 Real Estate Construction Lavasa (standalone) (millions of square feet) Completed Construction Built-up Area(1) 0.45 Saleable Area(2) 0.45 Order Book(3) Builtup Saleable Area Area 2.08 2.08 Expected Additional Construction(4) Built-up Area 1.07 Saleable Area 1.87 Total Expected Construction(5) Built-up Area 3.60 Saleable Area 4.40

Residential

106

Commercial Hospitality Institutional Social Total (2A)

0.03 0.08 0.00 0.00 0.56

0.03 0.08 0.00 0.00 0.56

0.28 0.00 0.00 0.00 2.36

0.28 0.00 0.00 0.00 2.36

0.25 0.43 0.19 0.34 2.28

0.37 0.43 0.19 0.34 3.2

0.56 0.51 0.19 0.34 5.2

0.68 0.51 0.19 0.34 6.12

Figure 2B Period 1 Developable Area Subsidiaries and Associates (millions of square feet) Expected Additional Construction(4) Built-up Saleable Area Area 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Residential Commercial Hospitality Institutional Social Total (2B)

Completed Construction Built-up Saleable Area(1) Area(2) 0.00 0.00 0.02 0.02 1.92 1.92 1.98 1.98 0.43 0.43 4.35 4.35

Order Book(3) Built-up Saleable Area Area 0.00 0.00 0.00 0.00 0.65 0.65 0.00 0.00 0.33 0.33 0.98 0.98

Total Expected Construction(5) Built-up Saleable Area Area 0.00 0.00 0.02 0.02 2.57 2.57 1.98 1.98 0.76 0.76 5.33 5.33

Figure 2C Period 1 Developable Area Third Parties (millions of square feet) Expected Additional Construction(4) Built-up Saleable Area Area 0.07 0.07 0.05 0.05 0.73 0.73 3.82 3.82 1.56 1.56 6.23 6.23 8.51 9.43

Residential Commercial Hospitality Institutional Social Total (2C) Total Period 1(6)

Completed Construction Built-up Saleable Area(1) Area(2) 0.85 0.85 0.00 0.00 0.16 0.16 0.06 0.06 1.71 1.71 2.78 2.78 7.69 7.69

Order Book(3) Built-up Saleable Area Area 0.00 0.00 0.00 0.00 0.00 0.00 0.20 0.20 0.66 0.66 0.86 0.86 4.20 4.20

Total Expected Construction(5) Built-up Saleable Area Area 0.92 0.92 0.05 0.05 0.89 0.89 4.08 4.08 3.94 3.94 9.88 9.88 20.41 21.33

Notes: (1) Built-up area refers to completed construction excluding common areas. (2) Saleable Area refers to Built-up area plus common areas and includes (i) a sale/lease arrangement whereby we sell purchasers the physical structures or buildings and grant them a leasehold interest pursuant to a 999 year lease in the underlying land and (ii) pure long-term leases whereby we lease our real estate products, such as our apartments, to residents pursuant to a 999 year lease where no part of the transaction is structured as a sale. (3) Our Order Book refers to our real estate under construction for which an agreement for sale has been executed with a purchaser or projects for which a LoI/MoU has been executed which are yet to commence construction. (4) Expected Additional Construction refers to construction which we expect or propose to complete in Period 1 for which no agreement for sale, LoI or MoU has been executed. (5) Total Expected Construction refers to an aggregate of our completed construction, Order Book and Expected Additional Construction in Period 1.

107

(6)

Total Period 1 refers to the sum of (i) our estimated total planned land development during Period 1 (Figure 2A), (ii) the developable area leased to Subsidiaries and Associates during Period 1 (Figure 2B) and (iii) third parties during Period 1 (Figure 2C).

For additional risks relating to our development plan, please see Risk Factors Our development plan may fail to anticipate the construction/development of diverse institutions essential in a full fledged city; We may not be able to successfully manage the growth of our operations on page xvii. Period 2 (FY 2012-14) We expect that our focus during Period 2 would be to commence operations for a significant component of the development of the second town Town 2, with its constituent villages being Mugaon, Bhoini, Koloshi and Ugawali, spread over 2,466 acres, as the economic centre of Lavasa with a focus on continuing to build the Lavasa brand and the real estate platform, on the one hand, and consolidating education, tourism and leisure, hospitality and healthcare and other businesses and services primarily through the development of residential, office and supporting commercial projects, on the other hand. Figure 3 below reflects the land we intend to develop in Town 2 on a standalone basis and whether such land is submerged, forest or available for development and the status of purchase of land. Figure 4A below reflects our estimated total planned land development during Period 2 on a standalone basis across the residential, commercial, hospitality, institutional and social real estate markets, as measured by square feet constructed. Figure 4B reflects the developable area which we expect to lease on a long-term basis to subsidiaries, associates and third parties during Period 2. Figures 3, 4A and 4B reflect expected real estate development relating to and contained on land we own or with respect to which we have entered into MoUs in connection with purchase on the date of this Draft Red Herring Prospectus. We may be unable to develop or sell the built up structures and/or lease the underlying land referred to in Figures 3 and 4A below and the lessees of the developable area do not necessarily intend to develop the land referred to in Figure 4B during Period 2 and they may be unable or unwilling to develop the land at all. In addition, with respect to the developable area leased to third parties, we will have no recourse or rights with respect to the revenues relating to the developable area. For additional risks relating to our development plan, please see Risk Factors We may be unable to successfully implement our development plan on page xv.

108

Figure 3 Town 2 Land Type (acres) Total land area 5,233.87 Submerged (738.61) Forest* (1,002.18) Developable area 3493.07 Area already purchased 2083.14 Area under MoU 427.33 Balance area to be purchased 982.78 Land above 1000 m* (20.58) Land under water body (23.88) Net Area Available for Development** 2,465.83 * The hill station notification and the development plan excludes forest area and any development requires consent of applicable regulatory authorities. The in-principle sanction from the Urban Development Department permits no development over 1,000 meters. ** Includes the aggregate of total land available which we propose to develop ourselves and which we expect to lease on a long-term basis to subsidiaries and associates net of the submerged and forest land. Figure 4A Period 2 Real Estate Construction Lavasa (standalone) (millions of square feet) Total Expected Construction Built-up Area(1) Saleable Area(2) 19.47 24.02 6.27 7.73 0.11 0.11 0.00 0.00 2.89 3.89 28.74 35.75 Cumulative Construction(3) Built-up Area Saleable Area 23.08 28.42 6.84 8.41 0.61 0.61 0.19 0.19 3.22 4.23 33.94 41.86

Residential Commercial Hospitality Institutional Social Total (4A)

Figure 4B Period 2 Developable Area Subsidiaries, Associates and Third Parties (millions of square feet) Developable Area Built-up Area(1) Saleable Area(2) 0.00 0.00 0.00 0.00 1.02 1.02 5.10 5.10 0.92 0.92 7.04 7.04 35.78 42.79 Cumulative Developable Area(4) Built-up Area Saleable Area 0.92 0.92 0.07 0.07 4.48 4.48 11.15 11.15 5.61 5.61 22.23 22.23 56.17 64.09

Residential Commercial Hospitality Institutional Social Total (4B) Total Period 2(5)

Notes: (1) Built-up area refers to completed construction excluding common areas. (2) Saleable Area refers to Built-up area plus common areas and includes (i) a sale/lease arrangement whereby we sell purchasers the physical structures or buildings and grant them a leasehold interest pursuant to a 999 year lease in the underlying land and (ii) pure long-term leases whereby we lease our real estate products,

109

(3) (4) (5)

such as our apartments, to residents pursuant to a 999 year lease where no part of the transaction is structured as a sale. Cumulative Construction refers to the sum or our Total Expected Construction in Periods 1 and 2. Cumulative Developable Area refers to the sum of the developable area by our subsidiaries, associates and third parties in Periods 1 and 2. Total Period 2 refers to the sum of (i) our estimated total planned land development during Period 2 (Figure 4A) and (ii) the developable area expected to be leased to Subsidiaries, Associates and third parties during Period 2 (Figure 4B).

For additional risks relating to our development plan, please see Risk Factors Our development plan may fail to anticipate the construction/development of diverse institutions essential in a full fledged city; We may not be able to successfully manage the growth of our operations on page xvii. Period 3 (FY 2015 - 18) We expect that our focus for Period 3 would be to complete the development of Town 3 (constituting of Dhamanohol and Gadle) and Town 4 (comprising of Wadavali and Sakhari), spread over 4,165 acres with a focus on driving the economic activities by catering to the high-end residential market which for Lavasa refers to premium pricing in properties with special amenities, such as lake facing views and proximity to a golf course, linked to and helping sustain additional demand for hospitality, tourism and leisure. Figure 5 below reflects the land we intend to develop in Towns 3 and 4 on a standalone basis and whether such land is submerged, forest or available for development and the status of purchase of land. Figure 6A below reflects our estimated total planned land development during Period 3 on a standalone basis across the residential, commercial, hospitality, institutional and social real estate markets, as measured by square feet constructed. Figure 6B reflects the developable area which we expect to lease on a long-term basis to our subsidiaries, associates and third parties during Period 3. Figures 5, 6A and 6B reflect expected real estate development relating to and contained on land we own or with respect to which we have entered into MoUs in connection with purchase on the date of this Draft Red Herring Prospectus. We may be unable to develop or sell the built up structures and/or lease the underlying land referred to in Figures 5 and 6A below and the lessees of the developable area do not necessarily intend to develop the land referred to in Figure 6B during Period 3 and they may be unable or unwilling to develop the land at all. In addition, with respect to the developable area leased to third parties, we will have no recourse or rights with respect to the revenues relating to the developable area. For additional risks relating to our development plan, please see Risk Factors We may be unable to successfully implement our development plan on page xv.

Figure 5 Towns 3 and 4 Land Type (acres) Town 3 Town 4 Total land area 6,545.43 2,041.61 Submerged (262.12) (381.22) Forest * (1,945.50) (380.18) Developable area 4,337.82 1,280.21 Area already purchased 2,923.70 1,129.53 Area under MoU 176.00 0.00 Balance area to be purchased 1,238.12 150.67 Land above 1000 m * 0.00 0.00 Land under water body (64.39) 0.00 Contingency 0.00 0.00 Net Area Available for 3,035.31 1,129.53 Development** * The hill station notification and the development plan excludes forest

110

area and any development requires consent of applicable regulatory authorities. The in-principle sanction from the Urban Development Department permits no development over 1,000 meters. ** Includes the aggregate of total land available which we propose to develop ourselves and which we expect to lease on a long-term basis to subsidiaries and associates net of the submerged and forest land.

Figure 6A Period 3 Real Estate Construction Lavasa (standalone) (millions of square feet) Total Expected Construction Built-up Area(1) Saleable Area(2) 29.67 35.96 26.91 33.15 0.00 0.00 0.00 0.00 0.03 0.03 56.61 69.14 Cumulative Construction(3) Built-up Area Saleable Area 52.75 64.37 33.74 41.55 0.61 0.61 0.19 0.19 3.26 4.26 90.55 110.98

Residential Commercial Hospitality Institutional Social Total (6A)

Figure 6B Period 3 Developable Area Subsidiaries, Associates and Third Parties (millions of square feet) Developable Area Built-up Area(1) Saleable Area(2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.59 0.59 0.59 0.59 57.20 69.73 Cumulative Developable Area(4) Built-up Area Saleable Area 0.92 0.92 0.07 0.07 4.48 4.48 11.15 11.15 6.20 6.20 22.82 22.82 113.37 133.80

Residential Commercial Hospitality Institutional Social Total (6B) Total Period 3(5)

Notes (1) (2)

(3) (4) (5)

Built-up area refers to completed construction excluding common areas. Saleable Area refers to Built-up area plus common areas and includes (i) a sale/lease arrangement whereby we sell purchasers the physical structures or buildings and grant them a leasehold interest pursuant to a 999 year lease in the underlying land and (ii) pure long-term leases whereby we lease our real estate products, such as our apartments, to residents pursuant to a 999 year lease where no part of the transaction is structured as a sale. Cumulative Construction refers to the sum or our Total Expected Construction in Periods 1, 2 and 3. Cumulative Developable Area refers to the sum of the developable area by our subsidiaries, associates and third parties in Periods 1, 2 and 3. Total Period 3 refers to the sum of (i) our estimated total planned land development during Period 3 (Figure 6A) and (ii) the developable area expected to be leased to Subsidiaries, Associates and third parties during Period 3 (Figure 6B).

For additional risks relating to our development plan, please see Risk Factors Our development plan may fail to anticipate the construction/development of diverse institutions essential in a full fledged city; We may not be able to successfully manage the growth of our operations on page xvii.

111

Period 4 (FY 2019-21) We expect that our focus for Period 4 would be to develop the remaining areas of our Master Plan (classified as Town 5) by developing about 4,507 acres of land in Pathersehjet, Admal, Padalghar, Bhode, Palase, Bembatmal, Mose (Bk), Saiv (Bk) and Warasgaon villages in line with our strategies. Figure 7 below reflects the land we intend to develop in Town 5 on a standalone basis and whether such land is submerged, forest or available for development and the status of purchase of land. Figure 8A below reflects our estimated total planned land development during Period 4 on a standalone basis across the residential, commercial, hospitality, institutional and social real estate markets, as measured by square feet constructed. Figure 8B reflects the developable area which we expect to lease on a long-term basis to subsidiaries, associates and third parties during Period 4. Figures 7, 8A and 8B reflect expected real estate development relating to and contained on land we own or with respect to which we have entered into MoUs in connection with purchase on the date of this Draft Red Herring Prospectus. We may be unable to develop or sell the built up structures and/or lease the underlying land referred to in Figures 7 and 8A below and the lessees of the developable area do not necessarily intend to develop the land referred to in Figure 8B during Period 4 and they may be unable or unwilling to develop the land at all. In addition, with respect to the developable area leased to third parties, we will have no recourse or rights with respect to the revenues relating to the developable area. For additional risks relating to our development plan, please see Risk Factors We may be unable to successfully implement our development plan on page xv.

Figure 7 Town 5 Land Type (acres) Total land area 13,152.99 Submerged (2,739.64) Forest * (2,496.40) Developable area 7,916.95 Area already purchased 1,779.56 Area under MoU 3,152.90 Balance area to be purchased 2,984.48 Land above 1000 m * (114.34) Land under water body (11.56) Contingency 300.00 Net Area Available for Development** 4,506.57 * The hill station notification and the development plan excludes forest area and any development requires consent of applicable regulatory authorities. The in-principle sanction from the Urban Development Department permits no development over 1,000 meters. ** Includes the aggregate of total land available which we propose to develop ourselves and which we expect to lease on a long-term basis to subsidiaries and associates net of the submerged and forest land. Figure 8A Period 4 Real Estate Construction Lavasa (standalone) (millions of square feet) Total Expected Construction Built-up Area(1) Saleable Area(2) 50.67 65.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cumulative Construction(3) Built-up Area Saleable Area 103.42 129.97 33.74 41.55 0.61 0.61 0.19 0.19 3.26 4.26

Residential Commercial Hospitality Institutional Social

112

Total (8A)

50.67

65.6

141.22

176.58

Figure 8B Period 4 Developable Area Subsidiaries, Associates and Third Parties (millions of square feet) Developable Area Built-up Area(1) Saleable Area(2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.67 65.60 Cumulative Developable Area(4) Built-up Area Saleable Area 0.92 0.92 0.07 0.07 4.48 4.48 11.15 11.15 6.20 6.20 22.82 22.82 164.04 199.40

Residential Commercial Hospitality Institutional Social Total (8B) Total Period 4(5)

Notes: (1) Built-up area refers to completed construction excluding common areas. (2) Saleable Area refers to Built-up area plus common areas and includes (i) a sale/lease arrangement whereby we sell purchasers the physical structures or buildings and grant them a leasehold interest pursuant to a 999 year lease in the underlying land and (ii) pure long-term leases whereby we lease our real estate products, such as our apartments, to residents pursuant to a 999 year lease where no part of the transaction is structured as a sale. (3) Cumulative Construction refers to the sum or our Total Expected Construction in Periods 1, 2, 3 and 4. (4) Cumulative Developable Area refers to the sum of the developable area by our subsidiaries, associates and third parties in Periods 1, 2, 3 and 4. (5) Total Period 4 refers to the sum of (i) our estimated total planned land development during Period 4 (Figure 8A) and (ii) the developable area expected to be leased to Subsidiaries, Associates and third parties during Period 4 (Figure 8B). For additional risks relating to our development plan, please see Risk Factors Our development plan may fail to anticipate the construction/development of diverse institutions essential in a full-fledged city; We may not be able to successfully manage the growth of our operations on page xvii. The following is the map of the 18 villages as notified under the Hill Station Regulations.

113

Our Businesses We are in the business of city development, with an integrated offering of three distinct business lines real estate, infrastructure and consumption. We aim to develop a 365 day economy meaning that Lavasa will not simply be a weekend or tourist destination; instead, we aim to develop an economy at Lavasa where we expect to share in the revenue streams related to our ongoing consumption and infrastructure businesses. Our real estate business line relates to the sale and/or lease of such structures and buildings and the lease of underlying land, development of plots, construction of residential, commercial, institutional, hospitality and social real estate as well as the sale of built up structures and/or lease thereof. Our infrastructure business relates to the development, ownership and management of our infrastructure as well as the collection of revenues in the form of management fees. Our consumption business relates to our ongoing revenue streams in the hospitality, education, healthcare, tourism and leisure and retail sectors of our economy, through direct or indirect participation. We are consciously cultivating these interlinked and co-dependent businesses within the framework of our governance platform which we believe will significantly contribute to this economic integration. Based on the land we own or have entered into MoUs and/or agreements to purchase as of September 10, 2010 measuring 13,226 acres, we estimate that Lavasa can accommodate a permanent population of approximately 300,000 with facilities for approximately two million tourists per annum and an employment base consisting of our potential permanent and tourist populations of approximately 97,000. Our real estate business Our real estate business aims to continue to develop, sell and lease real estate assets and comprises a range of offerings, including residential (villas, villa plots, apartments, rental housing, retiree housing, student and faculty facilities and hostels), commercial (retail and office), institutional (largely through plot leases), hospitality (hotels, wedding and banquet halls), tourism and leisure and social (education, healthcare and other facilities). As set out in the following table, our villa and hospitality related real estate transactions which we refer to as sale/lease transactions are structured such that the purchasers purchase the structures, but they typically only obtain a 999-year leasehold interest (and in some cases 99 year or 198 year leasehold interest) in the underlying land which allows our governance platform to maintain control over our development pursuant to our development plan. Our remaining real estate transactions comprising of villas, plot leases, rental housing, retail, education, tourism and leisure and healthcare which we refer to as pure leases are typically structured as long-term lease for 999 years. We typically receive and acquire the lease premiums with respect to leases relating to our transactions and our pure lease

114

transactions in tranches with only a nominal annual rent. For more information, see Our governance platform on page 131. Type of Product Villas Description of Transactions We typically sell the constructed structures to customers. The relevant underlying land is owned by us and granted on a lease (typically for a period of 999 years) to customers. We receive a nominal annual lease rental (Re. 1 per annum) in addition to the premiums and the premiums are either a one-time payment or payable in tranches. We typically enter into agreements to lease (typically 999 years) in connection with apartments developed by us. The relevant land, the building/s on which the apartments are situated and the common spaces of the said building/s are still owned by us, and are not leased, licensed or sold to customers. We have leased a parcel of land for a period of 999 years to RHL, and have consented to RHL to develop a rental housing project for persons working in Lavasa. In addition, we sold RHL an aggregate of 160,000 sq. ft. of built up area. RHL is required to pay a yearly rent of ` 1 per annum per sq. mtr. as annual lease rent and a lease premium payable in 10 tranches with first payment at the execution of the agreement and remaining based on the percentage of completion. RHL in turn would lease out such rental housing accommodations for a periodical rent. We leased a parcel of land for a period of 999 years to Ashiana Housing Limited, and have consented to Ashiana Housing Limited to develop an assisted and retiree housing project and the entire lease premium has been paid upfront by Ashiana Housing Limited. We typically structure our hospitality transactions as follows: Lease of land/sale of the right to develop: We typically grant our hospitality related Subsidiaries or Associates a leasehold interest pursuant to a 999 year lease in the underlying land and sell them development rights or a permissible amount of developable area. We receive nominal yearly lease rents and lease premiums relating to the lease of the land as well as the sale of the permissible developable area (either paid at the time of execution of the lease deed or in a number tranches (not necessarily periodical)). This is our most common hospitality real estate structure and we have followed this approach with, for example, Mercure Lavasa, Novotel Lavasa and Double Tree by Hilton. Long-term lease of the structure: We grant our hospitality related Subsidiaries or Associates a long-term leasehold interest in a structure which we developed. The lease premiums are collected upfront or in tranches within a stipulated time period as agreed. Long-term lease of the land: We grant a long-term leasehold interest pursuant to a 999 year lease in the underlying land along with the right to develop subject to the permissible area under the lease agreement.

Apartments

Rental Housing

Retiree Housing

Hospitality

Tourism and leisure

We leased certain parcels of land to FSAL for a period of 999 years and have given consent to FSAL to develop an adventure and training institute that will offer multi sports activities, water sports, adventure sports and training academy relating to personality development programs. FSAL is required to pay a nominal yearly rent (per sq. mtr. for the lease of the land), and a one-time lease premium. We leased various parcels of land and sold the development rights with respect to the

Retail

115

Type of Product

Description of Transactions developable area to DRL for a period of 999 years each and have given our consent to allow DRL to develop and operate various retail outlets. Pursuant to the relevant lease deeds, DRL is required to pay a nominal yearly rent (per sq. mtr. for the lease of the land) and a one-time lease premium. DRL in turn would develop such land either on its own or jointly with us and lease/license units to various third parties such as food and beverage outlets, theatres and apparel stores. We lease land to educational institutions pursuant to 999 year leases where no part of the transaction is structured as a sale. We receive a nominal annual lease rental in addition to the premiums and the premiums are a one-time payment. We leased land to our subsidiary Apollo Lavasa Health Corporation Limited pursuant to a 999 year lease where no part of the transaction is structured as a sale. We receive a nominal annual lease rental of Re. 1 per acre in addition to the premiums paid in form of allotment of equity shares.

Education

Healthcare

The following table sets out our aggregate real estate leased or built up structures sold or in relation to which we have signed term sheets or entered into agreements to lease up to June 30, 2010: Property Type Residential Commercial Institutional Hospitality Social Total Aggregate Units 1,884 Aggregate acres 3 203.61 93.97 227.01 Aggregate sq. ft. 2,941,046 322,657 2,070,292 2,688,084 3,130,334 10,829,756

We have leased on long term basis 411.71 acres of land through lease deeds and approximately 25.34 acres of land through agreements to lease with permissible developable areas of 5,727,725 sq. ft. and 852,584 sq. ft. respectively to various customers in the commercial, institutional, hospitality and social (including education) sectors. Further, we have entered into MoUs and signed term sheets for leasing on a long term basis 90.54 acres of land with a permissible developable area of 1,328,401 sq. ft. to various customers in the commercial, institutional, hospitality and social (including education) sectors.

Residential real estate Our portfolio of residential products includes villas, apartments, rental housing, staff, faculty and student accommodations in the form of hostels and specialised housing units such as retiree homes. Villas Our villas are aesthetically designed and we have leased land and sold villas (including sale of structures) and expect to continue to construct three main types: lake facing, valley facing and golf course facing. Our villas typically have ground floor plus one storey or ground floor plus two-storey structures with sloping roofs, spacious rooms and large windows. Villas in Dasve range from 1/8th of an acre to two acres. We expect that our villas will be clustered in the villages of Dhamanohol, Gadle, Wadavli and Sakhari, subject to demand across our various villages. As of June 30, 2010, we have executed and registered agreements to lease the land and sell the structures thereon for 337 villas and have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) in connection with the lease of 124 villas. Further, we have completed construction of 110 villas.

116

Further, we have executed and registered agreements to lease for 110 villa plots while we have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) in connection with the lease of the remaining 17 villa plots. Further, we have entered into agreements with certain of the lessees whereby we will construct the villas on such plots and the construction of 52 such villas has commenced. Apartments We construct apartments and typically lease them. Most of the apartments will be located at the town centre and be lake facing. The apartments are functional, have adequate cross-ventilation and covered balconies and sizes range from studio to three-bedroom apartments. As of June 30, 2010, we have executed and registered agreements to lease in connection with the lease of 548 apartments and have issued allotment letters (where the agreements to lease with respect to such allotment letters are pending execution and/or registration) in connection with the lease of 348 apartments. Further, we have completed construction of 91 apartments. Rental housing We plan to offer residential rental units for housing support staff working in our hotels, residences, education, businesses and other facilities. This, we expect, would benefit the support staff and will also have social amenities built within it. As of the date of this Draft Red Herring Prospectus, we have entered into a lease agreement with RHL to construct and sell an aggregate of 160,000 sq. ft. of rental housing to RHL along with lease of underlying land, leading to development of approximately 399 rental housing units. As of the date of this Draft Red Herring Prospectus, we have completed construction of 206 rental units and another 193 are under construction. Retiree housing Ashiana Housing Limited, a chain of retiree real estate developers in India, is developing Utsav, a retirement village at Dasve. Utsav is expected to have 500 residential units, spread across 31 acres at Dasve. We have leased land to Ashiana Housing Limited on long term basis for purposes of the project and accordingly our revenues are in the form of lease premiums. We have entered into a term sheet to form an associate, in which we expect to own 26% stake, with the remaining stake being held by RPG International Limited, UAE, for developing 207,185 sq. ft. of assisted and retiree housing at Mugaon to be spread over approximately 15.86 acres. The development is expected to commence operations by December 2012. Hostel We have entered into an agreement with Money Matters Advisory Services Limited to invest in our subsidiary, Green Hills Residences Limited. We have entered into a lease agreement to transfer a developable area of 197,462 sq. ft along with an interest in the undivided underlying land to the subsidiary to run its hostel facilities and further lease out the hostel facilities to educational institutions. Commercial real estate Our portfolio of commercial real estate is comprised of real estate related to our retail and office space businesses. Retail real estate We plan to develop our real estate around the densely populated town centres. In order to do this effectively, we have organised the retail business under our subsidiary, DRL. Pursuant to six lease deeds executed with DRL, we have leased 106,384 sq. ft. of retail space in various buildings constructed, under construction and/or proposed to be constructed on the various parcels of land to DRL for the purpose of setting up and operating retail, food and beverage and other such outlets. As of June 30, 2010, DRL has leased out 28,249 sq. ft. to various brands through leave and licence agreements and has also signed term sheets for the lease of a further 11,757 sq. ft.

117

Office space Our office spaces, which we expect will benefit from the Mumbai Pune economic corridor due to our proximity to the two cities, comprise standalone buildings and campus developments. We plan to construct and lease buildings which combine functional efficiency and aesthetic appeal. We generally intend to rent these units to end-tenants. We expect to develop the stand-alone buildings targeted at IT/ITeS companies in the SEZ format and other offices in the non SEZ format. The first stand-alone building is currently under development in Dasve. Features of this office space will include power and water supplies, fire-fighting systems, IT systems, parking, and high speed elevators. The application filed by our wholly owned subsidiary, Future City Multiservices SEZ Limited to develop a 250 acres multi-services SEZ in Dhamanohol is pending with the Commerce Ministry, Government of India. Hospitality real estate We aim to offer hotels of various categories ranging from budget to high-end hotels and have been granted mega status by the Tourism and Cultural Affairs Department, Government of Maharashtra under the Tourism Policy 2006 of the Government of Maharashtra in connection with the our proposed tourism project at Lavasa Hill Station at Taluka Mulshi and Tehsil Velhe falling under 'C' zone. For more information related to our hospitality business, see Our hospitality business. As part of our overall strategy, we expect to form subsidiaries and/or associates to own these hospitality assets with recognised operators managing assets. We also expect to divest various stakes in these subsidiaries or associates to third parties. However, in some cases, we grant a long-term leasehold interest pursuant to a 999 year lease in the underlying land along with the right to develop subject to the developable area permissible under the lease agreement. As of the date of this Draft Red Herring Prospectus, approximately 253 rooms are operational and another 458 rooms are under construction and development. Tourism and leisure real estate We have leased certain parcels of land to FSAL for a period of 999 years and have given consent to FSAL to develop an adventure and training institute that will offer multi sports activities, water sports, adventure sports and training academy relating to personality development programs. FSAL is required to pay a nominal yearly rent (per sq. mtr. for the lease of the land), and a one-time lease premium. Social Real Estate Education Real Estate Education is, in our view, one of our main economic drivers. The educational facilities present at Lavasa can be broadly categorised as primary, secondary, tertiary and continuing education. We develop educational institutes in two different revenue formats: 1. By way of long term land leases to educational institutions, for instance, to Symbiosis Society, Christ University and NSHM Academy; and Through our ownership interest in subsidiaries and/or associates, such as Knowledge Vistas and Dasve Hospitality Institutes Limited whereby we indirectly share in ongoing revenues.

2.

In this section, we have described our leases of land to educational institutions pursuant to 999-year leases. We receive a nominal annual lease rental (on a per square foot basis) in addition to the premiums and the premiums are either a one-time payment or payable in tranches. For more information related to our education consumption business where we additionally share in the ongoing revenues of the schools, see Education on page 129. Our education real estate business is comprised of primary, secondary, tertiary and continuing education institutions. Primary and Secondary Education

118

We intend to have primary and secondary educational institutions located at Lavasa. We aim to develop our education business by providing access to modern infrastructure and support facilities for educational institutions and research organisations. Christel House Lavasa. Christel House Lavasa (CH Lavasa), a trust set up by us and Christel House India, will provide education, nutrition and healthcare to children from impoverished and underserved communities in and around Lavasa. The school will cater exclusively to children hailing from the economically disadvantaged sections of society. We expect that CH Lavasa will be housed in a modern building in the town of Dasve. CH Lavasa commenced operations in July 2010, with two sections each of grades kindergarten, first and second. Euroschool Education Trust. We have signed a term sheet with Euroschool Education Trust pursuant to which we will lease on long term basis 10 acres of land with a permissible built up area of 120,000 sq. ft. to them to build and operate a Eurokids School at Lavasa. The school is expected to commence its operations by June 2012. Kapila Krishi Udyog Limited. We have signed a term sheet with Kapila Krishi Udyog Limited pursuant to which we will lease on a long term basis two parcels of land aggregating to 18.76 acres to Kapila Krishi Udyog Limited, which will own and operate two schools in our second town. Tertiary and continuing education We aim to set up management institutions in Period 1 of our development by seeking partners across a host of varied disciplines from institutions across the world. Our plan is to ensure greater representation of disciplines and introduce a wider range of specialisations in keeping with the infrastructure being developed. We also aim to set up the Lavasa Centre of Excellence (LCE) at Dasve for professional executive education. We expect that LCE will be spread across 160,000 sq. ft. (approximately) and will be home to a portfolio of certificate courses and management development programmes in all three disciplines humanities, social sciences and engineering/sciences. Christ University. We have entered into a lease deed with Christ University, Bangalore, under which we have, on long term basis, leased 20 acres of land in Dasve to Christ University for the purpose of construction and operation of an educational institution for management and science programmes. The total built up area on the land allocated to Christ University is not expected to exceed 261,371 sq. ft. and the operation of the facility is expected to commence from June 2012. Symbiosis Society. We have entered into a lease deed with Symbiosis Society, Pune under which we have on a long term basis leased 59.57 acres of land in Dasve for the establishment of educational institutions. Symbiosis Society intends to commence their education program from June 2012. NSHM Academy. We have entered into a lease deed with NSHM Academy (NSHM), Kolkata in connection with NSHM opening a retail university at Lavasa. NSHM has leased 20 acres of land on a 999 year basis in our second town for the purpose of building the facility. The campus would host a portfolio of courses in areas such as retail management, media, communications, design and management. The total built up area for the land leased cannot exceed 350,000 sq. ft. Healthcare real estate We have entered into exclusive arrangements with Apollo Hospitals Enterprise Limited, a recognised Indian healthcare provider in the private sector, for the setting up and management of our subsidiary Apollo Lavasa Health Corporation Limited and for health and wellness development at Lavasa covering primary hospitals, wellness research development and medical education. As of the date of this Draft Red Herring Prospectus, our subsidiary has started operations of a 60 bed multispecialty hospital in Dasve. For more information related to our health business see Our healthcare consumption business. Others

119

We have leased approximately 14,043 sq. mtrs. of land to Brand Equity Treaties Limited in FY 2009. This land is proposed to be developed to set up a training centre, learning centre, spiritual centre or company guest house having a permissible developable area of 60,000 sq. ft. Future purchases of land As of September 10, 2010, we have purchased 9,460 acres of land and executed MoUs to purchase an additional 3,766 acres of land and will consider purchasing approximately 5,469 acres of land available for purchase within the hill station notified area on an opportunistic basis. For details of risks relating to the purchase of this additional land, please see Risk Factors Our inability to purchase the remaining parcels of land required for completion of Lavasa on acceptable terms or at all may affect our future development on page xx. The details of the land in respect of which MoUs or other agreements have been signed are set forth below: No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. TOTAL Village Admal Dhamanohol Bhode Bhoini Mose (Bk) Siav (Bk) Gadle Mugaon Koloshi Ugavali Dasve Area in acres 99.72 234.66 2,436.00 227.59 198.86 249.22 161.80 122.73 16.31 9.52 9.02 3,765.43

Our infrastructure business We define our infrastructure business as planning, developing, owning and managing (which includes operations, maintenance and revenue collection) our infrastructure assets. We develop and own major infrastructure assets related to dams, water, sewerage, drainage, solid waste management, power distribution within Lavasa, telecommunications, roads and lighting and landscaping and propose to own future assets to be created. Based on our engineer certificate dated August 11, 2010, on the land that we own and have developed as of the date of this Draft Red Herring Prospectus, we expect to treat 100% sewage and solid waste generated in our city, we expect to have 100% piped water, sewage and septic tank coverage, our storm water drains are expected to cover 120% of our road network and we have designed our water supply to deliver 216 litre per capita per day, all of which, according to MGI, are better than or comparable to current best-in-class standards. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Statistical data on the progress of our various infrastructure segments as of June 30, 2010 are set out below. There can be no assurance that we will be able to develop the entire remaining infrastructure. For risks relating to our infrastructure, see Risk Factors on page xii. Water We have installed a treatment capacity of 3.4 MLD and are currently developing another 22.9 MLD out of total final planned capacity of 65 MLD; We have installed distribution pipelines of 35.5 kilometres and are currently developing another 34.29 kilometres out of total final planned capacity of 325 kilometres; and Out of 10 planned dams, we have completed one dam and are currently developing another three dams.

120

Roads Out of a total planned 263 kilometres of internal road network, we have completed 40 kilometres and are currently developing another 42.5 kilometres; We are currently developing the Mugaon tunnel that we expect would reduce access time to Lavasa; and Out of 50 kilometres of inter village roads planned, we have completed 37 kilometres and are currently developing the remaining 13 kilometres.

Power Out of the total connected load of 500 MW, we have completed 34 MW and are currently developing another 51 MW; We have installed a distribution network of 36.5 kilometres and are currently developing another 39 kilometres out of total final planned capacity of 422 kilometres; and We have installed a transmission network of 12.5 kilometres and are currently developing another 19.79 kilometres out of a total final planned capacity of 187 kilometres.

Sewerage

We have installed a collection network of 51.5 kilometres and are currently developing another 28.25 kilometres out of a total final planned capacity of 462 kilometres; We have installed a storm drainage network of 33 kilometres and are currently developing another 39.60 kilometres out of a total final planned capacity of 315 kilometres; and We have installed a treatment capacity of 2.4 MLD and are currently developing another 20 MLD out of total final planned capacity of 58.5 MLD.

Solid Waste Dams and water

We have installed treatment capacity of 0.8 tpd and are currently developing capacity of 51 tpd out of a total planned 97 tpd; and Vermicomposting rechnique is being implemented on a pilot basis.

We expect our aggregate water requirement for our estimated residential population of 300,000 and estimated annual tourist population of two million by 2021 to be 891 million cubic feet (mcft). We expect that this requirement will be met by rainfall in the catchment area of the existing two dams and by the eight new check-dams that we have been granted permission to build. In September 2002, we executed an agreement with the MKVDC pursuant to which we were granted permission to construct, at our cost, two check-dams in the submergence area of the Warasgaon dam and six check-dams outside the submergence area but within the catchment area of the Warasgaon dam. The total capacity of the eight checkdams is expected to be 871 mcft. In December 2003, we executed a similar agreement with the Irrigation Department of the Government of Maharashtra pursuant to which we were granted permission to construct two check-dams with a total capacity of 160 mcft on the catchment areas of the west-flowing rivers in Dhamanohol village. The total capacity of the 10 dams is expected to be 1,031 mcft. These dams, particularly those at Dasve and Gadle, would create permanent bodies of water in these towns enabling the development of lakefront real estate. Within the allocation of 871 mcft of water from the Warasgaon catchment area, we are also seeking approval from the MKVDC to construct an additional check-dam in our second town in the submergence area of the Warasgaon dam. Without depriving the Warasgaon dam of its present storage, we plan to

121

create additional bodies of water in the area to make Lavasa more self-sufficient with respect to its water needs. We also plan to recycle 80% of the water used for domestic purposes and re-use it for flushing, landscaping, irrigating mass plantation and construction. For risks relating to the satisfaction of our water requirements see Risk Factors Our water requirements may not be met due to hydrological conditions or water flows inconsistent with our expectations and there are certain water bodies contiguous with Lavasa that we will not be able to access on page xxvii. We currently manage the collection, treatment and distribution of our water. The drinking water treatment system is presently operational in Dasve and produces potable water meeting Indian standard drinking water specifications (IS-10500). In the future, we expect that our infrastructure subsidiary will manage future water collection, treatment and distribution. Water charges have already been decided including a fixed and a variable fee for water service. They will be adjusted annually to include sufficient funds to recover operations, maintenance, capital replacement and overhead costs, plus repayment to us for a portion of the capital cost incurred. Sewage and drainage Our waste water system was designed according to industry norms and involves the establishment of large sewerage treatment plants (STPs) and collection networks in densely populated zones that would treat waste water to meet standards prescribed by regulation. Modular STPs are planned for sparsely populated zones to minimise the cost of the collection network. The 2.4 million litres per day sewerage system is presently operational in Dasve. Waste water is treated to near-drinking water quality, substantially exceeding the quality of raw water in Warasgaon Lake. It is then used for irrigation, construction purposes and other non-potable uses in Lavasa. We currently manage the treatment and disposal of waste water. In the future, we expect that our subsidiary would be responsible for the collection, treatment and disposal of waste water and maintenance of the network and STPs. The operation, maintenance, customer billing and cost recovery for the sewerage system has been integrated with the water system and we expect that the invoices to be issued to customers will include charges for water and sewer services as a single service. Power Our primary source of power is the 110 KV transmission line laid from Tata Power's existing grid network at Nive, which is approximately 16 kilometres from Lavasa. A main receiving station (MRS) was established at Bhoini, one of the villages falling within the notified hill station area which has installed capacity of 50 MW. In the future, we expect that our infrastructure subsidiary will be responsible for the internal transmission of power, power quality monitoring, generation of alternative energy to be fed into the distribution system at the MRS, maintenance of generator back-up of sub-stations and related power functions. Roads Lavasa is located approximately 42 kilometres from Chandni Chowk, a suburb of Pune. Prior to the commencement of construction of Lavasa, access to the project site was through a 70 kilometre drive from Pune to the Warasgaon dam, followed by a 20 kilometre boat ride to the project site. Our initial focus was to enhance accessibility of the project to Pune city. To achieve this, a subsidiary of HCC in which we own a 10% interest, has widened and improved a road 31.8 kilometres in length on a BOT basis which is currently operational and which has reduced driving time from Pune to Lavasa. This road ends at Mutha village beyond which a 17.3 kilometre road from Mutha to Lavasa's entry gate was developed by us. A 9.5 kilometre public road from Mutha to Temghar was widened and improved and a new 7.8 kilometre hill road from Temghar to Lavasa's entry gate was constructed by us. We are also widening and improving a third access to Lavasa through a six kilometre road up to Mugaon. Since a part of this road is a steep hill road we intend to construct a 2 kilometre tunnel (including an approach road of 800 metres) to ease the movement across the Mugaon hills. In-principle approval from the Ministry of Environment and Forest, Government of India has been obtained and the work is expected to commence in October 2010. Within Lavasa we have a mandate from the Zilla Parishad, Pune to widen, improve and maintain inter-village roads from Warasgaon to Wadavali along the Warasgaon lake edge. We have completed construction of 40 kilometres of

122

external/internal roads between different towns. We have also completed construction of 37 kilometres out of a total of 50 kilometres of planned intra-village roads which connect the different towns within Lavasa. Lighting Our lighting activities are comprised of street lighting, lighting in common areas and lighting in common public areas. We maintain and operate streetlights on all our internal, external and intra-village roads as per Indian Roads Congress guidelines. We install the streetlights concurrently with the construction of our roads, the lights in the buildings at the completion of the construction and the lights in the open areas concurrently with the landscaping of the area. Costs for developing, operating and maintaining public realm lighting are recovered from maintenance charges collected against all residential and commercial properties in Lavasa on a developed square foot basis. Landscaping Our approach in relation to development of our landscape is to gracefully transition the native forest habitat into the urban environment while attempting to minimise the impact of development on the character of the Sahyadri mountains. We have a range of indigenous species and mass plantation and hydro-seeding aims to ensure the restoration with diverse mix of native species. Top soil is preserved and re-used. The preservation of the character and flow of the natural streams is also a priority of our development efforts. Our city management team The city management team will be responsible over the long term for ensuring that the quality of life, daily service delivery and community experience at Lavasa is demonstrably different than the quality of life, service quality and overall community experience to be found in other Indian cities. To accomplish this aim, we have divided the city management team into six departments: public works, safety and security, enterprise utilities, property management, administration and finance and corporate and civic participation. In addition to normal operational responsibilities, managers in the city management team oversee the assets of our Subsidiaries created specifically to provide municipal-like functions and services (power, water and sewer, rental housing and the facility management services). We also employ a city manager, Scot Wrighton, with over 20 years of international experience in city management in the states of Illinois, Kansas and Missouri in the USA. Public works department Our public works department will be comprised of 12 Lavasa employees plus contracted personnel responsible for managing public amenities, our streets and public areas (including parks, promenades, lighting, pedestrian facilities, public rest rooms, horticulture, storm drainage systems) and providing environmentally sound, efficient and costeffective solid waste and recycling services. Costs for developing, operating and maintaining public works services are recovered primarily from maintenance charges assessed against all residential and commercial properties in Lavasa on a developed square foot basis. These revenues are supplemented by minor fees for services such as special waste disposal and other service-driven assessments. Public works assets will be managed by a separate subsidiary. Safety and security Safety and security at Lavasa is proposed to be provided through two separate levels: first, a police force provided by the Government of Maharashtra and totally under the supervision of the state police; and second, a Lavasatrained and recruited mobile patrolling security force which is expected to be comprised initially of about 15 personnel for each town, plus necessary contracted security guards and traffic wardens, all under the supervision of our city management team. Lavasa safety and security personnel will, however, work closely with the state police. The bulk of day-to-day safety and security work will be performed by Lavasa-employed or Lavasa-contracted personnel, but they will have to rely on state police to intervene in cases of serious crime, arrest and criminal investigation. In addition, we are constructing a modern fire station and fire hydrants; portions of this system are already operational. In the future we intend to construct a police station for the Maharashtra State Police which will include

123

a detention area. Our security force will be complimented by our electronic security system which will comprise of optical fibre cables networks, communication and mobile phone towers, cameras, sensors and data centres. Security communications and an emergency answering centre for all of Lavasa will be housed at the Dasve Public Safety Centre. Each home at Lavasa includes a home solution or basic security features, such as an emergency response button and our community solution relates to various security points throughout Lavasa, including surveillance cameras and radio communication devices. Residents will be able to contract with My City Technology and other vendors for value-added security services, such as specialised alarm systems. Costs for developing, operating and maintaining safety and security services are recovered primarily from maintenance charges assessed against all residential and commercial properties in Lavasa on a developed square foot basis. These revenues are supplemented by minor fees for services such as special/extra security services and safety inspection fees. Safety and security assets will be managed by separate subsidiary. Enterprise utilities We expect that our enterprise utilities department will be comprised of 34 employees and is responsible for managing our water and sewer systems including managing the collection, treatment, distribution and disposal of our water, maintaining reliable power service by providing internal transmission and maintenance activities, including power quality monitoring and end-user metering. Billing and collection of utility revenues is performed by a separate department of city management services. The services and operations of the enterprise utilities department have been arranged to eventually be completely operationally self-supporting through utility revenues once the number of customers reaches projected levels. Property management We expect that our property management department will comprise of 18 employees and will be responsible for assisting the sales/business development department in the final handover and transfer of residential and commercial real estate to the end-user. Our property management department is responsible for enforcing our building code and managing customer service centres focused on giving residents and guests 24 hour access to information about services available at Lavasa. Our property management department also manages the services and assets of RHL. Costs for developing, operating and maintaining property management services are expected to be recovered primarily from maintenance charges assessed against all residential and commercial properties in Lavasa on a developed square foot basis. Property management assets will be overseen by a separate subsidiary. Administration and finance We expect that our administration and finance department will be comprised of 33 employees and will be responsible for providing internal support to our city management team and our other departments for communications and vehicle services, office space allocation and management, labour colony management, as well as centralised financial management of city management transactions and external city management billing. Costs for developing, operating and maintaining administration and finance services are recovered primarily from maintenance charges assessed against all residential and commercial properties in Lavasa on a developed square foot basis and charges to subsidiary and other departments for services rendered on actual cost or cost-plus basis. Corporate and civic participation We expect that our corporate department will be comprised of three employees and will be responsible for tending to the social and service needs of villages and transient labourers who choose to take up permanent residence in Lavasa. It is housed in city management because it is an extension of customer service responsibilities, but it is anticipated that it will be financially supported both by general revenues from city management and by contributions of Lavasa and its Promoters as an extension of its corporate social responsibility goals. Our civic participation department is also an extension of corporate function and as such they are responsible for encouraging our residents to participate in governance through citizen advisory boards, e-Governance whereby residents can pay applicable charges, manage land deeds, certificates and surveys and provide feedback about our services.

124

City Management Starting in FY 2012, we expect that certain city management functions would be executed by separate subsidiaries and that CMS will complete its migration to a separate corporate entity. As of the date of this Draft Red Herring Prospectus, our CMS subsidiaries are comprised of the following entities: Whistling Thrush Facilities Services Limited, Warasgaon Power Supply Limited, Sahyadri City Management Limited and Warasgaon Infrastructure Providers Limited. While none of these entities are currently operational, we may in the future transfer and vest our infrastructure assets and their operational maintenance in these companies. Our consumption business We expect to generate income on an ongoing basis based on the consumption of residents, visitors and workers within the city. We expect to have a direct or indirect participation in the hospitality, education, hotels, hospitals, retail and tourism and leisure businesses of Lavasa. In most cases, we intend to maintain an equity stake in the subsidiary developed for the purpose, thus providing an ongoing stream of income from consumer spending in Lavasa. For more information related to our Subsidiaries and Associates, see History and Certain Corporate Matters and Our Subsidiaries and Associates on pages 142 and 173 respectively. Our hospitality consumption business Our hospitality consumption business is comprised of our hotels, convention centres and clubs. For details of the Subsidiaries and Associates for the hospitality consumption business, see section titled History and Certain Corporate Matters on page 142. Hotels, clubs and convention centres A material part of our development plan is devoted to our hospitality and convention business, and the aim is to turn Lavasa into a convention destination that will attract meetings, exhibitions, corporate events, training and development and national and international conventions. We expect that this business would primarily be the bulk of our tourist business during the week. Additionally, we plan to create a tourist destination with theme parks and several other similar entertainment attractions which will draw people from neighbouring cities which would form the tourist business over the weekends. Accommodation at Lavasa will range from ` 1,500 to ` 2,000 for budget properties to ` 7,000 to ` 9,000 for highend properties. We also plan to introduce a variety of food and beverage options to cater to different types of tourists and residents. Fortune Select Dasve We have developed the Fortune Select Dasve hotel. While we maintain ownership of the hotel, we have entered into a managing agreement with our wholly owned subsidiary Lavasa Hotel Limited pursuant to which we have granted the right to manage this hotel to Lavasa Hotel Limited. We have also entered into a technical audit, pre-opening, operating and marketing services agreement with Fortune Park Hotels Limited pursuant to which Fortune Park Hotels Limited will provide technical audit, pre-opening, marketing and operational services for the hotel. The midscale hotel spreads across 2.3 acres and has 60 rooms including 48 standard rooms, six club rooms, six suites and two restaurants (called Zodiac and Earthenoven). All rooms include contemporary dcor, modern amenities and views of the hills or the lake. The Fortune Select Dasve hotel has been operational since March 2009. The hotel has been certified as a Green Building with a silver rating by the Indian Green Building Council. Mercure Lavasa We developed the Mercure Lavasa hotel in Dasve pursuant to our associate Ecomotel Hotel Limited which is 26% owned by us and 74% owned by CRH. This 130-room hotel with a multi-cuisine restaurant called Celebration is

125

spread across an area of approximately 1.2 acres. AAPC Singapore Pte Limited has been appointed to manage the hotel. This hotel was completed in April 2010 and has been fully operational since May 2010. For further details of this arrangement, see Summary of Key Agreements /Scheme of Amalgamation in History and Certain Corporate Matters on page 148. Ekaant the Retreat We developed Ekaant the Retreat in Dasve which is owned and operated by us. This 20 room resort, spread across an area of four acres, features a mix of double and twin bedded rooms. Vyanjan, the multi-cuisine restaurant at Ekaant, offers a view of the hills and the Warasgaon lake. It also features conference facilities and provision for other indoor and outdoor activities. Ekaant the Retreat has been operational since August 2007. Novotel Lavasa We are developing the Novotel Lavasa hotel through our wholly owned subsidiary Warasgaon Lakeview Hotels Limited. This resort hotel spread over 7.48 acres in the Dasve village and 1.46 acres in Padalghar village, would have a total of 200 guest rooms. The facilities available in this hotel will include guest rooms, square dining, specialty restaurants, lounge bar, business centre, banquets and meeting rooms, swimming pool, pool bar, health club and spa with gymnasium, indoor recreation facilities, outdoor viewing deck and reflective pool. We have entered into a management contract with AAPC Singapore Pte Ltd to run the hotel under the Novotel brand. The hotel is expected to be completed during FY 2012. Pullman Lavasa We are developing and constructing the Pullman Lavasa hotel in Dasve. We may in the future transfer the hotel to our subsidiary Dasve Business Hotel Limited. This proposed business hotel will be located on 3.71 acres land parcel in Dasve town and would have 258 guest rooms, all-day dining, coffee bar, deli and patisserie shops, lounge bar, swimming pool, pool bar, gymnasium, ballroom, boardroom, executive lounge, library, spa, pub and specialty restaurants. We have entered into a management agreement with AAPC Singapore Pte Ltd to manage and operate the hotel under the Pullman brand. The hotel is expected to be completed during FY 2012. Double Tree by Hilton We are developing a full service upscale hotel under the brand Double Tree by Hilton through our associate Palmetto Hospitality which is 26% owned by us and 74% owned by third party investors. Palmetto Hospitality has entered into a franchise license agreement with Hilton International Franchisor Corp by which they have been granted the right to use the above brand in order to run the hotel. The facilities available in this hotel will likely include banquet, spa, speciality restaurant and all day dining. Construction of this 150 room hotel is scheduled to be completed during FY 2013. Budget Hotel Dasve We have signed a term sheet with Rachvan Singh and Associates for development of a 120 to 150 room budget hotel on a plot of land of approximately 1.95 acres at Dasve through our subsidiary, Andromeda Hotels Limited. We expect to own up to 26% of the equity stake of the Andromeda Hotels Limited with Rachvan Singh and Associates holding the balance 74% equity stake. As on June 30, 2010, Andromeda Hotels Limited is our wholly owned subsidiary. The hotel is expected to be operational in FY 2013. Hotel at Dasve We have signed a term sheet with Jukasso Hotels for the development of an approximately 80-room hotel at Dasve. We expect to own a 26% equity stake in the hotel while Jukasso Hotel will own the balance 74% equity stake. The hotel is expected to be operational in FY 2013. Langham Palace Mugaon

126

We have signed an MoU with Langham Hospitality Limited. We expect that Langham will manage a 200-guest room under the Langham Palace brand pursuant to a management agreement to be entered into with our wholly owned subsidiary Sirrah Palace Hotels Limited. The hotel is expected to be operational in FY 2013. Eaton Hotel Mugaon We have signed a MoU with the Langham Hospitality Limited. We expect that Langham will manage a hotel under the Eaton Brand pursuant to a management agreement to be entered into with our proposed subsidiary. The 200guest room business hotel is expected to be operational in FY 2013. The Waterfront Shaw We have developed service apartments at Dasve, which we continue to own as of the date of this Draft Red Herring Prospectus. A service apartment is a rental facility, such as a hotel, where guests typically stay for a few days or a few weeks. Service apartments have amenities traditionally associated with hotels and in particular are fully furnished with security surveillance. Service apartments are usually less expensive than moderately priced hotels because the pricing structure is predicated on longer duration stays. We have granted the right to manage these service apartments to Bona Sera, our associate which, as of the date of this Draft Red Herring Prospectus, is 26% owned by us and 74% owned by Shawman Software Private Limited. Bona Sera has also entered into a management contract with Shawman Hospitality Limited to manage the service apartments. The Waterfront Shaw has 43 selfcontained, fully equipped service apartments (comprising of studio, 1 BHK and 2BHK apartments) with Wifi and LAN connectivity and has been operational since April 2009. For further details of this arrangement, see Summary of Key Agreements /Scheme of Amalgamation in History and Certain Corporate Matters on page 148. Dasve Service Apartments We have formed Our Home Service Apartments Limited, which is expected to develop 100,000 sq. ft. of service apartments at Dasve. We intend that these service apartments would be managed by a third party operator and are expected to be operational by the end of FY 2013. We are in the process of inducting a financial investor into this subsidiary. As of June 30, 2010, Our Home Service Apartments Limited is our wholly owned subsidiary. Mugaon Service Apartments We have also formed Hill City Service Apartments Limited, which is expected to develop 130,000 sq. ft. of the service apartments in Mugaon. These service apartments are expected to be operational by the end of FY 2013. As of June 30, 2010, this is a wholly owned subsidiary. We have entered into a term sheet with Rachvan Singh and associates who will own 74% of the equity stake in this subsidiary to build and operate a 150-service apartment complex. This is subject to a joint venture agreement which we expect to be entered into by August 31, 2010. Restaurants SOL Hospitality Limited has a franchise agreement with Old World Hospitality Private Limited through which it has the franchise for the following restaurant brands All American Dinner, Oriental Octopus, ChaatWaat, Chor Bizarre, Granmas Homemade, Tikka Town, Veg Restaurant, Lebanese QSR, Video Bar. As of June 30, 2010, we own a 26% equity stake in SOL Hospitality and the remaining 74% is owned by Shawman Software Private Limited. Dasvino Town and Country Club We have developed the Dasvino Town and Country Club at Dasve. The club is located in Dasve valley and its facilities include a family restaurant, bar, function and activity rooms, swimming pool, pool bar, health club and modern gymnasium, a spa, indoor and outdoor sports facilities and an amphitheatre. International Leisure Consultants has been appointed to manage the club. The Dasvino Town and Country Club commenced operations in April 2010. Lavasa International Convention Centre

127

We have developed the Lavasa International Convention Centre at Dasve. While we maintain ownership of the convention centre, we expect to grant the right to operate this convention centre to our wholly owned subsidiary Dasve Convention Center Limited. We also have entered into a management contract with AAPC Singapore Pte. Ltd. to manage and operate the convention centre. The Lavasa International Convention Centre is equipped with amenities for organizing meetings, events, conferences and exhibitions with a capacity of up to 1,500 persons. The convention centre has six main convention halls, meeting rooms, a VIP lounge and business centre. The Convention Centre has been operational since April 2010. Further, we have entered into an agreement with OASE Asia Pacific Pte Limited for the supply of a multi media fountain which will have the facility for laser and sound shows and a central 60 metre high jet. Tourism and leisure Together with our partners, we intend to offer various tourism and leisure amenities such as golf training, boating, nature trails, water sports, outdoor sports, adventure sports, theme based entertainment parks with an intention to draw visitors. We have arrangements in place with Space Investment Corporation LLC to set up a space themed entertainment park and have signed a term sheet with I Dream Productions Private Limited for developing an Indiacentric theme park. We are additionally developing sports related training programs with recognised professionals and companies. For further details, see Our education consumption business Training institutes on page 130. Lakeshore Watersports As on the date of this Draft Red Herring Prospectus, we own a 100% stake in our Subsidiary, Lakeshore Watersports, and we have entered into a term sheet with Ocean Blue Boating Private Limited pursuant to which it will acquire a 51% stake in this Subsidiary, which has developed water sports activities at Dasve. We offer various water sports/activities such as jet ski, pontoon boats, water bikes, pools, bumper boats, personal water crafts, pedal boats, trampolines, kayaks and water obstacles. As of the date of this Draft Red Herring Prospectus, we also have a games arcade which has games such as Neo Arcade, electronic darts and Photo Play. X-thrill Adventure Academy We developed our Adventure Academy activities in a three- acre parcel of land at Bembatmal pursuant to our wholly owned subsidiary FSAL. FSAL has entered into a management agreement with Z-Bac Adventure Institute India (Private) Limited for operating Full Spectrum Adventure under the X-Thrill brand. We offer various activities including paint ball, camping, rock climbing, trekking rappelling and corporate camps and events. Space Theme Park Space Theme Park India Limited is developing a space themed entertainment park at Mugaon and Dhamanohol, which is 19% owned by Lavasa and 81% owned by Space Investment Company LLC, Dubai. Pursuant to an addendum dated June 23, 2010, we shall hold 40% in the space theme park and our partner shall hold the balance 60% equity stake. We expect that the space themed entertainment park will be a key tourist attraction. The space themed entertainment park will provide entertainment, lodging, shopping and training to visitors through various modules under licensing agreement, support and business operations guidelines from the SIC and the United States Space and Rocket Center. This project will operate under the brand names Space Camp System and Aviation Challenge System and will encompass approximately 65 acres in Mugaon and Dhamanohol. The project is expected to be developed in two phases and the first phase would include development of the dome and dormitory which is expected to be completed in FY 2012. Valley View Entertainment Limited

128

We intend to develop an amusement park at Lavasa pursuant to our wholly owned subsidiary Valley View Entertainment Limited. The project is expected to be developed by FY 2014. India-centric Theme Park Pursuant to a term sheet executed with I Dream Productions Private Limited, we have agreed to lease on a long term basis of 30 years, with an option to extend for another 30 years, a 43 acre piece of land in Mugaon to I Dream Productions Private Limited, for the development of an India-centric theme park. We will receive revenues of ` 0.50 million per month per acre as lease payments or 10% of the revenue, whichever is greater, from the theme park entity. Our education consumption business We intend to have primary, secondary, tertiary, continuing and training educational institutions located at Lavasa. In this section, we describe the education at Lavasa where we will have a share in the ongoing revenue of the institutions through (i) lease premiums or (ii) potential dividend payments from our Subsidiaries or Associates. We believe that our education consumption business will benefit from a location which is uncluttered and planned to provide for the needs of such institutions which we believe will attract leading academics and students. In addition, we believe that our business will benefit from our varied long-term and short-term rental options for student and support staff housing, supported by our infrastructure and amenities. As of the date of this Draft Red Herring Prospectus, we have entered into the following education consumption related businesses: Subsidiary/Associate Knowledge Vistas Limited Dasve Hospitality Institutes Limited -* Partner(s) Educomp Infrastructure and School Management Limited N.A. Birla Edutech Limited Project Residential school Ecole Hoteliere Lavasa International boarding school Our Share 49% 100% 40%

* The name of the company has not yet been decided.

For details of these agreements, see section titled History and Certain Corporate Matters on page 142. Primary and secondary education Residential School We expect to develop our residential school on approximately eight acres of land in Dasve town pursuant to our associate, Knowledge Vistas Limited. We currently own 49% of the equity of Knowledge Vistas Limited with Educomp Infrastructure and School Management Limited owning the remaining 51%. For further details of this arrangement, see Summary of Key Agreements /Scheme of Amalgamation in History and Certain Corporate Matters on page 148. We expect to receive returns on equity infusions in Knowledge Vistas Limited. The primary objective of Knowledge Vistas Limited is to provide quality education with an international curriculum to equip students to progress to appropriate universities. The academic facilities available in the school would include classrooms, auditoriums, assembly hall, science laboratories, music and drama rooms, art and design technology room, library and IT facilities. The outdoor facilities in the school would include gardening and outdoor sports facilities. The school is expected to be operational from academic year 2011. International boarding school

129

We have signed a MoU with Birla Edutech Limited for setting up an international boarding School at Lavasa. The proposed school will be spread across 30.5 acres in our second town and is expected to be amongst the largest school projects at Lavasa. The venture aims at providing a world school that is international in its outlook and the curriculum being developed is in keeping with recognised primary and secondary institutions. A teachers' training institute is also planned in the facility. The school is targeted for a 2012 academic year opening. We expect to hold 40% equity stake in the above school and accordingly expect to receive returns on our equity infusion. The estimated student intake at maturity is 960 students. Continuing Education Ecole Hoteliere Lavasa (LEH) We have entered into a consulting agreement with Ecole Hoteliere de Lausanne (EHL) whereby for a fixed periodical consultation fee and the reimbursement of certain defined costs, EHL will provide consultancy services to us in connection with the development of a hospitality learning institute. The hospitality management institute would provide academic certification from Ecole htelire de Lausanne. The institute is planned to be developed in two phases with the main academic building being developed in phase I while the hostel block would be developed in phase II. Phase I of Ecole Hotelier Lavasa campus is scheduled to open by end of FY 2011. LEH has already begun operations, with the first class having commenced their programme in July 2009 in the Lavasa Experience Centre. Training institutes We intend to also offer students at Lavasa learning experiences that go beyond the academic curriculum and include sports academies, adventure sports, amateur astronomy and fine arts. Our leisure facilities are expected to include music events, tennis, cricket, football, rowing and golf academies. Pursuant to an agreement with Faldo Academies Limited, we are developing a golf training academy in Mugaon and which is expected to be operational by FY 2013. We have arrangements with Nick Faldo Designs (Overseas) Limited for designing of the golf course at Dhamanohol. In addition, pursuant to term sheets, we are also setting up a training academy for hockey along with Hockey Australia, a training academy for football along with Manchester City Football Club Limited and a licence agreement for rowing and training activities with Sir Steve Redgrave through Golden Five Limited. Arts and the performing arts A component of our education growth strategy is the development of an area with a view to attracting a host of artists including, performers, sculptors and others. We have entered into an art consultancy services agreement with Sara Pearce for providing consulting, advisory and related services in the field of contemporary art, art promotion and allied activities. We are on the preliminary stages of planning a Centre for Performing Arts, which will be located at Dasve. Our vision is for the Centre for Performing Arts to become the focal point for a vibrant arts community in the sphere of drama, music, dance, literature, visual arts, design and photography. Our healthcare consumption business We have entered into an agreement with Apollo Hospitals Enterprise Limited for the setting up and the management of our subsidiary Apollo Lavasa Health Corporation Limited and for health and wellness development at Lavasa covering primary hospitals, wellness research development and medical education. The day to day management of Apollo Lavasa Health Corporation Limited shall vest with Apollo Hospitals Enterprise Limited. Apollo Hospitals Enterprise Limited shall have the exclusive option to develop ventures in the hospital and pharmacy space only in Lavasa. A hospital at Dasve, with a capacity of 60 beds has been operational since January 2010. Under the terms of the agreement, within 24 months of the commissioning of this hospital, the parties shall plan for the second phase which shall comprise of wellness and education. Apollo Lavasa Health Corporation Limited may also develop customised health care package for the residents of Lavasa to be provided by the hospital, pursuant to specific agreement.

130

Under the provisions of our agreement with Apollo Hospitals Enterprise Limited, we shall hold 62.5% of Apollo Lavasa Health Corporation Limited and provide 200 acres of land including five acres of land at Dasve and Apollo Hospitals Enterprise Limited shall hold 37.5% of the shares of Apollo Lavasa Health Corporation Limited and permit the use of the brand Apollo Healthcity by Apollo Lavasa Health Corporation Limited. Under the terms of the agreement, our shareholding of Apollo Lavasa Health Corporation Limited can reduce to 49%. For further details of this arrangement see Summary of Key Agreements /Scheme of Amalgamation in History and Other Corporate Matters on page 148. Our retail business We plan to develop our real estate around the densely populated town centres. In order to do this effectively, we have organised the retail business under our subsidiary, DRL. Pursuant to three lease deeds executed with DRL, we have leased 106,384 sq. ft. of retail space in various buildings constructed, under construction and/or proposed to be constructed on the various parcels of land to DRL for the purpose of setting up and operating retail, food and beverage and other such outlets. As of the date of this Draft Red Herring Prospectus, DRL has leased out 28,249 sq. ft. to various brands through leave and licence agreements and has also signed termsheets for the lease of a further 11,757 sq. ft. Union Bank of India has entered into a sub lease agreement with DRL, pursuant to which it has opened a branch of Lavasa. Our laundry business We have entered into arrangements with Akash Cleaners Private Limited and Tex-Kare Cleaners Private Limited for developing and operating a centralised laundry facility at Lavasa through our Subsidiary, Spotless Laundry Services Limited. We currently own a 74% stake in the Spotless Laundry Services Limited while 3.06% is held by Akash Cleaners Private Limited and 22.94% by Tex-Kare Cleaners Private Limited. We expect this facility to cater to the laundry needs of all of our retail, educational, commercial, and hospitality and residential customers. For further details of this arrangement, see Summary of Key Agreements /Scheme of Amalgamation in History and Certain Corporate Matters on page 148. Lavasa Bamboocrafts Limited We have formed Lavasa Bamboocrafts Limited which, as of the date of this Draft Red Herring Prospectus, is our wholly owned subsidiary. Lavasa Bamboocrafts Limited deals in many kinds and forms of bamboos, canes, grass and agro forestry products. Our governance platform Pursuant to a notification dated June 12, 2008, issued under the MRTP Act, (SPA Notification), the Government of Maharashtra has appointed our Company as a special planning authority in connection with land owned and proposed to be developed by us. The SPA is our governance platform, which aims to ensure an optimum quality of life for our residents and visitors and benefits from exclusive development rights. In terms of the MRTP Act, the SPA is required to, from time to time, submit its proposals for the developments of the land in the area as detailed in the SPA Notification, (being land either currently owned by us or land which is proposed to be purchased by us), (Statutory Proposals), to the State Government after having invited and considered suggestions and objections from the public. The State Government may in turn, after consultation with the Director of Town Planning, approve such Statutory Proposals either with or without modification. The Statutory Proposals are required to be prepared taking into consideration the provisions of any regional plan or a draft thereof, any development plan, building bye-laws and regulations, which are already in force in the area notified under the SPA Notification. Prior to the SPA Notification, pursuant to a letter dated June 7, 2008, the Office of the Collector, Revenue Department, District Pune, has approved and granted permission to our Company for our proposed development at Village Dasve and Padalghar for a total area of 636.82 hectares.

131

Currently, the draft Statutory Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication amongst others in the official gazette and local newspapers, for public review and receipt of public suggestions and objections thereon. Consequently, this draft Statutory Proposals, after having considered the objections and suggestions received from the public, as appropriate, shall be submitted to the State Government for its approval. The SPA also approves certain draft development control regulations applicable to the land under the control and jurisdiction of the SPA (the Lavasa DCRs), which are required to be subsequently approved by the State Government. The Lavasa DCRs are required to be within the framework of the regional plan, which includes the Hill Station Regulations and the development control rules, regulations, and notifications issued by the State Government of Maharashtra, as applicable to the notified area in the Pune district (the Pune Region DCRs). Thus, the SPA prepares the Statutory Proposals and the Lavasa DCRs and supervises and ensures that all development within the city is in accordance with the Statutory Plan, the Lavasa DCRs, the master plan designed by our Company with HOK International Limited and applicable statutory, regulatory and other requirements. For risks related to the Statutory Proposals including potential impacts on our development plan, see Risk Factors Our ability to develop Lavasa in accordance with our proposed designs and development plan, in a timely manner or at all may be adversely affected if the State Government does not approve the proposals for development of Lavasa prepared by the SPA, in a timely manner or at all, or suggests material modifications to such proposals on page xiv. Our intellectual property We will consider undertaking similar city development projects on an opportunistic basis and applying our Lavasa related industry and market knowledge to such opportunities. We believe that our experience in designing and developing the infrastructure, industrial structures and town planning and management at Lavasa, on the one hand, as well as our pre-existing relationships with recognised industry participants in the infrastructure, education, hospitality, tourism and town planning and management sectors, on the other hand, will give us a competitive advantage in winning and efficiently executing such future projects. We have entered into a consultancy agreement dated September 9, 2010 with our Promoters, pursuant to the terms of which, HCC/HREL and/or its affiliates conferred exclusively upon our Company, in relation to undertaking development of new cities, the right to develop, operate, manage and maintain such new cities and/or act as a consultant in relation thereto. In the event we propose to develop any new cities either by ourselves or through any of our Subsidiaries, neither our Promoters nor any of their affiliates shall have the right to develop such new city. In the event that the development of any new city is not proposed to be carried out by our Company or any of our Subsidiaries, our Promoters have agreed to appoint us as consultants to HCC, HREL, and/or any of their respective affiliates which propose to undertake such development. Any intellectual property, whether registered or not, pertaining to the development, operations, management, planning and maintenance of any future new cities shall vest exclusively with our Company. We are considering developing Dholera Special Investment Region in Gujarat. This potential development has a different concept and platform from Lavasa, but would be built on the foundations of our intellectual property. Our intellectual property may not be enforceable and we may compete with HCC with respect to future development opportunities. For additional risks, see Risk Factors We may not be able to ensure that we are able to participate in the development of future cities along with our Promoters HCC and/or HREL, and/or their affiliates. Further, our Promoters, HCC and/or HREL may have a conflict of interest with us in connection with future city development opportunities on page xxxiv. We have registered our trademark Lavasa under various classes such as class 16, 25, 35, 36, 37 and 39. Additionally, we have registered certain logos of our Subsidiaries and made applications for the registration of our logos and trademarks and those of our Subsidiaries. Our Development Process Flow Our business development, design, land and town planning, control cell, construction and Geographic Information System teams support our real estate and infrastructure businesses.

132

Business development Our business development team identifies synergistic commercial opportunities, serves as the liaison between current and potential partners and, together with specialist teams, structures and documents an advantageous corporate form. In addition, our subsidiary and associate teams arranges both debt and equity funding as needed, prepares business models and coordinates all company related issues. Design Following a brief from our business development team our design team is responsible for preparing tender drawings and estimated costs of construction and appointing architects and consultants. Town planning and SPA After a project is initially approved by our business development team, our town planning team identifies a land parcel based on suitability for the project. The team then defines various design parameters in terms of built up area, height of the building, open spaces and any other specifications specified in the master plan. Once the building design is finalised, the SPA approves the building plans and issues a commencement certificate. The SPA carries out the checking to confirm that the building complies with the Pune Region DCRs and the Lavasa DCRs. Upon completion the SPA issues an occupancy certificate after ensuring that all the necessary requirements for the occupancy certificate have been met. As of June 30, 2010, the SPA has issued 62 commencement certificates and five part occupancy and one occupancy certificate. Project control cell Our project control cell team is responsible for the pre-qualification of contractors and vendors and the awarding of work. We expect to follow HCC's vendors qualification policies with respect to the technical and financial qualification requirements of contractors and vendors which includes an evaluation of relevant experience, financial strength, availability of resources and construction plant and equipment, quality control procedures and satisfaction of licensing requirements. At the tender stage, our design team releases the bill of quantities (BOQ) to the control cell for comments which the design cell incorporates into a revised BOQ. Our control cell then prepares a comparative statement in view with existing rates, budgeted cost, rate analysis and based on offers received. Initial negotiations are held with contractors in the presence of the concerned vertical head so as to finalise the methodology and other technical aspect of the work. Pre-bid meetings with potential contractors are then held and following such meetings, the potential contractors are short listed and a recommendation note is sent to the relevant sanctioning authority within Lavasa for the award of the contract. Construction Our construction team is responsible for overseeing the contractors and the execution of the projects according to the BOQ and project specifications specified by our design team. Construction activities starts with a kick-off meeting with contractors selected for particular job and include the following ongoing activities: Monitoring compliance with environmental, safety and quality guidelines; Managing vendors with respect to the relevant area and the submission of a work plan along with a schedule of machinery and resource mobilisation plan; Monitoring work on day-to-day basis in line with the work plan; Maintaining budgetary control at every stage of construction to ensure expenditures are contained within the approved budget; Performing value engineering with a view to containing cost without compromising functionality and quality; Enforcing quality assurance and quality control as part of a separate team reporting directly to the construction head. Our quality control team is responsible for ensuring compliance of material and design specifications and quality of onsite activities; Managing coordination between all vendors involved with the job for smooth completion and handover;

133

Monitoring and certification of running bills as well as final bills; and Handing over of the completed properties to customers through our city management team. During handing over all necessary documents such as as-built drawings, O&M manuals, warranty and guaranty certificates, etc. are submitted to the customers through our city management team.

Geographic Information Systems (GIS) Since inception, we have used GIS in many aspects. The planning of Lavasa is based on GIS and we leverage GIS technology, which involves the use of digital maps to depict on ground realities, to improve operational efficiency. The status of construction of the projects is depicted in the GIS by graphic and pictorial form. This enables site engineers and management to maintain the status of the projects. Nearly all aspects of our projects are digitally mapped on our GIS system. This single repository of project-wide information provides benefits to the planners and site engineers. Underground utilities are mapped by means of asbuilt surveys. Global positioning systems is also used to map tourist sites such as the nature trails, gardens and parks. In the long term, we expect that GIS will be used for day to day operations and maintenance. Further, we expect that it will be used to plan the security aspects, solid waste management, emergency response systems etc. The GIS will, we believe, be integrated with other IT deployments such as customer relationship management, document management systems and enterprise resource planning. In short, we expect that GIS implementation at Lavasa will allow for e-governance and our residents will have access to a single portal for all transactions. This will include grievance resolution, property tax payment, booking for special events and a host of other such features. GIS will be at the hub of these deployments and will, we believe, provide the residents with an optimum quality of lifestyle. Branding and Marketing We introduced our live, work, learn and play vision through various channels, such as a marketing centre at Lavasa, kiosks at key locations, signage on buses and cars and gift and merchandise promoting our brand. In addition, our website and websites for certain of our Subsidiaries, new advertisements campaigns and social media initiatives, such as Touchpoint, a quarterly newsletter and an e-newsletter, have helped disseminate information to customers and various stakeholders. The Lavasa Future Cities initiative is an initiative undertaken by Lavasa in association with the Times of India to sensitize and create awareness amongst the Indian public on the need for planned new cities. This campaign is aimed to create awareness amongst the Indian public on the need for new cities. The initiative also reviews existing cities to develop awareness of practices followed for city planning, governance, infrastructure development, basic necessities, environmental issues and technology. We hosted a city planning and governance summit in Mumbai in January 2010 which was an opportunity and a platform for business leaders, senior government representatives, town planners, architects and citizens to share and discover insights and strategies for shaping the existing and future cities of India. Our sustained marketing and branding efforts aim to ensure that our brand is considered a premium brand. Our Employees and Our CSR Human resources As of June 30, 2010 Lavasa Corporation Limited employ approximately 447 employees including engineers, technologists, scientists, commercial law specialists, urban designers and planners. The details of our employees are set forth below: Category No. of Employees

134

Engineers Architects Management Graduates CA/CS Others Total

172 22 73 9 171 447

We have not experienced any materials strikes, work stoppages or action by or with our employees and we consider our relationship with our employees to be good. Corporate social responsibility and eco-friendly practices Development of village settlements (Gaothan) In Period 1 we have constructed 34 houses for villagers of Dasve village in the form of a resettlement colony. The residents have been allotted fully constructed houses ranging from 450 sq. ft. to 650 sq. ft. The resettlement colony has been provided with school building, roads, solar lights, toilets, and drains. We plan to follow a similar approach for villagers in Mugaon, Bhoini and Dhamanohol in Period 2. Crche As a part of our CSR initiative we own a crche in Bhoini. We have entered into an MOU with TaraMobile Crches which is non-governmental organisation that operates crches. Our Crche in Bhoini is designed for 400 children and it provides facilities such as a day care centre, food, education, entertainment, regular health camps and vocational training to children. Skills Training program We have signed a MoU with Career Launcher aimed at building capacities of people residing in Lavasa. This activity is part of the Lavasa initiative aimed at lifting the standards of the local community. The training modules offered are tailored to suit the needs and demands as per the opportunities available in the local market especially of Lavasa city management services team as well as other stakeholders like hotels, corporate institutions, tourismrelated ventures and residential property management. Rehabilitation Program Apart from resettlement we have implemented various rehabilitation programmes for original land owners and villagers to make them a part of the development of Lavasa. The programmes include the development of job skills such as training villagers to develop skills in bamboo craft with help from non-governmental organisations, entrepreneurship skills, and community development programmes which include the establishment of religious places, assistance for primary education, superstition eradication campaign, environmental awareness and construction of school buildings. As part of the programme, we provide contract jobs to villagers for various gardening jobs such as tree plantation, contour trenching, bush cutting, seed collection, mass plantation and fencing, encourage self-employment with jobs related to providing water, electricity and garbage disposal and provide drinking water and health services to villages where regular health checks up and vaccination programs regularly undertaken. New urbanism and biomimicry Our dedication to efficiently developing Lavasa is matched by our planning and adherence to New Urbanism, which organises all components of essential city life within walking distance and Biomimicry, which incorporates the concepts of nature into our design and construction to achieve synergy with nature and energy savings. New urbanism incorporates the Transect Planning Model which defines a series of zones that transition from sparse rural farmhouse to the dense urban core. Each zone is split into parts such that it contains a transition from the edge to the centre of the neighbourhood. New urbanism aims to promote sustainable natural resources through optimal utilization and minimal exploitation of the available natural resources. Our eco-conscious approach has earned us

135

international recognition and awards, including the Charter Awards for the Best Master Plan in 2005 by the Congress for the New Urbanism, based in the USA as well as the following three awards from the American Society of Landscape Architects: the Award of Excellence for the Dasve Master Plan in 2005, the Honour Award for the Mugaon Master Plan in 2009 and the Merit Award for Lavasa Landscape in 2010. We have signed an MoU with the Biomimicry Guild (the Guild) which covers two areas: firstly, education workshops wherein the Guild's work in education and consulting may include, but not be limited to: biomimicry trainings and consulting for Lavasa staff, local biologists, and designers; and, biomimicry seminars, workshops and retreats as part of corporate education initiatives offered at the Lavasa for external customers. Secondly, we and the Guild will work toward the development of a centre within existing facilities at Lavasa, aimed at showcasing the discipline of biomimicry. Hydroseeding To enable us to treat large areas in order to better prevent soil erosion and to facilitate re-vegetation, we brought in the technology of hydroseeding from the USA. A mixture of seeds, mulch, cellulosic tackifier (binding material), geobinder and water is thoroughly mixed in a 6,000 gallon machine and sprayed over a distance of approximately 100150 feet over barren slopes to prevent the soil erosion and facilitate quick re-vegetation. The result of this treatment is an improved percentage of germination of seeds. Information Communication and Technology We use information technology to enhance our performance and efficiency as well as the quality of life of our residents and visitors. We expect that our residents and visitors will have access to wireless, data and voice connectivity through seamless connectivity between Pune and Lavasa. We will encourage multiple operators to provide services in Lavasa and the competition is expected to result in quality services. We expect that each home at Lavasa will have advance network design which will enable the residents to enjoy various internet protocol-based services on high speed cabling, ethernet and wireless internet. Our e-home concept includes home automation, internet protocol-based communication and integrated security. We have entered into an agreement with Wipro to set up My City Technology to plan, implement and manage information and communication technology services across Lavasa. Further, we have entered into an agreement with a leading network industry player for divesting 18% of the share capital in My City Technology in favour of this industry player. My City Technology is committed to develop our technology infrastructure using the latest technology and trends. It will make all governance services available on web and to help our city management team provide governance to our residents. It will also provide the necessary infrastructure support including technology selection, supply, installation and management of various information technology platforms, networks, data centres etc. for our residents and business partners. For further details of this arrangement, see Summary of Key Agreements /Scheme of Amalgamation in History and Certain Corporate Matters on page 148. Insurance Our operations are subject to hazards inherent in real estate, infrastructure, city management, hospitality, water sports, adventure sports, health and tourism sectors, including accidents, collapse of structures, erosion, exposure to dangerous materials, such as certain solvents and risks related to machinery noise and manual handling activities. We maintain comprehensive insurance coverage for all of our projects under development as well as under operation with Oriental Insurance Company Limited. The insurance coverage we carry varies from project to project, but generally includes, among other things, losses related to earthquake, fire, flooding, inundation, accidents and general liability including our legal liability consequent to act of terrorism. Under our Comprehensive Project Insurance cum Operational Cover, we are also insured against our legal liability to pay damages for third party civil claims arising from bodily injury or property damage caused by an accident during project construction. We use an outside

136

broker to secure our insurance policies and believe that our coverage is adequate. We have not made any major claims under our insurance policies. Our Corporate and Registered Office, which is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083, is not owned by us. Pursuant to a letter dated November 2, 2009, our Promoter, HCC, has permitted us to share the premises located at 247 Park licensed to HCC by Vikhroli Corporate Park Private Limited. Under this arrangement, we are required to pay ` 14.57 million annually for the use of such premises.

137

REGULATIONS AND POLICIES The following description is a summary of some of the relevant regulations and policies as prescribed by the Central and State Governments in India. The information detailed in this chapter has been obtained from publications available in the public domain. The regulations set out below are not exhaustive, and this section is only intended to provide general information to the investors and is neither designed nor intended to be a substitute for professional legal advice. Maharashtra Regional and Town Planning Act, 1966 The MRTP Act has been enacted with the object of establishing local development authorities in Maharashtra to ensure efficient town planning and development of lands within their jurisdiction. It provides for the creation of new towns and compulsory acquisition of land required for public purposes. It provides a mechanism for the better preparation of planning proposal and their effective execution. The Special Planning Authority The State Government may appoint a company as a Special Planning Authority for planning the development of any undeveloped area notified under the MRTP Act. A planning proposal is to be prepared by the SPA indicating the manner in which the land is going to be developed by a planning authority, which includes a SPA. The SPA, in furtherance of the approved planning proposal, has the power to hold, manage and dispose of the land and other property, to carry out buildings and other operations, to provide water, electricity, gas, sewerage and other services, amenities and facilities and generally do anything which is necessary and expedient to give effect to the development of the area as planned subject to the directions of the State Government. The planning proposal shall contain details regarding land use, construction and all other civic amenities and services intended to be provided by that authority. A planning proposal is to be made by the SPA indicating the manner in which the land is going to be developed. The planning proposal would contain details regarding land use, construction and all other civic amenities and services intended to be provided by that authority. Any change in the use or development of any land which is part of a notified area or site for a new town requires the permission of the planning authority and it may revoke or modify the permission granted if it appears inconsistent with the planning proposal. All development permissions granted by the SPA shall be brought to the notice of the Assistant Director of Town Planning within a period of three months from the date of grant of permission. The MRTP Act empowers the SPA to levy development charges on the use, change of use or development of land for which permission is required at specified rates. The local authorities will make contributions towards the expenses incurred by the SPA as determined and fixed by the State Government, either in lump sum or in installments. The SPA is also entitled to borrow money from the open market and also receive deposits in relation to allotments and sale of land made in furtherance of the approved planning proposal. Special Regulation for Development of Tourist Resorts/ Holiday Homes/ Town Ships in Hill Station Type Areas, 1996 The Maharashtra Government passed the Hill Station Regulations in 1996 to permit the development of tourism sites. The Urban Development Department is empowered to declare any area at appropriate height, having suitable topographical features, for the purposes of the development, as a hill station. Hill station development is treated as an industry under the Hill Station Regulations. The developer can purchase agricultural land and use it for nonagricultural purposes. In this context, the condition that an agricultural land can be bought only by an agriculturist shall be waived and the ceiling of agricultural land holding shall not apply. The Bombay High Court in the matter of Bombay Environmental Action Group and Others v. State of Maharashtra and others has passed certain observations in relation to Regulation 19 and which have not yet been clarified by the State of Maharashtra and its applicability is not free from doubt. These regulations, amongst other things, provide that the developer shall provide all infrastructural facilities like storm water drains, drainage lines, electrical lines, drinking water and sewage disposal facilities. The developer may also provide for amenities like shopping malls, club houses, hospitals, schools, college,

138

golf course and helipad. The Hill Station Regulations also provide that 33% of the total area under development should be kept as open space/ garden/parks and the minimum size of residential plots should be 500 Sq. Mtrs. The power of planning lies with the Collector and all disputes with regard to the interpretation of any of the Hill Station Regulations will be decided by the State Government, whose decision shall be binding on the concerned parties. Tourism Policy of the Government of Maharashtra, 2006 (the Tourism Policy) The Tourism Policy was formulated in 2006, in order to develop tourism in Maharashtra in a systematic manner. It shall remain in force for a period of 10 years or until substituted by a new package scheme of incentives. Incentives under the Tourism Policy cover tourism projects in the private sector, state public sector/joint sector and the cooperative sector but not in the central public sector. The objectives of the Tourism Policy are to develop infrastructure at tourist destinations and ensure accessibility to tourist destinations. It also encourages public private partnership in tourism related activities and infrastructural development by providing fiscal and other incentives to private investors. The Maharashtra Tourism Development Corporation Limited (the MTDC) shall be the notified authority for the purpose of registration, providing incentives, marketing and promotional activities. A tourism unit developing hill stations is an eligible unit for claiming incentives under the Tourism Policy. General steps to be taken for investment under the policy are as follows: A registration certificate has to be obtained from the MTDC. A project report has to be submitted specifying the category of tourism activity and the incentives that are proposed to be availed of by the eligible unit will all relevant details. Permission has to be obtained from all concerned statutory and executive authorities from whom permission is required under various laws. The units should have a minimum fixed capital investment of ` 10 million or more which should be made within three years from the date of registration. These units can avail tax exemptions, electricity concessions and other benefits. These units will have to apply to MTDC to avail of the benefits and MTDC after due consideration shall issue Eligibility Certificates following which they will be entitled to avail these benefits. The licenses/ permissions are to be renewed every five years. The unit shall remain in commercial operation continuously for at least eight to 17 years after it is commissioned. However, in cases where the operation is discontinued due to any reason, the unit shall have to repay the amount of incentives availed. Regular details need to be furnished to the State Government about commercial operations, employment and other matters. Additionally, quarterly details has to be submitted to MTDC about the benefits availed during the eligibility period. Any excess claims of incentives by a unit will be recovered with interest of 2% per month.

Property Related Laws Transfer of Property Act, 1882 (the TP Act) The TP Act establishes the general principles relating to transfer of property in India. It forms a basis for identifying the categories of property that are capable of being transferred, the persons competent to transfer property, the validity of restrictions and conditions imposed on the transfer and the creation of contingent and vested interest in the property. It also provides for the rights and liabilities of the vendor and purchaser in a transaction of sale of land. Registration Act, 1908 (the Registration Act)

139

The Registration Act has been enacted with the objective of providing public notice of the execution of documents affecting, inter alia, the transfer of interest in immovable property. The purpose of the Registration Act is the conservation of evidence, assurances, title and publication of documents and prevention of fraud. It details the formalities for registering an instrument. Section 17 of the Registration Act identifies documents for which registration is compulsory and includes, among other things, any non-testamentary instrument which purports or operates to create, declare, assign, limit or extinguish, whether in present or in future, any right, title or interest, whether vested or contingent, in any immovable property of the value of one hundred rupees or more, and a lease of immovable property for any term exceeding one year or reserving a yearly rent. A document will not affect the property comprised in it, nor be treated as evidence of any transaction affecting such property (except as evidence of a contract in a suit for specific performance or as evidence of part performance under the TP Act or as collateral), unless it has been registered. Evidence of registration is normally available through an inspection of the relevant land records, which usually contains details of the registered property. Further, registration of a document does not guarantee title of land. Indian Stamp Act, 1899 (the Stamp Act) Under the Stamp Act, 1899 stamp duty is payable on instruments evidencing a transfer or creation or extinguishment of any right, title or interest in immovable property. Stamp duty must be paid on all instruments specified under the Stamp Act at the rates specified in the schedules to the Stamp Act. The applicable rates for stamp duty on instruments chargeable with duty vary from state to state. Instruments chargeable to duty under the Stamp Act, which are not duly stamped, are incapable of being admitted in court as evidence of the transaction contained therein and it also provides for impounding of instruments that are not sufficiently stamped or not stamped at all. However, the instruments which have not been properly stamped can, in certain cases, be validated by paying a penalty of up to 10 times of the proper duty or deficient portion thereof payable on such instruments. Indian Easements Act, 1882 (the Easement Act) An easement is a right which the owner or occupier of land possesses for the beneficial enjoyment of that land and which permits him to do or to prevent something from being done, in or upon, other land not his own. Under the Easements Act, a license is defined as a right to use property without any interest in favour of the licensee. The period and incident may be revoked and grounds for the same may be provided in the license agreement entered in between the licensee and the licensor. STATE LAWS OF MAHARASHTA State legislations provide for the planned development of urban areas and the establishment of regional and local development authorities charged with the responsibility of planning and development of urban areas within their jurisdiction. Real estate projects have to be planned and developed in conformity with the norms established in these laws and regulations made there under and require sanctions from the government departments and developmental authorities at various stages. The Bombay Village Panchayats Act, 1958 The 73rd Amendment to the Constitution inserted Part IX to the Constitution of India (Constitution) which provides for the constitution and functioning of panchayats. Article 243-H (a) authorised the panchayats to levy, collect and appropriate such taxes, duties, tolls and fees in accordance with such procedure and subject to such limits. Accordingly, The Bombay Village Panchayats Act, 1958 was legislated to empower the panchayat to levy taxes on buildings and lands within the limits of the village, shop keeping and hotel keeping, trade or calling other than agriculture. The panchayat passes a resolution specifying the tax to be levied and the rate at which it is to be levied and then notify it to the public. Any person may in writing object to the levy of tax. The panchayat may, at a special meeting, pass a resolution to propose the abolition or variation of any tax already levied. The tax is primarily leviable from the actual occupier of the building or land, if such occupier is the owner of the building or land. If the land or building is occupied by the lessee, the tax is leviable from the lessor. Tax on shop-keeping and hotel-keeping is to be paid by the proprietor of the shop or hotel. Tax on trades and calling is levied on the person carrying on the business.

