You are on page 1of 4

UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

BILL OF QUANTITIES FOR KHOST CUSTOM ICD Khost, Afghanistan Boundary Wall

NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE: All bidders MUST examine the complete project documents. These documents include the Drawings, BOQ, Schedules and Specifications. Any discrepancies between these documents are to be brought to the immediate attention of UNOPS engineer. Costs given on this BOQ are to cover any and all additional materials, labor or associated costs to complete the works as documented on the complete project documents. Claims for extra works that are documented on any of the project documents but not specifically identified in the BOQ will be INVALID and not paid to the contractor.

All prices in US Dollars

Project No.: 554.03 Date: May 17, 2010

UNOPS
United Nations Office for Project Services Vertical Structures Unit

DETAILED BILL OF QUANTITIES


Project No.: Project: Address: Phase: Date: 554.03 KHOST CUSTOM ICD Khost, Afghanistan Boundary Wall May 17, 2010

All prices in US Dollars

Pos. 1. General

Description of Work/Items

Project Schedules Ref.


1.1 Occupied Areas, 1.1 Existing Services Schedule, 1.1 Items to be supplied, 1.2 Inspection notification schedule and 1.2 Warranty schedules.

Unit

Quantity

Unit Cost

Total Cost

1.1 Preliminaries

Pre-construction work, mobilisation activities including paper/ documentation tasks. LS 1.00 1.00 Post construction works and clean up. LS

Subtotal General 2. Site 2.3 Earthwork


2.1 Identified hazardous materials, Salvaged materials for re-use and 2.3 Earthwork schedules

Excavation (any soil type) for foundation. This item includes all excavations, disposal and temporary support or shoring if needed. See drawing and schedule for details. The volume given here is the net volume of excavated space based on dimensions shown on the drawing, NOT the bulk volume of disposing materials. The contractor is responsible for any unexpected increment in excavation. The contractor is also responsible for the demining of the under work area from any un-exploded ordinates or mines. CU.M 1,870.00 Soil backfilling around foundation up to designed ground level. This includes supplying of needed materials. See drawings and schedules for levels/dimensions and details. CU.M 620.00 -

Subtotal Site 3. Structure 3.1 Concrete-General


NOTE: Cost for concrete items in this section includes the concrete, reinforcement, shuttering, curing and all as required to the complete job. For all visible concrete surfaces use steel shuttering for best off-form finishing subject to approval of UNOPS engineer. 3.1 Reinforced concrete schedules

c d e

PCC lean concrete under all foundations. See drawings and Schedule for location, size and details. RCC Ring beam (at designed ground level) RCC Ring beam (at 1.5m higher than the ground, at the mid-height of wall) RCC Capping on top of wall

CU.M CU.M CU.M CU.M

233.00 228.00 91.00 128.00

2/4

Project No.: Project: Address: Phase: Date:

554.03 KHOST CUSTOM ICD Khost, Afghanistan Boundary Wall May 17, 2010

All prices in US Dollars

Pos. f

Description of Work/Items
RCC column, @ 3330mm c/c spans. There will be an expansion joint @ 6 spans (or @ 20m c/c). This item includes RCC foundation at columns at the gates. Refer drawings for details.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

CU.M 3.5 Brickwork construction schedule

169.00

3.5 Brickwork b
First Class Brick masonry with mortar 350mm thick. This item inludes pointing finishes to all grooves. For bonding patterns see drawing.

SQ.M 3.6 Stonework construction schedule

5,900.00

3.6 Stonework a
Stone masonry with mortar at foundation. It includes complete job with finish if required.

CU.M

1,655.00

3.7 Light Steelwork


NOTE: The following steel items include painting according to the schedules and specifications for steel member painting for complete installation. See drawing for details.

3.7 Light Steelwork and 6.6 Exterior painting schedules

Steel frame sliding gates. These are the main entrance/exit gates to/from the ICD compound (600x250cm each, see drawing for detailed dimensions). This item includes making, transportation, installation, finishing and all needed accessories and work to complete the job as per UNOPS engineer satisfaction and as per given drawing and schedule. Steel frame drainage points located at the bottom of boundary wall. These are implemented on those points through the wall that requires rainwater drain (consult UNOPS engineer for exact locations at the site, thus the acutal number of drainage points will be known at the end of contract). This item includes making, transportation, installation, finishing, PVC embeded pipe into concrete and all needed accessories and work to complete the job as per given drawing and schedule.

No

2.00

No

200.00

Subtotal Structure

3/4

UNOPS
United Nations Office for Project Services Vertical Structures Unit

SUMMARY BILL OF QUANTITIES


Project No.: Project: Address: Phase: Date: 554.03 KHOST CUSTOM ICD Khost, Afghanistan Boundary Wall May 17, 2010

All prices in US Dollars

Work Type
Total for General Total for Site Total for Structure 0.00 0.00 0.00

Total for Bill of Quantities Total for Bill of Quantities in words:

0.00

Zero

Agreed on behalf of Contractor Name Position Signature

UNOPS Name Position Signature

Address and Mobile Number

You might also like