You are on page 1of 45

Transforming A LOVABLE KANPUR TO A LIVABLE KANPUR

In Managing MSW in Kanpur


A2Z Infrastructure Ltd. 1

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

1
The project has to be SELF-sustainable

5
Follow the book (Law) religiously

2
Integrated and Inclusive Approach

4
Near ZERO landfill: thus maximum derivation

3
Zero tolerance for compromise in quality

A2Z Infrastructure Ltd.

We make self sustainable projects, otherwise it will keep on depending on Govt. grants,
and alibis for non-performance, none of which could be allowed. So the garbage has to undergo metamorphosis to something useful and commercially viable like:
1. Compost

2. RDF
3. A C&D waste value added plant like manufacturing bricks, 4.

5.
6. 7. 8. 9.

blocks or even plain aggregate Plastic recycling Inorganic recyclable material Waste to energy, by using appropriate technology combustion/steam cycle route or biomethanation Advertising on C&T vehicles collection and Transportation user charge revenue CDM

like

A2Z Infrastructure Ltd.

Our projects are integrated i.e. C&T and P&D to us only, because:

It ensures synergies in operation


One of the many operators may prove to be the weakest link in the chain The entire system is efficient for there are no allegations/counter allegations amongst multiple operators Fixation of responsibilities is possible Costs are controlled because of there will be no duplicity of efforts And Inclusive, to include all the stakeholders like Public, State, and most important the garbage dependant populace like Rag Pickers
A2Z Infrastructure Ltd. 6

Only good quality sells and sells repeatedly.A small example:


Quality of Compost vis a vis FCO Specification
Vasundra Test Report as per SGS Report dated 12th August 2010 19.70 Black Agreeable

Sl No. 1 2 3 Color Odour

City Compost Moisture %

FCO Spcefication 15-25% by weight Dark Brown to Black NIL 90%Pass 4 MM Is Sieve <1

4
5

Partical Size
Bulk Density g/ml Total minimum Organic carbon% g/Cm3 Total Minimum N % Total Minimum P % Total Minimum K % C:N Ratio PH

100% pass
0.9

6 7 8 9 10 11

12 0.8 0.4 0.4 20:1 or Less

18.6 1.2 1.14 0.95 15.5:1

6.5-7.5 A2Z Infrastructure Ltd. 7.6

When the land is decreasing for Food, Forest, Housing and Recreation, it will be criminal to burden the mother earth with something as dispensable as Garbage. Moreover, the landfilling discourages recycling and increases the dependence of a

project to depend on Govt. doles to feed a landfill killing the spirit of self
sustainability.

A2Z Infrastructure Ltd.

When a system, society or legislature, decides a law it is an effort of that system to find a best solution for the problem of the time relevant to that times. So we, at A2Z, abide by laws religiously. And we respect the right of every human being to live a life of self respect, social respect and dignity.

So all our operations, be it collection & transportation or processing & disposal, are
conducted strictly meeting the letter and spirit of MSW (H&M) Rules, 2000 and various recommendations of CPHEEO and try to emulate the best International practices for handling such materials.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

10

Kanpur project: A factsheet


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Population: 3.6 million Quantity of MSW: 1500 MT/day Per capita waste generation: 472g/person/day Project Life-cycle period: 30 years Project part funded by JNNURM grant upto 45% of the project value Land: 46 ha Project Cost: Rs. 120 Crore, other than power plant Employment provided: 2500 men C&D waste component: Less than 10% Organic Waste component: 50-55% Plastics: < 6% Project running for last 2 years Landfill population so far: ZERO Compost sold so far: More than 100,000 MT Results: Commercially sustainable, ULB interests secured by Substitution Agreement C&T Charges paid by KNN: Rs. 456/MT Tipping fee for processing: ZERO Tipping fee for Disposal: ZERO Collection of User Charges: By A2Z. Daily deposit in Escrow account. KNN pays most of C&T charges to A2Z from this Escrow account
A2Z Infrastructure Ltd. 11