140

Bombay Stamp Act, 1958 (the Bombay Stamp Act) Stamp duty on instruments in the state of Maharashtra is governed by the Bombay Stamp Act. This act levies stamp duty on documents/instruments by which any right or liability is or purports to be created, transferred, limited, extended, extinguished or recorded. All instruments chargeable with duty and executed by any person are required to be stamped before or at the time of execution or immediately thereafter on the next working day following the day of execution. It authorises the State government on receiving information from any source, to call for examination of any instrument to satisfy itself that the market value of the property referred therein has been truly set forth and the duty paid on it is adequate. Instruments not duly stamped are incapable of being admitted in court as evidence of the transaction in question. The State government has the authority to impound insufficiently stamped documents. ENVIRONMENTAL REGULATION The three major statutes in India which seek to regulate and protect the environment against pollution and related activities in India are the Water (Prevention and Control of Pollution) Act 1974, the Air (Prevention and Control of Pollution) Act, 1981 and the Environment (Protection) Act, 1986. The basic purpose of these statutes is to control, abate and prevent pollution. In order to achieve these objectives, Pollution Control Boards (PCB) which are vested with diverse powers to deal with water and air pollution, have been set up in each state. The PCBs are responsible for setting the standards for maintenance of clean air and water, directing the installation of pollution control devices in industries and undertaking investigations to ensure that industries are functioning in compliance with the standards prescribed. These authorities also have the power of search, seizure, and investigation if the authorities are aware of or suspect pollution. In addition, the Ministry of Environment and Forests looks into Environment Impact Assessment. The Ministry of Environment and Forest receives proposals for expansion, modernization and setting up of projects and the impact which such projects would have on the environment is assessed by the Ministry of Environment and Forest before granting clearances for the proposed projects.

141

HISTORY AND CERTAIN CORPORATE MATTERS Brief History of our Company Our Company was incorporated as Pearly Blue Lake Resorts Private Limited on February 11, 2000 under the Companies Act. Pursuant to a resolution passed by the Board of Directors and shareholders on December 6, 2000 and December 11, 2000 respectively, the name of our Company was changed to The Lake City Corporation Private Limited on December 12, 2000. Our Company was converted into a public limited company on March 3, 2003 and consequently, the name was changed to The Lake City Corporation Limited. Pursuant to board and shareholders resolutions dated March 10, 2004 and March 26, 2004 respectively, the name of our Company was changed to Lavasa Corporation Limited and it received a fresh certificate of incorporation pursuant to change of name on June 8, 2004. On August 1, 2002, the Bombay High Court approved the scheme for the merger of Yashomala Leasing and Finance Private Limited (YLFPL) with our Company. For further details, please see - Summary of Key Agreements / Scheme of Amalgamation. Our Company is a city development and management company engaged in the development, construction and management of Lavasa, a private hill city development in India. Our vision is to develop Lavasa as a city which provides avenues for its residents and visitors to live, work, learn and play in harmony with nature. For further details, please see Our Business on page 98. Changes in the Registered Office of the Company Date January 2002 Details of change The registered office of our Company was changed from BG, 1/A, Konark Estates, 9, Cannought Road, Opposite Pune Club, Pune 411 001 to Amar Avinash Corporate City, 5 th Floor, S. No. 13, Bund Garden Road, Pune 411 001 The registered office of our Company was changed from Amar Avinash Corporate City, 5th Floor, S. No. 13, Bund Garden Road, Pune 411 001 to Viola Business Centre, D Building, S. No. 118, Katraj Dehu Road, Bypass (N.H. 4), Warje, Pune 411 052 The registered office of our Company was changed from Viola Business Centre, D Building, S. No. 118, Katraj Dehu Road Bypass (N.H. 4), Warje, Pune 411 052 to Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Reasons for change Greater operational efficiency

7,

February 24, 2003

Administrative convenience

September 26, 2008

Administrative convenience

Main Objects of our Company The main objects as contained in the Memorandum of Association are: I. To establish, build, construct, furnish, equip, decorate, improve, maintain, manage, organize, run places of returns in various forms such as holidays resorts, holiday camps, farm houses, guest houses, inns, hotels, motels, cottages, convention centers, vacation homes, residential houses, forests, dams, bridges, road and other amusement, recreation, commercial and educational amenities, facilities, inter alia including golf courses, health clubs, go-carting, snow parks, boating mini railway, water sports, racing tracks amusement and fantasy park and resorts, naturopathy centers, meditation and prayer centers, swimming pools, tennis courts, skating halls, indoor games, video games, rope ways, cable cars, mountaineering, hang gliding, theatres, seminar/conference halls, super markets, departmental stores, industrial park and hospitality, marketing arcades, residential schools, colleges, research institutions, natural health centres, adventure sports institution and similar establishments and to engage in other activities as may be deemed fit to develop the area as a hill station.

142

II.

To promote, develop, enlarge, purchase, own and otherwise deal in group schemes, farm houses, green houses, bungalows, townships, satellite townships and to purchase, buy, take on lease or in exchange or otherwise acquire any/or supervise, manage, develop and cultivate any farms, agricultural land or any other rural property to sell, allot, give on lease, exchange or otherwise any agricultural land either fully developed, particularly developed or underdeveloped subject to approval of appropriate authority. To promote, establish, improve develop, administer, own and run agro-industries, projects or enterprises or programs for manufacture or production of plant, machinery, implements, accessories, tools, materials, substances, goods or things will help the growth and modernization of agriculture, horticulture, forestry, sericulture, poultry farming and animal husbandry. To promote, establish, improve, develop, administer, own and run industries, projects or enterprises or programs for processing and preservation of agricultural products, forest produce and produce of horticulture, farming, handicrafts, sericulture for the purpose of increasing quality, sericulture for the purpose of increasing quality, availability or otherwise of goods and subsidiary food in all their forms and variations either for export or consumption in the country. To act as providers and suppliers of various infrastructural facilities and to undertake development of infrastructure project in all areas of infrastructure including basic infrastructure such as roads, power, water management, power, sewerage, waste management systems etc., industrial infrastructure, urban infrastructure, tourism infrastructure, social infrastructure such as healthcare, education and entertainment etc. & more particularly as contractor, sub contractor, builder, property developers, constructors, surveyors, engineers for design and construction of and repairs to residential, commercial, industrial and other buildings, bridges, culverts, reservoirs, dams, canal, hotels, telephone exchange, dock, harbors, cinema houses, auditoriums, plot houses, roads, air ports and industrial projects, contractors, sub-contractor and land developers for warehouses godowns and such other manufacturing or storage units, roads, dams, bridges, wharfs piers, laying of pipe lines, for water oil and gas either above the ground or underground or on an earth surface and setting up of telecommunication networks, Internet gateways, satellites, web sites and such other devices in information technology, ships, Barges, tugs, boats and craft builder, proprietor of docks, wharves, piers, workshops, marine engineers, dredges, tug and barge owners in wharfingers; warehousemen, ship breakers and freight contractors. To act as providers and suppliers of various infrastructural facilities and to carry on the business of providing services in India and outside India in all the areas of infrastructure including basic infrastructure such as roads, water management, power, sewerage, waste management systems etc., Industrial infrastructure, Urban infrastructure, Tourism infrastructure, Social infrastructure such as healthcare, education and entertainment and more particularly as consultant, project manager, market research consultant, valuers and estate agents, projects consultant and project appraisers, assessors, surveyors, actuaries and insurance brokers, vendors developers and intermediaries for obtaining licenses, permissions and approvals from state or central government or local statutory bodies and others for giving know-how which the company may have or arrange from others for the development and management thereof and generally to transact and undertake all type of agency and trustees business, whether or not the objects and business of such persons, firms, associations, concerns, contractors, companies or corporations are similar to those of the Company. To act as providers and suppliers of various infrastructural facilities. To invest in development of all types of infrastructural projects and more particularly to set up, provide and/or participate in providing venture capital, technology funds or any other funds for seed capital, risk capital foundation, including giving guarantees or such other financial assistance as may be conducive for development of new enterprises, innovative methods of production and development of existing and new technology, to identify projects, projects ideas, to prepare project profiles, project reports market research, feasibility studies and preinvestments studies and investigation of industries on macro and micro level; to undertake appropriate service to identify scope for potential and industrial development in any particular geographical areas or location whether in India and abroad; to act as lead managers in respect of project assignments by undertaking follow up, supervision and coordination work at the instance, behest or on behalf of banks

III.

IV.

V.

VI.

VII.

143

financial institutions, companies, bodies corporate and to monitor the same to the participants; to act as an advisor in the management of undertakings business, enterprises offices, trade, occupation, calling or professions by introducing modern methods and techniques and systems and render all assistance as may be necessary including by acting agents for recruitment of personnel, technical process, economic size, sources of plant and machinery and other utilities for business entrepreneurs and to carry on the business of promotion, organizing, procuring incorporation of and giving financial or other assistance in India and abroad independently or in association with any person, government or any other agencies whether incorporated or not, for any business of the company. Amendments to our Memorandum of Association Date of shareholders resolution November 20, 2000 Nature of Amendment Increase in the authorised share capital of our Company from ` 20 million divided into 2,000,000 Equity Shares to ` 50 million divided into 5,000,000 Equity Shares Change in the name of our Company from Pearly Blue Lake Resorts Private Limited to The Lake City Corporation Private Limited Increase in the authorised share capital from ` 50 million divided into 5,000,000 Equity Shares to ` 300 million divided into 9,000,000 Equity Shares and 21,000,000 Redeemable Preference Shares Addition of four new sub-clause in the main objects in our Memorandum of Association after replacing existing clause I in the clause (A) main object of Part III. I. To establish, build, construct, furnish, equip, decorate, improve, maintain, manage, organize, run places of returns in various forms such as holidays resorts, holiday camps, farm houses, guest houses, inns, hotels, motels, cottages, convention centers, vacation homes, residential houses, forests, dams, bridges, road and other amusement, recreation, commercial and educational amenities, facilities inter alia including golf courses, health clubs, go-carting, snow parks, boating, mini railway, water sports, racing tracks, amusement and fantasy park and resorts, naturopathy centers, meditation and prayer centers, swimming pools, tennis courts, skating halls, indoor games, video games, rope ways, cable cars, mountaineering, hang gliding, theatres, seminar/conference halls, super markets, departmental stores, industrial park and hospitality, marketing arcades, residential schools, colleges, research institutions, natural health centers, adventure sports institution and similar establishments and to engage in other activities as may be deemed fit to develop the area as a hill station. To promote, develop, enlarge, purchase, own and otherwise deal in group schemes, farm houses, green houses, bungalows, townships, satellite townships and to purchase, buy, take on lease or in exchange or otherwise acquire any / or supervise, mange, develop and cultivate any farms, agricultural land or any other rural property to sell, allot, give on lease, exchange or otherwise any agricultural land either fully developed, particularly developed or underdeveloped subject to approval of appropriate authority. To promote, establish, improve, develop, administer, own and run agro-industries, projects or enterprises or programs for manufacture or production of plant, machinery, implements, accessories, tools, materials, substances, goods or things will help the growth and modernization of agriculture, horticulture, forestry, sericulture, poultry farming and animal husbandry.

December 11, 2000

December 24, 2001

December 27, 2001

II.

III.

144

Date of shareholders resolution IV.

Nature of Amendment

February 5, 2003

To promote, establish, improve, develop, administer, own and run industries, projects or enterprises or programs for processing and preservation of agricultural produce, forest produce and products of horticulture, farming, handicrafts, sericulture for the purpose of increasing quality, sericulture for the purpose of increasing quality, availability or otherwise of goods and subsidiary food in all their forms and variations either for export or consumption in the country. Change in the name of our Company from The Lake City Corporation Private Limited to The Lake City Corporation Limited pursuant to conversion of our Company from a private to a public company Increase in the authorised share capital of our Company from ` 300 million divided into 9,000,000 Equity Shares and 21,000,000 Redeemable Preference Shares to ` 400 million divided into 9,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares Change in the name of our Company from The Lake City Corporation Limited to Lavasa Corporation Limited Addition of three new sub-clauses in the main objects in the Memorandum of Association after the existing sub clause IV. The sub-clauses included are provided below: V. To act as providers and suppliers of various infrastructural facilities and to undertake development of infrastructure project in all areas of infrastructure including basic infrastructure such as roads, power, water management, power, sewerage, waste management systems etc., industrial infrastructure, urban infrastructure, tourism infrastructure, social infrastructure such as healthcare, education and entertainment etc. & more particularly as contractor, sub contractor, builder, property developers, constructors, surveyors, engineers for design and construction of and repairs to residential, commercial, industrial and other buildings, bridges, culverts, reservoirs, dams, canal, hotels, telephone exchange, dock, harbors, cinema houses, auditoriums, plot houses, roads, air ports and industrial projects, contractors, sub-contractor and land developers for warehouses godowns and such other manufacturing or storage units, roads, dams, bridges, wharfs piers, laying of pipe lines, for water oil and gas either above the ground or underground or on an earth surface and setting up of telecommunication networks, Internet gateways, satellites, web sites and such other devices in information technology, ships, Barges, tugs, boats and craft builder, proprietor of docks, wharves, piers, workshops, marine engineers, dredges, tug and barge owners in wharfingers; warehousemen, ship breakers and freight contractors. To act as providers and suppliers of various infrastructural facilities and to carry on the business of providing services in India and outside India in all the areas of infrastructure including basic infrastructure such as roads, water management, power, sewerage, waste management systems etc., Industrial infrastructure, Urban infrastructure, Tourism infrastructure, Social infrastructure such as healthcare, education and entertainment and more particularly as consultant, project manager, market research consultant, valuers and estate agents, projects consultant and project appraisers, assessors, surveyors, actuaries and insurance brokers, vendors developers and intermediaries for obtaining licenses, permissions and approvals from state or central government or local statutory bodies and others for giving know-how which the company may have or arrange from others for the development and management thereof and generally to transact and undertake all type of agency and trustees business, whether or not the objects and business of such persons, firms, associations, concerns, contractors, companies or

December 5, 2003

March 26, 2004

March 26, 2004

VI.

145

Date of shareholders resolution

Nature of Amendment

corporations are similar to those of the Company. VII. To act as providers and suppliers of various infrastructural facilities. To invest in development of all types of infrastructural projects and more particularly to set up, provide and/or participate in providing venture capital, technology funds or any other funds for seed capital, risk capital foundation, including giving guarantees or such other financial assistance as may be conducive for development of new enterprises, innovative methods of production and development of existing and new technology, to identify projects, projects ideas, to prepare project profiles, project reports market research, feasibility studies and pre-investments studies and investigation of industries on macro and micro level; to undertake appropriate service to identify scope for potential and industrial development in any particular geographical areas or location whether in India and abroad; to act as lead managers in respect of project assignments by undertaking follow up, supervision and coordination work at the instance, behest or on behalf of banks financial institutions, companies, bodies corporate and to monitor the same to the participants; to act as an advisor in the management of undertakings business, enterprises offices, trade, occupation, calling or professions by introducing modern methods and techniques and systems and render all assistance as may be necessary including by acting agents for recruitment of personnel, technical process, economic size, sources of plant and machinery and other utilities for business entrepreneurs and to carry on the business of promotion, organizing, procuring incorporation of and giving financial or other assistance in India and abroad independently or in association with any person, government or any other agencies whether incorporated or not, for any business of the company.

March 13, 2006

Increase in the authorised share capital of our Company from ` 400 million divided into 9,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares to ` 650 million divided into 34,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares Increase in the authorised share capital of our Company from ` 650 million divided into 34,000,000 Equity Shares and 31,000,000 Redeemable Preference Shares to ` 1,000 million divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares Change in the registered office of our Company from Pune to Mumbai Increase in the authorised share capital of our Company from ` 1,000 million divided into 60,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares to ` 1,250 million divided into 60,000,000 Equity Shares, 40,000,000 Redeemable Preference Shares and 25,000,000 Compulsory Convertible Preference Shares Increase in the authorised share capital of our Company from ` 1,250 million divided into 60,000,000 Equity Shares, 40,000,000 Redeemable Preference Shares and 25,000,000 Compulsory Convertible Preference Shares to ` 6,250 million divided into 560,000,000 Equity Shares, 40,000,000 Redeemable Preference Shares and 25,000,000 Compulsory Convertible Preference Shares Increase in the authorised share capital of our Company from ` 6,250 million divided into 560,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares and 25,000,000 Compulsory Convertible Preference Shares to ` 8,650 million divided into 800,000,000 Equity Shares and 40,000,000 Redeemable Preference Shares and 25,000,000 Compulsory

January 15, 2007

January 21, 2008 June 25, 2008

June 7, 2010

July 30, 2010

146

Date of shareholders resolution Convertible Preference Shares

Nature of Amendment

Major events of our Company Date June 1, 2001 June 27, 2001 Event The Urban Development Department, Government of Maharashtra issued a notification declaring 18 villages as a hill station The Urban Development Department, Government of Maharashtra granted an in-principle sanction for the development of villages Bhode, Pathershet, Bembatal, Palse, Admal, Padalghar, Dasve, Wadavali, Sakari, Bhoini, Mugaon, Ugawali, Koloshi, Dhamanohol, Gadle, Mose, Saiv and Warasgaon for the purpose of tourist resorts and holiday homes Our Company entered into an memorandum of understanding with the Maharashtra Tourism Development Department whereby the Maharashtra Tourism Development Department agreed to provide technical information, data, assistance in obtaining various permissions and help promote the hill station being developed by our Company The Environment Department, Government of Maharashtra granted environmental clearance to develop a hill station The Urban Development Department, Government of Maharashtra issued a notification appointing our Company as a Special Planning Authority with respect to 14 villages Launch of Fortune Select Dasve The Urban Development Department, Government of Maharashtra issued a letter permitting research and development and other allied uses in the hill station Ecole Hoteliere Lavasa Academic Calender Launch First Massachusetts Institute of Technology workshop held at Lavasa Launch of Apollo Hospital, Lavasa Biomimicry workshop held at Lavasa The launch of Dasvino Town and Country Club The Ministry of Environment and Forest, Government of India granted an in-principle approval for the construction of a tunnel at Mugaon

June 5, 2002

March 18, 2004 June 12, 2008 March 6, 2009 August 21, 2009 October 8, 2009 January 11 - 13, 2010 January 15, 2010 March 10 12, 2010 March 24, 2010 June 3, 2010

Awards and Achievements Date 2005 Award/Achievement Congress for New Urbanism, USA awarded our Company with the Charter Award Award of excellence for Dasve village The American Society of Landscape Architects has awarded our Company the Award of Excellence in recognition of outstanding professional achievement Dasve village master plan The American Society of Landscape Architects has awarded our Company the Honor Award in recognition of outstanding professional achievement Mugaon valley master plan The American Society of Landscape Architects has awarded our Company the Merit Award in recognition of outstanding professional achievement Lavasa landscape guidelines

December 2005

January 2009

January 2010

Subsidiaries Our Company has 30 Subsidiaries. For details regarding our Subsidiaries, please see Our Subsidiaries and Associates on page 173.

147

Our Promoters The Promoters of our Company are HCC and HREL. For details, please see Our Promoters and Promoter Group on page 195. Capital raising activities through equity or debt For details regarding our capital raising activities through debt, please see Financial Indebtedness on page 309. Our Shareholders For details regarding our shareholders, please see Capital Structure on page 37. Summary of Key Agreements /Scheme of Amalgamation 1. Scheme of Amalgamation of Yashomala Leasing and Finance Private Limited with our Company

On January 15, 2002, our Board approved the scheme of merger under Sections 391 to 394 of the Companies Act for the amalgamation (the Scheme of Merger) of YLFPL with our Company, whereby all the assets, liabilities, rights, duties, obligations, etc. of YLFPL were transferred to our Company and YLFPL was dissolved without winding up, pursuant to a report by the official liquidator, with effect from the last of the dates on which all approvals were obtained and certified true copies of the orders of the Bombay High Court sanctioning the scheme are filed with the registrar of companies. Our Company obtained the approval of the Bombay High Court for the Scheme of Merger on August 1, 2002. The Scheme of Merger envisaged the transfer of the undertakings, business, investments, obligations, employees, etc. from YLFPL to our Company and the consequent issue of 750 Equity Shares of ` 10 each and 1600, redeemable preference shares of ` 10 each at a premium of ` 10 per share, by our Company to the shareholders of YLFPL for every 1 equity share of ` 100 held by the then shareholders of YLFPL in the manner provided therein. The Scheme of Merger, inter alia, provided the manner of vesting and transfer of the assets of YLFPL to our Company, the transfer of contracts of whatsoever nature of YLFPL to our Company and the continuance of our Company as a party in YLFPLs place in the same, the transfer of all debts and obligations of YLFPL to our Company, the transfer of all suits and proceedings by or against YLFPL to our Company and the transfer of employees engaged by YLFPL to our Company. 2. Shareholders agreement between Hindustan Finvest Limited, HCC, Hincon Holdings Limited, Aniruddha P. Deshpande, Vinay V. Maniar, Sadanand B. Sule, Janpath Investments & Holdings Limited, Venkateshwara Hatcheries Private Limited and our Company (the Parties) dated December 9, 2003 and the adherence deed between the Parties and Hincon Realty Limited dated September 27, 2005

Our Company, Hindustan Finvest Limited, HCC, Hincon Holdings Limited, Aniruddha P. Deshpande, Vinay V. Maniar, Sadanand B. Sule, Janpath Investments & Holdings Limited and Venkateshwara Hatcheries Private Limited (the Parties) have entered into a shareholders agreement dated December 9, 2003 (the SHA). The SHA, amongst other things, provides that: (i) Our Company shall amend the Articles of Association to incorporate the terms of the shareholders agreement and any further amendments to the Memorandum and Articles of Association shall require prior consent of Parties holding at least 12.5% of the subscribed, issued and paid up equity share capital; Unless prior consent of the Parties in writing is received, any further issue of equity/preference shares shall be made in such manner that the participation by the Parties in the total issued share capital of the Company shall at all times remain in the same proportion of their shareholding in the equity and preference share capital of our Company; The shareholders shall have the right of first refusal;

(ii)

(iii)

148

(iv) (v)

The shareholders shall not without the prior consent of the other parties (which shall not be unreasonably withheld) mortgage or pledge the whole or any part of its shares; Every shareholder who holds 12.5% of the shares shall be entitled to appoint one director on the board of the Company and every additional 12.5% shares shall entitle the shareholder to appoint an additional director.

Pursuant to the adherence deed dated September 27, 2005 between the Parties and HREL (known as Hincon Realty Limited), HCC had transferred 2,999,000 equity shares of our Company at a price of ` 120.68 per equity share. Additionally, HCC, Hindustan Finvest Limited and Hincon Holdings Limited transferred 9,000,000 cumulative redeemable preference shares, 2,625,000 preference shares and 2,375,000 preference shares each at a price of ` 20 per preference share. Pursuant to the adherence deed, HREL shall adhere to the terms of the SHA. The Board of Directors agreed to terminate the SHA at its meeting dated July 30, 2010. The shareholders of our Company at the meeting held on the same day confirmed such termination and amended the articles pursuant to such termination. 3. Shareholders agreement between our Company, Axis Bank Limited, HCC and HREL dated June 26, 2008

Our Company, Axis Bank Limited (Axis) and our Promoters have entered into a shareholders agreement dated June 26, 2008 (the Axis SHA) defining the rights and obligations of the shareholders in relation to the investment by Axis in our Company. The Axis SHA, amongst other things, provides that: (i) Axis shall be entitled to appoint a nominee director on the Board of our Company and the board may, at the request of the Axis, nominate him a member of the audit committee of the Board, till such time as the Axis continues to hold all the DDCDs or equity shares upon conversion or until an initial public offer, whichever is earlier; The Company shall not take any action with respect to certain matters without the prior written consent or affirmative vote of the nominee director of Axis; The Promoters shall act in the best interest of our Company and fully consult Axis on all matters materially affecting the development of the business of our Company; Axis shall be entitled to participate in all future issuances of equity shares or instruments convertible into equity shares to the extent necessary to maintain its proportionate equity interests in our Company pursuant to the conversion of the DDCDs and the CCPS; Our Company shall not undertake further issues at a price less than the proposed conversion price or the price at which Axis has subscribed to the Equity Shares; The Promoters shall have a right of first refusal in relation to transfer of DDCDs or Equity Shares by Axis and Axis shall have tag along rights in the event the Promoters propose to transfer Equity Shares; If our Company does not list and trade its shares on any stock exchange within 5 years of the closing date or HCC fails to honour the put option given to the Axis at the end of the third, fourth and fifth years, Axis shall have the right to convert the DDCDs (along with the agreed return of 15.5% pa at the end of the third year and thereafter at 18.5% pa at the end of the fourth and fifth year in case of default) based on valuation of our Company by an independent merchant banker appointed by Axis; The Promoters shall not transfer / sell any Equity Shares to any person at a price which is lower than the proposed conversion price of the DDCDs or the price at which Axis subscribed to the Equity Shares; Axis shall not transfer DDCDs, Equity Shares or CCPSs to the competitors of our Company. Shareholders agreement between Apollo Hospitals Enterprise Limited and our Company dated September 21, 2007

(ii) (iii) (iv)

(v) (vi) (vii)

(viii) (ix) 4.

Our Company and Apollo Hospitals Enterprise Limited (AHEL) have entered into a shareholders agreement dated September 21, 2007 (the Apollo Agreement) for the setting up and the management of a company, namely Apollo Lavasa Health Corporation Limited, for health and wellness development at Lavasa covering primary hospitals, wellness research development and medical education. The day to day management of Apollo Lavasa Health Corporation Limited shall vest with AHEL. AHEL shall have the exclusive option to develop ventures in the hospital and pharmacy space only in Lavasa. The parties envisaged that the company shall commence operations with approximately 50 bed hospital in Dasve. Within 24 months of the commissioning of this hospital, the parties shall plan for the second phase which shall comprise of wellness and education. Apollo Lavasa Health Corporation

149

Limited may also develop customized health care package for the residents of Lavasa to be provided by the hospital, pursuant to specific agreement. Under the provisions of the Apollo Agreement, our Company shall hold 62.5% of Apollo Lavasa Health Corporation Limited and provide 200 acres of land including five acres of land at Dasve which is valued at ` 600 million and AHEL shall hold 37.5% of the shares of Apollo Lavasa Health Corporation Limited and permit the use of the brand Apollo Healthcity by Apollo Lavasa Health Corporation Limited. Any further capital requirements of Apollo Lavasa Health Corporation Limited shall be funded by AHEL until its shareholding increases to 51% and that of our Company reduces to 49%. When AHEL makes a further contribution, our Company shall dilute its shareholding proportionately till such time the shareholding of AHEL is 51% and that of our Company is 49%. Any further dilution will be an option to our Company to infuse further equity, failing which AHEL or any other strategic investor may infuse further equity. The shares of Apollo Lavasa Health Corporation Limited in the hands of the parties shall be locked in for a period of five years. The five year lock-in period expires on March 29, 2014. Any transfer post the five year lock-in shall require the transferee to provide an option to the other party to purchase the shares before sale or transfer to any third party. The parties shall not sell or transfer the shares to the competitor of the other party. Neither party shall transfer their shareholding in such a manner that their direct shareholding in the company falls below 5% of the company. Further, the Apollo Agreement can be terminated by the written consent of the parties or when the shareholding of either party in Apollo Lavasa Health Corporation Limited falls below 5%. 5. Shareholders agreement between Shawman Software Private Limited and our Company dated November 7, 2008

Our Company and Shawman Software Private Limited (Shawman) have entered into a shareholders agreement dated November 7, 2008 (the Shawman Agreement) pursuant to which Shawman has subscribed to the shareholding of Bona Sera Hotels Limited, a company incorporated by our Company for management of service apartments being constructed in Lavasa. Our Company and Shawman are required to contribute 26% and 74% respectively in the Equity Share capital of Bona Sera. Pursuant to the terms of the Shawman Agreement, Bona Sera shall be responsible to bring in further contributions required provided that the debt to equity ratio shall not exceed 1.5. The JV Company shall have four directors of which three shall be appointed by Shawman and one by our Company. Further, in the event the shareholding of our Company in Bona Sera falls below 23%, our Company shall continue with one director and Shawman may appoint an additional director and certain rights of our Company in relation to approval of certain matters by the Board of Directors shall also cease. Neither party may sell / dispose off their shareholding in Bona Sera for five years except transfer to any affiliate. The five year lock-in period expires on April 15, 2014. Neither party may transfer / sell their shares to any party prohibited under the Shawman Agreement. Any transfer post the lock-in shall require the transferee to provide an option to the other party to purchase the shares before sale or transfer to any third party. Additionally, under the terms of the Shawman Agreement, Shawman shall not transfer its shareholding in such a manner that its shareholding in Bona Sera falls below 51% without consent of our Company. The Shawman Agreement will stand terminated in the event of breach of its terms by either party or in the event the shareholding of either party in Bona Sera falls below 5%. 6. Shareholders agreement between Akash Cleaners Private Limited, Spotless Laundry Services Limited and our Company dated February 12, 2009

Our Company, Akash Cleaners Private Limited (ACPL) and Spotless Laundry Services Limited (SLSL) have entered into a shareholders agreement dated February 12, 2009 (the Spotless Laundry Agreement) to develop laundry services. SLSL shall be a joint venture with our Company holding 74% and ACPL holding 26% in the share capital of SLSL. Our Company shall hold 50,000 ordinary shares of ` 10 each in SLSL. Under the provisions of the Spotless Laundry Agreement, ACPL shall be allotted 3,000 shares for ` 3,000,000 as brand value in January 2011. In the event ACPL defaults in making the investment, it shall be liable to pay interest. SLSL shall have four directors of which three shall be appointed by our Company and one by ACPL. ACPL can nominate one director as long as it holds 25% of the equity in SLSL and can nominate one more director when it increases its shareholding beyond 50% in SLSL. Our Company can nominate three directors as long as it holds between 50% and 74% of SLSL but if our shareholding in SLSL drops below 50% but remains above 26%, then our Company will be entitled to appoint two directors and only one director when shareholding falls below 26%. Pursuant to a deed of adherence

150

dated November 20, 2009 between Tex-Kare Cleaners Private Limited, ACPL, SLSL and our Company, ACPL has transferred 10,000 shares held by it in ACPL to Tex-Kare Cleaners Private Limited. Our Company shall arrange for 1.7 acres of land with a right to construct 25,000 sq. ft built up area to be leased to SLSL. ACPL shall provide its brand to SLSL for 15 years and this term may be extended by mutual consent. SLSL may grant a project management contract for the project to our Company and if so awarded, SLSL shall pay our Company an amount equivalent to 10% of the total development cost of the project and by way of fees for this consultancy service. Further, SLSL shall pay a management fee of 2.5% of the periodic annual turnover to ACPL. Neither party may sell / dispose off their shareholding in SLSL for three years except undertaking permitted transfer amongst themselves. The lock-in period expires on April 12, 2012. ACPL shall hold a minimum of 5% in SLSL at all times. Neither party may transfer / sell their shares to any party prohibited under the Spotless Laundry Agreement. Any transfer post the lock-in shall require the transferee to provide an option to the other party to purchase the shares before sale or transfer to any third party. Neither party may sell shares in such a manner that the direct shareholding in SLSL falls below 20% and in case of the ACPL during the term of the Spotless Laundry Agreement without written consent of our Company. The Spotless Laundry Agreement shall stand terminated if either party commits a breach of the Spotless Laundry Agreement which is not cured during the notice period of 30 days. In such an instance, the other party shall have the right to purchase the shares of the defaulting party at fair value as determined by the expert appointed by non defaulting party. 7. Shareholders agreement between Harinderjit Singh, Rachvan Singh, Harjit Singh, Deshvir Singh, Shamsher Singh and our Company dated March 3, 2009

Harinderjit Singh, Rachvan Singh, Harjit Singh, Deshvir Singh and Shamsher Singh (together, the Investors) and our Company have entered into a shareholders agreement dated March 3, 2009 (the Hilton Double Tree Agreement) for the proposed construction, management and operation of a hotel with approximately 125 rooms under the brand Hilton Double Tree at Lavasa. Our Company and the Investors shall hold 26% and 74% respectively in the joint venture company to be incorporated. Palmetto Hospitality Limited was incorporated on June 15, 2009. Under the provisions of the Hilton Double Tree Agreement, Lavasa has agreed to grant a lease of land alongwith right to construct on the same for a certain consideration. The Investors are responsible for finalizing the required agreements with Hilton and getting the designs approved by Hilton. The board of directors of Palmetto Hospitality shall have seven directors of which two shall be nominated by our Company and five shall be nominated by the Investors. Certain matters shall require the assent of atleast one nominee director of our Company and three nominee directors of the Investors. Neither party may sell / dispose off their shareholding in Palmetto Hospitality for five years except transfer to any affiliate. Any transfer post the lock-in shall require the transferee to provide an option to the other party to purchase the shares before sale or transfer to any third party. The Hilton Double Tree Agreement shall stand terminated if either party commits a material breach of the Hilton Double Tree Agreement after a 30 days notice. The Hilton Double Tree Agreement shall stand automatically terminated in the event the shareholding of our Company or the Investors in Palmetto Hospitality falls below 5%. 8. Shareholders agreement between Celebration Resorts and Hotels (India) Private Limited, Ecomotel Hotel Limited and our Company dated January 29, 2009

Our Company, Celebration Resorts and Hotels (India) Private Limited (CRH) and Ecomotel Hotel Limited (EHL) have entered into a shareholders agreement dated January 29, 2009 (the CRH Agreement) to enable CRH to become a shareholder of EHL and carry on its business jointly with our Company. EHL has been established for the purpose of development, operations and management of a 133 room hotel under Accor Mercure brand in Lavasa. Our Company and CRH shall hold 26% and 74% of the shareholding of EHL respectively. The board of directors of EHL shall have atleast four directors of which three shall be nominated by CRH and one by our Company. Our Company will provide project management consultancy to EHL for the fees as shall be prescribed by the agreement to be entered into in this regard. Neither party may sell / dispose off their shareholding in EHL for five years except transfer to any affiliate. Any transfer post the lock-in shall require the transferee to provide an option to

151

the other party to purchase the shares before sale or transfer to any third party. Under the provisions of the CRH Agreement, the shareholding of CRH in EHL cannot fall below 51%. The CRH agreement shall stand terminated in the event the shareholding of either party in EHL falls below 5% of the paid up share capital of EHL. 9. Share subscription and shareholders Agreement between Wipro Limited and our Company dated June 4, 2009, as amended and share purchase agreement between our Company, My City Technology Limited and a networking company dated July 9, 2010

Our Company and Wipro Limited (Wipro) have entered into a share subscription and shareholders agreement dated June 4, 2009 (the Wipro Agreement) to set up a special purpose vehicle (SPV) to plan, set up, maintain and operate activities and business of information and communication technology at Lavasa. Pursuant to the Wipro Agreement, the SPV, My City Technology Limited was incorporated on August 4, 2009. Our Company and Wipro agreed to hold 81% and 19% in the share capital of My City Technology. Subsequently, our Company and My City Technology have entered into a share purchase agreement dated July 9, 2010 with a leading network industry player whereby our Company has agreed to sell and transfer shares equal to 18% of the paid up capital in My City Technology to the networking company. Consequent to the transfer of shares to the networking company, our Company shall hold 63% of the share capital of My City Technology and Wipro shall hold 19% of the share capital of My City Technology. Concurrent with the execution of the share purchase agreement dated July 9, 2010, our Company, Wirpo and the networking company entered into an amendment to the Wipro Agreement, wherby the networking company became party to the Wipro Agreement. My City Technology will provide information and communication technology solutions, products and services at Lavasa, whereas Wipro will provide the information and communication technology solutions to My City Technology. The network company will propose the technology, products, services and solutions. My City Technology shall have a minimum of three directors, all of whom shall be nominated by our Company. Wipro and the network company shall each be entitled to appoint a non-voting invitee on the board of directors. 10. Share Subscription and Shareholders Agreement between Educomp Infrastructure and School Management Limited and Knowledge Vistas Limited and our Company dated March 30, 2010 and addendum agreement dated April 23, 2010

Our Company, Educomp Infrastructure and School Management Limited (Educomp) and Knowledge Vistas Limited have entered into a share subscription and shareholders agreement dated March 30, 2010 (the Educomp Agreement) and an addendum agreement to the Educomp Agreement dated April 23, 2010 to enable Educomp to become a shareholder of Knowledge Vistas and carry on its business jointly with our Company. Knowledge Vistas was incorporated to construct and lease land and infrastructure for setting up and carry on operations of residential and day schools and other institutions in Lavasa. Our Company and Educomp have agreed to hold 49% and 51% of the share capital of Knowledge Vistas. Under the provisions of the Educomp Agreement, Knowledge Vistas is required to obtain the consent of Educomp prior to undertaking any further issuances of security. Our Company and Knowledge Vistas shall have the right to subscribe to any proposed issuance and Knowledge Vistas shall provide a notice to both parties. Educomp and our Company agree that Knowledge Vistas will undertake an initial public offer within 6 years from the closing of the Educomp Agreement or any extended time as decided by the board of Knowledge Vistas and both parties agree and undertake to proportionately offer their shares for restriction on transfer as applicable to Promoters. The board of directors of Knowledge Vistas shall comprise of five directors of which three shall be nominated by Educomp and two shall be nominated by our Company. In the event the shareholding of either party in Knowledge Vistas falls below 26%, the number of nominee directors of that entity shall be reduced to one and if it falls below 10% the respective entity shall not have the right to appoint any nominee directors. Neither party may sell / dispose off their shareholding in Knowledge Vistas for five years except transfer to any affiliate. The five year lock-in period expires on April 22, 2015. Any transfer post the lock-in shall require the selling shareholder to provide an option to the other party to purchase the shares before sale or transfer to any third party. In the event the other shareholder does not elect to exercise its right of first refusal, then it shall have the right to sell all or any portion of its shares. If the prospective purchaser refuses to purchase shares from the other shareholder, then the Selling shareholder cannot sell its shares unless the prospective buyer purchases the shares of the other shareholder. If

152

Educomp wishes to sell or transfer its shares to a third party and the third party wishes, as part of the same transaction, to acquire the entire or substantial part of the share capital of Knowledge Vistas, Educomp may, in its sole discretion, require the other shareholders to sell to such third party, shares as Educomp shall specify. However, the total shareholding of our Company and its affiliates collectively after such drag along sale shall not drop below 26% of the total shareholding of Knowledge Vistas. 11. Shareholders Agreement between Shawman Software Private Limited, Sol Hospitality Limited and our Company dated February 19, 2009

Our Company, Shawman Software Private Limited (Shawman) and Sol Hospitality Limited (SHL) have entered into a shareholders agreement dated February 19, 2009 (the Shawman SHA) to enable Shawman to become a shareholder of SHL and carry on its business jointly with our Company. Our Company had incorporated SHL for the purpose of management and operation of the food and beverages outlets, catering and commissary being developed in Lavasa. Our Company will provide project management consultancy to SHL and the latter shall pay a fee of 10% on all costs of construction and procurement for the food and beverages facilities. SHL will also pay a management fee of 3% of the gross operating revenue and management incentive fee of 10% of the gross operating profits to Shawman for the management of the initial food and beverages facilities. In addition, 1% of the gross operating revenue shall be paid to Shawman for central marketing and administration. Our Company and Shawman shall hold 26% and 74% of the equity capital of SHL respectively. The board of directors of SHL shall comprise of four directors of which three shall be nominee directors of Shawman and one director shall be a nominee of our Company. Neither party shall be entitled to sell their shareholding in SHL for a period of three years except any transfers to their respective affiliates. The three year lock-in shall expire on April 15, 2012. Post the lock in, any transfer shall require the selling shareholder to provide an option to the other party to purchase the shares before sale or transfer to any third party. Under the provisions of the Shawman SHA, Shawman shall not transfer its shares such that its direct shareholding in the JV Company falls below 51% of its share capital. The Shawman SHA shall terminate in the event the shareholding of either party in the JV Company falls below 5% or if either party goes into liquidation or winding up. 12. Share Purchase, Share Subscription and Shareholders Agreement between Money Matters Advisory Services Limited, Green Hills Residences Limited and our Company dated May 24, 2010

Our Company, Money Matters Advisory Services Limited (MMASL) and Green Hills Residences Limited (GHRL) have entered into a share purchase, share subscription and shareholders agreement dated May 24, 2010 (the Agreement) to record the terms on which MMASL shall become a shareholder of GHRL. Pursuant to the terms of the Agreement, GHRL shall issue equity shares at ` 1,000 each to our Company and equity shares to MMASL for ` 643.25 within 60 days of entering into the Agreement and MMASL shall pay ` 0.20 million to our Company as consideration for the transfer of 20,000 equity shares of GHRL. The board of directors of GHRL shall comprise of 5 directors, of which three shall be nominees of our Company and two shall be nominees of MMASL. If the shareholding of either MMASL or our Company falls below 26%, that party shall be entitled to nominate one director. Neither party shall be entitled to transfer their shareholding in GHRL for a period of 5 years except any transfer to any affiliate. The lock-in shall expire on May 25, 2015. Post the lock in, any transfer shall require the selling shareholder to provide an option to the other party to purchase the shares before sale or transfer to any third party. In the event our Company or our affiliates intend to transfer their shareholding in GHRL after the lock-in period, it shall seek the consent of MMASL which shall not be unreasonably withheld and MMASL shall have the option to exercise tag along rights. Further, in the event the Agreement is terminated due to the default of our Company, our Company shall be obliged to acquire the entire shareholding of MMASL in GHRL at a fair market value and in the event our Company is not able to acquire such shares, MMASL may offer it to a third party. 13. Shareholders joint venture agreement between Space Investment Co. LLC, Dubai and our Company dated December 22, 2008

Our Company and Space Investment Co. LLC, Dubai (SIC) have entered into a shareholders agreement (the SIC Agreement) dated December 22, 2008 to set up Space Theme Park India Limited (the JV Company), a joint

153

venture between our Company and SIC to set up space world projects at Lavasa. The JV Company shall be engaged in providing entertainment, lodging, shopping and training to visitors through various modules under licensing agreement, support and business operations guidelines from the SIC and the United States Space and Rocket Center (USSRC). The parties have further agreed that for a period of three years from the commencement of operations in Lavasa, neither party shall engage in setting up a similar project in India, either directly or indirectly. Additionally, upon expiry of three years, if there is any similar project to be set up by the parties, the JV Company shall have the right of first refusal to participate in the equity of the new company and preferred opportunity shall be given to the other party and the JV Company. Further, if one of the party exits the JV Company within 3 years of commencement of operations, the exiting party shall not enter into a similar project for the remaining period. However, SIC shall have the right to set up projects at other locations in India under separate legal entities. Our Company and SIC shall hold 19% and 81% respectively in the JV Company. Any further financing requirements of the JV Company shall be as provided in the SIC Agreement. The board of directors of the JV Company shall have five directors of which one shall be appointed by our Company and four by SIC. None of the shares of the JV Company shall be sold, transferred or encumbered without the prior consent of the other party. The other party shall have the right of first refusal during any sale of shares of the JV Company. Further, all transfer of shares of the JV Company are subject to the consent of SIC and USSRC. Pursuant to an addendum agreement between Space Investment Co, LLC, Dubai, Space Theme Park India Limited and our Company dated June 23, 2010, our Company shall hold 40% of the equity share capital of Space Theme Park India Limited and Space Investments Co, LLC, Dubai shall hold the balance 60%. 14. Memorandum of understanding between Birla Edutech Limited and our Company dated July 21, 2010

Our Company and Birla Edutech Limited (Birla) have entered into a memorandum of understanding dated July 21, 2010 (the Birla MoU) to set up an international boarding school having a capacity of accommodating 960 children at Mugaon, Lavasa under a joint venture company (the JV Company) which shall construct, develop and operate the international residential school. Under the provisions of the MoU, our Company has agreed to exclusively demarcate an area admeasuring 30.50 acres and hand over the said land to the JV Company on lease for a period of 999 years. The JV Company shall complete the construction and development activities of the international boarding school as per agreed timelines and shall ensure that it is operational on or before 2013. Birla shall create the required set up and curriculum for the international boarding school. Lavasa shall have the option to provide project management services to the JV Company for a consideration mutually decided between the JV Company and our Company. Birla shall, under a separate agreement, provide operations management to the JV Company for a fee of 3% - 8% of the total school fees revenue per year in such a manner that the average fee per year shall be 5% of the total school fees. The day to day management of the international boarding school shall be the responsibility of Birla and shall be entitled to a one time set up fee of not less than ` 15 million and not exceeding ` 25 million payable by the JV Company. Birla and our Company shall hold 60% and 40% of the equity capital of the JV Company, respectively. In the event, either party intends to exit the JV Company, such party shall offer its stake to the other party prior to offering it to any third party. Subject to the terms of the definitive agreement between the parties, Birla shall retain the management control of the JV Company. The board of directors of the JV Company shall initially comprise of five directors, of which Birla shall nominate three and our Company shall nominate two directors. A decision in relation to any reserved matter shall be taken with the affirmative consent of atleast one director of both parties. The MoU shall remain in force until the parties execute a definitive joint venture agreement or 90 days from the date of the MoU, whichever is earlier. Either party can terminate the MoU by giving a 15 days notice to the other party. 15. Share cum Warrant Subscription Agreement between Bennett, Coleman & Co. Limited, HREL and our Company dated March 30, 2009

Our Company, HREL and Bennett, Coleman & Co. Limited (BCCL) have entered into a share cum warrant agreement dated March 30, 2009 (the SW Agreement). Pursuant to the SW Agreement, BCCL agreed to subscribe

154

to 10 shares of ` 10 each at a premium of ` 2,107 each and one warrant for a consideration of ` 81,250,000. By a letter dated June 29, 2010, BCCL has consented to convert the warrant held by them into fully paid up Equity Shares of ` 10 each prior to the filing of the Red Herring Prospectus of our Company with the RoC. 16. Compulsory Convertible Preference Shares Subscription Agreement between Axis Bank Limited., our Promoters and our Company dated June 26, 2008

Our Company, our Promoters and Axis Bank Limited have entered into a compulsory convertible preference shares subscription agreement dated June 26, 2008 pursuant to which Axis Bank Limited has agreed to subscribe to 25,000,000 Compulsorily Convertible Preference Shares. By a letter dated September 7, 2010, Axis Bank Limited has consented to convert the Compulsorily Convertible Preference Shares held by them into fully paid up Equity Shares of ` 10 each prior to the filing of the Red Herring Prospectus of our Company with the RoC. 17. Agreements in relation to the DDCDs issued by our Company

Our Company has issued one DDCD each to Axis Bank Limited, Bank of India, United Bank of India, IndusInd Bank Limited, Andhra Bank and The Jammu and Kashmir Bank Limited, 10 DDCDs to ICICI Bank Limited and two DDCDs to Allahabad Bank (together referred to as the DDCD holders) in accordance with the terms of the deep discount convertible debenture subscription agreement entered into by our Company with each of the DDCD holders. The details of the deep discount convertible debentures subscription agreements entered into by our Company and our Promoters in relation to the DDCDs are provided below: Name of the bank Axis Bank Limited Bank of India Allahabad Bank IndusInd Bank Limited Andhra Bank United Bank of India Allahabad Bank ICICI Bank Limited The Jammu and Kashmir Bank Limited Date of the DDCD subscription agreement June 26, 2008 September 23, 2008 December 10, 2008 July 7, 2009 July 24, 2009 August 5, 2009 October 23, 2009 December 31, 2009 March 25, 2010 Issue price per DDCD (` in Million) 2,250 1,500 500 500 250 500 500 2,500 1,000 No. of DDCDs issued One One One One One One One Ten One

Our Company has prepaid the DDCD held by Andhra Bank and by a letter dated September 4, 2010, Andhra Bank has confirmed receipt of ` 255,316,376 towards the full and final settlement of DDCD of ` 250 million held by Andhra Bank. Pursuant to a letter dated September 7, 2010, Axis Bank Limited has consented to convert the DDCD held by it into Equity Shares of our Company, prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to a letter dated September 2, 2010 IndusInd Bank Limited has consented to convert the DDCDs held by it into Equity Shares of our Company, prior to the filing of the Red Herring Prospectus with the RoC, subject to it being allotted Equity Shares by our Company prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to a letter dated September 9, 2010, Bank of India has consented to convert 40% of the subscription amount towards the DDCD held by it into Equity Shares of our Company and the remaining 60% of the subscription amount to be repaid by our Company, prior to the filing of the Red Herring Prospectus with the RoC. By a letter dated September 7, 2010, ICICI Bank Limited has agreed to convert five DDCDs held by it into Equity Shares of our Company and to convert five DDCDs into non-convertible debentures, prior to the filing of the Red Herring Prospectus with the RoC. This is subject to our Company allotting Equity Shares upon conversion of the five DDCDs prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to the supplementary agreement dated September 3, 2010, between The Jammu and Kashmir Bank Limited, our Promoters and our Company, The Jammu and Kashmir Bank has converted the DDCD held by it to non-convertible debentures

155

aggregating to ` 1,000 million. Pursuant to a letter dated September 8, 2010, Allahabad Bank has agreed to convert the two DDCDs held by it into Equity Shares of our Company or into non-convertible debentures or any other debt instrument (without any right to convert into equity or preference shares) prior to the filing of the Red Herring Prospectus with the RoC. In the event none of the above options are acceptable to our Company or the Allahabad Bank, Allahabad Bank will allow our Company to prepay the DDCDs prior to the filing of the Red Herring Prospectus with the RoC. Pursuant to a letter dated September 9, 2010, United Bank of India has intimated our Company that they are considering to either the prepayment of the DDCD on any day after September 9, 2010 at a specified penal rate or to the conversion of the DDCD into 12.50% non-convertible debenture, subject to the approval from the competent authority in the United Bank of India. 18. Agreement between HCC, HREL, Hincon Finance Limited, Hincon Holdings Limited, Janpath Investments and Holdings Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar, Vinay V. Maniar and our Company dated December 12, 2008

Our Company, HCC, HREL, Hincon Finance Limited, Hincon Holdings Limited, Janpath Investments and Holdings Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar and Vinay V. Maniar (together the Parties) have entered into an agreement dated December 12, 2008 (Agreement). Our Company has issued DDCDs to Axis Bank Limited, Bank of India and Allahabad Bank (together the Investors) and has entered into different put option agreement with the Investors and the Promoters in this regard. Pursuant to the terms of the Agreement, the Parties have agreed to share the obligation of HCC with respect to payment of put option amount on the exercise of put exercise dates amongst themselves in the ratio of their proportionate shareholding in our Company. Therefore, upon the exercise of the put option by the Investors, HCC shall have the option to offer the same to other Parties and in the event any of them do not contribute, the other Parties can further contribute. HCC shall then transfer the DDCD to the other Parties in the proportion of their respective contribution to the put option. The stake of HCC and the other Parties shall be calculated based on the equity valuation of ` 100,000 million or as per the valuation of our Company determined by an independent merchant banker, whichever is lower. 19. Agreement between HCC, HREL, Hincon Finance Limited, Hincon Holdings Limited. Avantha Realty Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar, Vinay V. Maniar and our Company dated October 26, 2009

Our Company, HCC, HREL, Hincon Finance Limited, Hincon Holdings Limited, Avantha Realty Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar and Vinay V. Maniar (together the Parties) have entered into an agreement dated October 26, 2009 (Agreement). Our Company has issued DDCDs to IndusInd Bank Limited, Andhra Bank, United Bank of India and Allahabad Bank (together the Investors) and has entered into different put option agreements with the Investors and Promoters in this regard. Pursuant to the terms of the Agreement, the Parties have agreed that on the exercise of the put options by the Investors, HCC shall have the option to offer this put option to the other existing shareholders who may contribute in proportion of their respective equity shareholding. In the event any party does not contribute, the other Parties shall have the option to further contribute. The stake of HCC and the other Parties shall be calculated based on the equity valuation of ` 100,000 million or as per the valuation of our Company determined by an independent merchant banker, whichever is lower.

156

OUR MANAGEMENT

Under our Articles of Association we are required to have not less than three Directors and not more than 12 Directors. We currently have 10 Directors. The following table sets forth details regarding our Board as of the date of filing of the Draft Red Herring Prospectus: Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN Ajit Gulabchand (S/o. Late Gulabchand Hirachand) Chairman, Non-Executive Director Address: Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Occupation: Business Nationality: Indian Term: Liable to retire by rotation DIN: 00010827 Age (in years) 62 Other Directorships/Partnerships/Trusts in which the Director is a trustee Other directorships 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. HCC Hincon Finance Limited Hincon Technoconsult Limited Hincon Holdings Limited HREL HCC Infrastructure Limited HCC Construction Limited Western Securities Limited The Indian Hume Pipe Company Limited Bajaj Electricals Limited RPG Life Sciences Limited Motorsports Association of India Charosa Wineries Limited Highbar Technologies Limited Shalaka Investment Private Limited Champali Garden Private Limited Gulabchand Foundation Sarama Petcare Private Limited HCC Singapore Enterprises Pte. Ltd. HCC Mauritius Enterprises Ltd. Karl Steiner AG, Switzerland

Partnerships Nil Trusteeships 1. 2. 3. Gautam Thapar ( S/o. B. M. Thapar) Non-Executive Director Address: E-16 Pushpanjali Farms Brijwasan, New Delhi 110 062 Occupation: Industrialist 49 Gulabchand Memorial Trust Seth Walchand Hirachand Memorial Trust Mrs. Kasturbai Walchand Trust

Other directorships 1. 2. 3. 4. 5. 6. 7. 8. Ballarpur Industries Limited Crompton Greaves Limited Salient Business Solutions Limited Solaris Holdings Limited Avantha Holdings Limited Avantha Realty Limited Bilt Paper Holdings Limited CG Capital & Investments Limited

157

Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN Nationality: Indian Term: Liable to retire by rotation DIN: 00012289

Age (in years)

Other Directorships/Partnerships/Trusts in which the Director is a trustee 9. 10. 11. 12. 13. 14. 15. 16. 17. Global Green Company Limited Asahi India Glass Limited KCT Papers Limited Karam Chand Thapar & Bros. Limited Sohna Stud Farm Private Limited Avantha Foundation Ballarpur International Graphic Paper Holdings B.V. Avantha International Holdings B.V. Compass Limited

Trusteeships 1. 2. Anuradha Jitendra Desai (D/o. Dr. B. Vasudev Rao) Non-Executive Director Address: Venkatesh Farms, S.No.95/1, N.D.A Road, Mauje village Warje, Taluka Haveli, , Pune 411 029 Occupation: Business Nationality: Indian Term: Liable to retire by rotation DIN: 00012212 48 Aspen Institute India Patiala Technical Education Trust

Other directorships 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Venkateshwara Hatcheries Private Limited Venkys (India) Limited Venco Research and Breeding Farm Private Limited Venkateshwara Research and Breeding Farm Private Limited V.J. Equipment Private Limited V.R. Equipment Limited Srivenk Investments and Finance Private Limited Venka Investments Private Limited B.V. Bio Corp Private Limited Agrocorpex India Limited Bala Entertainment International Private Limited Uttara Masala Product Private Limited Uttara Foods and Feeds Private Limited Center for International Trade in Agriculture and Agro Based Industries Bharat Egg Producers Association All India Poultry Development and Services Private Limited Poultry Development Promotion Council Uttara Hatcheries and Agri-Farms Private Limited Uttara Poultry and Agri-Farms Private Limited Uttara Biosciences Private Limited Uttara Impex Private Limited Wayward Acres Inc. Venkys (Middle East) FZCO Venkys South Africa Pty Limited Eastern Hatcheries Private Limited Uttara Foods & Feeds (Private) Limited Venkys Inc., Switzerland Venkys (Vietnam) Company Limited

Partnerships 1. 2. Venkateshwara Foods and Feeds Poultry Corporation of India

158

Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN

Age (in years)

Other Directorships/Partnerships/Trusts in which the Director is a trustee

Trusteeships 1. 2. 3. 4. Vithal Maniar (S/o. Badrinarayan Ramdayal Maniar) Non-Executive Director Address: 227, Nana Peth, Pune 411 002 Occupation: Business Nationality: Indian Term: Liable to retire by rotation DIN: 00023045 Trusteeships 1. 2. 3. 4. 5. Shalaka Gulabchand Dhawan (D/o. Ajit Gulabchand) Non-Executive Director Address: Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083 Occupation: Company executive Partnerships Nationality: Indian Nil Term: Liable to retire by rotation Trusteeships DIN: 00011094 1. Gulabchand Memorial Trust 2. Seth Walchand Hirachand Memorial Trust Sharad M. Kulkarni (S/o. Madhav Govind Kulkarni) 71 Other directorships 1. HCC 33 Vidya Pratishthan Pune Zilla Krishi Vikas Pratisthan Pawar Public Charitable Trust Pune Film Foundation Pawar Vidya Charitable Trust 70 Venkateshwara Charitable Trust Uttaradevi Charitable and Research Foundation Lord Venkateshwara Charitable and Religious Trust National Egg Co-ordination Committee

Other directorships 1. 2. 3. 4. 5. 6. 7. Sharda Microfin Limited Jaya Hind Investments Private Limited Green Apple Developers Private Limited Miracle Agro Products Private Limited RVS Hospitality Private Limited Citizen Development Society of India Life and General Insurance Brokers Private Limited

Partnerships 1. 2. Tool Crib City Development Corporation

Other directorships 1. 2. 3. 4. 5. 6. 7. Hincon Holdings Limited Hincon Finance Limited HREL Highbar Technologies Limited Gulabchand Foundation Sarama Petcare Private Limited Klemanor Investments Limited

159

Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN Independent Director Address: 161A, 16th Floor, Twin Towers, Veer Savarkar Marg, Prabhadevi, Mumbai 400 025 Occupation: Consultant and corporate advisor Nationality: Indian

Age (in years)

Other Directorships/Partnerships/Trusts in which the Director is a trustee 2. 3. 4. 5. 6. 7. 8. 9. 10. HREL Bayer CropScience Limited INEOS ABS (India) Limited KEC International Limited Raychem RPG Limited RPG Enterprises Limited JM Financial Trustee Company Private Limited Navin Fluorine International Limited Camlin Fine Chemicals Limited

Partnerships Term: Liable to retire by rotation Nil DIN: 00003640 Trusteeships Nil Sam Bhadha (S/o. Peshotan M. Bhadha) Independent Director Partnerships Address: 511, Lexington Avenue, New York, NY 10017 Nil Trusteeships Occupation: Hotelier Nil Nationality: American Term: Liable to retire by rotation DIN: 03146389 His Highness Gaj Singh (S/o. H. L. H. Maharaja Hanwant Singhji) Independent Director Address: Umaid Bhawan Palace Jodhpur 342 006, Rajasthan 62 Other directorships 1. 2. 3. 4. 5. Occupation: Hotelier Nationality: Indian Term: Liable to retire by rotation DIN: 00061278 6. 7. 8. 9. 10. 11. 12. 13. Marudhar Hotels Private Limited Marudhar Tours & Travels Private Limited Mehrangarh Publishers Private Limited Jodhan Real Estate Development Company Private Limited Jodhan Investments and Finance Corporation Private Limited Marudhar Investments Private Limited Marudhar Theaters Private Limited Marudhar Cultivators Private Limited Umaid Investments Company Private Limited Engineers Impex Private Limited Jodhana Heritage Resorts Private Limited Jodhana Developers Private Limited Jodhana Alternative Energy Solutions India Private Limited 62 Other directorships Nil

160

Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN

Age (in years)

Other Directorships/Partnerships/Trusts in which the Director is a trustee 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. Apodis Hotels & Resorts Private Limited Mallani Hotels, Motels & Restaurants Private Limited Mayur Travels (Raj.) Private Limited Ess Gee Realty Private Limited Urban Akarsh Infrastructure Private Limited Royal Marwar Hospitality Private Limited Jodhana Medical & Research Centre Limited Maharaja Heritage Resorts Limited Shankar Packagings Limited Fortune Park Hotels Limited Umaid Heritage Estate Management Private Limited

Partnerships 1. Balsamand Horticulture & Animal Husbandry Enterprise 2. Estate Owners Associates Trusteeships 1. 2. 3. 4. H. H. Maharaja Umaid Singhji Religious Trust H. H. Rajdadiji Smt. Badan Kanwer Medical Trust Maji Shri Chouhanji Religious Trust Major Maharaja Hari Singhji Benefit of Defence Service Personnel Charitable Trust 5. Meharangarh Museum Trust 6. H. H. Maharaja Hanwant Singhji Charitable Trust 7. H. H. Maharaja Gaj Singh Sports Foundation 8. Indian Head Injury Foundation 9. Marwar Disaster Management Foundation 10. Umaid Foundation for Agro Research 11. Jai Bhagirathi Foundation Ajay B. Shirke (S/o. Baburao G. Shirke) Independent Director Address: 1205, Apte Road, Pune 411 004 Occupation: Business Nationality: Indian Term: Liable to retire by rotation DIN: 00006807 Partnerships 1. Cadence Trusteeships 52 Other directorships 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. B.G. Shirke Construction Technology Private Limited Siporex India Private Limited Karmveer Investments Private Limited Krikland Investments Private Limited Ashwamedh Investments Private Limited Convex Investments and Trading Private Limited Cadence Specialty Audio Products Private Limited First Future Air Services Private Limited International Audio Holdings B.V. Spendor Audio Systems Limited Cadence Channel Islands Limited Cadence Audio S.A.BVI

161

Name, Fathers Name, Designation, Address, Occupation, Nationality Term and DIN

Age (in years)

Other Directorships/Partnerships/Trusts in which the Director is a trustee

1. 2. Ram P. Gandhi (S/o. Late Pravinchandra Gandhi) Independent Director Address: Amalfi, 6th Floor, 15 L. D. Ruparel Marg, Malabar Hill, Mumbai 400 006 Occupation: Business Nationality: Indian 58

Shirke Trust Maharashtra Cricket Association

Other directorships 1. 2. 3. 4. 5. 6. 7. 8. 9. HCC Hincon Finance Limited Western Securities Limited Hincon Holdings Limited HCC Construction Limited Youngbuzz India Limited Beacons Private Limited The States People Private Limited Pravinchandra Private Limited

Partnerships Term: Liable to retire by rotation DIN: 00050625 1. Kahan Traders 2. Pravinchandra & Sons Trusteeships 1. National Institute of Construction Management and Research (NICMAR) 2. IMC Relief Fund 3. IMC Diamond Jubilee Endowment Trust 4. IMC Ramkrishna Bajaj National Quality Award Trust 5. IMC Economic Research & Training Foundation 6. IMC Centenary Trust 7. Indian Merchants Chamber 8. Shri Pranlal Devkaran Nanjee Smarak Fund 9. Sardar Vallabhbhai Patel Hall Committee 10. Saurashtra Trust (Janmabhoomi Group of Newspapers) 11. Saurashtra Trust Gratuity Fund 12. Janmabhoomi Newspaper Education Foundation 13. Janmabhoomi Patro Rahat Nidhi

Except for Shalaka Gulabchand Dhawan, who is the daughter of Ajit Gulabchand, none of our other Directors are related to each other. Brief Biographies Ajit Gulabchand is the Chairman and a Non-Executive Director of our Company. He holds a bachelors degree in Commerce (honours) from the University of Mumbai. He has been associated with our Company for seven years. He has approximately 30 years experience and is the chairman and managing director of HCC. He is a member of the CIIs national council and chairman of CIIs national committee on construction and projects. He has also served as a founding permanent member of the board of governors of the Construction Industry Development Council of India and has also been the president of the Construction Federation of India since its inception in 2001. He chairs the steering board of the Engineering and Construction Community, is a member of the CII-World Economic Forum

162

infrastructure task force, a founder member of the Geneva based Disaster Resource Network, a collaboration of the World Economic Forum, United Nations and International Red Cross. He is also a member of the United Nations Global Compacts CEO Water Mandate. Gautam Thapar is a Non-Executive Director of our Company. He is the chairman and chief executive officer of the Avantha Group. He holds a bachelors degree in chemical engineering from Pratts University, U.S.A. He has approximately 18 years of experience in the industry. He is on the boards of various companies in India and overseas. He has been associated with our Company for three years. In 2008, he received the Ernst & Young entrepreneur of the year award for manufacturing. Anuradha Jitendra Desai is a Non-Executive Director of our Company. She is the chairperson of Venkateshwara Hatcheries Private Limited and VH group of companies. She holds a bachelors degree in arts and a bachelors degree in law from the Pune University, Maharashtra. She has been associated with our Company for seven years. She has been awarded the Best Women Entrepreneur Gold Award from the Institute of Marketing Management in 1990, the Best Woman Entrepreneur Award from Yuva Bharati in 1996, the Udyog Rattan Award by the Institute of Economic Studies-Delhi in 2003 and an Honorary Doctorate from Tamil Nadu University of Veterinary and Animal Sciences in 2009. Anuradha Jitendra Desai has also served as president of the World Poultry Science Association. Vithal Maniar is a Non-Executive Director of our Company. He holds a bachelors degree in commerce and a bachelors degree in law from the Pune University. He has been associated with our Company for approximately two years. Vithal Maniar has approximately 50 years of experience in the steel business and serves on the board of various companies. He is also a trustee of three educational institutions in Maharashtra, Vidya Prathishthan, Pawar Public Charitable Trust and Pawar Vidya Charitable Trust. Shalaka Gulabchand Dhawan is a Non-Executive Director of our Company. She holds a bachelors degree from Boston University, U.S.A. majoring in international relations. She has been associated with our Company for five years. She has approximately 10 years of experience in the field of business development and is the vice president business development at HCC. Sharad Kulkarni, is an Independent Director of our Company. He holds a bachelors degree in engineering from the University of Pune and is also a fellow member of the Institute of Engineers of India. He has been associated with our Company for the last one year. He has approximately 40 years of experience in the area of business development, property development, international alliance management and educational institutions of higher learning, investments and institutional economic research and analysis across industries. He is also a member of the Asia Pacific Advisory Board of Johnsondiversey Inc, USA. He is associated with several NGOs and education trusts. He was the president and currently is a member of the governing board of the Maharashtra Economic Development Council, an economic research and analysis wing created by various chambers of commerce in Mumbai. Sam Bhadha is an Independent Director of our Company. He holds a bachelors degree in electrical engineering (honours) from Veermata Jijabai Technological Institute, Mumbai University. He has been associated with our Company since July 2010. He has over 36 years of experience in the hospitality industry. He is also the executive vice president of Highgate Holdings, Radisson Lexington Hotel, New York. His experience includes his tenure at Taj International, New York and London and The Taj Mahal Hotel, India. His Highness Gaj Singh is an Independent Director of our Company. He holds a masters degree in politics, philosophy and economics from Eton College and Christchurch, Oxford, London. He is the managing director of Marudhar Hotels Private Limited and Jodhan Investments and Finance Corporation Private Limited. He has been associated with our Company since July 2010. He has over 37 years of experience in the hospitality industry. In 2006 he was awarded the Hadrian award by the World Monument Fund. Ajay B. Shirke is an Independent Director of our Company. He holds a bachelors degree in commerce from Pune University. He has been associated with our Company since July 2010. He has over 32 years of experience in the paper industry and high end audio industry. He holds a stake in a high end cable manufacturing company in the Netherlands, International Audio Holdings B.V. and a loudspeaker manufacturing company in UK, Spendor Audio Systems Limited. He is the president of the Maharashtra Cricket Association, Pune and the vice chairman of the

163

National Cricket Academy, Bengaluru. He is also a member of the resource utilisation committee and affiliation committee of the Board for Control of Cricket in India. Ram P. Gandhi is an Independent Director of our Company. He obtained a bachelors degree in commerce from Mumbai University with honours in 1972. He has been associated with our Company since July 2010. He is on the board of several public and private companies and is also a member on the advisory board of The Bank of Tokyo Mitsubishi UFJ, Limited. He has been associated with the Indian Merchants Chamber (IMC) as an active managing committee member for the past 25 years, and was its vice-president in 1996-97 and president in 1997-98. He has served as chairman/vice-chairman of various IMC committees, including the international trade committee, transport and tourism committee and internal trade committee. He is also a member of the managing committee of Associated Chambers of Commerce and Industry of India. He is a member of executive committee of international chamber of commerce ICC India. He was a president of the Western India Automobile Association and has served on its managing committee for over 15 years. He is the committee member (chairman fund raising) of the Helen Keller Institute for Deaf and the Deaf-Blind. He has also served as a member of the RBIs standing consultative committee on exchange control and custom advisory committee and regional central excise advisory committee (SSIs). He is also a committee member of the Matheran Bachao Samiti. Terms of Appointment of the Chairman Ajit Gulabchand Ajit Gulabchand was appointed the Chairman of our Company on May 7, 2003. Pursuant to Board and shareholders resolutions dated February 24, 2003 and December 5, 2003 respectively, Ajit Gulabchand was appointed a NonExecutive Director of our Company and is liable to retire by rotation. Ajit Gulabchand does not receive any remuneration from our Company. Service Agreement with the Manager Pursuant to Board and shareholders resolutions dated April 21, 2008 and June 9, 2008, respectively, Rajgopal Nogja has been appointed as the Manager of our Company for a period of five years with effect from April 21, 2008. Our Company has entered into an agreement dated June 9, 2008 (the Manager Agreement) with Rajgopal Nogja for the appointment of Rajgopal Nogja as the Manager of the Company, for a period of five years. The Manager Agreement, inter alia, provides that the Manager shall be in charge of the day to day management of the business and affairs of our Company and shall be subject to the superintendence, control and direction of the Board of Directors, the provisions of the Companies Act and the Articles of Association of our Company. Under the Manager Agreement, Rajgopal Nogja does not receive any remuneration from our Company. Rajgopal Nogja may resign from his office and our Company may terminate his appointment by giving a notice of one month to the other party. Payment or benefit to Directors of our Company Apart from sitting fees, our Company does not pay any other remuneration to our Directors. 1. Remuneration to Executive Directors:

Our Company did not have any Executive Directors in Fiscal 2010. 2. Remuneration to Non-Executive Directors:

The details of the sitting fees paid to the Non-Executive Directors of our Company in Fiscal 2010 are set forth in the table below: Sr. No. 1. 2. 3. Name of the Director Ajit Gulabchand Gautam Thapar Anuradha Jitendra Desai Remuneration (In `) 20,000

164

Sr. No. 4. 6. 7. 8. 9. 10. 11.


*

Name of the Director Vithal Maniar Shalaka Gulabchand Dhawan Sharad Kulkarni Sam Bhadha* His Highness Gaj Singh* Ajay B. Shirke* Ram P. Gandhi*

Remuneration (In `) 40,000 40,000 50,000 -

Appointed as Directors on July 16, 2010.

Apart from any ESOPs granted, no amount or benefit (non salary related) has been paid within the two preceding years or is intended to be paid or given to any of our Companys officers including our Directors and key management personnel, including benefits in kind for all capacities and contingent or deferred compensation. None of the beneficiaries of loans, and advances and sundry debtors are related to the Directors of our Company. Further, except statutory benefits upon termination of their employment in our Company or retirement, no officer of our Company, including our Directors and our key management personnel, are entitled to any benefits upon termination of employment. No loans have been availed by our Directors or the key management personnel from our Company. Shareholding of Directors The shareholding of our Directors as of the date of filing this Draft Red Herring Prospectus is set forth below: Name of Director Vithal Maniar Number of Equity Shares held 3,847

Our Articles of Association do not require our Directors to hold any qualification shares. Borrowing Powers of Board Our Company has, pursuant to an EGM held on July 30, 2010 resolved that in accordance with the provisions of the Companies Act, our Board is authorised to borrow such sum or sums of money, from any bank(s), financial institution(s) and / or any other institution(s), firm(s), bodies corporate, government(s) and / or any other person(s) in India or abroad, either in rupee currency and / or foreign currency, including but not limited to debentures, bonds and / or any other foreign debt securities etc., in any manner, from time to time, with or without security and upon such terms and conditions as the Board may deem fit and expedient for the purposes of the businesses of our Company, notwithstanding that the monies to be borrowed together with the monies already borrowed by our Company (apart from temporary loans obtained from our Companys bankers in the ordinary course of business), may exceed the aggregate of the paid-up capital of our Company and its free reserves, provided however, that the amounts so borrowed by the Board (apart from temporary loans obtained from our Companys bankers in the ordinary course of business) and outstanding at any time shall not exceed the sum of ` 100,000 million. Corporate Governance The provisions of the Listing Agreement to be entered into with the Stock Exchanges with respect to corporate governance will be applicable to us immediately upon the listing of our Equity Shares with the Stock Exchanges. We believe we are in compliance with the requirements of the applicable regulations, including the Listing Agreement with the Stock Exchanges and the SEBI Regulations, in respect of corporate governance including constitution of the Board and committees thereof. The corporate governance framework is based on an effective independent Board, separation of the Boards supervisory role from the executive management team and constitution of the Board Committees, as required under law.

165

We have a Board constituted in compliance with the Companies Act and Listing Agreement with Stock Exchanges. Our Board functions either as a full board or through various committees constituted to oversee specific functions. Our executive management provides our Board detailed reports on its performance periodically. Currently our Board has 10 Directors and our Chairman is Ajit Gulabchand. In compliance with the requirements of Clause 49 of the Listing Agreement, our Chairman is a non-Executive Director and we have five Non-Executive Directors and five Independent Directors, on our Board. Committees of the Board In addition to the committees of the Board detailed below, our Board of Directors may, from time to time, constitute committees for various functions. Audit Committee The members of the Audit Committee are: 1. 2. 3. Sharad Kulkarni, Chairman; Ram P. Gandhi; and Ajay B. Shirke

The Audit Committee was constituted by a meeting of our Board held on December 9, 2003 and was reconstituted on July 16, 2010. The scope and function of the Audit Committee is in accordance with Section 292A of the Companies Act and Clause 49 of the Listing Agreement and its terms of reference include the following: 1. 2. Overseeing the Companys financial reporting process and disclosure of its financial information; Recommending to the Board the appointment, re-appointment, and replacement of the statutory auditor and the fixation of audit fee; Approval of payments to the statutory auditors for any other services rendered by them; Reviewing, with the management, the annual financial statements before submission to the Board for approval, with particular reference to: i. ii. iii. iv. v. vi. vii. 5. Matters required to be included in the Directors Responsibility Statement to be included in the Boards report in terms of clause (2AA) of section 217 of the Companies Act, 1956; Changes, if any, in accounting policies and practices and reasons for the same; Major accounting entries involving estimates based on the exercise of judgment by management; Significant adjustments made in the financial statements arising out of audit findings; Compliance with listing and other legal requirements relating to financial statements; Disclosure of any related party transactions; and Qualifications in the draft audit report.

3. 4.

Reviewing, with the management, the quarterly, half-yearly and annual financial statements before submission to the Board for approval; Reviewing, with the management, the statement of uses / application of funds raised through an issue (public issue, rights issue, preferential issue, etc.), the statement of funds utilized for purposes other than those stated in the offer document/prospectus/notice and the report submitted by the monitoring agency monitoring the utilization of proceeds of a public or rights issue, and making appropriate recommendations to the Board to take up steps in this matter; Reviewing, with the management, the performance of statutory and internal auditors, and adequacy of the internal control systems;

6.

7.

166

8.

Reviewing the adequacy of internal audit function, if any, including the structure of the internal audit department, staffing and seniority of the official heading the department, reporting structure coverage and frequency of internal audit; Discussion with internal auditors any significant findings and follow up there on; Reviewing the findings of any internal investigations by the internal auditors into matters where there is suspected fraud or irregularity or a failure of internal control systems of a material nature and reporting the matter to the Board; Discussion with statutory auditors before the audit commences, about the nature and scope of audit as well as post-audit discussion to ascertain any area of concern; To look into the reasons for substantial defaults in the payment to the depositors, debenture holders, shareholders (in case of nonpayment of declared dividends) and creditors; Approval of appointment of the chief financial officer (i.e., the whole-time finance director or any other person heading the finance function or discharging the function) after assessing the qualifications, experience and background of the candidate Reviewing the functioning of the whistle blower mechanism, in case the same is existing; Review of management discussion and analysis of financial condition and results of operations, statements of significant related party transactions submitted by management, management letters/letters of internal control weaknesses issued by the statutory auditors, internal audit reports relating to internal control weaknesses, and the appointment, removal and terms of remuneration of the chief internal auditor; and Carrying out any other function as is mentioned in the terms of reference of the Audit Committee.

9. 10.

11.

12.

13.

14. 15.

16.

The powers of the re-constituted Audit Committee shall include the following: 1. 2. 3. 4. To investigate activity within its terms of reference; To seek information from any employees; To obtain outside legal or other professional advice; and To secure attendance of outsiders with relevant expertise, if it considers necessary.

The Audit Committee is required to meet at least four times in a year under Clause 49 of the Listing Agreement. Remuneration Committee The members of the Remuneration Committee are: 1. 2. 3. His Highness Gaj Singh, Chairman; Ajay B. Shirke; and Sharad M. Kulkarni.

The Remuneration Committee was constituted by our Board on July 16, 2010. The terms of reference of the Remuneration Committee include the following:

167

1.

Framing suitable policies and systems to ensure that there is no violation, by an employee of any applicable laws in India or overseas, including: i. ii. The Securities and Exchange Board of India (Prohibition of Insider Trading) Regulations, 1992; or The Securities and Exchange Board of India (Prohibition of Fraudulent and Unfair Trade Practices relating to the Securities Market) Regulations, 1995.

2.

Determine on behalf of the Board and the shareholders the Companys policy on specific remuneration packages for executive directors including pension rights and any compensation payment. Such other matters as may from time to time be required by any statutory, contractual or other regulatory requirements to be attended to by such committee.

3.

Shareholders/Investors Grievance Committee The members of the Shareholders/Investors Grievance Committee are: 1. 2. 3. Ram P. Gandhi, Chairman; Shalaka Gulabchand Dhawan; and Ajay B. Shirke.

The Shareholders/Investors Committee was constituted by our Board on July 16, 2010. This committee is responsible for the redressal of shareholder grievances. The terms of reference of the Shareholders/Investors Grievance Committee of our Company include the following: addressing the shareholders and investors complaints with respect to transfer of equity shares, non-receipt of annual report, non-receipt of declared dividends, etc. and ensuring expeditious equity share transfer process. This committee shall also evaluate the performance and service standards of the registrar and share transfer agents of our Company and also provide continuous guidance to improve the service levels of investors. ESOP Compensation Committee The members of this committee are: 1. 2. 3. Ajit Gulabchand, Chairman; Ram P. Gandhi; and Vithal Maniar.

This committee was constituted by our Board at its meeting held on October 22, 2007 and was re-constituted on July 16, 2010. The terms of reference of this committee include the following: a) b) The quantum of options to be granted under the Scheme per employee and in aggregate. The conditions under which option vested in employees may lapse in case of termination of employment for misconduct. The exercise period within which the employee should exercise the option and that option would lapse on failure to exercise the option within the exercise period. The specified time period within which the employee shall exercise the vested options in the event of termination or resignation of an employee. The right of an employee to exercise all the options vested in him at one time or at various points of time within the exercise period.

c)

d)

e)

168

f)

The procedure for making a fair and reasonable adjustment to the number of options and to the exercise price in case of corporate actions such as rights issues, bonus issues, merger, sale of division and others. In this regards, the following be taken into consideration by the compensation committee: i) ii) iii) The number and the price of ESOS shall be adjusted in a manner such that total value of the ESOS remains the same after the corporate action. Global best practices in this area including the procedures followed by the derivative markets in India and abroad shall be considered. The vesting period and the life of the options shall be left unaltered as far as possible to protect the rights of the option holders.

g) h)

The grant, vest and exercise of option in case of employees who are on long leave; Fringe benefit tax on issue of options or the shares upon exercise of the options.

Employee Stock Options Scheme For details of our Companys employee stock option schemes, please see Capital Structure on page 37. Interest of Directors All of our Directors may be deemed to be interested to the extent of fees payable to them for attending meetings of our Board of Directors or a Committee thereof as well as to the extent of other remuneration and reimbursement of expenses payable to them under our Articles. Our Directors may also be regarded as interested in the Equity Shares, if any, held by them or that may be subscribed by or Allotted to them under the Employee Reservation Portion or that may be subscribed by or allotted to the companies, firms and trusts, in which they are interested as directors, members, partners, trustees and promoters, pursuant to this Issue. All of our Directors may also be deemed to be interested to the extent of any dividends payable to them and other distributions in respect of the Equity Shares. Our Company has, in the past, leased villas (including sale of built up area) in Lavasa on a long term basis to certain of our Directors. Our Directors have no interest in any property purchased by our Company within the preceding two years from the date of this Draft Red Herring Prospectus. Except as stated in Related Party Transactions on page 216 and described herein to the extent of shareholding in our Company, if any, our Directors do not have any other interest in our business. Further, there is no arrangement or understanding with the major shareholders, customers, suppliers or others, pursuant to which the Directors or the key management personnel were selected as directors or members of senior management. Changes in the Board in the last three years Name Vithal Maniar Vithal Maniar Shyamkant Kalidas Dharmadhikari Aniruddha Deshpande Sharad M. Kulkarni Shyamkant Kalidas Dharmadhikari S. K. Khandelwal Date of Appointment/ Change/ Cessation October 18, 2007 October 22, 2007 October 22, 2007 April 17, 2008 March 24, 2009 July 16, 2010 July 16, 2010 Resignation Appointment Appointment Resignation Appointment Resignation Resignation Reason

169

Name K. G. Tendulkar Sam Bhadha His Highness Gaj Singh Ajay Shirke Ram P. Gandhi

Date of Appointment/ Change/ Cessation July 16, 2010 July 16, 2010 July 16, 2010 July 16, 2010 July 16, 2010 Resignation Appointment Appointment Appointment Appointment

Reason

Management Organisation Chart

Key Management Personnel Provided below are the details of our key management personnel, as of the date of this Draft Red Herring Prospectus. None of our key management personnel are related to each other. All our key management personnel, except Rajgopal Nogja, are the permanent employees of our Company. There are no arrangements or understanding with major shareholders, customers, suppliers or others, pursuant to which any of our key management personnel were selected as members of our senior management. Rajgopal Nogja, aged 38, is the President of our Company and has been appointed as a Manager (under the Companies Act) of our Company. He holds a bachelors degree in civil engineering from Pune University and a masters degree in construction management from the National Institute of Construction Management and Research, Pune. He has experience of over 15 years in the real estate and construction industry. He joined HCC group in 2000 and has been associated full time with our Company since May 2007. He has earlier worked as an executive engineer with Mahindra Realty and Infrastructure Developers Limited. Rajgopal Nogja was not paid any compensation during Fiscal 2010 by our Company. His term of office as a Manager (under the Companies Act) of our Company expires on April 20, 2013.

170

Nathan Andrews, aged 51, is executive vice-president business development of our Company. He holds a bachelors degree in arts from the Mumbai University and has completed his post graduation in hotel management from the Oberoi School of Hotel Management. He has over 31 years of experience in hospitality concepts, deluxe hotels and fast food restaurants. He joined our Company on February 6, 2006. Prior to joining our Company, Nathan Andrews has worked as the chief executive officer - real estate and hotel division, with the Kohinoor Group. During Fiscal 2010, he was paid a gross compensation of ` 10.84 million. His term of office expires on January 27, 2017. Ambuj Jain, aged 50, is executive vice president - operations of our Company. He holds a bachelors degree in engineering from the Birla Institute of Technology and Science, Pilani, a masters of technology degree (construction management) from the Indian Institute of Technology, New Delhi and a masters in business administration (finance) from the Indira Gandhi National Open University, New Delhi. He has over 26 years of experience in construction, procurement, subcontracts, monitoring and co-ordination (both in public and private sector) along with overall operations segment. He joined our Company on July 1, 2007. Prior to joining our Company, Ambuj Jain worked as general manager procurement and sub contract with HCC. During Fiscal 2010, he was paid a gross compensation of ` 11.12 million. His term of office expires on September 21, 2018. Vinayak Jadhav, aged 50, is the senior vice president accounts and finance of our Company. He holds a bachelors and masters degree in commerce and a masters degree in financial management from the Mumbai University and is an associate cost and works accountants and associate company secretary. He has over 31 years of experience in the field of corporate and strategic finance. He joined our Company on October 1, 2007. Prior to joining our Company, Vinayak Jadhav has worked as general manager finance at HCC. During Fiscal 2010, he was paid a gross compensation of ` 5.80 million. His term of office expires on August 26, 2017. Anuradha Paraskar, aged 41, is senior vice president - marketing of our Company. She holds a bachelors degree in science from the Mumbai University, and has completed her masters in management studies in marketing from Chetnas Institute of Management and Research, Mumbai. She has over 20 years of experience across branding, marketing and communications. She joined our Company on November 3, 2003. Prior to joining our Company, Anuradha Paraskar, worked as vice president with Mattel Toys (India) Private Limited. During Fiscal 2010, she was paid a gross compensation of ` 6.29 million. Her term of office expires on August 2, 2026. Sureshkumar Prabhakar Pendharkar, aged 64, is the chief planner of our Company. He holds a bachelors degree in architecture from the Nagpur University and a masters degree in town planning from Government College of Engineering, Pune. He is also an associate member of the Institute of Town Planners, India, and has approximately 39 years of experience in town planning. Sureshkumar Prabhakar Pendharkar has worked with the Mumbai Metropolitan Regional Development Authority for 25 years, and retired as the chief of planning division and chief of town and country planning division. He has been associated with our Company since June 13, 2005. During Fiscal 2010, he was paid a gross compensation of ` 5.84 million. His term of office expires on March 31, 2015. Scot Wrighton, aged 53, is the city manager of our Company. He holds a bachelors degree in arts from Sterling College, Kansas, USA and a masters degree in public administration from the University of Kansas. He has nearly 30 years of experience in city management and has been an officer of different states such as of Illinois, Kansas and Missouri. He joined the Company on April 27, 2009. Prior to joining our Company, Scot Wrighton, has worked as a managerial development associate with the University of Georgia. During Fiscal 2010, he was paid a gross remuneration of ` 9.14 million. His term of office expires on April 26, 2012. Arun Bodupali, aged 43, is the senior vice president - legal of our Company. He holds a bachelors degree in science from Mumbai University and a bachelors degree in law from Government Law College, Mumbai. He has over 18 years of experience dealing in legal functions. He joined our Company on March 10, 2006. Prior to joining our Company, Arun Bodupali, worked as group head, legal with Ion Exchange (India) Limited. During Fiscal 2010, he was paid a gross compensation of `7.57 million. His term of office expires on June 30, 2024. Venkatesan Arunachalam, aged 42, is the Company Secretary of our Company. He holds a bachelors degree in commerce from the Mumbai University and a bachelors degree in general law from the Mumbai University. He is an associate company secretary and has done intermediate from Institute of Cost and Work Accountants of India. He has approximately 19 years of experience in secretarial and legal functions. He joined our Company on May 7,

171

2007. Prior to joining our Company, Venkatesan Arunachalam, worked as company secretary and legal head with Shringar Cinemas Limited. During Fiscal 2010, he was paid a gross compensation of ` 3.06 million. His term of office expires on May 4, 2026. Shareholding of key management personnel None of our key management personnel hold any Equity Shares in our Company. Bonus or profit sharing plan of the key management personnel Our Company has a performance linked pay for the key management personnel based on certain performance parameters. Interests of key management personnel The key management personnel of our Company do not have any interest in our Company other than to the extent of the remuneration or benefits to which they are entitled to as per their terms of appointment, reimbursement of expenses incurred by them during the ordinary course of business and the employee stock options held, if any. The key management personnel may be regarded as interested in the Equity Shares that may be Allotted to them under the Employee Reservation Portion. All of the key management personnel may also be deemed to be interested to the extent of any dividends payable to them and other distributors in respect of the above-mentioned Equity Shares. The following are the details of the employee stock options granted by the following key management personnel: Name of the Key Management Personnel Rajgopal Nogja Ambuj Jain Anuradha Paraskar Arun Bodupali Nathan Andrews Sureshkumar Prabhakar Pendharkar Vinayak Jadhav Number of Options granted 403,303 224,126 224,126 224,126 224,126 224,126 224,126

None of our key management personnel have been paid any consideration or benefit of any nature from our Company, other than their remuneration. Our Company has, in the past, leased villas (including sale of built up area) on a long term basis in Lavasa to certain of our key management personnel. Changes in our key management personnel The changes in our key management personnel in the last three years are as follows: Name Ambuj Jain Vinayak Jadhav Scot Wrighton Date of change July 1, 2007 October 1, 2007 April 27, 2009 Reason for change Appointment Appointment Appointment

Payment or Benefit to officers of our Company No non-salary related amount or benefit (except ESOPs granted, if any) has been paid or given within two years, or intended to be paid or given, to any officer of our Company (including our Directors and key management personnel).

172

OUR SUBSIDIARIES AND ASSOCIATES Our Company has 30 Subsidiaries and five Associates. Except Apollo Lavasa Health Corporation Limited which has undertaken a rights issue on March 30, 2009, none of our Subsidiaries have made any public or rights issue in the last three years. None of our Subsidiaries have become sick companies under the meaning of SICA and are not under winding up. Other than as disclosed in the section Our Promoters and Promoter Group, our Promoters have not disassociated themselves from any companies during the preceding three years. Unless otherwise specified, all information in this section is as of the date of this Draft Red Herring Prospectus. Interest of the Subsidiaries in our Company None of our Subsidiaries hold any Equity Shares in our Company. We have entered into certain business contracts with our Subsidiaries. For details, please see Related Party Transactions on page 216. SUBSIDIARIES Our Company has the following Subsidiaries as of the date of this Draft Red Herring Prospectus: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 1. Andromeda Hotels Limited; Apollo Lavasa Health Corporation Limited; Dasve Business Hotel Limited; Dasve Convention Center Limited; Dasve Hospitality Institutes Limited; Dasve Retail Limited; Full Spectrum Adventure Limited; Future City Multiservices SEZ Limited; Green Hills Residences Limited; Hill City Service Apartments Limited; Kart Racers Limited; Lakeshore Watersports Company Limited; Lakeview Clubs Limited; Lavasa Bamboocrafts Limited; Lavasa Hotel Limited; My City Technology Limited; Nature Lovers Retail Limited; Our Home Service Apartments Limited; Reasonable Housing Limited; Rhapsody Hospitality Limited; Sahyadri City Management Limited; Sirrah Palace Hotels Limited; Spotless Laundry Services Limited; Valley View Entertainment Limited; Verzon Hospitality Limited; Warasgaon Infrastructure Providers Limited; Warasgaon Lake View Hotels Limited; Warasgaon Power Supply Limited; Warasgaon Tourism Limited; and Whistling Thrush Facilities Services Limited. Andromeda Hotels Limited

Corporate Information: Andromeda Hotels Limited was incorporated under the Companies Act on January 22, 2010, in Mumbai. Andromeda Hotels Limited is involved in the business of establishing and/or running hotels, motels, resorts, clubs,

173

restaurants and cafes. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Andromeda Hotels Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 2.

Apollo Lavasa Health Corporation Limited

Corporate Information: Apollo Lavasa Health Corporation Limited was incorporated under the Companies Act on December 13, 2007, in Mumbai. Apollo Lavasa Health Corporation Limited is involved in the business of setting up, running and construction of multi speciality and super speciality hospitals, nursing homes and wellness centers. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Apollo Lavasa Health Corporation Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. Name of the shareholder No. of equity shares of ` 10 each 688,240 10 10 10 10 10 10 50,000 7,38,300 Percentage of total equity holding (%) 93.22 0.00 0.00 0.00 0.00 0.00 0.00 6.77 100.00 5,000,000 738,300

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Apollo Hospitals Enterprise Limited Total * As nominees of Lavasa Corporation Limited.

174

3.

Dasve Business Hotel Limited

Corporate Information: Dasve Business Hotel Limited was incorporated under the Companies Act on August 19, 2008, in Mumbai. Dasve Business Hotel Limited is involved in the business of establishing and running hotels. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Dasve Business Hotel Limited is as follows: Sr. No. 1. 2. 3. 4. 5. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* 6. Vinayak Jadhav* 7. Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 4. Dasve Convention Center Limited

Corporate Information: Dasve Convention Center Limited was incorporated under the Companies Act on August 19, 2008, in Mumbai. Dasve Convention Center Limited is involved in the business of developing and maintaining convention centers, halls, exhibition centers, exhibition halls and auditoriums. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Dasve Convention Center Limited is as follows: Sr. No. 1. 2. 3. 4. 5. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* No. of equity shares of ` 10 each 49,940 10 10 10 10 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 200,000 50,000

175

Sr. No. 6. 7.

Name of the shareholder

Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 5. Dasve Hospitality Institutes Limited

No. of equity shares of ` 10 each 10 10 50,000

Percentage of total equity holding (%) 0.02 0.02 100.00

Corporate Information: Dasve Hospitality Institutes Limited was incorporated under the Companies Act on September 19, 2008, in Mumbai. Dasve Hospitality Institutes Limited is involved in the business of establishing, promoting, encouraging, providing, maintaining, developing and conducting culinary academy(s), academy pertaining to hospitality industry and training / human resource development centre for culinary / hospitality. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Dasve Hospitality Institutes Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 1,04,940 10 10 10 10 10 10 1,05,000 Percentage of total equity holding (%) 99.94 0.01 0.01 0.01 0.01 0.01 0.01 100.00 200,000 105,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 6. Dasve Retail Limited

Corporate Information: Dasve Retail Limited was incorporated under the Companies Act on October 8, 2008, in Mumbai. Dasve Retail Limited is in the business of carrying on trade or retail business in India through retail formats and including but not limited to hyper markets, super markets and mega markets. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Dasve Retail Limited is as follows: 200,000 50,000

176

Sr. No. 1. 2. 3. 4. 5. 6. 7.

Name of the shareholder

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 7. Full Spectrum Adventure Limited

No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000

Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00

Corporate Information: Full Spectrum Adventure Limited was incorporated under the Companies Act on December 1, 2008, in Mumbai. Full Spectrum Adventure Limited is involved in the business of organizing, promoting, managing nominating representatives thereat of companies in the field of adventure training, events, course design and conducting adventure camps including adventure sports. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Full Spectrum Adventure Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 8. Future City Multiservices SEZ Limited

Corporate Information: Future City Multiservices SEZ Limited was incorporated under the Companies Act on November 30, 2009, in Mumbai, as Minfur Interior Technologies Limited. The name of the company was changed to Future City Multiservices SEZ Limited with effect from May 5, 2010. Future City Multiservices SEZ Limited is involved in the business of promoting, developing, building, organising all kinds of infrastructure facilities and services including but not limited to free trade zone, special economic zones and export processing zones.

177

Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Future City Multiservices SEZ Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 9. Green Hills Residences Limited

Corporate Information: Green Hills Residences Limited was incorporated under the Companies Act on May 6, 2009, in Mumbai. Green Hills Residences Limited is involved in the business of establishing and running hostels, hotels and resorts. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Green Hills Residences Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. Name of the shareholder No. of equity shares of ` 10 each 53,259 10 10 10 10 10 10 35,546 88,865 Percentage of total equity holding (%) 59.94 0.01 0.01 0.01 0.01 0.01 0.01 40.00 100.00 200,000 88,865

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Money Matters Advisory Services Limited Total * As nominees of Lavasa Corporation Limited.

178

10.

Hill City Service Apartments Limited

Corporate Information: Hill City Service Apartments Limited was incorporated under the Companies Act on March 26, 2010, in Mumbai. Hill City Service Apartments Limited is involved in the business of constructing, acquiring, selling, developing, promoting, conducting, managing and running for commercial objectives service apartments, land, properties, estates, buildings, townships, complexes and hotels. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Hill City Service Apartments Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 11. Kart Racers Limited

Corporate Information: Kart Racers Limited was incorporated under the Companies Act on April 1, 2010, in Mumbai. Kart Racers Limited is involved in the business of organising, promoting, managing, operating, administering, creating events, developing academies in the field of adventures, including motor sports, go-karting and motor car racing. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Kart Racers Limited is as follows: Sr. No. 1. 2. 3. 4. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* No. of equity shares of ` 10 each 49,940 10 10 10 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 200,000 50,000

179

Sr. No. 5. 6. 7.

Name of the shareholder

Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited 12.

No. of equity shares of ` 10 each 10 10 10 50,000

Percentage of total equity holding (%) 0.02 0.02 0.02 100.00

Lakeshore Watersports Company Limited

Corporate Information: Lakeshore Watersports Company Limited was incorporated under the Companies Act on August 1, 2008, in Mumbai. Lakeshore Watersports Company Limited is involved in the business of organizing, promoting, managing, running, administering, nominating representatives thereat, of companies in the field of adventures, including adventure sports and marine sports. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Lakeshore Watersports Company Limited is as follows: Sr. No. 1. 2. 3. 4. 5. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* 6. Vinayak Jadhav* 7. Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 13. Lakeview Clubs Limited

Corporate Information: Lakeview Clubs Limited was incorporated under the Companies Act on September 19, 2008, in Mumbai. Lakeview Clubs Limited is involved in the business of establishing and running clubs, hotels and resorts. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital 200,000 50,000

180

Shareholding Pattern: The shareholding pattern of Lakeview Clubs Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 14. Lavasa Bamboocrafts Limited

Corporate Information: Lavasa Bamboocrafts Limited was incorporated under the Companies Act on February 24, 2009, in Mumbai. Lavasa Bamboocrafts Limited deals in all kinds and forms of bamboos, cranes, grass and agro-forestry products. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Lavasa Bamboocrafts Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 15. Lavasa Hotel Limited

Corporate Information: Lavasa Hotel Limited was incorporated under the Companies Act on September 1, 2007, in Mumbai. Lavasa Hotel Limited is involved in the business of establishing and running hotels. Capital Structure:

181

No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Lavasa Hotel Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 1,000,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 16. My City Technology Limited

Corporate Information: My City Technology Limited was incorporated under the Companies Act on August 4, 2009, in Mumbai. My City Technology Limited is involved in the business of information and communication technology (ICT) in the areas of city management system and services, E-governance, ICT infrastructure planning, building and management and intelligent home solutions. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of My City Technology Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. Name of the shareholder No. of equity shares of ` 10 each 232,005 10 10 10 10 10 10 54,435 286,500 Percentage of total equity holding (%) 81.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 100.00 300,000 286,500

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Wipro Limited Total * As nominees of Lavasa Corporation Limited. 17. Nature Lovers Retail Limited

Corporate Information:

182

Nature Lovers Retail Limited was incorporated under the Companies Act on April 30, 2010, in Mumbai. Nature Lovers Retail Limited is involved in the business of trade or retail business through retail formats and including but not limited to hyper markets, super markets, mega markets and mega stores / discount stores. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Nature Lovers Retail Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 18. Our Home Service Apartments Limited

Corporate Information: Our Home Service Apartments Limited was incorporated under the Companies Act on March 10, 2010, in Mumbai. Our Home Service Apartments Limited is involved in the business of constructing, acquiring, selling, developing, promoting, conducting, managing and running service apartments, land, properties, estates, buildings, townships, complexes and hotels for commercial objectives. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Our Home Service Apartments Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 200,000 50,000

183

Sr. No.
*

Name of the shareholder

Total As nominees of Lavasa Corporation Limited. Reasonable Housing Limited

No. of equity shares of ` 10 each 50,000

Percentage of total equity holding (%) 100.00

19.

Corporate Information: Reasonable Housing Limited was incorporated under the Companies Act on September 23, 2009, in Mumbai. Reasonable Housing Limited is in business relating to housing of any type such as flats, dwelling houses, shops, offices and clubs. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Reasonable Housing Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 20. Rhapsody Hospitality Limited

Corporate Information: Rhapsody Hospitality Limited was incorporated under the Companies Act on January 14, 2010, in Mumbai. Rhapsody Hospitality Limited is involved in the business of establishing and/or running hotels, motels, resorts, clubs and restaurants. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Rhapsody Hospitality Limited is as follows: 200,000 50,000

184

Sr. No. 1. 2. 3. 4. 5. 6. 7.

Name of the shareholder

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 21. Sahyadri City Management Limited

No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000

Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00

Corporate Information: Sahyadri City Management Limited was incorporated under the Companies Act on March 12, 2010, in Mumbai. Sahyadri City Management Limited is involved in the business of constructing, improving, decorating, furnishing and maintaining flats, houses, markets, shops, workshops, restaurants, theatres, discotheques, safari park, town plaza, hospitals, schools and business centres. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Sahyadri City Management Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 22. Sirrah Palace Hotels Limited

Corporate Information: Sirrah Palace Hotels Limited was incorporated under the Companies Act on January 25, 2010, in Mumbai. Sirrah Palace Hotels Limited is involved in the business of establishing and/or running hotels, motels and resorts. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital 200,000 50,000

185

Shareholding Pattern: The shareholding pattern of Sirrah Palace Hotels Limited is as follows:

Sr. No. 1. 2. 3. 4. 5. 6. 7.

Name of the shareholder

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 23. Spotless Laundry Services Limited

No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000

Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00

Corporate Information: Spotless Laundry Services Limited was incorporated under the Companies Act on January 20, 2009, in Mumbai. Spotless Laundry Services Limited is involved in the business of steam and general laundry. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Spotless Laundry Services Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Name of the shareholder No. of equity shares of ` 10 each 72,431 10 10 10 10 10 10 3,000 22,470 97,961 Percentage of total equity holding (%) 73.94 0.01 0.01 0.01 0.01 0.01 0.01 3.06 22.94 100.00 200,000 97,961

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Akash Cleaners Private Limited Tex-Kare Cleaners Private Limited Total * As nominees of Lavasa Corporation Limited. 24. Valley View Entertainment Limited

Corporate Information: Valley View Entertainment Limited was incorporated under the Companies Act on January 20, 2010, in Mumbai. Valley View Entertainment Limited is involved in the business of constructions, running, managing amusement

186

centres or parks of all the nature and to carry on the business of hotels, motels, restaurants and cafes. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Valley View Entertainment Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited.

25.

Verzon Hospitality Limited

Corporate Information: Verzon Hospitality Limited was incorporated under the Companies Act on January 8, 2010, in Mumbai. Verzon Hospitality Limited is involved in the business of establishing and/or running hotels, motels, resorts, clubs and restaurants. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Verzon Hospitality Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited.

187

26.

Warasgaon Infrastructure Providers Limited

Corporate Information: Warasgaon Infrastructure Providers Limited was incorporated under the Companies Act on April 5, 2010, in Mumbai. Warasgaon Infrastructure Providers Limited is involved in the business of constructing, re-constructing, repairing, pulling down, altering, improving, decorating, furnishing and maintaining flats, dwelling houses, shops, offices, clubs, buildings and works. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Warasgaon Infrastructure Providers Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 27. Warasgaon Lake View Hotels Limited

Corporate Information: Warasgaon Lake View Hotels Limited was incorporated as Lavasa Star Hotel Limited on September 1, 2007, in Mumbai. The name of the company as changed to Warasgaon Lake View Hotels Limited with effect from February 19, 2010. Warasgaon Lake View Hotels Limited is involved in the business of establishing and running hotels. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Warasgaon Lake View Hotels Limited is as follows: Sr. No. 1. 2. 3. 4. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* No. of equity shares of ` 10 each 49,940 10 10 10 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 250,000 50,000

188

Sr. No. 5.

Name of the shareholder

Sureshkumar Prabhakar Pendharkar* 6. Vinayak Jadhav* 7. Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 28. Warasgaon Power Supply Limited

No. of equity shares of ` 10 each 10 10 10 50,000

Percentage of total equity holding (%) 0.02 0.02 0.02 100.00

Corporate Information: Warasgaon Power Supply Limited was incorporated under the Companies Act on March 12, 2010, in Mumbai. Warasgaon Power Supply Limited is an electric power, light and supply company involved in the business of constructing, laying down, establishing, fixing, power stations, cables, wires, lines, accumulators and lamps. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Warasgaon Power Supply Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 29. Warasgaon Tourism Limited

Corporate Information: Warasgaon Tourism Limited was incorporated under the Companies Act on February 25, 2010, in Mumbai. Warasgaon Tourism Limited is involved in the business of creation, development, constructing, running, operating, establishing, improving, organizing, maintaining and managing, tourism parks, tourist homes and guest houses. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: 200,000 50,000

189

The shareholding pattern of Warasgaon Tourism Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. 30.

Whistling Thrush Facilities Services Limited

Corporate Information: Whistling Thrush Facilities Services Limited was incorporated under the Companies Act on January 27, 2010, in Mumbai. Whistling Thrush Facilities Services Limited is involved in the business of providing facilities management services such as house keeping, landscaping, interior plants and external facade cleaning. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Whistling Thrush Facilities Services Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 49,940 10 10 10 10 10 10 50,000 Percentage of total equity holding (%) 99.88 0.02 0.02 0.02 0.02 0.02 0.02 100.00 200,000 50,000

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Total * As nominees of Lavasa Corporation Limited. OUR ASSOCIATES

Our Company has the following Associates as of the date of this Draft Red Herring Prospectus: 1. 2. 3. 4. 5. 1. Bona Sera Hotels Limited; Ecomotel Hotel Limited; Knowledge Vistas Limited; Palmetto Hospitality Limited; and SOL Hospitality Limited. Bona Sera Hotels Limited

190

Corporate Information: Bona Sera Hotels Limited was incorporated under the Companies Act on July 31, 2008, in Mumbai. Bona Sera Hotels Limited is involved in the business of establishing and/or running hotels, motels, resorts, clubs, restaurants, commissary and cafes. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Bona Sera Hotels Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. Name of the shareholder No. of equity shares of `10 each 28,962 10 10 10 10 10 10 82,600 111,622 Percentage of total equity holding (%) 25.94 0.01 0.01 0.01 0.01 0.01 0.01 74.00 100.00 200,000 111,622

Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Shawman Software Private Limited Total * As nominees of Lavasa Corporation Limited.

The board of directors of Bona Sera Hotels Limited have, in their meeting held on October 15, 2009 have proposed the amalgamation of SOL Hospitality Limited with Bona Sera Hotels Limited. The application for amalgamation is being finalised and may be filed in due course. 2. Ecomotel Hotel Limited

Corporate Information: Ecomotel Hotel Limited was incorporated under the Companies Act on August 18, 2008, in Mumbai. Ecomotel Hotel Limited is involved in the business of establishing and running hotels. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Ecomotel Hotel Limited is as follows: Sr. No. 1. 2. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* No. of equity shares of ` 10 each 44,613 10 Percentage of total equity holding (%) 26.00 0.00 200,000 171,820

191

Sr. No. 3. 4. 5. 6. 7. 8.

Name of the shareholder

Arun Karambelkar* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar* Vinayak Jadhav* Shripad Waman Gaitonde* Celebration Resorts and Hotels India Private Limited Total * As nominees of Lavasa Corporation Limited. 3. Knowledge Vistas Limited

No. of equity shares of ` 10 each 10 10 10 10 10 127,147 171,820

Percentage of total equity holding (%) 0.00 0.00 0.00 0.00 0.00 74.00 100.00

Corporate Information: Knowledge Vistas Limited was incorporated as GDST-Oxford International School Limited, on February 24, 2009, in Mumbai. The name of the company was changed to Knowledge Vistas Limited with effect from September 30, 2009. Knowledge Vistas Limited is involved in the business of spreading and/or promoting education and learning including establishing and/or acquiring and maintaining or supporting schools, colleges, vidyapiths, bal mandirs, study centres, technical institutions and colleges, engineering colleges, medical colleges, research centers, universities and other institutions or fund for imparting education and training of students. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Knowledge Vistas Limited is as follows: Sr. No. 1. 2. 3. 4. Name of the shareholder No. of equity shares of ` 10 each 218,233 10 10 227,159 Percentage of total equity holding (%) 49.00 0.00 0.00 51.00 0.00 0.00 0.00 100.00 500,000 445,415

Lavasa Corporation Limited Vinayak Jadhav* Shripad Gaitonde* Educomp Infrastructure and School Management Limited 5. Shantanu Prakash# 1 6. Sharad Agarwal# 1 7. Ravi Pillai# 1 Total 445,415 * As nominees of Lavasa Corporation Limited. # As nominees of Educomp Infrastructure and School Management Limited. 4. Palmetto Hospitality Limited

Corporate Information: Palmetto Hospitality Limited was incorporated under the Companies Act on June 15, 2009, in Mumbai. Palmetto Hospitality Limited is involved in the business of establishing and/or running hotels, motels, resorts, hostels, clubs, restaurants, cafes and bars.

192

Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of Palmetto Hospitality Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 12,990 10 6,500 12,000 11,000 1,000 6,500 50,000 Percentage of total equity holding (%) 25.98 0.02 13.00 24.00 22.00 2.00 13.00 100.00 200,000 50,000

Lavasa Corporation Limited Rajgopal Nogja* Harjit Singh Hura Rachvan Singh Harinderjit Singh Deshvir Singh Shamsher Singh Hura Total * As a nominee of Lavasa Corporation Limited. 5. SOL Hospitality Limited

Corporate Information: SOL Hospitality Limited was incorporated under the Companies Act on February 5, 2009, in Mumbai. SOL Hospitality Limited is involved in the business of establishing and/or running hotels, motels, resorts, clubs, restaurants, commissary and cafes. Capital Structure: No. of equity shares of ` 10 each Authorised capital Issued, subscribed and paid-up capital Shareholding Pattern: The shareholding pattern of SOL Hospitality Limited is as follows: Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. Name of the shareholder Lavasa Corporation Limited Vithal P. Kulkarni* Praveen Sood* Rajgopal Nogja* Sureshkumar Prabhakar Pendharkar
*

200,000 53,378

No. of equity shares of ` 10 each 13,818 10 10 10 10 10 10 39,500 53,378

Percentage of total equity holding (%) 25.88 0.02 0.02 0.02 0.02 0.02 0.02 74.00 100.00

Vinayak Jadhav* Shripad Waman Gaitonde* Shawman Software Private Limited Total * As nominees of Lavasa Corporation Limited.

The board of directors of SOL Hospitality Limited have, in their meeting held on October 15, 2009 proposed the

193

amalgamation of SOL Hospitality Limited with Bona Sera Hotels Limited. The application for amalgamation is being finalised and may be filed in due course. Space Theme Park India Limited Space Theme Park India Limited is currently not an associate of our Company. Pursuant to an addendum agreement between Space Investment Co, LLC, (SIC) Dubai, Space Theme Park India Limited and our Company dated June 23, 2010, our Company shall hold 40% of the equity share capital of Space Theme Park India Limited and Space Investments Co, LLC, Dubai shall hold the balance 60%.

194

OUR PROMOTERS AND PROMOTER GROUP Our Promoters The Promoters of our Company are: 1. 2. 1. Hindustan Construction Company Limited; and HCC Real Estate Limited. Hindustan Construction Company Limited

HCC was incorporated on January 27, 1926 as a public limited company. The registered office of HCC is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083. Principal Business of HCC The principal business of HCC spans across the following four broad segments: Engineering and Construction; Infrastructure Developer; Comprehensive Urban Development and Management; and Real Estate.

Promoters of HCC The promoters of HCC are: (a) (b) (c) (d) (e) Hincon Holdings Limited; Hincon Finance Limited; Shalaka Investment Private Limited; Shalaka Gulabchand Dhawan; and Ajit Gulabchand.

Shareholding Pattern as of September 3, 2010


Number of shareholde rs (III) Total number of shares (IV) Number of shares held in dematerialised form (V)

Category code (I)

Category of Shareholder (II)

Total Shareholding as a percentage of total number of shares As a percentage of (A+B) (VI) As a percentage of (A+B+C) (VII)

Shares pledged or otherwise encumbered As a Percentage (IX)=(VIII) / (IV)*100

Number of shares (VIII)

(A)

(1) (a) (b)

(c) (d) (e) (2)

Shareholding of Promoter and Promoter Group Indian Individuals / Hindu Undivided Family Central Government / State Government(s) Bodies Corporate Financial Institutions / Banks Any Other (specify) Sub-Total (A) (1) Foreign

4 0

2,127,294 0

2,127,294 0

0.35 0.00

0.35 0.00

0 0

0.00 0.00

3 0 0 7

239,607,100 0 0 241,734,394

239,607,100 0 0 241,734,394

39.51 0.00 0.00 39.86

39.51 0.00 0.00 39.86

0 0 0 0

0.00 0.00 0.00 0.00

195

Category code (I)

Category of Shareholder (II)

Number of shareholde rs (III)

Total number of shares (IV)

Number of shares held in dematerialised form (V)

Total Shareholding as a percentage of total number of shares As a percentage of (A+B) (VI) As a percentage of (A+B+C) (VII) 0.00

Shares pledged or otherwise encumbered As a Percentage (IX)=(VIII) / (IV)*100 0.00

Number of shares (VIII) 0

Individuals (NonResident Individuals / Foreign Individuals) (b) Bodies Corporate (c) Institutions (d) Any Other (specify) Sub-Total (A) (2) Total Shareholding of Promoter and Promoter Group (A) = (A)(1)+(A)(2) (B) Public Shareholding (1) Institutions (a) Mutual Funds / UTI (b) Financial Institutions / Banks (c) Central Government / State Government(s) (d) Venture Capital Funds (e) Insurance Companies (f) Foreign Institutional Investors (g) Foreign Venture Capital Investors (h) Foreign national/Bodies/OC B Sub-Total (B) (1) (2) Non-Institutions (a) Bodies Corporate (b) Individuals i. Individual shareholders holding nominal share capital upto `1 lakh ii. Individual shareholders holding nominal share capital in excess of `1 lakh (c) Any Other (specify) i. Trust ii. Foreign Bodies Sub-Total (B) (2) Total Public Shareholding (B) = (B)(1)+(B)(2) TOTAL (A)+(B) (C) Shares held by Custodians and against which Depository Receipts have been issued

(a)

0.00

0 0 0 0 7

0 0 0 0 241,734,394

0 0 0 0 241,734,394

0.00 0.00 0.00 0.00 39.86

0.00 0.00 0.00 0.00 39.86

0 0 0 0 0

0.00 0.00 0.00 0.00 0.00

N.A N.A 0 0 0

N.A N.A 0.00 0.00 0.00

40 12 1

54,995,723 2,402,333 10,620

54,986,723 2,391,833 10,620

9.07 0.40 0.00

9.07 0.40 0.00

0 10 95 0 0

0 23,749,727 166,233,586 0 0

0 23,749,727 166,167,586 0 0

0.00 3.92 27.41 0.00 0.00

0.00 3.91 27.41 0.00 0.00

0 0 0 0 0

0.00 0.00 0.00 0.00 0.00

158 2,209 121,815

247,391,989 30,882,007 77,303,518

247,306,489 30,790,507 67,591,626

40.80 5.09 12.75

40.79 5.09 12.74

0 N.A 0 0 0

0.00 N.A 0.00 0.00 0.00

28

9,091,988

8,923,988

1.50

1.50

0.00

3 0 124,055 124,213 124,220 1

8,304 0 117,285,817 364,677,806 606,412,200 120,720

8,304 0 107,314,425 354,620,914 596,355,308 120,720

0.00 0.00 19.34 60.14 100.00 0.02

0.00 0.00 19.33 60.12 99.98 0.02

0 0 0 0 N.A 0 0

0.00 0.00 0.00 0.00 N.A 0.00 0.00

196

Category code (I)

Category of Shareholder (II)

Number of shareholde rs (III)

Total number of shares (IV)

Number of shares held in dematerialised form (V)

Total Shareholding as a percentage of total number of shares As a percentage of (A+B) (VI) As a percentage of (A+B+C) (VII) 100.00

Shares pledged or otherwise encumbered As a Percentage (IX)=(VIII) / (IV)*100 0.00

Number of shares (VIII) 0

GRAND TOTAL (A)+(B)+(C)

124,221

606,532,920

596,476,028

There has been no change in the control or the management of HCC in the three years preceding the filing of this Draft Red Herring Prospectus. Our Company confirms that the permanent account number, bank account number, company registration number and the address of the registrar of companies where HCC is registered shall be submitted to the Stock Exchanges at the time of filing the Draft Red Herring Prospectus. Interests of HCC and Common Pursuits HCC is interested to the extent of its shareholding in and the promotion of our Company. For details on the shareholding of HCC in our Company, please see Capital Structure on page 37. Certain directors and employees of HCC are also Directors of our Company or our Subsidiaries. Except as stated in this Draft Red Herring Prospectus, our Company has not entered into any contract, agreements or arrangements during the preceding two years from the date of this Draft Red Herring Prospectus in which HCC is directly or indirectly interested and no payments have been made to HCC in respect of the contracts, agreements or arrangements which are proposed to be made with HCC including the properties purchased by our Company other than in the normal course of business. Further, our Company pays HCC certain credit protection fees in relation to the DDCDs issued by our Company. HCC does not have any interest in any venture that is involved in any activities similar to those conducted by our Company. Our Company will adopt the necessary procedures and practices as permitted by law to address any conflict situation as and when they arise. Payment of benefits to HCC Except as stated in Related Party Transactions on page 216, there has been no payment of benefits to HCC during the two years preceding the filing of this Draft Red Herring Prospectus. Companies with which HCC has disassociated in the last three years HCC has not disassociated with any companies during the preceding three years. 2. HCC Real Estate Limited

HREL was incorporated on June 15, 2005 as a public limited company as Hincon Realty Limited. The name of the company was changed to HCC Real Estate Limited and a fresh certificate of incorporation was issued on August 8, 2006. The registered office of HREL is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083. Principal Business of HREL

197

The principal business of HREL is construction and development of buildings, houses, halls, flats, office premises, shops, residential / commercial complexes, shopping malls, entertainment parks or any landed property. Promoters of HREL HCC is the promoter of HREL. Shareholding Pattern as of August 31, 2010 Sr. No. 1. 2. 3. 4. 5. 6. 7. Name of the shareholder No. of equity shares of ` 10 each 57,367,421 1 1 1 1 1 1 57,367,427 Percentage of total equity holding (%) 99.99 0 0 0 0 0 0 100

HCC Ajit Gulabchand* K. G. Tendulkar* Shalaka Gulabchand Dhawan* V. P. Kulkarni* Rajgopal Nogja* Shekhar Patil* Total * As nominees of HCC.

There has been no change in the control or the management of HREL in the three years preceding the filing of this Draft Red Herring Prospectus. Our Company confirms that the permanent account number, bank account number, company registration number and the address of the registrar of companies where HREL is registered shall be submitted to the Stock Exchanges at the time of filing the Draft Red Herring Prospectus. Interests of HREL and Common Pursuits HREL is interested to the extent of its shareholding in and the promotion of our Company. For details on the shareholding of HREL in our Company, please see Capital Structure on page 37. Certain directors and employees of HREL are also Directors of our Company or our Subsidiaries. Except as stated in this Draft Red Herring Prospectus, our Company has not entered into any contract, agreements or arrangements during the preceding two years from the date of this Draft Red Herring Prospectus in which HREL is directly or indirectly interested and no payments have been made to HREL in respect of the contracts, agreements or arrangements which are proposed to be made with HREL including the properties purchased by our Company other than in the normal course of business. Except for HREL, HRL (Thane) Real Estate Limited, HRL Township Developers Limited, Nashik Township Developers Limited, Maan Township Developers Limited, HCC Realty Limited and Powai Real Estate Developers Limited, which are engaged in the same line of business as our Company, HREL does not have any interest in any venture that is involved in any activities similar to those conducted by our Company. Our Company will adopt the necessary procedures and practices as permitted by law to address any conflict situation as and when they arise. Payment of benefits to HREL Except as stated in Related Party Transactions on page 216, there has been no payment of benefits to HREL during the two years preceding the filing of this Draft Red Herring Prospectus. Companies with which HREL has disassociated in the last three years

198

HREL has not disassociated with any company during the preceding three years. Promoters of our Promoters 1. Promoters of HCC

The promoters of HCC are: (a) (b) (c) (d) (e) (a) Hincon Holdings Limited; Hincon Finance Limited; Shalaka Investment Private Limited; Ajit Gulabchand; and Shalaka Gulabchand Dhawan. Hincon Holdings Limited

Hincon Holdings Limited was incorporated on September 24, 1996 as a private limited company. The company was converted to a public limited company and the name of the company was changed with effect from July 23, 1999. The registered office of Hincon Holdings Limited is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083. Principal Business Hincon Holdings Limited is registered with the RBI as a non-banking finance company. The principal business of Hincon Holdings Limited is to carry on business as an investment company and other related activities. Board of Directors The board of directors of Hincon Holdings Limited comprises of: 1. 2. 3. 4. (b) Ajit Gulabchand; Shalaka Gulabchand Dhawan; K. G. Tendulkar; and Ram P. Gandhi. Hincon Finance Limited

Hincon Finance Limited was incorporated on May 20, 1992 as a private limited company under the name of Hindustan Finvest Private Limited. The company was converted to a public limited company and the name of the company was changed to Hindustan Finvest Limited with effect from August 1, 1995. The name of the company was changed to its present name pursuant to a fresh certificate of incorporation pursuant to change of name dated September 5, 2006. The registered office of Hincon Finance Limited is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083. Principal Business Hincon Finance Limited is registered with the RBI as a non-banking finance company. Hincon Finance Limited is engaged in investing, acquiring, holding and exchanging shares, stocks, debentures, debenture stocks, bonds, obligations and securities. Board of Directors The board of directors of Hincon Finance Limited comprises of: 1. 2. Ajit Gulabchand; Shalaka Gulabchand Dhawan;

199

3. 4. 5. (c)

K. G. Tendulkar; Ram P. Gandhi; and Praveen Sood. Shalaka Investment Private Limited

Shalaka Investment Private Limited was incorporated on April 5, 1979 as a private limited company. The registered office of Shalaka Investment Private Limited is located at Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083. Principal Business The principal business of Shalaka Investment Private Limited is to act as an investment company and related activities. Board of Directors The board of directors of Shalaka Investment Private Limited comprises of: 1. 2. (d) Ajit Gulabchand; and Meera Gulabchand. Ajit Gulabchand Ajit Gulabchand, aged 62 years, is a resident Indian national. His driving license number is MH 01 20070006015. His voter identification number is ISD 1563477. Address: Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083

(e)

Shalaka Gulabchand Dhawan Shalaka Gulabchand Dhawan, aged 33 years, is a resident Indian national. Her driving license number is MH-01-2003/10652. Her voter identification number is ISD 1563485. Address: Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai 400 083

2.

Promoters of HREL

The promoter of HREL is HCC. For details, please see Our Promoters and Promoter Group - Our Promoters Hindustan Construction Company Limited on page 195. OUR PROMOTER GROUP In addition to our Promoters named above, the following corporate entities form a part of our Promoter Group: Companies (i) Western Securities Limited;

200

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) (xiii) (xiv) (xv) (xvi) (xvii) (xviii) (xix) (xx) (xxi) (xxii) (xxiii) (xxiv) (xxv) (xxvi) (xxvii) (xxviii)
1

Hincon Technoconsult Limited; Pune-Paud Toll Road Company Limited; Panchkutir Developers Limited; Nirmal BOT Limited; HCC Singapore Enterprises Pte. Ltd.; HCC Mauritius Enterprises Ltd.; HCC Infrastructure Limited; HCC Aviation Limited; Badarpur Faridabad Tollway Limited; HCC Construction Limited; Highbar Technologies Limited; Baharampore-Farakka Highways Limited; Farakka-Raiganj Highways Limited; Raiganj-Dalkhola Highways Limited; Hincon Finance Limited; Dhule Palesner Tollway Limited; HRL Township Developers Limited; HRL (Thane) Real Estate Limited; Nashik Township Developers Limited; Maan Township Developers Limited; Charosa Wineries Limited; Powai Real Estate Developers Limited; HCC Realty Limited; Hincon Holdings Limited; Klemanor Investments Limited; Karl Steiner AG, Switzerland; and Vikhroli Corporate Park Private Limited1.

Pursuant to a shareholders agreement dated July 22, 2010 between our Promoters, Milestone Real Estate Fund (Milestone) and Vikhroli Corporate Park Private Limited, Milestone has inter alia subscribed to the equity shares of Vikhroli Corporate Park Private Limited, representing 74% of the paid up capital of Vikhroli Corporate Park Private Limited. The shareholding of our Promoters has consequently reduced to 26% of the paid up capital of Vikhroli Corporate Park Private Limited.

201

OUR GROUP COMPANIES Unless otherwise specified, all information in this section is as of the date of this Draft Red Herring Prospectus. Our Group Companies are as follows: The Group Companies are as follows: Companies 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. A. Nirmal BOT Limited; Hincon Finance Limited; HCC Aviation Limited; HCC Infrastructure Limited; Karl Steiner AG, Switzerland; Highbar Technologies Limited; Pune-Paud Toll Road Company Limited; Panchkutir Developers Limited; HCC Singapore Enterprises Pte. Ltd.; HCC Mauritius Enterprises Ltd.; HRL Township Developers Limited; HRL (Thane) Real Estate Limited; Nashik Township Developers Limited; Maan Township Developers Limited; Western Securities Limited; Hincon Technoconsult Limited; Badarpur Faridabad Tollway Limited; HCC Construction Limited; Baharampore-Farakka Highways Limited; Farakka-Raiganj Highways Limited; Raiganj-Dalkhola Highways Limited; Charosa Wineries Limited; Powai Real Estate Developers Limited; HCC Realty Limited; Klemanor Investments Limited; and Dhule Palesner Tollway Limited. Details of the five largest Group Companies (based on turnover)

The top five Group Companies on the basis of total turnover are as follows: 1. Nirmal BOT Limited

Corporate Information Nirmal BOT Limited was incorporated on September 19, 2006, in Mumbai. Nirmal BOT Limited is engaged in designing, developing, establishing, constructing, commissioning, operating, maintaining, improving, repairing, administering and managing a four lane carriageway on Armur-Kadtal Section on NH-7 in Andhra Pradesh on build-operate-transfer (annuity) basis or otherwise, by widening and rehabilitation of the existing two lane stretch and to construct toll plazas and all other works or conveniences of public or private utility for the purpose of smooth traffic on the road(s). Interest of our Promoters HCC holds 31,500,000 equity shares of ` 10 each, aggregating to 100% of the issued and paid-up equity share capital of Nirmal BOT Limited.

202

Financial Performance The operating results of Nirmal BOT Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 315 315 315 (7.83) 0.00 0.00 200.56 (7.83) (0.25) (0.25) 9.75 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00

Sr. No. 1. 2. 3. 4. 5. 6. 7. 2.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share Hincon Finance Limited

Corporate Information Hincon Finance Limited was incorporated on May 20, 1992, in Mumbai. Hincon Finance Limited is engaged in investing, acquiring, holding and exchanging shares, stocks, debentures, debenture stocks, bonds, obligations, and securities. Interest of our Promoters HCC holds 120,000 equity shares of `10 each, aggregating to 15% of the issued and paid-up equity share capital of Hincon Finance Limited. Financial Performance The operating results of Hincon Finance Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 2009 2008 8.00 8.00 8.00 297.21 288.52 272.92 92.83 15.71 19.64 19.64 381.52 128.73 22.61 28.26 28.26 370.65 163.71 32.95 41.24 41.24 351.16

S. No. 1. 2. 3. 4. 5. 6. 7. 3.

Particulars Equity Capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value `10) Earnings per share (diluted) (face value ` 10) Net asset value per share HCC Aviation Limited

Corporate Information

203

HCC Aviation Limited was incorporated on May 19, 2008, in Mumbai. HCC Aviation Limited is engaged in the business of consultancy services in aviation security and other aviation related activities and provides security, schedule, maintains and operates commercial and non-commercial aircrafts and helicopters. Interest of our Promoters HCC holds 50,000 equity shares of `10 each, aggregating to 100% of the issued and paid-up equity share capital of HCC Aviation Limited. Financial Performance The operating results of HCC Aviation Limited for the last two fiscal years are as follows: (` In Million, except share data) For the year ended March 31, 2010 March 31, 2009 0.5 0.5 (85.55) (39.00) 46.10 (46.55) (930.94) (930.94) (1,700.99) 0.00 (39.00) (780.05) (780.05) (783.04)

S. No. 1. 2. 3. 4. 5. 6. 7. 4.

Particulars Equity Capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value `10) Earnings per share (diluted) (face value ` 10) Net asset value per share HCC Infrastructure Limited

Corporate Information HCC Infrastructure Limited was incorporated on February 14, 2008 under the Companies Act, in Mumbai. HCC Infrastructure Limited acts as builders, contractors, promoters, operation and maintenance operators, developers of all type of infrastructural facilities which includes infrastructure projects on build-own-operate (BOO). build-owntransfer (BOT), build-own-operate-maintain (BOOM), build-own-operate-transfer (BOOT), design-buildfinance-operate (DBFO), build-operate-lease-transfer (BOLT) or any other model basis in the infrastructure development sector. Interest of the Promoter HCC holds 50,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of HCC Infrastructure Limited. Financial Performance The operating results of HCC Infrastructure Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 0.5 0.5 (203.20) 35.85 (127.53) (2,550.63) (75.67) 0 (75.67) (1,513.35) -

S. No. 1. 2. 3. 4. 5.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10)

204

S. No. 6. 7. 5.

Particulars Earnings per share (diluted) (face value ` 10) Net asset value per share Karl Steiner AG, Switzerland March 31, 2010 (2,550.63) (4,053.98)

For the year ended March 31, 2009 (1,513.35) (1,510.85)

March 31, 2008 -

Corporate Information Karl Steiner AG, Switzerland was incorporated under the Swiss Code of Obligations on March 18, 1980 as a Limited Company. Karl Steiner AG, Switzerland is a total or general services contractor and is engaged in the business of planning and developing real estate projects as well as undertaking construction and renovation work. Interest of the Promoter HCC Mauritius Enterprises Ltd., wholly owned subsidiary of HCC holds 26,400 equity shares of CHF 1,000 each, aggregating to 66% of the issued and paid up equity share capital of Karl Steiner AG. Financial Performance The operating results of Karl Steiner AG, Switzerland for the last three fiscal years are as follows: (In CHF Million, except per share data) For the year ended December 31, 2008 December 31, 2007 40.00 40.00 18.95 95.91 879.72 (76.97) (1,924.15) (1,924.15) 1,473.63 1,156.03 18.61 465.25 465.25 3,397.77

S. No. 1. 2. 3. 4. 5. 6. 6. B. 1.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value 1,000) Earnings per share (diluted) (face value 1,000) Net asset value per share December 31, 2009 40.00 (56.33) 735.45 (84.27) (2,106.75) (2,106.75) (408.12)

Group Companies with negative net worth Highbar Technologies Limited

Corporate Information Highbar Technologies Limited was incorporated on November 25, 2009 under the Companies Act, in Mumbai. Highbar Technologies Limited is involved in the business of developing, designing, maintaining and supporting services, products, tools, accessories used in the field of information technology. Interest of the Promoter HCC holds 50,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Highbar Technologies Limited. Financial Performance The operating results of Highbar Technologies Limited for the last three fiscal years are as follows:

205

S. No. 1. 2. 3. 4. 5. 6. 7. 2.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share Pune-Paud Toll Road Company Limited

(` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 0.5 (1.82) (1.82) (36.33) (36.33) (26.33)

Corporate Information Pune-Paud Toll Road Company Limited was incorporated on March 17, 2005 under the Companies Act, in Mumbai. Pune-Paud Toll Road Company Limited is involved in the business of developing, maintaining, operating, administering, managing or controlling, as required a toll bridge on build-own-transfer basis and to construct a toll plaza and all other works or conveniences or public or private utility. Interest of the Promoter HCC holds 5,444,500 equity shares, aggregating to 90% of the issued and paid up equity share capital of Pune-Paud Toll Road Company Limited. Financial Performance The operating results of Pune-Paud Toll Road Company Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 60.5 60.5 60.5 (216.47) (111.93) (8.73) 23.20 (104.54) (17.28) (17.28) (25.78) 20.11 (103.20) (17.06) (17.06) (8.50) 5.26 (8.73) (1.44) (1.44) 8.56

S. No. 1. 2. 3. 4. 5. 6. 7. 3.

Particulars Equity Capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value `10) Earnings per share (diluted) (face value ` 10) Net asset value per share Panchkutir Developers Limited

Corporate Information Panchkutir Developers Limited was incorporated on October 5, 2006 under the Companies Act, in Mumbai. Panchkutir Developers Limited is involved in the business of construction and development of buildings, houses, halls, flats, office premises, shops and residential /commercial complexes.

206

Interest of the Promoter HCC holds 100,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Panchkutir Developers Limited. Financial Performance The operating results of Panchkutir Developers Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 1 1 1 (41.01) (15.82) (0.83) 0 (25.19) (251.95) (251.95) (400.12) 0 (14.99) (149.86) (149.86) (148.17) 0 (0.66) (6.64) (6.64) 1.69

S. No. 1. 2. 3. 4. 5. 6. 7. 4.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share HCC Infrastructure Limited

For details, please see Group Companies A. Details of the five largest Group Companies (based on turnover) HCC Infrastructure Limited on page 204. 5. HCC Aviation Limited

For details, please see Group Companies A. Details of the five largest Group Companies (based on turnover) HCC Aviation Limited on page 203. 6. Karl Steiner AG, Switzerland

For details, please see Group Companies A. Details of the five largest Group Companies (based on turnover) Karl Steiner AG, Switzerland on page 205. 7. HCC Singapore Enterprises Pte. Ltd.

Corporate Information HCC Singapore Enterprises Pte. Ltd. was incorporated on December 18, 2007 under the Companies Act, Chapter 50 in Singapore. HCC Singapore Enterprises Pte. Ltd. is involved in the business of investment. Interest of the Promoter HCC holds 5,000 equity shares of USD 1 each, aggregating to 100% of the issued and paid up equity share capital of HCC Singapore Enterprises Pte. Ltd. Financial Performance The operating results of HCC Singapore Enterprises Pte. Ltd. for the last three fiscal years are as follows:

(Amount in USD)

207

S. No. 1. 2. 3. 4. 5. 6. 7. 8.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share HCC Mauritius Enterprises Ltd. March 31, 2010 5,000 (23,680) 0 (8,460) (1.69) (1.69) (3.74)

For the year ended March 31, 2009 5,000 (15,220) 0 (15,220) (3.04) (3.04) (2.04)

March 31, 2008 -

Corporate Information HCC Mauritius Enterprises Ltd. was incorporated on January 17, 2008 under the Companies Act, 2001 (republic of Mauritius), in Mauritius. HCC Mauritius Enterprises Limited is involved in the business of investment. Interest of the Promoter HCC holds 5,005,000 equity shares of USD 1 each, aggregating to 100% of the issued and paid up equity share capital of HCC Mauritius Enterprises Ltd.. Financial Performance The operating results of HCC Mauritius Enterprises Ltd. for the last three fiscal years are as follows: (Amount in USD) S. No. 1. 2. 3. 4. 5. 6. 7. 9. Particulars Equity Capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share HRL Township Developers Limited For the year ended March 31, 2010 March 31, 2009 5,000 5000 (18,046) (10,576) 0 (7,470) (1.49) (1.49) (2.61) 0 (10,576) (2.12) (2.12) (1.12) March 31, 2008 -

Corporate Information HRL Township Developers Limited was incorporated on August 2, 2006 under the Companies Act, in Mumbai. HRL Township Developers Limited is involved in the business of construction and development of buildings / townships. Interest of the Promoter HREL holds 100,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of HRL Township Developers Limited. Financial Performance

208

The operating results of HRL Township Developers Ltd for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 1 1 1 (3.27) (3.02) (2.75) (0.24) (2.43) (2.43) (22.66) (0.28) (2.77) (2.77) (20.23) (2.57) (25.74) (25.74) (17.45)

S. No. 1. 2. 3. 4. 5. 6. 7. 10.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share HRL (Thane) Real Estate Limited

Corporate Information HRL (Thane) Real Estate Limited was incorporated on August 3, 2006 under the Companies Act, in Mumbai. HRL (Thane) Real Estate Limited is involved in the business of construction and development of buildings / townships. Interest of the Promoter HREL holds 100,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of HRL (Thane) Real Estate Limited. Financial Performance The operating results of HRL (Thane) Real Estate Ltd for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 1 1 1 (1.02) (0.76) (0.54) (0.26) (2.58) (2.58) (0.16) (0.22) (2.19) (2.19) 2.42 (0.35) (3.54) (3.54) 4.62

S. No. 1. 2. 3. 4. 5. 6. 7. 11.

Particulars Equity Capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share Nashik Township Developers Limited

Corporate Information: Nashik Township Developers Limited was incorporated on January 31, 2007 under the Companies Act, in Mumbai. Nashik Township Developers Limited is involved in the business of construction and development of townships and other buildings farms and agricultural lands. Interest of the Promoter

209

HREL holds 100,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Nashik Township Developers Limited. Financial Performance The operating results of Nashik Township Developers Limited for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 1 1 1 (2.02) (1.77) (0.81) (0.25) (2.54) (2.54) (10.22) (0.96) (9.61) (9.61) (7.68) (0.81) (8.06) (8.06) 1.94

S. No. 1. 2. 3. 4. 5. 6. 7. 12.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share Maan Township Developers Limited

Corporate Information: Maan Township Developers Limited was incorporated on February 2, 2007 under the Companies Act, in Mumbai. Maan Township Developers Limited is involved in the business of construction and development of townships and other buildings farm houses and development of land. Interest of the Promoter HREL holds 100,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Maan Township Developers Limited. Financial Performance The operating results of Maan Township Developers Ltd for the last three fiscal years are as follows: (` in Million, except share data) For the year ended March 31, 2010 March 31, 2009 March 31, 2008 1 1 1 (1.72) (1.40) (0.65) (0.32) (3.22) (3.22) (7.18) (0.75) (7.49) (7.49) (3.96) (0.65) (6.47) (6.47) 3.53

S. No. 1. 2. 3. 4. 5. 6. 7. C. 1.

Particulars Equity capital Reserves (excluding revaluation reserves) and surplus Income including other income Profit after tax Earnings per share (face value ` 10) Earnings per share (diluted) (face value ` 10) Net asset value per share Details of other Group Companies Western Securities Limited

210

Corporate Information Western Securities Limited was incorporated on September 17, 1985 under the Companies Act, in Mumbai. Western Securities Limited is an investment company and involved in the business of buying, underwriting, investing in, acquiring, holding and dealing in shares stocks, debentures, debenture-stock, bonds, obligations and securities of any kind. Interest of the Promoter HCC holds 1,957,495 equity shares, aggregating to 97.87% of the issued and paid up equity share capital of Western Securities Limited. 2. Hincon Technoconsult Limited

Corporate Information Hincon Technoconsult Limited was incorporated on May 20, 1954 under the Companies Act, in Mumbai. Hincon Technoconsult Limited is involved in the business of public works as constructional engineers, mechanical engineers, civil engineers and general contractors and as manufacturers of and dealers in bridges, tunnels and steel frame buildings. Interest of the Promoters HCC holds 1,000,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Hincon Technoconsult Limited. 3. Badarpur Faridabad Tollway Limited

Corporate Information Badarpur Faridabad Tollway Limited was incorporated on July 17, 2008 under the Companies Act, in Mumbai. Badarpur Faridabad Tollway Limited is involved in the business of undertaking, designing, developing, establishing, constructing, erecting, executing, carrying out, commissioning, operating, maintaining, improving, repairing, administering and managing a highway project namely, construction of elevated six lane highway at Badarpur from km 16.100 to km 20.500 on national highway no. 2 (Delhi-Agra section) on build-operate-transfer (BOT) basis and to construct toll plazas and all other works of conveniences of public or private utility for the purpose of smooth traffic on the road(s). Interest of the Promoter HCC holds 43,860,000 equity shares, aggregating to 51% and 42,140,000 equity shares, through its subsidiary HCC Infrastructure Limited, aggregating to 49% of the issued and paid up equity share capital of Badarpur Faridabad Tollway Limited. 4. HCC Construction Limited

Corporate Information HCC Construction Limited was incorporated on March 5, 2009 under the Companies Act, in Mumbai. HCC Construction Limited is involved in the business of constructing, executing, managing, control works and conveniences of all kinds, including railways, tramways, docks, harbours, piers, wharves, canals and reservoirs. Interest of the Promoter

211

HCC holds 50,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of HCC Construction Limited. 5. Baharampore-Farakka Highways Limited

Corporate Information Baharampore-Farakka Highways Limited was incorporated on March 11, 2010 under the Companies Act, in Mumbai. Baharampore-Farakka Highways Limited is involved in the business of four-laning of Baharampore Farakka section of NH-34 from km 191.416 to Km 294.684 in the state of West Bengal on design, build, finance, operate and transfer toll basis under National Highways Development Project NHDP III under a concession agreement with National Highways Authority of India. Interest of the Promoter HCC holds 25,500 equity shares, aggregating to 51% and 24,500 equity shares, through its subsidiary HCC Infrastructure Limited, aggregating to 49% of the issued and paid up equity share capital of Baharampore-Farakka Highways Limited. 6. Farakka-Raiganj Highways Limited

Corporate Information Farakka-Raiganj Highways Limited was incorporated on March 11, 2010 under the Companies Act, in Mumbai. Farakka-Raiganj Highways Limited is involved in the business of four-laning of Farakka-Raiganj section of NH-34 from km 295 to km 398 in West Bengal on design, build, finance, operate and transfer toll basis under NHDP III under a concession agreement with National Highways Authority of India. Interest of the Promoter HCC holds 25,500 equity shares, aggregating to 51% and 24,500 equity shares, through its subsidiary HCC Infrastructure Limited, aggregating to 49% of the issued and paid up equity share capital of Farakka-Raiganj Highways Limited. 7. Raiganj-Dalkhola Highways Limited

Corporate Information Raiganj-Dalkhola Highways Limited was incorporated on March 11, 2010 under the Companies Act, in Mumbai. Raiganj-Dalkhola Highways Limited is involved in the business of four-laning of Raiganj Dalkhola section of NH34 from km 398 to km 452.750 (excluding Dalkhola Bypass) in West Bengal on design, build, finance, operate and transfer toll basis under National Highways Development Project III under a concession agreement with National Highways Authority of India. Interest of the Promoter HCC holds 25,500 equity shares, aggregating to 51% and 24,500 equity shares, through its subsidiary HCC Infrastructure Limited, aggregating to 49% of the issued and paid up equity share capital of Raiganj-Dalkhola Highways Limited. 8. Charosa Wineries Limited

Corporate Information Charosa Wineries Limited was incorporated on December 11, 2007 under the Companies Act, in Mumbai. Charosa

212

Wineries Limited is involved in the business of manufacturing and trading of wines, liquors, cultivation of cane, grapes and other fruits for distillery purpose. Interest of the Promoter HREL holds 5,000,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Charosa Wineries Limited. 9. Powai Real Estate Developers Limited

Corporate Information Powai Real Estate Developers Limited was incorporated on January 21, 2009 under the Companies Act, in Mumbai. Powai Real Estate Developers Limited is involved in the business of construction and development of buildings and acquisition of land for development purpose. Interest of the Promoter HREL holds 50,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of Powai Real Estate Developers Limited. 10. HCC Realty Limited

Corporate Information HCC Realty Limited was incorporated on February 18, 2010 under the Companies Act, in Mumbai. HCC Realty Limited is involved in the business of construction and development of buildings and acquisition of land for development purpose. Interest of the Promoter HREL holds 50,000 equity shares, aggregating to 100% of the issued and paid up equity share capital of HCC Realty Limited. 11. Klemanor Investments Limited

Corporate Information Klemanor Investments Limited was incorporated on March 24, 2010 under the Companies Law, CAP 113, Law of Cyprus in Nicosia, Cyprus. Klemanor Investments Limited is involved in the business of construction, development in the real estate sector and to act as group financing company for providing finance and financial assistance to group companies and ventures. Interest of the Promoter HCC Mauritius Enterprises Ltd., a wholly owned subsidiary of HCC holds 5,000 equity shares of 1 Euro each, aggregating to 100% of the issued and paid up equity share capital of Klemanor Investments Limited. 12. Dhule Palesner Tollway Limited

Corporate Information: Dhule Palesner Tollway Limited was incorporated on March 25, 2009, under the Companies Act, in Mumbai. Dhule Palesner Tollway Limited undertakes to design, engineer, finance, develop, establish, construct, erect, execute, carry out, commission, operate, maintain, improve, repair, administer, manage, four Laning of MP/Maharashtra Border-

213

Dhule Section of NH-3 from km 168.50 to km 265 in Maharashtra under NHDP Phase III on design, build, finance, operate and transfer basis and to construct toll plazas and all other works of conveniences of public or private utility for the purpose of smooth traffic on the road(s). Interest of the Promoter HCC holds 6,461,000 equity shares, aggregating to 26% of the issued and paid up equity capital and HCC Infrastructure Limited, a wholly owned subsidiary of HCC, holds 2,733,500 equity shares, aggregating to 11% of the issued and paid up equity share capital of Dhule Palesner Tollway Limited. Nature and Extent of Interest of Promoter and Group Companies (a) In the promotion of our Company Except to the extent of the shareholding of the Promoters and Hincon Finance Limited, a Group Company, and except for transactions disclosed as related party transactions, none of our Group Companies have any interest in the promotion of our Company. (b) In the properties acquired or proposed to be acquired by our Company in the past two years before filing the Draft Red Herring Prospectus with SEBI Neither our Promoters nor any of our Group Companies is interested in the properties purchased by our Company in the two years preceding the filing of the Draft Red Herring Prospectus or proposed to be purchased by our Company. (c) In transactions for acquisition of land, construction of building and supply of machinery Except as disclosed in the section Related Party Transactions on page 216 and below, neither our Promoters nor any of our Group Companies is interested in any transactions for the purchase of land, construction of building or supply of machinery. Common Pursuits amongst the Group Companies and Associate Companies with our Company Except for HREL, HRL (Thane) Real Estate Limited, HRL Township Developers Limited, Nashik Township Developers Limited, Maan Township Developers Limited, HCC Realty Limited and Powai Real Estate Developers Limited, which are engaged in the same line of business as our Company, there are no common pursuits amongst any of our Group Companies and our Company. Related Business Transactions within the Group Companies and Significance on the Financial Performance of our Company For details, please see Related Party Transactions on page 216. Sale/Purchase between Group Companies, Subsidiaries and Associate Companies For details, please see Related Party Transactions on page 216. Business Interest of Group Companies, Subsidiaries and Associate Companies in our Company We have entered into certain business contracts with our Promoters, Group Companies and our Subsidiaries. For details, please see Related Party Transactions on page 216. We may continue to enter into such business contracts with our Promoters, Group Companies, Subsidiaries and Associate Companies in the future. Further, we have in the past, provided loans to our Subsidiaries and Associates and may continue to do so in the future. Except as stated above, none of our Group Companies and Associate Companies has any business interest in our Company. Defunct Group Companies

214

None of our Group Companies remain defunct and no application has been made to the registrar of companies for striking off the name of any of our Group Companies during the five years preceding the date of filing the Draft Red Herring Prospectus with SEBI except for HCC Infotech Limited, which ceased to be a subsidiary of HCC with effect from March 23, 2007, when its name was struck off from the Register of Companies, Mumbai. None of our Group Companies fall under the definition of sick companies under SICA and none of them is under winding up. Public issue or rights issue None of our Group Companies has made any public or rights issue in the last three years preceding the date of filing the Draft Red Herring Prospectus.

215

RELATED PARTY TRANSACTIONS For details of the related party transactions, please see the sections entitled Financial Statements on page 218.

216

DIVIDEND POLICY The declaration and payment of dividends, if any, will be recommended by our Board of Directors and approved by our shareholders at their discretion, subject to the provision of the Articles of Association and the Companies Act. The dividends, if any, will depend on a number of factors, including but not limited to the earnings, capital requirements and overall financial position of our Company. Our Company has no formal dividend policy. Our Board may also from time to time pay interim dividends. Our Company has not paid any dividends on its Equity Shares during the last five Fiscals. Our Company has not paid any dividends on Preference Shares during Fiscal 2008, 2007 and 2006. The dividends declared by our Company on Preference Shares during the last two Fiscals have been presented below: Particulars Cumulative Redeemable Preference Shares Face value per Preference Share (`) Dividend Paid (In `) Rate of dividend Compulsory Convertible Preference Shares Face value per Preference Share (`) Dividend Paid (In `) Rate of dividend
*

Fiscal 2010 10 16,372,985 6% 10 2,500 0.001%

Fiscal 2009 10 95,323,179* 6% 10 1,863 0.001%

For the period commencing from the year ended March 31, 2003 to March 31, 2009.

The amounts paid as dividends in the past are not necessarily indicative of our Companys dividend policy or dividend amounts, if any, in the future.

217

FINANCIAL STATEMENTS To, The Board of Directors Lavasa Corporation Limited Hincon House, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai- 400083 Dear Sirs, 1. We have examined the restated financial information of Lavasa Corporation Limited (the Company) annexed to this report for the purposes of inclusion in the offer document prepared by the Company in connection with its proposed Initial Public Offer (IPO). Such financial information, which has been approved by the Board of Directors of the Company, has been prepared in accordance with the requirements of: a. b. paragraph B(1) of Part II of Schedule II to the Companies Act, 1956 ('the Act') and the Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2009, as amended (the Regulations) issued by the Securities and Exchange Board of India (SEBI) on August 26, 2009, as amended from time to time in pursuance of Section 30 of the Securities and Exchange Board of India Act, 1992.

2.

We have examined such restated financial information taking into consideration: a. the terms of reference received from the Company vide their letter dated July 30, 2010, requesting us to carry out work on such financial information, proposed to be included in the offer document of the Company in connection with its proposed IPO; and the Guidance Note (Revised) on Reports in Company Prospectuses issued by the Institute of Chartered Accountants of India.

b.

3.

The Company proposes to make an IPO for the fresh issue of equity shares of ` 10 each at such premium, arrived at by the 100% book building process (referred to as the Issue), as may be decided by the Board of Directors. The restated financial information of the Company has been compiled by the management from: a. the audited unconsolidated balance sheets of the Company as at June 30, 2010, March 31, 2010, March 31, 2009, March 31, 2008, March 31, 2007 and March 31, 2006 and the related audited unconsolidated profit and loss accounts and cash flow statements for the three months period ended June 30, 2010, year ended March 31, 2010 ,March 31, 2009, March 31, 2008, March 31, 2007 and March 31, 2006 which have been audited by us; and the audited consolidated balance sheets of the Company and its subsidiaries (collectively hereinafter referred to as the Group) as at June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008 and the related audited consolidated profit and loss accounts and cash flow statements for the three months period ended June 30, 2010, year ended March 31, 2010, March 31, 2009, and March 31, 2008 which have been audited by us.

4.

b.

The financial statements of certain Subsidiaries for the year ended March 31, 2009, whose financial statements reflect total assets of ` 18.53 millions, Companys share in Revenue of ` Nil, in Loss of ` 0.47 millions and Cash inflows of ` 4.51 millions are unaudited.

218

We did not audit the financial statements of certain associates for the year ended March 31, 2010, whose financial statements reflect the Groups share of loss of ` 2.52 millions for the year then ended. These financial statements and other financial information have been audited by other auditors whose reports have been furnished to us by the Management of the Group, and accordingly reliance has been placed on the financial statements of the associates audited by them for the said year. The financial statements of certain Subsidiaries for the year ended March 31, 2010, whose financial statements reflect total assets of ` 3.30 millions, total revenue of ` Nil, share in loss of ` 0.44 millions and Cash inflows of ` 3.59 millions for the period ended on that date, are unaudited and we have relied upon the unaudited financial statements as provided by the Companys Management for the purpose of our examination of the consolidated financial statements of the Group. We did not audit the financial statements of certain associates for the period from April 01, 2010 to June 30, 2010, whose financial statements reflect the Groups share of loss of ` 0.85 millions for the period then ended. These financial statements and other financial information have been audited by other auditors whose reports have been furnished to us by the Management of the Group, and accordingly reliance has been placed on the financial statements of the associates audited by them for the said period. 5. In accordance with the requirements of Schedule II of the Act, the Regulations and the terms of our engagement agreed with you, we report that: a. We have examined the restated unconsolidated summary statement of assets and liabilities of the Company as at June 30, 2010, March 31, 2010, March 31, 2009, March 31, 2008, March 31, 2007 and March 31, 2006 and the related restated unconsolidated summary statement of profits and losses and cash flows for the three months period ended June 30, 2010, year ended March 31, 2010, March 31, 2009, March 31, 2008, March 31, 2007 and March 31, 2006 and as set out in Annexure I to III (collectively the Restated Unconsolidated Summary Statements); and We have also examined the restated consolidated summary statement of assets and liabilities of the Group as at June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008 and the related restated consolidated summary statement of profits and losses and cash flows for the three months period ended June 30, 2010, year ended March 31, 2010, March 31, 2009 and March 31, 2008 and as set out in Annexure XVIII to XX (collectively the Restated Consolidated Summary Statements).

b.

The Restated Unconsolidated Summary Statements and the Restated Consolidated Summary Statements are hereinafter collectively referred to as Restated Summary Statements. 6. Based on our examination, we further report that: a. the restated financial information have been arrived at after making such adjustments as, in our opinion, are appropriate and more fully described in the notes appearing in Annexure IV to this report; there are no extraordinary items which need to be disclosed separately in the attached Restated Summary Statements; and there are no qualifications in the auditors reports, which require any adjustments to the Restated Summary Statements.

b.

c.

7.

We have not audited any financial statements of the Company or consolidated financial statements of the Group as of any date or for any period subsequent to June 30, 2010. Accordingly, we express no opinion on the financial position, results of operations or cash flows of the Company or the Group as of any date or for any period subsequent to June 30, 2010.

219

8.

We have also examined the restated unconsolidated financial information of the Company listed below, as at June 30, 2010, March 31, 2010, March 31, 2009, March 31, 2008, March 31, 2007 and March 31, 2006 which, as approved by the Board of Directors of the Company and annexed to this report, is proposed to be included in the offer document:a. b. c. d. e. f. g. h. i. j. k. l. m. Details of Fixed Assets, as appearing in Annexure V Details of Loans and Advances, as appearing in Annexure VI Details of Sundry Debtors, as appearing in Annexure VII Details of Investments, as appearing in Annexure VIII Details of Accounting Ratios, as appearing in Annexure IX Details of Unsecured Loans, as appearing in Annexure X (a) and (b) Details of Secured Loans, as appearing in Annexure XI (a) and (b) Details of Other Income, as appearing in Annexure XII Details of Land and Construction Cost, as appearing in Annexure XIII Details of Employees Remuneration and Benefits, as appearing in Annexure XIV Capitalization Statement , as appearing in Annexure XV Statement of Tax Shelters, as appearing in Annexure XVI Details of Rates of Dividend, as appearing in Annexure XVII

9.

We have also examined the restated consolidated financial information of the Group listed below, as at and June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008, which as approved by the Board of Directors of the Company and annexed to this report, is proposed to be included in the offer document:a. b. c. d. e. f. g. h. i. j. k. Details of Fixed Assets, as appearing in Annexure XXII Details of Loans and advances, as appearing in Annexure XXIII Details of Sundry Debtors, as appearing in Annexure XXIV Details of Investments, as appearing in Annexure XXV Details of Accounting ratios, as appearing in Annexure XXVI Details of Unsecured Loans, as appearing in Annexure XXVII (a) and (b) Details of Secured Loans, as appearing in Annexure XXVIII (a) and (b) Details of Other Income, as appearing in Annexure XXIX Details of Land and Construction Cost, as appearing in Annexure XXX Details of Employees remuneration and Benefits, as appearing in Annexure XXXI Capitalization Statement , as appearing in Annexure XXXII

10.

We report that the consolidated financial information of the Group as at June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008 have been prepared by the Group in accordance with the requirements of AS 21 Consolidated Financial Statements and AS 23 Accounting for investment in Associates in the Consolidated Financial Statements [notified Pursuant to the Companies (Accounting Standard) Rules, 2006 (as amended). This report should not in any way be construed as a reissuance or redating of any of the previous audit reports issued by us nor should this be construed as a new opinion on any of the financial statements referred to herein. In our opinion, the financial information of the Group as attached to this report, read with the significant accounting policies and notes on accounts and other notes contained in the aforesaid Annexures, has been prepared in accordance with Part II of Schedule II of the Act and the Guidelines issued by SEBI. We did not perform audit tests for the purpose of expressing an opinion on individual balances of account or summaries of selected transactions, and accordingly, we express no such opinion thereon. We have no responsibility to update our report for events and circumstances occurring after the date of the report.

11.

12.

13.

220

14.

This report is intended solely for your information and for inclusion in offer document prepared in connection with the proposed IPO of the Company, and is not to be used, referred to or distributed for any other purpose without our prior written consent.

For K. S. Aiyar & Co, Chartered Accountants Registration No. 100186W

Place: Mumbai Date: July 30, 2010

Raghuvir M. Aiyar Partner Membership No: 38128

221

LAVASA CORPORATION LIMITED ANNEXURE -I RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF ASSETS AND LIABILITIES (Rupees in Millions) Particulars As at June 30, 2010 As at March 31, 2010 As at March 31, 2009 As at March 31, 2008 As at March 31, 2007 As at March 31, 2006

SOURCES OF FUNDS Share Capital Share Warrant Reserves & Surplus Total Shareholders' Funds Loan Funds (a) Secured Loans (b) Unsecured Loans Total Loans Deferred Tax Liability (Net) TOTAL APPLICATION OF FUNDS Fixed Assets (a) Gross Block (b) Less : Depreciation (c) Net Block (d) Capital Work In Progress Investments Current Assets, Loans & Advances A) Current Assets (a) Inventories (b) Sundry Debtors (c) Cash and Bank Balances (d) Other Current Assets B) Loans and Advances Total Current Assets, Loans and Advances Less: Current Liabilities & Provisions (a) Current Liabilities (b) Provisions Net Current Assets Miscellaneoues Expenditure (To the extent not written off) Profit and Loss Account TOTAL Note :

4,774.51 81.25 1,071.92 5,927.68 17,154.04 1,000.00 18,154.04 1,055.10 25,136.82

994.94 81.25 4,357.35 5,433.54 15,759.50 2,000.00 17,759.50 808.43 24,001.47

994.95 81.25 2,974.58 4,050.78 9,797.82 9,797.82 115.73 13,964.33

625.90 1,624.18 2,250.08 4,970.00 4,970.00 7,220.08

512.26 1,237.81 1,750.07 3,213.28 20.08 3,233.36 4,983.43

330.00 591.07 921.07 2,012.56 207.22 2,219.78 3,140.85

4,317.10 354.80 3,962.30 8,765.75 12,728.05 2,344.56

3,533.90 302.77 3,231.13 8,573.30 11,804.43 3,795.94

2,752.38 128.98 2,623.40 5,942.33 8,565.73 842.33

318.30 80.15 238.15 24.27 262.42 7.99

208.61 53.02 155.59 4.35 159.94 51.39

161.06 29.76 131.30 5.73 137.03 8.47

6,567.45 3,992.74 853.60 117.08 11,530.87 3,281.20 14,812.07

6,286.49 3,153.93 609.29 72.93 10,122.64 3,098.04 13,220.68

4,302.23 1,007.87 236.38 46.63 5,593.11 1,099.80 6,692.91

7,251.49 236.11 7,487.60 411.65 7,899.25

4,671.45 255.56 4,927.01 192.67 5,119.68

3,075.18 103.45 3,178.63 77.09 3,255.72

4,713.89 33.97 4,747.86 10,064.21 25,136.82

4,768.77 50.81 4,819.58 8,401.10 24,001.47

2,004.64 132.00 2,136.64 4,556.27 13,964.33

1,094.81 6.78 1,101.59 6,797.66 152.01 7,220.08

435.51 2.81 438.32 4,681.36 90.74 4,983.43

325.95 2.31 328.26 2,927.46 0.51 67.38 3,140.85

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV

222

LAVASA CORPORATION LIMITED ANNEXURE -II RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF PROFITS AND LOSSES

(Rupees in Millions)
Particulars

For the Period For the Year For the Year For the Year For the Year For the Year ended June 30, ended March 31, ended March 31, ended March 31, ended March 31, ended March 31, 2010 2010 2009 2008 2007 2006

INCOME Income From Operations Other Income TOTAL EXPENDITURE Land and Construction Expenses Employee's Remuneration and Benefits Office and Site Establishment Expenses Finance Charges (net) Depreciation Less : Transferred to Fixed Asset / Capital Work in Progress

1,799.11 10.21 1,809.32

4,786.30 29.25 4,815.55

2,120.42 0.48 2,120.90

0.07 0.07

0.38 0.38

0.09 0.09

934.28 188.96 320.42 587.55 8.32 2,039.53 971.03 1,068.50 740.82

3,189.47 486.60 548.89 1,814.94 36.27 6,076.17 3,355.22 2,720.95 2,094.60

6,047.11 487.81 413.67 2,132.25 6.84 9,087.68 8,317.70 769.98 1,350.92

13.83 40.54 3.37 57.74 57.74 (57.67)

7.22 12.72 1.97 21.91 21.91 (21.53)

7.65 20.61 1.51 29.77 29.77 (29.68)

Profit/(Loss) before Tax Less: Provision for taxation: Income Tax Deferred Tax Wealth Tax Fringe Benefit Tax MAT Credit Entitlement Profit/(Loss) after Tax Add: Balance brought forward from last year Amount available for appropriation Less : Appropriations a) Proposed Preference Share Dividend b) Tax on Proposed Dividend c) Capital Redemption Reserve Balance carried to Balance Sheet Note :

147.64 246.67 0.01 (147.64) 494.14 2,136.08 2,630.22 2,630.22

355.97 692.69 0.06 (355.97) 1,401.85 753.32 2,155.17 16.37 2.72 19.09 2,136.08

152.33 115.74 0.03 2.19 (152.33) 1,232.95 (152.01) 1,080.94 95.33 16.20 216.11 327.64 753.30

0.06 3.54

0.05 1.78

0.04 1.09

(61.27) (90.74) (152.01) (152.01)

(23.36) (67.38) (90.74) (90.74)

(30.81) (36.57) (67.38) (67.38)

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV

223

LAVASA CORPORATION LIMITED ANNEXURE -III RESTATED UNCONSOLIDATED SUMMARY STATEMENT OF CASH FLOWS

Particulars

For the Period ended June 30, 2010

For the Year ended March 31, 2010

For the Year ended March 31, 2009

For the Year ended March 31, 2008

(Rupees in Millions) For the Year For the Year ended March ended March 31, 2007 31, 2006

Cash Flow From Operating Activities Net Profit Before Taxation Adjustments For : Depreciation (Profit)/Loss On Sale/Disposal Of Fixed Assets (Profit) / Loss on Investments Sale of Inventory (land) for consideration other than cash Preliminary/Miscellaneous Expenditure Written off Interest/Dividend Income Interest Expenses Operating Profit Before Working Capital Changes Decrease / (Increase) In Sundry Debtors Decrease / (Increase) In Other Current Assets Decrease /( Increase ) In Land Inventory Decrease /( Increase ) In Construction and Development Expenses Decrease /( Increase) In Loans & Advances (Decrease) / Increase In Current Liabilities and Provisions Cash Generated from Operations Income Tax Paid Net Cash Generated from Operations Cash Flows From Investing Activities Interest/Dividend Received Sale/(Purchase) Of Investments Decrease/(Increase) in Capital Work in Progress Sale Of Fixed Assets Purchase Of Fixed Assets Net Cash flows from Investing Activities ( B ) Cash Flow From Financing Activities : Issue Of Shares On Premium Issue of Share Warrants Proceeds from Long Term and Other Borrowings Dividend Paid Interest & Finance Expenses Net Cash Generated From Financing Activities (C ) Net Increase In Cash And Cash Equivalents (A+B+C) Cash And Cash Equivalents Cash And Cash Equivalents At Beginning Of Period Cash And Cash Equivalents At End Of Period

740.82 8.32 (53.48) 641.03 1,336.69 (823.60) (44.15) (254.64) 17.39 (118.91) (52.63) 60.15 (79.45) (19.30)

2,094.60 36.27 (0.31) (588.30) (123.70) 1,938.64 3,357.20 (2,171.61) (26.29) (471.55) (1,512.70) (1,553.01) 2,775.36 397.40 (419.72) (22.32)

1,350.92 6.84 (0.15) (66.71) (169.78) 2,368.74 3,489.86 (1,007.87) (46.62) (807.15) (4,517.56) (779.80) 1,090.18 (2,578.96) (77.22) (2,656.18)

(57.67) 3.37 (54.30) (480.21) (1,551.53) (218.40) 662.69 (1,641.75) (3.61) (1,645.36)

(21.53) 1.98 0.52 (19.03) (91.89) (1,170.35) (113.14) 110.13 (1,284.28) (3.53) (1,287.81)

(29.69) 1.51 0.08 0.94 (27.16) (35.40) (1,099.68) 21.06 117.59 (1,023.59) (1.86) (1,025.45)

53.48 1,451.38 (192.46) (783.20) 529.20

123.70 (2,365.32) (2,491.80) 0.84 (783.70) (5,516.28)

169.78 (767.62) 1.10 (37.16) (633.90)

30.76 43.40 (129.59) (55.43)

15.37 (42.92) 0.04 (46.23) (73.74)

7.14 42.00 0.04 (92.06) (42.88)

394.54 (19.10) (641.03) (265.59) 244.31 609.29 853.60 103.45 0.00

7,961.68 (111.53) (1,938.64) 5,911.51 372.91 236.38 609.29 255.56 -

750.02 81.25 4,827.82 (2,368.74) 3,290.35 0.27 236.11 236.38 236.11 -

500.00 1,736.63 (555.29) 1,681.34 (19.45) 255.56 236.11 236.38 -

829.00 1,012.21 (327.55) 1,513.66 152.11 103.45 255.56 609.29 -

1,031.32 (156.09) 875.23 (193.10) 296.55 103.45 853.60

Note :

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure IV The Cash Flow Statement has been prepared under the indirect method as set out in Accounting Standard - 3 on Cash Flow Statements of the Companies ( Accounting Standard ) Rules, 2006
Negative figures represents Cash Outflows. Proceeds from Long Term and Other Borrowings are shown net of repayments.

224

LAVASA CORPORATION LIMITED ANNEXURE IV

Notes to the Restated Unconsolidated Summary of Assets and Liabilities, Profit and Losses and Cash Flows, as restated.

STATEMENT OF SIGNIFICANT OF ACCOUNTING POLICIES ADOPTED BY THE COMPANY IN THE PREPERATION OF FINANCIAL STATEMENTS
Basis Of Accounting and the use of Estimates: The Company maintains its accounts on accrual basis following historical cost convention, in compliance with the Accounting Standards issued by the Institute of Chartered Accountants of India, relevant provisions of the Companies Act, 1956 and the Rules. Management makes estimates and technical and other assumptions regarding the amounts of income and expenses, assets and liabilities, and disclosure of contingencies, in accordance with Generally Accepted Accounting Principles in India in the preparation of the financial statements. Difference between the actual results and estimates are recognized in the period in which determined.

a)

b)

Fixed Assets and Intangible Assets Fixed Assets are stated at cost of acquisition or construction including attributable overheads, interest and financial costs till such assets are ready for its intended use, less accumulated depreciation, & impairment losses if any.

Costs relating to trademark and design have been treated as intangible assets which also comprise license fees, other implementation costs for software and application software acquired for in-house use. Cost of purchase of land to the extent of one percent is accounted as fixed assets and remaining is accounted as stock in trade.

c)

Depreciation and Amortization Depreciation on fixed assets is provided: i) In respect of office buildings, furniture & fixtures, office equipments, vehicles, speed boats & infrastructure assets on written down value method at the rates specified in Schedule XIV of the Companies Act, 1956 on pro-rata basis.

ii) In respect of intangible assets being computer software relating to Geographical Information System and Enterprise Resource System is amortized over the estimated useful life of ten years under straight line method on pro-rata basis. iii)In respect of trademark and design costs are amortized equally over a period of ten years.
d) Investments Investments are classified as long term and current investments. Long term investments are shown at cost or written down value (in case of diminution which is other than temporary diminution) and current investments are shown at cost or market value whichever is lower.

e)

Inventories of Land and Floor Space Index (FSI) i) Cost of land accounted in Stock in trade is treated as (a) Cost of FSI - 95%, (b) Land, stock-in-trade 5%, both being distinct items of inventory. Cost of Land and FSI are on a weighted average basis along with related purchase / acquisition price plus all direct and indirect expenditure incurred in connection with the purchase of land. Land and FSI are valued at lower of Cost or Net Realizable Value. Land or FSI utilized for own construction is transferred to Fixed Assets at cost.

ii) Project Work-in-Progress is valued at the contract rates in accordance with Long-term Construction Accounting Standards. iii) Where construction of any unit is undertaken for which there are no sales, such inventory is valued at lower of cost or net realizable value and is not considered under Long-term Construction for accounting purposes.

225

f)

Foreign Currency Transactions Foreign currency transactions during the year are accounted at the prevailing rate on the date of transaction. Current assets and current liabilities are translated at the exchange rate prevailing on the last day of the year. Gains or losses arising out of remittance/ translations at the year end are credited/ debited to the profit and loss account for the year.

g)

Revenue Recognition i) Sale of Land and FSI Revenues are recognized in the year in which the agreement to lease is executed. Income from land sales (including on a long term lease basis) is recognized on the transfer of all significant risks and rewards of ownership to the buyers and a reasonable expectation of collection of the sale consideration from the buyers exists. Exchange of parcels of land against other parcels of land is not treated as sale but is adjusted in the land account.

ii) Project Construction Work The Company follows the percentage completion method, on the basis of physical measurement of work actually completed at the balance sheet date, taking into account the contractual price and revision thereto by estimating total revenue and total cost to the completion of the contract and the profit so determined accounted for proportionate to the percentage of the actual work done. Foreseeable losses are accounted for as and when they are determined. Revenue from sales of constructed units other than under long term construction contracts are recognized on execution of transfer agreements.

iii) Project Management Consultancy Fees Revenue from Project Management Consultancy Fees is recognized on accrual basis as per the agreements iv) During the year ended 31st March 2006, 2007,2008 the Company had not started sales except for collecting certain booking advances. Appropriate accounting policies were framed upon commencement of sleeing operations in the year ended 31st March 2009.

h)

Borrowing Costs Borrowing costs (less any income on the temporary investments of those borrowings) that are directly attributable to qualifying assets / project workin-progress are charged over such qualifying assets/ project work in progress.

i)

Employee Benefits i) Defined Contribution Plans Contribution to provident fund and superannuation fund is accounted on accrual basis ii) Defined Benefit Plan Gratuity is charged to revenue on the basis of actuarial valuation. iii) Other benefits Short term and long term compensated absences are provided for based on actuarial valuation. The actuarial valuation is done as per projected unit credit method. Taxes on Income The tax expense comprises of current, deferred and fringe benefits tax. Current income tax benefit tax are measured in accordance with the Indian Income Tax Act. The deferred tax is measured based on the tax rates and the tax laws enacted or substantially enacted as on the Balance Sheet date. Deferred Tax Assets are not recognized unless there is virtual certainty that sufficient future taxable income will be available against which such deferred tax assets can be realized.

j)

k)

Impairment The Company makes assessment of any indicator that may lead to impairment of the Assets on an annual basis. An asset is treated as impaired when the carrying cost of the asset exceeds its recoverable value, which is higher of net selling price and the value in use. Impairment loss, if any, is charged to profit and loss account in the year in which it is identified as impaired.

226

l)

Contingencies / Provisions Provisions involving substantial degree of estimation in measurement are recognized when there is a present obligation as a result of past events and it is probable that there will be outflow of resources. Contingent Liabilities are not recognized but are disclosed in the Notes. Contingent assets are neither recognized nor disclosed in the financial statement.

m)

Leases Lease rentals in respect of assets acquired under operating lease are charged to Profit & Loss Account. Earnings Per Share Basic earnings per share are calculated by dividing the net profit or loss for the period attributable to equity shareholders (after deducting preference dividends and attributable taxes) by the weighted average number of equity shares outstanding during the period. The weighted average number of equity shares outstanding during the period are adjusted for bonus shares issued during the period. For the purpose of calculating diluted earnings per share, the net profit or loss for the period attributable to equity shareholders and the weighted average number of shares outstanding during the period are adjusted for the effects of all dilutive potential equity shares.

n)

o)

Segmental Reporting: The Company is primarily engaged in the business of Comprehensive Urban Development and Management which as per Accounting Standards 17 on Segment reporting issued by the ICAI is considered to be the only reportable business Segment. The Company is primarily operating in India which is considered to be as a single geographical segment.

p)

Miscellaneous Expenditure Miscellaneous expenditure includes preoperative/ preliminary expenses and merger expenses to be amortized over a period of five years.

227

B. MATERIAL ADJUSTMENTS

Summary of results of adjusstments made to the audited financial statements of the Company for the respective period/years and their impact on the Profit / (Losses) of the Company are as given below: Rupees in Millions Adjustments made in Restated Profit & Loss As At June 30, As At March 31, As At March 31, As At March 31, As At March 31, As At March 31, Account 2010 2010 2009 2008 2007 2006
Adjustments (Income / Expenses) in statement of Profit & Loss arising out of : Prior period Item (Expenses)/Income (Refer note below) Total Adjustments

19.89
19.89

Prior Period Items

During the year 2005-06, overhead costs incurred since inception relating to site management and administration have been regrouped so as to be included in the Project Work in Progress in terms of the requirements of Accounting Standard 2 - Valuation of Inventories. Costs relating to entity maintainance/administration and marketing continue to be charged off to the Profit and Loss Account as per earlier practice. This change in policy has resulted in a write back of expenses to the extent of ` 13.72 millions.

Duriing the year 2005-06, 6.75 millions being costs incurred in prior periods, for designing and registering the corporate trademarks have been capitalised as an intangible asset by making a prior period adjustment, which has resulted in a write back of expenses to the extent of ` 6.18 millions. This treatment is in confirmity withthe requirements of Accounting Standards 26 - Intangible Assets.

228

Other Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows, as restated.

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

(Rupees in Millions) As at March As at March 31, 2007 31, 2006

Cost of Land includes Land in respect of which Sale deed yet to be executed in the name of Company
Land in respect of which irrevocable Power of Attroney obtained in the name of Company

127.30

129.37

129.37

133.43

135.04

138.76

1.11

1.11

1.11

2.51

4.13

19.45

Land not covered by the Master Plan in respect of which sale deed is yet to be executed in the name of the Company 2

8.17

8.17

8.27

8.27

18.50

18.50

Depreciation included in construction / development expenses on the assets used for project
Foreign Currency exposure not hedged US Dollar $ GBP

43.71

139.17

23.90

24.34

21.29

15.87

0.41 0.01 $

9.32 0.21 $ 2.46 0.04

1.92 0.04 $ 2.09 0.03

0.82 0.02 2.09 0.03

Technical surveys/estimates are involved in respect of physical verification procedures / determination of Project work-in-progress / related costs. These estimates made by the Company and certified to the auditors, have been relied upon by them, as these are of a technical nature.

STATEMENT OF CONTINGENT LIABILITY NOT PROVIDED FOR IN RESPECT OF:

Particulars

As at June 30, 2010


26.51 1760.00 9.70

As at March 31, 2010


50.27 1760.00 9.70

As at March 31, 2009


20.23 -

As at March 31, 2008


8.55 -

(Rupees in Millions) As at March As at March 31, 2007 31, 2006


1.38 0.78 -

Guarantee given by banks on behalf of the Company Corporate Guarantee Outstanding Claims not acknowledged as debt 6 Employee Benefits Defined Benefit Plans / Long Term Compensated Absences As per Actuarial Valuation Particulars 30th June 2010

Gratuity Unfunded 31st March 2010 31st March 2009 31st March 2008 30th June 2010

(Rupees in Millions) Leave Encashment Unfunded


31st March 2010 31st March 2009 31st March 2008

Expenses recognized in the Statement of Profit & Loss Current Service Cost 1.31 Interest Cost 0.26 Expected return on plan assets Net Actuarial (Gains) / Losses (0.54) Past Service Cost Settlement Cost Total Expense 1.03 Net Asset / (Liability) recognized in the Balance Sheet Present value of Defined Benefit Obligation (14.01) Fair value of plan assets Net Asset / (Liability) (14.01) Change in Obligation during the period Present value of Defined Benefit Obligation at beginning of 13.06 the year. Current Service Cost 1.31 Interest Cost 0.26 Actuarial ( Gains ) / Losses (0.54) Benefits Payments (0.08) Present value of Defined Benefit Obligation at the end of the 14.01 Year Actuarial Assumptions: Discounted Rate 8 % p.a.
Mortality Table Particulars Contribution/ Provision to and for Provident and other Funds

5.20 0.57 1.16

3.95 0.21 0.79

1.44 0.10 (0.07)

1.30 0.34 (0.42)

5.35 0.88 (0.46)

4.52 0.30 4.16

3.35 0.11 5.01

6.93 (13.06) (13.06)


7.59

4.94 (7.59) (7.59)


2.75

1.47 (2.75) (2.75)


1.32

1.22 (18.00) (18.00)


16.97

5.77 (16.97) (16.97)


11.79

8.98 (11.79) (11.79)


4.03

8.47 (4.03) (4.03)


1.49

5.20 0.57 1.16 (1.46)


13.06

3.95 0.21 0.79 (0.10)


7.59

1.44 0.10 (0.07) (0.04)


2.75

1.30 0.34 (0.42) (0.19)


18.00

5.35 0.88 (0.46) (0.59)


16.97

4.52 0.30 4.16 (1.22)


11.79

3.35 0.11 5.01 (5.93)


4.03

8 % p.a.