S. No. 1 2 3 4 5 6 7 Hills of waste Dhalaos

Problem

A2Z Solution Reclamation of land by remediation of legacy waste Door to door collection / Bins Door to door collection system of garbage to be strengthened A conservancy worker after every 20 bins to take care of garbage lying outside the bins A2Z ops sustainable by selling compost and RDF Technology selection to be reviewed and RDF to be potentiated Ragpickers must move out of dump to mainstream job with the concessionaire Collection of user charges must be allowed through necessary amendments in bye-laws to make enforce discipline in the polluters They MUST be served A2Z Infrastructure Ltd.

Ineffective primary collection system Garbage strewn around the bins The present operations yet to become self-sustainable Failed WtE Ragpickers rehabilitation Non-collection of user charges

8 9

NO Service in Slum Areas

Mixed wet heterogeneous garbage

D2D Primary Collection, & Secondary Transportation

Power generation

Processing at IRRF: 1. Progressive Segregation 2. Aerobic Composting 3. RDF Compaction 4. Recyclables cleaning and sales
A2Z Infrastructure Ltd. 13

A2Z Infrastructure Ltd.

14

A2Z Infrastructure Ltd.

15

The A2Z touch

A2Z Infrastructure Ltd.

16

The A2Z touch

A2Z Infrastructure Ltd.

17

The A2Z touch

A2Z Infrastructure Ltd.

18

The A2Z touch

A2Z Infrastructure Ltd.

19

The A2Z touch

A2Z Infrastructure Ltd.

20

Collection & Transportation


The city and all cluster ULBs are divided into clear working zones which may be contiguous with the existing zonal structuring of the respective ULBs. A2Z starts the working prospectively and progressively so that all the zones get covered in 90 days of the COD. The door to door collection starts at 7 am and will go on till 1 pm. Even in the slum areas are covered efficiently.

All the team members going door to door for collection of garbage are called Safai Mitra. Each Safai Mitra wears an eye catching uniform which is clean and has protective gear on his body like gloves and mask etc. The Safai Mitra with an 8-bin rickshaw goes to a house and whistles. One member of the house comes out with the package full of garbage and drops it in one of the 8 bins in the rickshaw. Once the rickshaw is full, it unloads into the nearby 1100 CC bin. The 1100 CC bin is unloaded in to the Refuse Compactor. There are no strewn garbage around the bins. The area around bins are clean.

Each & every lane of each ward and each bin location are mapped, marked and tabulated. Each of the vehicles is equipped with GPS system and every incidence of the compactor halting at every bin is monitored and recorded.

Old dhalaos (community waste stations/WSDs as they are called in Any Indian City) have been cleaned and abandoned. The user charges are collected by us and we use the onsite online data loggers to collect payment, track user response and issue receipts.

A2Z Infrastructure Ltd.

25

A2Z Infrastructure Ltd.

26

A2Z Infrastructure Ltd.

27

A2Z Infrastructure Ltd.

28

A2Z Infrastructure Ltd.

29

A2Z Infrastructure Ltd.

30

This material for RDF is shredded and homogenized to RDF Fluff

and is briquetted for greater market acceptance. Holcim in India


already buying for Kymore cement Kiln. Apart from Compost and RDF we recycle the Waste to produce:

Value added products from laminated plastics like Lays


pouches. Recycled plastic granules from the non-laminated plastic

Construction grade aggregate, Building blocks, interlocking


tiles, and agriculture aggregate from construction and demolition debris.
A2Z Infrastructure Ltd. 31

We are here to partner with Kanpur city in providing the most basic of civic amenities to public Clean city. And like true partners, we are available to shoulder all responsibilities that are expected of us. We have never nurtured the idea of our identity separately from Nagar Nigam. We are working for and on behalf of NNK like their extended arm only

We welcome a reference check!

A2Z Infrastructure Ltd.

32

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

You might also like