7.50%

7.50%

8 % p.a.

8 % p.a.

7.50%

7.50%

LIC (1994-96) (ultimate)

30th June 2010 4.43

31st March 2010 25.97

31st March 2009 16.15

31st March 2008 8.00

The estimates of future salary increases, considered in actuarial valuation, take account of inflation, seniority, promotion and other relevant factors, such as supply and demand in the employment market.

229

Compulsory Convertible Preference Shares Particulars As at June 30, 2010 As at March 31, 2010 As at March 31, 2009 As at March 31, 2008 (Rupees in Millions) As at March As at March 31, 2007 31, 2006

Axis Bank Limited Subscribed Amount Coupon Rate p.a. on Face Value Maximum Tenure Conversion Valuation Put/Call Option by HCC/Investor*

250 0.0010% 5 Years 100000 Yes

250 0.0010% 5 Years 100000 Yes

250 0.0010% 5 Years 100000 Yes

Put/Call Option period

At the end of 36th, At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month 48th & 60th month

* HCC - Hindustand Construction Company Limited 8 Bennett Coleman & Co. Limited (BCCL) has subscribed to one warrant on preferential basis. It has paid the warrant subscription price of ` 81.25 Millions being 10% of the warrant value of ` 812.50 Millions. This entitles BCCL to subscribe to 0.8125%of the fully diluted equity share capital of the Company as on the date of exercise of the warrant which can be exercised at any time within a period of 5 (five) years (warrant exercise period) from the closing date. BCCL can exercise the warrant in part or whole for a maximum 5 times during the above warrant exercise period or at the time of Initial Public Offer (IPO). Any non conversion during the above period or part conversion would lead to forfeiture of the warrant subscription price to the extent on unconverted portion.

The Company operates in a single segment namely "Comprehensive Urban Development and Management". Therefore, the Companys business does not fall under different business segments as defined by Accounting Standard 17 Segment Reporting issued by the Institute of Chartered Accountants of India.

10

RELATED PARTY DISCLOSURES (In compliance with Accounting Standard 18 Related Party Disclosures) A. List of related parties: (As identified by the management) i) Parent/Holding Companies and their subsidiaries As at June 30, 2010 As at March 31, 2010 As at March 31, 2009 As at March 31, 2008 As at March 31, 2007 As at March 31, 2006

Hincon Technoconsult Limited (Subsidiary of HCC)

Hincon Hincon Hincon Hincon Hincon Technoconsult Technoconsult Technoconsult Technoconsult Technoconsult Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HCC) of HCC) of HCC) of HCC)

Pune paud Toll Road Company Limited (Subsidiary of HCC)

Pune paud Toll Pune paud Toll Pune paud Toll Pune paud Toll Pune paud Toll Road Company Road Company Road Company Road Company Road Company Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HCC) of HCC) of HCC) of HCC)

HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited)

HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited)

HCC Real Estate HCC Real Estate HCC Real Estate Limited (HREL) Limited (HREL) Limited (Formerly Hincon Realty (Formerly known as (Formerly known as known as Hincon Hincon Realty Hincon Realty Limited (Subsidiary Realty Limited) Limited) Limited) of HCC & Holding (Subsidiary of HCC company of Lavasa (Subsidiary of HCC (Subsidiary of HCC & Holding company Corporation & Holding company & Holding company of Lavasa of Lavasa of Lavasa Limited) Corporation Corporation Corporation Limited) Limited) Limited)

Nirmal BOT Limited (Subsidiary of HCC)

Nirmal BOT Nirmal BOT Nirmal BOT Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HCC) of HCC)

HRL (Thane) Real Estate Limited (Subsidiary of HREL)

HRL (Thane) Real HRL (Thane) Real HRL (Thane) Real Estate Limited Estate Limited Estate Limited (Subsidiary of (Subsidiary of (Subsidiary of HREL) HREL) HREL)

HRL Township Developers Limited (Subsidiary of HREL)

HRL Township HRL Township HRL Township Developers Limited Developers Limited Developers Limited (Subsidiary of (Subsidiary of (Subsidiary of HREL) HREL) HREL)

Panchkutir Developers Limited (Subsidiary of HCC)

Panchkutir Panchkutir Panchkutir Developers Limited Developers Limited Developers Limited (Subsidiary of (Subsidiary of (Subsidiary of HCC) HCC) HCC)

230

HCC Singapore Enterprises PTE Limited (Subsidiary of HCC)

Hinjewadi Hinjewadi HCC Singapore Township Township Enterprises PTE Developers Limited Developers Limited Limited (Subsidiary (Subsidiary of (Subsidiary of of HCC) HREL) HREL)

HCC Mauritius Enterprises PTE Limited (Subsidiary of HCC)

HCC Singapore HCC Singapore HCC Mauritius Enterprises PTE Enterprises PTE Enterprises PTE Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HCC) of HCC)

Charosa Wineries Limited (Subsidiary of HREL)

HCC Mauritius HCC Mauritius Charosa Wineries Enterprises PTE Enterprises PTE Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HREL) of HCC) of HCC)

HCC Infrastructure Limited (Subsidiary of HCC)

HCC Infrastructure Charosa Wineries Charosa Wineries Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HREL) of HREL)

Nashik Township Developers Limited (Subsidiary of HREL)

Nashik Township HCC Infrastructure HCC Infrastructure Developers Limited Limited (Subsidiary Limited (Subsidiary (Subsidiary of of HCC) of HCC) HREL)

Western Securities Limited (Subsidiary of HCC)

Nashik Township Nashik Township Western Securities Developers Limited Developers Limited Limited (Subsidiary (Subsidiary of (Subsidiary of of HCC) HREL) HREL)

HCC Aviation Limited (Subsidiary of HCC)

Western Securities Western Securities HCC Aviation Limited (Subsidiary Limited (Subsidiary Limited (Subsidiary of HCC) of HCC) of HCC)

Badlapur Faridabad Tollways Limited (Subsidiary of HCC)

Badlapur Faridabad HCC Aviation Tollways Limited Limited (Subsidiary (Subsidiary of of HCC) HCC)

Mann Township Developers Limited (Subsidiary of HREL)

Mann Township Badlapur Faridabad Developers Limited Tollways Limited (Subsidiary of (Subsidiary of HCC) HREL)

HCC Realty Limited (Subsidiary of HREL)

Mann Township HCC Realty Limited Developers Limited (Subsidiary of (Subsidiary of HREL) HREL)

HCC Construction Limited (Subsidiary of HCC)

HCC Construction Limited (Subsidiary of HCC)

Highbar Technologies Limited (Subsidiary of HCC)

Highbar Technologies Limited (Subsidiary of HCC)

Baharampore-Faraka Highways Limited (Subsidiary of HCC)

BaharamporeFaraka Highways Limited (Subsidiary of HCC)

Faraka-Raiganj Highways Limited (Subsidiary of HCC)

Faraka-Raiganj Highways Limited (Subsidiary of HCC)

231

Raiganj-Dalkhola Highways Limited (Subsidiary of HCC)

Raiganj-Dalkhola Highways Limited (Subsidiary of HCC)

Powai Real Estate Developers Limited (Subsidiary of HREL)

Powai Real Estate Developers Limited (Subsidiary of HREL)

Karl Steiner AG, Switzerland Steiner Promotions et Paricipations SA Eurohotel SA VM+ST AG Steiner (Deutschland) GmbH Steiner Lman SAS SNC Valleiry Route de Bloux Klemanor Investments Limited Vikhroli Corporate Park Private Limited ( From 28th June 2010 )

ii) Subsidiary Companies: Direct Subsidiaries As at June 30, 2010


Lavasa Hotel Limited

As at March 31, 2010


Lavasa Hotel Limited

As at March 31, 2009


Lavasa Hotel Limited

As at March 31, 2008


Lavasa Hotel Limited

As at March 31, 2007


-

As at March 31, 2006


-

Warasgaon lake View Hotels Limited (formerly known as Lavasa Star Hotel Limited)

Warasgaon lake View Hotels Limited (formerly known as Lavasa Star Hotel Limited)

Lavasa Star Hotel Limited

Lavasa Star Hotel Limited (From 01/09/2007)

Apollo Lavasa Health Corporation Limited

Apollo Lavasa Apollo Lavasa Apollo Lavasa Health Corporation Health Corporation Health Corporation Limited (From Limited Limited 31/12/2007) Bona Sera Hotels Limited (Upto 16/04/2009) Bona Sera Hotels Limited (From 31/07/2008) Lakeshore Watersports Company Limited (From 01/08/2008) Ecomotel Hotel Limited (From 18/08/2008)

Kart Racers Limited

Lakeshore Watersports Company Limited

Lakeshore Watersports Company Limited

Ecomotel Hotel Limited

Ecomotel Hotel Limited

232

Dasve Convention Center Limited

Dasve Convention Center Limited

Dasve Convention Center Limited (From 19/08/2008)

Dasve Business Hotel Limited

Dasve Business Hotel Limited

Dasve Business Hotel Limited (From 19/08/2008)

Dasve Hospitality Institutes Limited

Dasve Hospitality Institutes Limited

Dasve Hospitality Institutes Limited (From 19/08/2008)

Lakeview Clubs Limited

Lakeview Clubs Limited

Lakeview Clubs Limited (From 19/09/2008) Dasve Retail Limited (From 08/10/2008)

Dasve Retail Limited

Dasve Retail Limited

Full Spectrum Adventure Limited

Full Spectrum Full Spectrum Adventure Limited Adventure Limited (From 01/12/2008)

Spotless Laundry Services Limited

Spotless Laundry Services Limited

Spotless Laundry Services Limited (From 20/01/2009) SOL Hospitaality Limited (From 05/02/2009)

Nature Lovers Retail Limited

SOL Hospitaality Limited (Upto 20/07/2009)

Knowledge Vistas GDST - Oxford Knowledge Vistas Limited (Formerly known as GDST Limited (Formerly International School Oxford International School Limited) (UPTO 21ST April known as GDST Limited (From Oxford International 2010) 244/02/2009) School Limited) Lavasa Bamboocrafts Limited (From 24/02/2009)

Lavasa Bamboocrafts Limited

Lavasa Bamboocrafts Limited

Warasgaon Infrastructure Providers Limited

Space Theme Park Space Theme Park India Limited (Upto India Limited (From 08/04/2009) 20/03/2009)

Green Hills Residences Limited

Green Hills Residences Limited (From 06/05/2009)

My City Technology Limited

My City Technology Limited (From 04/08/2009)

Reasonable Housing Limited

Reasonable Housing Limited (From 23/09/2009)

233

Future City Multiservices SEZ Limited (formerly known as Minfur Interior Technologies Limited

Minfur Interior Technologies Limited (From 30/11/2009) Verzon Hospitality Limited (From 08/01/2010) Rhapsody Hospitality Limited (From 14/01/2010) Valley View Entertainment Limited (From 20/01/2010) Andromeda Hotels Limited (From 22/01/20110)

Verzon Hospitality Limited

Rhapsody Hospitality Limited

Valley View Entertainment Limited

Andromeda Hotels Limited

Sirrah Palace Hotels Limited

Sirrah Palace Hotels Limited (From 25/01/2010)


Whistling Thrush Facilities Services Limited (From 27/01/2010)

Whistling Thrush Facilities Services Limited

Warasgaon Tourism Limited

Warasgaon Tourism Limited (From 25/02/2010)


Our Home Service Apartments Limited (From 10/03/2010) Sahyadri City Management Limited (From 12/03/2010) Warasgaon Power Supply Limited (From 12/03/2010)

Our Home Service Apartments Limited

Sahyadri City Management Limited

Warasgaon Power Supply Limited

Hill City Service Apartments Limited

Hill City Service Apartments Limited (From 26/03/2010)

iii) Other Related Parties

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008


Hincon Finance Limited

As at March 31, 2007

As at March 31, 2006

Palmetto Hospitality Limited

Palmetto Hospitality Hincon Holdings Limited (From Limited 15.06.2009)

Vikhroli Corporate Park (Firm, upto 28th June 2010)

Vikhroli Corporate Park (Firm)

Hincon Finance Limited

234

Hincon Holdings Limited Hincon Finance Limited

Hincon Holdings Limited Hincon Finance Limited SOL Hospitality Limited (From 08/04/2009)

SOL Hospitality Limited

Nathapa Jhakri Joint Venture (NJJV) HCC Pati Joint Venture Kumagai Skanska HCC Itouch Group (Kshi Jv) HCC L & T Joint Venture Alpine Samsung HCC Joint Venture Alpine Hcc Joint Venture Dhule Palesner Tollway Ltd Evostate AG MCR Managing Corp. Real Estate Projektentwicklungsges. Parking Kunstmuseum AG ARGE Prime Tower

b) Key Management Personnel and their relatives: As at June 30, 2010


Rajgopal Nogja Nathan Andrews Ambuj Jain

As at March 31, 2010


Rajgopal Nogja Nathan Andrews Ambuj Jain

As at March 31, 2009


Rajgopal Nogja Nathan Andrews Ambuj Jain

As at March 31, 2008


Rajgopal Nogja Nathan Andrews Ambuj Jain

As at March 31, 2007


Nathan Andrews Ambuj Jain Anuradha Paraskar Sureshkumar Prabhakar Pendharkar

As at March 31, 2006


Sureshkumar Prabhakar Pendharkar

Vinayak Jadhav

Vinayak Jadhav

Vinayak Jadhav

Vinayak Jadhav

Anuradha Paraskar

Anuradha Paraskar Anuradha Paraskar Anuradha Paraskar Arun Bodupali Sureshkumar Prabhakar Pendharkar Scott Wrighton Arun Bodupali Venkatesan Arunachalam Sureshkumar Prabhakar Pendharkar Arun Bodupali Venkatesan Arunachalam Sureshkumar Prabhakar Pendharkar Arun Bodupali Venkatesan Arunachalam

Sureshkumar Prabhakar Pendharkar Scott Wrighton Arun Bodupali Venkatesan Arunachalam

235

B. Transactions during the year/period and Balances Outstanding as at the year/period end with related parties and associate companies are as follows:

Particulars

As at June 30, 2010


5.72 31.32 1.75 3.37 1.51

As at March 31, 2010


0.89 254.88 10.13

As at March 31, 2009


746.69 -

As at March 31, 2008

As at March 31, 2007


868.38 5.13

(Rupees in Millions) As at March 31, 2006

Project and other services received during the year HCC Real Estate Limited Hindustan Construction Company Limited Vikhroli Corporate Park Hincon Technoconsultant Limited Pune Paud Toll Road Company Limited Lavasa Bamboocraft Limited Lavasa Hotel Limited Others Inter Corporate Deposit taken during the year Hindustan Construction Company Limited HCC Real Estate Limited Inter Corporate Deposit Repaid during the year My City Technology Limited HCC Real Estate Limited Hindustan Construction Company Limited
Corporate Guarantees Received on behalf of the Company & Outstanding Hindustan Construction Company Limited

804.97 1.53

1,062.07 25.02 2.28

18.80 1.08

100.00

20.00 -

192.50 -

190.00 -

19.10 -

16.98 100.00 -

40.00

382.50

4,915.77

6,072.04

1,854.30

Outstanding Balances included in Current Assets Hindustan Construction Company Limited Green Hills Residences Limited Lake View Club Limited Dasve Retail Limited Reasonable Housing Limited Lavasa Hotel Limited Others Outstanding Balances included in Current Liabilities Hindustan Construction Company Limited Dasve Business Hotel Limited Dasve Hospitality Institutes Limited Reasonable Housing Limited Lavasa Hotel Limited Dasve Convention Centre My City Technology Limited Others Equity Share Contribution HCC Real Estate Limited Hindustan Construction Company Limited Knowledge Vistas Limited My City Technology Limited Apollo Lavasa Health Corporation Limited Lavasa Hotel Limited Lavasa Star Hotel Limited Pune Paud Toll Road Company Limited Others

414.67 7,652.29 403.79 259.11 7.28

345.56 0.35 344.10 245.03 11.31

5.37

1,733.06 29.08

1,144.83

77.03

559.65 58.70

125.49 25.72 110.55 198.86

0.01 0.44 13.99 5.91 25.01 3.37

233.81 87.55 25.82 127.28 11.31 7.14 191.57 9.99

122.90

80.42

14.96

2.79

307.05 0.00 0.26 1.92 2.32 588.30 11.74

326.12 -

372.39 -

46.67

0.50 0.50 0.50 3.00

15.74

236

Inter Corporate Deposit given during the year Hindustan Construction Company Limited Warasgaon Lake View Hotels Limited Dasve Retail Limited Knowledge Vistas Limited Apollo Lavasa Healthcare Limited Ecomotel Hotel Limited Dasve Convention Centre Limited Full Spectrum Adventures Limited Others Inter Corporate Deposit paid during the year Hindustan Construction Company Limited Warasgaon Lake View Hotels Limited Ecomotel Hotel Limited Dasve Retail Limited Knowledge Vistas Limited Lakeview Club Limited Dasve Hospitality Institutes Limited Spotless laundry Services Limited Others Interest on Inter Corporate Deposit Hindustan Construction Company Limited Lavasa Hotel Limited Lakeshore Watersports Company Limited Dasve Convention Centre Limiited Dasve Business Hotel Limited Others
Corporate Guarantees Given on behalf of the Company & Outstanding Warasgaon Lake View Hotels Limited Ecomotel Hotel Limited Dasve Hospitality Institutes Limited Knowledge Vistas Limited Others Share Application Money Dasve Hospitality Institutes Limited Reasonable Housing Limited Others

1,750.00 1.23 0.50 30.65 33.79 70.95 38.20 27.10 104.77 313.64 134.50 175.41

698.04

1,750.00 8.34 30.53 45.50 10.60 21.50 24.00 15.61 322.19 115.75 85.31 160.56 7.89 16.58 88.18

4.25 2.32 4.00 4.20 15.23

15.95 9.36 3.62 6.53 30.74

57.97

0.91

3.69

1.27

810.00 180.00 300.00 370.00 100.00

810.00 180.00 300.00 370.00 100.00

35.50

30.10 100.00 4.97

11.42

Sale of Land / Construction Apollo Lavasa Health Corporation Limited Reasonable Housing Limited Dasve Business Hotel Limited Dasve Retail Limited Green Hills Residences Limited
Lake View Club Limited (Upfront lease premium with Re. 1/- per annum as lease rent over ro years) Others

0.27 13.98 59.70 69.11


760.00 2.59

588.30 345.03 175.00 266.50 345.56

11.73

143.39

Project and other services given during the year Lavasa Hotel Limited Apollo Lavasa Health Corporation Limited Knowledge Vistas Limited Dasve Convention Center Limited Lakeview Clubs Limited Dasve Hospitality Institutes Limited Full Spectrum Adventure Limited Others Intercorporate Deposit given Outstanding Lavasa Hotel Limited Dasve Convention Center Limited Dasve Business Hotel Limited Apollo Lavasa Health Corporation Limited Others Deposit Given during the year/period Reasonable Housing Limited Advance Received during the year/period My City Technology Limited

7.31 1.81 5.09 5.55 6.23 8.91 0.45 11.18

39.82 12.46 20.68

38.14 23.26

49.04

131.46

155.98 128.51 127.19 81.58 344.24

146.37 96.81 120.76 316.74

62.39 5.56 14.71 91.44

0.17

191.57

Note During the financial year 2009-10, Lavasa has contributed to share capital in Apollo Lavasa Health Corporation Limited by way of sale of land

237

Details of transactions relating to persons referred to in item (B) above :

Nature of Transactions Remuneration Paid Rent Paid

As at June 30, 2010 21.20 0.23 21.43

As at March 31, 2010 57.31 0.91 58.22

As at March 31, 2009 37.27 0.64 37.91

As at March 31, 2008 42.29 0.54 42.83

As at March 31, 2007 12.29 0.07 12.36

As at March 31, 2006 1.00 1.00

ESOP granted to Key Management Personnel under Employee Stock Option Scheme
Number of Options Granted As at March As at March 31, 2009 31, 2008 29690 16490 16490 16490 16490 16490 16490 128,630 -

Name of Key Personnel Mr. Rajgopal Nogja Mr. Vinayak Jadhav Mr. Nathan Andrews Mr. Ambuj Jain Ms. Anuradha Paraskar Mr. Arun Bodupali Mr. Suresh Pendharkar Total

As at June 30, 2010


352,890 196,110 196,110 196,110 196,110 196,110 196,110 1,529,550

As at March 31, 2010


39210 21790 21790 21790 21790 21790 21790 169,950

As at March 31, 2007


-

As at March 31, 2006


-

11

Lavasa holds 10% equity shares in Pune Paud Toll Road Company Limited(PPTRCL). The accumulated loss of PPTRCL has exceeded its Equity as on 31st March, 2010 by ` 15.59 crores. The toll road operated by the PPTRCL is expected to generate many fold increase in the traffic plying on the road during balance part of the concession period due to large scale development taking place in the vicinity of Lavasa City and also planned ring road development extending the municipal limits of Pune City beyond present toll plaza location. In the opinion of the management these losses are of temporary in nature hence no diminution in value of investment is considered necessary.

12

Employee Stock Option Scheme


a. Options granted i) The Company granted 154200 Stock Options on April 21, 2008 (each option carrying entitlement for one equity share of the face value of ` 10/- each) at an exercise price of ` 534.52 per equity share ii) The ESOP Compensation committee at its meeting held on 20th October, 2009 granted 49000 additional options to existing option holders at an exercise price of ` 534.52 per equity share for making an adjustment to the number of options on account of the increase in the equity share capital of the Company, post grant of the initial options. iii) The ESOP Compensation committee at its meeting held on 11th June, 2010 granted 1516560 additional options to existing option holders at an exercise price of ` 59.39 per equity share for making an adjustment to the number of options on account of the increase in the equity share capital of the Company, due to bonus issue of equity shares. iv) The ESOP Compensation committee at its meeting held on 11th June, 2010 also approved the adjustment / modification of exercise price mentioned in a(i) and a(ii) above to ` 59.39 per equity share due to bonus issue of equity shares. v) The ESOP was approved by Board of Directors on 22nd October 2007 and by Shareholders on 20th November 2007. b. Settlement : c. Options vested : Through Equity Shares. Not applicable since the Options shall not be vested before the expiry of 3 to 5 years from the date of grant of Options, i.e. April 21, 2008.

Particulars

As at June 30, 2010


191750 1516560 Nil Nil 2180 1706130 Nil

As at March 31, 2010


152550 49000 Nil Nil 9800 191750 Nil

As at March 31, 2009


Nil 154200 Nil Nil 1650 152550 Nil

As at March 31, 2008


Nil Nil Nil Nil Nil Nil Nil

As at March 31, 2007


Nil Nil Nil Nil Nil Nil Nil

As at March 31, 2006


Nil Nil Nil Nil Nil Nil Nil

Outstanding at the beginning of the year Granted during the year Forfeited during the year Exercised during the year Expired / cancelled / lapsed during the year Outstanding at the end of the year Exercisable at the end of the year

13

The Income-tax assessments of the Company have been completed upto the accounting year ended 31st March, 2007. There are no appeals preferred by the Company.

Deferred Tax liability for the year has been provided on the estimated tax computation for the year. Major components of deferred tax assets and liabilities arising on account of timing differences are:

Deferred tax Liability Particulars As at June 30, 2010 As at March 31, 2010 As at March As at March 31, 2009 31, 2008 Assets / (Liabilities) (Rupees in Millions) As at March As at March 31, 2007 31, 2006

Major components
Depreciation Claims and Allowances Carry Forward Losses (58.50) (1159.91) 163.31 (46.52) (1001.54) 239.64 (71.28) (72.40) 27.95 Nil Nil Nil Nil Nil Nil Nil Nil Nil

Total

(1055.10)

(808.43)

(115.74)

238

14

Operating Lease Particulars As at June 30, 2010 As at March 31, 2010 As at March 31, 2009 As at March 31, 2008 (Rupees in Millions) As at March As at March 31, 2007 31, 2006

Future Lease Rental payments (i) Not later than one year (ii) Later than one year and not later than five years (iii) Later than five years

62.43 76.44 4.81 17.82

66.07 91.93 4.27 40.55

33.84 28.56 4.82 38.93

3.58 0.83 5.37 5.37

5.98 0.83 5.64 5.42

0.51 0.88 5.92 3.28

Lease payment recognised during the year

General description of the leasing arrangement: i) Leased Assets : Office premises, Guest Houses, Vehicles ii) Future lease rental payments are determined on the basis of lease payable as per the agreement.
15 a) In the year 2006 - 07 the Company has made a rights issue of 6612245 equity shares of face value of ` 10 each at a premium of ` 39 per equity share b) The Company has, during that year made a further rights issue of 22727273 equity shares of face value of ` 10 each (` 5 called up and paid up per equity share at a premium of ` 34/per share. 16 During the period ended 30th June, 2010, the Company has issued and allotted 377956728 equity shares of ` 10 each, fully paid up in the ratio of 8 equity shares for for every 1 share to the existing shareholder. Figure "0.00" represents amount less than 0.01 Million

17

239

DETAILS OF FIXED ASSETS (UNCONSOLIDATED) ANNEXURE V (Rupees in Millions)


As at June 30, 2010 Particulars Gross Block Accumulated Depreciation 169.85 93.10 32.07 36.72 5.11 0.37 13.89 3.70 354.80 354.80 As at March 31, 2010 Accumulated Depreciation 135.03 81.29 29.07 35.08 4.96 0.36 13.46 3.52 302.77 302.77 As at March 31, 2009 Accumulated Depreciation 19.91 43.14 18.76 26.58 5.74 0.34 11.73 2.79 128.98 128.98 As at March 31, 2008 Accumulated Depreciation 6.18 29.01 10.99 18.54 6.06 0.31 6.99 2.07 80.15 80.15 As at March 31, 2007 Accumulated Depreciation 3.96 18.14 7.67 12.40 4.13 0.27 5.09 1.36 53.02 53.02 As at March 31, 2006

Net Block

Gross Block

Net Block

Gross Block

Net Block

Gross Block

Net Block

Gross Block

Net Block

Gross Block

Accumulate d Depreciatio n
1.49 9.39 5.90 6.95 2.67 0.22 2.47 0.68 29.76 29.76

Net Block

1 2 3 4 5 6 7 8 9

Land Buildings Plant & Machinery, Office Equipments Furniture & Fixtures Computers Vehicles Boats Intangible Assets - Software Intangible Assets - Trademarks & Designs Total Capital Work In Progress Total

29.65 3,537.72 562.92 95.14 51.56 7.32 0.47 24.93 7.39 4,317.10 8,765.75 13,082.85

29.65 3,367.88 469.82 63.07 14.84 2.20 0.10 11.04 3.69 3,962.30 8,765.75 12,728.05

26.98 2,920.79 413.08 81.54 51.40 7.32 0.47 24.93 7.39 3,533.90 8,573.30 12,107.20

26.98 2,785.75 331.79 52.47 16.32 2.36 0.11 11.47 3.87 3,231.13 8,573.30 11,804.43

21.66 2,292.71 300.43 56.04 44.27 9.50 0.47 20.11 7.19 2,752.39 5,942.33 8,694.72

21.66 2,272.81 257.28 37.28 17.69 3.76 0.14 8.38 4.40 2,623.40 5,942.33 8,565.73

0.26 89.76 109.54 52.18 32.48 11.60 0.47 14.89 7.12 318.30 24.27 342.57

0.26 83.58 80.53 41.19 13.94 5.54 0.16 7.90 5.05 238.15 24.27 262.42

52.61 87.61 15.83 23.57 11.53 0.47 10.20 6.79 208.62 4.35 212.97

48.65 69.47 8.16 11.17 7.40 0.20 5.11 5.43 155.59 4.35 159.94

50.63 56.15 12.14 18.92 7.50 0.47 8.46 6.79 161.06 5.73 166.79

49.14 46.76 6.23 11.97 4.84 0.25 5.99 6.11 131.30 5.73 137.03

240

DETAILS OF LOANS AND ADVANCES (UNCONSOLIDATED) ANNEXURE VI (Rupees in Millions) As at March As at March 31, 2007 31, 2006

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

Loans & Advances (Unsecured, considered Good, unless otherwise stated) Advances recoverable in cash or in kind or for value to be received Advances for Land Purchases Advances to Suppliers Advance Payment of Taxes (Net of Provisions) Other amounts recoverable Inter Corporate Deposits Deposits Total Loans and Advances to Promoters, Director and Promoter Group 315.47 501.33 594.23 736.20 1,084.01 49.96 3,281.20 11.05 419.35 503.08 514.78 796.62 825.22 38.99 3,098.04 46.49 280.26 339.52 95.11 176.80 200.76 7.35 1,099.80 5.37 210.06 141.94 6.82 45.75 7.08 411.65 29.08 85.40 87.56 2.60 5.69 11.42 192.67 77.03 6.40 61.43 0.98 2.87 5.41 77.09 58.70

Note The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete.

The figures disclosed above are based on the restated unconsolidated summary statement of Assets and Liabilities of the Company.

241

DETAILS OF SUNDRY DEBTORS (UNCONSOLIDATED) ANNEXURE VII (Rupees in Millions) As at March As at March 31, 2007 31, 2006

Particulars Sundry Debtors ( Unsecured - Considered good) Outstanding for a period exceeding six months Others TOTAL Amounts due from Promoters, Director and Promoter Group Note

As at

June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

1,415.67 2,577.07 3,992.74

962.65 2,191.27 3,153.93

1,007.87 1,007.87

10.62

11.14

8.15

The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete. The figures disclosed above are based on the restated unconsolidated summary statement of Assets and Liabilities of the Company.

242

DETAILS OF INVESTMENTS (UNCONSOLIDATED) ANNEXURE VIII DETAILS OF INVESTMENTS


Particulars as at

June 30, 2010 Unquoted Quoted 1,232.93 0.44 1,233.38

March 31, 2010 Unquoted 1,059.09 17.29 6.55 1,082.93 Quoted 2,712.57 0.44 2,713.01

March 31, 2009 Unquoted 58.37 6.05 64.42 Quoted 777.46 0.44 777.91

March 31, 2008 Unquoted 1.50 6.05 7.55 Quoted 0.44 0.44

March 31, 2007 Unquoted 6.05 6.05 Quoted 44.98 0.37 45.34

(Rupees in Millions) March 31, 2006 Unquoted 3.05 3.05 Quoted 5.05 0.37 5.42

Investment In Subsidiary Companies In India Investment In Associate Companies In India Current Investments In Mutual Funds Other Investments Total Aggregate of investments

918.59 186.04 6.55 1,111.18

COST

MARKET VALUE

COST

MARKET VALUE 2,713.55

COST

MARKET VALUE 777.87

COST

MARKET VALUE 0.44

COST

MARKET VALUE 45.34

COST

MARKET VALUE

Quoted Investments Unquoted Investments


Total

1233.38 1111.18 2344.56

1,233.96

2713.01 1082.93 3795.94

777.91 64.42 842.33

0.44 7.55 7.99

45.34 6.05 51.39

5.42 3.05 8.47

5.50

The figures disclosed above are based on the restated unconsolidated summary statement of Assets and Liabilities of the Company.

243

DETAIL OF ACCOUNTING RATIOS (UNCONSOLIDATED) ANNEXURE IX Rupees in Millions except for per share
Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

As at March 31, 2007

As at March 31, 2006

Basic Earnings Per Share (Eps) Net Profit After Tax No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Earnings Per Share (Eps) Diluted Earnings Per Share (Eps) Net Profit After Tax No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Earnings Per Share (Eps)

489.38 425,201,319 425,201,319.00 1.15

1,382.73 425,201,319 425,201,319.00 3.25

1,204.01 425,201,319 406,120,992.66 2.96

(77.62) 318,058,362 304,608,797.70 (0.25)

(39.68) 318,058,362 120,173,404.75 (0.33)

(27.12) 54,002,700 54,002,700.00 (0.50)

489.38 425,201,319 439,629,896.88 1.13

1,382.73 425,201,319 453,229,122.48 3.21

1,204.01 425,201,319 421,231,427.68 2.93

(77.62) 318,058,362 304,608,797.70 (0.25)

(39.68) 318,058,362 120,173,404.75 (0.33)

(27.12) 54,002,700 54,002,700.00 (0.50)

Net Assets Value (Nav) Net Assets No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Nav Per Share Return On Net Worth Net Profit After Tax Net Worth Return On Net Worth

5,927.68 425,201,319 425,201,319.00 13.94

5,433.54 425,201,319 425,201,319.00 12.78

4,050.78 425,201,319 406,120,992.66 9.97

2,098.07 318,058,362 304,608,797.70 6.89

1,659.34 318,058,362 13,352,601.00 124.27

853.17 54,002,700 54,002,700.00 15.80

494.14 5,927.68 8.34%

1,401.85 5,433.54 25.80%

1,232.95 4,050.78 30.44%

(61.27) 2,098.07 -2.92%

(23.36) 1,659.34 -1.41%

(30.81) 853.17 -3.61%

244

Definition of Ratios The ratios have been computed as below: Earnings Per Share (`) Adjusted Profit / (Loss) After Tax But Before Extraordinary Items Weighted Average Number Of Equity Shares Outstanding During The Year Net Worth Excluding Revaluation Reserve Weighted Average Number Of Equity Shares Outstanding During The Year Networth = Share Capital + Share Warrant + Reserves & Surplus (+/-) surplus/(Deficit) in the Profit and Loss Account Miscellaneoues Expenditure to the extent not written off Adjusted Profit / (Loss) After Tax But Before Extraordinary Items Net Worth Excluding Revaluation Reserve

Net Asset Value Per Share =

Return On Net Worth (%) =

Earnings per share has been calculated in accordance with Accounting Standard 20 - Earnings per share issued by The Institute of Chartered Accountants of India For the period ended 30th June 2010, the Company has issued and allotted 377956728 equity shares of ` 10/- each, fully paid up in the ratio of 8 equity shares for every 1 share to the existing shareholders. In accordance with Accounting Standard 20 "Earnings per Share", the afforsaid shares have been adjusted for the event of bonus shares in computation of the earnings per share. Net Assets value per share has been computed after adjusting the number of equity shares outstanding at the end of the year/period, for the aforesaid shares. Profit and Loss as restated has been considered for the purpose of computing the above ratios.

245

DETAILS OF UNSECURED LOANS (UNCONSOLIDATED) ANNEXURE X (a)

Particulars

As at

June 30, 2010

As at March 31, 2010 2,000.00 -

As at March 31, 2009 -

As at March 31, 2008 -

(Rupees in Millions) As at March As at March 31, 2007 31, 2006 20.08 20.08
20.08

Term Loans from Financial Institutions Inter Corporate Deposits

1,000.00

207.22 207.22
207.22

1,000.00 Amounts due to Promoters, Director and Promoter Group Note


-

2,000.00
-

The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete. The figures disclosed above are based on the restated unconsolidated summary statement of Assets and Liabilities of the Company.

246

DETAILS OF UNSECURED LOANS AS ON 30TH JUNE 2010 (UNCONSOLIDATED) ANNEXURE X (b) (Rupees in Millions) Sr. No. 1. Name of the Lender(/s) L&T Infrastructure Finance Company Limited Loan Agreement Facility agreement dated September 17, 2009 Purpose For township development project Amount Sanctioned 1,000 Total Amount Outstanding 1,000 Interest p.a. Penal Interest & liquidated damages Repayment

Non-payment of 14 Qtrly. L&T interest / Installments Infrastructure installment on starting from PLR minus 1.25%, 12.75% the due date will March 21, 11 attract penal to June, 14 interest @ 2% pa on the overdue interest / installment.

247

DETAILS OF SECURED LOANS OUTSTANDING (UNCONSOLIDATED) ANNEXURE XI (a)

(Rupees in Millions)

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

As at March 31, 2007

As at March 31, 2006

SECURED LOANS Term Loans from Banks


Secured By Charge Created by way of English Mortgage Deed / other charges on respective Land and premises, buildings constructed or to be constructed thereon and all present & future moveable assets. 7,070.97 6,806.61 5,123.63 4,970.00 3,210.85 1,999.99

Interest Accrued and due on Secured Loan VEHICLE LOAN FROM BANK Secured against mortgage of Vehicles FROM NON BANKING FINANCIAL COMPANIES Secured against mortgage of Crusher Debentures Axis Bank Limited
1 (One) 3.52% Secured Deep Discount Convertible Debenture having face value of ` 3874000000 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 0.26 Hectors. Less : Unexpired Discount 3,874.00

15.04

3.21

0.21

2.43 -

12.37

3,874.00

3,874.00

1,183.33

2,690.67

1,245.15

2,628.85

1,479.84

2,394.16

Bank of India 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 2349152295 Secured By Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Allahabad Bank 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 783050765 Secured by Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Allahabad Bank 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 708403784 Secured by Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Indusind Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 749372799 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount ICICI Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 3534036929 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Andhra Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 354201892 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount United Bank of India 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 708403784 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Jammu & Kashmir Bank 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 1,41,68,07,569 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Total

2,349.15

2,349.15

2,349.15

684.18

1,664.97

723.40

1,625.75

631.97

1,717.18

783.05

783.05

783.05

239.12

543.93

252.19

530.86

220.19

562.86

708.40

708.40

215.16

493.24

224.08

484.32

749.37

749.37

212.31

537.06

200.00

549.37

3,534.04

3,534.04

1,097.73

2,436.31

1,142.35

2,391.68

354.20

354.20

102.97

251.23

107.43

246.77

708.40

708.40

207.41

500.99

216.34

492.07

1,416.81

467.20

949.61 17,154.03 15,759.50 9,797.82 4,970.00 3,213.28 2,012.56

248

DETAILS OF DEEP DISCOUNT CONVERTIBLE DEBENTURES (UNCONSOLIDATED) ANNEXURE XI (b) (Rupees in Millions) As at March 31, 2006

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

As at March 31, 2007

Axis Bank Limited Subscribed Amount Coupon Rate

2250 3.52%

2250 3.52%

2250 3.52%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier whichever is earlier 100000 100000 100000 Yes Yes Yes At the end of 36th, At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month 48th & 60th month
1500 6.00% 1500 6.00% 1500 6.00%

Put/Call Option period


Bank of India Subscribed Amount Coupon Rate

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier whichever is earlier 100000 100000 100000 Yes Yes Yes At the end of 39th, At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month 48th & 60th month

Put/Call Option period


Allahabad Bank Subscribed Amount Coupon Rate

500 6.00%

500 6.00%

500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier whichever is earlier 100000 100000 100000 Yes Yes Yes At the end of 39th, At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month 48th & 60th month
500 6.00% 500 6.00% -

Put/Call Option period


Indusind Bank Limited Subscribed Amount Coupon Rate

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

Put/Call Option period


Andhra Bank Subscribed Amount Coupon Rate

250 6.00%

250 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month
500 6.00% 500 6.00%

Put/Call Option period


Union Bank of India Subscribed Amount Coupon Rate

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month

Put/Call Option period

249

DETAILS OF DEEP DISCOUNT CONVERTIBLE DEBENTURES (UNCONSOLIDATED) ANNEXURE XI (b) (Rupees in Millions) As at March 31, 2006 -

Particulars Allahabad Bank Subscribed Amount Coupon Rate

As at June 30, 2010 500 6.00%

As at March 31, 2010 500 6.00%

As at March 31, 2009 -

As at March 31, 2008 -

As at March 31, 2007

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

Put/Call Option period

ICICI Bank Limited Subscribed Amount Coupon Rate

2500 6.00%

2500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

Put/Call Option period

Jammu & Kashmir Bank Subscribed Amount Coupon Rate

1,000 6.00%
5 Years or IPO whichever is earlier 120000 Yes At the end of 39th, 48th & 60th month

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor

Put/Call Option period

250

DETAILS OF OTHER INCOME (UNCONSOLIDATED) ANNEXURE XII (Rupees in Millions) As at March As at March 31, 2007 31, 2006 0.38 0.38 0.09 0.09

Particulars

As at June 30, 2010 9.16 0.90 0.15 10.21

As at March 31, 2010 27.97 0.15 0.82 0.31 29.25

As at March 31, 2009 0.11 0.22 0.15 0.48

As at March 31, 2008 0.07 0.07

Other Income Sale of Scrap Conversion / Translation Difference Profit on Sale of Asset TOTAL

251

DETAILS OF LAND AND CONSTRUCTION EXPENSES (UNCONSOLIDATED) ANNEXURE XIII

Particulars

As at June 30, 2010 267.20 856.70 0.17 7.49 2.70 (199.98) 934.28

As at March 31, 2010 550.63 4,552.27 0.87 29.97 39.99 (1,984.26) 3,189.47

As at March 31, 2009 920.95 2,040.47 10.79 22.87 102.79 2,949.24 6,047.11

As at March 31, 2008 480.21 1,323.81 7.70 15.65 24.14 (1,851.51) -

(Rupees in Millions) As at March As at March 31, 2007 31, 2006 91.89 1,082.55 3.98 6.55 19.30 (1,204.26) 35.41 1,040.37 0.90 42.75 4.52 (1,123.94) -

Land purchased / acquired Civil Work & Contract Charges (net of recoveries) Repair & Maintenance Rent, Rates & Taxes Power & Fuel (net of recoveries) (Accretion) / Decretion to Inventory TOTAL

252

DETAILS OF EMPLOYEE'S REMUNERATION AND BENEFITS (UNCONSOLIDATED) ANNEXURE XIV


(Rupees in Millions) As at March As at March 31, 2007 31, 2006 86.07 0.40 (79.25) 7.22 48.36 (40.71) 7.65

Particulars

As at June 30, 2010 181.94 4.43 2.59 188.96

As at March 31, 2010 454.16 25.98 6.46 486.60

As at March 31, 2009 458.90 23.16 5.75 487.81

As at March 31, 2008 216.73 1.09 (203.99) 13.83

Salary, Wages, Bonus and Gratuity Contribution / Provisions to and for provident and other funds Welfare Expenses Transfer to Project Work In Progress TOTAL

253

UNCONSOLIDATED CAPITALIZATION STATEMENT AS AT 30th JUNE 2010 ANNEXURE XV (Rupees in Millions) Particulars Long Term Debts Short Term Debts Total Debts Shareholders' Funds Equity Share Capital Preference Share Capital Share Warrant Total (A) Reserves, as Restated Securities Premium Amalgamation Reserve Capital Redemption Reserve Profit & Loss Account Less :- Miscellaneous Expenditure (to the extent not written off) Total (B) Total Shareholders Funds (A+B) Long Term Debts/ Equity Notes: 1 Short term debts represent debts which are due within twelve months from 3oth June 2010 2 Long term debts represent debts other than short term debts, as defined above. Pre Issue 18,154.03 18,154.03 Post Issue

4,252.01 522.50

4,774.51 81.25 4,855.76

201.07 216.11 654.73 1,071.92 5,927.68 3.06

3 The figures disclosed above are based on the Restated Unconsolidated Summary Statement of Assets and Liabilities of the Company as at 30th June 2010
4 Long Term Debts/ Equity = Long Term Debts Shareholders Fund

5 The Corresponding Post issue figures are not determinable at this stage pending the completion of the Book Building Process and hence have not been furnished.

254

UNCONSOLIDATED TAX SHELTER STATEMENT ANNEXURE XVI (Rupees in Millions) As at As at March March 31, 2007 31, 2006 (21.53) 33.66% 22.44% 11.22% 11.22% (7.25) (0.02) (5.02) (8.89) 4.01 321.90 (0.03) (0.12) 1.09 312.92 105.33 (29.69) 33.66% 22.44% 11.22% 8.42% (9.99) (0.03) (0.58) (19.89) 17.40 (0.47) (3.57) (1.20) -

Particulars

As at June As at March As at March 30, 2010 31, 2010 31, 2009


740.82 33.22% 22.66% 17.00% 19.93% 246.08 (1.78) (0.00) 36.04 479.04 (2.27) 511.02 169.75 2,094.60 33.99% 22.66% 17.00% 17.00% 711.95 (0.11) (0.34) 83.38 1,578.22 37.83 (5.47) 1,693.51 575.63 1,350.92 33.99% 22.66% 17.00% 11.33% 459.18 (1.32) 0.15 (4.12) 58.48 1,460.37 (48.85) (4.94) 1,459.77 496.17 -

As at March 31, 2008 (57.67) 33.99% 22.66% 11.33% 11.33% (19.60) (0.09) (0.05) 8.71 524.53 (2.39) (1.39) 529.32 179.92 -

Profit before tax as per books (A) Normal Rate of Tax Tax rate on Long Term Capital gain Tax Rate on short term capital gain (u/s 111A) Minimum Alternate Tax rate Tax at normal rate of book profit Adjustments: Permanent Difference Donation Capital Expenditure Profit on sale of assets Other adjustments Timing Difference Difference between Tax & Books Depreciation Interest Disallowance u/s 40(a)(ia) Disallowance u/s 43B Prelimanery Expenses u/s 35D Other adjustments Net Adjustment (B) Tax savings thereon

Profit / (loss) As per income tax return (D)=(A-B)** Brought Forward tax losses adjusted Taxable (loss) / income Taxable (loss) / income as per MAT Tax as per income tax returns

229.80 229.80 740.82 -

401.09 401.09 2,094.60 -

(108.84) (108.84) 1,340.92 -

(586.99) (586.99) (57.67) -

(334.45) (334.45) (21.53) -

(26.12) (26.12) (29.69) -

** figures for the year ended 31st March 2010 and period ended 30th June 2010 are extracted from draft computation of total income

255

DETAILS OF RATES OF DIVIDEND (UNCONSOLIDATED) ANNEXURE XVII

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

(Rupees in Millions except for per share) As at March As at March As at March 31, 2008 31, 2007 31, 2006

Equity Shares Number of Shares Face Value (`) Paid -up Value (`) Rate of dividend Total dividend Corporate dividend tax on above Equity Shares Partly paid up Number of Shares Face Value (`) Paid -up Value (`) Rate of dividend Total dividend Corporate dividend tax on above 6% Cumulative Redeemable Preference Shares of ` 10/- each fully paid up Number of Shares Face Value (`) Paid -up Value (`) Rate of dividend Total dividend Corporate dividend tax on above 0.001% Compulsory Convertible Preference Shares of ` 10/- each Number of Shares Face Value (`) Paid -up Value (`) Rate of dividend Total dividend Corporate dividend tax on above

425,201,319 10 10 -

47,244,591 10 10 -

47,244,591 10 10 -

35,339,818 10 10 -

12,612,543 10 10 -

6,000,300 10 10 -

22,727,273 10 5 -

27,250,000 10 10 6%

27,250,000 10 10 6% 16.37 2.72

27,250,000 10 10 6% 95.33 16.20

27,250,000 10 10 -

27,250,000 10 10 -

27,000,000 10 10 -

25,000,000 10 10 0.001%

25,000,000 10 10 0.001% 0.00 0.00

25,000,000 10 10 0.001% 0.00 0.00

256

LAVASA CORPORATION LIMITED ANNEXURE - XVIII RESTATED CONSOLIDATED SUMMARY STATEMENT OF ASSETS AND LIABILITIES (Rupees in Millions)

Particulars

As At June 30, 2010

As At March 31, 2010

As At March 31, 2009

As At March 31, 2008

SOURCES OF FUNDS Share Capital Share Warrant Reserves & Surplus Total Shareholders' Funds Minority Interest Loan Funds (a) Secured Loans (b) Unsecured Loans Total Loans Deferred Tax Liability (Net) TOTAL APPLICATION OF FUNDS Fixed Assets (a) Gross Block (b) Less : Depreciation (c) Net Block (d) Capital Work In Progress

4,774.52 81.25 417.19 5,272.96 366.27

994.95 81.25 2,771.15 3,847.35 361.16

994.94 81.25 2,884.71 3,960.90 183.76

625.90 1,624.17 2,250.07 35.00

17,531.10 1,001.00 18,532.10 1,058.87 25,230.20

16,235.96 2,000.00 18,235.96 811.26 23,255.73

9,797.82 9,797.82 115.74 14,058.22

4,970.00 4,970.00 7,255.07

5,733.36 409.25 5,324.11 8,923.21 14,247.32 1,465.58

4,240.05 339.23 3,900.82 9,765.83 13,666.65 2,797.86

2,842.50 133.50 2,709.00 6,205.84 8,914.84 815.79

318.29 80.15 238.14 24.27 262.41 6.49

Investments Current Assets, Loans & Advances A) Current Assets (a) Inventories (b) Sundry Debtors (c) Cash and Bank Balances (d) Other Current Assets

6,586.42 2,926.20 1,027.44 117.08 10,657.14 2,155.72 12,812.86 4,829.71 36.17 4,865.88 7,946.98 -

6,316.62 2,173.90 951.56 76.50 9,518.58 2,182.43 11,701.01 4,857.73 52.06 4,909.79 6,791.22 -

4,302.68 928.56 291.64 46.63 5,569.51 929.26 6,498.77 2,039.18 132.00 2,171.18 4,327.59 -

7,251.48 297.61 7,549.09 385.94 7,935.03 1,094.89 6.78 1,101.67 6,833.36 -

B) Loans and Advances Total Current Assets, Loans and Advances Less: Current Liabilities & Provisions (a) Current Liabilities (b) Provisions

Net Current Assets Miscellaneoues Expenditure (To the extent not written off) Profit and Loss Account TOTAL Note :

1,570.32 25,230.20

23,255.73

14,058.22

152.81 7,255.07

The above statement should be read with the Notes to the Restated Consolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI

257

LAVASA CORPORATION LIMITED ANNEXURE -XIX RESTATED CONSOLIDATED SUMMARY STATEMENT OF PROFITS AND LOSSES Particulars As At June 30, 2010 As At March 31, 2010 As At March 31, 2009

(Rupees in Millions) As At March 31, 2008

INCOME Income From Operations Other Income TOTAL EXPENDITURE Land and Construction Expenses Employee's Remuneration and Benefits Office and Site Establishment Expenses Finance Charges (net) Depreciation
Less : Transferred to Fixed Asset / Capital Work in Progress

923.73 11.47

3,063.71 25.38

2,071.04 5.70

0.07 0.07

935.20

3,089.09

2,076.74

530.47 215.93 431.60 608.48 26.32 1,812.80 971.03 841.77

2,737.90 538.84 640.19 1,865.34 68.46 5,850.73 3,355.22 2,495.51

6,047.11 487.81 436.02 2,148.54 11.35 9,130.83 8,317.70 813.13

13.83 41.33 3.37 58.53 58.53

Profit/(Loss) before Tax


Less: Provision for taxation: Income Tax Deferred Tax Wealth Tax Fringe Benefit Tax MAT Credit Entitlement

93.43

593.58

1,263.61

(58.46)

147.89 247.42 0.01 (147.74)

355.97 695.53 0.06 (355.97)

153.49 115.74 0.03 2.19 (152.31)

0.06 3.55 -

Profit/(Loss) after Tax


Less : Minority Adjustments Add : Share in Profit/(Loss) of Associates Add: Balance brought forward from last year

(154.15)
(10.47) (1.03) 549.87

(102.01)
(10.08) (2.55) 663.45

1,144.47
0.57 (152.81)

(62.07)
(90.74)

Amount available for appropriation Less : Appropriations a) Proposed Preference Share Dividend b) Tax on Proposed Dividend c) Capital Redemption Reserve Balance carried to Balance Sheet
Note :

405.16
405.16

568.97
16.38 2.72 19.10 549.87

991.09
95.33 16.20 216.11 327.64 663.45

(152.81)
(152.81)

The above statement should be read with the Notes to the Restated Unconsolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI

258

LAVASA CORPORATION LIMITED ANNEXURE -XX RESTATED CONSOLIDATED SUMMARY STATEMENT OF CASH FLOWS

(Rupees in Millions)
Particulars As At June 30, 2010 As At March 31, 2010 As At March 31, 2009 As At March 31, 2008

A. Cash Flow From Operating Activities Net Profit Before Taxation Adjustments For : Depreciation Profit/Loss On Sale Of Fixed Assets (Profit) / Loss on Investments Preliminary/Miscellaneous Expenditure Written off Interest/Dividend Income Interest & Finance Expenses Operating Profit Before Working Capital Changes Decrease / (Increase) In Sundry Debtors Decrease / (Increase) In Other Current Assets Decrease /( Increase ) In Land Inventory Decrease /( Increase ) In Construction and Development Expenses Decrease /( Increase) In Loans & Advances (Decrease) / Increase In Current Liabilities and Provisions Cash Generated Used In Operations Income Tax Paid Cash Flow after Extra Ordinary Items (A) B. Cash Flows From Investing Activities Interest/Dividend Received Sale/(Purchase) Of Investments Sale Of Fixed Assets Decrease/(Increase) in Fixed Asstes/Capital Work in Progress Net Cash Used In Investing Activities ( B ) C. Cash Flow From Financing Activities : Application Money Received For Issue Of Shares/Warrants Issue Of Shares On Premium Issue of Share Warrants Increase in Minority Interest Increase In Long Term Borrowings (Net) Dividend Paid Interest & Finance Expenses Net Cash Generated From Financing Activities (C ) D. Net Increase In Cash And Cash Equivalents (A+B+C) Cash And Cash Equivalents Cash And Cash Equivalents At Beginning Of Period Cash And Cash Equivalents At End Of Period

93.42 26.34 (36.00) 644.48 728.24 (748.73) (44.15) (254.64) (15.16) 105.44 (24.81) (253.81) (78.72) (332.53)

593.59 68.24 (0.31) (95.50) 1,960.84 2,526.86 (1,202.28) (26.29) (471.55) (1,542.39) (877.54) 2,831.04 1,237.85 (422.30) 815.55

1,263.60 11.36 (0.15) (66.71) (160.19) 2,375.44 3,423.35 (928.58) (46.62) (807.15) (4,518.00) (637.31) 1,287.98 (2,226.33) (77.19) (2,303.52)

(58.46) 3.37 (55.09) (480.21) (1,551.53) (192.70) 662.78 (1,616.75) (3.61) (1,620.36)

36.00 1,331.25 26.75 (633.73) 760.27

95.50 (1,984.62) 0.84 (4,820.59) (6,708.87)

160.19 (742.58) 1.09 (390.77) (972.07)

30.76 44.90 (129.59) (53.93)

15.00 0.57 296.15 (19.10) (644.48) (351.86)

100.37 87.10 8,438.14 (111.53) (1,960.84) 6,553.24

98.07 750.02 81.25 (0.57) 4,827.82 (111.53) (2,375.44) 3,269.62

35.00 500.00 1,736.63 (555.29) 1,716.34

75.88
951.56 1,027.44 -

659.92
291.64 951.56 951.56

(5.97)
297.61 291.64

42.05
255.56 297.61

The above statement should be read with the Notes to the Restated Consolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows as appearing in Annexure XXI The Cash Flow Statement has been prepared under the indirect method as set out in Accounting Standard - 3 on Cash Flow Statements of the Companies ( Accounting Standard ) Rules, 2006 Negative figures represents Cash Outflows. Proceeds from Long Term and Other Borrowings are shown net of repayments.

259

LAVASA CORPORATION LIMITED ANNEXURE XXI


Notes to the Restated Consolidated Summary of Assets and Liabilities, Profit and Losses and Cash Flows, as restated.

A) CRITERION FOR PREPARATION OF CONSOLIDATED FINANCIAL STATEMENT


1 Lavasa Corporation Limited (LAVASA) has prepared the consolidated financial statement to provide the financial information of its activities along with the subsidiaries and associates as a single entity. They are collectively referred as "Group" herein. Where separate disclosures of interests in subsidiary and associate companies are required to be made, the LAVASA reference excludes the amount pertaining to the subsidiaries and associates . The Consolidated financial statements are prepared by

i) Consolidating its accounts with financial statements of its subsidiaries ii) Applying the equity method of accounting for its investee companies in which it holds between 20 and 50 percent of the equity share capital.

Method of Consolidation The consolidated financial statements have been prepared by the Company in accordance with the requirements of Accounting Standards AS-21 "Consolidated Financial Statements" and AS 23 "Accounting for Investments in Associates in Consolidated Financial Statements" notified pursuant to the companies ( Accounting Standards) Rules, 2006 (as amended). The consolidated financial statements comprises of financial statements of its subsidiaries namely Lavasa Hotels Limited (LHL), Warasgaon Lake View Hotels Limited (WLVHL), Apollo Lavasa Health Corporation Limited (ALHCL), Lakeshore Watersports Company Limited (LWCL), Ecomotel Hotel Limited (EHL), Dasve Convention Centre Limited (DCCL), Dasve Business Hotel Limited (DBHL), Lakeview Clubs Limited(LVCL), Dasve Hospitality Institutes Limited (DHIL), Dasve Retail Limited (DRL), Full Spectrum Adventure Limited (FSAL), Spotless Laundry Services Limited(SLSL), Lavasa Bamboocrafts Limited (LBCL), Green Hills Residences Limited (GHRL), My City Technology Limited (MCTL), Reasonable Housing Limited (RHL), Future City Multiservices SEZ Limited (formerly known as Minfur Interior Technology Limited) (FCMSL), Verzon Hospitality Limited (VHL), Rhapsody Hospitality Limited (RHL) The year end balances and common transactions with the subsidiaries are eliminated in full.

B) SIGNIFICANT ACCOUNTING POLICIES: 1 Basis Of Accounting and the use of Estimates: The Company maintains its accounts on accrual basis following historical cost convention, in compliance with the Accounting Standards issued by the Institute of Chartered Accountants of India, relevant provisions of the Companies Act, 1956 and the Rules. Management makes estimates and technical and other assumptions regarding the amounts of income and expenses, assets and liabilities, and disclosure of contingencies, in accordance with Generally Accepted Accounting Principles in India in the preparation of the financial statements. Difference between the actual results and estimates are recognized in the period in which determined.

2 Fixed Assets and Intangible Assets Fixed Assets are stated at cost of acquisition or construction including attributable overheads, interest and financial costs till such assets are ready for its intended use, less accumulated depreciation, & impairment losses if any.
Costs relating to trademark and design have been treated as intangible assets which also comprise license fees, other implementation costs for software and application software acquired for in-house use. Cost of purchase of land to the extent of one percent is accounted as fixed assets and remaining is accounted as stock in trade.

3 Depreciation and Amortization Depreciation on fixed assets is provided: i) In respect of office buildings, furniture & fixtures, office equipments, vehicles, speed boats & infrastructure assets on written down value method at the rates specified in Schedule XIV of the Companies Act, 1956 on pro-rata basis.
ii) In respect of intangible assets being computer software relating to Geographical Information System and Enterprise Resource System is amortized over the estimated useful life of ten years under straight line method on pro-rata basis. iii)In respect of trademark and design costs are amortized equally over a period of ten years.

4 Investments Investments are classified as long term and current investments. Long term investments are shown at cost or written down value (in case of diminution which is other than temporary diminution) and current investments are shown at cost or market value whichever is lower.

5 Inventories of Land and Floor Space Index (FSI) i) Cost of land accounted in Stock in trade is treated as (a) Cost of FSI - 95%, (b) Land, stock-in-trade 5%, both being distinct items of inventory. Cost of Land and FSI are on a weighted average basis along with related purchase / acquisition price plus all direct and indirect expenditure incurred in connection with the purchase of land. Land and FSI are valued at lower of Cost or Net Realizable Value. Land or FSI utilized for own construction is transferred to Fixed Assets at cost.
ii) Project Work-in-Progress is valued at the contract rates in accordance with Long-term Construction Accounting Standards.

iii) Where construction of any unit is undertaken for which there are no sales, such inventory is valued at lower of cost or net realizable value and is not considered under Long-term Construction for accounting purposes.

260

iv) The Stock of Stores, Food and Beverages, groceries and provisions, other guest amenities, information technology material, finished products including traded goods and semi finished goods are stated at lower of cost or net realisable value. The inventories of Raw materials, Lab materials, other consumables and housekeeping items, medicines, medicare items are stated at cost.

6 Foreign Currency Transactions Foreign currency transactions during the year are accounted at the prevailing rate on the date of transaction. Current assets and current liabilities are translated at the exchange rate prevailing on the last day of the year. Gains or losses arising out of remittance/ translations at the year end are credited/ debited to the profit and loss account for the year. 7 Revenue Recognition i) Sale of Land and FSI Revenues are recognized in the year in which the agreement to lease is executed. Income from land sales (including on a long term lease basis) is recognized on the transfer of all significant risks and rewards of ownership to the buyers and a reasonable expectation of collection of the sale consideration from the buyers exists. Exchange of parcels of land against other parcels of land is not treated as sale but is adjusted in the land account.
ii) Project Construction Work The Company follows the percentage completion method, on the basis of physical measurement of work actually completed at the balance sheet date, taking into account the contractual price and revision thereto by estimating total revenue and total cost to the completion of the contract and the profit so determined accounted for proportionate to the percentage of the actual work done. Foreseeable losses are accounted for as and when they are determined. Revenue from sales of constructed units other than under long term construction contracts are recognized on execution of transfer agreements.

iii) Project Management Consultancy Fees Revenue from Project Management Consultancy Fees is recognized on accrual basis as per the Agreements iv) Sales comprise of revenue from room, allied services relating to hotel operation. Revenue is recognised upon rendering of services.

v) During the year ended 31st March 2006, 2007,2008 the Company had not started sales except for collecting certain booking advances. Appropriate accounting policies were framed upon commencement of sales operations in the year ended 31st March 2009.

8 Borrowing Costs Borrowing costs (less any income on the temporary investments of those borrowings) that are directly attributable to qualifying assets / project work-in-progress are charged over such qualifying assets/ project work in progress. 9 Employee Benefits i) Defined Contribution Plans Contribution to provident fund and superannuation fund is accounted on accrual basis ii) Defined Benefit Plan Gratuity is charged to revenue on the basis of actuarial valuation. iii) Other benefits Short term and long term compensated absences are provided for based on actuarial valuation. The actuarial valuation is done as per projected unit credit method. 10 Taxes on Income The tax expense comprises of current and deferred tax. Current income tax are measured in accordance with the Indian Income Tax Act. The deferred tax is measured based on the tax rates and the tax laws enacted or substantially enacted as on the Balance Sheet date. Deferred Tax Assets are not recognized unless there is virtual certainty that sufficient future taxable income will be available against which such deferred tax assets can be realized.

11 Impairment The Company makes assessment of any indicator that may lead to impairment of the Assets on an annual basis. An asset is treated as impaired when the carrying cost of the asset exceeds its recoverable value, which is higher of net selling price and the value in use. Impairment loss, if any, is charged to profit and loss account in the year in which it is identified as impaired.

12 Contingencies / Provisions Provisions involving substantial degree of estimation in measurement are recognized when there is a present obligation as a result of past events and it is probable that there will be outflow of resources. Contingent Liabilities are not recognized but are disclosed in the Notes. Contingent assets are neither recognized not disclosed in the financial statement. 13 Leases Lease rentals in respect of assets acquired under operating lease are charged to Profit & Loss Account. 14 Earnings Per Share
Basic earnings per share are calculated by dividing the net profit or loss for the period attributable to equity shareholders (after deducting preference dividends and attributable taxes) by the weighted average number of equity shares outstanding during the period. The weighted average number of equity shares outstanding during the period are adjusted for bonus shares issued during the period. For the purpose of calculating diluted earnings per share, the net profit or loss for the period attributable to equity shareholders and the weighted average number of shares outstanding during the period are adjusted for the effects of all dilutive potential equity shares.

261

Other Notes to the Restated consolidated Summary Statements of Assets and Liabilities, Profits and Losses and Cash Flows, as restated.

Particulars

As At June 30, 2010

(Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008

Cost of Land includes Land in respect of which Sale deed yet to be executed in the name of Company Land in respect of which irrevocable Power of Attroney obtained in the name of Company

127.30

129.37

129.37

133.43

1.11

1.11

1.11

2.51

Land not covered by the Master Plan in respect of which sale deed is yet to be executed in the name of the Company 2

8.17

8.17

8.27

8.27

Depreciation included in construction/development expenses on the assets used for project Foreign Currency exposure not hedged US Dollor $ GBP EURO

43.71

139.17

23.90

24.34

0.41 0.01 $ 0.11 0.00

9.32 0.21 $ 2.46 0.04 0.13 0.00

1.92 0.04 $ 2.09 0.03 -

0.82 0.02 2.09 0.03 -

Technical surveys/estimates are involved in respect of physical verification procedures / determination of Project work-in-progress / related costs. These estimates made by the Company and certified to the auditors, have been relied upon by them, as these are of a technical nature.

STATEMENT OF CONTINGENT LIABILITY NOT PROVIDED FOR IN RESPECT OF: (Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008

Particulars

As At June 30, 2010

Guarantee given by banks on behalf of the Company Claims not acknowledged as debt

26.51 9.70

50.27 9.70

20.23 -

8.55 -

7 Compulsory Convertible Preference Shares

Particulars

As At June 30, 2010

(Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008

Axis Bank Limited Subscribed Amount Coupon Rate p.a. on Face Value Maximum Tenure Conversion Valuation Put/Call Option by HCC/Investor

Put/Call Option period

250 0.0010% 5 Years 100000 Yes At the end of 36th, At the end of 36th, At the end of 36th, 48th & 60th 48th & 60th month 48th & 60th month month

250 0.0010% 5 Years 100000 Yes

250 0.0010% 5 Years 100000 Yes

262

Bennett Coleman & Co. Limited (BCCL) has subscribed to one warrant on preferential basis. It has paid the warrant subscription price of ` 81.25 Millions being 10% of the warrant value of ` 812.50 Millions. This entitles BCCL to subscribe to 0.8125%of the fully diluted equity share capital of the Company as on the date of exercise of the warrant which can be exercised at any time within a period of 5 (five) years (warrant exercise period) from the closing date. BCCL can exercise the warrant in part or whole for a maximum 5 times during the above warrant exercise period or at the time of Initial Public Offer (IPO). Any non conversion during the above period or part conversion would lead to forfeiture of the warrant subscription price to the extent on unconverted portion.

The Company operates in a single segment namely "Comprehensive Urban Development and Management". Therefore, the Companys business does not fall under different business segments as defined by Accounting Standard 17 Segment Reporting issued by the Institute of Chartered Accountants of India.

10

RELATED PARTY DISCLOSURES (In compliance with Accounting Standard 18 Related Party Discloser) A. List of related parties: (As identified by the management) i) Parent/Holding Comnpanies and their subsidiaries
As At June 30, 2010

As At March 31, 2010

As At March 31, 2009

As At March 31, 2008

Hindustan Hindustan Hindustan Construction Construction Construction Company Limited Company Limited Company Limited Hindustan Construction Company Limited (HCC) (Parent (HCC) (Parent of (HCC) (Parent of (HCC) (Parent of of Holding Company) Holding Company) Holding Company) Holding Company) Hincon Technoconsult Limited (Subsidiary of HCC) Pune paud Toll Road Company Limited (Subsidiary of HCC) HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited) Nirmal BOT Limited (Subsidiary of HCC) Hincon Technoconsult Limited (Subsidiary of HCC) Pune paud Toll Road Company Limited (Subsidiary of HCC) HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited) Nirmal BOT Limited (Subsidiary of HCC) Hincon Technoconsult Limited (Subsidiary of HCC) Pune paud Toll Road Company Limited (Subsidiary of HCC) HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited) Nirmal BOT Limited (Subsidiary of HCC)

Hincon Technoconsult Limited (Subsidiary of HCC)

Pune paud Toll Road Company Limited (Subsidiary of HCC)

HCC Real Estate Limited (HREL) (Formerly known as Hincon Realty Limited) (Subsidiary of HCC & Holding company of Lavasa Corporation Limited)

Nirmal BOT Limited (Subsidiary of HCC)

HRL (Thane) Real HRL (Thane) Real HRL (Thane) Real Estate Limited Estate Limited Estate Limited (Subsidiary of (Subsidiary of (Subsidiary of HREL) HREL) HREL) HRL (Thane) Real Estate Limited (Subsidiary of HREL)

263

HRL Township Developers Limited (Subsidiary of HREL)

HRL Township Developers Limited (Subsidiary of HREL) Panchkutir Developers Limited (Subsidiary of HCC) Hinjewadi Township Developers Limited (Subsidiary of HREL) HCC Singapore Enterprises PTE Limited (Subsidiary of HCC) HCC Mauritius Enterprises Limited (Subsidiary of HCC)

HRL Township Developers Limited (Subsidiary of HREL) Panchkutir Developers Limited (Subsidiary of HCC) Hinjewadi Township Developers Limited (Subsidiary of HREL) HCC Singapore Enterprises PTE Limited (Subsidiary of HCC) HCC Mauritius Enterprises Limited (Subsidiary of HCC)

HRL Township Developers Limited (Subsidiary of HREL) Panchkutir Developers Limited (Subsidiary of HCC) Hinjewadi Township Developers Limited (Subsidiary of HREL) HCC Singapore Enterprises PTE Limited (Subsidiary of HCC) HCC Mauritius Enterprises Limited (Subsidiary of HCC)

Panchkutir Developers Limited (Subsidiary of HCC)

Hinjewadi Township Developers Limited (Subsidiary of HREL)

HCC Singapore Enterprises PTE Limited (Subsidiary of HCC)

HCC Mauritius Enterprises Limited (Subsidiary of HCC)

Charosa Wineries Limited (Subsidiary of HREL)

Charosa Wineries Charosa Wineries Charosa Wineries Limited Limited Limited (Subsidiary of (Subsidiary of (Subsidiary of HREL) HREL) HREL)

HCC Infrastructure Limited (Subsidiary of HCC)

HCC Infrastructure HCC Infrastructure HCC Infrastructure Limited Limited Limited (Subsidiary of (Subsidiary of (Subsidiary of HCC) HCC) HCC)
Nashik Township Nashik Township Nashik Township Developers Developers Developers Limited Limited Limited (Subsidiary of (Subsidiary of (Subsidiary of HREL) HREL) HREL)

Nashik Township Developers Limited (Subsidiary of HREL)

Western Securities Limited (Subsidiary of HCC)

Western Securities Western Securities Western Securities Limited Limited Limited (Subsidiary of (Subsidiary of (Subsidiary of HCC) HCC) HCC)
HCC Aviation Limited (Subsidiary of HCC) HCC Aviation Limited (Subsidiary of HCC)

HCC Aviation Limited (Subsidiary of HCC)

Badlapur Faridabad Tollways Limited (Subsidiary of HCC)

Badlapur Badlapur Faridabad Faridabad Tollways Limited Tollways Limited (Subsidiary of (Subsidiary of HCC) HCC) Mann Township Developers Limited (Subsidiary of HREL) HCC Realty Limited (Subsidiary of HREL) Mann Township Developers Limited (Subsidiary of HREL)

Mann Township Developers Limited (Subsidiary of HREL)

HCC Realty Limited (Subsidiary of HREL)

264

HCC Construction Limited (Subsidiary of HCC)

HCC Construction Limited (Subsidiary of HCC)


Highbar Technologies Limited (Subsidiary of HCC) BaharamporeFarakka Highways Limited (Subsidiary of HCC) Farakka-Raiganj Highways Limited (Subsidiary of HCC) Raiganj-Dalkhola Highways Limited (Subsidiary of HCC)

Highbar Technologies Limited (Subsidiary of HCC)

Baharampore-Farakka Highways Limited (Subsidiary of HCC)

Farakka-Raiganj Highways Limited (Subsidiary of HCC)

Raiganj-Dalkhola Highways Limited (Subsidiary of HCC)

Karl Steiner AG, Switzerland Steiner Promotions et Paricipations SA Eurohotel SA VM+ST AG Steiner (Deutschland) GmbH Steiner Lman SAS SNC Valleiry Route de Bloux Klemanor Investments Limited

iii) Other Related Parties


As At June 30, 2010 Hincon Holdings Limited Hincon Finance Limited

As At March 31, 2010 Hincon Holdings Limited


Hincon Finance Limited

As At March 31, 2009 Hincon Holdings Limited


Hincon Finance Limited

As At March 31, 2008 Hincon Holdings Limited


Hincon Finance Limited -

Vikhroli Corporate Park (Firm upto 28th June 2010)

Vikhroli Corporate Vikhroli Corporate Park (Firm) Park (Firm)


Bona Sera Hotels Limited (From 16/04/2009) Palmetto Hospitality Limited (From 15.06.2009)

Bona Sera Hotels Limited

Palmetto Hospitality Limited

265

SOL Hospitality Limited Nathapa Jhakri Joint Venture (NJJV) HCC Pati Joint Venture Kumagai Skanska HCC Itouch Group (Kshi Jv) HCC L & T Joint Venture Alpine Samsung HCC Joint Venture Alpine Hcc Joint Venture Dhule Palesner Tollway Ltd Evostate AG MCR Managing Corp. Real Estate Projektentwicklungsges. Parking Kunstmuseum AG ARGE Prime Tower Vikhroli Corporate Park Private Limited ( From 28th June 2010 )

SOL Hospitality Limited (From 08/04/2009)

Key Management Personnel and their relatives:


As At June 30, 2010 Rajgopal Nogja Nathan Andrews Ambuj Jain Vinayak Jadhav Anuradha Paraskar

As At March 31, 2010 Rajgopal Nogja Nathan Andrews Ambuj Jain Vinayak Jadhav

As At March 31, 2009 Rajgopal Nogja Nathan Andrews Ambuj Jain Vinayak Jadhav

As At March 31, 2008 Rajgopal Nogja Nathan Andrews Ambuj Jain Vinayak Jadhav

Anuradha Paraskar Anuradha Paraskar Anuradha Paraskar Sureshkumar Prabhakar Pendharkar Scott Wrighton Arun Bodupali Venkatesan Arunachalam Sureshkumar Prabhakar Pendharkar Arun Bodupali Venkatesan Arunachalam Sureshkumar Prabhakar Pendharkar Arun Bodupali Venkatesan Arunachalam

Sureshkumar Prabhakar Pendharkar Scott Wrighton Arun Bodupali Venkatesan Arunachalam

266

B. Transactions during the year and Balances Outstanding as at the year end with related parties are as follows:

Particulars

As At June 30, 2010

(Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008

Nature of Transactions Project and other services received during the year HCC Real Estate Limited Hindustan Construction Company Limited Vikhroli Corporate Park Hincon Technoconsultant Limited Pune Paud Toll Raod Company Limited Others Inter Corporate Deposit taken during the year HCC Real Estate Limited Hindustan Construction Company Limited Inter Corporate Deposit Repaid during the year HCC Real Estate Limited Hindustan Construction Company Limited Corporate Guarantees Received on behalf of the Company & Outstanding Hindustan Construction Company Limited Outstanding Balances included in Current Assets Hindustan Construction Company Limited Outstanding Balances included in Current Liabilities Hindustan Construction Company Limited Equity Share Contribution HCC Real Estate Limited Hindustan Construction Company Limited Interest in Inter Corporate Deposit Hindustan Construction Company Limited Inter Corporate Deposit given during the year Hindustan Construction Company Limited Inter Corporate Deposit Repaid during the year Hindustan Construction Company Limited Interest in Inter Corporate Deposit Hindustan Construction Company Limited

5.72 31.32

0.89 254.88 10.13

746.69 -

804.97 1.53

0.06

1.08

100.00

20.00

100.00

40.00

4,915.77

6,072.00

1,854.30

5.37

1,733.06 29.08 80.42 326.12 0.91

0.10

233.81

122.90

307.05 0.00

1,750.00

1,750.00

57.87

267

Details of transactions relating to key management personnel: (Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008 57.31 37.27 42.29 0.91 0.64 0.54 58.22 37.91 42.83

Nature of Transactions

Remuneration Paid Rent Paid

As At June 30, 2010 21.20 0.23 21.43

ESOP granted to Key Management Personnel under Employee Stock Option Scheme Number of Options Granted
Name of Key Personnel

As At June 30, 2010 352,890 196,110 196,110 196,110 196,110 196,110 196,110 1,529,550

As At March 31, As At March 31, As At March 31, 2010 2009 2008 39210 21790 21790 21790 21790 21790 21790 169,950 29690 16490 16490 16490 16490 16490 16490 128,630 -

Mr. Rajgopal Nogja Mr. Vinayak Jadhav Mr. Nathan Andrews Mr. Ambuj Jain Ms. Anuradha Paraskar Mr. Arun Bodupali Mr. Suresh Pendharkar Total

11

Lavasa holds 10% equity shares in Pune Paud Toll Road Company Limited(PPTRCL). The accumulated loss of PPTRCL has exceeded its Equity as on 31st March, 2010 by ` 15.59 crores. The toll road operated by the PPTRCL is expected to generate many fold increase in the traffic plying on the road during balance part of the concession period due to large scale development taking place in the vicinity of Lavasa City and also planned ring road development extending the municipal limits of Pune City beyond present toll plaza location. In the opinion of the management these losses are of temporary in nature hence no diminution in value of investment is considered necessary.

12

Employee Stock Option Scheme a. Options granted i) The Company granted 154200 Stock Options on April 21, 2008 (each option carrying entitlement for one equity share of the face value of ` 10/- each) at an exercise price of ` 534.52 per equity share
ii) The ESOP Compensation committee at its meeting held on 20th October, 2009 granted 49000 additional options to existing option holders at an exercise price of ` 534.52 per equity share for making an adjustment to the number of options on account of the increase in the equity share capital of the Company, post grant of the initial options.

iii) The ESOP Compensation committee at its meeting held on 11th June, 2010 granted 1516560 additional options to existing option holders at an exercise price of ` 59.39 per equity share for making an adjustment to the number of options on account of the increase in the equity share capital of the Company, due to bonus issue of equity shares.

iv) The ESOP Compensation committee at its meeting held on 11th June, 2010 also approved the adjustment / modification of exercise price mentioned in a(i) and a(ii) above to ` 59.39 per equity share due to bonus issue of equity shares.

b. Settlement : c. Options vested :

Through Equity Shares. Not applicable since the Options shall not be vested before the expiry of 3 to 5 years from the date of grant of Options, i.e. April 21, 2008. As At June 30, 2010 191750 1516560 Nil Nil 2180 1706130 Nil As At March 31, As At March 31, As At March 31, 2010 2009 2008 152550 49000 Nil Nil 9800 191750 Nil Nil 154200 Nil Nil 1650 152550 Nil Nil Nil Nil Nil Nil Nil Nil

Nature of Transactions

Outstanding at the beginning of the year Granted during the year Forfeited during the year Exercised during the year Expired / cancelled / lapsed during the year Outstanding at the end of the year Exercisable at the end of the year

268

13

The Income-tax assessments of the Company have been completed upto the accounting year ended 31st March, 2007. There are no appeals preferred by the Company.

Deferred Tax liability for the year/period ended has been provided on the estimated tax computation for the year. Major components of deferred tax assets and liabilities arising on account of timing differences are: Deferred tax Liability
Nature of Transactions

As At June 30, 2010

(Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008 Assets / (Liabilities)

Major components Depreciation Claims and Allowances Carry Forward Losses Total 14 Operating Lease
Nature of Transactions

(63.33) (1158.19) 162.65 (1,058.87)

(50.07) (1001.41) 240.21 (811.27)

(71.28) (72.40) 27.95 (115.73)

Nil Nil Nil -

As At June 30, 2010

(Rupees in Millions) As At March 31, As At March 31, As At March 31, 2010 2009 2008

Future Lease Rental payments (i) Not later than one year (ii) Later than one year and not later than five years (iii) Later than five years Lease payment recognised during the year

62.43 76.44 4.81 17.82

66.07 91.93 4.27 41.07

33.84 28.56 4.82 38.93

3.58 0.83 5.37 5.37

General description of the leasing arrangement: i) Leased Assets : Office premises, Guest Houses, Vehicles ii) Future lease rental payments are determined on the basis of lease payable as per the agreement.

15

During the period ended 30th June, 2010, the Company has issued and allotted 377956728 equity shares of ` 10 each, fully paid up in the ratio of 8 equity shares for every 1 share to the existing shareholder.

16

Figure "0.00" represents amount less than 0.01 Million

269

DETAILS OF FIXED ASSETS (CONSOLIDATED) ANNEXURE XXII

As at June 30, 2010


Particulars Gross Block Goodwill Land Buildings Plant & Machinery, Office Equipments Furniture & Fixtures Computers Vehicles Boats Intangible Assets - Software Intangible Assets - Trademarks & Designs 36.41 221.23 4,427.50 694.18 165.72 55.38 11.81 36.31 77.28 7.54 5,733.36 Capital Work In Progress Total 5,733.36 Accumulated Depreciation 179.20 109.78 46.97 38.32 6.67 10.27 14.21 3.83 409.25 409.25 Net Block 36.41 221.23 4,248.30 584.40 118.75 17.06 5.13 26.03 63.07 3.72 5,324.11 8,923.21 14,247.32 Gross Block -

As at March 31, 2010


Accumulated Depreciation 138.72 92.32 39.47 36.35 6.32 8.91 13.60 3.54 339.23 339.23 Net Block 209.79 3,085.83 433.25 105.08 18.45 5.49 27.40 11.53 4.01 3,900.82 9,765.83 13,666.65 Gross Block -

As at March 31, 2009


Accumulated Depreciation 19.91 43.81 20.35 26.60 5.95 2.36 11.73 2.79 133.50 133.50 Net Block 39.52 2,272.81 286.78 42.94 17.73 7.71 28.68 8.38 4.46 2,709.00 6,205.84 8,914.84 Gross Block -

(Rupees in Millions) As at March 31, 2008


Accumulated Depreciation 6.18 29.01 10.99 18.54 6.06 0.31 6.99 2.07 80.15 80.15 Net Block 0.26 83.57 80.53 41.19 13.94 5.54 0.16 7.90 5.05 238.14 24.27 262.41

209.79 3,224.56 525.57 144.55 54.80 11.81 36.30 25.14 7.54 4,240.05 4,240.05

39.52 2,292.71 330.59 63.29 44.33 13.66 31.04 20.11 7.25 2,842.50 2,842.50

0.26 89.75 109.54 52.18 32.48 11.60 0.47 14.89 7.12 318.29 318.29

270

DETAILS OF LOANS AND ADVANCES (CONSOLIDATED) ANNEXURE XXIII

(Rupees in Millions)

Particulars

As at June 30, As at March 31, As at March 31, As at March 31, 2010 2008 2010 2009

Loans & Advances (Unsecured, considered Good, unless otherwise stated) Advances recoverable in cash or in kind or for value to be received Advances for Land Purchases Advances to Suppliers Advance Payment of Taxes (Net of Provisions) Other amounts recoverable Deposits Total Loans and Advances to Promoter, Director and Promoter Group 325.47 572.06 594.93 612.84 50.42 2,155.72 0.69 419.34 618.36 516.20 589.37 39.15 2,182.43 20.93 280.26 339.52 93.95 208.18 7.35 929.26 5.37 210.06 141.94 6.82 20.04 7.08 385.94 29.08

Note The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete.

The figures disclosed above are based on the restated unconsolidated summary statement of Assets and Liabilities of the Company.

271

DETAILS OF SUNDRY DEBTORS (CONSOLIDATED) ANNEXURE XXIV


(Rupees in Millions)

Particulars
Sundry Debtors ( Unsecured - Considered good) Outstanding for a period exceeding six months Others TOTAL Loans and Advances to Promoter, Director and Promoter Group Note

As at June 30, 2010

As at March 31, 2010

As at March 31, As at March 31, 2009 2008

962.65 1,963.55 2,926.20

534.02 1,639.88 2,173.90

928.56 928.56

10.62

11.14

8.15

The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete.

The figures disclosed above are based on the restated consolidated summary statement of Assets and Liabilities of the Company.

272

DETAILS OF INVESTMENTS (CONSOLIDATED) ANNEXURE XXV (Rupees in Millions)

Particulars
Investment In Associate Companies In India Other Investments Current Investments In Mutual Funds Total Aggregate of investments

As at June 30, 2010


Unquoted Quoted 145.11 6.49 151.60 151.60 0.44 1,313.54 1313.98 1,313.98 MARKET VALUE 1,314.56

As at March 31, 2010


Unquoted Quoted 13.80 6.49 20.29 20.29 0.44 2,777.13 2777.57 2,777.57 MARKET VALUE 2,778.11

As at March 31, 2009


Unquoted 6.05 6.05 6.05 Quoted 0.44 809.30 809.74 809.74 MARKET VALUE 809.74

As at March 31, 2008


Unquoted 6.05 6.05 6.05 Quoted 0.44 0.44 0.44 MARKET VALUE 0.44

COST
Quoted Investments Unquoted Investments 1313.98 151.60 1465.58

COST
2777.57 20.29 2797.86

COST
809.74 6.05 815.79

COST
0.44 6.05 6.49

Total The figures disclosed above are based on the restated consolidated summary statement of Assets and Liabilities of the Company.

273

CONSOLIDATED ACCOUNTING RATIO STATEMENT AS AT 30th JUNE 2010 ANNEXURE XXVI Rupees in Millions except for per share As At March 31, As At March 31, As At March 31, 2010 2009 2008

Particulars

As At June 30, 2010

Basic Earnings Per Share (Eps) Net Profit After Tax No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Earnings Per Share (Eps) Diluted Earnings Per Share (Eps) Net Profit After Tax No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Earnings Per Share (Eps)

(149.47) 425201319 425201319 (0.35)

(113.60) 425201319 425201319 (0.27)

1,111.34 425201319 406120993 2.74

(78.42) 318058362 304608798 (0.26)

(149.47) 425,201,319 425,201,319 (0.35)

(113.60) 425,201,319 425,201,319 (0.27)

1,111.34 425,201,319 410,736,351 2.71

(78.42) 318,058,362 304,608,798 (0.26)

Net Assets Value (Nav) Net Assets No. Of Equity Shares Weighted Average Number Of Equity Shares Outstanding During The Year Nav Per Share Return On Net Worth Net Profit After Tax Net Worth Return On Net Worth Definition of Ratios The ratios have been computed as below: Earnings Per Share (`)

3702.64 425201319 425201319 8.71

3847.35 425201319 425201319 9.05

3960.90 425201319 406120993 9.75

2097.26 318058362 304608798 6.89

(154.15) 3702.64 -4.16%

(102.01) 3847.35 -2.65%

1,144.47 3960.90 28.89%

(62.07) 2097.26 -2.96%

Adjusted Profit / (Loss) After Tax But Before Extraordinary Items Weighted Average Number Of Equity Shares Outstanding During The Year Net Worth Excluding Revaluation Reserve Weighted Average Number Of Equity Shares Outstanding During The Year
Networth = Share Capital + Share Warrant + Reserves & Surplus (+/-) surplus/(Deficit) in the Profit and Loss Account - Miscellaneoues Expenditure to the extent not written off

Net Asset Value Per Share =

Return On Net Worth (%) =

Adjusted Profit / (Loss) After Tax But Before Extraordinary Items Net Worth Excluding Revaluation Reserve

Earnings per share has been calculated in accordance with Accounting Standard 20 - Earnings per share issued by The Institute of Chartered Accountants of India During the period ended 30th June 2010, the Company has issued and allotted 377956728 equity shares of ` 10/- each, fully paid up in the ratio of 8 equity shares for every 1 share to the existing shareholders. In accordance with Accounting Standard 20 "Earnings per Share", the afforsaid shares have been adjusted for the event of bonus shares in computation of the earnings per share. Net Assets value per share has been computed after adjusting the number of equity shares outstanding at the end of the year/period, for the aforesaid shares. Profit and Loss as restated has been considered for the purpose of computing the above ratios.

274

DETAILS OF UNSECURED LOANS (CONSOLIDATED) ANNEXURE XXVII(a) (Rupees in Millions) As at March 31, 2008 -

Particulars

As at June 30, 2010

As at March 31, 2010

Term Loans from Financial Institutions Inter Corporate Deposits Total Amounts due to Promoters, Director and Promoter Group Note

1,000.00 1.00
1,001.00

2,000.00 2,000.00

The list of persons/entities classified as Promoters and Promoters Group Companies has been determined by the Management and relied upon by Auditors. The Auditors have not performed any procedures to determine whether this list is accurate or complete.

The figures disclosed above are based on the restated consolidated summary statement of Assets and Liabilities of the Company.

275

DETAILS OF UNSECURED LOANS AS ON 30TH JUNE 2010 (CONSOLIDATED) ANNEXURE XXVII (b)

Sr. No.

Name of the Lender(/s)

Loan Agreement

Purpose

Amount Sanctioned 1,000

Total Amount Outstanding 1,000

Interest p.a.

Penal Interest & liquidated damages

Repayment

1.

L&T Facility Infrastructure agreement Finance Company dated September 17, Limited 2009

For township development project

L&T Infrastructure Non-payment of 14 Qtrly. PLR minus 1.25%, interest / installment Installments 12.75% on the due date will starting from attract penal interest June, 11 to Sept., @ 2% pa on the 14 overdue interest / installment.

276

DETAILS OF SECURED LOANS OUTSTANDING (CONSOLIDATED) ANNEXURE XXVIII (a)


(Rupees in Millions)

Particulars

As at June 30, 2010

As at March 31, 2010

As at March 31, 2009

As at March 31, 2008

SECURED LOANS Term Loans from Banks

Secured By Charge Created by way of English Mortgage Deed / other charges on respective Land and premises, buildings constructed or to be constructed thereon and all present & future moveable assets.
Interest Accrued and due on Secured Loan Debentures Axis Bank Limited

7,447.30

7,280.81

5,123.63

4,970

15.78

5.47

1 (One) 3.52% Secured Deep Discount Convertible Debenture having face value of ` 3874000000 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 0.26 Hectors. Less : Unexpired Discount
Bank of India 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 2349152295 Secured By Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Allahabad Bank 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 783050765 Secured by Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Allahabad Bank 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 708403784 Secured by Charge Created by English Mortgage Deed on Land of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Indusind Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 749372799 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount ICICI Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 3534036929 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Andhra Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 354201892 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount United Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debentures having face value of ` 708403784 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Jammu & Kashmir Bank Limited 1 (One) 6% Secured Deep Discount Convertible Debenture having face value of ` 1,41,68,07,569 Secured By Charge Created by English Mortgage Deed on Land Of Lavasa Project admeasuring 1 Acre. Less : Unexpired Discount Total

3,874.00

3,874.00

3,874.00

1,183.33

2,690.67

1,245.15

2,628.85

1,479.84

2,394.16

2,349.15

2,349.15

2,349.15

684.18

1,664.97

723.40

1,625.75

631.97

1,717.18

783.05

783.05

783.05

239.12

543.93

252.19

530.86

220.19

562.86

708.40

708.40

215.16

493.24

224.08

484.32

749.37

749.37

212.31

537.06

200.00

549.37

3,534.04

3,534.04

1,097.73

2,436.31

1,142.35

2,391.68

354.20

354.20

102.97

251.23

107.43

246.77

708.40

708.40

207.41

500.99

216.33

492.07

1,416.81

467.20

949.61 17,531.10 16,235.96 9,797.82 4,970.00

277

DETAILS OF DEEP DISCOUNT CONVERTIBLE DEBENTURES (CONSOLIDATED) ANNEXURE XXVIII (b) (Rupees in Millions) As at March As at March 31, 2009 31, 2008

Particulars

As at June 30, 2010

As at March 31, 2010

Axis Bank Limited Subscribed Amount Coupon Rate

2250 3.52%

2250 3.52%

2250 3.52%
5 Years or IPO whichever is earlier 100000 Yes At the end of 36th, 48th & 60th month

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

Bank of India Subscribed Amount Coupon Rate

1500 6.00%

1500 6.00%

1500 6.00%
5 Years or IPO whichever is earlier 100000 Yes At the end of 39th, 48th & 60th month

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month

Allahabad Bank Subscribed Amount Coupon Rate

500 6.00%

500 6.00%

500 6.00%
5 Years or IPO whichever is earlier 100000 Yes At the end of 39th, 48th & 60th month

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month

278

Indusind Bank Limited Subscribed Amount Coupon Rate

500 6.00%

500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period
Andhra Bank Subscribed Amount Coupon Rate

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

250 6.00%

250 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period
Union Bank of India Subscribed Amount Coupon Rate

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month
500 6.00% 500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period
Allahabad Bank Subscribed Amount Coupon Rate

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 39th, At the end of 39th, 48th & 60th month 48th & 60th month
500 6.00% 500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month

279

ICICI Bank Limited Subscribed Amount Coupon Rate

2500 6.00%

2500 6.00%

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period
Jammu & Kashmir Bank Subscribed Amount Coupon Rate

5 Years or IPO 5 Years or IPO whichever is earlier whichever is earlier 100000 100000 Yes Yes At the end of 36th, At the end of 36th, 48th & 60th month 48th & 60th month
1,000 6.00% -

Maximum Tenur Conversion Valuation Put/Call Option by HCC/Investor Put/Call Option period

5 Years or IPO whichever is earlier 120000 Yes At the end of 39th, 48th & 60th month

280

DETAILS OF OTHER INCOME (CONSOLIDATED) ANNEXURE XXIX

Particulars

(Rupees in Millions) As at As at As at As at June March 31, March 31, March 31, 30, 2010 2010 2009 2008

Other Income Other Income Sale of Scrap Dividend on Investment Conversion / Translation Difference Profit on Sale of Asset Profit on Sale of Investment Total

10.18 0.90 0.39 11.47

23.92 0.15 0.04 0.96 0.31 25.38

0.02 0.11 1.63 0.22 0.15 3.57 5.70

0.07 0.07

281

DETAILS OF LAND AND CONSTRUCTION EXPENSES (CONSOLIDATED) ANNEXURE XXX

Particulars

As at June 30, 2010

As at March 31, 2010

(Rupees in Millions) As at March 31, As at March 2009 31, 2008

Land And Construction Expenses Land purchased / acquired Civil Work & Contract Charges (net of recoveries) Repair & Maintenance Rent, Rates & Taxes Power & Fuel (net of recoveries) (Accretion) / Decretion to Inventory Total

267.19 450.25 0.17 8.33 4.51 (199.98) 530.47

440.68 4,153.09 3.61 34.60 90.17 (1,984.25) 2,737.90

920.95 2,040.46 10.79 22.87 102.79 2,949.25 6,047.11

480.21 1,323.81 7.70 15.65 24.14 (1,851.51) -

282

DETAILS OF EMPLOYEE'S REMUNERATION AND BENEFITS (CONSOLIDATED) ANNEXURE XXXI

Particulars
Employee'S Remuneration And Benefits Salary, Wages, Bonus and Gratuity Contribution / Provisions to and for provident and other funds Welfare Expenses Transfer to Project Work In Progress Total

(Rupees in Millions) As at June As at March As at March As at March 30, 2010 31, 2010 31, 2009 31, 2008

205.98 5.23 4.72 215.93

510.93 27.91 538.84

464.65 23.16 487.81

216.73 1.09 (203.99) 13.83

283

CONSOLIDATED CAPITALIZATION STATEMENT AS AT 30th JUNE 2010 ANNEXURE XXXII

Particulars Long Term Debts Short Term Debts Total Debts Shareholders' Funds Equity Share Capital Preference Share Capital Share Warrant Total (A) Reserves, as Restated Securities Premium Amalgamation Reserve Capital Redemption Reserve Profit & Loss Account Less :- Miscellaneous Expenditure (to the extent not written off) Total (B) Total Shareholders Funds (A+B) Long Term Debts/ Equity Notes: Short term debts represent debts which are due within twelve months from 30th June 2010 Long term debts represent debts other than short term debts, as defined above.

Rupees In Millions Pre Issue Post Issue 18,531.10 1.00 18,532.10

4,252.01 522.50

4,774.51 81.25 4,855.76

201.07 216.11 (1,570.32) (1,153.14) 3,702.62 5.00

The figures disclosed above are based on the Restated consolidated Summary Statement of Assets and Liabilities of the Company as at 30th June 2010

Long Term Debts/ Equity = Long Term Debts / Shareholders Fund

The Corresponding Post issue figures are not determinable at this stage pending the completion of the Book Building Process and hence have not been furnished.

284

MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND RESULTS OF OPERATIONS You should read the following discussion of our financial condition and results of operations together with the Financial Statements, the notes and significant accounting policies thereto and the reports thereon, in "Financial Statements". The Financial Statements are based on Indian GAAP, which differ in certain significant respects from U.S. GAAP and IFRS. Accordingly, the degree to which the Financial Statements in this DRHP will provide meaningful information to a prospective investor in countries other than India is entirely dependent on the reader's level of familiarity with Indian accounting practices. Our financial year ends on March 31 of each year, so all references to a particular Fiscal year are to the twelvemonth period ended March 31 of that year. This discussion contains forward-looking statements and reflects our current views with respect to future events and financial performance. Actual results may differ materially from those anticipated in these forward-looking statements. Given these uncertainties, prospective investors are cautioned not to place undue reliance on such forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those discussed in "Risk Factors" and "Our Business" on page xii and page 52, respectively. In this section, acquisition of land refers to land purchased by us directly from landowners through private negotiations. In addition, sale of land refers to lease of land on a long term basis and FSI refers to developable area which we lease on a long term basis. Overview We are a city development and management company engaged in the development, construction and management of Lavasa, a hill city development in India. The state of Maharashtra has declared an area of 18 villages in Mulshi and Velhe Tehasil in the district of Pune as a hill station, measuring approximately 23,014 acres (based on our internal estimates pursuant to review of available land records). As of September 10, 2010, we have purchased approximately 9,460 acres of largely contiguous land within this designated area. We were granted an in-principle approval by the state of Maharashtra to develop this land which was separately notified as a hill station pursuant to which we maintain exclusive development rights over the land owned by us. Our vision is to develop Lavasa as a city which provides avenues for its residents and visitors to live, work, learn and play in harmony with nature. The area declared as a hill station is almost one-fifth of the land area of Municipal Corporation of Greater Mumbai (MCGM) and includes submerged land of 4,320 acres (Source: www.mcgm.gov.in and internal project report prepared by our planning department). Based on the land we own or have entered into MoUs and/or agreements to purchase as of September 10, 2010 measuring 13,226 acres, we estimate that Lavasa can accommodate a permanent population of approximately 300,000 with facilities for approximately two million tourists per annum. Cities comprise a myriad of businesses that are typically provided by multiple private and public entities and are governed by diverse regulatory frameworks. At Lavasa, we are developing businesses which, we believe, will over time facilitate and sustain the economy of Lavasa in a complementary fashion. We aim to develop a 365 day economy meaning that Lavasa will not simply be a weekend or tourist destination; instead, we aim to develop an economy at Lavasa where we expect to share in the revenue streams related to our ongoing consumption and infrastructure businesses. We expect that our initial real estate development and early stage investments in core infrastructure assets such as roads, dams, bridges, water and sewage network may lead to real estate revenues in the short term and ongoing consumption driven revenues from businesses located within Lavasa in the long term. Through our continued emphasis on infrastructure and city management, we aim to achieve optimum resident satisfaction which in turn, we believe, may lead to additional real estate transactions and consumption opportunities in the hospitality, education, tourism and leisure, healthcare and retail sectors. We are consciously cultivating these interlinked and co-dependent businesses within the framework of our governance platform which we believe will significantly contribute to this economic integration. Driven by our focus on integration, we are organised as follows:

285

Real estate. Our real estate business aims to continue to purchase, develop, sell built up structures and/or lease land and/or real estate assets across the residential, commercial, institutional, hospitality and social sectors. Our revenues are primarily derived from real estate sales and leases of built up structures and/or land leases, grant of long term leasehold interests in the underlying lands and, to a lesser extent, the lease of certain assets and our consolidated revenue from this business was ` 3,063.71 million for FY 2010 and ` 2,071.04 million for FY 2009. Governance. Pursuant to a notification dated June 12, 2008, issued under the MRTP Act, (SPA Notification), the Government of Maharashtra has appointed our Company as a special planning authority in connection with land owned and proposed to be developed by us. The SPA is our governance platform, which aims to ensure an optimum quality of life for our residents and visitors and benefits from exclusive development rights. In terms of the MRTP Act, the SPA is required to, from time to time, submit its proposals for the developments of the land in the area as detailed in the SPA Notification, (being land either currently owned by us or land which is proposed to be purchased by us), (Statutory Proposals), to the State Government after having invited and considered suggestions and objections from the public. The State Government may in turn, after consultation with the Director of Town Planning, approve such Statutory Proposals either with or without modification. The Statutory Proposals are required to be prepared taking into consideration the provisions of any regional plan or a draft thereof, any development plan, building bye-laws and regulations, which are already in force in the area notified under the SPA Notification. Prior to the SPA Notification, pursuant to a letter dated June 7, 2008, the Office of the Collector, Revenue Department, District Pune, has approved and granted permission to our Company for our proposed development at Dasve and Padalghar for a total area of 636.82 hectares. Currently, the draft Statutory Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication amongst others in the official gazette and local newspapers, for public review and receipt of public suggestions and objections thereon. Consequently, this draft Statutory Proposals, after having considered the objections and suggestions received from the public, as appropriate, shall be submitted to the State Government for its approval. The SPA also approves certain draft development control regulations applicable to the land under the control and jurisdiction of the SPA (the Lavasa DCRs), which are required to be subsequently approved by the State Government. The Lavasa DCRs are required to be within the framework of the regional plan, which includes the Hill Station Regulations and the development control rules, regulations, and notifications issued by the State Government of Maharashtra, as applicable to the notified area in the Pune district (the Pune Region DCRs). Thus, the SPA prepares the Statutory Proposals and the Lavasa DCRs and supervises and ensures that all development within the city is in accordance with the Statutory Plan, the Lavasa DCRs, the master plan designed by our Company with HOK International Limited and applicable statutory, regulatory and other requirements.

Infrastructure. We construct and own assets related to dams, water and sewage, drainage, solid waste management, power, roads, street lighting, landscaping, public utilities and information, communication and technology. We expect that our information, communication and technology infrastructure will include telephone, mobile and broadband networks, e-governance and a data centre. In addition, we also construct, develop and maintain social infrastructure such as townhalls, parks and gardens, post offices and police and fire stations. In addition, our city management team enforces our public health and welfare, public safety and regulations and will maintain our infrastructure and civic amenities once these become operational. We aim to provide better services than those available in the average Indian city and to achieve economies of scale given the size of Lavasa's expected population and the scale of Lavasa. Based on our engineer certificate dated August 11, 2010, on the land that we own and have developed as of the date of this Draft Red Herring Prospectus, we expect to treat 100% sewage and solid waste generated, we expect to have 100% piped water, sewage and septic tank coverage, our storm water drains are expected to cover 120% of our road network and we have designed our water supply to deliver 216 litres per capita per day, all of 286

which, according to McKinsey Global Institute (MGI), are better than or comparable to current best-inclass standards. (Source: India's urban awakening: Building inclusive cities, sustaining economic growth, Mckinsey Global Institute April 2010). Consumption. Our consumption business comprises businesses in the hospitality, education, tourism and leisure, healthcare and retail sectors and aims to achieve ongoing annuity revenues through tie-ups with corporate and other institutions in the relevant sectors. o Hospitality. Our hospitality business comprises of hotels, a convention centre and clubs. Together with our partners, we aim to offer hotels of various categories ranging from budget to high-end hotels. We have been granted mega status by the Tourism and Cultural Affairs Department, Government of Maharashtra under the Tourism Policy 2006 of the Government of Maharashtra in connection with our proposed tourism project at Lavasa Hill Station at Taluka Mulshi and Velhe falling under 'C' zone. Fortune Select Dasve and Mercure Lavasa, two hotels developed by us, are currently operational and we have also developed an international convention centre in Dasve with a plenary capacity of 1,500 people, which commenced operations in April 2010. Further, Dasvino, our town and country club, has also started its operations in April 2010. Education. We have tied up with international and national educational institutions to establish an education infrastructure traversing primary, secondary, tertiary and continuing education aimed at providing quality education centred around recognised national and international curricula. Our revenue from the education business is derived from lease income from the educational institutions and, in some instances, ongoing revenue pursuant to our shareholdings in these businesses. As of the date of this Draft Red Herring Prospectus, we have entered into arrangements with institutions, such as Educomp Infrastructure and School Management Limited, Birla Edutech Limited and Ecole Hoteliere de Lausanne whereby we will develop educational institutions jointly with these entities. Tourism and leisure. We intend to offer various tourism and leisure amenities such as golf training, boating, nature trails, water sports, outdoor sports, adventure sports and theme based entertainment parks with an intention to draw visitors to Lavasa. We have arrangements in place with Space Investment Corporation LLC to set up a space themed entertainment park, Nick Faldo Designs Overseas Limited for designing the golf course at Dhamanohol, Faldo Academies Limited for golf training academy at Mugaon, a licence agreement with Golden Five Limited for rowing and training activities with Sir Steve Redgrave and have signed term sheets with Hockey Australia, Manchester City Football Club Limited and I Dream Productions Private Limited. Healthcare. We have entered into arrangements with Apollo Hospitals Enterprise Limited for health and wellness development at Lavasa, covering primary hospitals, wellness research development and medical education and have developed a hospital with a capacity of 60 beds at Dasve through a subsidiary. Retail. We are developing commercial retail spaces with an intention to lease such spaces and in some cases lease land on a long term basis for the lessee to set up diverse retail businesses. We are developing retail spaces ranging from single brand flagship stores to retail squares concentrated in the town centre. In addition, we are developing retail spaces attached to a space themed entertainment park.

We view Lavasa as a replicable model for the development of future cities and we will, in our view, have a competitive advantage with respect to bidding for and efficiently developing and executing such future cities. We will, on an opportunistic basis, evaluate options for developing future cities and marketing our city management expertise to other developers of new cities.

287

We are jointly promoted by HCC, a recognised engineering, construction and infrastructure development company in India, through its wholly-owned subsidiary company HREL. HCC holds a 64.99% stake in Lavasa, through its subsidiary, HREL. Note Regarding Presentation The Financial Statements have been prepared in accordance with Indian GAAP and standards issued by the Institute of Chartered Accountants of India (ICAI) and SEBI ICDR Regulations. The discussion below covers our consolidated restated results for the three months ended June 30, 2010, FY 2010, FY 2009 and FY 2008. Factors Affecting Our Financial Results The general factors affecting our financial condition and performance are discussed below: General economic, income and demographic conditions in India and elsewhere We are a city development and management company. As such, our financial performance depends upon changes in the general economic condition, growth in GDP, rate of urbanisation, demographic changes, changes in disposable incomes and the real estate sector in India. The Indian economy grew at a rate of nearly 9% in FY 2008, and 6.7% in FY 2009, making it one of the fastest growing economies in the world. (Source: Reserve Bank of India, Third Quarter Review of Monetary Policy for the Year 2009-10) As investments related to urban development are driven by increases in employment and disposable income, any slowdown or perceived slowdown in the Indian economy or GDP, or in specific sectors of the Indian economy, could adversely impact our business and financial performance. Other economic conditions affecting our business include market pricing trends that affect sales and room rental rates of our projects, demographic changes, interest rates, changes in levels of disposable income and the availability of consumer financing. We expect these trends to continue and expect our results of operations to continue to vary from period to period in accordance with fluctuations in the Indian economy and the Indian real estate market. Rate of urbanisation in India Our success depends upon the rate of urbanisation in India and the need for new urban developments such as Lavasa which seek to provide better amenities than those available in most India cities. The rate of urbanisation is affected by many factors, including the growth in the target market for urbanisation (ages 16 to 64 years), changing demographic profiles, strain on existing infrastructure and housing shortages. Hence, our financial results depend upon our ability to take advantage of the rate of urbanisation in India and to attract residents, visitors and businesses to Lavasa which would, in turn, generate revenues. Factors affecting the components of our income streams Our total income will likely be comprised of lease premiums, project management consultancy fees, annuities from infrastructure services and consumption driven annuities, sales and/or leases of retail built up structures, lease rentals from rental housing, lease rentals linked to revenues of retail outlets and fees for design and construction on the leased land. These inputs are affected by various factors outside our control, including: prevailing local economic, income and demographic conditions; availability of consumer and project development financing (interest rates and eligibility criteria for loans); availability of and demand for projects comparable to those we develop; changes in governmental policies relating to zoning and land use; changes in applicable regulatory schemes;

288

our ability to collect fees from residents for infrastructure and civic amenity services provided; and the ongoing spending patterns of our residents and the success of our hospitality, education, tourism and leisure, healthcare and retail businesses.

Occupancy levels of our hospitality projects We aim to offer hotels of various categories ranging from budget to high end hotels and have been granted mega status by the Tourism and Cultural Affairs Department, Government of Maharashtra under the Tourism Policy 2006 of the Government of Maharashtra in connection with the our proposed tourism project at Lavasa hill station at Taluka Mulshi and Velhe in Pune district falling under C zone. A material part of our development plan is devoted to our hospitality and convention business and our aim is to turn Lavasa into a convention destination that will attract meetings, exhibitions, corporate events, training and development and national and international conventions. Revenues from our hospitality projects depend upon the attractiveness of India as a tourist/business destination, our ability to attract tourists and business visitors to Lavasa and the occupancy levels in our hotels. Revenues and cash flows in the tourism industry are affected by seasonality depending on the location and categories of hotels. We expect that Lavasa would attract the maximum number of tourists in specific months of the year (during the holiday periods, from November to May). Accordingly, we expect that our hospitality revenues may generally be higher during these months of each fiscal year compared to the other months of the fiscal year. Interest in our educational projects We have tied up with educational institutions to establish an education infrastructure traversing primary, secondary, tertiary and continuing education. Revenue from our education business is expected to be derived from lease income from the educational institutions and, in some instances, we expect to have a share in the ongoing revenue of the institutions once operational through (i) lease premiums or (ii) potential dividend payments from our Subsidiaries or Associates. Revenue from our education business segment will likely depend upon several factors, such as tie-ups with recognised educational institutions, our ability to attract interest from students in our educational projects and our ability to attract suitably qualified professionals such as professors, teachers and instructors. Lease prices of our developed land Our profit margin depends in part on the pricing of our leases which is impacted by several factors, including: the growth of the Mumbai Pune corridor; the level of success of the consumptive aspects of our economy which are currently operational; the success of and occupancy rates of our current hospitality projects; the availability of consumer and project development financing (interest rates and eligibility criteria for loans); changes in applicable regulatory schemes; and real estate prices in the state of Maharashtra.

Construction costs We are indirectly exposed to market risk with respect to the prices of raw material and components used in our projects, particularly steel and cement. For steel and cement, some of the contractors may negotiate and pass through those costs to us. However, our exposure to fluctuations in the prices of these raw materials is limited due to 289

escalation clauses in our lease agreements/contracts to sell built up structures whereby we can, under certain conditions, increase the prices charged to purchasers and residents due to increases in the costs of steel and cement. Raw material prices, particularly, those of steel and cement, may be affected by price volatility caused by different factors that affect the Indian and international commodity markets. If there are extraordinary price increases in construction materials due to increase in demand for steel and cement, or shortages in supply, the contractors we hire for construction or development work may be unable to fulfil their contractual obligations and may therefore be compelled to increase their contract prices. As a result, increases in costs for construction materials may impact our construction costs. In addition, the timing and quality of construction of the projects we develop depend on the availability and skill of our contractors, architects and consultants, as well as contingencies affecting them, including labour and industrial actions such as strikes. Such labour and industrial actions may cause significant delays to the construction timetables for our projects, and we may therefore be required to find replacement contractors and consultants at higher costs. As a result, any increase in prices resulting from higher construction costs could adversely affect demand for our projects and the relative affordability of our projects as compared to our competitors' projects. Government policies including taxes and duties The state government of Maharashtra has granted us SPA status which is our governance platform. The SPA approves the master plan and amendments to it in accordance with the applicable development control regulation and supervises and ensures that all development within the city is in accordance with the master plan, statutory, regulatory and other requirements, as prescribed. Notwithstanding the foregoing, we require certain statutory and regulatory permits, licenses and approvals to execute our projects and operate our business and applications need to be made at appropriate stages for such approvals. Regulations applicable to our operations include standards regarding transfer of property, registration, the ratio of built-up area to land area, land usage, road access, necessary community facilities, open spaces, water supply, sewage disposal systems, electricity supply and environmental suitability. Competition We may face competition from (i) the cities of Mumbai and Pune to the extent that these cities offer improved infrastructure development and facilities as compared to existing facilities; and (ii) new urban centres which are being developed or may be developed in the Mumbai Pune corridor. To a lesser extent, we may face competition from real estate developments in Mumbai and Pune, townships in other economic corridors in India or in the event that the municipal limits of Pune are expanded. The aforementioned competition may impact our ability to attract potential future residents and thereby adversely affect our ability to develop and sell or lease our projects. Other Factors For further details on these and other factors that may affect our results of operations, see Risk Factors on page xii. Principles of Consolidation The consolidated financial statements have been prepared by us in accordance with the requirements of Accounting Standards AS-21 Consolidated Financial Statements and AS- 23 Accounting for Investments in Associates in Consolidated Financial Statements notified pursuant to the Companies (Accounting Standards) Rules, 2006 (as amended). The consolidated financial statements comprises financial statements of our Subsidiaries namely Andromeda Hotels Limited (AHL), Apollo Lavasa Health Corporation Limited (ALHCL), Dasve Business Hotel Limited (DBHL), Dasve Convention Center Limited (DCCL), Dasve Hospitality Institutes Limited (DHIL), Dasve Retail Limited (DRL), Ecomotel Hotel Limited (EHL)*, Full Spectrum Adventure Limited (FSAL), Future City Multiservices SEZ Limited (FCMSL), Green Hills Residences Limited (GHRL), Hill City Service Apartments Limited (HCSAL), Kart Racers Limited (KRL), Lakeshore Watersports Company Limited (LWCL), Lakeview Clubs Limited (LCL), Lavasa Bamboocrafts Limited (LBL), Lavasa Hotel Limited (LHL), My City Technology 290

Limited (MCTL), Nature Lovers Retail Limited (NLRL), Our Home Service Apartments Limited (OHSAL), Reasonable Housing Limited (RHL), Rhapsody Hospitality Limited (RHL), Sahyadri City Management Limited (SCML), Sirrah Palace Hotels Limited (SPHL), Spotless Laundry Services Limited (SLSL), Valley View Entertainment Limited (VVEL), Verzon Hospitality Limited (VHL), Warasgaon Infrastructure Providers Limited (WIPL), Warasgaon Lake View Hotels Limited (WLVHL), Warasgaon Power Supply Limited (WPSL), Warasgaon Tourism Limited (WTL), Whistling Thrush Facilities Services Limited (WTFSL) and its Associates namely Bona Sera Hotels Limited (BSHL), Knowledge Vistas Limited (KVL), Palmetto Hospitality Limited (PHL) and SOL Hospitality Limited (SHL). The year end balances and common transactions with the Subsidiaries are eliminated in full. *Ecomotel Hotel Limited (EHL) ceased to be our Subsidiary on September 2, 2010 and became and our Associate. Significant Accounting Policies Basis of accounting and the use of estimates We maintain our accounts on accrual basis following historical cost convention, in compliance with the Accounting Standards issued by the ICAI, relevant provisions of the Companies Act and the rules made thereunder. Our management makes estimates and technical and other assumptions regarding the amounts of income and expenses, assets and liabilities, and disclosure of contingencies, in accordance with Indian GAAP in the preparation of the financial statements. Difference between the actual results and estimates are recognised in the period in which determined. Fixed assets and intangible assets Fixed assets are stated at the cost of acquisition or construction including attributable overheads, interest and financial costs till such assets are ready for their intended use, less accumulated depreciation and impairment losses, if any. Costs relating to trademark and design have been treated as intangible assets which also comprise license fees, other implementation costs for software and application software acquired for in-house use. The cost of purchase of land to the extent of one percent is accounted as fixed assets and the remaining amount is accounted for as stock-in-trade. Depreciation and amortisation Depreciation on fixed assets is provided: (i) in respect of office buildings, furniture and fixtures, office equipments, vehicles, speed boats and infrastructure assets on written down value method at the rates specified in Schedule XIV of the Companies Act on pro-rata basis; in respect of intangible assets being computer software relating to our geographic information system and enterprise resource planning is amortised over the estimated useful life of 10 years under straight line method on pro-rata basis; and in respect of trademark and design costs are amortised equally over a period of 10 years.

(ii)

(iii)

Investments Investments are classified as long term and current investments. Long term investments are shown at cost or written down value (in case of diminution which is other than temporary diminution) and current investments are shown at cost or market value whichever is lower. Inventories of land and Floor Space Index (FSI)

291

(i)

The cost of land accounted for as stock-in-trade is treated as (a) Cost of FSI - 95%, (b) Land, stock-in-trade 5%, both being distinct items of inventory. Cost of land and FSI are accounted for on a weighted average basis along with related purchase/acquisition price plus all direct and indirect expenditure incurred in connection with the purchase of land. Land and FSI are valued at lower of cost or net realisable value. Land or FSI utilised for own construction is transferred to fixed assets at cost. Project work in progress is valued at the contract rates in accordance with long-term construction accounting standards. Where construction of any unit is undertaken for which there are no sales, such inventory is valued at lower of cost or net realisable value and is not considered under long-term construction for accounting purposes. The stock of stores, food and beverages, groceries and provisions, other guest amenities, information technology material, finished products including traded goods and semi finished goods are stated at the lower of cost or net realisable value. The inventories of raw materials, lab materials, other consumables and housekeeping items, medicines and healthcare items are stated at cost.

(ii) (iii) (iv)

Foreign currency transactions Foreign currency transactions during the year are accounted at the prevailing rate on the date of transaction. Current assets and current liabilities are translated at the exchange rate prevailing on the last day of the fiscal year. Gains or losses arising out of remittances/translations at the year-end are credited/debited to the profit and loss account for the fiscal year. Revenue recognition (i) Sale of land (including lease premium) and FSI Revenues are recognised in the year in which the agreement to lease is executed. Income from land sale (including on long term lease basis) is recognised on the transfer of all significant risks and rewards of ownership to the buyers and a reasonable expectation of collection of the sale consideration from the buyers exists. Exchange of parcels of land against other parcels of land is not treated as a sale but is adjusted in the inventories of our balance sheet. (ii) Project Construction Work Our Company follows the percentage completion method, on the basis of physical measurement of work actually completed at the balance sheet date, taking into account the contractual price and revision thereto by estimating total revenue and total cost to the completion of the contract and the profit so determined accounted for proportionate to the percentage of the actual work done. Foreseeable losses are accounted for as and when they are determined. Revenues from sales of constructed units, other than under long term construction contracts, are recognised on execution of transfer agreements. (iii) Project Management Consultancy Fees Revenues from project management consultancy fees are recognised on accrual basis as per the agreements. (iv) Revenues from room rentals and allied services relating to hotel operations are recognised upon rendering of services.

Borrowing costs Borrowing costs (less any income on the temporary investments of those borrowings) that are directly attributable to qualifying assets/project work in progress are charged over such qualifying assets/project work in progress.

292

Employee benefits (i) Defined Contribution Plans Contribution to provident fund and superannuation fund is accounted on accrual basis. (ii) Defined Benefit Plan Gratuity is charged to revenue on the basis of actuarial valuation. (iii) Other benefits Short term and long term compensated absences are provided for based on actuarial valuation. The actuarial valuation is done as per projected unit credit method. Taxes on income The tax expense comprises of current, deferred and wealth tax. Current income tax is measured in accordance with the I. T. Act. The deferred tax is measured based on the tax rates and the tax laws enacted or substantially enacted as on the balance sheet date. Deferred tax assets are not recognised unless there is virtual certainty that sufficient future taxable income will be available against which such deferred tax assets can be realised. Wealth tax is measured in accordance with the Wealth Tax Act, 1987. Impairment Our Company makes an assessment of any indicator that may lead to the impairment of its assets on an annual basis. An asset is treated as impaired when the carrying cost of the asset exceeds its recoverable value, which is the higher of net selling price and the value in use. Impairment loss, if any, is charged to profit and loss account in the fiscal year in which it is identified as impaired. Earnings per share Basic earnings per share are calculated by dividing the net profit or loss for the period attributable to equity shareholders (after deducting preference dividends and attributable taxes) by the weighted average number of equity shares outstanding during the period. The weighted average number of equity shares outstanding during the period is adjusted for bonus shares issued during the period. For the purpose of calculating diluted earnings per share, the net profit or loss for the period attributable to shareholders and the weighted average number of shares outstanding during the period are adjusted for the effects of all dilutive potential equity shares. Contingencies/Provisions Provisions involving substantial degree of estimation in measurement are recognised when there is a present obligation as a result of past events and it is probable that there will be an outflow of resources. Contingent liabilities are not recognised but are disclosed in the notes. Contingent assets are neither recognised not disclosed in the financial statements. Leases Lease rentals in respect of assets acquired under operating leases are charged to our profit and loss account. Treatment of expenditure transferred to fixed assets/capital work in progress In respect of each financial period we transfer certain expenses from the profit and loss account to the fixed asset or capital work in progress items on our balance sheet. Such reallocated expenses are expenses incurred in connection with the construction/acquisition of a capital asset. We determine the amount of such expenditure to be transferred by reviewing our actual expenses and reallocate accordingly based on whether such expenses were incurred in connection with the construction/acquisition of capital assets or fixed assets. This is done in order to comply with 293

the requirements of Part II of Schedule VI to the Companies Act, 1956. The amount of expenditure reallocated to our balance sheet varies year on year and was ` 971.03 million, ` 3,355.22 million, ` 8,317.70 million and nil for the three months ended June 30, 2010, FY 2010, FY 2009 and FY 2008, respectively. Prior to FY 2009, all our costs were classified as project work in progress (which is a separate line item under inventories in our balance sheet). In FY 2009, due to the commencement of revenue generating activity and the execution of lease agreements, we implemented our revenue recognition policy. As a result, all costs incurred for the years prior to and including FY 2009 which were accumulated in project work in progress were reallocated in the following manner: Expenses incurred in relation to land sales, including long-term land leases and sales of constructed structures recognised were charged to our profit and loss account. Expenses incurred in relation to construction/acquisition of fixed assets and capital work in progress were reallocated to fixed assets or capital work in progress on our balance sheet. Expenses incurred in relation to incomplete and unsold inventories continued to be carried forward on our balance sheet as project work in progress.

Results of Operations The following table sets forth certain items derived from our audited restated consolidated financial statements for the three months ended June 30, 2010, FY 2010, FY 2009 and FY 2008, and also expressed as a percentage of total income for the periods presented.
(` in millions Three months ended June 30, 2010 ` % 923.73 11.47 935.20 98.77 1.23 100 For the years ended March 31, 2009 ` % 2,071.04 5.70 2,076.74 99.73 0.27 100

Particulars Income Income from Operations.................................................................. Other Income ................................................................................... Total Expenditure Land and Construction Expenses .................................................... Employee's Remuneration and Benefits .......................................... Office and Site Establishment Expenses ......................................... Finance Charges (net)...................................................................... Depreciation .................................................................................... Less: Transferred to Fixed Asset / Capital Work in Progress ......... Profit/(Loss) before Tax ................................................................ Less: Provision for taxation: Income Tax ................................................................................. Deferred Tax ............................................................................... Wealth Tax ................................................................................. Fringe Benefit Tax ...................................................................... MAT Credit Entitlement ............................................................. Profit/(Loss) after Tax .................................................................. Less: Minority Adjustments ............................................................ Add: Share in Profit/(Loss) of Associates ....................................... Add: Balance brought forward from last year ................................. Amount available for appropriation ........................................... Less: Appropriations ....................................................................... a) Proposed Preference Share Dividend .......................................... b) Tax on Proposed Dividend.......................................................... c) Capital Redemption Reserve ....................................................... Balance carried to Balance Sheet ....................................................

2010 ` 3,063.71 25.38 3,089.09 % 99.18 0.82 100

2008 ` 0.07 0.07 % 100 100

530.47 215.93 431.60 608.48 26.32 1812.80 971.03 841.77 93.43 147.89 247.42 0.01 (147.74) (154.15) (10.47) (1.03) 549.89 405.18 405.18

56.72 23.09 46.15 65.06 2.81 193.84 103.83 90.01 9.99 15.81 26.46 0 (15.80) (16.48) 1.12 (0.11) 58.80 43.33 43.33

2,737.90 538.84 640.19 1,865.34 68.46 5,850.73 3,355.22 2,495.51 593.58 355.97 695.53 0.06 (355.97) (102.01) (10.08) (2.55) 663.45 568.97 16.38 2.72 19.10 549.87

88.63 17.44 20.72 60.38 2.22 189.40 108.62 80.78 19.22 11.52 22.52 0 (11.52) (3.30) 0.33 (0.08) 21.48 18.42 0.53 0.09 0.62 17.80

6,047.11 487.81 436.02 2,148.54 11.35 9,130.83 8,317.70 813.13 1,263.61 153.49 115.74 0.03 2.19 (152.31) 1,144.47 0.57 (152.81) 991.09 95.33 16.20 216.11 327.64 663.45

291.18 23.49 21.0 103.46 0.55 439.67 400.52 39.15 60.85 7.39 5.57 0 0.11 (7.33) 55.11 0.03 (7.36) 47.72 4.59 0.78 10.41 15.78 31.95

13.83 41.33 3.37 58.53 58.53 (58.46) 0.06 3.55 (62.07) (90.74) (152.81) (152.81)

19,757.14 59,042.86 4,814.29 83,614.29 83,614.29 (83,514.29) 85.71 5,071.43 (88,671.43) 129,628.57 (218,300) (218,300)

Income Income from operations 294

Our income from operations accounted for 98.77%, 99.18% and 99.73% of our total income for the three months ended June 30, 2010, FY 2010 and FY 2009, respectively. Our operating income consists of (i) land sales including long-term land leases; (ii) progress billing and project management consultancy fees. Lease premium from long term lease consists of upfront lease income for such land. Progress billing consists of (i) sales of constructed structures and villas (from which revenues are recognized according to the percentage completion method, please see Significant Account Policies - Revenue Recognition), and (ii) revenue of subsidiaries engaged in our hospitality, education, tourism and leisure and retail businesses. Project management consultancy consists of project management services provided to entities other than our subsidiaries. Other income Our other income consists mainly of (i) room rental and allied services (which are largely food and beverage sales) from Hotel Ekaant, a hotel which is owned and operated by our Company itself (rather than by our subsidiaries), (ii) scrap sold, (iii) conversion/translation differences (which is a non-cash item relating to the import of goods), and (iv) profits on the sale of assets. Expenditure Land and construction expenses Land and construction expenses consist of expenses relating to the purchase/acquisition of land, civil work and contract charges, repairs and maintenance, rents, rates and taxes, power and fuel and change in inventories. Employees remuneration and benefits Employees remuneration and benefits consist of salaries and wages, bonus and gratuity, and contribution to provident and other funds. Office and site establishment expenses Office and site establishment expenses consist of office and other expenses, consultation charges, insurance, selling and marketing expenses, commission on sales and auditors remuneration. Finance charges Finance charges consist of interest on fixed loans, interest on debentures and other financial expenses adjusted for interest and dividend income earned on temporary investment of borrowings. Depreciation Depreciation consists of depreciation on buildings, plant and machinery, furniture and fixtures, motor vehicles, computers, office equipment, boats and intangible assets such as software and trademarks and design. Taxation Income taxes are accounted for in accordance with provisions of the I. T. Act and AS-22 issued by the ICAI on Accounting for Taxes on Income. Taxes comprise income tax, deferred tax, fringe benefit tax and wealth tax.

295

Provision for income taxes is made at income tax rates applicable after taking into consideration the benefits admissible under the provisions of the I. T. Act. In cases where our income tax liability under the provisions of the I. T. Act is less than the tax liability calculated on our book profits (as defined by I. T. Act), we are liable to pay the Minimum Alternate Tax at the applicable rate, in accordance with Section 115JB of the I. T. Act. In conformity with the Accounting Standard 22 Accounting for Taxes on Income issued by the ICAI, deferred tax asset or liability is recognised for timing differences between the profit/loss as per financial statements and the profit/loss offered for income tax, based on tax rates that have been enacted or substantively enacted at the balance sheet date. Deferred tax assets are recognised only if there is reasonable certainty that sufficient future taxable income will be available, against which they can be realised. If there is unabsorbed depreciation or carry forward of losses under income tax laws, deferred tax assets are recognised only to the extent that there is virtual certainty supported by convincing evidence that sufficient future taxable income will be available against which such deferred tax assets can be realised. The carrying amount of deferred tax assets is reviewed at each balance sheet date and adjusted, wherever required, to reflect reasonable and sufficient balances. Since Fringe Benefit Tax was abolished effective April 2009 the same has not been provided for FY 2010 onwards. Wealth Tax has been computed and provided at each balance sheet date in light with provisions of Wealth Tax Act, 1957. Minority interest Minority interest is that part of the results of operations and of the assets of a subsidiary which is attributable to 'interests' which are not owned by our Company either directly or indirectly through subsidiaries. Three months ended June 30, 2010 Income Our total income for the three months ended June 30, 2010 was ` 935.20 million. The total income consist of income from operations and other income. Income from operations Income from operations for the three months ended June 30, 2010 was ` 923.73 million. Income from long-term land leases was ` 458.81 million, progress billing (including sales and service income of subsidiaries) was ` 449.16 million and project management consultancy fees was ` 15.76 million. Other income Other income for the three months ended June 30, 2010 was ` 11.47 million, mainly comprising of room rental income from Hotel Ekaant of ` 7.36 million. Expenditure Total expenditure for the three months ended June 30, 2010 was ` 841.77 million. The expenditure on land and construction expenses was ` 530.47 million, employees remuneration and benefits was ` 215.93 million, office and site establishment expenses were ` 431.60 million, finance charges were ` 608.48 million and depreciation was ` 26.32 million. Expenditure transferred to project work in progress/fixed assets was ` 971.03 million.

296

Land and construction expenses Our land and construction expenses for the three months ended June 30, 2010 was ` 530.47 million. This primarily consists of expenses related to land purchased of ` 267.19 million, civil work and contract charges of ` 450.25 million and net accretion in inventory of ` 199.98 million. Employees remuneration and benefits Our employees remuneration and benefits for the three months ended June 30, 2010 was ` 215.93 million. This consists of salaries, wages, bonus and gratuity of ` 205.98 million, contribution made to provident and other funds of ` 5.23 million and welfare expenses of ` 4.72 million. Office and site establishment expenses Office and site establishment expenses for the three months ended June 30, 2010 was ` 431.60 million. This primarily consists of office expenses of ` 200.29 million, consultation charges of ` 70.91 million, selling and marketing expenses of ` 130.03 million and commission on sales of villas/apartments of ` 26.51 million. Finance charges Our finance charges for the three months ended June 30, 2010 was ` 608.48 million. This primarily consists of interest on fixed loans of ` 260.50 million, interest on debentures of ` 313.86 million, other interest of ` 70.12 million and adjusted for interest and dividend earned of ` 36.0 million on liquid mutual funds and bank fixed deposits. Depreciation Depreciation for the three months ended June 30, 2010 was ` 26.32 million. This primarily consists of depreciation on building, plant and machinery, furniture and fixtures, computers, vehicles, boats and intangibles. Profit/(Loss) before tax Our profit before tax for the three months ended June 30, 2010 was ` 93.43 million. Provision for Tax Our provisions for tax for the three months ended June 30, 2010 was ` 247.58 million. This is primarily due to provision for taxation from our standalone results of operations. Profit/(Loss) after Tax As a result of the foregoing, we incurred a loss after tax of ` 154.15 million. Profit/(Loss) before Share of Associates and Minority Interest As a result of the foregoing, we incurred a loss before share of associates and minority interest of ` 154.15 million for the three months ended June 30, 2010. Share of (Loss)/Profit from Associates and Minority interests Our share of loss from associates was ` 1.03 million and minority interest represented ` 10.47 million for the three months ended June 30, 2010. FY 2010 compared with FY 2009 297

Income Our total income increased by ` 1,012.35 million, or 48.75%, from ` 2,076.74 million in FY 2009 to ` 3,089.09 million in FY 2010. This increase was primarily due to an increase in progress billing. Income from operations Income from operations increased by ` 992.67 million, or 47.93%, from ` 2,071.04 million in FY 2009 to ` 3,063.71 million in FY 2010. The increase in progress billing from ` 680.40 million in FY 2009 to ` 1,937.30 million in FY 2010 was primarily due to the advancement of ongoing construction activity for villas, apartments, institutions and others and the commencement of additional construction activities during FY 2010 leading to revenue recognition based on the percentage completion method. The decrease in land sales/leases from ` 1,390.63 million in FY 2009 to ` 1,126.41 million in FY 2010 was primarily due to lesser land sales/leases on account of market forces. Other income Other income increased by ` 19.68 million, or 345.26%, from ` 5.70 million in FY 2009 to ` 25.38 million in FY 2010. This was primarily due to an increase in room rentals and allied services from Hotel Ekaant. Expenditure Total expenditure increased by ` 1,682.38 million, or 206.90%, from ` 813.13 million in FY 2009 to ` 2,495.51 million in FY 2010. This increase was primarily due to a decrease in FY 2010 in the amount of expenses we reallocated to fixed assets or capital work in progress compared to FY 2009. Our total expenditure (excluding the amount reallocated to our balance sheet) decreased by ` 3,280.10 million, or 35.92%, from ` 9,130.83 million in FY 2009 to ` 5,850.73 million in FY 2010. Land and construction expenses Our land and construction expenses decreased by ` 3,309.21 million, or 54.72%, from ` 6,047.11 million in FY 2009 to ` 2,737.90 million in FY 2010. The decrease was primarily due to the recognition of one-off expenses in FY 2009 as a result of the commencement of revenue generating activity and the execution of lease agreements, which caused us to implement our revenue recognition policy. Employees remuneration and benefits Our employees remuneration and benefits increased by ` 51.03 million, or 10.46%, from ` 487.81 million in FY 2009 to ` 538.84 million in FY 2010. The increase was primarily due to an increase in the number of employees on account of increase in business operations, the commencement of operations of certain Subsidiaries/Associates and an increase in average remuneration. Office and site establishment expenses Office and site establishment expenses increased by ` 204.17 million, or 46.83%, from ` 436.02 million in FY 2009 to ` 640.19 million in FY 2010. The increase was primarily due to an increase in selling and marketing expenses on account of enhanced marketing activities. Finance charges Our finance charges (net) decreased by ` 283.20 million, or 13.18% from ` 2,148.54 million in FY 2009 to ` 1,865.34 million in FY 2010. The decrease was primarily due to the recognition of one-off expenses in FY 2009 as a result of the commencement of revenue generating activity and the execution of lease agreements, which caused us to implement our revenue recognition policy.

298

Depreciation Depreciation increased by ` 57.11 million, or 503.17%, from ` 11.35 million in FY 2009 to ` 68.46 million in FY 2010 due to an increase in the capital asset base in FY 2010 compared with FY 2009. Profit/(Loss) before tax As a result of the foregoing, our profit before tax decreased by ` 670.03 million, or 53.03%, from ` 1,263.61 million in FY 2009 to ` 593.58 million in FY 2010. Provision for Tax Our provisions for tax increased by ` 576.45 million, or 483.85%, from ` 119.14 million in FY 2009 to ` 695.58 million in FY 2010. The increase was primarily due to: For FY 2009 our standalone tax charge was less than FY 2010 due to availability of brought forward losses of earlier years under the I. T. Act which we utilised in FY 2009. Further deferred tax assets have not been recognised on carried forward losses of subsidiaries in accordance with the principles of Accounting Standard 22 Accounting for Taxes on Income.

Profit/(Loss) after Tax As a result of the foregoing increase in our provision for tax in FY 2010, we incurred a loss after tax of `102.01 million in FY 2010 as against a profit after tax of `1,144.47 million in FY 2009. Profit/(Loss) before Share of Associates and Minority Interest As a result of the foregoing, we incurred a loss before share of associates and minority interest of ` 102.01 million in FY 2010 as against profit of ` 1,144.47 million in FY 2009. Share of (Loss)/Profit from Associates and Minority interests Our share of loss from associates was ` 2.55 million in FY 2010 as against ` Nil in FY 2009 due to the fact that (i) in FY 2009 there were no associates and only subsidiaries (ii) in FY 2010 two subsidiaries became associates and one new associate was formed. Our minority interest represented a loss of ` 10.08 million, compared to a profit of ` 0.57 million in FY 2009 because of the increased losses of subsidiaries in FY 2010. FY 2009 compared with FY 2008 Income Our total income increased by ` 2,076.67 million, from ` 0.07 million in FY 2008 to ` 2,076.74 million in FY 2009. This increase was primarily due to the commencement of revenue generating activity in FY 2009 and, in particular, the execution of lease agreements and sale of built up areas/structures. Income from operations Income from operations was ` 2,071.04 million in FY 2009. This was primarily due to the commencement of revenue generating activities in FY 2009 and the execution of lease agreements. There was no such revenue generation in FY 2008. Other income

299

Other income increased by ` 5.63 million, from ` 0.07 million in FY 2008 to ` 5.70 million in FY 2009. The increase was primarily due to dividend income and profit on sale of investment during FY 2009. Expenditure Total expenditure increased by ` 754.60 million, or 1,289.25%, from ` 58.53 million in FY 2008 to ` 813.13 million in FY 2009. In FY 2009, we commenced the recognition of expenses against the commencement of revenue generating activity. Prior to FY 2009, only entity maintenance costs, marketing costs and administrative costs were charged to the profit and loss account. Our total expenditure (excluding the amount reallocated to our balance sheet) increased by ` 9,072.30 million, or 15,500.26%, from ` 58.53 million in FY 2008 to ` 9,130.83 million in FY 2009. Land and construction expenses Our land and construction expenses were ` 6,047.11 million in FY 2009. The increase was primarily due to our recognition of expenses against the commencement of revenue generating activity in FY 2009. Prior to FY 2009, all land and construction expenses, were recognised as part of project work in progress. Employees remuneration and benefits Our employees remuneration and benefits increased by ` 473.98 million, or 3,427.19%, from ` 13.83 million in FY 2008 to ` 487.81 million in FY 2009. The increase was primarily due to our recognition of expenses against the commencement of revenue generating activity in FY 2009. Prior to FY 2009, all project related employee cost were recognised as part of project work in progress. Office and site establishment expenses Our office and site establishment expenses increased by ` 394.69 million, or 954.97%, from ` 41.33 million in FY 2008 to ` 436.02 million in FY 2009. The increase was primarily due to recognition of expenses against the commencement of revenue generating activity in FY 2009. Prior to FY 2009, all site, office and establishment expenses were recognised as part of project work in progress. Finance charges Our finance charges (net) increased from ` Nil to ` 2,148.54 million in FY 2009. The increase was primarily due to the fact that prior to FY 2009, all finance charges were classified under project work in progress until revenue generating activity commenced in FY 2009. Depreciation Depreciation increased by ` 7.98 million, or 237% , from ` 3.37 million in FY 2008 to ` 11.35 million in FY 2009. The increase was primarily due to an increase in depreciable capital assets during FY 2009. Profit/(Loss) before tax As a result of the foregoing, our profit before tax increased by ` 1,322.07 million from a loss of ` 58.46 million in FY 2008 to ` 1,263.61 million in FY 2009. Provision for Tax Our provision for tax increased by `115.53 million, from ` 3.61 million in FY 2008 to ` 119.14 million in FY 2009. Profit/(Loss) after Tax Our profit after tax was ` 1,144.47 for FY 2009 as against a loss of ` 62.07 million in FY 2008.

300

Profit/(Loss) before Share of Associates and Minority Interest As a result of the foregoing, profit before share of Associates and minority interest increased by ` 1,206.54 million, from a loss of ` 62.07 million in FY 2008 to a profit of ` 1,144.47 million in FY 2009. Assets and Liabilities Assets Fixed Assets Our fixed assets primarily consist of land, buildings, plant and machinery, equipment, furniture and fixtures, computers, vehicles and boats. Our net block of fixed assets were ` 5,324.11 million, ` 3,900.82 million, ` 2,709.00 million and ` 238.14 million as of June, 30, 2010, March 31, 2010, 2009 and 2008, respectively. The increase in fixed assets from March 31, 2009 to March 31, 2010 was primarily due to increase in building value of ` 813.02 million, land of ` 170.27 million, plant and machinery of ` 146.47 million and furniture of ` 62.14 million. The increase in fixed assets from March 31, 2008 to March 31, 2009 was primarily due to increase in building value of ` 2,189.24 million, land of ` 39.26 million, plant and machinery of ` 206.25 million and boats of ` 28.52 million. We also have intangible assets such as software and trademark designs. Investments Our investments are temporary uses of funds that are to be used for operations. We invest mainly in liquid mutual funds. Our aggregated investments were ` 1,465.58 million, ` 2,797.86 million, ` 815.79 million and ` 6.49 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. Our investments decreased as of June 30, 2010 due to an increased proportion of funds used for projects. Our investments increased as of March 31, 2010 and March 31, 2009 as a result of an increase in investments in liquid mutual funds respectively. Current assets, loans and advances Our current assets, loans and advances comprise inventories, sundry debtors, cash and bank balances, other current assets, and loans and advances (some of which are further detailed below). Our total current assets, loans and advances were ` 12812.86 million, ` 11,701.01 million, ` 6,498.77 million and ` 7,935.03 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. Our current assets, loans and advances increased as of March 31, 2010 primarily as a result of an increase in debtors of ` 1,245.34 million, loans and advances of ` 1,253.17 million, inventories of ` 2,013.94 million and cash and bank balances of ` 659.92 million and decreased as of March 31, 2009 as a result of a decrease in inventories of ` 2,948.80 million, which was partially offset by increases in debtors of ` 928.56 million and loans and advances of ` 543.32 million Inventories Our inventories comprise land and land FSI which we intend to develop and sell and project work in progress. Project work in progress includes partly completed residential, institutional and commercial construction projects. Our total inventory were ` 6,586.42 million, ` 6,316.62 million, ` 4,302.68 million and ` 7,251.48 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. The increase in our inventory as of March 31, 2010 was primarily due to higher construction activities during FY 2010 and the decrease as of March 31, 2009 was primarily due to the commencement of revenue recognition during FY 2009 and the subsequent recognition of expenditure we had previously accounted for as inventory.

301

Sundry debtors Our sundry debtors were ` 2,926.20 million, ` 2,173.90 million, ` 928.56 million and ` Nil as of June 30, 2010, March 31, 2010 and 2009, respectively. The increase from March 31, 2009 to March 31, 2010 was due to higher long term lease activity during FY 2010 as compared to FY 2009. The increase from March 31, 2008 to March 31, 2009 was primarily due to higher long term lease activity. Cash and bank balances Our consolidated cash and bank balances comprise cash in hand, balances with banks and fixed deposits placed with banks. Total cash and bank balances were ` 1,027.44 million, ` 951.56 million, ` 291.64 million and ` 297.61 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. The increase from March 31, 2009 to March 31, 2010 was primarily due to increases in fixed deposits and current accounts with banks. The increase in current accounts was due to a greater number of subsidiaries on a consolidated basis as of March 31, 2010 which required an increased number of such accounts with certain minimum sums/balances required in each account. Loans and advances Loans and advances include advance for purchases of land, advances to suppliers, advance income tax payments, deposits and other amounts recoverable. The total loans and advances were ` 2,155.72 million, ` 2,182.43 million, ` 929.26 million and ` 385.94 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. The increase as of March 31, 2010 compared to March 31, 2009 was primarily due to increase in taxes paid and advances to suppliers and the increase as of March 31, 2009 compared to March 31, 2008 was primarily due to increases in advances relating to land procurement and to suppliers and taxes paid. Liabilities and Provisions Current liabilities and provisions Our total current liabilities and provisions were ` 4,865.88 million, ` 4,909.79 million, ` 2,171.18 million and ` 1,101.67 million as of June 30, 2010, March 31, 2010, 2009 and 2008, respectively. Our current liabilities and provisions include sundry creditors, booking advances due to customer and other liabilities such as contractor's retention money, statutory dues and provision for expenses. Current liabilities increased between March 31, 2009 and March 31, 2010 primarily due to increases in creditors and other liabilities arising out of an increase in construction activity and increased between March 31, 2008 and March 31, 2009 primarily due to increases in dues to customers (which are advances received from customers in excess of the completion stage of their property). Liquidity and Capital Resources As of June 30, 2010, we had cash and bank balances of ` 1,027.44 million. Cash and bank balances primarily consist of cash on hand and balances with scheduled banks. Our primary liquidity requirements have been to finance our working capital for the development of Lavasa. Historically, we have financed our projects through (i) cash from operations; (ii) sale of equity shares of our Company and our Subsidiaries or Associates; and (iii) debt financing through bank loans and issuances of convertible debentures. For our projects that we develop in collaboration with third parties, such third parties also invest equity capital in the entities set up to develop these projects.

302

Our business requires a significant amount of working capital. We expect to meet our working capital requirements for the next 12 months primarily from undrawn term loans, liquid investments and customer advances as may be expedient. Cash Flows
(` in millions) For the three months ended June 30, 2010 Net cash flows (used in)/from operating activities ............................................................ Cash (used in) investing activities .................... Cash (used in)/from from financing activities... Cash and cash equivalents at end of period....... (332.53) 760.27 (351.86) 1,027.44 For the year ended March 31, 2010 2009 2008 815.55 (6,708.87) 6,553.24 951.56 (2,303.52) (972.07) 3,269.62 291.64 (1,620.36) (53.93) 1,716.34 297.61

Cash flow generated from/used in operating activities For the three months ended June 30, 2010, we had profit before taxation of ` 93.42 million. Our operating profit before working capital changes was ` 728.24 million primarily as a result of adjustments for depreciation of ` 26.34 million and interest expenses of ` 644.48 million. The net cash used in operating activities was ` 253.81 million as a result of working capital adjustments, including an increase in inventories of ` 254.64 million in respect of land and ` 15.16 million in respect of construction and development expenses. We also paid ` 78.72 million in direct taxes. For FY 2010, we had profit before taxation of ` 593.59 million. Our operating profit before working capital changes was ` 2,526.86 million primarily as a result of adjustments for depreciation of ` 68.24 million and interest expenses of ` 1,960.84 million. However, net cash generated in operating activities was ` 1,237.85 million as a result of working capital adjustments, including an increase in inventories of ` 471.55 million in respect of land and ` 1542.39 million in respect of construction and development expenses and a ` 2,831.04 million increase in current liabilities and provisions. We also paid ` 422.30 million in direct taxes. For FY 2009, we had profit before taxation of ` 1,263.60 million. Our operating profit before working capital changes was ` 3,423.35 million primarily as a result of adjustments for depreciation of ` 11.36 million and interest expenses of ` 2,375.44 million. However, net cash used in operating activities was ` 2,226.33 million as a result of working capital adjustments, including a ` 807.15 million increase in land inventories and a ` 4518.00 million increase in construction and development inventories and a ` 1,287.98 million increase in current liabilities and provisions. We also paid ` 77.19 million in direct taxes. For FY 2008, we had a loss before taxation of ` 58.46 million. Our operating loss before working capital changes was ` 55.09 million primarily as a result of an adjustment for depreciation of ` 3.37 million. However, net cash used in operating activities was ` 1,616.75 million primarily as a result of working capital adjustments, including a ` 480.21 million increase in land inventories, ` 1551.53 million increase in construction and development inventories and a ` 662.78 million increase in current liabilities and provisions. We also paid ` 3.61 million in direct taxes. Cash flow generated from/used in investing activities For the three months ended June 30, 2010, our net cash generated from investing activities was ` 760.27 million. This reflected ` 633.73 million used in the purchase of fixed assets such as land, construction of infrastructure and utility assets and ` 1,331.25 million realised from the sale of investments such as liquid mutual funds. In FY 2010, our net cash used in investing activities was ` 6,708.87 million. This reflected ` 4,820.59 million used in the purchase of fixed assets such as land, investment in infrastructure and utility assets and ` 1,984.62 million used in investments such as liquid mutual funds. 303

In FY 2009, our net cash used in investing activities was ` 972.07 million. This reflected ` 390.77 million used in the purchase of/investment in fixed assets such as infrastructure and utility assets such as roads and dams, etc. and ` 742.58 million used in investments such as liquid mutual funds. In FY 2008, our net cash used in investing activities was ` 53.93 million. This reflected ` 129.59 million used in the purchase of fixed assets such as infrastructure and utility assets, furniture and fixtures and office equipment and ` 44.90 million realised from the sale of investments such as liquid mutual funds. Cash flow generated from/used in financing activities For the three months ended June 30, 2010, our net cash used in financing activities was ` 351.86 million. This reflected ` 296.15 million in respect of increases in our long term borrowings such as deep discount convertible debentures and term loans from banks. We used ` 644.48 million to pay interest and finance expenses and ` 19.10 million to pay dividends. In FY 2010, our net cash generated in financing activities was ` 6,553.24 million. This reflected ` 8,438.14 million in respect of increases in our long term borrowings such as deep discount convertible debentures and term loans from banks. We used ` 1,960.84 million to pay interest and finance expenses and ` 111.53 million to pay dividends. In FY 2009, our net cash generated in financing activities was ` 3,269.62 million. This reflected ` 4,827.82 million in respect of increases in our long term borrowings such as deep discount convertible debentures and a ` 929.34 million increase in capital contribution (i.e. increase in our equity share capital due to increased capital infusion). We used ` 2,375.44 million to pay interest and finance expenses and ` 111.53 million to pay dividends. In FY 2008, our net cash generated in financing activities was ` 1,716.34 million. This reflected ` 1,736.63 million in respect of increases in our long term borrowings such as terms loans from banks and a ` 535 million increase in capital contribution (i.e. increase in our equity share capital due to increased capital infusion). We used ` 555.29 million to pay interest and finance expenses. Capital Expenditure We have invested, in aggregate, ` 132.89 million, ` 8,708.48 million, ` 4,959.74 million and ` 1,493.31 million on capital expenditure in FY 2008, FY 2009, FY 2010 and the three months ended June 30, 2010, respectively.
(` in millions) Three months ended June 30, 2010 Nil 1,493.31 1,493.31 For the year ended March 31, 2010 2009 3,559.99 6,181.57 1,399.74 2,526.90 4,959.74 8,708.48

Capital Work In Progress ............... Fixed Assets ................................... Total...............................................

2008 19.91 112.98 132.89

Financial Indebtedness The following table sets forth our consolidated secured and unsecured debt position as at June 30, 2010, March 31, 2010, March 31, 2009 and March 31, 2008.
(` in millions) SECURED LOANS Term Loan from Banks Secured by charge created by way of English mortgage deed/other charges on respective land of Lavasa project and premises, buildings As at June 30, 2010 7,447.30 2008 4,970.00 As at March 31, 2009 5,123.63 2010 7,280.81

304

constructed or to be constructed thereon and all present and future moveable assets Interest accrued and due on secured loan Debentures 1 (One) 3.52% secured deep discount convertible debenture having face value of ` 3,874,000,000 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

15.78 3,874.00 3,874.00

5.47 3,874.00

1,183.33 2,690.67 2,349.15

1,479.84 2,394.16 2,349.15

1,245.15 2,628.85 2,349.15

1 (One) 6% secured deep discount convertible debenture having face value of ` 2,349,152,295 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

684.18 1,664.97 783.05

631.97 1,717.18 783.05

723.40 1,625.75 783.05

1 (One) 6% secured deep discount convertible debenture having face value of ` 783,050,765 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

239.12 543.93 708.40

220.19 562.86

252.19 530.86 708.40

1 (One) 6% secured deep discount convertible debenture having face value of ` 708,403,784 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

215.16 493.24 749.37

224.08 484.32 749.37

1 (One) 6% secured deep discount convertible debenture having face value of ` 749,372,799 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

212.31 537.06 3,534.04

200.00 549.37 3,534.04

1 (One) 6% secured deep discount convertible debenture having face value of ` 3,534,036,929 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

1,097.73 2,436.31 354.20

1,142.35 2,391.68 354.20

1 (One) 6% secured deep discount convertible debenture having face

305

value of ` 354,201,892 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

102.97 251.23 708.40

107.43 246.77 708.40

1 (One) 6% secured deep discount convertible debenture having face value of ` 708,403,784 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

207.41 500.99 1,416.81

216.33 492.07

1 (One) 6% secured deep discount convertible debenture having face value of ` 1,416,807,569 secured by charge created by English mortgage deed on land of Lavasa project admeasuring 1 (one) acre Less : Unexpired discount

467.20 949.61 17,531.10 4,970.00 9,797.82 16,235.96

Total

(` in millions) UNSECURED LOANS Term loans from financial institutions Inter-corporate deposit Total As at June 30 2010 1,000 1 1,001 2008 As at March 31, 2009 2010 2,000.00 2,000.00

As of June 30, 2010, our total consolidated indebtedness was ` 18,532.10 million. For further details of our financial indebtedness, see Financial Indebtedness on page 309. Contractual Obligations Our total capital commitments as of June 30, 2010 were ` 2,090.62 million, which are due either in stages or on a milestone basis. Contingent Liabilities As of June 30, 2010, we had the following contingent liabilities that have not been provided for in our consolidated financial statements:

Particulars Guarantee given by banks on behalf of the Company Claims not acknowledged as debts

As at March 31, 2010 50.27 9.70 306

(` millions) As at June 30, 2010 26.51 9.70

Off-Balance Sheet Arrangements Except for our contingent liabilities described above, we do not have any off-balance sheet arrangements, derivative contracts, swap transactions or relationships with unconsolidated entities or financial partnerships that would have been established for the purpose of facilitating off-balance sheet transactions. Quantitative and Qualitative Disclosure about Market Risk Interest Rate Risk Our exposure to interest rate risks relates primarily to our debt. Our long-term rupee-denominated debts, which bear interest at floating rates linked with prime lending rates of the respective lenders, as determined from time to time, are subject to fluctuations in interest rates, which could increase the amount of interest payable by us under our debt obligations and could make it difficult for us to procure new debt on attractive terms. Changes in interest rates also affect the ability and willingness of our prospective real estate customers, particularly the customers for our residential properties, to obtain financing for their purchases of our units. Commodity Price Risk Where we have entered into fixed price contracts, the contractors purchase raw materials and provide us with a fixed cost for all their services. However, we are exposed to indirect market risk with respect to the prices of raw material and components used in our projects, particularly steel and cement for those contracts which are not on a fixed price basis. For steel and cement, some of the contractors with whom contracts are not on a fixed price basis may negotiate and pass through cost escalations to us. However, our exposure to such cost escalations is limited due to escalation clauses in our lease agreements/contracts to sell constructed structures whereby we can, under certain conditions, increase the prices charged to purchasers and residents due to increases in the costs of steel and cement. Seasonality Our operations may be adversely affected by difficult working conditions during monsoons that restrict our ability to carry on construction activities and fully utilise our resources. Our business is also cyclical and fluctuates in line with the general economic cycles impacting the hospitality, tourism, education and real estate sectors. While we generally do not believe that our business is seasonal, our revenues and cash flows in the hospitality industry are affected by seasonality depending on the location and categories of hotels. We expect that Lavasa would attract the maximum number of tourists in specific months of the year (during the holiday periods, from November to May). Accordingly, we expect that our hospitality revenues may generally be higher during these months of each fiscal year compared to the other months of the fiscal year. Credit Risk We are exposed to credit risk from our buyers paying in installments and from customers making ongoing payments for our infrastructure services, such as maintenance charges for public works services and utility bills. Credit risk is the risk of loss that may occur from the failure of a customer to abide by the terms of conditions of its financial contract with us, principally the failure to make required payments on amounts due to us. Our customers pay in installments for projects during the construction period based on the percentage of completion and also make ongoing payments for our infrastructure services. The credit risk we face is mitigated by the terms of the standard agreements with our buyers whereby the property may be returned to us in the event of a customer's failure to pay its installments. Inflation In recent years, although India has experienced minor fluctuations in inflation rates, inflation has not had a material impact on our business and results of operations.

307

Related Party Transactions For details in relation to the related party transactions, see Financial Statements on page 218. Significant Developments after June 30, 2010, that May Affect Our Future Results of Operations No circumstances have arisen since the date of the last financial statements as disclosed in this Draft Red Herring Prospectus, which materially and adversely affect or are likely to affect, our revenues and profitability, or the value of our consolidated assets or our ability to pay our material liabilities within the next 12 months. Unusual or Infrequent Events or Transactions To our knowledge there have been no unusual or infrequent events or transactions that may be described as unusual or infrequent and may have taken place during the last three years, except as disclosed in the Draft Red Herring Prospectus. Future Relationship between Costs and Income Other than as described in this section and the sections Risk Factors and Our Business, to our knowledge, there are no known factors which will materially impact the future relationship between our operations and revenues. Significant Regulatory Changes Except as described in Regulations and Policies and Risk Factors, there have been no significant regulatory changes that could affect our income from continuing operations. Known Trends or Uncertainties Except as described in this Draft Red Herring Prospectus in general and Risk Factors and this section in particular, to the best of our knowledge and belief, there are no known trends or uncertainties that have or had or are expected to have any material adverse impact on our revenues or income from continuing operations. New Products or Business Segments There are currently no publicly announced new products or business segments. For further details on our business strategy, see Our Business Our Strategy and Risk Factors. Dependence on a Few Suppliers/Customers We do not depend on any particular supplier or customer. Total Turnover of Each Major Industry Segment Our Company predominantly operates in a single segment namely and hence no separate industry segment is required to be reported under Indian GAAP. Competitive Conditions We operate in a competitive environment. For further details, please refer to the discussions of our competition in the sections Risk Factors and Our Business.

308

FINANCIAL INDEBTEDNESS The aggregate outstanding borrowings of our Company on a standalone basis, as of August 31, 2010 are as follows: Sr. No. 1. 2. Nature of Borrowing Secured borrowings Unsecured borrowings (In ` million) Amount 7,757.41 2,500.00

Set forth below is a brief summary of the aggregate borrowings of our Company as on August 31, 2010: Details of Secured Borrowings
Sr. No. Name of the Lender(/s) Loan Agreement Purpose Amount Sanctioned (In ` million) Aggregate = 4,970.00 Union bank of India = 1,020.00 Total Amount Outstanding as on August 31, 2010 (In ` million) 887.34 Interest (p.a.) Repayment Amount (in ` million) Security

1.

Union Bank of India, Punjab National Bank, Corporation Bank, Canara Bank, Oriental Bank of Commerce, UCO Bank, Karnataka Bank Limited, Yes Bank Limited, Bank of India and Bank of Baroda

Second common loan agreement dated June 29, 2006

For developing a hill station township in the nature of a laketown over and above the Mose valley close to the Warasgaon Dam Reservoir Lake in Pune district

BPLR, 11.75% For the year ended: 435.00 BPLR minus 0.5% minimum 10%, 13.25%

See Note 1 below

2010-2011: 140.20 2011-2012: 306.00 2012-2013: 372.30 2013-2014: 94.40 See Note 1 below

Karnataka Bank Limited = 500.00

For the year ended: 2010-2011: 68.80 2011-2012: 150.00 2012-2013: 182.50 2013-2014: 46.20

Punjab National Bank = 400.00

351.83

BPLR + 1.50%, 12.50%

For the year ended: 2010-2011: 55.00 2011-2012: 122.00 2012-2013: 144.00 2013-14: 37.00

See Note 1 below

UCO Bank = 400.001

349.77

BPLR, 11.75%

For the year ended: 2010-2011: 60.00 2011-2012: 140.00 2012-2013: 148.40 2013-2014: 2.60

See Note 1 below

Corporatio n Bank = 200.00

167.93

UBI PLR + 1.25%, 13.00%

For the year ended: 2010-2011: 30.60 2011-2012: 71.30 2012-2013: 71.70

See Note 1 below

Oriental Bank of Commerce = 200.00

166.50

BPLR 1%, 11.00%

For the year ended: 2010-2011: 27.50 2011-2012: 60.00

See Note 1 below

309

Sr. No.

Name of the Lender(/s)

Loan Agreement

Purpose

Amount Sanctioned (In ` million)

Total Amount Outstanding as on August 31, 2010 (In ` million)

Interest (p.a.)

Repayment Amount (in ` million)

Security

Bank India 500.00 of = 414.00 BPLR, 12.00%

2012-2013: 73.00 2013-2014: 18.50 See Note 1 below

For the year ended: 2010-2011: 72.50 2011-2012: 152.00 2012-2013: 177.00 2013-2014: 44.50

Bank of Baroda =500.00

416.00

BPLR , 12.00%

For the year ended: 2010-2011: 68.90 2011-2012: 150.20 2012-2013: 229.00

See Note 1 below

2.

Central Bank India

of

Loan Agreement dated December 16, 2009

For financing the project of setting up an integrated township in 18 villages in Pune district To part finance the second part of the Lavasa township project To part finance second phase of Lavasa township project along with other lenders For the project

2,000.00

1,000.00

BPLR plus 1%, 13.50%

20 quarterly installments of ` 100 million each starting from September 2011 to June 2016

See Note 1 below

3.

Union Bank India

of

Term loan agreement dated January 27, 2010 Loan agreement dated January 6, 2010

2,000.00

399.99

BPLR, 11.75%

20 equal quarterly installments from September 2011

See Note 1 below

4.

Punjab National Bank

1,600.00

554.05

BPLR plus term premium (0.50) plus 1.5% per annum , 13.00% 0.75% above State Bank of Hyderaba d PLR, 13.00% BPLR minus 2%, 12.75%

20 equal quarterly installments of ` 80 million each from September 2011

See Note 1 below

5.

State Bank of Hyderabad

Term loan agreement dated December 22, 2009 Term loan agreement dated December 11, 2007

1,000.00

950.00

20 equal quarterly installments of ` 50 million from September 30, 2011

See Note 1 below

6.

Axis Bank Limited

For development of Lavasa project (mainly for Period 1, Dasve village) and refinancing of existing term loan of the Company For the development of Lavasa project and refinancing of existing term loan of the Company

1,000.00

950.00

20 equal quarterly installments of ` 50 million each starting from July 2010

See Note 1 below

7.

Axis Bank Limited

Term loan agreement dated March 5, 2008

250.00

237.50

BPLR minus 2%, 12.75%

20 equal quarterly installments of ` 12.50 million each starting from July 2010

See Note 1 below

310

Sr. No.

Name of the Lender(/s)

Loan Agreement

Purpose

Amount Sanctioned (In ` million) 250.00

8.

Axis Bank Limited

Term loan agreement dated March 5, 2008 Term loan agreement dated October 22, 2009

9.

Axis Bank Limited

For the development of Lavasa project and refinancing of existing term loan of the Company Development of Dasve and Mugaon of the Lavasa hill station township

Total Amount Outstanding as on August 31, 2010 (In ` million) 227.50

Interest (p.a.)

Repayment Amount (in ` million)

Security

BPLR minus 2%, 12.75%

20 equal quarterly installments of ` 12.50 million each starting from July 2010

See Note 1 below

500.00

250.00

BPLR minus 2%, 12.75%

20 equal quarterly installments of ` 25 million starting from January 2012

See Note 1 below

Under the provisions of the second common loan agreement dated June 29, 2006, UCO Bank had sanctioned and disbursed a loan of ` 400 million. The amount outstanding under this loan has been taken over by Union Bank of India and the security in favour of UCO Bank has been created in favour of Union Bank of India.

Note 1: The loans are secured by: (i) (ii) (iii) (iv) (v) An English mortgage of land admeasuring 6,881.62 acres on first pari passu charge basis; A first pari passu charge on the entire immovable fixed assets of our Company, both present and future, on the aforementioned 6,881.62 acres of land; A first pari passu charge on the entire moveable fixed assets of our Company, both present and future; A first pari passu charge over all revenues and receivables of our Company from the project or otherwise; A first pari passu charge over / assignment of all project agreements, guarantees, performance guarantees of bonds, letters of credit that may be provided by any party / counter-party to any project agreement or otherwise in respect of the first phase of the project in favour of our Company and all clearances and all trademarks and patent rights, brands, titles, approvals, permit, clearances and interests and our Companys right, title, interest, benefit and claim in, to or under the project agreements, clearances and on the assets of the project; A first pari passu charge over / assignment of all our Companys right, title, interest, benefit and claim in, to or under the contracts and all licenses permits, approvals, consents Insurance contracts, Insurance policies and insurance proceeds; A first pari passu charge over all intangible assets of our Company including but not limited to goodwill; and A first pari passu charge over all bank accounts of our Company including without limitation, the trust and retention account (or any account in substitution thereof) each of other accounts required to be opened and maintained by our Company under any finance documents and in all funds from time to time deposited therein and in all permitted investments or other securities representing all amounts credited to the trust and retention account.

(vi) (vii) (viii)

Corporate Actions Certain corporate actions for which our Company requires the prior written consent of the lenders include: changing capital structure including increase, reduction, purchase, buy-back, re-organisation, or otherwise of its authorised, issued, subscribed, paid-up capital, otherwise than in accordance with the financing plan or as permitted by the lenders; amending the Memorandum and Articles of Association except to facilitate our Companys day to day affairs, but which shall not jeopardize the lenders interest; creating any security interest with respect to any property or revenue or assets; 311

conveying selling, leasing, transferring or assigning or otherwise part of any of its mortgaged property except in the ordinary course of business; entering into any borrowing arrangement, except that arranged as part of means of finance for the project; undertaking revaluation of assets; change of control or ownership whereby the effective beneficial ownership or control of our Company may change; changing the registered office of our Company; standing as a surety or guarantor for any third party liability or obligation; declaring dividends for any year except out of the profits relating to that year; winding up or entering into any merger, de merger, amalgamation arrangement, consolidation or reorganisation or any scheme for composition with its creditors; material change in the management set up; abandoning or agreeing to abandon the project; entering into any partnership, profit sharing or royalty agreement or similar arrangement whereby the income or profits are or might be shared with any other person, other than payment of dividends or similar payments to Promoters approved by lenders; and any action whether by acquisition or expansion scheme or undertake new project without the prior approval of the lender unless financed out of proceeds from investment or long term funds received which would constitute alteration of the nature of its business without the prior written approval of the lender.

Details of unsecured borrowing


Sr. No. Name of the Lender(/s) Loan Agreement Purpose Amount Sanctioned (In ` Million) 1,000.00 Total Amount Outstanding as on August 31, 2010 (In ` Million) 1,000.00 Interest (p.a.) Repayment

1.

L&T Infrastructure Finance Company Limited L&T Infrastructure Finance Company Limited

Facility agreement dated September 17, 2009 Facility agreement dated August 23, 2010

For township development project

2.

For refinancing DDCDs to develop basic infrastructure facilities such as roads, sewerage, telecommunication, water supply, electricity at Lavasa and for ongoing capital expenditure for infrastructure development at Lavasa For refinancing DDCDs to develop basic infrastructure facilities such as roads, sewerage, telecommunication, water supply, electricity at Lavasa and for ongoing capital expenditure for infrastructure development at Lavasa

1,000.00

500.00

L&T Infrastructure PLR minus spread of 1.25%, 12.25% L&T Infrastructure PLR minus 1.50%, 12%

14 quarterly installments starting from March 2011 10 equal quarterly installments starting after 10 quarters from the date of the first disbursement

3.

L&T Finance Limited

Facility agreement dated August 23, 2010

1,500.00

1,000.00

L&T Infrastructure PLR minus 1.50%, 12%

10 equal quarterly installments starting after 10 quarters from the date of the first disbursement

312

OUTSTANDING LITIGATION AND MATERIAL DEVELOPMENTS Except as stated below there are no outstanding litigation, suits, criminal or civil prosecutions, proceedings or tax liabilities against our Company, our Subsidiaries, our Directors, our Promoters and Group Companies and there are no defaults, non payment of statutory dues, over-dues to banks/financial institutions, defaults against banks / financial institutions, defaults in dues payable to holders of any debenture, bonds and fixed deposits and arrears of preference shares issue by our Company and its Subsidiaries, defaults in creation of full security as per terms of issue/other liabilities, proceedings initiated for economic/civil/any other offences (including past cases where penalties may or may not have been awarded and irrespective of whether they are specified under paragraph (I) of Part 1 of Schedule XIII of the Companies Act) other than unclaimed liabilities of our Company and our Subsidiaries and no disciplinary action has been taken by SEBI or any stock exchanges against our Company, our Subsidiaries, our Directors, our Promoters and Group Companies. Our Company does not owe any small scale industries any amounts exceeding ` 100,000 which is outstanding for more than 30 days except for those small scale sector industry entities where our payment terms are in excess of 30 days. There are no disputes with such entities in relation to payments to be made to them. Litigation against the Company Public Interest Litigations 1. Shamsunder Haribhau Potare (the Petitioner) has filed a public interest litigation (no. 148 of 2006) before the Bombay High Court and has sought the cancellation of allotments of land by the Maharashtra Krishna Khore Vikas Mahamandal (MKKVM) to all the allottees including allotments of 141.15 hectares made to our Company. The Petitioner has further sought that MKKVM take back possession of the allotted lands. The Petitioner has argued that this allotment of land is against the objects of the Maharashtra Krishna Valley Development Corporation Act, 1996 (the MKVDC Act) which provides for the protection and operation of irrigation projects and generation of hydro electric energy and the allotment does not fulfill the purpose of the MKVDC Act. Our Company has filed its affidavit in reply arguing that the allotment was made for the purpose of constructing bandharas, and for developing the supply of water to the hill station being developed by our Company, water sports, tourism and other recreational activities. Our Company has further submitted that the allotment was covered under sections 18, 19 and 28 of the MKVDC Act which provide that the function of the MKKVM is to promote and operate irrigational projects, plan, design and construct irrigational projects and promote tourism, water sports and other related activities and empowers MKKVM to acquire property and lease or sell land for the performance of its functions and duties. Our Company has sought that the public interest litigation be dismissed. The Bombay High Court by an interim order dated December 19, 2007 has directed the respondent-allottees not to alienate the property or create any third party interest in the property. The matter is currently pending. Bhagatraj G. Ahuja (the Petitioner) has filed a public interest litigation (no. 122 of 2008) before the Bombay High Court and has sought revocation and cancellation of allotments of land made by the Maharashtra Krishna Khore Vikas Mahamandal (MKKVM) to all the allottees including the allotment of 141.15 hectares to our Company. The Petitioner has argued that the allotment of land was illegal as it was in contravention of the Maharashtra Krishna Valley Development Corporation Act, 1996 (the MKVDC Act) and the Maharashtra Land Revenue Code, 1966 and the rules thereof. The Petitioner has argued that the allotment of land was against the objects of the MKVDC Act which provides for the promotion and operation of irrigation projects and generation of hydro electric energy and the allotment did not carry out the purpose of the MKVDC Act. The Petitioner has further argued that MKKVM has made allotments in contravention of rules of the Maharashtra Land Revenue (Disposal of Government Lands) Rules, 1971 which put a ceiling on the land that can be allotted and the terms and conditions for such allotment. Our Company has filed its affidavit in reply arguing that the allotment was made for the purpose of constructing bandharas and for developing the supply of water to the hill station being developed by our Company, water sports, tourism and other recreational activities and is covered under sections 18, 19 and 28 of the MKVDC Act. These sections provide the functions of the MKKVM including the function of promoting 313

2.

and operating irrigational projects, planning, designing and constructing irrigational projects and promoting tourism, water sports and other related activities. It empowers the MKKVM to acquire property and lease or sell for the performance of its functions and duties. Our Company has sought that the public interest litigation be dismissed. The matter is currently pending. 3. Shamsunder Haribhau Potare (the Petitioner) has filed a public interest litigation (no. 2 of 2009) before the Bombay High Court against the state of Maharashtra and the Collector, Pune and our Company. The Petitioner has argued that our Company has purchased more than 10,000 acres of land in violation of sections 9 and 10 of the Maharashtra Agricultural (Ceiling on Holdings) Act, 1961 (the Ceiling Act). Section 9 read with section 10 of the Ceiling Act states that any land purchased in excess of the ceiling area shall be forfeited and shall vest in the State Government. The Petitioner has argued that the purchase of land by our Company defeats the object of the Ceiling Act. The Petitioner has sought that a writ be issued directing the state of Maharashtra and the Collector, Pune to take action under the Ceiling Act with respect to the land purchased by our Company. The Petitioner has also sought an injunction restraining our Company from developing the land and creating any third party interest in the land purchased by our Company. Our Company has filed an affidavit in reply arguing that it has not violated the Ceiling Act as it had obtained requisite permission to buy land under section 63-1A of the Bombay Tenancy and Agricultural Lands Act, 1948 which permits a non-agriculturist to purchase agricultural land in excess of 10 hectares for bonafide industrial use. Our Company has further argued that the development of the hill station has been given the status of an industry under the Hill Station Regulations and the provisions of the Ceiling Act do not apply to the purchase of this land. Our Company has further argued that since the land was purchased for the development of a hill station, it becomes non-agricultural land under section 44 (A) of the Maharashtra Land Revenue Code, 1966. The matter is currently pending.

Civil Proceedings 1. Balwant Namdeo Tathe (the Petitioner) has filed a writ petition (no. 10347 of 2009) before the Bombay High Court against Yashomala Leasing and Financing Limited, wherein our Company has been added as a respondent. The Petitioner has challenged the termination of his services and sought reinstatement to his original post with full back wages. Our Company has filed its affidavit in reply to the petition. The matter is currently pending. Brian Robert Grimwade (the Plaintiff) has filed a summary suit (no. 1416 of 2008) against our Company before the Bombay High Court, for recovery of alleged dues payable to him on the termination of his services. The Plaintiff has claimed three months salary in lieu of termination of his services and the arrears of salary to the tune of USD 202,907.72. Our Company filed an affidavit in reply stating that the Plaintiff is not entitled to claim any amount from our Company. Thereafter, the Plaintiff took out chamber summons (no. 1123 of 2009) and as per the orders passed in the chamber summons, the plaint has been amended and the claim amount has been reduced to USD 60,211.72. The matter is currently pending. Paresh Tanna (the Plaintiff) has filed a special civil suit (no. 1601 of 2009) before the Court of Civil Judge, Senior Division, Pune against our Company, Raghu Soma Gethale and others (the Defendants). The Plaintiff has alleged that our Company has illegally bought lands admeasuring 0.15 hectares at village Sakhri, taluka Mulshi, district Pune bearing survey nos. 28/8, 48/6, 49/1, 49/3, 24/4 and 28/7 (the Suit Lands) by a sale deed dated October 3, 2008, which were originally acquired by the Plaintiff under a sale deed dated March 27, 1997. The Plaintiff has sought a declaration that he is the sole and the rightful owner of the Suit Lands. Further, the Plaintiff has also sought an injunction restraining the Defendants from creating any third party interest or encumbrances on the Suit Lands and a mandatory injunction against the Defendants to hand over possession of the Suit Lands to the Plaintiff. Our Company has filed its written statement praying that the plaint be dismissed. The matter is currently pending. Arun Govind Polekar (the Plaintiff) has filed a special civil suit (no. 1450 of 2009) before the Court of Civil Judge, Senior Division, Pune against our Company and 15 other defendants. The Plaintiff has sought a declaration that the sale of land admeasuring 3.054 hectares situated at village Palse, taluka Mulshi, district Pune, bearing survey nos. 34/7+9 F, 48/6 F, 48/7 F, 56/3+4 P/4 F, 60/2 F (the Suit Lands) by the other defendants in favour of our Company is null and void and therefore not valid and binding on the 314

2.

3.

4.

Plaintiff. The Plaintiff has further prayed that the Court grant possession of the Suit Lands in favour of the Plaintiff. The matter is currently pending. 5. Anil Babulalji Chopra (the Plaintiff) has filed a suit (no. 495 of 2008) before the Court of Civil Judge, Junior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has alleged that the land admeasuring 1.66 hectares situated at village Sakhri, taluka Mulshi, district Pune, bearing survey no. 37/1 (the Suit Land) has been illegally sold by the Other Defendants to our Company, as the Other Defendants had already sold the Suit Land to the Plaintiff earlier. The Plaintiff has sought a declaration that the subsequent sale is not binding on the Plaintiff and that he is the owner, occupier and possessor of the Suit Land. Our Company has filed its written statement praying that the claim of the Plaintiff that he is the owner, occupier and possessor of the suit property be rejected and accordingly suit be dismissed. The Court has passed a temporary injunction order restraining the defendants from creating any third party interest in the Suit Land till the disposal of the suit. The matter is currently pending. Anil Babulalji Chopra (the Plaintiff) has filed a suit (no. 543 of 2008) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has alleged that the land admeasuring 3.08 hectares situated at village Sakhri, taluka Mulshi, district Pune, bearing survey nos. 9 hissa no.4, 18 hissa no.13, 29 hissa no.4, 30 hissa no.1+2, 48 hissa no.5, 26 hissa no.6, 24 hissa no.3 and 52 hissa no.18, (the Suit Lands) has been illegally sold by the Other Defendants to our Company, as the other defendants had already sold the Suit Lands to the Plaintiff earlier. The Plaintiff has sought the cancellation of the sale deeds and a declaration that the subsequent sale is not binding on the Plaintiff and that he is the owner, occupier and possessor of the Suit Lands. The Plaintiff has further sought an injunction restraining the defendants from creating any third party interest in the Suit Lands. Our Company has filed its written statement praying that the claim of the Plaintiff be rejected and accordingly suit be dismissed. The matter is currently pending. Vasanti Dattaram Gorad (the Plaintiff) has filed three special civil suits (nos. 623 of 2010, 624 of 2010 and 627 of 2010 respectively) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has sought an order cancelling the deed of conveyance executed by the Other Defendants in favour of our Company pertaining to land admeasuring 0.26 hectares situated at village Dhamanohol, bearing survey no. 136, hissa no. 3 (in suit No. 623 of 2010), survey no. 2 hissa no. 4, survey no. 29 hissa no. 6 and survey no. 30 hissa no.3 of land admeasuring 1.1465 hectares in village Mulshi, tahasil Mulshi, district Pune, (in suit No. 624 of 2010 and Suit No. 627 of 2010 respectively ) (the Suit Lands), and declare it illegal and not binding on the Plaintiff as the same was executed without the consent and knowledge of the Plaintiff. The Plaintiff has also prayed that our Company be restrained by a permanent injunction from carrying out any construction and from selling or creating any third party interest in the Suit Lands. The matter is currently pending. Sachin Shrirang Bhosale (the Plaintiff) has filed a civil suit (no. 226 of 2006) before the Court of Civil Judge, Senior Division, Pune against our Company. The Plaintiff has sought an injunction restraining our Company from entering upon his land bearing survey no.78 hissa no.1, survey no.20 situated at village Mugaon, taluka Mulshi, district Pune (the Suit Lands) and laying roads through the Plaintiffs land. Our Company has filed its written statements denying the allegations of the Plaintiff that it had encroached on the Plaintiffs land. The matter is currently pending. Bhikaji Tukaram Bhikule and others (the Plaintiff) has filed a special civil suit (no. 1906 of 2008) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has sought a declaration that the sale deeds executed by the Other Defendants in favour of our Company pertaining to land admeasuring 1.30 hectares situated at village Mugaon, taluka Mulshi, district Pune, bearing survey no. 18, hissa no. 5 and survey no. 26, hissa no. 10 (the Suit Lands) are null and void and not binding on the Plaintiff as the other defendants had fraudulently executed sale deeds of the Suit Lands which were owned by the Plaintiff. Our Company has filed its written statement stating that the sale deeds have been validly executed and that the Plaintiff had knowledge of the same. The Court has passed an interim injunction restraining our Company from interfering with the peaceful possession of the Suit Lands by the Plaintiff and from creating any third party interest over the Suit Lands. The matter is currently pending. 315

6.

7.

8.

9.

10.

Shankar Bhau Margale (the Plaintiff) has filed a civil suit (no. 599 of 2006) before the Court of Civil Judge, Senior Division, Pune against our Company and others. The Plaintiff has challenged the sale of land admeasuring 0.9928 hectares situated at village Dasve bearing survey no. 53/4, 117/1, 118/1 on the ground that the other defendant did not have any right in the property that was sold to our Company and thus the sale is not binding on the Plaintiff. The matter is currently pending. Suryakant Thakkar (the Plaintiff) has filed a civil suit (no. 242 of 2006) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has alleged that the land admeasuring 10.46 hectares situated at village Ugavali bearing survey no. 7/1 (the Suit Land) has been illegally sold by the Other Defendants to our Company, as the Other Defendants had already sold the Suit Land to the Plaintiff earlier. The Plaintiff has sought declaration that the subsequent sale is not binding on the Plaintiff and has sought specific performance of the agreement under which the land was allegedly sold to him. The matter is currently pending. Yeshwant Sopan Shedge (the Plaintiff) has filed a civil suit (no. 457 of 2005) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has alleged that the land admeasuring 4.01 hectares bearing no. 92/1 situated at village Dhamanohol (the Suit Land) has been illegally sold by Rohini Vichare to our Company. Plaintiff has stated that Rohini Vichare had purchased the land from Namdeo Shedge. It is the case of the Plaintiff that Namdeo Shedge had executed a registered will of the Suit Land in favour of the Plaintiff. The Plaintiff has sought a declaration that the sale is not binding on the Plaintiff and has challenged the sale deeds between Rohini Vichare and our Company. The matter is currently pending. Satish Dattatraya Deshpande (the Plaintiff) has filed a civil suit (no. 1132 of 2008) before the Court of Civil Judge, Junior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has sought an order to declare that the deed of conveyance was invalidly executed by the Other Defendants in favour of our Company pertaining to land admeasuring totally 4.148 hectares bearing survey nos. 16/1 A, 19/1, 20/1, 22/1 situated at village Bembatmal, taluka Mulshi, district Pune (the Suit Land), and declare it illegal and not binding on the Plaintiff as the same was executed without the consent of the Plaintiff and without partition of the land by meters and bounds. The Plaintiff has also prayed that our Company be restrained by a permanent injunction from carrying out any construction and from selling or creating any third party interest in the Suit Land. The matter is currently pending. Malan Pandharinath Pasalkar and others (the Plaintiff) have filed a civil suit (no. 418 of 2007) before the Court of Civil Judge, Senior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has prayed that the sale of land admeasuring totally 1.119 hectares bearing gat no. 88, gat no.93 and gat no. 98 situated at village Mose (budruck) (the Suit Land) by the Other Defendants to our Company be declared illegal and the same should be cancelled in respect of their undivided share in the suit property. The Plaintiff has also prayed that our Company should not obstruct the Plaintiffs possession of the property and not create any third party interest in the Suit Land. The matter is currently pending. Prachi Shah (the Plaintiff) has filed a civil suit (no. 412 of 2009) before the Court of Civil Judge, Junior Division, Pune against our Company. The Plaintiff has alleged that our Company has encroached upon her land bearing survey no. 34/1 situated at village Tamhini, taluka Mulshi, district Pune while it was developing a road from village Tamhini to village Bhugaon. The Plaintiff has prayed that our Company be permanently restrained from encroaching and constructing a road through her property. The matter is currently pending. Leelabai Halande (the Plaintiff) has filed a civil suit (no. 1189 of 2009) before the Court of Civil Judge, Junior Division, Pune against our Company and others (the Other Defendants). The Plaintiff has sought declaration that the sale of land admeasuring 6.5 hectares situated at village Padalgar, taluka Mulshi, district Pune, bearing survey nos. 7/1+2 (the Suit Land) by the Other Defendants in favour of our Company is null and void and therefore not valid and binding on the Plaintiff as the sale was done fraudulently. The Plaintiff has further prayed that the Court grant a perpetual injunction against our Company from obstructing the possession of the Suit Land to the Plaintiff. The matter is currently pending. 316

11.

12.

13.

14.

15.

16.

17.

Datta Kondiba alias Kondu Kokare and others (the Plaintiff) has filed a special civil suit (no. 1316 of 2010) before the Court of Civil Judge Senior Division, Pune against our Company and others (the Defendants). The Plaintiff has alleged that the land admeasuring 5.6656 hectares situated at village Mugaon bearing survey no. 50/3 (the Suit Land) has been illegally sold by the Defendants to our Company by way of a forged and fabricated sale deed. The Plaintiff has sought a declaration that he is owner of the Suit Land and the sale deed is null and void. Ramchandra Dhau Bavdhane and other (the Plaintiffs) have filed a civil suit (no. 1829 of 2010) before the Court of Civil Judge, Senior Division, Pune against Sama Kondu Margale and others (the Defendants) wherein our Company has been added as Defendants. The Plaintiffs have alleged that the lands admeasuring 13.60 hectares situated at village Sakhari, taluka Mulshi, district Pune bearing survey nos. 38/1, 38/2, 39/2, 43/1/1, 43/2, 48/9, (the Suit Lands) have been illegally sold by the Defendants to our Company by way of a forged and fabricated sale deed. The Plaintiff has sought a declaration that the sale deed be declared illegal.

18.

Revenue Proceedings 1. Sindhutai Ananta More (the Applicant) has filed a revenue complaint application (no. 176 of 2009) against our Company and others before the Tahsildar, Mulshi and has alleged that she is a co-owner of the land bearing survey nos. 18/2 and 144/2 admeasuring 0.299 hectares of village Dasve, taluka Mulshi, purchased by our Company from the other defendants. The Applicant has sought mutation of her name in revenue records. On January 12, 2010, the Applicant filed an application stating that she does not want to proceed with this litigation and has sought to withdraw the application. The matter is currently pending. Baban Dhondiba Bavadhane (the Applicant) has filed a revenue complaint application (no. 352 of 2009) against our Company before the Tahsildar, Mulshi. The Applicant has alleged that the purchase of land bearing survey no. 35/1/3 admeasuring 3.0 hectares of village Gadle, taluka Mulshi, by our Company is illegal as the land was allotted to him by the order of the Tahsildar and the mutation entry was done for the same but his name was not recorded in the revenue records. The Applicant is seeking to mutate his name in the records by this application. The arguments of both sides have been heard. The matter is currently pending for order. Sandip Satypal Mehta (the Applicant) has filed a revenue complaint application (no. 04 of 2008) against our Company before the Tahsildar, Mulshi. By Exchange Deed registered at sr. no. 3094/2009 the applicant transferred the land bearing survey no. 76/3/1 admeasuring 1.76 hectares of village Gadle, taluka Mulshi to our Company and the said transaction was recorded in the revenue records. The Applicant has stated that the area stated in 7/12 extract of survey no. 76/3/2 was never in existence and accordingly he has asked for an amendment in the revenue records. The arguments of both sides have been heard. The matter is currently pending for order. Maruti Thaku Zore (the Applicant) has filed a revenue complaint application (no. 16 of 2010) against our Company before the Tahsildar, Mulshi. Our Company has purchased an area admeasuring 7 hectares 88 acres from the property bearing survey no. 25/1 of village Bhoini. The Applicant is a co-owner of the land and, as per the revenue records, he holds 4 acre 31 gunthas in this property. The Applicant has now alleged that he owns 5 acres 36 gunthas. The matter is currently pending. Ramchandra Laxman Jambhale (the Applicant) has filed a revenue complaint application (no. 76 of 2010) against our Company and others before the Tahsildar, Mulshi. Our Company has purchased an area admeasuring one hectare in land bearing survey no. 2 Hissa No. 3 of village Koloshi out of the total area 1 Hectare 72 ares. The Applicant has alleged that his father owned an area of 41 ares in this property but without any reason his name was deleted from revenue the records. The Applicant has sought for the mutation of his name in the revenue records. By order dated July 16, 2010, the Tahsildar passed an order in favour of the Applicant, mutating the Applicants fathers name in the revenue records. On an application made by Govind Prasad Gupta, one of the respondents, Tahsildar by an order dated August 9, 2010 stayed the order dated July 16, 2010 for a period of 60 days. Govind Prasad Gupta has further filed an appeal (no. 317

2.

3.

4.

5.

RTS -239 of 2010) before the Sub Divisional Officer, Maval, Pune challenging the order of the Tahsildar dated July 16, 2010 passed in favour of the Applicant. Our Company has received a copy of the notice from the Sub Divisional Officer but has not received a copy of the appeal and is not aware of the allegations made therein. The Sub Divisional Officer has passed an order of status quo till further orders. The matter is currently pending. 6. Radhabai Pandu Pasalkar (the Applicant) has filed a revenue complaint application (no. 89 of 2010) against our Company and others, before the Tahsildar, Mulshi with respect to land admeasuring 1.1549 hectares bearing survey nos. 45/1, 58/7, 82/3, 118/2 and 136/8 (the Suit Lands) of village Dhamanohol, taluka Mulshi, district Pune. Our Company had purchased the Suit Lands from the son of the Applicant. The Applicant has sought for mutation of her name in the revenue records. The matter is currently pending. Ashok Chandrakant Deshpande and others (the Applicants) has filed a revenue complaint application (no. 91 of 2010) against our Company before the Tahsildar, Mulshi. This application is made for lands admeasuring 7.85 hectares bearing survey nos. 33/2, 40/1 and 49/2 (the Suit Lands) of village Sakhari, taluka Mulshi, district Pune. The Suit Lands were sold to our Company and by mutation no. 302, our Companys name was recorded in the revenue records. The Applicant has sought for mutation of his name in the revenue records. The matter is currently pending. Ashok Chandrakant Deshpande and another (the Applicants) has filed a revenue complaint application (no. 106 of 2010) against our Company before the Tahsildar, Mulshi with respect to land admeasuring 0. 75 hectares bearing survey no. 83/1 (the Suit Land) of village Dhamanohol, taluka Mulshi, district Pune, purchased by our Company. The Applicant has sought for mutation of his name in the revenue records. The matter is currently pending. Yenubai Vitthal Ubhe (the Applicant) and others have filed a revenue complaint application (no. 109 of 2010) against our Company before the Tahsildar, Mulshi with respect to land admeasuring 4.35 hectares bearing survey no. 38/1 (the Suit Land) of village Dasve, taluka Mulshi, district Pune. The Applicant has alleged that her father was the original owner of the Suit Land, but without any reason the Suit Land was recorded in the name of Narayan Krishna Deshpande. Our Company has purchased the said Suit Land from legal heirs of Narayan Krishna Deshpande. The Applicant has sought for the mutation of her name in the revenue records. The matter is currently pending. Vitthal Dagdu Pandit and others (the Applicants) have filed a revision application (no. 9 of 2009) against our Company before the Court of Sub Divisional Officer, Maval Sub Division, Pune. The Applicants have alleged that our Company has illegally bought lands at village Bhoini, taluka Mulshi, district Pune bearing survey no. 62 by a sale deed dated October 3, 2002, which was thereafter illegally mutated vide mutation no. 502. The Applicants have sought a declaration that the order of mutation entry no. 502 be declared illegal. The matter is currently pending. Maruti Nama Sambre and others (the Appellants) has filed an appeal (no. 166 of 2009) before the Court of Sub Divisional Officer, Maval Sub Division, Pune against the order of the Tahsildar, Mulshi in respect of land bearing survey no. 51/1 situated in village Mugaon, taluka Mulshi. The Appellants have sought that the mutation entry nos. 326, 509, 645 and 811 be declared illegal and deleted and the names of the Appellants alone be maintained in the records. The matter is currently pending. Ganpat Maruti Kadu (the Applicant) has filed a revenue complaint application (no. 118 of 2010) against our Company and others before the Tahsildar, Mulshi. The application has been filed in respect of land admeasuring 1.96 hectares bearing survey no. 8/10 of village Wadavali, taluka Mulshi for entering the Applicants name in the revenue records instead of the name of Gana Barku Kadu, one of the other respondents. Our Company has not received a copy of the application and is not aware of allegations made therein. The matter is currently pending. Janabai Bapu Pawale (the Applicant) has filed a revenue complaint application (no. 119 of 2010) against our Company and others before the Tahsildar, Mulshi with respect to purchase of land by our Company admeasuring 4.50 hectares bearing survey nos. 7/1/1+2, 15/1, 20/2, 23/3 and 39/7 of village Padalghar, 318

7.

8.

9.

10.

11.

12.

13.

taluka Mulshi, district Pune. The Applicant has sought for mutation of her name in the revenue records. The matter is currently pending. 14. Ashok Dwarkanath Deshpande and others (the Appellants) has filed an appeal (no. 188 of 2010) against Nitin Suresh Takle and others before the Sub Divisional Officer, Maval Division, wherein our Company has been added as a respondent. The appeal has been filed against the certification of mutation entry nos. 496, 567, 837 and 863 of village Mugaon, taluka Mulshi, which was purchased by our Company. Our Company has not yet received a copy of the appeal and is not aware of allegations made therein. The matter is currently pending. Yashvant Sama Margale and others (the Appellants) has filed an appeal (no. 179 of 2010) against Circle Officer, Mutha and others before the Sub Divisional Officer, Maval Division, wherein our Company has been added as a respondent. This appeal has been filed against the certification of mutation entry nos. 499, 582, 857 and 863 in respect of land admeasuring 3.0 hectares bearing survey no. 34/2B of village Mugaon, taluka Mulshi, which was purchased by our Company. Our Company has not yet received a copy of the appeal and is not aware of allegations made therein. The matter is currently pending. Prakash Nathu Dabade and others (the Appellants) has filed an appeal (no. 210 of 2010) against Dattu Nathu Dabade and others before the Sub Divisional Officer, Maval Division, wherein our Company has been added as a respondent. This Appeal has been filed against the certification of mutation entry nos. 422 in respect of lands admeasuring 5.98 hectares bearing survey no. 25/1/2 (part), 26/1/2 (part), 45/1/2 (part), 56/1/2 (part), 72/3/2 (part) and 73/1/2 (part) of village Bhoini, taluka Mulshi, which was purchased by our Company. Our Company has not yet received a copy of the appeal and is not aware of the allegations made therein. The matter is currently pending. Gena Ramaji More (the Applicant) has filed a revenue complaint application (no. 177 of 2009) against our Company before the Tahsildar, Mulshi. The Applicant has alleged that he is the co-owner of the land purchased by our Company bearing survey no. 64/1 FA situated at village Dasve, taluka Mulshi and has sought mutation of his name in the revenue records for his share of property admeasuring one hectare and 12.75 ares. The matter is currently pending. Gena Ramji More (the Applicant) has filed a revenue complaint application (no. 178 of 2009) against our Company before the Tahsildar, Mulshi. The Applicant has alleged that he is the owner of the land bearing survey nos. 63/1, 65/1 and 67/1 situated at village Dhamanohol, taluka Mulshi (the Suit Land) purchased by our Company and has sought correction in the land records. The matter is currently pending. Baban Sonu Shedage and others (the Applicants) have filed a revenue complaint application (no. 182 of 2009) against our Company before the Tahsildar, Mulshi. The Applicants have alleged that they are the owners of the lands bearing survey nos. 1/8, 1/9, 1/13, 5/1, 11/1, 26/2, 43/1, 52/1+2+3, 73/3/1, 73/4, 74/1, 88/3, 93/1, 98/4, 99/1+2/1 to 8, 125/1, 124/2, 136/7, gaonthan No. 6 and gaonthan No. 9 of village Dhamanohol, taluka Mulshi (the Suit Lands) purchased by our Company. The Applicants have alleged that their names were not in the mutation records and have sought correction in the land records to enter their names as owners of the Suit Lands. The matter is currently pending. Kondu Sagu Margale (the Applicant) has filed a revision application (no. 652 of 2009) against our Company and others before Sub Divisional Officer, Maval. The Applicant has challenged the mutation entry nos. 491, 492, 580, 857 and 863 for land bearing survey no. 30/3 (the Suit Land) situated at village Mugaon, taluka Mulshi. The Applicant has alleged that the property was wrongly mutated and that the subsequent sale of the Suit Land to our Company is illegal. The Applicant has sought a declaration that the subsequent sale of the Suit Land to our Company is illegal and a correction to be carried out in the land records. The matter is currently pending. Laxman Sagu Margale (the Applicant) has filed a revision application (no. 644 of 2009) against our Company and others before Sub Divisional Officer, Mulshi. The Applicant has challenged the mutation entry nos. 600, 627, 851 and 863 for land bearing survey no. 30/2 (the Suit Land) situated at village Mugaon, taluka Mulshi. The Applicant has alleged that the property was wrongly mutated and that the 319

15.

16.

17.

18.

19.

20.

21.

subsequent sale of the Suit Land to our Company is illegal. The Applicant has sought a declaration that the subsequent sale of the Suit Land to our Company is illegal and a correction to be carried out in the land records. The matter is currently pending. 22. Kisan Gopal Polekar and others (the Applicants) have filed a revision application (no. 16 of 2009) against our Company and others before Sub Divisional Officer, Mulshi. The Applicant has challenged the mutation entry no. 198, 321, 429 and 467 for land bearing survey no. 39 (the Suit Land) situated at village Gadle, taluka Mulshi. The Applicant has alleged that the property was wrongly mutated and that the subsequent sale of the Suit Land to our Company is illegal. The Applicant has sought a declaration that the subsequent sale of the Suit Land to our Company is illegal and a correction to be carried out in the land records. The matter is currently pending. Bamabai Bhoru Margale (the Applicant) and others have filed a revision application (no. 217 of 2009) against our Company and others before Sub Divisional Officer, Mulshi. The Applicant has challenged the mutation entry no. 582, 857 and 863 for land bearing survey no. 30/4 (the Suit Land) situated at village Mugaon, taluka Mulshi. The Applicant has alleged that the property was wrongly mutated and that the subsequent sale of the Suit Land to our Company is illegal. The Applicant has sought a cancellation of the subsequent sale of the Suit Land to our Company as it is allegedly illegal and a correction to be carried out in the land records. The matter is currently pending. Rama Zima Margale (the Applicant) has filed a revision application (no. 218 of 2009) against our Company and others before Sub Divisional Officer, Mulshi. The Applicant has challenged the mutation entry no. 502, 583, 858 and 863 for land bearing survey no. 30/1 (the Suit Land) situated at village Mugaon, taluka Mulshi. The Applicant has alleged that the property was wrongly mutated and that the subsequent sale of the Suit Land to our Company is illegal. The Applicant has sought a cancellation of the subsequent sale of the Suit Land to our Company as it is allegedly illegal and a correction to be carried out in the land records. The matter is currently pending. Laxman Dagdu Dohne (the Applicant) has filed a revenue complaint (no.11 of 2009) against our Company before the Circle Officer, Mutha. The Applicant has alleged that he has not received full consideration for sale of land admeasuring 55.02 hectares bearing survey no. 60 of village Mugaon purchased by our Company. The Applicant has objected to the mutation of our Companys name in the revenue record. The matter is currently pending. Chandrabhaga Chindhu Ubhe and others (the Applicants) have filed a revenue complaint (no. 130 of 2010) against our Company and others before the Tahsildar, Mulshi with respect to purchase of land by our Company admeasuring 0.286 hectares bearing survey no.84/1 and 85/3 of village Admal and entry of our Companys name in the revenue records by mutation entry no. 586. The Applicants have sought for the mutation of their names in the revenue records as per mutation entry no. 343 for land bearing survey nos. 10/8, 52/1, 53/7, 63/2, 63/6, 75/2, 84/1, and 85/3. The matter is currently pending. Pandurang Epte (the Applicant) has filed a revenue complaint (no. 129 of 2010) against our Company and others before Tahsildar, Mulshi. Our Company has purchased land admeasuring 1.88 hectares bearing survey nos. 67/7 and 64/1 (the Suit Land) of village Admal, taluka Mulshi. The Applicant has alleged that the Suit Land was transferred to him by his father but the same was not entered in the revenue records. The Applicant has sought for the mutation of his name in the revenue records. The matter is currently pending. Rambhau Gopal Kadu (the Applicant) has filed a revenue complaint (no. 128 of 2010) against our Company before Tahsildar, Mulshi. The Applicant has sought mutation of his name as a legal heir of late Rakhmabai Gopal Kadu, in the revenue records for land admeasuring 5.0645 hectares bearing survey nos. 17/4, 18/2, 57/1, 59/8, 59/15, 59/20, 61/1, 64/4, 70/1, 71/1 in Village Wadavali. The matter is currently pending. Arjun Tukaram Damgude and others (the Applicants) have filed an appeal (no. 94 of 2010) against Laxman Halande and others before the Sub Divisional Officer, Maval Division, wherein our Company has 320

23.

24.

25.

26.

27.

28.

29.

been added as a respondent. The appeal has been filed against the certification of the mutation entry no. 556 in respect of the land bearing survey no. 60/9 of village Palse, which was purchased by our Company. Our Company has not yet received a copy of the application and is not aware of the allegations made therein. The matter is currently pending. 30. Kisan Baburao Pasalkar and others (the Applicants) have filed revenue application (no. 69 of 2010) against our Company before the Circle Officer, Kuran budruk. The application has been filed against the certification of the mutation entry no. 878 in respect of the land of village Saiv (budruk), taluka Velhe. Our Company has not yet received a copy of the application and is not aware of the allegations made therein. The matter is currently pending.

Notice from Collector 1. The office of the Collector, Pune issued a notice (no. KKA/Kavi/508/10) dated September 6, 2010 to our Company stating that our Company has not taken any permission under section 4 (2) (b) Bombay Entertainment Duty Act, 1923 and rules thereof, for the water sport and entertainment park at village Patharshet, taluka Mulshi, Pune. The notice further states that our Company has not obtained permission from the Inspector, Entertainment Duty Department for charging fees for boating at the water sport and entertainment park. The Collector has stated that our Company is in breach of section 3, 4, and 5 of the Bombay Entertainment Duty Act 1923 and rules thereof. The Collector has directed our Company to show cause on or before September 14, 2010, as to why the entertainment tax and penalty thereon should not be charged from the date of commencement of water sport. In our interim reply dated September 8, 2010, our Company has clarified that the water sports had been started in accordance with the permission granted by the Irrigation Department, Pune. The matter is currently pending.

Letters from Gram Panchayat 1. Group Gram Panchayat, Dasve sent a letter dated June 15, 2010, asking our Company to make entry of its buildings in the records of the Gram Panchayat so as to enable the Gram Panchayat to assess property taxes and issue demand notices on the buildings. Our Company by a letter dated July 22, 2010 has replied stating that it is entitled under the Maharashtra Regional and Town Planning Act, 1969 for concession on tax imposed on buildings in the projects developed by the special planning authority. The Company has further given the details of the buildings. The matter is currently pending.

Litigation by the Company Criminal Proceedings 1. Our Company has filed a criminal complaint (no. 3260 of 2010) against Baban Dhondu Dalvi and others (the Accused) before the Court of Judicial Magistrate, First Class, Pune under sections 425, 427, 465, 471, 447, 504 and 506 of the Indian Penal Code, 1860. Our Company has alleged that the Accused has committed forgery of title documents purporting to be owners of the property owned by our Company. Further, our Company has charged the Accused with criminal trespass of property owned by our Company and criminal intimidation. Our Company has sought that the Court of Judicial Magistrate issue summons to the Accused or, in the alternative, order an investigation into the offence. The matter is currently pending.

Civil Proceedings 1. Our Company has filed two writ petitions (no. 5255 of 2010 and 6463 of 2010) before the Bombay High Court against the State of Maharashtra and others (the Respondents) seeking cancellation of demand notices issued by the Tahsildar, taluka Mulshi, for village Dasve and Mugaon. The Respondents have demanded the amount of ` 116.09 million and ` 61.45 million respectively, from our Company as royalty and penalty on the material excavated from the surface of the land for the purpose of construction of roads and pathways, under section 48 of the Maharashtra Land Revenue Code, 1966. Our Company has argued that the levy of such royalty is unconstitutional and illegal and section 48 of the Maharashtra Land Revenue Code, 1966 is not applicable to our Company. Our Company has prayed that the order of the Tahsildar be 321

set aside and for a declaration that the Tahsildar does not have any authority to levy and demand such royalty from our Company. The writ petitions have been admitted and a stay has been granted by orders dated July 8, 2010 and August 16, 2010 respectively, against the Respondents from taking any coercive steps to recover penalty and royalty. The matter is currently pending. 2. Our Company and certain others have filed a defamation claim (no. HQ09D05680) before the High Court of Justice, Queens Bench Division against the Times News Paper Limited (the Defendant). Our Company has sought damages for libel from the Defendant for the publication of an allegedly defamatory article dated August 30, 2009, in The Sunday Times in the United Kingdom which alleges that our Company used armed employees to threaten and coerce indigenous farmers into selling their land at rock bottom price. The article alleges that our Company has used fraudulent intermediaries to procure land from illiterate tribal people by making them sign sale documents which they did not understand. The article further states that our Company has fraudulently procured signature of Vishnu Navji Shedge, a 97 year old blind man and subsequently paid for the land through cheques which were dishonoured. The article also alleges that our Company has worsened deforestation and committed serious environmental damages by cutting down millions of trees. Our Company has also sought an injunction to restrain the Defendant from further publication of articles or news items of such nature. The Defendant has filed its defense stating that the article was true in substance and in fact, although the Defendant have removed this article from its website. Our Company has filed a rejoinder to the defense filed by the Defendant. The matter is currently pending.

Electricity related matters 1. Maharashtra State Electricity Distribution Company Limited (MSEDCL) had served a notice (no. SE/PRC/A/cs/HT/CONF/267) dated May 26, 2008, to our Company for finalizing tariff for the year 20082009 and directed our Company to pay ` 31.2 million as electricity charges, as applicable for construction activity. Our Company filed a petition (no. 34 of 2008) before the Maharashtra Electricity Regulatory Commission (MERC) seeking a separate tariff classification as our Company is in the process of developing a hill station. MSEDCL prayed that the petition was not maintainable and by an order dated December 19, 2008, the MERC dismissed the petition on the grounds that the policy of the Government of Maharashtra has no bearing on the categorization and tariffs determined by the commission under the Electricity Act, 2003. Our Company filed an appeal (no. 105 of 2009) before the Appellate Tribunal for Electricity, New Delhi challenging the order of the MERC contending that MERC gave its orders on merits of the case without hearing our Company. The Appellate Tribunal for Electricity has, by its order dated May 7, 2010, held that our Company had not been heard on merits and set aside the order of the MERC and remanded the matter back to MERC to be heard on merits. Our Company had entered into an agreement with the Maharashtra State Electricity Distribution Company Limited (MSEDCL) under which MSEDCL was supplying power to our Company for commercial purposes at its premises situated at Lavasa. After a spot inspection dated May 7, 2008 of our Companys site, MSEDCL observed that the power supplied to our Company was being used for construction activities and by an assessment order (no. SE/PRC/A/cs/HT/CONF/267) dated May 26, 2008 sought our Company to pay ` 31.2 million as electricity charges. Aggrieved by the assessment order, our Company has filed an appeal (no. 170 of 2009) before the Appellate Authority under section 127 of the Electricity Act, 2003 for setting aside of the assessment order. The matter is currently pending.

2.

Our Company may, from time to time, be served with notices by Gram Panchayats for payment of tax liability in relation to certain of our properties. Our Company has paid property taxes of ` 0.13 million to Dasve Grampanchayat, ` 0.05 million to Bhoini Grampanchayat and ` 0.018 million to Mugaon Grampanchayat respectively, due up to March 31, 2010. There is no property tax outstanding against our Company. Litigation involving our Subsidiaries Nil Litigation involving our Associates 322

Nil Litigation involving our Directors A. Litigation involving Ajit Gulabchand

Litigation against Ajit Gulabchand 1. Kirloskar Brothers Limited (the Complainant) has filed a criminal complaint (no. 3700041/SW/2007) before the Additional Chief Metropolitan Magistrate, 37th Court, Mumbai against Ajit Gulabchand in his capacity as the chairman and managing director of HCC, former directors and employees of HCC (as they were then) (the Accused). For more information, see Litigation against HCC Criminal Proceedings on page 323.

Litigation by Ajit Gulabchand Nil B. Nil C. Nil D. Nil E. Nil F. Nil G. Nil H. Nil I. Nil J. Nil Litigation involving our Promoters 323 Litigation involving Sharad M. Kulkarni Litigation involving Ram P. Gandhi Litigation involving Ajay B. Shirke Litigation involving His Highness Gaj Singh Litigation involving Sam Bhadha Litigation involving Shalaka Gulabchand Dhawan Litigation involving Vithal Maniar Litigation involving Anuradha Jitendra Desai Litigation involving Gautam Thapar

Litigation against HCC Criminal Proceedings 1. Kirloskar Brothers Limited (the Complainant) has filed a criminal complaint (no. 3700041/SW/2007) before the Additional Chief Metropolitan Magistrate, 37th Court, Mumbai against Ajit Gulabchand in his capacity as the chairman and managing director of HCC, former directors and employees of HCC (as they were then) (the Accused). The Complainant has charged the Accused of fabrication and pilferage of the intellectual property of the Complainant, under the provisions of the Indian Penal Code, 1860, The Copyright Act, 1957 and The Information Technology Act, 2000. Issue of summons by the Additional Chief Metropolitan Court has been stayed by the order dated July 27, 2007, passed by the court of Session for Greater Bombay in the criminal revision (no. 913 of 2007) filed by the Accused. This criminal revision is pending for arguments. The Central Bureau of Investigation (the Complainant) has filed a calendar case (no. 26 of 2003) before the Additional Special Judge for CBI Cases, Chennai against M.P. Kanakasabai, Additional Chief Engineer, Ennore Port Project, Chennai Port Trust, S. Muthu Srinivasan, Financial Advisor and Chief Account Officer, Chennai Port Trust and Ennore Port Project, HCC represented by Ajit Gulabchand in his capacity as the managing director of HCC (now represented by the company secretary) and M/s. Haskoning Consulting Engineers. The Complainant has alleged that HCC and others had entered into a criminal conspiracy to cheat the Chennai Port Trust by filing false claims of ` 146.3 million in relation to work done by HCC during the year 1999 and 2000 for the Ennore Port Project. The matter is currently pending. Criminal proceedings have been initiated by the State of Uttar Pradesh (no.1383 of 2009) with Additional Chief Judicial Magistrate, Lucknow against the project manager, section incharge, site engineer, (HCC officials) resident engineer, material and bridge engineer (officials of LEA Associates South Asia Private Limited (LASA) project engineer) under sections 288, 337, 338, 304-A and 427 of the Indian Penal Code, 1860. They are charged of negligently carrying out construction work and for grossly violating safety measures at the Lucknow - Muzzafarabad national highway site leading to an accident at the site. Ullas Bhattacharya, Nagender Rai and T. K. Choudhary (HCC officials) appeared in the court and were granted bail on October 21, 2008. The matter is currently at trial stage. Bimal Kumar Sodhani has filed an special leave petition (no. 4600 of 2010) against Parvez Alam and Dilbagh Singh, officers of HCC (the Respondents) challenging the order of the Calcutta High Court quashing the charge sheet filed against the Respondents in (G.R. case no. 813 of 2002) under sections 382,420,406 and 120B of the Indian Penal Code, 1860 and quashing the order (no. 127 of 2002) passed by the Sub Divisional Judicial Magistrate taking cognizance of the offence. The matter is currently pending.

2.

3.

4.

Civil Proceedings 1. Kirloskar Brothers Limited (KBL) has filed a writ petition (no. 1066 of 2006) before the High Court of Andhra Pradesh for cancellation of award of Godavari Lift Irrigation Scheme Package II to the joint venture of HCC- Nagarjuna Construction Company Limited. The High Court of Andhra Pradesh held that since KBL has not participated in the tender, the Civil Court should be approached. KBL contended that the petition was in the nature of a public interest litigation. The High Court of Andhra Pradesh has directed KBL to place the matter before the appropriate court dealing with public interest litigation in view of its assertion to that effect. The writ petition is pending before the High Court of Andhra Pradesh. Lt. Uday Bhan Singh and others (the Complainants) have filed a consumer complaint (no. 107 of 2005) before the State Consumer Dispute Redressal Commission, New Delhi against the Army Navy Housing Board and HCC alleging defects in construction of a building in Navi Mumbai. The Complainants have sought a direction for repair / renovation of the building under the commissions supervision or, in the alternative, that the opposite parties be directed to jointly and severally pay an amount of ` 3.7 million. HCC has filed its reply stating that the complainants are not consumers of HCC and there is no privity of contract between the complainants and HCC. The matter is currently pending for arguments. 324

2.

3.

G.K. Construction has filed a suit for permanent injunction (no. 78 of 2009) before the Principal Junior Civil Judge, Kovvur, to restrain one of HCCs sub-contractors from receiving bills from HCC. HCC has, through its project manager, filed a counter statement stating that HCC is not concerned with the dispute between G.K Construction and HCCs sub contractor. The matter is currently pending. Ugrasen Upadhyay has filed a civil suit bearing suit (no. 4013 of 2000) against HCC before the Bombay High Court for recovery of an amount of ` 0.776 million along with future interest on the principal amount. The dispute pertains to the total number of girders casted and the quality/rate of the girders. HCC has filed a written statement and counter claim against Ugrasen Upadhyay seeking ` 3.8 million with further interest. The matter is currently pending. The Kerala State Electricity Board (KSEB) and the State of Kerala have filed appeals (no. 197 of 2008 and 205 of 2008) before the Division Bench in the High Court of Kerala against a writ petition filed by HCC. KSEB had called for re-tendering for a project where HCC and Bharat Heavy Electricals Limited was selected. HCC challenged this decision of KSEB in the High Court of Kerala which gave a decision in favour of HCC. The matter is currently pending. The Kerala Public Works Department has challenged an arbitral award dated November 15, 2006 before the District Court of Ernakulum (no. 64 of 2007), made in favour of HCC for an amount of ` 4.1 million. The matter is currently pending. The Municipal Corporation of Greater Mumbai has challenged an arbitral award dated September 24, 2007 before the Bombay High Court (arbitration petition no. 65 of 2008) in favour of HCC for an amount of ` 9.79 million. The matter is currently pending. The Maharashtra State Road Development Corporation Limited has filed an appeal before the division bench of the Bombay High Court against the decision of the Bombay High Court dismissing the arbitration petition (no. 103 of 2007). The arbitration petition challenged the arbitral award of ` 18.1 million made in favour of HCC. The matter is currently pending. The Brihanmumbai Municipal Corporation has challenged before the Bombay High Court two arbitral awards made in favour of HCC for an amount of ` 8.2 million and ` 16.6 million vide arbitration petition (no. 982 of 2009) in respect of additional dewatering during 229 additional days of boring in Charkop tunnel. The matter is currently pending. Satluj Jal Vidyut Nigam Limited (the Plaintiff) has filed a civil suit before the High Court of New Delhi against the Nathpa Jhakri joint venture (the Defendants). The Plaintiff has sought recovery of paid amounts of ` 7.5 millions as per the final dispute review board award regarding electricity tariffs, along with interest. The matter is currently pending. Satluj Jal Vidyut Nigam Limited (the Plaintiff) has filed a civil suit before the High Court of New Delhi against the Nathpa Jhakri joint venture (the Defendants). The Plaintiff has sought for recovery of paid amounts of ` 23.10 million as per the final dispute review board award regarding appearance of quartzite in Wadhal, along with interest. The matter is currently pending. Satluj Jal Vidyut Nigam Limited (the Appellant) has filed an appeal before the Division Bench of the High Court of New Delhi against the Nathpa Jhakri joint venture (the Respondents) challenging the dismissal by the single judge of the High Court of New Delhi of the suit for declaring the dispute review board award of ` 48.6 million, with regard to unilateral recovery of interest by Satluj Jal Vidyut Nigam Limited on deferred contractual advances void. The matter is currently pending. Satluj Jal Vidyut Nigam Limited (the Plaintiff) has filed a civil suit before the High Court of New Delhi against the Nathpa Jhakri joint venture (the Defendants). The Plaintiff has challenged the arbitral award made by an arbitral tribunal in favour of the Nathpa Jhakri joint venture for an amount of ` 301.4 million, in respect of loss of productivity due to the Manglad floods. The matter is currently pending. 325

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

Ennore Port Limited has filed a special leave petition (no. 25755 of 2005) before the Supreme Court challenging an order of the High Court of Madras which upheld the award passed by the arbitral tribunal providing interim extension of time of 138 days and liquidated damages of ` 27.3 million. The Supreme Court has directed Ennore Port Limited to release the amounts towards arbitration award and admitted the Special Leave Petition. Ennore Port Limited has released the amount and the matter is currently pending. Ennore Port Limited has filed an original petition (no. 964 of 2007) before the High Court of Madras against HCC challenging an award passed by an arbitral tribunal consisting of Jagman Singh, R Rajagopalan and Dharm Vir, directing the employer to pay ` 212.4 million towards operational delay payments. The matter is currently pending. Ennore Port Limited has filed an original petition (no. 427 of 2005) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of Jagman Singh and Dharm Vir, rejecting the claim of Ennore Port Limited towards wagon charges amounting to ` 99.9 million. The matter is currently pending. Ennore Port Limited has filed an original petition (no. 259 of 2005) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of Jagman Singh, R. Rajagopalan and Dharm Vir, awarding a recovery of ` 12.4 million. The matter is currently pending. Ennore Port Limited has filed an appeal (no. 247 of 2004) before the High Court of Madras against the order of the High Court of Madras upholding an award passed by the Arbitral Tribunal consisting of V. Subramanian, A. Ananthakrishnan and T.V. Ranganathan awarding ` 26.8 million towards engineers review of variation order. The matter is currently pending. HCC had filed an arbitration proceeding for a material markup claim of ` 20.01 million. The claim of HCC was been rejected by the arbitrator and HCC challenged the award before the High court of New Delhi. The High Court of New Delhi remanded back directing the arbitrator to pass fresh order on merits. This order of the High court is challenged by National Hydroelectric Power Corporation Limited and the matter is currently pending. Ennore Port Limited has filed an original petition (no. 260 of 2005) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of M. Velu, M. C. Bhide and O. P Goel of ` 12 million towards rocks method of measurement. The matter is currently pending. Ennore Port Limited has filed an appeal (O.P. no 262 of 2005) before the High Court of Madras against the order of the High Court of Madras upholding an award passed by the Arbitral Tribunal consisting of M. Velu, M. C. Bhide and O.P. Goel for an amount of ` 21.6 million towards release of retention money. The matter is currently pending. Ennore Port Limited has filed an original petition (no. 325 of 2005) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of M. Velu, M.C. Bhide and O.P. Goel for an amount of ` 17.5 million providing release of retention money. The matter is currently pending. Ennore Port Limited has filed an original petition (no. 487 of 2008) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of Subramaniam, Jagman Singh and K. Dharmalingam providing for ` 243.6 million, USD 794,043 and Euro 2,186,646 towards nonpayment of monthly interim payment certificate, certified by engineer in respect of work executed. The matter is currently pending. Ennore Port Limited has filed an original petition before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of Subramaniam, Jagman Singh and K. Dharmalingam providing for ` 21 million, USD 15,062 and Euro 14,003 towards bank guarantee charges. The matter is currently pending. 326

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Ennore Port Limited has filed an original petition (no. 348 of 2004) before the High Court of Madras against HCC challenging an award passed by the Arbitral Tribunal consisting of O.P. Goel and M.C. Bhide rejecting the counter claim amount of the Ennore Port Limited of ` 87.23 million on rock escalation. The matter is currently pending. The National Highway Authority of India has filed an original petition (no. 96 of 2007) before the High Court of New Delhi against HCC challenging an award passed by the Arbitral Tribunal consisting of K. K. Madan, D.C. Nautiyal and N.N. Singhal awarding an amount of ` 105.8 million and ` 2.64 million towards deemed export benefits, shoulder treatment for the existing carriageway. The matter is currently pending. The National Highway Authority of India has filed an original petition (no. 474 of 2007) before the High Court of Delhi against HCC challenging an award passed by the Arbitral Tribunal consisting of K.K. Madan, D.C. Nautiyal and N.N. Singhal awarding an amount of ` 5.94 million towards tree cutting and loss of overheads and profit on account of omission of bill of quantity and payment for the reinforcement provided in case-in-situs piles. The matter is currently pending. The Irrigation Department, Government of Haryana has filed an appeal before the High Court of Punjab and Haryana against the order of the District Court, Jaghdhri, Yamunanagar, upholding an award passed in favour of HCC providing ` 2 million towards refund of recovery of liquidated damages and ` 9.47 million towards adjustment in rate of concrete. The matter is currently pending. The Irrigation Department, Government of Haryana has filed an appeal to be numbered before the High Court of Punjab and Haryana against the order of the District Court, Jaghdhri, Yamunanagar, upholding an award passed in favour of HCC providing ` 1.4 million and ` 10.1 million towards varied rate for the work executed. The matter is currently pending. The Tamil Nadu Electricity Board has filed an original petition (no. 425 of 2000) before the Madras High Court against HCC, challenging an award of ` 2.39 million granted in favour of HCC for the construction of barrages for lower mettur hydro electric project. The matter is currently pending. Tirumala Tirupathi Devasthanam has filed an appeal before the High Court of Andhra Pradesh against the order of the Principal Subordinate Judge, Tirupathi which confirmed an award of ` 4.80 million in favour of HCC for the construction of the Papavinasanam Dam. The High Court of Andhra Pradesh has remanded the matter to the lower court. The matter is currently pending. Anjanabai H. Sonawane and others (the Plaintiffs) have instituted a suit (no. 2688 of 2008) against HCC before the Bombay High Court in relation to certain property at Vikhroli (East). The Plaintiffs have sought to be declared as the lessees of the property under the indenture of lease. The matter is currently pending. Bimal Kumar Sodhani (the Plaintiff) has filed a money suit (No.58 of 2002) against Associated Infrastructure (India) Private Limited and others before the Civil Judge, Senior Division, Medinipore, West Bengal, seeking ` 31.88 million and damages of ` 40 million, wherein HCC has been added as defendants. Subsequently an amendment application was filed by the Plaintiff revising the claim amount to ` 18.59 million. The plaintiff has also filed a declaratory suit (No. 114 of 2002) against Associated Infrastructure (India) Private Limited and others before the Civil Judge, Senior Division, Medinipore, West Bengal wherein HCC has been added as defendants and has sought declaration that the plaintiff is entitled to lien over all unpaid bills due to Associated Infrastructure (India) Private Limited from HCC. The Bombay High Court vide its orders dated January 31, 2007 and March 20, 2007 (petition no. 369 of 2004) discharged HCC from all the third party claims upon payment of ` 5.11 million. The money suit and the declaratory suit filed before the Civil Judge, Senior Division, Medinipore, West Bengal are pending.

26.

27.

28.

29.

30.

31.

32.

33.

Industrial and Labour Proceedings

327

1.

P.M. Rahate has filed suit (no. 3845 of 2000) before the Bombay High Court against HCC seeking compensation of ` 6 million and status quo on his sitting arrangement. A notice of motion (no. 2771 of 2000) was taken out by him in the said suit praying for injunction to keep the sitting arrangement/position of the Plaintiff in status quo till disposal of the suit. Justice F.I. Rebello of the Bombay High Court vide his order dated October 13, 2000 dismissed the notice of motion since the relief was not maintainable. The matter is currently pending. P.M. Rahate has filed suit (no. 3542 of 2004) before the Bombay High Court against HCC seeking payment of ` 1.2 million towards provident fund and gratuity. The matter is currently pending. Idrish Khan, an ex-employee of HCC has filed a complaint (no. 401 of 2004) before the 2nd Labour Court, Bandra, Mumbai under section 33C (2) of Industrial Disputes Act, 1947. He has filed a claim for payment of overtime dues to a tune of ` 0.32 million. HCC has filed its written statement. The matter is currently pending. Arul Raj has filed a complaint (industrial dispute no. 126 of 2002) before the Additional Labour Court, Chennai against HCC claiming permanency of services and compensation amounting to ` 0.035 million towards back wages for the break period of services. HCC has filed its written statement. The matter is currently pending. The legal heir of late Virendra Kumar Gupta has filed a suit (no. 15 of 2005) before the Civil Court, Senior Division, Surendranagar, Gujarat against HCC claiming compensation to the tune of ` 4 million on account of the death of Virendra Kumar Gupta, who died of a heart attack, alleging that the same was caused by stress and carelessness in the treatment given by HCC. The matter is currently pending. A. S. Kothari has filed a petition (no. 3024 of 2003) before the Bombay High Court against HCC seeking incremental benefits and reinstatement with back wages to a tune of ` 0.58 million. The matter is currently pending. J. N. Agnihotri has filed case (no. 25811 of 2007) before the High Court of Madras against HCC against the impugned order passed by the presiding officer of the Labour Court in claim petition (no. 572 of 2002) requesting the High Court of Madras to direct the presiding officer to call for the records of the above mentioned claim petition and quash the same. The matter is currently pending. J. N. Agnihotri has filed a case (no. 12954 of 2009) before the High Court of Madras against HCC against the impugned order of the appellate authority, requesting the High Court of Madras to quash the impugned order and consider the salary of ` 5,500 for calculation of gratuity, the interest at the rate of 24% and ` 0.01 million as cost. The matter is currently pending. Maharashtra Navnirman Kamgar Sena (MNKS) has filed a complaint (no. 534 of 2006) before Industrial Tribunal, Mumbai against HCC alleging unfair labour practices. The Industrial Tribunal has passed an exparty ad-interim order restraining MNKS from resorting to any agitational activities in and around the project site. The Bandra Worli Sea Link Workers Union has filed a complaint (no. 32 of 2007) before the Industrial Tribunal, Mumbai, against HCC alleging unfair labour practices. The Industrial Tribunal has passed an exparty ad-interim order restraining HCC from negotiating with any other trade union other than the complainant. Liaquat Ali has filed a case before the Assistant Labour Commissioner, Doda, Jammu and Kashmir, against the project manager of USB rail project for a workmen compensation claim to the tune of ` 1 million. HCC has submitted objections in this regard. The matter is currently pending. Sadam Hussain has filed a case before the Motor Accident Claims Tribunal, Ramban, Jammu and Kashmir against New India Insurance and project manager of USB Rail Project for workmen compensation claim to the tune of ` 0.5 million. The matter is currently pending. 328

2. 3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13. 14.

Kulwant Singh has filed a case before the Motor Accident Claims Tribunal, Ramban, Jammu and Kashmir against HCC for workmen compensation to the tune of ` 0.5 million. The matter is currently pending. Mohammed Iqbal Manhas has filed a case before the Deputy Labour Commissioner, Jammu and Kashmir against HCC for workmen compensation to the tune of ` 1.45 million. HCC has submitted its reply before the Assistant Labour Commissioner, Jammu. The matter is currently pending. Ashraf, son of Gulam Nabi, has filed a case before the Assistant Labour Commissioner, Doda, Jammu and Kashmir against HCC seeking workmens compensation to the tune of ` 1 million. HCC has submitted its objections. The matter is currently pending. Uma Devi, wife of late Om Prakash Baigra, has filed a case before the Assistant Labour Commissioner, Jammu against HCC seeking workmens compensation towards disablement to the tune of ` 1 million. The matter is currently pending. Six dismissed workmen have filed a case (no. 2007-324-25) before the Assistant Labour Commissioner (Central), Chandigarh, against HCC for re-engagement of their services. The matter is currently pending. Mamini Rana, wife of Late Rajendra Rana, has filed a case before the Sub Divisional Judicial Magistrate Court, Behrampur, Orissa against HCC for insurance amount of ` 0.12 million and monthly family pension of ` 0.002 million. The matter is currently pending. T Aji Dora, wife of T. Markanda Dora, has filed a case before the Sub Divisional Judicial Magistrate Court, Behrampur, Orissa against HCC regarding compensation under Payment of Wages Act, 1936 to the tune of ` 0.6 million. HCC has filed its written statements. The matter is currently pending. Abdul Hamid Bhat has filed a case before the Workmen Compensation Commissioner, Baramulla, Jammu and Kashmir, claiming compensation to the tune of ` 0.45 million from HCC. The matter is currently pending. Tiku Sethi has filed a case (MJC no. 2 of 2009) against HCC, before the Labour Court, Chamba claiming compensation for the accident met in course of employment. The matter is currently pending. Maharashtra Navnirman Kamgar Sena has filed a complaint (no. 474 of 2006) before the Industrial Tribunal, Mumbai against HCC alleging unfair labour practices and has obtained ex-party interim orders restraining HCC from negotiating with any other trade union other than the complainant. The matter is currently pending. Raja Reddy has filed a case (no. 47 of 2008) against HCC, before the Court of the Judicial Magistrate, Behrampur, Orissa seeking workmen compensation towards disablement due to an accident. The matter is currently pending. State of Himachal Pradesh has filed an appeal (no. 306 of 2008) before the High Court of Himachal Pradesh against the acquittal of H.S. Dhillon for an offence under section 302 of the Indian Penal Code, 1860. Raja Reddy has filed a case (MJC no.1 of 2008) against HCC, before the Court of the Sub Divisional Magistrate at Behrampur, Orissa seeking workmens compensation claim disablement due to an accident. The matter is currently pending.

15.

16.

17. 18.

19.

20.

21. 22.

23.

24.

25.

Share Related Proceedings 1. Sham Sunder B Kukreja (the Plaintiff) has filed a civil suit (no. 6573 of 2007) before the Court of Civil Judge, Bangalore against HCC and others (the Defendants). The Plaintiff has sought an injunction restraining the Defendants from transferring the shares and directing them to issue duplicate certificates or 329

transfer 50% shares to the Plaintiff along with benefits. The Defendants have filed their written statements. The matter is currently pending. 2. Arvind Vajpeyi (the Plaintiff) has filed a civil suit (no. 2164 of 1996) before the City Civil Court, Calcutta against HCC and MCS Limited (the Defendants). The Plaintiff has sought an injunction restraining the Defendants from transferring the suit shares to any other person except the Plaintiff. The matter is currently pending. Amee Piyush Shah and Piyush Ramesh Shah (the Plaintiffs) have filed a civil suit (no. 1352 of 2005) before the Bombay High Court against HCC and others (the Defendants). The Plaintiffs are claiming title to the shares allegedly stolen from the Plaintiffs and currently in the physical custody of the Defendants. The Defendants have filed their affidavits. The matter is currently pending. Dr. Abha Saraf (the Plaintiff) has filed a civil suit (no. 1929 of 2007) before the City Civil Court, Calcutta against HCC and others (the Defendants). The Plaintiff has sought declaration of its title to the suit shares and for injunction restraining the Defendants from transferring the shares to any other person other than the Plaintiff. The Defendants have filed their written objections. The matter is currently pending. Kalpana Kamlesh Shah (the Plaintiff) has filed a civil suit (no. 7 of 2006) before the Court of Principal Senior Civil Judge, Gandevi against HCC and others (the Defendants). The Plaintiff has sought declaration that the transfer of shares lodged by Sanjay Chaganlal Shah on October 18, 2005 in his name be declared invalid. The Plaintiff has further sought anr injunction restraining the Defendants from further transferring the shares. The matter is currently pending. Shrikant M. Aithal (the Plaintiff) has filed a civil suit (no. 4775 of 2005) before the City Civil Court, Bombay against HCC and others (the Defendants). The Plaintiff has sought declaration of the his title to the shares and a direction to the Defendants to transfer the shares to the Plaintiff along with all benefits. The Defendants have filed their written statements. The matter is currently pending. Sunanda Prakash Kajale and Prakash D Kajale (the Plaintiffs) have filed a special civil suit (no. 147 of 2006) before the Court of Civil Judge Senior Division, Pune against MCS Limited and Mahesh Waikar (the Defendants). The Plaintiffs have sought an injunction restraining the Defendants from issuing duplicate share certificates to Mahesh Waikar and declaration of their title to the suit share. The Suit was dismissed on February 29, 2008 by the Court of Civil Judge Senior Division, Pune on grounds on default. The Plaintiffs have filed an application for condonation and restoration of the suit. The matter is currently pending. Mohkamsingh V. Sodhi (the Plaintiff) has filed a civil suit (no. 115 of 2006) before the Court of Civil Judge, Junior Division Ulhasnagar against HCC and others (the Defendants). The Plaintiff has sought for declaration of his title to the suit shares and injunction restraining the Defendants from transferring the shares. The Defendants have filed their written statements. The matter is currently pending. Siby Joseph (the Plaintiff) has filed an interlocutory application (no. 61 of 1995) before the District Court, Thiruvanthapuram against HCC and others (the Defendants). The Plaintiff has sought an injunction restraining the Defendants from transferring the shares without the written consent of the Plaintiff. The matter is currently pending. Rikhab Chand (the Plaintiff) has filed a civil suit (no. 154 of 2000) before the Court of Civil Judge, Junior Division, Arsikere against HCC and others (the Defendants). The Plaintiff has sought for declaration of their title to the suit shares and injunction restraining the Defendants from transferring the shares. The Defendants have filed their written statements. The matter is currently pending. S. Anand (the Plaintiff) has filed a civil suit (no. 6099 of 2005) before the Court of VIII Assistant City Civil Judge, Madras against HCC and others (the Defendants). The Plaintiff has sought an injunction restraining the Defendants from transferring the shares to any other person except the Plaintiff. The matter is currently pending. 330

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Amita Devnani (the Appellant) has filed an appeal (no. 670 of 2008 C.P. 124/111/ClB MB/2009/4078) before the Company Law Board, Mumbai against HCC and others (the Respondents) and has sought transfer of shares in her name. The Respondents have filed their written statements. The matter is currently pending.

Tax Proceedings 1. State of Tamil Nadu through Joint Commissioner (CT), Chennai (no. 290 and 291 of 2008) has filed an appeal before the Sales Tax Appellate Tribunal, Chennai against the first appeal order passed by the appellate authority in favour of HCC, for levy of additional sales tax of ` 4.36 million and ` 7.07 million on sub-contract turnover for assessment year 2003-2004 and 2004-2005 respectively. The matter is currently pending. The Commissioner of Central Excise has filed an appeal (no. S/167 of 2007) before the CESTAT against the order of the Commissioner of Central Excise, Cochin in favour of HCC permitting availment of benefit of 67% abatement, to the tune of ` 2.36 million, on the taxable value for payment of service tax on construction services under service tax rules. The matter is currently pending. The Commissioner of Central Excise has filed an appeal (no. 434 of 2008) before the High Court of Madras against the refund of ` 28.40 million granted to HCC by the CESTAT, Chennai. The matter is currently pending. The Commissioner of Central Excise, Thirunelvelli has filed an appeal before the CESTAT, Chennai against the order of the Commissioner (Appeals) nullifying the demand of ` 2.36 million raised against HCC. The matter is currently pending. State of Haryana has filed special leave petitions (no. 18476 of 2005, 18477 of 2006 and 18478 of 2005) before the Supreme Court of India against orders of the High Court of Punjab and Haryana at Chandigarh squashing re-assessment and demand of tax from HCC by the Joint Commissioner of ` 6.53 million for the period 1998-1999, ` 4.49 million for the period 1999-2000 and ` 0.37 million for the period 2000-2001. The matter is currently pending. State of Karnataka has filed special leave to appeal (civil no. 9209 -10 and 9213-15 of 2010) before the Supreme Court of India against final order passed by High Court of Karnataka squashing re-assessment and demand by the Additional Commissioner, Commercial Taxes, Bangalore for of ` 1.81 million for the assessment year 2002-2003, ` 5.97 million for the assessment year 2003-2004 and ` 9.53 million for the assessment year 2004-2005 from HCC. The matter is currently pending.

2.

3.

4.

5.

6.

Arbitration Proceedings 1. M/s. Kumaraan Demolishers (the Claimant) has initiated arbitration proceedings against HCC and has raised a claim of ` 4.7 million against HCC on account of loss of hire charges and foreclosure of contract. The arbitrator had refused to include the said additional claim of the Claimant in the present arbitral proceedings. The Claimant has filed a separate application for appointment of arbitrator. The matter is currently pending.

Litigation by HCC Criminal proceedings filed by HCC 1. HCC has filed a criminal appeal (no. 1145 of 2008) before the Bombay High Court against Good Value Marketing Company Limited and its Chairman Dilip S. Dhanukar. This appeal is filed challenging the order of the Metropolitan Magistrates Court acquitting all the accused. The case pertains to section 138 of Negotiable Instruments Act, 1881 as the cheque issued by Good Value Marketing Company Limited for `

331

10 million towards repayment of deposits bounced. The appeal has been admitted vide order dated March 4, 2009. The appeal is pending in the Bombay High Court. Civil Proceedings 1. HCC has filed a suit (no. 4579 of 1990) against Alliance Capital Services Private Limited and others before the Bombay High Court for recovery of a sum of ` 14.05 million towards the principal amount of inter corporate deposit of ` 8 million together with interest thereon that matured on April 9, 1997. The matter is currently pending. HCC has filed a petition (no. 34027/2001-A) before the High Court of Kerala and has sought to restrain the electricity board from invoking the bank guarantees of ` 4 million, or from receiving, realizing, adjusting and/or appropriating any amount under the bank guarantees. The High Court of Kerala has granted stay on invoking of the bank guarantee. The matter is currently pending. HCC has filed a municipal appeal (no. 18 of 1999) against the Municipal Corporation of Greater Mumbai before the Court of Small Causes at Dhobi Talao, Mumbai challenging the increase in rateable value from ` 0.01 million to ` 3.09 million of its property located at Vikhroli, Mumbai. The matter is currently pending. HCC has filed a suit (no. 8 of 2004) before the Joint Civil Judge, Senior Division, Panvel, against Khalil Dakhve and others for specific performance of agreement for sale of property for the land bearing survey no. 19, village Tara, taluka Panvel, district Raigad admeasuring about 24.95 acres. HCC had paid a sum of ` 0.25 million as part consideration. HCC has moved an application before the Joint Civil Judge, Senior Division to impede the new buyers of the land under the sale deed dated May 16, 2008 and the same was allowed. The matter is currently pending. HCC has filed suit (no. 670 of 1995) before the Delhi High Court against R. N. Mathur for the recovery of ` 2.25 million along with interest thereon. The suit was decreed on May 17, 2005. HCC has subsequently filed an execution petition (no. 46 of 2008) before the High Court of New Delhi for execution of decree of ` 2.25 million along with interest and cost thereon against R.N. Mathur. The matter is currently pending. HCC and Nuclear Power Corporation have filed a civil suit bearing suit (no. 218 of 1993) before the Bombay High Court against West Coast Engineering Works for recovery of ` 0.59 million due to HCC in lieu of 38.85 metric tonnes of M.S. flats supplied. HCC has alleged that West Coast Engineering Works had dishonestly misappropriated and disposed off the flats erroneously delivered by the Nuclear Power Corporation and fraudulently converted the same to its own use. West Coast Engineering Works has filed a counter claim to the tune of ` 0.57 million and HCC filed a written statement to the counter claim. The matter is currently pending. HCC has filed suit (no. 423 of 2004) before the City Civil Court, Bangalore, against Karnataka Power Corporation Limited (KPCL) for recovery of a sum of ` 122.7 million towards the final bill together with interest thereon for the project completed by HCC under the contract agreements executed between KPCL and HCC on December 22, 1989 and the supplementary agreement dated December 7, 1994. The matter is currently pending. HCC has filed an execution petition (no. 30 of 2005) before the District Court, Trivandrum to recover the balance decree debt amount of ` 35.4 million out of the total amount of decreed amount of ` 221.6 million from Kerala State Electricity Board, as decreed in favour of HCC by the High Court of Kerala. The matter is pending. HCC has challenged an arbitral award of ` 51.10 million awarded to HCC against a claim of ` 609.9 million before the Bombay High Court by an arbitration petition (no. 364 of 2008). The Maharashtra State Road Development Corporation Limited has also separately challenged the award in the Bombay High Court by an arbitration petition (no. 282 of 2008). The matters are currently pending. 332

2.

3.

4.

5.

6.

7.

8.

9.

10.

The Nathpa Jhakri joint venture (the Plaintiff) has challenged an arbitral award of ` 56.8 million, in respect of minimum wages, made in favour of the Satlej Jal Vidyut Nigam Limited (the Defendants) before the High Court of New Delhi. The matter is currently pending. HCC has filed an execution petition before the High Court of Allahabad for release of payment in accordance with the award initiated by HCC against the Government of Uttar Pradesh for settling the dispute regarding the compensation for increase in price of other ancillary commodities. The High Court of Allahabad ordered the release of the full decreed amount. Currently, an amount of ` 53.7 million deposited by the Government of Uttar Pradesh has been withdrawn and a bank guarantee for an amount of ` 26.9 million has been issued to the Registrar, Allahabad High Court. The matter is currently pending. HCC has filed an appeal proceeding (no. 2 of 2002) before the High Court of Jharkhand against the order of the Court of the Sub-ordinate Judge-I, Seraikella. The arbitration proceeding was initiated by HCC against the State of Bihar for a claim of ` 227.22 million for dispute regarding the suspension of works in the Icha Dam project. During the course of arbitral proceedings, an application for extension of time and appointment of arbitrators was filed in the Sub-ordinate Judge-I, Seraikella. Due to procedural mistakes by HCC, the application was dismissed. A restoration petition was filed to restore the application for appointment of arbitrator and the same was dismissed by the Court of the Sub-ordinate Judge-I, Seraikella. An appeal has been filed against the dismissal order before the High Court of Jharkhand. The matter is currently pending. HCC has filed an execution petition before the High Court of New Delhi for the enforcement of an arbitral award in favour of HCC, confirming that HCC is entitled to the total sum of ` 24.3 million from Malvika Steel Limited as outstanding dues. The matter is currently pending. HCC has filed an execution before the High Court of Uttaranchal for the enforcement of an arbitral award in favour of HCC, confirming that HCC is entitled to the total sum of ` 22.9 million as recovery of dam losses and flood losses from the State of Uttar Pradesh. HCC has already received a payment of ` 12.2 million. The matter is currently pending. HCC has filed an execution before the District Court of Uttaranchal and caveat before the High Court of Uttaranchal for the enforcement of an arbitral award in favour of HCC, confirming that HCC is entitled to the total sum of ` 24.9 million as difference in payment variations of wages. The High Court of Uttaranchal has directed for deposit of 50 % of the decreed amount and the Government of Uttaranchal has deposited ` 22 million. The matter is currently pending. HCC has filed an execution petition before the Court of the Sub-ordinate Judge, Jamshedpur for the enforcement of an arbitral award in favour of HCC, confirming that HCC is entitled to the total sum of ` 25 million from State of Jharkhand for losses, damages and loss of profit earning capacity during the seasons 1988-1989 and 1989 -1990 in the Chandil Dam Works project. The matter is currently pending. HCC has filed a writ petition before the Bombay High Court against the an order passed by the Industrial Tribunal, Mumbai awarding payment of full back wages from the date of discharge to the date of superannuation to S.M. Nayak. The matter is currently pending. HCC has filed a suit (no. 4446 of 1993) before the Bombay High Court against Bangalore Water Supply and Sewerage Board (BWSSB) and has sought recovery of ` 30.30 million for refusal to pay outstanding dues towards HCC and removal of the escalation ceiling amongst other breaches. BWSSB has filed a counter suit and has sought recovery of ` 37.80 million. The matter is currently pending. HCC has filed a suit (no. 9 of 2004) before the Joint Civil Judge, Senior Division, Panvel, against Khalil Dakhve and others for specific performance of agreement for sale of property for the land bearing survey no. 21, village Tara, taluka Panvel, district Raigad admeasuring about 8 hectare and 45 ares (the Suit Land). HCC had paid a sum of ` 0.25 million as part consideration. HCC has moved an application before the Joint Civil Judge, Senior Division to impede the new buyers of the land under the sale deed dated May 16, 2008 and the same was allowed. The matter is currently pending. 333

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

HCC has filed an appeal (no. 320 of 2008) before the High Court of Madras against the order of the High Court of Madras setting aside an award passed in favour of HCC by the Arbitral Tribunal consisting of M. Velu, M.C. Bhide and O.P. Goel ` 17.5 million towards increase in specific density of rock. The matter is currently pending. HCC has filed an appeal before the High Court of Punjab and Haryana against the order of the District Court setting aside an award passed in favour of HCC by the Arbitral Tribunal consisting of Justice K. Rama Moorthy, Jagman Singh and Mahendra Pratap providing ` 28.1 million towards extended stay costs. The matter is currently pending. HCC has instituted a suit (no. 248/297 of 2008) against the legal heirs and representatives of Fakira and Sonawane (the Defendants) before the Small Causes Court, Mumbai and has sought eviction of the Defendants and possession of the property situated at Vikhroli (East), Mumbai. The matter is currently pending.

21.

22.

Tax Proceedings 1. HCC has filed an appeal before the Appellate Assistant Commissioner (CT) VI Chennai (no. 26 of 2005) against order of the Commercial Tax Officer levying additional sales tax amounting to `1.1 million on subcontracting turnover for the assessment year 2002-2003. The matter is currently pending HCC has filed an appeal before the CESTAT South Zonal Branch, Chennai vide (no. 27 of 2007) against an order by the Commissioner of Central Excise (Service Tax) Tirunelvelli challenging the levy of penalty amounting to ` 1.31 million. The matter is currently pending. HCC has filed an appeal before the Appellate Assistant Commissioner Commercial Tax Cuttack, against an assessment order by the sales Tax Officer, Cuttack II Circle, (AA no. 136 of 2002-2003) for the year 20012002 towards refund of ` 0.218 million. The matter is currently pending. HCC has filed an appeal before the Appellate Assistant Commissioner Cuttack, against an assessment order of the Sales Tax Officer Cuttack II Circle (AA no. 111 of 2006-07) for the year 2002-2003 disallowing works contract tax deducted at source of ` 0.121 million. The matter is currently pending. HCC has filed an appeal before the Appellate Assistant Commissioner, Cuttack II, against an assessment order of the Sales Tax Officer, Cuttack II Circle of 2004-2005 creating demand of ` 1.4 million by disallowing service and overhead expenses. The matter is currently pending. HCC has filed an appeal before the Appellate Assistant Commissioner Cuttack II, against an audit assessment order of ` 25.2 million by the Sales Tax Officer, Cuttack II Circle, under Orissa value added tax for the period April 2005 to September 2007. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Ahmedabad, against a revision order for levy of tax of ` 0.45 million on ground granulated blast furnace slag at higher rate. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Appeal 1, Ahmedabad for levy of sales tax of ` 0.80 million on conversion of steel plates into pipes for use in execution of work. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Appeal, Guwahati against an entry tax assessment order for 2007-2008 by the Superintendent of Taxes, Guwahati by levying demand of ` 9.1 million. The matter is currently pending.

2.

3.

4.

5.

6.

7. 8.

9.

334

10.

HCC has filed an appeal before the Deputy Commissioner, Appeal, Jammu against an assessment under Jammu and Kashmir General Sales Tax Act for the period 2007-2008 demand amounting of ` 3.1 million. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Commercial Taxes for re-assessment of 20% profit margin and disallowances of benefit under Uttar Pradesh Trade Tax Act. HCC has paid ` 3.9 million under protest. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner for disallowance of input tax credit for the period April to August 2008 amounting to ` 34.1 million. HCC has paid ` 3.5 million under protest. The matter is currently pending. HCC has filed an appeal before the Joint Commissioner Appeals for provisional assessment order of ` 6 million for the month of July 2009 by Deputy Commissioner, Sales Tax, Lucknow. The matter is currently pending. HCC has filed an appeal before the Joint Commissioner Appeal against an entry tax penalty of ` 1.30 million levied by the Deputy Commissioner, Lucknow for consignment held up at Uttar Pradesh border by check post officials. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Appeal, Udaipur against an entry tax assessment order by Commercial Tax Officer, Bhilwara for the year 2006-2007 and levy demanding ` 2.5 million. HCC has paid ` 1 million under protest. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Appeal, Udaipur against value added tax assessment order by Commercial Tax Officer, Bhilwara for the year 2006-2007 and levy demand ` 6.6 million. The matter is currently pending. HCC has filed an appeal before the Deputy Commissioner, Appeal against central sales tax assessment order of ` 11.80 million by Commercial Tax Officer, Bhilwara for disallowance of stock transfer. The Deputy Commissioner, Appeal has granted stay on payment of ` 9.20 million. HCC has paid ` 2.60 million under protest. The matter is currently pending. HCC has filed an appeal (no. 1853 to 1856 of 2004-05) before the Orissa Sales Tax Tribunal, Cuttack against the orders of the Appellate Assistant Commissioner for the period 1997-1998 to 2000-2001 levying demand of ` 5.3 million by rejecting labour deductions. The matter is currently pending. HCC has filed an appeal (no. Central II, 6438 / M / to 6441 / M / 2008) before the Income Tax Appellate Tribunal Mumbai, against order by Deputy Commissioner of Income Tax Central of 2003-2004 to 20062007 disallowing various claims. The matter is currently pending. HCC has filed a writ petition (no. 4294 of 2005) before the Madras High Court challenging of levy of additional tax on the contract value under the Tamil Nadu Additional Sales Tax Act. The matter is currently pending. HCC has filed a revision petition (no. 35 of 2004), before the High Court of Orissa, Cuttack, challenging the order of the Orissa Sales Tax Tribunal denying labour charges exceeding 30% for the year 1996-1997 amounting to ` 0.56 million. The matter is currently pending. HCC has filed a writ petition (no. CWP 18539 of 2004) before the High Court of Punjab and Haryana, Chandigarh against a revision order by Joint Commissioner of Excise and Taxation of ` 8.63 million for the period 1997-1998. The State of Haryana has filed a Special Leave Petition before Supreme Court. The matter is currently pending.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

335

23.

HCC has filed an appeal before the CESTAT, Chennai against an appeal order passed by Commissioner of Central Excise, Coimbatore for the period January 2004 to March 2008 raising demand of ` 28.7 million. The matter is currently pending. HCC has filed a revision petition before the Madras High Court against the order of appellate tribunal for the year 1998-1999, 1999-2000 for tax liability on rock recovery confirmed by the Tamil Nadu Sales Tax Appellate Tribunal, (Additional Bench), Chennai amounting to ` 20.3 million and ` 19.1 million. The matter is currently pending.

24.

Arbitration Proceedings 1. HCC has initiated arbitration proceedings before the arbitral panel consisting of Justice B. N. Srikrinha, Justice Sujata Manohar and Justice G.T. Nanavati at Mumbai against Kirloskar Brothers Limited (KBL) claiming an amount of ` 416.2 million from KBL for settling the disputes regarding the expenses and deductions in the Saurashtra branch canal pumping scheme project. KBL had filed counterclaims worth ` 390.4 million and has reserved their right to claim further. HCC has filed its reply to the statement of defense and counter claim of KBL. The matter is currently pending. HCC has initiated arbitration proceedings before the arbitral panel consisting of Justice R C Lahoti, Justice Jayasimha Babu and Justice G. T. Nanavati, against New Tirupur Area Development Corporation Limited (NTADCL) for settling the disputes in context to the EPC contracts, entered into by the parties for completion of the facilities for the purpose of extraction, treatment and supply of water. It is alleged by HCC that HCC had completed the contract and handed over the facility to NTADCL, however, NTADCL invoked a performance bank guarantees furnished by HCC to the tune of ` 270 million. HCC has sent a legal notice to NTADCL, claiming approximately ` 1,500 million. NTADCL has admitted HCCs claim for ` 18 million towards variation and ` 64.5 million towards excise benefit, and in turn have claimed ` 200.8 million due after adjusting the amount realized on invoking the bank guarantees. The matter is currently pending. HCC had initiated arbitration proceedings before the arbitral panel of L. M. Patra, Justice H Suresh and Justice S M Jhunjhunuwala against Brihanmumbai Municipal Corporation in respect of cost incurred on encountering of adverse physical obstructions during Charkop Tunnel Boring for an amount of ` 151.5 million. The proceedings were concluded on April 28, 2010 and the award is awaited. The Nathpa Jhakri joint venture had initiated arbitration proceedings before the Debt Recovery Board against Satlej Jal Vidyut Nigam limited (SJVN) claiming an amount of ` 117.3 million of which ` 80.30 million have been paid in the past from SJVN for settling the disputes regarding the Rock reconstruction and stabilising tunnel floor (invert) after excavation. Debt Recovery Board decided the matter in favour of the Nathpa Jhakri joint venture. SJVN appealed to Debt Recovery Board for review of its decision. On June 30, 2007, Debt Recovery Board rejected the appeal filed by SJVN and upheld its earlier decision. The matter is currently pending. The dispute was referred to Arbitration Tribunal on July 27, 2007 by SJVN. The matter is currently pending. The Nathpa Jhakri joint venture and Satlej Jal Vidyut Nigam limited had initiated arbitration proceedings before the Arbitral Panel regarding the entitlement to benefits under the Export - Import Policy. The total amount involved is ` 80 million, from Directorate General of Foreign Trade, Government of India. Arbitration proceedings are over. An arbitral award has been given in favour of the Nathpa Jhakri Joint Venture. Satlej Jal Vidyut Nigam Limited initiated the arbitration proceedings before the Arbitration Tribunal against the Nathpa Jhakri joint venture for recovery of differential custom duty, which was allegedly awarded to the Nathpa Jhakri joint venture. The matter is currently pending. HCC has initiated arbitration proceedings against the State of Uttar Pradesh for settling disputes arose pertaining to compensation for increase in price of other ancillary commodities in the sai aqueduct works 336

2.

3.

4.

5.

6.

7.

project. An award of ` 361.9 million has been made in favour of HCC. The matter is currently pending at the stage of decree of award. 8. HCC has initiated arbitration proceedings against the National Hydroelectric Power Corporation Limited regarding the rate analysis of labour for the Chamera hydro-electric works project. An award is made in favour of HCC for an amount of approximately ` 30.3 million. The matter is currently pending at the stage of decree of award. HCC has initiated arbitration proceedings against the State of Bihar (now Jharkhand) towards escalation, extra items and extra rate for variation in the Chandil dam works project. The State of Bihar (now Jharkhand) had challenged the jurisdiction of arbitral panel before the Court of Sub-Judge at Saraikella. This application was dismissed and the court has ordered for the resumption of arbitration proceedings. The matter is now pending at the stage of appointment of new arbitrator. HCC has initiated arbitration proceedings against R.L. Sharma and others before the arbitration panel of D.R. Dhanuka in respect of dispute that arose between the parties towards payment of advance of ` 70.80 million with interest. The hearings are in progress and the matter is currently pending.

9.

10.

Litigation against HREL Nil Litigation by HREL Civil Proceedings 1. HREL has instituted a summary suit (no. 1344 of 2008) against Swati Enterprises (the Defendant) and others before the Bombay High Court alleging non performance of Swati Enterprises under a memorandum of understanding dated October 19, 2005 in relation to the acquisition of land at Anjur, Deva (Diva Pada) and Alimgarh at district Thane and seeking recovery of an amount of ` 2.59 million together with further interest at the rate of 12% on ` 2 million till payment and/or realisation. By an order passed on February 2010, Swati Enterprises have been directed to deposit ` 1 million within four months pursuant to which written statement can be filed and failing which the matter shall stand decreed. The Defendants have not deposited the amount. The matter is currently pending.

Arbitration Proceedings 1. HREL has instituted arbitration proceedings before Rafiq Dada, the arbitrator against Pratima Pundalik Nayak, sole heir and legal representative of Pundalik Vaman Nayak (the Respondent) seeking specific performance of the memorandum of understanding dated June 1, 2006 executed by the parties whereby the Respondent inter alia sold/granted the land/development right to HREL of certain land situated at Powai, Mumbai. Pursuant to the application filed by HREL, the Arbitrator has passed an interim order restraining the Respondent from creating third party rights in relation to the land. In the alternative, HREL has sought refund of ` 98 million along with the interest at the rate of 18% from the date of filing of statement of claim till payment and/or realization and damages, compensation of a sum of ` 3,654 million along with the interest at the rate of 18% till payment and/or realization. The Respondent has filed a counter claim for a sum of ` 27,634 million against HREL alleging that HREL has wrongfully blocked the development of the said property and caused loss. The matter is currently pending.

Litigation involving Group Companies Nil

337

GOVERNMENT APPROVALS In view of the approvals listed below, our Company can undertake this Issue and our current business activities and no further major approvals from any governmental or regulatory authority or any other entity are required to undertake the Issue or continue our business activities. Unless otherwise stated, these approvals are all valid as of the date of this Draft Red Herring Prospectus. Approvals and Notifications in relation to the hill station 1. Notification (No. TPS 1800/1004/CR-106/I/2000/UD-13) dated June 1, 2001 from the Urban Development Department, Government of Maharashtra declaring 18 villages, excluding forest lands, as a hill station. In-principle sanction (No. TPS-1800/1004/C.R. 106-1/2000/UD-13) dated June 27, 2001 from the Urban Development Department, Government of Maharashtra for the development of villages Bhode, Pathershet, Bembatal, Palse, Admal, Padalghar, Dasve, Wadavali, Sakari, Bhoini, Mugaon, Ugawali, Koloshi, Dhamanohol, Gadle, Mose (budruk), Saiv (budruk) and Warasgaon, declared as Hill Station Area for the purpose of tourist resorts and holiday homes. The in-principle sanction is subject to certain conditions which include inter alia that no development shall be undertaken in an area which is above 1,000 meters and that the environment impact assessment report shall be sanctioned by the Environment Department. Grant of environmental clearance (No. ENV/Cle/765/CR.105/TC.I) dated March 18, 2004 from the Environment Department, Government of Maharashtra, to develop a hill station in Mulshi and Velhe Tehsil, District Pune. The clearance is valid for 2,000 hectares within which the development activities are to be carried on. The environmental clearance states that forest land shall be protected from the developmental activities of the hill station. Our Company has made an application for grant of environmental clearance (No. TPD/LCL/2009) dated August 5, 2009 to the State Environment Impact Assessment Authority ("SEIAA") for 5,000 hectares of the project area. This includes the 2,000 hectares for which clearance has already been obtained above. Notification (No. TPS-1808/449/CR-93/08/UD-13) dated June 12, 2008 from the Urban Development Department, Government of Maharashtra appointing our Company as a Special Planning Authority with respect to land owned by our Company in 14 villages. The notification states that the SPA shall not have the power to acquire land. The SPA is required to follow the Development Control Regulations and the provisions of the sanctioned Regional Plan and the amendments made to it. The notification further provides that the SPA has no right to grant any relaxation in relation to the applicable Development Control Regulations applicable to the notified area. Permission (No. PMA/CR/2115/2001) dated July 4, 2001 from the Office of the Collector, Revenue Department, Pune for purchasing private land classified as occupant class I in villages Bhode, Patharshet, Bembatmal, Palse, Admal, Padalghar, Dasve, Wadavali, Sakari, Bhoini, Mugaon, Kaloshi, Ugawali, Dhamanohol, Gadle in taluka Mulshi and villages Mose Budruk, Saiv Budruk and Warasgaon in taluka Velhe for hill station development. In accordance with the terms of this permission, forest land cannot be purchased without the prior permission of the competent authority. The permission further states that land notified for acquisition under the Land Acquisition Act, 1894 or Maharashtra Industrial Development Act, 1961 or land to be acquired as per the Road Plan 1981 2001 prepared by the Government cannot be purchased. Permission (No. DI/Land/Permission/255/2002/C-16983 dated December 5, 2002 read with corrigendum (No. DI/Land/Permission/ 255/2002 /C- 17386) dated December 11, 2002 under the Bombay Tenancy and Agricultural Land Act, 1948, from Development Commissioner (Industries), Government of Maharashtra to purchase 4,000 hectares of agricultural land for the development of a hill station. The permission provides that if the land to be sold belongs to a person of a scheduled tribe, such sale shall be subject to 338

2.

3.

4.

5.

6.

sections 36 and 36A of the Maharashtra Land Revenue Code, 1966 and the Maharashtra Restoration of Lands to Scheduled Tribes Act, 1974. 7. Permission (No. PMA/NA/SR/262/2007) dated June 7, 2008 from the Office of the Collector, Revenue Department, Pune granting non agricultural permission for hill station development at village Dasve and Padalghar for a total area of 636.82 hectares. The permission provides approval for the layout of Dasve and Padalghar and that the use of land with the buildings thereon shall be used exclusively for the permission for which it is granted. The permission further provides that the buildings shall be constructed as per the sanctioned layout/building plan and no modifications shall be made without the prior permission from the Office of the Collector, Revenue Department. The permission also states that permission does not cover the area under the jurisdiction of the Forest Department, land not in possession of our Company and land above the height of 1000 meters. Certificate (No. MTDC/INCENTIVE/Certificate-19/2009) dated September 29, 2009 by Maharashtra Tourism Development Corporation Limited granting exemption of stamp duty for purchase of land in the following villages - Dasve, Dhamanohol, Gadle, Wadwali, Sakhari, Bhoini, Adma, Mugaon, Palse, Pathershet, Padalghar, Koloshi, Ugavali, Bembatmal, Bhode of taluka Mulshi and Mose (budruck), Saiv (budruck) and Warasgaon of taluka Velhe to promote the proposed tourism project of our Company. This approval is valid till the Tourism Policy of Government of Maharashtra, 2006 is in force. Grant of mega status (No. D.O.No. TDM 2010/7/CR 414 Tourism) dated July 14, 2010 from the Tourism and Cultural Affairs Department, Government of Maharashtra to the the tourism project at taluka Mulshi and Velhe. In principle approval (No. 6-MHC014/2010-BHO/1012) dated June 3, 2010 from the Ministry of Environment and Forests, Government of India, for diversion of 6.1868 hectares (2.5550 hectares open surface and 3.6318 hectares passage through a tunnel without breaking the top surface) reserved forest land for widening existing Mugaon Tamhini road, proposed approach road, via duct and tunnel. The approval states that the status of the forest land shall remain unchanged and the order for diversion of the forest land shall not be issued by the State Government till formal approval order is issued by the Ministry of Environment and Forests, Government of India. Approval (No. 6-MHB160/2007-BHO/742) dated March 23, 2009 from the Ministry of Environment and Forests, Government of India for diversion of 4.9368 hectares of reserved forest land for laying 110KV LILO at LOC No. 19, Bhira-Khopadi. The status of the forest land shall remain unchanged. Approval (No. 8B/017/2001-FCW/920) dated April 16, 2009 from the Ministry of Environment and Forests, Government of India for diversion of 2.40 hectares of reserved forest and for up gradation of existing Mugaon Tamhini Road under the Pune Forest Division. The status of the forest land shall remain unchanged. The approval is given to the Executive Engineer, Public Works Department (North), Zilla Parishad, Pune. Permission (No. TPS-1809/1987 C.R. 1950/09/UD-13) dated August 21, 2009 from the Urban Development Department, Government of Maharashtra. The permission provides that for research related usage (strictly non polluting/zero discharge of effluent) along with ancillary uses like laboratories and pilot plant in public/semi-public area will be permitted on 12% of the total land. Approval (No. KIR/Gov/4891/2002) dated July 16, 2002 from the Maharashtra Krishna Valley Development Corporation, Khadakwasla Irrigation Region for construction of eight bandharas in the Mose valley. Permission (No. PB-4/KID/91/2003) dated April 10, 2003 by Khadakwasla Irrigation Division to carry out preliminary works related to dam constructions at village Dasve. Vetting of design and drawings (No. CDO/MD-4/VETTING/DASVE DAM/546) dated December 9, 2003 by Central Designs Organization, Nasik for the construction of storage structure at village Dasve. 339

8.

9.

10.

11.

12.

13.

14.

15. 16.

17.

No objection certificate (No. BO/TB/RO(HQ)PUNE-63/444) dated May 30, 2002 from the Maharashtra Pollution Control Board for developing land of 17 villages as a township in hill station type area on 6181.3743 hectares. The no objection certificate states that no objection is issued for developing the hill station and no industrial activity shall be commenced without the prior approval of the Maharashtra Pollution Control Board. The certificate also states that our Company shall not generate or handle any hazardous wastes. Consent to operate (No. BO/Pune-2/0/cc-3) dated January 5, 2005 from the Maharashtra Pollution Control Board for carrying out incidental utilities and services like tailoring, laundry, bakery, kitchens-eating places, stores, multiplexes, petrol pumps, helipads, plane landing, ropeway, convention centers, hotels, biotechnology and information parks to the extent of 0.5 per cent of the developed area. The consent is valid till April 30, 2014. The consent to operate states that the consent is issued only for tourism projects and no industrial activity shall be commenced without the prior approval of the Maharashtra Pollution Control Board. The consent states that our Company shall provide decentralised comprehensive sewage treatment system. The consent further states that our Company shall not generate or handle any hazardous wastes and that the development activity shall not be undertaken in an area which is above 1,000 meters. Consent (No. ROP/E-25/CC/UB/PUNE/3160/10304/06) dated December 8, 2006 from the Maharashtra Pollution Control Board to operate a batching plant at Village Bhoini, under section 25/26 of the Water Act, 1974, Section 21 of the Air Act, 1981 and Rule 5 of The Hazardous Wastes (Management and Handling) and Amended Rules, 2003. The consent is valid till December 31, 2010. The authorization under The Hazardous Wastes (Management and Handling) and Amended Rules, 2003 is valid for a period of 5 years from the date of issue. The consent to operate states that our Company shall not generate any hazardous wastes. Consent (No. ROP/E-25/CC/UB/PUNE/14721/585/04) dated April 12, 2004 from the Maharashtra Pollution Control Board to operate a crusher, stone aggregates, stone sand and stone dust at Village Bhoini under the provisions of the Air Act, Water Act and Hazardous Waste (Management and Handling) Amended Rules, 2000. Consent is valid till April 30, 2014. The authorization under The Hazardous Wastes (Management and Handling) and Amended Rules, 2003 is valid for a period of five years from the date of issue. The consent states that our Company shall not generate any hazardous wastes.

18.

19.

20.

Approvals in relation to our Real Estate Activities We and certain of our Subsidiaries, namely Lavasa Hotel Limited, Lakeview Club Limited and Apollo Lavasa Health Corporation Limited require various approvals to carry on our construction and development activities. We have undertaken and/or are in the process of developing various projects, which can be divided into the following segments: A. B. C. D. Real estate; Hospitality; Health and Wellness; and Education

In relation to the projects undertaken, our Company has obtained and in some cases is in the process of obtaining the following government approvals: 1. 2. 3. Lay out plan approval which is required for projects having more than one building. This gives approval to layout of design and zoning of various areas on plot like roads, recreation areas, sale buildings. Commencement Certificate which gives permission to commence the work on site. Further Commencement Certificate which is issued after completion of the plinth of any building or Stilt slab where the building comprises Stilt and upper floors. This permits commencement of work on the upper 340

floors to the terrace of the building unless specified otherwise. 4. 5. 6. 7. 8. No Objection Certificate granted by the Chief Fire Officer. This No Objection Certificate is granted in respect of buildings which would exceed 15 metres of height. No Objection Certificates granted by the gram panchayats for the implementation and development of the hill station project. Tree felling permission from the Tree and Forest Officer granting permission to cut trees obstructing the development work. Permission for quarry lease for minor minerals from the Additional Collector, Mining Department, Pune. Licence for the production for sale/storage/distribution of food and beverages at Vyanjan, The Restaurant from the Assistant Commissioner (Food) and Licensing Officer, Food and Drugs Administration.

Approvals applied for and pending receipt 1. Application dated October 14, 2008 to the Urban Development Department, Government of Maharashtra for relaxation of height for special structures, commercial structures, hotel and public buildings.

Approvals not applied for 1. In terms of the MRTP Act, the SPA is required to, from time to time, submit its draft Planning Proposals for the development of the land in the area as detailed in the SPA Notification, (being land either currently owned by our Company or land which is proposed to be purchased by our Company), to the State Government after having invited and considered suggestions and objections from the public. Currently, the draft Planning Proposals for land owned and proposed to be developed by us has been approved by the SPA and is pending publication in the official gazette and local newspapers, for public review and receipt of public comments. Consequently, this draft Planning Proposals, after having considered the comments received from the public, as appropriate, shall be submitted to the State Government for its approval.

Approvals required by our Subsidiaries Hospitality Certain of our Subsidiaries namely, Lavasa Hotel Limited, Ecomotel Hotel Limited, Dasve Convention Center Limited and Lakeview Clubs Limited, involved in the hotel business have obtained and in some cases are in the process of obtaining the following government approvals and licenses: 1. 2. 3. 4. 5. 6. License to open or keep a place of public entertainment from the Sub Divisional Magistrate, Pune for lodging and boarding. Liquor licenses from the Collector, Pune for serving liquor in restaurants. No objection certificates from the gram panchayats for serving liquor in restaurants. Licenses for the preparation and serving of food and beverages in the property from the Office of the Joint Commissioner. Health certificates for food preparation area and serving area of the restaurants from the Taluka Health Executive. Certificate of registration of the property as eating house from the Tahasildar.

341

7. 8.

No objection certificate from the Superintendant of Police, Pune Gramin, with regard to the operation of the hotel/restaurant. Public performance license from the Phonographic Performance Limited to perform all sound recordings controlled by the Phonographic Performance Limited.

Health and Wellness Certain of our Subsidiary, Apollo Lavasa Health Corporation Limited, involved in the health and wellness business has obtained and in some cases is in the process of obtaining the following government approvals and licenses: 1. 2. 3. 4. 5. 6. Nursing home registrations from the District Health Officer, Pune. Certificate of registration for the hospital from the Civil Surgeon, Civil Hospital, Aundh, Pune. License for the possession and use of rectified spirit in the hospital from the Collector, Pune. License for preparation and serving of food and beverages in the hospital from the Office of the Joint Commissioner (Pune Division). Certificate of Registration of the hospital as eating house from the Tahasildar. Authorization from the Maharashtra Pollution Control Board for generation of bio-medical wastes.

Tax Related Approvals 1. 2. 3. 4. Permanent account number issued by the Income Tax Department to our Company is AABCT4435E. Tax deduction account number issued by the Income Tax Department is MUML07279G. Central sales tax number issued to our Company is 27320345383C/27320345383V. Service tax number issued to our Company is AABCT4435EST001.

342

OTHER REGULATORY AND STATUTORY DISCLOSURES Authority for the Issue The issue of Equity Shares in the Issue by our Company has been authorised by the resolutions of the Board of Directors passed at their meetings held on June 7, 2010, July 16, 2010 and July 30, 2010 subject to the approval of shareholders through a special resolution to be passed pursuant to section 81 (1A) of the Companies Act. The shareholders have authorised the Issue by a special resolution in accordance with Section 81(1A) of the Companies Act, passed at the Extraordinary General Meeting of our Company held on July 30, 2010, at Mumbai. Our Company will file an application with the RBI seeking confirmation that FIIs are permitted to subscribe to Equity Shares in the Issue under the portfolio investment scheme and that Press Note 2 (2005 Series) is not applicable to investments by FIIs in initial public offerings. Prohibition by SEBI Our Company, our Promoters, Directors, Promoter Group entities, and Group Companies, and natural persons behind the Promoters, which are body corporates, have not been prohibited from accessing or operating in capital markets under any order or direction passed by SEBI or any other authorities. The companies, with which our Promoters, Directors or persons in control of our Company are associated as promoters, directors or persons in control have not been prohibited from accessing or operating in capital markets under any order or direction passed by SEBI. Details of the entities that our Directors are associated with, which are engaged in securities market related business and are registered with SEBI for the same, have been provided to SEBI. Prohibition by RBI Neither our Company, our Promoters, the relatives (as defined under the Companies Act) of our Promoters and Group Companies have been identified as wilful defaulters by the RBI or any other governmental authority. There are no violations of securities laws committed by them in the past or are pending against them. Eligibility for the Issue The Company is eligible for the Issue in accordance with the Regulation 26(2) of the SEBI Regulations, which states as follows: (2) An issuer not satisfying any of the conditions stipulated in sub-regulation (1) may make an initial public offer if: (a) (i) the issue is made through the book building process and the issuer undertakes to allot at least fifty per cent. of the net offer to public to qualified institutional buyers and to refund full subscription monies if it fails to make allotment to the qualified institutional buyers; OR (ii) at least fifteen per cent. of the cost of the project is contributed by scheduled commercial banks or public financial institutions, of which not less than ten per cent. shall come from the appraisers and the issuer undertakes to allot at least ten per cent. of the net offer to public to qualified institutional buyers and to refund full subscription monies if it fails to make the allotment to the qualified institutional buyers; AND

343

(b)

(i)

the minimum post-issue face value capital of the issuer is ten crore rupees; OR

(ii)

the issuer undertakes to provide market-making for at least two years from the date of listing of the specified securities, subject to the following: (A) the market makers offer buy and sell quotes for a minimum depth of three hundred specified securities and ensure that the bid-ask spread for their quotes does not, at any time, exceed ten per cent.; the inventory of the market makers, as on the date of allotment of the specified securities, shall be at least five per cent. of the proposed issue.

(B)

We are an unlisted company not complying with the conditions specified in the Regulations 26(1) SEBI Regulations and are therefore required to meet both the conditions detailed in Clause (a) and Clause (b) of Regulation 26(2) of the SEBI Regulations. We are complying with Regulation 26(2) (a) (i) of the SEBI Regulations and at least 50% of the Issue is proposed to be allocated to QIBs and in the event we fail to do so, the full subscription monies shall be refunded to the Bidders. We are complying with Regulation 43(2) of the SEBI Regulations and Non-Institutional Bidders and Retail Individual Bidders will be allocated 15% and 35% of the Issue respectively. We are also complying with Regulation 26(b)(i) of the SEBI Regulations and the post-issue face value capital of the Company shall be ` [] million, which is more than the minimum requirement of ` 10 Crore (` 100 million).

Hence, we are eligible for the Issue under Regulation 26(2) of the SEBI Regulations. DISCLAIMER CLAUSE OF SEBI AS REQUIRED, A COPY OF THE DRAFT RED HERRING PROSPECTUS HAS BEEN SUBMITTED TO SEBI. IT IS TO BE DISTINCTLY UNDERSTOOD THAT SUBMISSION OF THE DRAFT RED HERRING PROSPECTUS TO SEBI SHOULD NOT, IN ANY WAY, BE DEEMED OR CONSTRUED THAT THE SAME HAS BEEN CLEARED OR APPROVED BY SEBI. SEBI DOES NOT TAKE ANY RESPONSIBILITY EITHER FOR THE FINANCIAL SOUNDNESS OF ANY SCHEME OR THE PROJECT FOR WHICH THE ISSUE IS PROPOSED TO BE MADE OR FOR THE CORRECTNESS OF THE STATEMENTS MADE OR OPINIONS EXPRESSED IN THE DRAFT RED HERRING PROSPECTUS. THE BOOK RUNNING LEAD MANAGERS HAVE CERTIFIED THAT THE DISCLOSURES MADE IN THE DRAFT RED HERRING PROSPECTUS ARE GENERALLY ADEQUATE AND ARE IN CONFORMITY WITH SEBI (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 IN FORCE FOR THE TIME BEING. THIS REQUIREMENT IS TO FACILITATE INVESTORS TO TAKE AN INFORMED DECISION FOR MAKING AN INVESTMENT IN THE PROPOSED ISSUE. IT SHOULD ALSO BE CLEARLY UNDERSTOOD THAT WHILE THE COMPANY IS PRIMARILY RESPONSIBLE FOR THE CORRECTNESS, ADEQUACY AND DISCLOSURE OF ALL RELEVANT INFORMATION IN THE DRAFT RED HERRING PROSPECTUS, THE BOOK RUNNING LEAD MANAGERS ARE EXPECTED TO EXERCISE DUE DILIGENCE TO ENSURE THAT THE COMPANY DISCHARGES ITS RESPONSIBILITY ADEQUATELY IN THIS BEHALF AND TOWARDS THIS PURPOSE, THE BOOK RUNNING LEAD MANAGERS, HAVE FURNISHED TO SEBI, A DUE DILIGENCE CERTIFICATE DATED SEPTEMBER 14, 2010 WHICH READS AS FOLLOWS: WE, THE LEAD MERCHANT BANKER(S) TO THE ABOVE MENTIONED FORTHCOMING ISSUE, 344

STATE AND CONFIRM AS FOLLOWS: 1. WE HAVE EXAMINED VARIOUS DOCUMENTS INCLUDING THOSE RELATING TO LITIGATION LIKE COMMERCIAL DISPUTES, PATENT DISPUTES, DISPUTES WITH COLLABORATORS, ETC. AND OTHER MATERIAL IN CONNECTION WITH THE FINALISATION OF THE DRAFT RED HERRING PROSPECTUS PERTAINING TO THE SAID ISSUE; ON THE BASIS OF SUCH EXAMINATION AND THE DISCUSSIONS WITH THE ISSUER, ITS DIRECTORS AND OTHER OFFICERS, OTHER AGENCIES, AND INDEPENDENT VERIFICATION OF THE STATEMENTS CONCERNING THE OBJECTS OF THE ISSUE, PRICE JUSTIFICATION AND THE CONTENTS OF THE DOCUMENTS AND OTHER PAPERS FURNISHED BY THE ISSUER, WE CONFIRM THAT: (A) THE DRAFT RED HERRING PROSPECTUS FILED WITH THE SECURITIES AND EXCHANGE BOARD OF INDIA IS IN CONFORMITY WITH THE DOCUMENTS, MATERIALS AND PAPERS RELEVANT TO THE ISSUE; ALL THE LEGAL REQUIREMENTS RELATING TO THE ISSUE AS ALSO THE REGULATIONS GUIDELINES, INSTRUCTIONS, ETC. FRAMED/ISSUED BY THE SECURITIES AND EXCHANGE BOARD OF INDIA, THE CENTRAL GOVERNMENT AND ANY OTHER COMPETENT AUTHORITY IN THIS BEHALF HAVE BEEN DULY COMPLIED WITH; AND THE DISCLOSURES MADE IN THE DRAFT RED HERRING PROSPECTUS ARE TRUE, FAIR AND ADEQUATE TO ENABLE THE INVESTORS TO MAKE A WELL INFORMED DECISION AS TO THE INVESTMENT IN THE PROPOSED ISSUE AND SUCH DISCLOSURES ARE IN ACCORDANCE WITH THE REQUIREMENTS OF THE COMPANIES ACT, 1956, THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 AND OTHER APPLICABLE LEGAL REQUIREMENTS.

2.

(B)

(C)

3.

WE CONFIRM THAT BESIDES OURSELVES, ALL THE INTERMEDIARIES NAMED IN THE DRAFT RED HERRING PROSPECTUS ARE REGISTERED WITH THE SECURITIES AND EXCHANGE BOARD OF INDIA AND THAT TILL DATE SUCH REGISTRATION IS VALID. WE HAVE SATISFIED OURSELVES ABOUT THE CAPABILITY OF THE UNDERWRITERS TO FULFIL THEIR UNDERWRITING COMMITMENTS. NOTED FOR COMPLIANCE. WE CERTIFY THAT WRITTEN CONSENT FROM PROMOTER HAS BEEN OBTAINED FOR INCLUSION OF THEIR SPECIFIED SECURITIES AS PART OF PROMOTERS CONTRIBUTION SUBJECT TO LOCK-IN AND THE SPECIFIED SECURITIES PROPOSED TO FORM PART OF PROMOTERS CONTRIBUTION SUBJECT TO LOCK-IN SHALL NOT BE DISPOSED / SOLD / TRANSFERRED BY THE PROMOTER DURING THE PERIOD STARTING FROM THE DATE OF FILING THE DRAFT RED HERRING PROSPECTUS WITH THE SECURITIES AND EXCHANGE BOARD OF INDIA TILL THE DATE OF COMMENCEMENT OF LOCK-IN PERIOD AS STATED IN THE DRAFT RED HERRING PROSPECTUS. WE CERTIFY THAT REGULATION 33 OF THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009, WHICH RELATES TO SPECIFIED SECURITIES INELIGIBLE FOR COMPUTATION OF PROMOTER CONTRIBUTION, HAS BEEN DULY COMPLIED WITH AND APPROPRIATE DISCLOSURES AS TO COMPLIANCE WITH THE SAID REGULATION HAVE BEEN MADE IN THE DRAFT RED HERRING PROSPECTUS/DRAFT PROSPECTUS. NOT APPLICABLE. WE UNDERTAKE THAT SUB-REGULATION (4) OF REGULATION 32 AND CLAUSE (C) AND 345

4. 5.

6.

7.

(D) OF SUB-REGULATION (2) OF REGULATION 8 OF THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 SHALL BE COMPLIED WITH. WE CONFIRM THAT ARRANGEMENTS HAVE BEEN MADE TO ENSURE THAT PROMOTERS CONTRIBUTION SHALL BE RECEIVED AT LEAST ONE DAY BEFORE THE OPENING OF THE ISSUE. WE UNDERTAKE THAT AUDITORS CERTIFICATE TO THIS EFFECT SHALL BE DULY SUBMITTED TO THE SECURITIES AND EXCHANGE BOARD OF INDIA. WE FURTHER CONFIRM THAT ARRANGEMENTS HAVE BEEN MADE TO ENSURE THAT PROMOTERS CONTRIBUTION SHALL BE KEPT IN AN ESCROW ACCOUNT WITH A SCHEDULED COMMERCIAL BANK AND SHALL BE RELEASED TO THE ISSUER ALONG WITH THE PROCEEDS OF THE PUBLIC ISSUE. NOT APPLICABLE. 8. WE CERTIFY THAT THE PROPOSED ACTIVITIES OF THE ISSUER FOR WHICH THE FUNDS ARE BEING RAISED IN THE PRESENT ISSUE FALL WITHIN THE MAIN OBJECTS LISTED IN THE OBJECT CLAUSE OF THE MEMORANDUM OF ASSOCIATION OR OTHER CHARTER OF THE ISSUER AND THAT THE ACTIVITIES WHICH HAVE BEEN CARRIED OUT UNTIL NOW ARE VALID IN TERMS OF THE OBJECT CLAUSE OF ITS MEMORANDUM OF ASSOCIATION. WE CONFIRM THAT NECESSARY ARRANGEMENTS HAVE BEEN MADE TO ENSURE THAT THE MONEYS RECEIVED PURSUANT TO THE ISSUE ARE KEPT IN A SEPARATE BANK ACCOUNT AS PER THE PROVISIONS OF SUB-SECTION (3) OF SECTION 73 OF THE COMPANIES ACT, 1956 AND THAT SUCH MONEYS SHALL BE RELEASED BY THE SAID BANK ONLY AFTER PERMISSION IS OBTAINED FROM ALL THE STOCK EXCHANGES MENTIONED IN THE PROSPECTUS. WE FURTHER CONFIRM THAT THE AGREEMENT ENTERED INTO BETWEEN THE BANKERS TO THE ISSUE AND THE ISSUER SPECIFICALLY CONTAINS THIS CONDITION. NOTED FOR COMPLIANCE. WE CERTIFY THAT A DISCLOSURE HAS BEEN MADE IN THE DRAFT RED HERRING PROSPECTUS THAT THE INVESTORS SHALL BE GIVEN AN OPTION TO GET THE SHARES IN DEMAT OR PHYSICAL MODE. NOT APPLICABLE. AS THE OFFER SIZE IS MORE THAN ` 10 CRORES, HENCE UNDER SECTION 68B OF THE COMPANIES ACT, 1956, THE EQUITY SHARES ARE TO BE ISSUED IN DEMAT ONLY. WE CERTIFY THAT ALL THE APPLICABLE DISCLOSURES MANDATED IN THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 HAVE BEEN MADE IN ADDITION TO DISCLOSURES WHICH, IN OUR VIEW, ARE FAIR AND ADEQUATE TO ENABLE THE INVESTOR TO MAKE A WELL INFORMED DECISION. WE CERTIFY THAT THE FOLLOWING DISCLOSURES HAVE BEEN MADE IN THE DRAFT RED HERRING PROSPECTUS: (A) (B) AN UNDERTAKING FROM THE ISSUER THAT AT ANY GIVEN TIME, THERE SHALL BE ONLY ONE DENOMINATION FOR THE EQUITY SHARES OF THE ISSUER AND AN UNDERTAKING FROM THE ISSUER THAT IT SHALL COMPLY WITH SUCH DISCLOSURE AND ACCOUNTING NORMS SPECIFIED BY THE SECURITIES AND EXCHANGE BOARD OF INDIA FROM TIME TO TIME.

9.

10.

11.

12.

13.

WE UNDERTAKE TO COMPLY WITH THE REGULATIONS PERTAINING TO ADVERTISEMENT IN TERMS OF THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 WHILE MAKING THE ISSUE. WE ENCLOSE A NOTE EXPLAINING HOW THE PROCESS OF DUE DILIGENCE HAS BEEN EXERCISED BY US IN VIEW OF THE NATURE OF CURRENT BUSINESS BACKGROUND OR 346

14.

THE ISSUER, SITUATION AT WHICH THE PROPOSED BUSINESS STANDS, THE RISK FACTORS, PROMOTER EXPERIENCE, ETC. 15. WE ENCLOSE A CHECKLIST CONFIRMING REGULATION-WISE COMPLIANCE WITH THE APPLICABLE PROVISIONS OF THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009, CONTAINING DETAILS SUCH AS THE REGULATION NUMBER, ITS TEXT, THE STATUS OF COMPLIANCE, PAGE NUMBER OF THE DRAFT RED HERRING PROSPECTUS WHERE THE REGULATION HAS BEEN COMPLIED WITH AND OUR COMMENTS, IF ANY.

The filing of the Draft Red Herring Prospectus does not, however, absolve our Company from any liabilities under Section 63 or Section 68 of the Companies Act or from the requirement of obtaining such statutory and/or other clearances as may be required for the purpose of the proposed Issue. SEBI further reserves the right to take up at any point of time, with the Book Running Lead Managers, any irregularities or lapses in the Draft Red Herring Prospectus. All legal requirements pertaining to the Issue will be complied with at the time of filing of the Red Herring Prospectus with the RoC in terms of Section 60B of the Companies Act. All legal requirements pertaining to the Issue will be complied with at the time of registration of the Prospectus with the RoC in terms of Sections 56, 60 and 60B of the Companies Act. Caution - Disclaimer from our Company and the BRLMs Our Company, our Directors and the BRLMs accept no responsibility for statements made otherwise than in this Draft Red Herring Prospectus or in the advertisements or any other material issued by or at our Companys instance and anyone placing reliance on any other source of information, including our Companys website www.lavasa.com, would be doing so at his or her own risk. The BRLMs accept no responsibility, save to the limited extent as provided in the agreement entered into between the BRLMs and our Company and the Underwriting Agreement to be entered into between the Underwriter and our Company. All information shall be made available by our Company, the BRLMs to the public and investors at large and no selective or additional information would be available for a section of the investors in any manner whatsoever including at road show presentations, in research or sales reports, at bidding centres or elsewhere. Neither our Company nor the Syndicate is liable for any failure in uploading the Bids due to faults in any software/hardware system or otherwise. Investors who Bid in the Issue will be required to confirm and will be deemed to have represented to our Company, the Underwriters and their respective directors, officers, agents, affiliates, and representatives that they are eligible under all applicable laws, rules, regulations, guidelines and approvals to acquire the Equity Shares of our Company and will not Issue, sell, pledge, or transfer the Equity Shares of our Company to any person who is not eligible under any applicable laws, rules, regulations, guidelines and approvals to acquire the Equity Shares of our Company. Our Company, the Underwriters and their respective directors, officers, agents, affiliates, and representatives accept no responsibility or liability for advising any investor on whether such investor is eligible to acquire Equity Shares of our Company. The BRLMs and their respective associates and affiliates may engage in transactions with, and perform services for, the Company and their respective group companies, affiliates or associates or third parties in the ordinary course of business and have engaged, or may in future engage, in commercial banking and investment banking transactions with the Company and their respective group companies, affiliates or associates or third parties, for which they have received, and may in future receive, compensation. Disclaimer in respect of Jurisdiction

347

This Issue is being made in India to persons resident in India (including Indian nationals resident in India who are not minors, HUFs, companies, corporate bodies and societies registered under the applicable laws in India and authorised to invest in shares, Indian Mutual Funds registered with SEBI, Indian financial institutions, commercial banks, regional rural banks, co-operative banks (subject to RBI permission), or trusts under applicable trust law and who are authorised under their constitution to hold and invest in shares, permitted insurance companies and pension funds) and to FIIs and eligible NRIs. This Draft Red Herring Prospectus does not, however, constitute an invitation to purchase shares offered hereby in any jurisdiction other than India to any person to whom it is unlawful to make an offer or invitation in such jurisdiction. Any person into whose possession this Draft Red Herring Prospectus comes is required to inform himself or herself about, and to observe, any such restrictions. Any dispute arising out of this Issue will be subject to the jurisdiction of appropriate courts in Mumbai only. No action has been, or will be, taken to permit a public offering in any jurisdiction where action would be required for that purpose, except that this Draft Red Herring Prospectus has been filed with SEBI for its observations and SEBI shall give its observations in due course. Accordingly, the Equity Shares represented thereby may not be offered or sold, directly or indirectly, and this Draft Red Herring Prospectus may not be distributed, in any jurisdiction, except in accordance with the legal requirements applicable in such jurisdiction. Neither the delivery of this Draft Red Herring Prospectus nor any sale hereunder shall, under any circumstances, create any implication that there has been no change in the affairs of our Company since the date hereof or that the information contained herein is correct as of any time subsequent to this date. The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other jurisdiction outside India and may not be offered or sold, and Bids may not be made by persons in any such jurisdiction, except in compliance with the applicable laws of such jurisdiction. The Equity Shares have not been and will not be registered under the Securities Act, or any state securities laws of the United States and may not be offered or sold in the United States except pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act. Accordingly, the Equity Shares are being offered and sold (1) in the United States only to qualified institutional buyers (as defined in Rule 144A under the Securities Act) in transactions exempt from, or not subject to the registration requirements of the Securities Act and (2) outside the United States in offshore transactions in reliance on Regulation S under the Securities Act. Disclaimer Clause of the BSE As required, a copy of the Draft Red Herring Prospectus has been submitted to BSE. The disclaimer clause as intimated by BSE to our Company, post scrutiny of this Draft Red Herring Prospectus, shall be included in the Red Herring Prospectus prior to the RoC filing. Disclaimer Clause of the NSE As required, a copy of the Draft Red Herring Prospectus has been submitted to NSE. The disclaimer clause as intimated by NSE to our Company, post scrutiny of this Draft Red Herring Prospectus, shall be included in the Red Herring Prospectus prior to the RoC filing. Filing A copy of the Draft Red Herring Prospectus has been filed with SEBI at Corporation Finance Department, Plot No.C4-A,G Block, Bandra Kurla Complex, Bandra (East), Mumbai 400051. A copy of the Red Herring Prospectus, along with the documents required to be filed under Section 60B of the Companies Act, would be delivered for registration to the RoC and a copy of the Prospectus to be filed under Section 60 of the Companies Act would be delivered for registration with RoC at the Office of the Registrar of Companies, Everest 5th Floor, 100, Marine Drive, Mumbai 400 002. Listing

348

Applications will be made to the Stock Exchanges for permission to deal in and for an official quotation of the Equity Shares. [] will be the Designated Stock Exchange with which the Basis of Allotment will be finalised. If the permissions to deal in and for an official quotation of the Equity Shares are not granted by either of the Stock Exchanges mentioned above, our Company will forthwith repay, without interest, all moneys received from the applicants in pursuance of this Draft Red Herring Prospectus. If such money is not repaid within eight days after our Company becomes liable to repay it, i.e. from the date of refusal or within seven days from the Bid/Issue Closing Date, whichever is earlier, then our Company and every Director of our Company who is an officer in default shall, on and from such expiry of eight days, be liable to repay the money, with interest at the rate of 15% p.a. on application money, as prescribed under Section 73 of the Companies Act. Our Company shall ensure that all steps for the completion of the necessary formalities for listing and commencement of trading at all the Stock Exchanges mentioned above are taken within seven Working Days of finalisation of the Basis of Allotment for the Issue. Consents Consents in writing of: (a) our Directors, our Company Secretary and Compliance Officer, the auditors, the legal advisors, the Bankers to the Issue, the Bankers to our Company; and (b) the Book Running Lead Manager, the Syndicate Members, the Escrow Collection Banks and the Registrar to the Issue to act in their respective capacities, have been obtained and would be filed along with a copy of the Red Herring Prospectus with the RoC as required under Sections 60 and 60B of the Companies Act and such consents have not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus for registration with the RoC. In accordance with the Companies Act and the SEBI Regulations, M/s. K.S. Aiyar & Co, Chartered Accountants, our Companys Statutory Auditors have given their written consent to the inclusion of their report in the form and context in which it appears in the Draft Red Herring Prospectus and such consent and report has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus for registration with the RoC. Expert Opinion Except as stated below, our Company has not obtained any expert opinions: Our Company has obtained a master title certificate dated September 10, 2010 from Mahesh J. Sheguri in relation to land held by us. Mahesh J. Sheguri has given his written consent to be named as an expert to the Company for the Issue in relation to the land and/or rights in respect thereof that we own and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus. Our Company has obtained an architects certificate dated September 10, 2010 from Sadashiv Nargundkar & Associates in relation to the property developed/ to be developed by us. Sadashiv Nargundkar & Associates have given their written consent to be named as an expert to our Company for the Issue in relation the property developed/ to be developed by us and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring. Our Company has obtained an engineers certificate dated August 11, 2010 from Taamra Engineering Consultants Private Limited in relation to the infrastructure construction and development activities in Lavasa. Taamra Engineering Consultants Private Limited have given their consent to be named as an expert to our Company for the Issue in relation to the existing, under construction and planned infrastructure construction and development activities in Lavasa and such consent has not been withdrawn up to the time of delivery of the Draft Red Herring Prospectus. The Issue has been graded by []. The report of [] in respect of the IPO Grading of the Issue has been annexed with the Draft Red Herring Prospectus.

349

Issue Related Expenses The expenses of this Issue include, among others, underwriting and management fees, selling commission, printing and distribution expenses, legal fees, statutory advertisement expenses and listing fees. For further details of Issue related expenses, please see Objects of the Issue on page 52. The listing fee and all expenses with respect to the Issue will be borne by our Company. Fees Payable to the Registrar to the Issue The fees payable to the Registrar to the Issue for processing of applications, data entry, printing of CAN/refund orders, preparation of refund data on magnetic tape, printing of bulk mailing register will be as per the MoU signed with our Company, a copy of which is available for inspection at the Registered Office. The Registrar to the Issue will be reimbursed for all out-of-pocket expenses including cost of stationery, postage, stamp duty and communication expenses. Adequate funds will be provided to the Registrar to the Issue to enable it to send refund orders or allotment advice by registered post/speed post/under certificate of posting. Particulars regarding Public or Rights Issues by our Company during the last Five Years Except as disclosed in the section Capital Structure, our Company has not made any public or rights issues during the last five years. Previous issues of Equity Shares otherwise than for cash Except as disclosed in the section Capital Structure, our Company has not issued any Equity Shares for consideration otherwise than for cash. Commission and Brokerage paid on previous issues of the Equity Shares Since this is the initial public issue of Equity Shares, no sum has been paid or has been payable as commission or brokerage for subscribing to or procuring or agreeing to procure subscription for any of the Equity Shares since our Companys inception. Previous capital issue during the previous three years by listed Subsidiaries, Group Companies and associates of our Company None of the Group Companies, associates and Subsidiaries of our Company are listed on any stock exchange. Promise vis--vis objects Public/ Rights Issue of our Company and/ or listed Group Companies, Subsidiaries and associates of our Company Our Company has not undertaken any previous public or rights issue. None of the Group Companies, associates and Subsidiaries of our Company are listed on any stock exchange. Outstanding Debentures or Bonds Except as disclosed in the section titled Capital Structure on page 37, our Company does not have any outstanding debentures or bonds as of the date of filing this Draft Red Herring Prospectus. Outstanding Preference Shares Our Company does not have any outstanding Compulsory Convertible Preference Shares and Redeemable Preference Shares other than those mentioned in Capital Structure on page 37.

350

Stock Market Data of Equity Shares This being an initial public issue of our Company, the Equity Shares are not listed on any stock exchange. Mechanism for Redressal of Investor Grievances The agreement between the Registrar to the Issue and our Company will provide for retention of records with the Registrar to the Issue for a period of at least three years from the last date of dispatch of letters of allotment, demat credit, refund orders to enable the investors to approach the Registrar to the Issue for redressal of their grievances. All grievances relating to the Issue may be addressed to the Registrar to the Issue, giving full details such as name, address of the applicant, application number, number of Equity Shares applied for, amount paid on application, Depository Participant, and the bank branch or collection centre where the application was submitted. All grievances relating to the ASBA process may be addressed to the relevant SCSB, giving full details such as name, address of the applicant, application number, number of Equity Shares applied for, amount paid on application and the Designated Branch or the collection centre of the SCSB where the ASBA Bid cum Application Form was submitted by the such Bidders. Disposal of Investor Grievances by our Company Our Company estimates that the average time required by our Company or the Registrar to the Issue or the SCSB in case of Bidders applying through ASBA process for the redressal of routine investor grievances shall be 10 Working Days from the date of receipt of the complaint. In case of non-routine complaints and complaints where external agencies are involved, our Company will seek to redress these complaints as expeditiously as possible. Our Company has appointed Venkatesan Arunachalam, Company Secretary as the Compliance Officer and he may be contacted in case of any pre-Issue or post-Issue related problems. He can be contacted at the following address: Lavasa Corporation Limited Hincon House Lal Bahadur Shastri Marg Vikhroli (West) Mumbai 400 083 Tel: (91 22) 4025 6104 Fax: (91 22) 40256889 Email: secretarial@lavasa.com Changes in Auditors There has been no change in the auditors of our Company during the last three years. Capitalisation of Reserves or Profits Our Company has capitalised its reserves and profits during the last five years. Revaluation of Assets Our Company has not re-valued its assets in the last five years.

351

TERMS OF THE ISSUE The Issue shall be subject to the provisions of the Companies Act, the SCRA, the SCRR, the Memorandum and the Articles, the terms of this Draft Red Herring Prospectus, the Red Herring Prospectus and the Prospectus, Bid cum Application Form, the Revision Form, the CAN and other terms and conditions as may be incorporated in the Allotment advices and other documents/ certificates that may be executed in respect of the Issue. The Equity Shares shall also be subject to laws, guidelines, notifications and regulations relating to the issue of capital and listing of securities issued from time to time by SEBI, the Government of India, Stock Exchanges, RoC, RBI and/or other authorities, as in force on the date of the Issue and to the extent applicable. Ranking of Equity Shares The Equity Shares being issued shall be subject to the provisions of the Memorandum and the Articles and shall rank pari-passu with the existing Equity Shares of our Company including rights in respect of dividend. The Allotees in receipt of Allotment of Equity Shares under this Issue will be entitled to dividends and other corporate benefits, if any, declared by our Company after the date of Allotment. For further details, please see Main Provisions of the Articles of Association on page 394. Mode of Payment of Dividend Our Company shall pay dividends to the shareholders in accordance with the provisions of the Companies Act, our Articles and the provisions of the Listing Agreement. Face Value and Issue Price The face value of the Equity Shares is ` [] each and the Issue Price is ` [] per Equity Share. The Anchor Investor Issue Price is ` [] per Equity Share. At any given point of time there shall be only one denomination for the Equity Shares. Compliance with SEBI Regulations We shall comply with all disclosure and accounting norms as specified by SEBI from time to time. Rights of the Equity Shareholder Subject to applicable laws, the equity shareholders shall inter alia have the following rights: Right to receive dividend, if declared; Right to attend general meetings and exercise voting powers, unless prohibited by law; Right to vote on a poll either in person or by proxy; Right to receive offers for rights shares and be allotted bonus shares, if announced; Right to receive surplus on liquidation; Right of free transferability; and Such other rights, as may be available to a shareholder of a listed public company under the Companies Act, the terms of the listing agreement executed with the Stock Exchanges and our Companys Memorandum and Articles. 352

For a detailed description of the main provisions of the Articles relating to voting rights, dividend, forfeiture and lien and/or consolidation/splitting, please see Main Provisions of the Articles of Association on page 394. Market Lot and Trading Lot The Equity Shares shall be Allotted only in dematerialised form and trading shall only be in dematerialised form. Since trading of the Equity Shares is in dematerialised form, the tradable lot is one Equity Share. Allotment in this Issue will be only in electronic form in multiples of one Equity Share subject to a minimum Allotment of [] Equity Shares. The Price Band and the minimum Bid lot size for the Issue will be decided by our Company in consultation with the BRLMs and advertised in two national newspapers (one each in English and Hindi) and in one Marathi newspaper with wide circulation, at least two Working Days prior to the Bid/ Issue Opening Date. Jurisdiction Exclusive jurisdiction for the purpose of this Issue is with the competent courts/authorities in Mumbai. Nomination Facility to Investor The sole or first Bidder, along with other joint Bidders, may nominate any one person in whom, in the event of the death of sole Bidder or in case of joint Bidders, death of all the Bidders, as the case may be, the Equity Shares allotted, if any, shall vest. A person, being a nominee, entitled to the Equity Shares by reason of the death of the original holder(s), shall be entitled to the same advantages to which he or she would be entitled if he or she were the registered holder of the Equity Share(s). Where the nominee is a minor, the holder(s) may make a nomination to appoint, in the prescribed manner, any person to become entitled to Equity Share(s) in the event of his or her death during the minority. A nomination shall stand rescinded upon a sale of equity share(s) by the person nominating. A buyer will be entitled to make a fresh nomination in the manner prescribed. Fresh nomination can be made only on the prescribed form available on request at the Registered Office or to the Registrar. Further, any person who becomes a nominee shall, upon the production of such evidence as may be required by the Board, elect either: To register himself or herself as the holder of the Equity Shares; or To make such transfer of the Equity Shares, as the deceased holder could have made.

Further, the Board may at any time give notice requiring any nominee to choose either to be registered himself or herself or to transfer the Equity Shares, and if the notice is not complied with within a period of ninety days, the Board may thereafter withhold payment of all dividends, bonuses or other moneys payable in respect of the Equity Shares, until the requirements of the notice have been complied with. Since the Allotment of Equity Shares in the Issue will be made only in dematerialised form, there is no need to make a separate nomination with our Company. Nominations registered with respective depository participant of the applicant would prevail. If the investors require changing their nomination, they are requested to inform their respective depository participant. Minimum Subscription If our Company does not receive the minimum subscription of 90% of the Net Issue, including devolvement of underwriters within 60 days from the Bid/Issue Closing Date, our Company shall forthwith refund the entire subscription amount received not later than 70 days from the Bid/Issue Closing Date. If there is a delay beyond eight days after our Company becomes liable to pay the amount, our Company shall pay interest prescribed under Section 73 of the Companies Act.

353

If at least 50% of the Net Issue cannot be allocated to QIBs, then the entire application money will be refunded forthwith. Further, we shall ensure that the number of prospective allotees to whom Equity Shares will be allotted shall not be less than 1,000. The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other jurisdiction outside India and may not be offered or sold, and Bids may not be made by persons in any such jurisdiction. Arrangement for disposal of odd lots There are no arrangements for disposal of odd lots. Restriction on transfer of shares Except for lock-in of the pre-Issue Equity Shares, Promoters minimum contribution and Anchor Investor lock-in in the Issue as detailed in Capital Structure on page 37, and except as provided in the Articles, there are no restrictions on transfers of Equity Shares. There are no restrictions on transfers of debentures except as provided in the Articles. There are no restrictions on transmission of shares/ debentures and on their consolidation/ splitting except as provided in the Articles. Please see Main Provisions of the Articles of Association on page 394.

354

ISSUE STRUCTURE Issue of [] Equity Shares for cash at a price of ` [] per Equity Share (including share premium of ` [] per Equity Share) aggregating to ` 20,000 million. The Issue comprises a Net Issue of [] Equity Shares to the public and a reservation of [] Equity Shares aggregating upto ` 100 million, for Eligible Employees. The Issue and the Net Issue will constitute []% and []%, respectively of the post-Issue paid-up equity share capital of our Company. The Issue is being made through the 100% Book Building Process. QIBs# Number of Equity Shares* At least [] Equity Shares. Non-Institutional Bidders Not less than [] Equity Shares available for allocation or Net Issue less allocation to QIB Bidders and Retail Individual Bidders. Not less than 15% of Net Issue or the Net Issue less allocation to QIB Bidders and Retail Individual Bidders. Retail Individual Bidders Not less than [] Equity Shares available for allocation or Net Issue less allocation to QIB Bidders and Non-Institutional Bidders. Not less than 35% of the Net Issue or the Net Issue less allocation to QIB Bidders and NonInstitutional Bidders. Employee Reservation Portion Up to [] Equity Shares.

Percentage of Issue Size available for Allotment/allocation

At least 50% of the Net Issue Size being allocated. However, up to 5% of the QIB Portion (excluding the Anchor Investor Portion) shall be available for allocation proportionately to Mutual Funds only. Proportionate as follows: (a) [] Equity Shares shall be allocated on a proportionate basis to Mutual Funds only; and (b) [] Equity Shares shall be allotted on a proportionate basis to all QIBs including Mutual Funds receiving allocation as per (a) above. Such number of Equity Shares that the Bid Amount exceeds ` 100,000

Up to 0.5% of the Issue.

Basis of Allotment/Allocation if respective category is oversubscribed

Proportionate

Proportionate

Proportionate

Minimum Bid

Such number of Equity Shares that the Bid Amount exceeds ` 100,000 355

[] Equity Shares

[] Equity Shares net of Eligible Employee Discount and in multiples of

QIBs# and in multiples of [] Equity Shares thereafter. Maximum Bid Such number of Equity Shares not exceeding the Net Issue, subject to applicable limits. Compulsorily in dematerialised form. [] Equity Shares and in multiples of [] Equity Shares thereafter. [] Equity Shares and in multiples of one Equity Share thereafter One Equity Share Public financial institutions as specified in Section 4A of the Companies Act, scheduled commercial banks, mutual fund registered with SEBI, FII and subaccount registered with SEBI, other than a sub-account which is a foreign corporate or foreign individual, venture capital fund registered with SEBI, state industrial development corporation, insurance company registered with IRDA, provident fund with minimum

Non-Institutional Bidders and in multiples of [] Equity Shares thereafter. Such number of Equity Shares not exceeding the Net Issue subject to applicable limits. Compulsorily in dematerialised form. [] Equity Shares and in multiples of [] Equity Shares thereafter. [] Equity Shares and in multiples of one Equity Share thereafter One Equity Share Resident Indian individuals, Eligible NRIs, HUF (in the name of Karta), companies, corporate bodies, scientific institutions societies and trusts, sub-accounts of FIIs registered with SEBI, which are foreign corporates or foreign individuals.

Retail Individual Bidders

Employee Reservation Portion [] Equity Shares thereafter. Such number of Equity Shares per Eligible Employee so as to ensure that the Bid Amount does not exceed ` 100,000. Compulsorily in dematerialised form. [] Equity Shares and in multiples of [] Equity Shares thereafter. [] Equity Shares and in multiples of one Equity Share thereafter. One Equity Share Eligible Employee

Such number of Equity Shares whereby the Bid Amount does not exceed ` 100,000. Compulsorily in dematerialised form. [] Equity Shares and in multiples of [] Equity Shares thereafter. [] Equity Shares and in multiples of one Equity Share thereafter One Equity Share Retail Bidders Individual

Mode of Allotment Bid Lot

Allotment Lot

Trading Lot Who can Apply **

356

QIBs# corpus of ` 250 million, pension fund with minimum corpus of ` 250 million and National Investment Fund set up by Government of India and insurance funds set up and managed by army, navy or air force of the Union of India. Amount shall be payable at the time of submission of Bid cum Application Form to the Syndicate Members. (except for Anchor Investors) Full Bid Amount on Bidding

Non-Institutional Bidders

Retail Individual Bidders

Employee Reservation Portion

Terms of Payment

Amount shall be payable at the time of submission of Bid cum Application Form.##

Amount shall be payable at the time of submission of Bid cum Application Form.##

Amount shall be payable at the time of submission of Bid cum Application Form.##

Margin Amount
#

Full Bid Amount on Bidding

Full Bid Amount on Bidding

Full Bid Amount on Bidding

Our Company may allocate up to 30% of the QIB Portion to Anchor Investors on a discretionary basis. One-third of the Anchor Investor Portion shall be reserved for domestic Mutual Funds, subject to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is being done to other Anchor Investors. For further details, please see Issue Procedure on page 360. In case of Bidders submitting ASBA Bid cum Application Forms, the SCSBs shall be authorised to block such funds in the bank account of the Bidders that are specified in the ASBA Bid cum Application Forms.

##

Subject to valid Bids being received at or above the Issue Price, in accordance with Rule 19(2)(b) of the SCRR, this being an Issue for less than 25% of the post-Issue capital, the Issue is being made through the 100% Book Building Process wherein at least 50% of the Net Issue will be allocated on a proportionate basis to QIBs, out of the QIB Portion (excluding the Anchor Investor Portion), 5% shall be available for allocation on a proportionate basis to Mutual Funds only. The remainder shall be available for allocation on a proportionate basis to QIBs and Mutual Funds, subject to valid Bids being received from them at or above the Issue Price. If at least 50% of the Net Issue cannot be allocated to QIBs, then the entire application money will be refunded forthwith. However, if the aggregate demand from Mutual Funds is less than [] Equity Shares, the balance Equity Shares available for Allotment in the Mutual Fund Portion will be added to the QIB Portion and allocated proportionately to the QIB Bidders in proportion to their Bids. Further, not less than 15% of the Net Issue will be available for allocation on a proportionate basis to Non-Institutional Bidders and not less than 35% of the Net Issue will be available for allocation on a proportionate basis to Retail Individual Bidders, subject to valid Bids being received at or above the Issue Price. Under-subscription, if any, in any category except in the QIB category would be met with spill-over from other categories at the discretion of our Company in consultation with the BRLMs and the Designated Stock Exchange. Under subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue. The unsubscribed portion in the Net Issue, except the QIB Portion, shall be allowed to be met from spill over to the extent of under subscription from the Employee Reservation Portion, subject to the Net Issue constituting 10% of the post Issue capital of our Company. If at least 50% of the Net Issue is not allocated to the QIBs, the entire 357

subscription monies shall be refunded.


**

In case the Bid cum Application Form is submitted in joint names, the Bidders should ensure that the demat account is also held in the same joint names and are in the same sequence in which they appear in the Bid cum Application Form.

A discount of ` [] to the Issue Price, which is 10% of the Issue Price, determined pursuant to completion of the Book Building Process shall be offered to Eligible Employees. Eligible Employees Bidding at a price within the Price Band have to make payment based on their highest Bid price option. Eligible Employees bidding at Cut-Off Price have to ensure payment at the upper end of the Price Band. Eligible Employees should note that the discount is not being offered on application but on Allotment. The excess amount paid on application shall be refunded to such Bidders after Allotment along with any other refund, if any. Withdrawal of the Issue Our Company, in consultation with the BRLMs, reserves the right not to proceed with the Issue anytime after the Bid/Issue Opening Date but before the Allotment of Equity Shares. In such an event our Company would issue a public notice in the newspapers, in which the pre-Issue advertisements were published, within two days of the Bid/ Issue Closing Date, providing reasons for not proceeding with the Issue. The BRLMs, through the Registrar to the Issue, shall notify the SCSBs to unblock the bank accounts of the ASBA Bidders within one day from the day of receipt of such notification. Our Company shall also inform the same to Stock Exchanges on which the Equity Shares are proposed to be listed. Any further issue of Equity Shares by our Company shall be in compliance with applicable laws. The United Bank of India has, pursuant to a letter dated September 9, 2010, intimated our Company that they are considering either (i) a prepayment of the DDCDs held by them with a specified penal interest, or (ii) conversion of the DDCD into non-convertible debentures, subject to the approval from a competent authority in the United Bank of India. Our Company however cannot guarantee or assure you that the United Bank of India will exercise either of these two options in a timely manner or at all, in which event our Company will not be able to proceed with the Issue. Bid/ Issue Programme BID/ISSUE OPENS ON BID/ISSUE CLOSES ON
*

[]* []**

Our Company may consider participation by Anchor Investors. The Anchor Investor Bid/ Issue Period shall be one Working Day prior to the Bid/ Issue Opening Date. ** Our Company may consider closing the Bid/Issue Period for QIB Bidders one Working Day prior to the Bid/Issue Closing Date.

Bids and any revision in Bids shall be accepted only between 10.00 a.m. and 5.00 p.m. (Indian Standard Time, IST) during the Bid/ Issue Period as mentioned above at the bidding centres mentioned on the Bid cum Application Form. On the Bid/ Issue Closing Date, the Bids shall be accepted only between 10.00 a.m. and 3.00 p.m. (IST) and uploaded until (i) 4.00 p.m. (IST) in case of Bids by QIB Bidders and Non-Institutional Bidders, and (ii) until 5.00 p.m. (IST) or such extended time as permitted by the BSE and the NSE, in case of Bids by Retail Individual Bidders and Employees bidding under the Employee Reservation Portion. It is clarified that the Bids not uploaded in the book would be rejected. Bids by the Bidders applying through ASBA process shall be uploaded by the SCSB in the electronic system to be provided by the Stock Exchanges. In case of discrepancy in the data entered in the electronic book vis--vis the data contained in the physical Bid cum Application Form, for a particular Bidder, the details as per the physical Bid cum Application Form of the Bidder may be taken as the final data for the purpose of Allotment. In case of discrepancy in the data entered in the electronic book vis- -vis the data contained in the physical or electronic ASBA form, for a particular ASBA Bidder, the Registrar to the Issue shall ask the relevant SCSB for rectified data. 358

Due to limitation of time available for uploading the Bids on the Bid/ Issue Closing Date, the Bidders are advised to submit their Bids one day prior to the Bid/ Issue Closing Date and, in any case, no later than 3.00 p.m. (IST) on the Bid/ Issue Closing Date. Bidders are cautioned that in the event a large number of Bids are received on the Bid/ Issue Closing Date, as is typically experienced in public offerings, some Bids may not get uploaded due to lack of sufficient time. Such Bids that cannot be uploaded will not be considered for allocation under the Issue. Bids will be accepted only on Business Days, i.e., Monday to Friday (excluding any public holiday). On the Bid/ Issue Closing Date, extension of time will be granted by the Stock Exchanges only for uploading the Bids received by Retail Individual Bidders after taking into account the total number of Bids received up to the closure of time period for acceptance of Bid cum Application Forms as stated herein and reported by the BRLMs to the Stock Exchange within half an hour of such closure. Our Company, in consultation with the BRLMs, reserves the right to revise the Price Band during the Bid/ Issue Period, provided that the Cap Price shall be less than or equal to 120% of the Floor Price and the Floor Price shall not be less than the face value of the Equity Shares. The revision in Price Band shall not exceed 20% on the either side i.e. the floor price can move up or down to the extent of 20% of the floor price disclosed at least two Working Days prior to the Bid/ Issue Opening Date and the Cap Price will be revised accordingly. In case of revision of the Price Band, the Bid/Issue Period will be extended for three additional Working Days after revision of Price Band subject to the Bid/ Issue Period not exceeding 10 Working Days. Any revision in the Price Band and the revised Bid/ Issue Period, if applicable, will be widely disseminated by notification to the Stock Exchanges, by issuing a press release and also by indicating the changes on the websites of the BRLMs and at the terminals of the Syndicate.

359

ISSUE PROCEDURE This section applies to all Bidders. Please note that all Bidders other than Anchor Investors can participate in the Issue through the ASBA process. ASBA Bidders should note that the ASBA process involves application procedures that are different from the procedure applicable to Bidders other than the ASBA Bidders. Bidders applying through the ASBA process should carefully read the provisions applicable to such applications before making their application through the ASBA process. Please note that all the Bidders are required to make payment of the full Bid Amount along with the Bid cum Application Form. Book Building Procedure The Issue is being made through the 100% Book Building Process wherein at least 50% of the Net Issue shall be allocated to QIBs on a proportionate basis. Out of the QIB Portion (excluding the Anchor Investor Portion), 5% shall be available for allocation on a proportionate basis to Mutual Funds only. The remainder shall be available for allocation on a proportionate basis to QIBs and Mutual Funds, subject to valid Bids being received from them at or above the Issue Price. If at least 50% of the Net Issue cannot be allotted to QIBs, then the entire application money will be refunded forthwith. Further, not less than 15% of the Net Issue will be available for allocation on a proportionate basis to Non-Institutional Bidders and not less than 35% of the Net Issue will be available for allocation on a proportionate basis to Retail Individual Bidders, subject to valid Bids being received at or above the Issue Price. Allocation to Anchor Investors shall be on a discretionary basis and not on a proportionate basis. All Bidders other than the ASBA Bidders are required to submit their Bids through the Syndicate. ASBA Bidders are required to submit their Bids to the SCSBs. Investors should note that the Equity Shares will be Allotted to all successful Bidders only in dematerialised form. The Bid cum Application Forms which do not have the details of the Bidders depository account shall be treated as incomplete and rejected. Bidders will not have the option of being Allotted Equity Shares in physical form. The Equity Shares on Allotment shall be traded only in the dematerialised segment of the Stock Exchanges. Bid cum Application Form The prescribed colour of the Bid cum Application Form for the various categories is as follows: Category Colour of Bid cum Application Form White

Resident Indians and Eligible NRIs applying on a non-repatriation basis (ASBA as well as non ASBA Bidders) Eligible NRIs, FIIs or applying on a repatriation basis (ASBA as well as non ASBA Blue Bidders) Eligible Employees Pink Anchor Investors* White * Bid cum Application forms for Anchor Investors have been made available at the offices of the BRLMs.

Bidders (other than ASBA Bidders) are required to submit their Bids through the Syndicate. Such Bidders shall only use the specified Bid cum Application Form bearing the stamp of a member of the Syndicate for the purpose of making a Bid in terms of the Red Herring Prospectus. The Bidder shall have the option to make a maximum of three Bids in the Bid cum Application Form and such options shall not be considered as multiple Bids. The ASBA Bid cum Application Form will also be available on the websites of the Stock Exchanges at least one day prior to the Bid/Issue Opening Date. The BRLMs and the SCSBs will provide the hyperlink to BSE and NSE on their websites. ASBA Bidders shall submit an ASBA Bid cum Application Form either in physical or electronic form to the SCSB authorising blocking of funds that are available in the bank account specified in the ASBA Bid cum Application Form only. Only QIBs can participate in the Anchor Investor Portion and such Anchor Investors cannot submit their 360

Bids through the ASBA process. Upon the filing of the Prospectus with the RoC, the Bid cum Application Form shall be considered as the Application Form. Upon completion and submission of the Bid cum Application Form to a Syndicate or the SCSB, the Bidder or the ASBA Bidder is deemed to have authorised the Company to make the necessary changes in the Red Herring Prospectus as would be required for filing the Prospectus with the RoC and as would be required by RoC after such filing, without prior or subsequent notice of such changes to the Bidder or the ASBA Bidder. Who can Bid? Indian nationals resident in India who are not minors in single or joint names (not more than three); Hindu Undivided Families or HUFs, in the individual name of the Karta. The Bidder should specify that the Bid is being made in the name of the HUF in the Bid cum Application Form as follows: Name of Sole or First bidder: XYZ Hindu Undivided Family applying through XYZ, where XYZ is the name of the Karta. Bids by HUFs would be considered at par with those from individuals; Companies, corporate bodies and societies registered under the applicable laws in India and authorised to invest in equity shares; Mutual Funds registered with SEBI; Eligible NRIs on a repatriation basis or on a non repatriation basis subject to applicable laws. NRIs other than eligible NRIs are not eligible to participate in this issue; Indian financial institutions, commercial banks (excluding foreign banks), regional rural banks, cooperative banks (subject to RBI regulations and the SEBI Regulations and other laws, as applicable); FIIs and sub-accounts registered with SEBI, other than a sub-account which is a foreign corporate or foreign individual; Sub-accounts of FIIs registered with SEBI, which are foreign corporates or foreign individuals only under the Non-Institutional Bidders category. Venture Capital Funds registered with SEBI; State Industrial Development Corporations; Trusts/societies registered under the Societies Registration Act, 1860, as amended, or under any other law relating to trusts/societies and who are authorised under their respective constitutions to hold and invest in equity shares; Scientific and/or industrial research organisations authorised to invest in equity shares; Insurance Companies registered with Insurance Regulatory and Development Authority; Provident Funds with a minimum corpus of ` 250 million and who are authorised under their constitution to hold and invest in equity shares; Pension Funds with a minimum corpus of ` 250 million and who are authorised under their constitution to hold and invest in equity shares; National Investment Fund;

361

Insurance funds set up and managed by the army, navy or air force of the Union of India; and Eligible Employees.

As per the existing regulations, OCBs cannot participate in this Issue. Participation by associates and affiliates of the BRLMs and the Syndicate Members The BRLMs and the Syndicate Members shall not be allowed to subscribe to this Issue in any manner except towards fulfilling their underwriting obligations. However, the associates and affiliates of the BRLMs and Syndicate Members may subscribe to or purchase Equity Shares in the Issue, either in the QIB Portion or in Non-Institutional Portion as may be applicable to such Bidders, where the allocation is on a proportionate basis. The BRLMs and any persons related to the BRLMs or the Promoters and the Promoter Group cannot apply in the Issue under the Anchor Investor Portion. Bids by Mutual Funds An eligible Bid by a Mutual Fund shall first be considered for allocation proportionately in the Mutual Fund Portion. In the event that the demand is greater than [] Equity Shares, allocation shall be made to Mutual Funds proportionately, to the extent of the Mutual Fund Portion. The remaining demand by the Mutual Funds shall, as part of the aggregate demand by QIBs, be available for allocation proportionately out of the remainder of the QIB Portion, after excluding the allocation in the Mutual Fund Portion. One-third of the Anchor Investor Portion shall be reserved for domestic Mutual Funds, subject to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is being done to other Anchor Investors. In case of a Mutual Fund, a separate Bid can be made in respect of each scheme of the Mutual Fund registered with SEBI and such Bids in respect of more than one scheme of the Mutual Fund will not be treated as multiple Bids provided that the Bids clearly indicate the scheme concerned for which the Bid has been made. No mutual fund scheme shall invest more than 10% of its net asset value in equity shares or equity related instruments of any single company provided that the limit of 10% shall not be applicable for investments in index funds or sector or industry specific funds. No Mutual Fund under all its schemes should own more than 10% of any companys paid-up share capital carrying voting rights. Bids by Eligible NRIs 1. 2. Bid cum Application Forms have been made available for Eligible NRIs at the Registered Office of the Company, with the Syndicate and the Registrar to the Issue. Eligible NRIs applicants should note that only such applications as are accompanied by payment in free foreign exchange shall be considered for Allotment. Eligible NRIs who intend to make payment through Non-Resident Ordinary (NRO) accounts should use the form meant for Resident Indians.

Bids by FIIs As per the current regulations, the following restrictions are applicable for investments by FIIs: The issue of Equity Shares to a single FII should not exceed 10% of total post-Issue paid-up share capital. In respect of an FII investing in our Equity Shares on behalf of its sub-accounts, the investment on behalf of each sub-account shall not exceed 10% of our total paid-up share capital or 5% of our total paid-up share capital in case such subaccount is a foreign corporate or a foreign individual. As of now, the aggregate FII holding in our Company cannot exceed 24% of our total paid-up share capital. With the approval of the board and the shareholders by way of a 362

special resolution, the aggregate FII holding can go up to 100%. The Board of Directors and shareholders of our Company through resolutions dated July 30, 2010 have increased the limit for FII shareholding in the Company to up to 49% of the total paid up capital. Subject to compliance with all applicable Indian laws, rules, regulations guidelines and approvals in terms of regulation 15A(1) of the Securities and Exchange Board of India (Foreign Institutional Investors) Regulations, 1995, as amended (the SEBI FII Regulations), an FII, as defined in the SEBI FII Regulations, deal or hold, offshore derivative instruments (as defined under the SEBI FII Regulations as any instrument, by whatever name called, which is issued overseas by a FII against securities held by it that are listed or proposed to be listed on any recognised stock exchange in India, as its underlying) directly or indirectly, only in the event (i) such offshore derivative instruments are issued only to persons who are regulated by an appropriate regulatory authority; and (ii) such offshore derivative instruments are issued after compliance with know your client norms. An FII is also required to ensure that no further issue or transfer of any offshore derivative instrument is made by or on behalf of it to any persons that are not regulated by an appropriate foreign regulatory authority as defined under the SEBI FII Regulations. Associates and affiliates of the underwriters including the BRLMs and the Syndicate Members that are FIIs may issue offshore derivative instruments against Equity Shares Allotted to them in the Issue. Any such Offshore Derivative Instrument does not constitute any obligation or claim or claim on or an interest in, our Company. Bids by SEBI registered Venture Capital Funds The SEBI (Venture Capital Funds) Regulations, 1996 inter alia prescribe the investment restrictions on venture capital funds registered with SEBI. Accordingly, the holding by any individual venture capital fund registered with SEBI in one company should not exceed 25% of the corpus of the venture capital fund. Further, venture capital funds can invest only up to 33.33% of the investible funds by way of subscription to an IPO of a venture capital undertaking whose shares are proposed to be listed. The above information is given for the benefit of the Bidders. Our Company, the BRLMs and the Syndicate Members are not liable for any amendments or modification or changes in applicable laws or regulations, which may occur after the date of this Draft Red Herring Prospectus. Bidders are advised to make their independent investigations and Bidders are advised to ensure that any single Bid from them does not exceed the investment limits or maximum number of Equity Shares that can be held by them under applicable law or regulation or as specified in this Draft Red Herring Prospectus. Maximum and Minimum Bid Size (a) For Retail Individual Bidders: The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Share thereafter, so as to ensure that the Bid Amount payable by the Bidder does not exceed ` 100,000. In case of revision of Bids, the Retail Individual Bidders have to ensure that the Bid Amount does not exceed ` 100,000. In case the Bid Amount is over ` 100,000 due to revision of the Bid or revision of the Price Band or on exercise of Cut-off Price option, the Bid would be considered for allocation under the Non-Institutional Portion. The Cut-off Price option is an option given only to the Retail Individual Bidders indicating their agreement to Bid and purchase at the final Issue Price as determined at the end of the Book Building Process. For Other Bidders (Non-Institutional Bidders and QIBs excluding Bidders in Anchor Investors Portion): The Bid must be for a minimum of such number of Equity Shares such that the Bid Amount exceeds ` 100,000 and in multiples of [] Equity Shares thereafter. A Bid cannot be submitted for more than the Issue Size. However, the maximum Bid by a QIB investor should not exceed the investment limits prescribed for them by applicable laws. A QIB Bidder cannot withdraw its Bid after the Bid/Issue Closing Date and is required to pay the Bid Amount upon submission of the Bid. In case of revision in Bids, the Non-Institutional Bidders, who are individuals, have to ensure that the Bid Amount is greater than ` 100,000 for being considered for allocation in the Non-Institutional Portion. In 363

(b)

case the Bid Amount reduces to ` 100,000 or less due to a revision in Bids or revision of the Price Band, Bids by Non-Institutional Bidders who are eligible for allocation in the Retail Portion would be considered for allocation under the Retail Portion. Non-Institutional Bidders and QIBs are not allowed to Bid at Cutoff Price. (c) For Bidders in the Employee Reservation Portion: The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Shares thereafter, so as to ensure that the Bid Amount payable by Eligible Employee does not exceed ` 100,000, net of Eligible Employee Discount. In case of revision of Bids, the Eligible Employees have to ensure that the Bid Amount does not exceed ` 100,000. Any Bids in the Employee Reservation Portion exceeding ` 100,000 would be rejected. In the case that the Bid Amount is over ` 100,000 due to revision of the Bid or revision of the Price Band or on exercise of the Cut-off option, the Bid would be considered for allocation under the Non-Institutional Bidders Portion. The Cut-off option is an option given only to the Retail Individual Bidders and Eligible Employees indicating their agreement to Bid and purchase at the final Issue Price as determined at the end of the Book Building Process. Eligible Employees bidding under the Employee Portion may also Bid under the Retail Portion and NonInstitutional Portion and such Bids shall not be treated as multiple Bids. For Bidders in the Anchor Investor Portion: The Bid must be for a minimum of such number of Equity Shares such that the Bid Amount exceeds ` 100 million and in multiples of [] Equity Shares thereafter. Bids by Anchor Investors under the Anchor Investor Portion and the QIB Portion shall not be considered as multiple Bids. A Bid cannot be submitted for more than 30% of the QIB Portion under the Anchor Investor Portion. Anchor Investors cannot withdraw their Bids after the Anchor Investor Bid/ Issue Period and are required to pay the Bid Amount at the time of submission of the Bid. In case the Anchor Investor Issue Price is lower than the Issue Price, the balance amount shall be payable as per the payin date mentioned in the revised Anchor Investor Allocation Notice.

(d)

Information for the Bidders: (a) Our Company, the BRLMs shall declare the Bid/Issue Opening Date and Bid/Issue Closing Date in the Red Herring Prospectus to be registered with the RoC and also publish the same in two national newspapers (one each in English and Hindi) and in one Marathi newspaper with wide circulation. This advertisement shall be in the prescribed format. Our Company will file the Red Herring Prospectus with the RoC at least three days before the Bid/Issue Opening Date. Our Company may decide to close Bidding by QIBs one Working Day prior to the Bid/Issue Closing Date provided that Bidding shall be kept open for a minimum of three days for all categories of Bidders. Our Companys decision to close Bidding by QIBs one Working Day prior to the Bid/Issue Closing Date shall be disclosed in the Red Herring Prospectus to be filed with the RoC. Copies of the Bid cum Application Form and copies of the Red Herring Prospectus will be available with the Syndicate. The SCSBs shall ensure that the abridged prospectus is made available on their websites. Copies of the ASBA Bid cum Application Form will be available for download and printing, from the websites of the Stock Exchanges. The SCSBs shall ensure that the abridged prospectus is made available on their websites. Any Bidders (who is eligible to invest in the Equity Shares) who would like to obtain the Red Herring Prospectus and/ or the Bid cum Application Form can obtain the same from the Registered Office of our Company. Eligible Bidders who are interested in subscribing for the Equity Shares should approach any of the BRLMs or Syndicate Members or their authorised agent(s) to register their Bids. Bidders (other than Anchor Investors) who wish to use the ASBA process should approach the Designated Branches of the SCSBs to register their Bids.

(b) (c)

(d)

(e)

(f)

364

(g)

The Bids should be submitted on the prescribed Bid cum Application Form only. Bid cum Application Forms (other than the ASBA Bid cum Application Forms) should bear the stamp of the Syndicate, otherwise they will be rejected. Bids by ASBA Bidders shall be accepted by the Designated Branches of the SCSBs in accordance with the SEBI Regulations and any circulars issued by SEBI in this regard. Bidders (other than Anchor Investors) applying through the ASBA process also have an option to submit the ASBA Bid cum Application Form in electronic form. The Syndicate and the Designated Branches of the SCSBs shall accept Bids from the Bidders during the Bid/Issue Period in accordance with the terms of the Syndicate Agreement, provided that the BRLMs shall accept the Bids from Anchor Investors only during the Anchor Investor Bid/Issue Period. The applicants may note that in case the DP ID, Client ID and PAN mentioned in the Bid cum Application Form and entered into the electronic bidding system of the Stock Exchanges by the Syndicate do not match with the DP ID, Client ID and PAN available in the Settlement Depository database, the application is liable to be rejected.

(h)

Method and Process of Bidding (a) Our Company in consultation with the BRLMs will decide the Price Band, Eligible Employee Discount, if any and the minimum Bid lot size for the Issue and the same shall be advertised in two national newspapers (one each in English and Hindi) and in one Marathi newspaper with wide circulation at least two Working Days prior to the Bid/ Issue Opening Date. The Syndicate and the SCSBs shall accept Bids from the Bidders during the Bid/Issue Period. The Bid/Issue Period shall be for a minimum of three Working Days and shall not exceed 10 Working Days. The Bid/ Issue Period may be extended, if required, by an additional three Working Days, subject to the total Bid/Issue Period not exceeding 10 Working Days. Any revision in the Price Band and the revised Bid/ Issue Period, if applicable, will be published in two national newspapers (one each in English and Hindi) and one Marathi newspaper with wide circulation and also by indicating the change on the websites of the BRLMs and at the terminals of the Syndicate. During the Bid/Issue Period, Bidders, other than QIBs, who are interested in subscribing for the Equity Shares should approach the Syndicate or their authorised agents to register their Bids. The Syndicate shall accept Bids from all Bidders and have the right to vet the Bids during the Bid/ Issue Period in accordance with the terms of the Red Herring Prospectus. Bidders (other than Anchor Investors) who wish to use the ASBA process should approach the Designated Branches of the SCSBs to register their Bids. Each Bid cum Application Form will give the Bidder the choice to Bid for up to three optional prices (for details refer to the paragraph entitled Bids at Different Price Levels below) within the Price Band and specify the demand (i.e., the number of Equity Shares Bid for) in each option. The price and demand options submitted by the Bidder in the Bid cum Application Form will be treated as optional demands from the Bidder and will not be cumulated. After determination of the Issue Price, the maximum number of Equity Shares Bid for by a Bidder at or above the Issue Price will be considered for allocation/Allotment and the rest of the Bid(s), irrespective of the Bid Amount, will become automatically invalid. The Bidder cannot Bid on another Bid cum Application Form after Bids on one Bid cum Application Form have been submitted to any member of the Syndicate or the SCSBs. Submission of a second Bid cum Application Form to either the same or to another member of the Syndicate or SCBS will be treated as multiple Bids and is liable to be rejected either before entering the Bid into the electronic bidding system, or at any point of time prior to the allocation or Allotment of Equity Shares in this Issue. However, the Bidder can revise the Bid through the Revision Form, the procedure for which is detailed under the paragraph entitled Build up of the Book and Revision of Bids. Except in relation to the Bids received from the Anchor Investors, the Syndicate/the SCSBs will enter each Bid option into the electronic bidding system as a separate Bid and generate a Transaction Registration Slip (TRS) for each price and demand option and give the same to the Bidder. Therefore, a Bidder can receive 365

(b)

(c)

(d)

(e)

(f)

up to three TRSs for each Bid cum Application Form. (g) The BRLMs shall accept the Bids from the Anchor Investors during the Anchor Investor Bid/ Issue Period i.e. one Working Day prior to the Bid/ Issue Opening Date. Bids by QIBs under the Anchor Investor Portion and the QIB Portion shall not be considered as multiple Bids. Along with the Bid cum Application Form, all Bidders (other than ASBA Bidders) will make payment in the manner described in - Escrow Mechanism, Terms of payment and payment into the Escrow Accounts on page 367. Upon receipt of the ASBA Bid cum Application Form, submitted whether in physical or electronic mode, the Designated Branch of the SCSB shall verify if sufficient funds equal to the Bid Amount are available in the ASBA Account, as mentioned in the ASBA Bid cum Application Form, prior to uploading such Bids with the Stock Exchanges. If sufficient funds are not available in the ASBA Account, the Designated Branch of the SCSB shall reject such Bids and shall not upload such Bids with the Stock Exchanges. If sufficient funds are available in the ASBA Account, the SCSB shall block an amount equivalent to the Bid Amount mentioned in the ASBA Bid cum Application Form and will enter each Bid option into the electronic bidding system as a separate Bid and generate a TRS for each price and demand option. The TRS shall be furnished to the ASBA Bidder on request. The Bid Amount shall remain blocked in the aforesaid ASBA Account until finalisation of the Basis of Allotment and consequent transfer of the Bid Amount against the Allotted Equity Shares to the Public Issue Account, or until withdrawal/failure of the Issue or until withdrawal/rejection of the ASBA Bid cum Application Form, as the case may be. Once the Basis of Allotment is finalized, the Registrar to the Issue shall send an appropriate request to the Controlling Branch of the SCSB for unblocking the relevant ASBA Accounts and for transferring the amount allocable to the successful Bidders to the Public Issue Account. In case of withdrawal/failure of the Issue, the blocked amount shall be unblocked on receipt of such information from the Registrar to the Issue.

(h)

(i)

(j) (k)

(l)

Bids at Different Price Levels and Revision of Bids (a) Our Company, in consultation with the BRLMs and without the prior approval of, or intimation, to the Bidders, reserves the right to revise the Price Band during the Bid/ Issue Period, provided that the Cap Price shall be less than or equal to 120% of the Floor Price and the Floor Price shall not be less than the face value of the Equity Shares. The revision in Price Band shall not exceed 20% on the either side i.e. the floor price can move up or down to the extent of 20% of the floor price disclosed at least two days prior to the Bid/ Issue Opening Date and the Cap Price will be revised accordingly. Our Company, in consultation with the BRLMs will finalise the Issue Price within the Price Band in accordance with this clause, without the prior approval of, or intimation, to the Bidders. Our Company, in consultation with the BRLMs, can finalise the Anchor Investor Issue Price within the Price Band in accordance with this clause, without the prior approval of, or intimation, to the Anchor Investors. The Bidders can Bid at any price within the Price Band. The Bidder has to Bid for the desired number of Equity Shares at a specific price. Retail Individual Bidders and Bidders in the Employee Reservation Portion may Bid at the Cut-off Price. However, bidding at Cut-off Price is prohibited for QIB and NonInstitutional Bidders and such Bids from QIB and Non-Institutional Bidders shall be rejected. Retail Individual Bidders and Bidders in the Employee Reservation Portion, who Bid at Cut-off Price agree that they shall purchase the Equity Shares at any price within the Price Band. Retail Individual Bidders and Bidders in the Employee Reservation Portion, shall submit the Bid cum Application Form along with a 366

(b) (c)

(d)

(e)

cheque/demand draft for the Bid Amount based on the Cap Price with the Syndicate. In case of ASBA Bidders (excluding Non-Institutional Bidders and QIB Bidders) bidding at Cut-off Price, the ASBA Bidders shall instruct the SCSBs to block an amount based on the Cap Price. Escrow mechanism, terms of payment and payment into the Escrow Accounts For details of the escrow mechanism and payment instructions, please see Issue Procedure - Payment Instructions on page 376. Electronic Registration of Bids (a) (b) (c) The Syndicate and the SCSBs will register the Bids using the on-line facilities of the Stock Exchanges. The Syndicate and the SCSBs will undertake modification of selected fields in the Bid details already uploaded within one Working Day from the Bid/Issue Closing Date. There will be at least one on-line connectivity facility in each city, where a stock exchange is located in India and where Bids are being accepted. The Syndicate and / or the SCSBs shall be responsible for any acts, mistakes or errors or omission and commissions in relation to, (i) the Bids accepted by the Syndicate Members and the SCSBs, (ii) the Bids uploaded by the Syndicate Members and the SCSBs, (iii) the Bids accepted but not uploaded by the Syndicate Members and the SCSBs or (iv) with respect to the Bids by ASBA Bidders, Bids accepted and uploaded without blocking funds in the ASBA Accounts. It shall be presumed that for Bids uploaded by the SCSBs, the Bid Amount has been blocked in the relevant ASBA Account. The Stock Exchanges will offer an electronic facility for registering Bids for the Issue. This facility will be available with the Syndicate and their authorised agents and the SCSBs during the Bid/ Issue Period. The Syndicate Members and the Designated Branches of the SCSBs can also set up facilities for off-line electronic registration of Bids subject to the condition that they will subsequently upload the off-line data file into the on-line facilities for Book Building on a regular basis. On the Bid/ Issue Closing Date, the Syndicate and the Designated Branches of the SCSBs shall upload the Bids till such time as may be permitted by the Stock Exchanges. This information will be available with the BRLMs on a regular basis. Based on the aggregate demand and price for Bids registered on the electronic facilities of the Stock Exchanges, a graphical representation of consolidated demand and price as available on the websites of the Stock Exchanges would be made available at the Bidding centres during the Bid/Issue Period. At the time of registering each Bid other than ASBA Bids, the Syndicate shall enter the following details of the Bidders in the on-line system: Name of the Bidder: Bidders should ensure that the name given in the Bid cum Application Form is exactly the same as the name in which the Depositary Account is held. In case the Bid cum Application Form is submitted in joint names, Bidders should ensure that the Depository Account is also held in the same joint names and are in the same sequence in which they appear in the Bid cum Application Form; Investor Category Individual, Corporate, FII, NRI, Mutual Fund, etc; Numbers of Equity Shares Bid for; Bid Amount; Cheque Details; Bid cum Application Form number; DP ID and client identification number of the beneficiary account of the Bidder; PAN.

(d)

(e)

(f)

With respect to Bids by ASBA Bidders, at the time of registering such Bids, the Designated Branches of the SCSBs shall enter the following information pertaining to the ASBA Bidders into the online system: 367

Name of the ASBA Bidder(s); Application Number; PAN (of First ASBA Bidder, in case of more than one ASBA Bidder); Investor Category and Sub-Category: Non- Institutional Individual Corporate Other QIB

Retail (No sub category)

Mutual Funds Financial Institutions Insurance companies Foreign Institutional Investors other than corporate and individual sub-accounts Others

(g)

Employee/shareholder (if reservation); DP ID and client identification number; Beneficiary account number of Equity Shares Bid for; Quantity; Bid Amount; and Bank account number.

A system generated TRS will be given to the Bidder as a proof of the registration of each of the bidding options. It is the Bidders responsibility to obtain the TRS from the Syndicate or the Designated Branches of the SCSBs. The registration of the Bid by the member of the Syndicate or the Designated Branches of the SCSBs does not guarantee that the Equity Shares shall be allocated/Allotted either by the Syndicate or our Company. Such TRS will be non-negotiable and by itself will not create any obligation of any kind. In case of QIB Bidders, only the BRLMs and their Affiliate Syndicate Members have the right to accept the Bid or reject it. However, such rejection shall be made at the time of receiving the Bid and only after assigning a reason for such rejection in writing. In case of Non-Institutional Bidders, Retail Individual Bidders and Eligible Employees, Bids will be rejected on technical grounds listed on page 379. The Members of the Syndicate may also reject Bids if all the information required is not provided and the Bid cum Application Form is incomplete in any respect. The SCSBs shall have no right to reject Bids, except on technical grounds. The permission given by the Stock Exchanges to use their network and software of the online IPO system should not in any way be deemed or construed to mean that the compliance with various statutory and other requirements by our Company and/or the BRLMs are cleared or approved by the Stock Exchanges; nor does it in any manner warrant, certify or endorse the correctness or completeness of any of the compliance with the statutory and other requirements nor does it take any responsibility for the financial or other soundness of our Company, the Promoter, the management or any scheme or project of our Company; nor does it in any manner warrant, certify or endorse the correctness or completeness of any of the contents of this Draft Red Herring Prospectus; nor does it warrant that the Equity Shares will be listed or will continue to be listed on the Stock Exchanges. Only Bids that are uploaded on the online IPO system of the Stock Exchanges shall be considered for allocation/ Allotment. Members of the Syndicate will be given up to one Working Day after the Bid/Issue Closing Date to verify DP ID and Client ID uploaded in the online IPO system during the Bid/Issue Period after which the Registrar to the Issue will receive this data from the Stock Exchanges and will validate the electronic bid details with the depositories records. 368

(h) (i)

(j)

(k)

(l)

Details of Bids in the Anchor Investor Portion will not be registered on the on-line facilities of the electronic facilities of the Stock Exchanges.

Build up of the book and revision of Bids (a) (b) (c) Bids received from various Bidders through the Syndicate and the SCSBs shall be electronically uploaded to the Stock Exchanges mainframe on a regular basis. The Book gets built up at various price levels. This information will be available with the BRLMs at the end of the Bid/Issue Period. During the Bid/Issue Period, any Bidder who has registered his or her interest in the Equity Shares at a particular price level is free to revise his or her Bid within the Price Band using the printed Revision Form, which is a part of the Bid cum Application Form. Revisions can be made in both the desired number of Equity Shares and the Bid Amount by using the Revision Form. Apart from mentioning the revised options in the Revision Form, the Bidder must also mention the details of all the options in his or her Bid cum Application Form or earlier Revision Form. For example, if a Bidder has Bid for three options in the Bid cum Application Form and such Bidder is changing only one of the options in the Revision Form, he must still fill the details of the other two options that are not being revised, in the Revision Form. The Syndicate and the Designated Branches of the SCSBs will not accept incomplete or inaccurate Revision Forms. The Bidder can make this revision any number of times during the Bid/Issue Period. However, for any revision(s) in the Bid, the Bidders will have to use the services of the same member of the Syndicate or the SCSB through whom such Bidder had placed the original Bid. Bidders are advised to retain copies of the blank Revision Form and the revised Bid must be made only in such Revision Form or copies thereof. In case of an upward revision in the Price Band announced as above, Retail Individual Bidders and Eligible Employees who had Bid at Cut-off Price could either (i) revise their Bid or (ii) shall make additional payment based on the cap of the revised Price Band (such that the total amount i.e., original Bid Amount plus additional payment does not exceed ` 100,000 if the Bidder wants to continue to Bid at Cut-off Price), with the Syndicate to whom the original Bid was submitted. In case the total amount (i.e., original Bid Amount plus additional payment) exceeds ` 100,000, the Bid will be considered for allocation under the Non-Institutional Portion in terms of the Red Herring Prospectus. If, however, the Bidder does not either revise the Bid or make additional payment and the Issue Price is higher than the cap of the Price Band prior to revision, the number of Equity Shares Bid for shall be adjusted downwards for the purpose of allocation, such that no additional payment would be required from the Bidder and the Bidder is deemed to have approved such revised Bid at Cut-off Price. In case of a downward revision in the Price Band, announced as above, Retail Individual Bidders and Eligible Employees, who have Bid at Cut-off Price could either revise their Bid or the excess amount paid at the time of bidding would be refunded from the Escrow Account. Our Company, in consultation with the BRLMs, shall decide the minimum number of Equity Shares for each Bid to ensure that the minimum application value is within the range of ` 5,000 to ` 7,000. Any revision of the Bid shall be accompanied by payment in the form of cheque or demand draft for the incremental amount, if any, to be paid on account of the upward revision of the Bid. With respect to the Bids by ASBA Bidders, if revision of the Bids results in an incremental amount, the relevant SCSB shall block the additional Bid Amount. In case of Bids, other than ASBA Bids, the Syndicate shall collect the payment in the form of cheque or demand draft if any, to be paid on account of the upward revision of the Bid at the time of one or more revisions. In such cases, the Syndicate will revise the earlier Bids details with the revised Bid and provide the cheque or demand draft number of the new payment instrument in the electronic book. The Registrar will reconcile the Bid data and consider the revised Bid data for preparing 369

(d)

(e)

(f)

(g)

(h) (i)

the Basis of Allotment. (j) When a Bidder revises his or her Bid, he or she shall surrender the earlier TRS and may get a revised TRS from the Syndicate or the SCSB, as applicable. It is the responsibility of the Bidder to request for and obtain the revised TRS, which will act as proof of his or her having revised the previous Bid.

Price Discovery and Allocation (a) (b) Based on the demand generated at various price levels, our Company in consultation with the BRLMs shall finalise the Issue Price. Under-subscription, if any, in any category, except the QIB Portion, would be allowed to be met with spillover from any other category or combination of categories at the sole discretion of our Company in consultation with the BRLMs and the Designated Stock Exchange. Under subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue. In case of under subscription in the Net Issue, spill over to the extent of under subscription shall be permitted from the Employee Reservation Portion subject to the Net Issue constituting 10% of the post Issue capital of our Company. If at least 50% of the Net Issue is not allocated to the QIBs, the entire subscription monies shall be refunded. Allocation to Non-Residents, including Eligible NRIs and FIIs registered with SEBI, applying on repatriation basis will be subject to applicable law, rules, regulations, guidelines and approvals. Allocation to Anchor Investors shall be at the discretion of the Company in consultation with the BRLMs, subject to the compliance with the SEBI Regulations. QIB Bidders shall not be allowed to withdraw their Bid after the Bid/Issue Closing Date. Further the Anchor Investors shall not be allowed to withdraw their Bids after the Anchor Investors Bid/Issue Period. The Basis of Allotment shall be put up on the website of the Registrar.

(c) (d) (e) (f)

Signing of the Underwriting Agreement and the RoC Filing (a) (b) Our Company, the BRLMs and the Syndicate Members shall enter into an Underwriting Agreement on or immediately after the finalisation of the Issue Price. After signing the Underwriting Agreement, our Company will update and file the updated Red Herring Prospectus with the RoC in accordance with the applicable law, which then would be termed as the Prospectus. The Prospectus will contain details of the Issue Price, Issue size, underwriting arrangements and will be complete in all material respects.

Pre-Issue Advertisement Subject to Section 66 of the Companies Act, our Company shall, after registering the Red Herring Prospectus with the RoC, publish a pre-Issue advertisement, in the form prescribed by the SEBI Regulations, in one English language national daily newspaper, one Hindi language national daily newspaper and one Marathi language daily newspaper, each with wide circulation. Advertisement regarding Issue Price and Prospectus Our Company will issue a statutory advertisement after the filing of the Prospectus with the RoC. This advertisement, in addition to the information that has to be set out in the statutory advertisement, shall indicate the Issue Price and the Anchor Investor Issue Price. Any material updates between the date of the Red Herring Prospectus and the date of Prospectus will be included in such statutory advertisement. Issuance of Confirmation of Allotment Note (CAN)

370

(a) (b) (c)

Upon approval of the Basis of Allotment by the Designated Stock Exchange, the Registrar shall send to the Syndicate a list of the Bidders who have been Allotted Equity Shares in the Issue. The Registrar will then dispatch a CAN to the Bidders who have been Allotted Equity Shares in the Issue. The dispatch of a CAN shall be deemed a valid, binding and irrevocable contract for the Bidder. The Issuance of CAN is subject to Notice to Anchor Investors Allotment Reconciliation and Revised CANs as set forth under Issue Procedure on page 360.

Notice to Anchor Investors: Allotment Reconciliation and CANs A physical book will be prepared by the Registrar on the basis of the Bid cum Application Forms received from Anchor Investors. Based on the physical book and at the discretion of our Company, in consultation with the BRLMs, selected Anchor Investors will be sent an Anchor Investor Allocation Notice and/or a revised Anchor Investor Allocation Notice, as the case may be. All Anchor Investors will be sent Anchor Investor Allocation Notice post Anchor Investor Bid/Issue Period and in the event that the Issue Price is higher than the Anchor Investor Issue Price, the Anchor Investors will be sent a revised Anchor Investor Allocation Notice within one day of the Pricing Date indicating the number of Equity Shares allocated to such Anchor Investor and the pay-in date for payment of the balance amount. Anchor Investors should note that they shall be required to pay any additional amounts, being the difference between the Issue Price and the Anchor Investor Issue Price, as indicated in the revised Anchor Investor Allocation Notice within the pay-in date referred to in the revised Anchor Investor Allocation Notice. The revised Anchor Investor Allocation Notice will constitute a valid, binding and irrevocable contract (subject to the issue of CAN) for the Anchor Investor to pay the difference between the Issue Price and the Anchor Investor Issue Price and accordingly the CAN will be issued to such Anchor Investors. In the event the Issue Price is lower than the Anchor Investor Issue Price, the Anchor Investors who have been Allotted Equity Shares will directly receive CAN. The dispatch of CAN shall be deemed a valid, binding and irrevocable contract for the Allotment of Equity Shares to such Anchor Investors. The final allocation is subject to the physical application being valid in all respect along with receipt of stipulated documents, the Issue Price being finalised at a price not higher than the Anchor Investor Issue Price and Allotment by the Board of Directors. Designated Date and Allotment of Equity Shares (a). Our Company will ensure that (i) the Allotment of Equity Shares; and (ii) credit to the successful Bidders depositary account will be completed within 12 Working Days of the Bid/Issue Closing Date. After the funds are transferred from the Escrow Account to the Public Issue Account on the Designated Date, the Company will ensure the credit to the successful Bidders depositorys account is completed within two Working Days from the date of Allotment. In accordance with the SEBI Regulations, Equity Shares will be issued and Allotment shall be made only in the dematerialised form to the Allottees. Allottees will have the option to re-materialise the Equity Shares so Allotted as per the provisions of the Companies Act and the Depositories Act.

(b). (c).

Investors are advised to instruct their Depository Participant to accept the Equity Shares that may be allocated/ Allotted to them pursuant to this Issue. GENERAL INSTRUCTIONS Dos: (a). (b). Check if you are eligible to apply; Ensure that you have Bid within the Price Band; 371

(c). (d). (e).

Read all the instructions carefully and complete the Bid cum Application Form; Ensure that the details about the Depository Participant and the beneficiary account are correct as Allotment of Equity Shares will be in the dematerialised form only; Ensure that the Bids are submitted at the bidding centres only on forms bearing the stamp of a member of the Syndicate or with respect to ASBA Bidders, ensure that your Bid is submitted at a Designated Branch of the SCSB where the ASBA Bidder or the person whose bank account will be utilised by the Bidder for bidding has a bank account; With respect to Bids by ASBA Bidders ensure that the ASBA Bid cum Application Form is signed by the account holder in case the applicant is not the account holder. Ensure that you have mentioned the correct bank account number in the ASBA Bid cum Application Form; Ensure that you request for and receive a TRS for all your Bid options; Ensure that you have funds equal to the Bid Amount in your bank account maintained with the SCSB before submitting the ASBA Bid cum Application Form to the respective Designated Branch of the SCSB; Ensure that the full Bid Amount is paid for the Bids submitted to the Syndicate and funds equivalent to the Bid Amount are blocked in case of any Bids submitted though the SCSBs; Instruct your respective banks to not release the funds blocked in the bank account under the ASBA process; Submit revised Bids to the same member of the Syndicate through whom the original Bid was placed and obtain a revised TRS; Except for Bids submitted on behalf of the Central Government or the State Government and officials appointed by a court and Bidders resident in the state of Sikkim, all Bidders should mention their PAN allotted under the IT Act; Ensure that the Demographic Details (as defined herein below) are updated, true and correct in all respects; Ensure that the name(s) given in the Bid cum Application Form is exactly the same as the name(s) in which the beneficiary account is held with the Depository Participant. In case the Bid cum Application Form is submitted in joint names, ensure that the beneficiary account is also held in same joint names and such names are in the same sequence in which they appear in the Bid cum Application Form.

(f).

(g). (h). (i). (j). (k). (l).

(m). (n).

Donts: (a). (b). (c). (d). (e). (f). Do not Bid for lower than the minimum Bid size; Do not Bid/ revise Bid Amount to less than the Floor Price or higher than the Cap Price; Do not Bid on another Bid cum Application Form after you have submitted a Bid to the Syndicate or the SCSBs, as applicable; Do not pay the Bid Amount in cash, by money order or by postal order or by stockinvest; Do not send Bid cum Application Forms by post; instead submit the same to a member of the Syndicate or the SCSBs only; Do not Bid at Cut-off Price (for QIB Bidders and Non-Institutional Bidders, for Bid Amount in excess of ` 100,000); 372

(g). (h).

Do not Bid for a Bid Amount exceeding ` 100,000 (for Bids by Retail Individual Bidders and Eligible Employees bidding under the Employee Portion); Do not fill up the Bid cum Application Form such that the Equity Shares Bid for exceeds the Issue Size and/ or investment limit or maximum number of Equity Shares that can be held under the applicable laws or regulations or maximum amount permissible under the applicable regulations; Do not submit the GIR number instead of the PAN as the Bid is liable to be rejected on this ground; and Do not submit the Bids without the full Bid Amount.

(i). (j).

INSTRUCTIONS FOR COMPLETING THE BID CUM APPLICATION FORM Bids must be: (a) (b) Made only in the prescribed Bid cum Application Form or Revision Form, as applicable. Completed in full, in BLOCK LETTERS in ENGLISH and in accordance with the instructions contained herein, in the Bid cum Application Form or in the Revision Form. Incomplete Bid cum Application Forms or Revision Forms are liable to be rejected. Bidders should note that the Syndicate and / or the SCSBs, as appropriate, will not be liable for errors in data entry due to incomplete or illegible Bid cum Application Forms or Revision Forms. Information provided by the Bidders will be uploaded in the online IPO system by the Syndicate and the SCSBs, as the case may be, and the electronic data will be used to make allocation/ Allotment. The Bidders should ensure that the details are correct and legible. For Retail Individual Bidders and Eligible Employees, the Bid must be for a minimum of [ ] Equity Shares and in multiples of [ ] thereafter subject to a maximum Bid Amount of ` 100,000. For Non-Institutional Bidders and QIB Bidders, Bids must be for a minimum of such number of Equity Shares that the Bid Amount exceeds or is equal to ` 100,000 and in multiples of [ ] Equity Shares thereafter. Bids cannot be made for more than the Issue size. Bidders are advised to ensure that a single Bid from them should not exceed the investment limits or maximum number of Equity Shares that can be held by them under the applicable laws or regulations. For Anchor Investors, Bids must be for a minimum of such number of Equity Shares that the Bid Amount exceeds or equal to ` 100 million and in multiples of [ ] Equity Shares thereafter. In single name or in joint names (not more than three, and in the same order as their Depository Participant details). Thumb impressions and signatures other than in the languages specified in the Eighth Schedule to the Constitution of India must be attested by a Magistrate or a Notary Public or a Special Executive Magistrate under official seal.

(c)

(d) (e)

(f) (g) (h)

Bidders PAN, Depository Account and Bank Account Details Bidders should note that on the basis of PAN of the Bidders, DP ID and beneficiary account number provided by them in the Bid cum Application Form, the Registrar will obtain from the Depository the demographic details including address, Bidders bank account details, MICR code and occupation (hereinafter referred to as Demographic Details). These bank account details would be used for giving refunds (including through physical refund warrants, direct credit, NECS, NEFT and RTGS) or unblocking of ASBA Account. Hence, Bidders are advised to immediately update their bank account details as appearing on the records of the Depository Participant. Please note that failure to do so could result in delays in despatch/ credit of refunds to 373

Bidders or unblocking of ASBA Account at the Bidders sole risk and neither the BRLMs or the Syndicate Members or the Registrar or the Escrow Collection Banks or the SCSBs nor our Company shall have any responsibility and undertake any liability for the same. Hence, Bidders should carefully fill in their Depository Account details in the Bid cum Application Form. IT IS MANDATORY FOR ALL THE BIDDERS TO GET THEIR EQUITY SHARES IN DEMATERIALISED FORM. ALL BIDDERS SHOULD MENTION THEIR DEPOSITORY PARTICIPANTS NAME, DEPOSITORY PARTICIPANT IDENTIFICATION NUMBER AND BENEFICIARY ACCOUNT NUMBER IN THE BID CUM APPLICATION FORM. INVESTORS MUST ENSURE THAT THE NAME GIVEN IN THE BID CUM APPLICATION FORM IS EXACTLY THE SAME AS THE NAME IN WHICH THE DEPOSITORY ACCOUNT IS HELD. IN CASE THE BID CUM APPLICATION FORM IS SUBMITTED IN JOINT NAMES, IT SHOULD BE ENSURED THAT THE DEPOSITORY ACCOUNT IS ALSO HELD IN THE SAME JOINT NAMES AND ARE IN THE SAME SEQUENCE IN WHICH THEY APPEAR IN THE BID CUM APPLICATION FORM. These Demographic Details would be used for all correspondence with the Bidders including mailing of the CANs/allocation advice and printing of bank particulars on the refund orders or for refunds through electronic transfer of funds, as applicable. The Demographic Details given by Bidders in the Bid cum Application Form would not be used for any other purpose by the Registrar. By signing the Bid cum Application Form, the Bidder would be deemed to have authorised the Depositories to provide, upon request, to the Registrar, the required Demographic Details as available on its records. Refund orders/ CANs would be mailed at the address of the Bidder as per the Demographic Details received from the Depositories. Bidders may note that delivery of refund orders/ CANs may get delayed if the same once sent to the address obtained from the Depositories are returned undelivered. In such an event, the address and other details given by the Bidder (other than ASBA Bidders) in the Bid cum Application Form would be used only to ensure dispatch of refund orders. Please note that any such delay shall be at such Bidders sole risk and neither our Company, the Escrow Collection Banks, Registrar, the BRLMs and the Syndicate Members shall be liable to compensate the Bidder for any losses caused to the Bidder due to any such delay or liable to pay any interest for such delay. In case no corresponding record is available with the Depositories, which matches the three parameters, namely, PAN of the sole/First Bidder, the DP ID and the beneficiarys identity, then such Bids are liable to be rejected. Bids by Non-Residents including Eligible NRIs, FIIs on a repatriation basis Bids and revision to Bids must be made in the following manner: 1. On the Bid cum Application Form or the Revision Form, as applicable (blue in colour), and completed in full in BLOCK LETTERS in ENGLISH in accordance with the instructions contained therein. The Bid cum Application Form or the Revision Form will be available at our Registered Office and with the members of the Syndicate. In a single name or joint names (not more than three and in the same order as their Depositary Participant Details). Bids on a repatriation basis shall be in the names of individuals, or in the name of FIIs but not in the names of minors, OCBs, firms or partnerships, foreign nationals (excluding NRIs) or their nominees.

2. 3.

Bids by Eligible NRIs for a Bid Amount of up to ` 100,000 would be considered under the Retail Portion for the purposes of allocation and Bids for a Bid Amount of more than ` 100,000 would be considered under NonInstitutional Portion for the purposes of allocation. Refunds, dividends and other distributions, if any, will be payable in Indian Rupees only and net of bank charges and / or commission. In case of Bidders who remit money through Indian Rupee drafts purchased 374

abroad, such payments in Indian Rupees will be converted into US Dollars or any other freely convertible currency as may be permitted by the RBI at the rate of exchange prevailing at the time of remittance and will be dispatched by registered post or if the Bidders so desire, will be credited to their NRE accounts, details of which should be furnished in the space provided for this purpose in the Bid cum Application Form. Our Company will not be responsible for loss, if any, incurred by the Bidder on account of conversion of foreign currency. There is no reservation for Eligible NRIs and FIIs and all Bidders will be treated on the same basis with other categories for the purpose of allocation. Bids by Eligible Employees The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Shares thereafter so as to ensure that the Bid Price payable by the Eligible Employee does not exceed `100,000. The Allotment in the Employee Reservation Portion will be on a proportionate basis. Bidders under the Employee Reservation Portion may Bid at Cut off Price. Bids under Employee Reservation Portion by Eligible Employees shall be: (a) (b) Made only in the prescribed Bid cum Application Form or Revision Form (i.e. Pink colour form). The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Shares thereafter so as to ensure that the Bid Amount payable by the Eligible Employee does not exceed ` 100,000. The maximum Bid in this category by an Eligible Employee cannot exceed `100,000. Eligible Employees should mention their employee number at the relevant place in the Bid cum Application Form. The sole/ First Bidder should be an Eligible Employee as defined above. Only Eligible Employees would be eligible to apply in this Issue under the Employee Reservation Portion. Bids by Eligible Employees will have to Bid like any other Bidder. Only those Bids, which are received at or above the Issue Price, would be considered for Allotment under this category. Eligible Employees can apply at Cut-off Price. The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Shares thereafter subject to a maximum Bid Amount of ` 100,000. Bid by Eligible Employees can be made also in the Net Issue to the Public and such Bids shall not be treated as multiple Bids. If the aggregate demand in this category is less than or equal to [] Equity Shares at or above the Issue Price, full allocation shall be made to the Eligible Employees to the extent of their demand. Under-subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue. In case of under-subscription in the Net Issue, spill over to the extent of under-subscription shall be permitted from the Employee Reservation Portion subject to the Net Issue constituting 10% of the post-Issue share capital of our Company. If the aggregate demand in this category is greater than [] Equity Shares at or above the Issue Price, the allocation shall be made on a proportionate basis. For the method of proportionate basis of allocation, refer to para Basis of Allotment on page 384.

(c) (d) (e) (f) (g) (h) (i) (j)

(k)

Bids under Power of Attorney

375

In case of Bids made pursuant to a power of attorney or by limited companies, corporate bodies, registered societies, FIIs, Mutual Funds, insurance companies and provident funds with a minimum corpus of ` 250 million (subject to applicable law) and pension funds with a minimum corpus of ` 250 million, a certified copy of the power of attorney or the relevant resolution or authority, as the case may be, along with a certified copy of the memorandum of association and articles of association and/or bye laws must be lodged along with the Bid cum Application Form. Failing this, our Company reserves the right to accept or reject any Bid in whole or in part, in either case, without assigning any reason therefor. In addition to the above, certain additional documents are required to be submitted by the following entities: (a). (b). With respect to Bids by FIIs and Mutual Funds, a certified copy of their SEBI registration certificate must be lodged along with the Bid cum Application Form. With respect to Bids by insurance companies registered with the Insurance Regulatory and Development Authority, in addition to the above, a certified copy of the certificate of registration issued by the Insurance Regulatory and Development Authority must be lodged along with the Bid cum Application Form. With respect to Bids made by provident funds with a minimum corpus of ` 250 million (subject to applicable law) and pension funds with a minimum corpus of ` 250 million, a certified copy of a certificate from a chartered accountant certifying the corpus of the provident fund/pension fund must be lodged along with the Bid cum Application Form.

(c).

Our Company in its absolute discretion, reserves the right to relax the above condition of simultaneous lodging of the power of attorney along with the Bid cum Application form, subject to such terms and conditions that our Company and the BRLMs may deem fit. PAYMENT INSTRUCTIONS Escrow Mechanism for Bidders other than ASBA Bidders Our Company and the Syndicate shall open Escrow Account(s) with one or more Escrow Collection Bank(s) in whose favour the Bidders shall make out the cheque or demand draft in respect of his or her Bid and/or revision of the Bid. Cheques or demand drafts received for the full Bid Amount from Bidders would be deposited in the Escrow Account. The Escrow Collection Banks will act in terms of the Red Herring Prospectus and the Escrow Agreement. The Escrow Collection Banks for and on behalf of the Bidders shall maintain the monies in the Escrow Account until the Designated Date. The Escrow Collection Banks shall not exercise any lien whatsoever over the monies deposited therein and shall hold the monies therein in trust for the Bidders. On the Designated Date, the Escrow Collection Banks shall transfer the funds represented by allocation of Equity Shares (other than ASBA funds with the SCSBs) from the Escrow Account, as per the terms of the Escrow Agreement, into the Public Issue Account with the Bankers to the Issue. The balance amount after transfer to the Public Issue Account shall be transferred to the Refund Account. Payments of refund to the Bidders shall also be made from the Refund Account as per the terms of the Escrow Agreement and this Draft Red Herring Prospectus. The Bidders should note that the escrow mechanism is not prescribed by SEBI and has been established as an arrangement between our Company, the Syndicate, the Escrow Collection Banks and the Registrar to facilitate collections from the Bidders. Payment mechanism for ASBA Bidders The ASBA Bidders shall specify the bank account number in the ASBA Bid cum Application Form and the SCSB shall block an amount equivalent to the Bid Amount in the bank account specified in the ASBA Bid cum Application Form. The SCSB shall keep the Bid Amount in the relevant bank account blocked until withdrawal/ rejection of the ASBA Bid or receipt of instructions from the Registrar to unblock the Bid Amount. In the event of withdrawal or rejection of the ASBA Bid cum Application Form or for unsuccessful ASBA Bid cum Application 376

Forms, the Registrar shall give instructions to the SCSB to unblock the application money in the relevant bank account within one day of receipt of such instruction. The Bid Amount shall remain blocked in the ASBA Account until finalisation of the Basis of Allotment in the Issue and consequent transfer of the Bid Amount to the Public Issue Account, or until withdrawal/ failure of the Issue or until rejection of the Bids by ASBA Bidders, as the case may be. Payment into Escrow Account for Bidders other than ASBA Bidders Each Bidder shall draw a cheque or demand draft or (for the Anchor Investor) remit the funds electronically through the RTGS mechanism for the Bid Amount payable on the Bid as per the following terms: 1. 2. All Bidders would be required to pay the full Bid Amount at the time of the submission of the Bid cum Application Form. The Bidders shall, with the submission of the Bid cum Application Form, draw a payment instrument for the Bid Amount in favour of the Escrow Account and submit the same to the Syndicate. If the payment is not made favouring the Escrow Account along with the Bid cum Application Form, the Bid of the Bidder shall be rejected. The payment instruments for payment into the Escrow Account should be drawn in favour of: (a) (b) (c) (d) (e) 4. In case of Resident QIB Bidders: [] In case of Non-Resident QIB Bidders: [] In case of Resident Retail and Non-Institutional Bidders: [] In case of Non-Resident Retail and Non-Institutional Bidders: [] In case of Eligible Employees: []

3.

Anchor Investors would be required to pay the Bid Amount at the time of submission of the Bid cum Application Form. In the event of the Issue Price being higher than the price at which allocation is made to Anchor Investors, the Anchor Investors shall be required to pay such additional amount to the extent of shortfall between the price at which allocation is made to them and the Issue Price as per the pay-in date mentioned in the revised Anchor Investor Allocation Notice. If the Issue Price is lower than the price at which allocation is made to Anchor Investors, the amount in excess of the Issue Price paid by Anchor Investors shall not be refunded to them. For Anchor Investors, the payment instruments for payment into the Escrow Account should be drawn in favour of: (a) (b) In case of resident Anchor Investors: [] In case of non-resident Anchor Investors: []

5.

6.

In case of Bids by NRIs applying on repatriation basis, the payments must be made through Indian Rupee drafts purchased abroad or cheques or bank drafts, for the amount payable on application remitted through normal banking channels or out of funds held in Non-Resident External (NRE) Accounts or Foreign Currency Non-Resident (FCNR) Accounts, maintained with banks authorised to deal in foreign exchange in India, along with documentary evidence in support of the remittance. Payment will not be accepted out of Non-Resident Ordinary (NRO) Account of Non-Resident Bidder bidding on a repatriation basis. Payment by drafts should be accompanied by bank certificate confirming that the draft has been issued by debiting to NRE Account or FCNR Account. In case of Bids by NRIs applying on non-repatriation basis, the payments must be made through Indian 377

7.

Rupee Drafts purchased abroad or cheques or bank drafts, for the amount payable on application remitted through normal banking channels or out of funds held in Non-Resident External (NRE) Accounts or Foreign Currency Non-Resident (FCNR) Accounts, maintained with banks authorised to deal in foreign exchange in India, along with documentary evidence in support of the remittance or out of a Non-Resident Ordinary (NRO) Account of a Non-Resident Bidder bidding on a non-repatriation basis. Payment by drafts should be accompanied by a bank certificate confirming that the draft has been issued by debiting an NRE or FCNR or NRO Account. 8. In case of Bids by FIIs, the payment should be made out of funds held in a Special Rupee Account along with documentary evidence in support of the remittance. Payment by drafts should be accompanied by a bank certificate confirming that the draft has been issued by debiting the Special Rupee Account. The monies deposited in the Escrow Account will be held for the benefit of the Bidders (other than ASBA Bidders) till the Designated Date. On the Designated Date, the Escrow Collection Banks shall transfer the funds from the Escrow Account as per the terms of the Escrow Agreement into the Public Issue Account with the Bankers to the Issue. On the Designated Date and no later than 10 Working Days from the Bid/Issue Closing Date, the Escrow Collection Bank shall also refund all amounts payable to unsuccessful Bidders (other than ASBA Bidders) and also the excess amount paid on bidding, if any, after adjusting for allocation/Allotment to such Bidders. Payments should be made by cheque, or a demand draft drawn on any bank (including a co-operative bank), which is situated at, and is a member of or sub-member of the bankers clearing house located at the centre where the Bid cum Application Form is submitted. Outstation cheques/bank drafts drawn on banks not participating in the clearing process will not be accepted and applications accompanied by such cheques or bank drafts are liable to be rejected. Cash/ stockinvest/money orders/postal orders will not be accepted.

9. 10. 11.

12.

Submission of Bid cum Application Form All Bid cum Application Forms or Revision Forms duly completed and accompanied by account payee cheques or drafts shall be submitted to the Syndicate at the time of submission of the Bid. With respect to the ASBA Bidders, the ASBA Bid cum Application Form or the ASBA Revision Form shall be submitted to the Designated Branches of the SCSBs. No separate receipts shall be issued for the money payable on the submission of Bid cum Application Form or Revision Form. However, the collection centre of the Syndicate will acknowledge the receipt of the Bid cum Application Forms or Revision Forms by stamping and returning to the Bidder the acknowledgement slip. This acknowledgement slip will serve as the duplicate of the Bid cum Application Form for the records of the Bidder. OTHER INSTRUCTIONS Joint Bids in the case of Individuals Bids may be made in single or joint names (not more than three). In the case of joint Bids, all payments will be made out in favour of the Bidder whose name appears first in the Bid cum Application Form or Revision Form. All communications will be addressed to the First Bidder and will be dispatched to his or her address as per the Demographic Details received from the Depository. Multiple Bids A Bidder should submit only one Bid (and not more than one) for the total number of Equity Shares required. Two or more Bids will be deemed to be multiple Bids if the sole or First Bidder is one and the same. In case of a Mutual Fund, a separate Bid can be made in respect of each scheme of the Mutual Fund registered with SEBI and such Bids in respect of more than one scheme of the Mutual Fund will not be treated as multiple Bids 378

provided that the Bids clearly indicate the scheme concerned for which the Bid has been made. Eligible Employees can Bid in the Employee Reservation Portion and the Net Issue and such Bids shall not be considered as multiple Bids. Bids by QIBs under the Anchor Investor Portion and QIB Portion (excluding Anchor Investor Portion) will not be considered as multiple Bids. Our Company reserves the right to reject, in its absolute discretion, all or any multiple Bids in any or all categories. In this regard, the procedures which would be followed by the Registrar to detect multiple Bids are given below: 1. 2. 3. 4. All Bids will be checked for common PAN and will be accumulated and taken to a separate process file which would serve as a multiple master. In this master, a check will be carried out for the same PAN. In cases where the PAN is different, the same will be deleted from this master. The Registrar will obtain, from the depositories, details of the applicants address based on the DP ID and Beneficiary Account Number provided in the Bid data and create an address master. The addresses of all the applications in the multiple master will be strung from the address master. This involves putting the addresses in a single line after deleting non-alpha and non-numeric characters i.e. commas, full stops, hash etc. Sometimes, the name, the first line of address and pin code will be converted into a string for each application received and a photo match will be carried out amongst all the applications processed. A print-out of the addresses will be taken to check for common names. The Bids with same name and same address will be treated as multiple Bids. The Bids will be scrutinised for DP ID and Beneficiary Account Numbers. In case applications bear the same DP ID and Beneficiary Account Numbers, these will be treated as multiple applications.

5.

Permanent Account Number or PAN Except for Bids on behalf of the Central or State Government and the officials appointed by the courts, the Bidders, or in the case of a Bid in joint names, each of the Bidders, should mention his/ her PAN allotted under the I.T. Act. In accordance with the SEBI Regulations, the PAN would be the sole identification number for participants transacting in the securities market, irrespective of the amount of transaction. Any Bid cum Application Form without the PAN is liable to be rejected. It is to be specifically noted that Bidders should not mention the GIR number instead of the PAN as the Bid is liable to be rejected on this ground. With effect from August 16, 2010, the demat accounts for Bidders for which PAN details have not been verified shall be suspended credit and no credit of Equity Shares pursuant to the Issue shall be made into accounts of such Bidders. REJECTION OF BIDS In case of QIB Bidders, our Company in consultation with the BRLMs may reject Bids provided that the reasons for rejecting the same shall be provided to such Bidders in writing. In case of Non-Institutional Bidders and Retail Individual Bidders, our Company has a right to reject Bids based on technical grounds. Consequent refunds shall be made by RTGS/NEFT/NES/Direct Credit/cheque or pay order or draft and will be sent to the Bidders address at the Bidders risk. With respect to Bids by ASBA Bidders, the Designated Branches of the SCSBs shall have the right to reject ASBA Bids if at the time of blocking the Bid Amount in the Bidders bank account, the respective Designated Branch of the SCSB ascertains that sufficient funds are not available in the Bidders bank account maintained with the SCSB. Subsequent to the acceptance of the ASBA Bid by the SCSB, our Company would have a right to reject the ASBA Bids only on technical grounds. Grounds for Technical Rejections Bidders are advised to note that Bids are liable to be rejected inter alia on the following technical grounds:

379

Amount paid does not tally with the amount payable for the highest value of Equity Shares Bid for. With respect to Bids by ASBA Bidders, the amounts mentioned in the ASBA Bid cum Application Form does not tally with the amount payable for the value of the Equity Shares Bid for; In case of partnership firms, Equity Shares may be registered in the names of the individual partners and no firm as such shall be entitled to apply; Bid by persons not competent to contract under the Indian Contract Act, 1872 including minors, insane persons; PAN not mentioned in the Bid cum Application Form; GIR number mentioned instead of PAN; PAN details not being verified demat accounts. The demat accounts for such Bidders shall be suspended credit; Bids for lower number of Equity Shares than specified for that category of investors; Bids at a price less than the Floor Price; Bids at a price more than the Cap Price; Signature of sole and/or joint Bidders missing; Submission of more than five ASBA Bid cum Application Forms per bank account; Submission of Bids by Anchor Investors through ASBA process; Bids at Cut-off Price by Non-Institutional and QIB Bidders; Bids for more than ` 100,000 by Eligible Employees; Bids for number of Equity Shares which are not in multiples of []; Category not ticked; Multiple Bids as defined in this Draft Red Herring Prospectus; In case of Bids under power of attorney or by limited companies, corporate, trust etc., relevant documents are not submitted; Bids accompanied by stockinvest/money order/postal order/cash; Bid cum Application Forms does not have the stamp of the BRLMs or Syndicate Members or the SCSB; Bid cum Application Forms does not have Bidders depository account details; Bid cum Application Forms are not delivered by the Bidders within the time prescribed as per the Bid cum Application Forms, Bid/Issue Opening Date advertisement and this Draft Red Herring Prospectus and as per the instructions in this Draft Red Herring Prospectus and the Bid cum Application Forms; In case no corresponding record is available with the Depositories that matches three parameters namely, names of the Bidders (including the order of names of joint holders), the Depositary Participants identity 380

(DP ID) and the beneficiarys account number; With respect to Bids by ASBA Bidders, inadequate funds in the bank account to block the Bid Amount specified in the ASBA Bid cum Application Form at the time of blocking such Bid Amount in the bank account; Bids for amounts greater than the maximum permissible amounts prescribed by the regulations; Bids where clear funds are not available in Escrow Accounts as per final certificate from the Escrow Collection Banks; Bids by QIBs not submitted through the BRLMs or in case of ASBA Bids for QIBs (other than Anchor Investors) not intimated to the BRLMs; Bids by persons in the United States excluding qualified institutional buyers as defined in Rule 144A of the Securities Act or other than in reliance of Regulation S under the Securities Act; Bids by multilateral and bilateral development institutions; Bids by FVCIs; Bids by any person outside India if not in compliance with applicable foreign and Indian Laws; Bids not uploaded on the terminals of the Stock Exchanges; and Bids by persons prohibited from buying, selling or dealing in the shares directly or indirectly by SEBI or any other regulatory authority.

IN CASE THE DP ID, CLIENT ID AND PAN MENTIONED IN THE BID CUM APPLICATION FORM AND ENTERED INTO THE ELECTRONIC BIDDING SYSTEM OF THE STOCK EXCHANGES OR THE SYNDICATE/THE SCSBs DO NOT MATCH WITH THE DP ID, CLIENT ID AND PAN AVAILABLE IN THE RECORDS WITH THE DEPOSITORIES, THE APPLICATION IS LIABLE TO BE REJECTED. EQUITY SHARES IN DEMATERIALISED FORM WITH NSDL OR CDSL As per the provisions of Section 68B of the Companies Act, the Allotment of Equity Shares in this Issue shall be only in a dematerialised form, (i.e., not in the form of physical certificates but be fungible and be represented by the statement issued through the electronic mode). In this context, two agreements have been signed among our Company, the respective Depositories and the Registrar: Agreement dated [] between NSDL, our Company and the Registrar; Agreement dated September 2, 2010, between CDSL, our Company and the Registrar.

All Bidders can seek Allotment only in dematerialised mode. Bids from any Bidder without relevant details of his or her depository account are liable to be rejected. (a) (b) A Bidder applying for Equity Shares must have at least one beneficiary account with either of the Depository Participants of either NSDL or CDSL prior to making the Bid. The Bidder must necessarily fill in the details (including the Beneficiary Account Number and Depository Participants identification number) appearing in the Bid cum Application Form or Revision Form. 381

(c) (d)

Allotment to a successful Bidder will be credited in electronic form directly to the beneficiary account (with the Depository Participant) of the Bidder. Names in the Bid cum Application Form or Revision Form should be identical to those appearing in the account details in the Depository. In case of joint holders, the names should necessarily be in the same sequence as they appear in the account details in the Depository. If incomplete or incorrect details are given under the heading Bidders Depository Account Details in the Bid cum Application Form or Revision Form, it is liable to be rejected. The Bidder is responsible for the correctness of his or her Demographic Details given in the Bid cum Application Form vis--vis those with his or her Depository Participant. Equity Shares in electronic form can be traded only on the Stock Exchanges having electronic connectivity with NSDL and CDSL. All the Stock Exchanges where the Equity Shares are proposed to be listed have electronic connectivity with CDSL and NSDL. The trading of the Equity Shares of our Company would be in dematerialised form only for all Bidders in the demat segment of the respective Stock Exchanges.

(e) (f) (g)

(h)

Communications All future communications in connection with Bids made in this Issue should be addressed to the Registrar quoting the full name of the sole or First Bidder, Bid cum Application Form number, Bidders Depository Account Details, number of Equity Shares applied for, date of Bid form, name and address of the member of the Syndicate or the Designated Branch of the SCSBs where the Bid was submitted and cheque or draft number and issuing bank thereof or with respect to ASBA Bids, bank account number in which the amount equivalent to the Bid Amount was blocked. Bidders can contact the Compliance Officer or the Registrar in case of any pre-Issue or post-Issue related problems such as non-receipt of letters of Allotment, credit of Allotted shares in the respective beneficiary accounts, refund orders etc. In case of ASBA Bids submitted to the Designated Branches of the SCSBs, the Bidders can contact the Designated Branches of the SCSBs. PAYMENT OF REFUND Bidders other than ASBA Bidders must note that on the basis of the names of the Bidders, Depository Participants name, DP ID, beneficiary account number provided by them in the Bid cum Application Form, the Registrar will obtain, from the Depositories, the Bidders bank account details, including the nine digit Magnetic Ink Character Recognition (MICR) code as appearing on a cheque leaf. Hence, Bidders are advised to immediately update their bank account details as appearing on the records of the Depository Participant. Please note that failure to do so could result in delays in despatch of refund order or refunds through electronic transfer of funds, as applicable, and any such delay shall be at the Bidders sole risk and neither our Company, the Registrar, Escrow Collection Bank(s), Bankers to the Issue, the BRLMs and the Syndicate Members shall be liable to compensate the Bidders for any losses caused to the Bidder due to any such delay or liable to pay any interest for such delay. Mode of making refunds for Bidders other than ASBA Bidders The payment of refund, if any, for Bidders other than ASBA Bidders would be done through various modes in the following order of preference: 1. NECS Payment of refund would be done through NECS for applicants having an account at any of the centres where such facility has been made available. This mode of payment of refunds would be subject to availability of complete bank account details including the MICR code as appearing on a cheque leaf, from the Depositories. The payment of refunds is mandatory for applicants having a bank account at any of the 382

abovementioned centres, except where the applicant, being eligible, opts to receive refund through direct credit or RTGS. 2. Direct Credit Applicants having bank accounts with the Refund Bank (s), as mentioned in the Bid cum Application Form, shall be eligible to receive refunds through direct credit. Charges, if any, levied by the Refund Bank(s) for the same would be borne by our Company. RTGS Applicants having a bank account at any of the abovementioned centres and whose refund amount exceeds ` 5 million, have the option to receive refund through RTGS. Such eligible applicants who indicate their preference to receive refund through RTGS are required to provide the IFSC code in the Bid cum Application Form. In the event the same is not provided, refund shall be made through NECS. Charges, if any, levied by the Refund Bank(s) for the same would be borne by our Company. Charges, if any, levied by the applicants bank receiving the credit would be borne by the applicant. NEFT Payment of refund shall be undertaken through NEFT wherever the applicants bank has been assigned the Indian Financial System Code (IFSC), which can be linked to a Magnetic Ink Character Recognition (MICR), if any, available to that particular bank branch. IFSC Code will be obtained from the website of RBI as on a date immediately prior to the date of payment of refund, duly mapped with MICR numbers. Wherever the applicants have registered their nine digit MICR number and their bank account number while opening and operating the demat account, the same will be duly mapped with the IFSC Code of that particular bank branch and the payment of refund will be made to the applicants through this method. The process flow in respect of refunds by way of NEFT is at an evolving stage and hence use of NEFT is subject to operational feasibility, cost and process efficiency. The process flow in respect of refunds by way of NEFT is at an evolving stage, hence use of NEFT is subject to operational feasibility, cost and process efficiency. In the event that NEFT is not operationally feasible, the payment of refunds would be made through any one of the other modes as discussed in the sections. For all other applicants, including those who have not updated their bank particulars with the MICR code, the refund orders will be despatched under certificate of posting for value upto ` 1,500 and through Speed Post/ Registered Post for refund orders of ` 1,500 and above. Such refunds will be made by cheques, pay orders or demand drafts drawn on the Escrow Collection Banks and payable at par at places where Bids are received. Bank charges, if any, for cashing such cheques, pay orders or demand drafts at other centres will be payable by the Bidders.

3.

4.

5.

Mode of making refunds for ASBA Bidders In case of ASBA Bidders, the Registrar shall instruct the relevant SCSB to unblock the funds in the relevant ASBA Account to the extent of the Bid Amount specified in the ASBA Bid cum Application Forms for withdrawn, rejected or unsuccessful or partially successful ASBA Bids within 12 Working Days of the Bid/Issue Closing Date. DISPOSAL OF APPLICATIONS AND APPLICATION MONEYS AND INTEREST IN CASE OF DELAY With respect to Bidders other than ASBA Bidders, our Company shall ensure dispatch of Allotment advice, refund orders (except for Bidders who receive refunds through electronic transfer of funds) and give benefit to the beneficiary account with Depository Participants and submit the documents pertaining to the Allotment to the Stock Exchanges within two Working Days of the date of allotment of Equity Shares. In case of applicants who receive refunds through NECS, direct credit or RTGS, the refund instructions will be given to the clearing system within 12 Working Days from the Bid/ Issue Closing Date. A suitable communication shall be sent to the Bidders receiving refunds through this mode within 12 Working Days of Bid/ Issue Closing Date, giving details of the bank where refunds shall be credited along with amount and expected date of electronic credit of refund. Our Company shall use best efforts to ensure that all steps for completion of the necessary formalities for listing and commencement of trading at all the Stock Exchanges where the Equity Shares are proposed to be listed, are taken within 12 Working Days of the Bid/Issue Closing Date. 383

In accordance with the Companies Act, the requirements of the Stock Exchanges and the SEBI Regulations, our Company further undertakes that: Allotment of Equity Shares shall be made only in dematerialised form within 12 Working Days of the Bid/Issue Closing Date; and With respect to Bidders other than ASBA Bidders, dispatch of refund orders or in a case where the refund or portion thereof is made in electronic manner, the refund instructions are given to the clearing system within 12 Working Days of the Bid/Issue Closing Date would be ensured. With respect to the ASBA Bidders, instructions for unblocking of the ASBA Bidders Bank Account shall be made within 15 days from the Bid/Issue Closing Date. Our Company shall pay interest at 15% p.a. for any delay beyond the 12 Working Days from the Bid/Issue Closing Date as mentioned above, if Allotment is not made and refund orders are not dispatched or if, in a case where the refund or portion thereof is made in electronic manner, the refund instructions have not been given to the clearing system in the disclosed manner and/or demat credits are not made to investors within the 12 Working Days prescribed above. If such money is not repaid within eight days from the day our Company becomes liable to repay, our Company and every Director of our Company who is an officer in default shall, on and from expiry of eight days, be jointly and severally liable to repay the money with interest as prescribed under the applicable law.

IMPERSONATION Attention of the applicants is specifically drawn to the provisions of sub-section (1) of Section 68 A of the Companies Act, which is reproduced below: Any person who: (a) makes in a fictitious name, an application to a company for acquiring or subscribing for, any shares therein, or otherwise induces a company to allot, or register any transfer of shares, therein to him, or any other person in a fictitious name,

(b)

shall be punishable with imprisonment for a term which may extend to five years. BASIS OF ALLOTMENT A. For Retail Individual Bidders Bids received from the Retail Individual Bidders at or above the Issue Price shall be grouped together to determine the total demand under this category. The Allotment to all the successful Retail Individual Bidders will be made at the Issue Price. The Net Issue size less Allotment to Non-Institutional and QIB Bidders shall be available for Allotment to Retail Individual Bidders who have Bid in the Issue at a price that is equal to or greater than the Issue Price. If the aggregate demand in this category is less than or equal to [] Equity Shares at or above the Issue Price, full Allotment shall be made to the Retail Individual Bidders to the extent of their valid Bids. If the aggregate demand in this category is greater than [] Equity Shares at or above the Issue Price, the Allotment shall be made on a proportionate basis up to a minimum of [] Equity Shares. 384

For the method of proportionate Basis of Allotment, refer below. B. For Non-Institutional Bidders Bids received from Non-Institutional Bidders at or above the Issue Price shall be grouped together to determine the total demand under this category. The Allotment to all successful NonInstitutional Bidders will be made at the Issue Price. The Net Issue size less Allotment to QIBs and Retail shall be available for Allotment to NonInstitutional Bidders who have Bid in the Issue at a price that is equal to or greater than the Issue Price. If the aggregate demand in this category is less than or equal to [] Equity Shares at or above the Issue Price, full Allotment shall be made to Non-Institutional Bidders to the extent of their demand. In case the aggregate demand in this category is greater than [] Equity Shares at or above the Issue Price, Allotment shall be made on a proportionate basis up to a minimum of [] Equity Shares. For the method of proportionate Basis of Allotment refer below.

C.

For QIBs (other than Anchor Investors) Bids received from the QIB Bidders at or above the Issue Price shall be grouped together to determine the total demand under this portion. The Allotment to all the successful QIB Bidders will be made at the Issue Price. The QIB Portion shall be available for Allotment to QIB Bidders who have Bid in the Issue at a price that is equal to or greater than the Issue Price. Allotment shall be undertaken in the following manner: (a) In the first instance allocation to Mutual Funds for up to 5% of the QIB Portion (excluding Anchor Investor Portion) shall be determined as follows: (i) In the event that Bids by Mutual Fund exceeds 5% of the QIB Portion (excluding Anchor Investor Portion), allocation to Mutual Funds shall be done on a proportionate basis for up to 5% of the QIB Portion (excluding Anchor Investor Portion). In the event that the aggregate demand from Mutual Funds is less than 5% of the QIB Portion (excluding Anchor Investor Portion) then all Mutual Funds shall get full Allotment to the extent of valid Bids received above the Issue Price. Equity Shares remaining unsubscribed, if any, not allocated to Mutual Funds shall be available for Allotment to all QIB Bidders as set out in (b) below;

(ii)

(iii) (b)

In the second instance Allotment to all QIBs shall be determined as follows: (i) In the event that the oversubscription in the QIB Portion (excluding Anchor Investor Portion), all QIB Bidders who have submitted Bids above the Issue Price shall be allotted Equity Shares on a proportionate basis for up to 95% of the QIB Portion. Mutual Funds, who have received allocation as per (a) above, for less than the number of Equity Shares Bid for by them, are eligible to receive Equity Shares 385

(ii)

on a proportionate basis along with other QIB Bidders (excluding Anchor Investor Portion). (iii) Under-subscription below 5% of the QIB Portion (excluding Anchor Investor Portion), if any, from Mutual Funds, would be included for allocation to the remaining QIB Bidders on a proportionate basis.

D.

The aggregate Allotment to QIB Bidders shall not be less than [] Equity Shares.

For Employee Reservation Portion The Bid must be for a minimum of [] Equity Shares and in multiples of [] Equity Shares thereafter, so as to ensure that the Bid Amount payable by the Eligible Employees does not exceed ` 100,000. The Allotment in the Employee Reservation Portion will be on a proportionate basis. Bidders under the Employee Reservation Portion may Bid at Cut-off Price. Bids received from the Eligible Employees at or above the Issue Price shall be grouped together to determine the total demand under this category. The allocation to all the successful Eligible Employees will be made at the Issue Price. If the aggregate demand in this category is less than or equal to [] Equity Shares at or above the Issue Price, full allocation shall be made to the Employees to the extent of their demand. Under subscription, if any, in the Employee Reservation Portion will be added back to the Net Issue. If the aggregate demand in this category is greater than [] Equity Shares at or above the Issue Price, the allocation shall be made on a proportionate basis up to a minimum of [] Equity Shares and in multiple of one Equity Share thereafter. For the method of proportionate basis of allocation, refer below. Only Eligible Employees can apply under Employee Reservation Portion.

E.

For Anchor Investor Portion Allocation of Equity Shares to Anchor Investors at the Anchor Investor Issue Price will be at the discretion of our Company, in consultation with the BRLMs, subject to compliance with the following requirements: (a). (b). not more than 30% of the QIB Portion will be allocated to Anchor Investors; one-third of the Anchor Investor Portion shall be reserved for domestic Mutual Funds, subject to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is being done to other Anchor Investors; allocation to Anchor Investors shall be on a discretionary basis and subject to a minimum number of two Anchor Investors for allocation upto ` 2,500 million and minimum number of five Anchor Investors for allocation more than ` 2,500 million.

(c).

The number of Equity Shares Allotted to Anchor Investors and the Anchor Investor Issue Price, shall be made available in the public domain by the BRLMs before the Bid/ Issue Opening Date by intimating the same to the Stock Exchanges.

Method of Proportionate Basis of Allotment in the Issue Except in relation to Anchor Investors, in the event of the Issue being over-subscribed, our Company shall finalise the Basis of Allotment in consultation with the Designated Stock Exchange. The executive director (or any other 386

senior official nominated by them) of the Designated Stock Exchange along with the BRLMs and the Registrar shall be responsible for ensuring that the Basis of Allotment is finalised in a fair and proper manner. The Allotment shall be made in marketable lots, on a proportionate basis as explained below: a) b) Bidders will be categorised according to the number of Equity Shares applied for. The total number of Equity Shares to be Allotted to each category as a whole shall be arrived at on a proportionate basis, which is the total number of Equity Shares applied for in that category (number of Bidders in the category multiplied by the number of Equity Shares applied for) multiplied by the inverse of the over-subscription ratio. Number of Equity Shares to be Allotted to the successful Bidders will be arrived at on a proportionate basis, which is total number of Equity Shares applied for by each Bidder in that category multiplied by the inverse of the over-subscription ratio. In all Bids where the proportionate Allotment is less than [] Equity Shares per Bidder, the Allotment shall be made as follows: The successful Bidders out of the total Bidders for a category shall be determined by draw of lots in a manner such that the total number of Equity Shares Allotted in that category is equal to the number of Equity Shares calculated in accordance with (b) above; and Each successful Bidder shall be Allotted a minimum of [] Equity Shares.

c)

d)

e)

If the proportionate Allotment to a Bidder is a number that is more than [] but is not a multiple of one (which is the marketable lot), the decimal would be rounded off to the higher whole number if that decimal is 0.5 or higher. If that number is lower than 0.5 it would be rounded off to the lower whole number. Allotment to all in such categories would be arrived at after such rounding off. If the Equity Shares allocated on a proportionate basis to any category are more than the Equity Shares Allotted to the Bidders in that category, the remaining Equity Shares available for Allotment shall be first adjusted against any other category, where the Allotted Equity Shares are not sufficient for proportionate Allotment to the successful Bidders in that category. The balance Equity Shares, if any, remaining after such adjustment will be added to the category comprising Bidders applying for minimum number of Equity Shares. Subject to valid Bids being received, allocation of Equity Shares to Anchor Investors shall be at the sole discretion of our Company, in consultation with the BRLMs.

f)

g)

Illustration of Allotment to QIBs and Mutual Funds (MF) A. Issue Details Sr. No. 1. 2. 3. 4. Particulars Issue size Allocation to QIB* Anchor Investor Portion Portion available to QIBs other than Anchor Investors [(2) minus (3)] Of which: a. Allocation to MF (5%) b. Balance for all QIBs including MFs No. of QIB applicants 387 Issue details 2,000 million equity shares 1,000 million equity shares 300 million equity shares 700 million equity shares

5.

35 million equity shares 665 million equity shares 10

Sr. No.
*

6.

Particulars No. of shares applied for

Issue details 5,000 million equity shares

Where 50% of the issue size is required to be allotted to QIBs.

B.

Details of QIB Bids Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Type of QIB bidders# A1 A2 A3 No. of shares bid for (in million) 500 200 1,300 500 500 400 400 800 200 200 5,000

A4 A5 MF1 MF2 MF3 MF4 MF5 Total # A1-A5: (QIB bidders other than MFs), MF1-MF5 (QIB bidders which are Mutual Funds) C. Details of Allotment to QIB Bidders/ Applicants Type of QIB bidders (I) A1 A2 A3 A4 A5 MF1 MF2 MF3 MF4 MF5 Shares bid for (II) 500 200 1,300 500 500 400 400 800 200 200 5,000 Allocation of 35 million Equity Shares to MF proportionately (please see note 2 below) (III) 0 0 0 0 0 7 7 14 3.50 3.50 35

(Number of equity shares in million) Allocation of balance 665 Aggregate million Equity Shares to QIBs allocation to proportionately (please see MFs note 4 below) (IV) (V) 66.50 26.60 172.90 66.50 66.50 53.20 53.20 106.40 26.60 26.60 665 0 0 0 0 0 60.20 60.20 120.40 30.10 30.10 301

Please note: 1. 2. The illustration presumes compliance with the requirements specified in this Draft Red Herring Prospectus in Issue Structure on page 355. Out of 700 million equity shares allocated to QIBs, 35 million (i.e. 5%) will be allocated on proportionate basis among five Mutual Fund applicants who applied for 2000 million equity shares in QIB category. The balance 665 million equity shares (i.e. 700 - 35 (available for MFs)) will be allocated on proportionate basis among 10 QIB applicants who applied for 5000 million equity shares 388

3.

(including five MF applicants who applied for 2000 million equity shares). 4. The figures in the fourth column entitled Allocation of balance 665 million Equity Shares to QIBs proportionately in the above illustration are arrived as under: For QIBs other than Mutual Funds (A1 to A5) = No. of shares bid for (i.e. in column II) X 665 / 4,965. For Mutual Funds (MF1 to MF5)= [(No. of shares bid for (i.e. in column II of the table above) less Equity Shares allotted ( i.e., column III of the table above)] X 665 / 4,965. The numerator and denominator for arriving at allocation of 84 million shares to the 10 QIBs are reduced by 35 million shares, which have already been allotted to Mutual Funds in the manner specified in column III of the table above.

Letters of Allotment or Refund Orders or instructions to the SCSBs Our Company shall give credit to the beneficiary account with depository participants within 12 Working Days from the Bid/Issue Closing Date. Applicants residing at the centres where clearing houses are managed by the RBI, will get refunds through NECS only except where applicant is otherwise disclosed as eligible to get refunds through direct credit and RTGS. Our Company shall ensure dispatch of refund orders, if any, of value up to ` 1,500, by Under Certificate of Posting, and shall dispatch refund orders above ` 1,500, if any, by registered post or speed post at the sole or First Bidders sole risk within 12 Working Days of the Bid/Issue Closing Date. Bidders to whom refunds are made through electronic transfer of funds will be sent a letter through ordinary post, intimating them about the mode of credit of refund within 12 Working Days of the Bid/ Issue Closing Date. In case of ASBA Bidders, the Registrar shall instruct the relevant SCSBs to unblock the funds in the relevant ASBA Account to the extent of the Bid Amount specified in the ASBA Bid cum Application Forms for withdrawn, rejected or unsuccessful or partially successful ASBA Bids within 12 Working Days of the Bid/Issue Closing Date. Interest in case of delay in despatch of Allotment Letters or Refund Orders/ instruction to the SCSBs by the Registrar. Our Company agrees that (i) Allotment of Equity Shares; and (ii) credit to the successful Bidders depositary accounts will be completed within 12 Working Days of the Bid/ Issue Closing Date. Our Company further agrees that it shall pay interest at the rate of 15% p.a. if the Allotment letters or refund orders have not been despatched to the applicants or if, in a case where the refund or portion thereof is made in electronic manner, the refund instructions have not been given in the disclosed manner within 15 days from the Bid/ Issue Closing Date. Our Company will provide adequate funds required for dispatch of refund orders or Allotment advice to the Registrar. Refunds will be made by cheques, pay-orders or demand drafts drawn on a bank appointed by our Company as a Refund Bank and payable at par at places where Bids are received. Bank charges, if any, for encashing such cheques, pay orders or demand drafts at other centres will be payable by the Bidders. UNDERTAKINGS BY OUR COMPANY Our Company undertakes the following: That the complaints received in respect of this Issue shall be attended to by our Company expeditiously and satisfactorily; That all steps for completion of the necessary formalities for listing and commencement of trading at all the Stock Exchanges where the Equity Shares are proposed to be listed within 12 Working Days of the Bid/Issue Closing Date; 389

That funds required for making refunds to unsuccessful applicants as per the mode(s) disclosed shall be made available to the Registrar by the Issuer; That where refunds are made through electronic transfer of funds, a suitable communication shall be sent to the applicant within 15 days of the Bid/ Issue Closing Date, as the case may be, giving details of the bank where refunds shall be credited along with amount and expected date of electronic credit of refund; That the certificates of the securities/ refund orders to Eligible NRIs shall be despatched within specified time; That no further issue of Equity Shares shall be made till the Equity Shares offered through the Red Herring Prospectus are listed or until the Bid monies are refunded on account of non-listing, under-subscription etc.; That adequate arrangements shall be made to collect all ASBA Bid cum Application Forms and to consider them similar to non-ASBA applications while finalising the Basis of Allotment; and That our Company shall make an application as per applicable law and regulations in advance for the listing of Equity Shares on the conversion of bonds

Our Company shall not have recourse to the Issue Proceeds until the final approval for listing and trading of the Equity Shares from all the Stock Exchanges where listing is sought, has been received. Withdrawal of the Issue Our Company, in consultation with the BRLMs, reserves the right not to proceed with the Issue anytime after the Bid/Issue Opening Date but before the Allotment of Equity Shares. In such an event, our Company would issue a public notice in the newspapers, in which the pre-Issue advertisements were published, within two days of the Bid/ Issue Closing Date, providing reasons for not proceeding with the Issue. The BRLMs, through the Registrar to the Issue, shall notify the SCSBs to unblock the bank accounts of the ASBA Bidders within one day from the day of receipt of such notification. Our Company shall also inform the same to Stock Exchanges on which the Equity Shares are proposed to be listed. Any further issue of Equity Shares by our Company shall be in compliance with applicable laws. Utilisation of Issue proceeds The Board of Directors certify that: all monies received out of the Issue shall be credited/transferred to a separate bank account other than the bank account referred to in sub-section (3) of Section 73 of the Companies Act; details of all monies utilised out of Issue shall be disclosed, and continue to be disclosed till the time any part of the issue proceeds remains unutilised, under an appropriate head in our balance sheet indicating the purpose for which such monies have been utilised; details of all unutilised monies out of the Issue, if any shall be disclosed under an appropriate separate head in the balance sheet indicating the form in which such unutilised monies have been invested; the utilisation of monies received under the Employee Reservation Portion shall be disclosed, and continue to be disclosed till the time any part of the Issue proceeds remains unutilised, under an appropriate head in the balance sheet of our Company indicating the purpose for which such monies have been utilised; and

the details of all unutilised monies out of the funds received under the Employee Reservation Portion shall be disclosed under a separate head in the balance sheet of the issuer indicating the form in which such unutilised monies have been invested. 390

RESTRICTION ON FOREIGN OWNERSHIP OF INDIAN SECURITIES Foreign investment in Indian securities is regulated through the Industrial Policy, 1991 of the Government of India and FEMA. While the Industrial Policy, 1991 prescribes the limits and the conditions subject to which foreign investment can be made in different sectors of the Indian economy, FEMA regulates the precise manner in which such investment may be made. Under the Industrial Policy, unless specifically restricted, foreign investment is freely permitted in all sectors of Indian economy up to any extent and without any prior approvals, but the foreign investor is required to follow certain prescribed procedures for making such investment. Foreign investment limit is allowed up to 100% under automatic route in the Company. FIIs are permitted to subscribe to shares of an Indian company in a public offer without the prior approval of the RBI, so long as the price of the equity shares to be issued is not less than the price at which the equity shares are issued to residents. The transfer of shares between an Indian resident and a non-resident does not require the prior approval of the FIPB or the RBI, provided that (i) the activities of the investee company are under the automatic route under the foreign direct investment (FDI) Policy and transfer does not attract the provisions of the SEBI (Substantial Acquisition of Shares and Takeovers) Regulations, 1997 (ii) the non-resident shareholding is within the sectoral limits under the FDI policy; and (iii) the pricing is in accordance with the guidelines prescribed by the SEBI/RBI. As per the existing policy of the Government of India, OCBs cannot participate in this Issue. Foreign Investment in the Real Estate Sector Foreign investment in the real estate sector is regulated by the relevant provisions of the FDI Manual dated November 2005, FEMA Regulations, and the Consolidated FDI Policy issued by the Secretariat for Industrial Assistance, GoI. Investments by NRIs FDI Manual Item No. 9 of Annexure II to the said FDI Manual outlines the sectoral caps in relation to Housing and Real Estate. Annexure II specifies the following as activities under the automatic route in which investment is permitted only by NRIs: (a). (b). (c). (d). (e). (f). (g). Development of serviced plots and construction of built up residential premises; Investment in real estate covering construction of residential and commercial premises including business centres and offices; Development of townships; City and regional level urban infrastructure facilities, including both roads and bridges; Investment in manufacture of building materials, which is also open to FDI; Investment in participatory ventures in (a) to (e) above; Investment in housing finance institutions, which is also open to FDI as an NBFC.

FEMA Regulations The FEMA Regulations, state that the investment cap in the real estate on the activities in the Housing and Real Estate is permit investment to the extent of 100% only by NRIs in the following specified areas: 391

I. II. III. IV. V. VI. VII.

Development of serviced plots and construction of built up residential premises; Investment in real estate covering construction of residential and commercial premises including business centres and offices; Development of townships; City and regional level urban infrastructure facilities, including both roads and bridges; Investment in manufacture of building materials, which is also open to FDI; Investment in participatory ventures in (a) to (c) above; Investment in housing finance institutions, which is also open to FDI as an NBFC.

However, all other forms of FDI are prohibited in relation to Housing and Real Estate Business. Consolidated FDI Policy The law in relation to investment in the real estate sector has been provided in the Consolidated FDI Policy dated March 31, 2010 issued by the Department of Industrial Policy and Promotion, Ministry of Commerce and Industry, Government of India. Under the Consolidated FDI Policy, FDI up to 100% under the automatic route is allowed in townships, housing, built-up infrastructure and construction-development projects (which would include, but not be restricted to, housing, commercial premises, hotels, resorts, hospitals, educational institutions, recreational facilities, city and regional level infrastructure), subject to the compliance with the following requirements. (a). Minimum area to be developed under each project is as under: (i). (ii). (iii). (b). In case of development of serviced housing plots, a minimum land area of 10 hectares; In case of construction-development projects, a minimum built up area of 50,000 square metres; In case of a combination project, anyone of the above two conditions would suffice.

Minimum capitalisation of US$ 10 million for wholly owned subsidiaries and US$ 5 million for joint ventures with Indian partners. The funds are to be brought in within six months of commencement of business of the Company. Original investment is not to be repatriated before a period of three years from completion of minimum capitalization. The investor is to be permitted to exit earlier with prior approval of the Government through the FIPB. At least 50% of the project must be developed within a period of five years from the date of obtaining all statutory clearances. The investor would not be permitted to sell undeveloped plots. Undeveloped plots will mean where roads, water supply, street lighting, drainage, sewerage and other conveniences as applicable under prescribed regulations have not been made available. The State Government/Municipal Local Body concerned, which approves the building/development plans, would monitor compliance of the above conditions by the developer.

(c).

(d).

(e).

Therefore applicable law only permits investment by an NRI under the automatic route in the Housing and Real Estate sector up to 100% in relation to townships, housing, built-up infrastructure and construction-development projects (which would include, but not be restricted to, housing, commercial premises, hotels, resorts, hospitals, 392

educational institutions, recreational facilities, city and regional level infrastructure) and additionally permits up to 100% FDI in the Housing and Real Estate subject to compliance with the terms provided in the Consolidated FDI Policy. Investments by FIIs FIIs including institutions such as pension funds, investment trusts, asset management companies, nominee companies and incorporated, institutional portfolio managers can invest in all the securities traded on the primary and secondary markets in India. FIIs are required to obtain an initial registration from SEBI and a general permission from the RBI to engage in transactions regulated under FEMA. FIIs must also comply with the provisions of the SEBI (Foreign Institutional Investors) Regulations, 1995, as amended from time to time. The initial registration and the RBIs general permission together enable the registered FII to buy (subject to the ownership restrictions discussed below) and sell freely securities issued by Indian companies, to realise capital gains or investments made through the initial amount invested in India, to subscribe or renounce rights issues for shares, to appoint a domestic custodian for custody of investments held and to repatriate the capital, capital gains, dividends, income received by way of interest and any compensation received towards sale or renunciation of rights issues of shares. By way of Circular No. 53 dated December 17, 2003, the RBI has permitted FIIs to subscribe to shares of an Indian company in a public offer without the prior approval of the RBI, so long as the price of the equity shares to be issued is not less than the price at which the equity shares are issued to residents. Transfers of equity shares previously required the prior approval of the FIPB. However, vide a RBI circular dated October 4, 2004 issued by the RBI, the transfer of shares between an Indian resident and a non-resident does not require the prior approval of the FIPB or the RBI, provided that (i) the activities of the investee company are under the automatic route under the foreign direct investment (FDI) Policy and transfer does not attract the provisions of the Takeover Code (ii) the non-resident shareholding is within the sectoral limits under the FDI policy, and (iii) the pricing is in accordance with the guidelines prescribed by the SEBI/RBI. Press Note 2 and Press Note 4 (2006 series) are not applicable to foreign investment under the portfolio investment scheme by FIIs under Schedule II of the Foreign Exchange Management (Transfer or Issue of Security by a Person Resident outside India) Regulations, 2000, as amended from time to time. The Company is eligible to issue Shares to FIIs under the portfolio investment scheme, covered under notification FEMA No. 20/2000-RB dated May 3, 2000 and subsequent amendments thereto. Pursuant to the Portfolio Investment Scheme, FII registered with the SEBI may buy or sell securities of Indian companies on stock exchanges in India through registered stock brokers. FIIs are also permitted to purchase shares and convertible debentures of an Indian company, subject to the specified percentage limits. The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other jurisdiction outside India and may not be offered or sold, and Bids may not be made by persons in any such jurisdiction, except in compliance with the applicable laws of such jurisdiction. The Equity Shares have not been and will not be registered under the Securities Act, or any state securities laws of the United States and may not be offered or sold in the United States except pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act. Accordingly, the Equity Shares are being offered and sold (1) in the United States only to qualified institutional buyers (as defined in Rule 144A under the Securities Act) in transactions exempt from, or not subject to the registration requirements of the Securities Act and (2) outside the United States in offshore transactions in reliance on Regulation S under the Securities Act. The above information is given for the benefit of the Bidders. The Company and the BRLMs are not liable for any amendments or modification or changes in applicable laws or regulations, which may occur after the date of this Red Herring Prospectus. Bidders are advised to make their independent investigations and ensure that the number of Equity Shares Bid for do not exceed the applicable limits under laws or regulations.

393

MAIN PROVISIONS OF THE ARTICLES OF ASSOCIATION Capitalized terms used in this section have the meaning that has been given to such terms in the Articles of Association of our Company. Pursuant to Schedule II of the Companies Act and the SEBI Regulations, the main provisions of the Articles of Association of our Company are detailed below: Authorised Share Capital Article 3 provides that the Authorised Share Capital of the Company is ` 865,00,00,000/- (Rupees Eight Hundred Sixty Five Crores only) divided into 80,00,00,000 (Eighty Crores) Equity Shares of `10/- (Rupees Ten only) each, 4,00,00,000 (Four Crores) 6% Redeemable Preference Shares of `10/- (Rupees Ten only) each and 2,50,00,000 (Two Crores Fifty Lacs), 0.001% Compulsory Convertible Preference Shares of `10/- (Rupees Ten only) each. Article 4 provides that, the Company shall have the power to increase or reduce the capital for the time being of the Company and to divide the shares in the capital into several classes with rights, privileges or conditions as may be determined. The Company may issue preference shares, which shall, or at the option of the Company shall be liable to be redeemed. Article 5 provides that subject to the provisions of the Act and all other applicable provisions of law, the Company may issue equity shares with differential rights as to dividend, voting or otherwise. Increase, reduction and alteration in capital Article 71(a) provides that the Company may from time to time in General Meeting increase its share capital by creation of new shares of such amount as it thinks expedient. In addition, Article 71(b) provides that subject to the provisions of the Act, the new shares shall be issued upon such terms and conditions and with such rights and privileges annexed thereto as by the General Meeting creating the same shall be directed and if no direction be given as the Directors shall determine; and in particular such shares may be issued with a preferential or qualified right to dividends and in distribution of assets of the Company and any Preference Shares may be issued on the terms that they are or at the option of the Company to be liable to be redeemed. Article 74 provides that (1) The Company shall not have the power to buy its own shares unless the consequent reduction of capital is effected and sanctioned in pursuance of Article 76 or in pursuance of Sections 100 to 104 or Section 402 or other applicable provisions (if any) of the Act. (a) Notwithstanding anything to the contrary contained in this Articles of Association of the Company shall have the power, subject to and in accordance with all applicable provisions of the Act and/or any reenactment for the time being in force, to purchase any of its own fully paid shares and may either reissue or cancel the same. (2) Except to the extent permitted by Section 77 or other applicable provisions (if any) of the Act, the Company shall not give whether directly or indirectly and whether by means of a loan, guarantee, the provisions of security or otherwise any financial assistance for the purpose of, or in connection with the purchase or subscription made or to be made by any person of or for any shares in the Company. (3) Nothing in this Article shall affect the right of the Company to redeem any Redeemable Preference Shares issued under Section 80 or other relevant provisions (if any) of the Act or of any previous Companies Act. Article 76 provides that subject to confirmation by the Court in pursuance of Sections 101 to 104, the Company may from time to time by Special Resolution reduce its share capital in any way and in particular and without prejudice to the generally of the foregoing powers. (a) extinguish or reduce the liability on any of its shares in respect of share capital not paid up. 394

(b) either with or without extinguishing or reducing liability on any of its share cancel any paid-up share capital which is lost or is unrepresented by available assets, or (c) either with or without extinguishing or reducing liability on any of its shares, pay off any paid-up share capital which is in excess of the wants of the Company. (d) and may, if so far as is necessary, alter its Memorandum by reducing the amount of its share capital and of its shares accordingly. Article 77 provides that the Company may in General Meeting alter the conditions of its Memorandum as follows:(a) Consolidate and divide all or any of its share capital into shares of larger amounts than its existing shares. (b) Sub-divide its shares or any of them into shares of smaller amounts than originally fixed by the Memorandum so however, that in the sub-division, the proportion between the amount paid and the amount, if any, unpaid on each reduced share shall be the same as it was in the case of the share from which the reduced share is derived. (c) Cancel shares which at the date of such General Meeting have not been taken or agreed to be taken by any person and diminish the amount of its share capital by the amount of the shares so cancelled. Article 72(1) provides that where at any time after the expiry of two years from the formation of the company or at any time after the expiry of one year from the allotment of shares in the company made for the first time after its formation, whichever is earlier, it is proposed to increase the subscribed capital of the Company by the allotment of further shares, then: (a) such further shares shall be offered to the persons who, at the date of the offer, are holders of the equity shares of the Company, in proportion, as nearly as circumstances admit, to the capital paid up on those shares at that date; (b) the offer aforesaid shall be made by notice specifying the number of shares offered and limiting a time not being less than thirty days from the date of the offer within which the offer, if not accepted, will be deemed to have been declined. (c) the offer aforesaid shall be deemed to include a right exercisable by the person concerned to renounce the shares offered to him or any of them in favour of any other person; and the notice referred to in Sub-Clause(b) shall contain a statement of this right; (d) after the expiry of the time specified in the notice aforesaid, or on receipt of earlier intimation from the person to whom such notice is given that he declines to accept the shares offered, the Board of Directors may dispose of them in such manner as they think most beneficial to the Company. In addition, the proviso to Article 72 provides that the terms of issue of such debentures or the terms of such loans include a term providing for such option and such term: (a) Either has been approved by the Central Government before the issue of the debentures or the raising of the loans or is in conformity with Rules, if any, made by the Government in this behalf; and (b) In the case of debentures or loans other than debentures issued to or loans obtained from Government or any institution specified by the Central Government in this behalf, has also been approved by a special resolution passed by the Company in General Meeting before the issue of the debentures or raising of the loans. Payment of commission and brokerage

395

Article 15(1) provides that the Company may exercise the powers of paying commissions conferred by Section 76, provided that the rate per cent, or the amount of the commission paid or agreed to be paid shall be disclosed in the manner required by that section. Article 15(2) provides that subject to the provisions of the Section 76 of the Act the rate of commission shall not exceed the rate of five per cent of the price at which the shares in respect whereof the same is paid are issued or an amount equal to five percent of such price, as the case may be and in case of debentures two and half per cent of the price at which debentures are issued. In addition, Article 15(4) provides that the Company may also pay such brokerage as may be lawful on any issue of shares or debentures. Calls Article 20 provides that the Board may, from time to time, make such calls on uniform basis, as it thinks fit, upon the members in respect of all moneys unpaid on the shares (whether on account of the nominal value of the shares or by way of premium) held by them and not by conditions of allotments thereof made payable at fixed time and each such member shall pay the amount of every call so made on him to the person and at the time and place appointed by the Board. A call may be made payable by installments. Article 22 (2) provides that not less than 14 days notice of any call shall be given specifying the place and time of payment and to whom such call shall be paid provided that Board may subject to section 91of the Act, by notice in writing to a member, revoke the call or extend the time for payment thereof. Article 23 provides that if by the terms of issue of any share or otherwise any amount is made payable at any fixed time or by the installments at fixed times, whether on account or the amount of installment shall be payable as if it were a call duly made by the Board and of which due notice had been given and all provision herein contained in respect of calls for future or otherwise shall relate to such amount or installment accordingly. Article 24 provides that if the sum payable in respect of any call or installment be not paid on or before the day appointed for payment thereof the holder for the time being of the share in respect of which the call shall have been made or the installment shall be due, shall pay interest for the same at the rate of 9 (nine) percent per annum (or at such other rate as the Board may determine) from the appointed date for the payment thereof to the time of actual payment but the Board shall be at liberty to waive payment of the interest wholly or in part. Article 25 provides that the Directors may, if they think fit, subject to the provisions of Section 92 of the Act agree to and receive from any member willing to advance the same, all or any part of the money due upon the shares held by him beyond the sums actually called for and upon the money so paid or satisfied in advance, or so much thereof, as from time to time exceeds the amount of the calls then made upon the shares in respect of which such advance has been made, the Company may pay interest at such rate as the member paying such sum in advance and the Directors agree upon provided that the money so paid in advance of calls shall not confer a right to participate in profits or dividend. The Directors may at any time repay the amount so advanced. The members shall not be entitled to any voting rights in respect of the moneys so paid by him until the same would but for such payment, become presently payable. Forfeiture, surrender and lien Article 26 provides that if any member fails to pay the whole or any part of any call or instalment or any money due in respect of any shares either by way of principal or interest on or before the day appointed for the payment of the same the Directors may at any time thereafter during such time as the call or instalment or any part thereof or other moneys remain unpaid or a judgement or decree in respect thereof remains unsatisfied in whole or in part serve a notice on such member or on the person (if any) entitled to the share by transmission requiring him to pay such call or instalment or such part thereof or other moneys as remain unpaid together with any interest that may have accrued and all expenses (legal or otherwise) that may have been incurred by the Company by reason of such nonpayments. 396

In addition, Article 28 provides that if the requirement of any such notice as aforesaid shall not be complied with, any of the shares in respect of which such notice has been given, may at any time thereafter before payment of all calls or instalments, interest and expenses or other moneys due in respect thereof, be forfeited by a resolution of the Directors to that effect. Such forfeiture shall include all dividends declared in respect of the forfeited shares and not actually paid before the forfeiture. Article 30 provides that Any shares so forfeited shall be deemed to be the property of the Company and may be sold, re-allotted or otherwise disposed of either to the original holder thereof, or to any other person, upon such terms and in such manner as the Directors shall think fit. Article 31 provides that the Directors at any time before any share so forfeited shall have been sold, re-allotted or otherwise disposed off annul the forfeiture thereof upon conditions as they think fit. Article 34 provides that the Company shall have a first and paramount lien upon all the shares / debentures (other than fully paid-up shares / debentures) registered in the name of each member (whether solely or jointly with others) and upon the proceeds of sale thereof for all moneys (whether presently payable or not) called or payable at a fixed time in respect of such shares / debentures and no equitable interest in any share shall be created except upon the footing and condition that this Article will have full effect and such lien shall extend to all dividends and bonuses from time to time declared in respect of such shares / debentures. Unless otherwise agreed the registration of a transfer of shares/debentures shall operate as a waiver of the companys lien if any, on such shares/debentures. The Directors may at any time declare any shares/debentures wholly or in part to be exempt from the provisions of this clause. Article 35 provides that for the purpose of enforcing such lien the Board of Directors may sell the shares subject thereto in such manner as they think fit, but no sale shall be made unless a sum in respect of which the lien exists is presently payable and until notice in writing of the intention to sell shall have been served on such members, his executors or administrators or his committee, curator bonis or other legal representatives as the case may be and default shall have been made by him or them in the payment of the sum payable as aforesaid for seven days after the date of such notice. Transfer and transmission of shares Article 39 provides that the instrument of transfer shall be in writing and all provisions of section 108 of the Act and statutory modifications thereof for the time being shall be duly complied with in respect of all transfer of shares and registration thereof. Article 48 provides that All instrument of transfer, which shall be registered, shall be retained by the Company, but any instrument of transfer which the Board may decline to register shall be returned to the person depositing the same. Subject to the provisions of Section 111A of the Act, these Articles and other applicable provisions of the Act or any other law for the time being in force, the Board may refuse whether in pursuance of any power of the Company under these Articles or otherwise to register the transfer of, or the transmission by operation of law or the right to, any shares or interest of a Member in or debentures of the Company. The Company shall within one month from the date on which the instrument of transfer, or the intimation of such transmission, as the case may be, was delivered to Company, send notice of the refusal to the transferee and the transferor or to the person giving intimation of such transmission, as the case may be, giving reasons for such refusal. Provided that the registration of a transfer shall not be refused on the ground of the transferor being either alone or jointly with any other person or persons indebted to the Company on any account whatsoever except where the Company has a lien on shares. Article 58 provides that any person becoming entitled to a share in consequence of the death, lunacy, or insolvency of a member may, upon producing such evidence of his title as the Board thinks sufficient, be registered as a member in respect of such shares; or may subject to the regulations as to transfer hereinbefore contained transfer such shares. In addition, Article 59 provides that a person becoming entitled to a share by reason of the death or insolvency of the holder shall be entitled to the same dividends and other advantages to which he would be entitled if he were the registered holder of the share, except that he shall not before being registered as a member in respect of the share, be entitled in respect of it to exercise any right conferred by membership in relation to meetings of the Company. 397

Borrowing Powers Article 82 provides that subject to the provisions of the Act and these Articles and without prejudice to the other powers conferred by these Articles the Directors shall have power from time to time at their discretion to accept deposits from members of the Company either in advance of calls or otherwise and generally to raise or borrow or secure the payment of any sum or sums of money for the purposes of the company provided that the total amount raised, borrowed or secured and outstanding at any time together with the moneys already borrowed by the Company (apart from temporary loans obtained from the Company's Bankers in the ordinary course of business) shall not without the consent of the Company in General Meeting exceed the aggregate of the paid-up capital of the Company and its free reserves that is to say reserves not set apart for any specific purpose. In addition, Article 83 provides that subject to the provisions of the Act and these Articles the Directors may raise and secure the payment of such sum or sums in such manner and upon such terms and conditions in all respects as they think fit and in particular by the issue of bonds, perpetual or redeemable, debentures or debenture-stock or any mortgage or charge or other security on the undertaking of the whole or any part of the property of the Company (both present and future) including its uncalled capital for the time being. Conversion of shares into stock Article 63 provides that the Company may, by ordinary resolution (a) convert any fully paid-up shares into stock; and (b) re-convert any stock into fully paid-up shares of any denomination. In addition, Article 64 provides that the holders of stock may transfer the same or any part thereof in the same manner as, and subject to the same regulations under which, the shares from which the stock arose might before the conversion have been transferred, or as near thereto as circumstances admit; Provided that, the Board may, from time to time, fix the minimum amount of stock transferable, so however that such minimum shall not exceed the nominal amount of the shares from which the stock arose. Convening Meeting Article 91(1) provides that the Company shall, in each year, hold in addition to any other meetings, a General Meeting (herein called an Annual General Meeting) at the intervals and in accordance with the provision herein specified. The Annual General Meeting of the Company shall be held within six months after the expiry of each financial year; Provided however, that if the Registrar of Companies shall have for any special reason extend the time within which any Annual General Meeting shall be held by a further period not exceeding three months, the Annual General Meeting may be held within the additional time fixed by the Registrar. Except in the cases where the Registrar has given an extension of time as aforesaid for holding any Annual General Meeting not more than fifteen months shall elapse between the date of one Annual General Meeting and that of the next. In addition, Article 91(2) provides that every Annual General Meeting shall be called for a time during business hours and on such day (not being a public holiday) as the Directors may from time to time determine and it shall be held either at the Registered Office of the Company or at some other place within the City of Bombay. The notice calling the meeting shall specify it as the Annual General Meeting. Article 93 provides that the Board of Directors may call an Extraordinary General Meeting whenever it thinks fit. In addition, Article 94(1) provides that the Board of Directors shall, on the requisition of such number of members of the Company as hold in regard to any matter at the date of deposit of the requisition, not less than one-tenth of such of the paid-up capital of the Company as at that date carries the right of voting in regard to that matter,

398

forthwith proceed duly to call an Extra ordinary General Meeting of the Company and the provisions of Section 169 of the Act (including the provisions below) shall be applicable. Article 103 provides that five members entitled to vote and present in person shall be a quorum for a General Meeting and no business shall be transacted at any General Meeting unless the quorum requisite be present at the commencement of the business. Article 110 provides that at any General Meeting, a resolution put to the vote of the meeting shall unless a poll is demanded, be decided on a show of hands. A declaration by the Chairman that on a show of hands a resolution has or has not been carried. or has or has not been carried unanimously or by a particular majority, and an entry to that effect in the books containing the minutes of the proceedings of the Company, shall be conclusive evidence of the fact, without proof of the number or proportion of the votes cast in favour of or against such resolution. In addition, Article 111 provides that before or on the declaration of the result of the voting on any resolution on a show of hands, a poll may be ordered to be taken by the Chairman of the meeting on his own motion and shall be ordered to be taken by him on a demand made in that behalf by any member or members present in person or by proxy and fulfilling the requirement as laid down in Section 179 of the Companies Act, 1956, for the time being in force. The demand for a poll may be withdrawn at any time by the person or persons who made the demand. Article 115 provides that in the case of an equality of votes, whether on a show of hands or on a poll, the Chairman of the meeting at which the show of hands takes place, or at which the poll is demanded, shall be entitled to a casting vote in addition to his own vote or votes to which he may be entitled to as a member. Votes of Members Article 129 provides that every proxy shall be appointed by an instrument in writing signed by the appointer or his attorney duly authorised in writing or if the appointer is a body corporate, be under its Seal or be signed by an Officer or an attorney duly authorised by it. In addition, Article 130(a) provides that the instrument appointing a proxy and the power of attorney or other authority, if any, under which it is signed or a notarially certified copy thereof shall be deposited at the office of the Company not less than forty-eight hours before the time for holding the meeting at which the person named in the instrument proposes to vote and in default the instrument of proxy shall not be treated as valid. No instrument appointing, a proxy shall be valid after the expiration of twelve months from the date of its execution except in the case of the adjournment of any meeting first held previously to the expiration of such time. Directors Article 137 provides that unless otherwise determined by the Company in General Meeting the number of Directors shall not be less than three and more than twelve. Article 138 provides if it is provided by any agreement deed or other documents securing or otherwise in connection with any loan taken by the Company or in connection with taking of any shares by any person that any such person or persons shall have power to nominate a Director on the Board of Directors of the Company then and in case of taking of any such loan or shares or entering into such agreement the person having such power may exercise his power from time to time and appoint a Director accordingly. Such Director may be removed from office at any time by the persons or persons in whom the power under which he was appointed is vested and another Director may be appointed in his place but while holding such office he shall not be liable to retire by rotation nor hold any qualification shares. Article 140 provides that the Board of Directors of the Company may appoint an Alternate Director to act for a Director (hereinafter called the original Director) during his absence for a period of not less than three months from the State of Maharashtra and such appointment shall have effect and such appointee, Whilst he holds office as an Alternate Director, shall be entitled to notice of meetings of the Directors and to attend and vote thereat accordingly. An Alternate Director appointed under this Article shall vacate office if and when the original Director returns to the State of Maharashtra. If the terms of office of the original Director is determined before he so returns 399

to the State of Maharashtra, any provisions in the Act or in these Articles for the Automatic reappointment of retiring Directors in default of another appointment shall apply to the original Director and not to the Alternate Directors. Article 142 provides that subject to the provisions of Section 260, 261 and 284(6)and other applicable provision (if any) of the Act, the Directors shall have powers at any time and from time to time to appoint a person as an Additional Director. The Additional Director shall hold office upto the next following Annual General Meeting, and shall be eligible for reappointment. Article 143(1) provides that the remuneration of a Director for his services shall be such sum as may be determined by the Board of Directors, but not exceeding the sum as may be prescribed from time to time by the Central Government under Section 310 of the Act for each meeting attended by him and subject to the limitations provided by the Act such additional remuneration as may be fixed by the Company, may be paid to any one or more of their numbers for services rendered by him or them and the Directors shall be paid further remuneration (if any) as the Company in General Meeting shall from time to time determine, and such further remuneration shall be divided among the Directors in proportion and manner as the Directors may from time to time determine, and in default of such determination within the year equally. Article 155 provides that subject to the provisions of Section 297 of the Act, a Director or his relative, a firm in which such Director or relative is a partner, any other partner in such a firm, or a private company of which the Director is a member or Director shall not enter into any contract with the Company for the sale, purchase or supply of goods, materials, services or for underwriting the subscription of any shares in or debentures of the Company except with the consent of the Board of Directors by a resolution passed at a meeting of the Board before the contract is entered into or within three months of the date on which it was entered into. Nothing contained in this clause shall affect the purchase of goods and materials from the Company or sale of goods and materials to the Company by a Director, relative, firm, partner or private company as the case may be, for cash at the prevailing market prices or any contract or any contract or contracts between the Company on one side and any such Director, relative, firm, partner or private company on the other for sale, purchases or supply of any goods, materials or services in which either the Company or the Director, relative, firm, partner or private company, as the case may be, regularly trades or does business provided that such contract or contracts do not relate to goods and materials the value of which or services, the cost of which exceeds five thousand rupees in the aggregate in any year comprising the period of contract or contracts. If consent is not accorded to any contract anything done in pursuance of the contract shall be voidable at the option of the Board. Managing Director/Whole-Time Director Article 184A (a) provides that the Board of Directors may from time to time appoint any one or more of their body to be Managing/Whole-time Directors of the Company upon such terms and conditions as they may deem fit and may from time to time remove or dismiss him or them from office and appoint another or others in his or their place or places. Article 184A (b) provides that the Managing/Whole-time Director shall not while he continues to hold that office, be subject to retirement by rotation and he shall not be reckoned as a Director for the purpose of determining the rotation of requirement of Directors or in fixing the number of Directors to retire but subject to terms of any contract between him and the company he shall be subject to the same provisions as to qualifications, resignation and removal as the other directors of the company and he shall immediately cease to be a Managing/Whole-time Director as the case may be, if he ceases to hold the office of Director for any cause. In addition, Article 184A (d) provides that The Board of Directors may from time to time entrust to and confer upon the Managing/Whole-time Director for the time being such of the powers exercisable under these Articles by the Directors as they think fit and may confer such powers for such time and to be exercisable for such object and purposes and upon such terms and conditions and with such restrictions as they think expedient and they may confer such powers either collaterally with or to the exclusion of or in substitution For all or any of the powers of the 'Directors' in that behalf and may from time to time revoke, withdraw, alter or vary all or any of such powers. Unless and until otherwise determined by the Board of Directors, a Managing/Whole-time Director may exercise all powers exercisable by the Directors save such powers as by the Act or by these Articles shall be exercisable by the Directors 400

themselves, the Board of Directors may whenever there is more than one Managing /Whole-time Director, decide whether they should act Jointly or severally and may delegate powers separately to one or more Managing/Wholetime Director. Proceedings of Board of Directors Article 163 provides that subject to Section 285 of the Companies Act, the Meeting of the Board of Directors shall be held at least once in every three months and at least four such Meetings shall be held every year. The Directors may adjourn and otherwise regulate their Meetings and proceedings as they may deem fit. In addition, Article 165 provides that subject to the provisions of Section 287 and other applicable provisions, (if any) of the Act, the quorum for a meeting of the Board of Directors shall be one-third of the total strength (excluding Directors, if any, whose places may be vacant at the time and any fraction contained in that one-third being rounded off as one) or two Directors, whichever is higher; Provided that where at any time the number of interested Directors exceeds or is equal to two-thirds of the total strength, the number of the remaining Directors, that is to say the number of Directors who are not interested present at the meeting being not less than two shall be quorum during such time. A meeting of the Directors for the time being, at which a quorum is present shall be competent to exercise all or any of the authorities, powers and discretion by or under the Act or the Articles, of the Company, for the time being vested in or exercisable by the Board of Directors generally. Article 171(1) provides that a resolution passed by circular, without a Meeting of the Board or a Committee of the Board appointed under Article 163, shall, subject to the provisions of sub-clause (2) hereof be as valid and effectual as a resolution duly passed at a meeting of the Directors or of a Committee duly called and held. In addition, Article 171(2) provides that a resolution shall be deemed to have been duly passed by the Board or by a Committee thereof by circulation; if the resolution has been circulated in draft together with the necessary papers, if any, to all the Directors or to all the members of the Committee then in lndia (not being less in number than the quorum for a meeting of the Board or Committee as the case may be), and to all other Directors or members of the Committee at their usual address in lndia and has been approved by such of the Directors or members of the Committee as are then in lndia or by a majority of such of them as are entitled to vote on the resolution. Dividends Article 189 provides that the Company may in General Meeting declare a dividend to be paid to the members according to their respective rights and interest in the profits and subject to the provisions in the Act may fix the time for payment within 30 days from the date of the declaration. Article 186 provides that, profits of the Company subject to any special rights relating thereto created or authorised to be created by the Memorandum and these Articles and subject to the provisions of these Articles shall be divisible among the members in proportion to the amount of capital paid up on the shares held by them respectively. Article 190 provides that No larger dividend shall be declared than is recommended by the Directors but the Company in General Meeting may declare a smaller dividend. No dividend shall be payable except out of the profits of the year or any other undistributed profits of the Company and no dividend shall carry interest as against the Company. The declaration of the Directors as to the amount of the net profits of the Company shall be conclusive. Article 191 provides that Subject to the provisions of the Act, the Directors may, from time to time pay to the members on account of the next forthcoming dividend such interim dividends as in their judgement the position of the Company justifies. Capitalisation Article 199(1) provides that Subject to the provisions of the Act and regulations made thereunder or any other applicable Law, the Company shall have power, by a resolution of the Board, to capitalize its profits, gains, investments or other or other assets forming part of the undivided profits for the time being of the Company standing to the credit of the Reserve Fund or any other Fund or the Profit and Loss Account of the Company or in the hands 401

of the Company and available for dividend or representing premium, received on the issue of shares and standing to the credit of the securities Premium Account or otherwise available for distribution: (a) by the distribution among the holders of the shares of the Company or any of them in accordance with their respective rights, and interests and in proportion to the amounts paid or credited as paid thereon, of paid up shares, or (b) by crediting shares of the Company which may have been issued and are not fully paid up, in proportion to the amounts paid or credited as paid thereon respectively, with the whole or any part of the sums remaining unpaid thereon. (2) The Directors shall have authority, in its absolute discretion to apply such portion of the profits, General Reserve, Reserve or Reserve Fund or any other fund as may be required for the purpose of making payment in full or part for the shares, so distributed or (as the case may be) for the purpose of paying, in whole or in part, the amount remaining unpaid on the shares, which may have been issued and are not fully paid-up. Such distribution and payment shall stand accepted by such shareholders in full satisfaction of their interest in the said capitalised sum. (3) the Directors shall have power to settle any difficulty which may arise in regard to the distribution or payment as aforesaid as they think expedient and in particular they may issue shares in lieu of fraction and generally may make such arrangements for the acceptance, allotment and sale of such shares, and such shares fractional or otherwise as they think fit and may make cash payments to any holders of shares or fraction on the footing of the value so fixed in order to adjust such rights, and may vest any shares, in trustees upon such trusts for adjusting such rights as may seem expedient to the Directors. (4) where some of the shares of the Company are fully paid and others are partly paid only, the board shall have powers to effect the capitalisation by the distribution of further shares in respect of the fully paid shares and by crediting the partly paid shares with the whole or part of the unpaid liability thereon but so that as between the holders of the fully paid shares and the party paid shares the sums so applied in the payment of such further shares and in the extinguishment or diminution of the liability on the partly paid shares shall be pro rata in proportion to the amounts then already paid or credited as paid on the existing fully paid and partly paid shares respectively. Winding up Article 225 provides that If the Company shall be wound up, and the assets available for distribution among the members as such shall be insufficient to repay the whole of the paid up capital, such assets shall be distributed so that, as nearly as may be, the losses shall be borne by the members in proportion to the Capital paid up, or which ought to have been paid up, at the commencement of the winding up on the shares held by them respectively. And if in a winding up the assets available for distribution among the members shall be more than sufficient to repay the whole of the Capital paid up at the commencement of the winding up, the excess shall be distributed amongst the members in proportion to the capital at the commencement of the winding up, paid up or which ought to have been paid up on the shares held by them respectively. But this Article is to be without prejudice to the rights of the holders of shares issued upon special terms and conditions. Indemnity Article 229 provides that (1) Subject to the provisions of Section 201 of the Act, every Director of the Company or the Managing Director, Manager, Secretary and any other Officer or employee of the Company shall be indemnified by the Company against and it shall be the duty of the Directors to pay out of the funds of the Company, all costs, losses and expenses including traveling expenses which any such Director, Managing Director, Manager, Secretary, Officer or employee may incur or become liable to by reason of any contract entered into or act or deed done by him as such Director, Managing Director, Manager, Secretary or Officer or employee or in any way in the discharge of his duties. (2) Subject as aforesaid, every Director. Managing Director, Manager, Secretary, or any other officer or employee of the Company shall be indemnified against any liability incurred by them or him in defending any proceedings, 402

whether civil or criminal, in which judgement is given in their favour or his favour or in which he is acquitted or discharged or in connection with any obligations under Section 633 of the Act in which relief is given to him by the Court. Secrecy Article 228 provides that No member shall be entitled to visit or inspect any works of the Company without the permission of the Directors, Managing Director, Manager or Secretary or to require discovery of or any information respecting and detail of the Company's trading or any matter which is or may be in the nature of trade secret mystery or trade or secret process, which may relate to the conduct of the business of the Company, and which, in the opinion of Directors, will be inexpedient in the interest of the members of the Company to communicate to the public.

403

MATERIAL CONTRACTS AND DOCUMENTS FOR INSPECTION The copies of the following contracts which have been entered into or are to be entered into by our Company (not being contracts entered into in the ordinary course of business carried on by our Company or contracts entered into more than two years before the date of this Draft Red Herring Prospectus) which are or may be deemed material have been attached to the copy of the Red Herring Prospectus delivered to the RoC for registration. Copies of the abovementioned contracts and also the documents for inspection referred to hereunder, may be inspected at the Registered Office between 10 a.m. and 5 p.m. on all Working Days until the Bid/Issue Closing Date. A. 1. 2. 3. 4. 5. 6. B. 1. 2. Material Contracts for the Issue Issue Agreement dated September 11, 2010 between our Company and the BRLMs. Memorandum of Understanding dated September 2, 2010 between our Company and the Registrar to the Issue. Escrow Agreement dated [] between our Company, the BRLMs, Escrow Collection Bank and the Registrar to the Issue. Underwriting Agreement dated [] between our Company, the BRLMs and the Syndicate Members. Syndicate Agreement dated [] between our Company, BRLMs and the Syndicate Members. Agreement dated [] between our Company and the Monitoring Agent. Material Documents Scheme of amalgamation of Yashomala Leasing and Finance Private Limited with our Company. Shareholders agreement between Hindustan Finvest Limited, HCC, Hincon Holdings Limited, Aniruddha P. Deshpande, Vinay V. Maniar, Sadanand B. Sule, Janpath Investments & Holdings Limited, Venkateshwara Hatcheries Private Limited and our Company dated December 9, 2003 and the adherence deed between the Parties and Hincon Realty Limited dated September 27, 2005, the board resolution dated July 30, 2010 terminating the shareholders agreement and the shareholders resolutions dated July 30, 2010 confirming the same. Shareholders agreement between our Company, Axis Bank Limited, HCC and HREL dated June 26, 2008. Share cum warrant subscription agreement between Bennett, Coleman & Co. Limited, HREL and our Company dated March 30, 2009 and the letter dated June 29, 2010 from Bennett, Coleman & Co. Limited. Compulsory Convertible Preference Shares subscription agreement between Axis Bank Limited, our Promoters and our Company dated June 26, 2008 and letter dated September 7, 2010 from Axis Bank Limited. Agreement between HCC, HREL, Hincon Finance Limited, Hincon Holdings Limited, Janpath Investments and Holdings Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar, Vinay V. Maniar and our Company dated December 12, 2008. Agreement between HCC, HERL, Hincon Finance Limited, Hincon Holdings Limited. Avantha Realty Limited, Venkateshwara Hatcheries Private Limited, Vithal Maniar, Vinay V. Maniar and our Company dated October 26, 2009. Deep discount convertible debentures subscription agreement between Axis Bank Limited, our Promoters and our Company dated June 26, 2008 and letter dated September 7, 2010 from Axis Bank Limited.

3. 4. 5.

6.

7.

8.

404

9. 10. 11.

Deep discount convertible debentures subscription agreement between Bank of India, our Promoters and our Company dated September 23, 2008 and letter dated September 9, 2010 from Bank of India. Deep discount convertible debentures subscription agreement between Allahabad Bank, our Promoters and our Company dated December 10, 2008 and letter dated September 8, 2010 from Allahabad Bank. Deep discount convertible debentures subscription agreement between IndusInd Bank Limited, our Promoters and our Company dated July 7, 2009 and letter dated September 2, 2010 from IndusInd Bank Limited. Deep discount convertible debentures subscription agreement between Andhra Bank, our Promoters and our Company dated July 24, 2009 and letter dated September 4, 2010 from Andhra Bank. Deep discount convertible debentures subscription agreement between United Bank of India, our Promoters and our Company dated August 5, 2009 and letter dated September 9, 2010 from United Bank of India. Deep discount convertible debentures subscription agreement between Allahabad Bank, our Promoters and our Company dated October 23, 2009 and letter dated September 8, 2010 from Allahabad Bank. Deep discount convertible debentures subscription agreement between ICICI Bank Limited, our Promoters and our Company dated December 31, 2009 and letter dated September 7, 2010from ICICI Bank Limited. Deep discount convertible debentures subscription agreement between The Jammu and Kashmir Bank Limited, our Promoters and our Company dated March 25, 2010 and supplementary agreement dated September 3, 2010 between The Jammu and Kashmir Bank Limited, our Promoters and our Company. Certified copies of the updated Memorandum and Articles of Association of our Company as amended from time to time. Certificate of Incorporation dated February 11, 2000. Fresh certificates of incorporation consequent to change of name dated December 12, 2000, March 3, 2003 and June 8, 2004. Resolutions of the Board of Directors dated June 7, 2010, July 16, 2010 and July 30, 2010 in relation to this Issue and other related matters. Shareholders resolution dated July 30, 2010 in relation to this Issue and other related matters. Agreement dated June 9, 2008 between our Company and Rajgopal Nogja and the resolutions of our Board of Directors and our shareholders dated April 21, 2008 and June 9, 2008 respectively, pertaining to the appointment of Rajgopal Nogja as Manager of our Company. The examination reports of the statutory auditor M/s. K.S. Aiyar & Co, Chartered Accountants, on our restated financial information, included in this Draft Red Herring Prospectus. Copies of the annual reports of our Company for the last five financial years. Consent from the Auditors for inclusion of their names as the statutory auditors and of their reports on accounts in the form and context in which they appear in this Draft Red Herring Prospectus. The Statement of Tax Benefits dated September 8, 2010 from our Companys statutory auditors. Consent of our Directors, BRLMs, the Syndicate Members, Domestic Legal Counsel to our Company, Domestic Legal Counsel to the Underwriters, International Legal Counsel to the Underwriters, Registrars to the Issue, Escrow Collection Banker, Banker to the Issue, Bankers to our Company, Company Secretary and Compliance Officer as referred to in their specific capacities.

12. 13. 14. 15. 16.

17. 18. 19. 20. 21.

22. 23. 24. 25. 26.

405

27.

Certificate dated September 8, 2010 issued by the Auditors of our Company in relation to the Objects of the Issue. Due Diligence Certificate dated September 14, 2010 addressed to SEBI from the BRLMs. In principle listing approvals dated [] and [] issued by BSE and NSE respectively. Tripartite Agreement dated [] between our Company, NSDL and the Registrar to the Issue. Tripartite Agreement dated September 2, 2010 between our Company, CDSL and the Registrar to the Issue. IPO Grading Report dated [], 2010 by []. Observation letter no. [] dated [] issued by SEBI and reply to the same dated [].

28. 29. 30. 31. 32. 33.

Any of the contracts or documents mentioned in this Draft Red Herring Prospectus may be amended or modified at any time if so required in the interest of our Company or if required by the other parties, without reference to the shareholders subject to compliance of the provisions contained in the Companies Act and other relevant statutes.

406

DECLARATION We hereby declare that all relevant provisions of the Companies Act and the guidelines issued by the Government or the regulations or guidelines issued by SEBI established under Section 3 of the SEBI Act as the case may be have been complied with and no statement made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act or the SEBI Act or rules or regulations made there under or guidelines issued, as the case may be. We further certify that all statements in this Draft Red Herring Prospectus are true and correct. SIGNED BY THE DIRECTORS OF OUR COMPANY
Ajit Gulabchand (Chairman and Non-Executive Director) Gautam Thapar (Non-Executive Director) Anuradha Desai (Non-Executive Director) Vithal Maniar (Non-Executive Director) Shalaka Gulabchand Dhawan (Non-Executive Director) Sharad M. Kulkarni (Independent Director) Sam Bhadha (Independent Director) His Highness Gaj Singh (Independent Director) Ajay B. Shirke (Independent Director)

_________________________

_________________________

_________________________

_________________________

_________________________

_________________________

_________________________

_________________________

_________________________

_________________________

Ram P. Gandhi (Independent Director)

Date: September 14, 2010 Place: Mumbai

___________________ Rajgopal Nogja (Manager) ________________________ Vinayak Jadhav (Finance Head / Chief Financial Officer)

407

THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

You might also like