You are on page 1of 116

APC

8,9 March 2012

Presenter: Kogi Wang

APC

(5 Racks)

4 hours

(10 Racks ----> 20 Racks)

4 hours

Agenda
- 5 10
20
&

Design Portal

3

Rack Level
Sensor POD

NetBotz
Camera
PDU

NetBotz

InRow SC

IT

All In 1

UPS
Smart UPS

Row Level

Sensor POD

NetBotz
Camera

NetBotz

PDU

IT

KVM Solution
LCD

KVM

SURT UPS
20KVA6U

InRow RD
Row level

Smart UPS

( ) --- 5
1.

WDH = 800x400x500 cm ( 10 )

2.

??

3.

IT ?

4.

(<3KW ) ?
(3~8KW) ?
(>8KW ) ?
??

6.

?? UPS ??
6

( ) --- 5
7.

??
??
??
(kpa) ??

8.

??

9.

Multi site ?
?

1.

4.

2.

5.

3.

6.

10

11

12

13

Server

14

Server

15

16

17

18

19

20

21

5-15 to C13

C13 to C14

22

23

24

25

26

27

Rack Basic pdu

Rack Meter pdu

28

Power Distribution Unit

1.

2.

3. /

4. /
29

??

30

31

32

UPS
1. ( KVA / KW )

2.

3.

4.

33

UPS

35

On-Line
( )

36

Off Line
( )

37

Line-interactive
( )

38

UPS
208V 20KW

ISX20K

: 20 KW
: 166-240 V
: 40-70 Hz
: 1
THD-I
: < 6%
: 1000% 500 ms , 150% 30 , 125%

: > 91.5%

: 1.9 KW , 6489 BTU / hr


: 3
: 4
: 39

39

UPS
380V 48KW

SYPX48K
: 48 KW
: 340-477 V
: 40-70 Hz
: >0.98
THD-I
: < 5%
: 150% 60 , 125% 10 , 100%
THD-V : <2% , <6%

: 35-100% >95%
15-34% >90%
: 3
: 4
: 6
40

V.S UPS

1.

2. /

41

PDU

UPS

IT

42

N+1

PDU

UPS

IT

UPS
43

SBP

1. Service Bypass Panel

2.

3. /

44

SBP

45

ATS / rATS
/
1. Auto Transfer Switch

2. ,

3.

4.

46

ATS
( )

47

ATS
( )
, , ,

48

rATS
( )

49

ATS
( )
, , ,

50

STS
( )
1. Static Transfer Switch

2. ,

3.

4.

51

STS
( )

52

53

54

18KW

10KW

5KW

55

56

Chiller

57

Cooling Tower

58

59


1.

2.

3. Sensor

4.

60

61

Sensor

1.

2.

3.

5.

6.

7.

9.

10.

4.

8.

11.

12.

Sensor

13.

17.

19.

14.

15.

18.

16.


2.
SNMP

64


2.

65


2.

Modbus

66


2.

4-20mA 0-5V

67

68


AP9465

69

MONITORING

STANDARD

ENTERPRISE

APPLIANCE

Data Collection

ENTERPRISE MANAGEMENT SYSTEM

DATA CENTER

BUILDING MANAGEMENT SYSTEM

BASIC

Data Points
POWER

COOLING

SENSORS

METERS

IT EQUIPMENT

Room Level

10

StruxtrueWare Operation

IT

NetBotz

PDU
IT

5
OA

InRow

Symmetra PX
UPS
16KW500KW

Row level
IT

StruxtrueWare
Central

( )--- 10
1.

WDH = 1200x1000x500 cm ( 36 )

2.

??

3.

IT ?

4.

(<3KW ) ?
(3~8KW) ?
(>8KW ) ?
5.

??

6.

?? UPS ??
72

( )--- 10
7.

??
??
??
??

8.

??

9.

Multi site ?
?
?
?
?
73

Rack Basic pdu

Rack Meter pdu

Rack Switch pdu


74

UPS
380V 48KW

380V 160KW

75

N+1

PDU

UPS

IT

UPS
76

2N

PDU-1

UPS-1

IT

PDU-2

UPS-2
77


AP9470

78


Operations
StruxureWare for Data Centers:
Monitoring Suite

Cluster

Monitoring

iPhone app.
Blackberry app.

3D

79

Building Level

UPS

IT

( )--- 20
1.

WDH = 1200x3000x500 cm ( 100 )

2.

??

3.

IT ?

4.

(<3KW ) ?
(3~8KW) ?
(>8KW ) ?
5.

??

6.

?? UPS ??
81

( )--- 20
7.

??
??
??
??

8.

??

9.

Multi site ?
?
?
?
?
?
?
82

2N

PDU-1

UPS-1

IT

PDU-2

UPS-2
83

2N+1

PDU-1
PDU-2

UPS-1
UPS-2

STS-1
IT

PDU-3

UPS-3

PDU-4

UPS-4

STS-2

84

Design Portal

85

Drop Ceiling

Raise floor

86

Power trough

Data trough

87


PDRPPNX10

PDPM144F

88

89

90

600mm 2
910mm 9900mm, APC914mm


910mm 9900mm, APC1219mm

, mm
mm

(A)

600mm 2

,mm

91

UPS

,,

N (UPS UPS)
N+1(UPS UPS)
2None additional UPS is added per UPS (one for A feed and one for B feed).
2N UPS(AB)
2N+1both one additional UPS is added per UPS and one additional internal power
module in UPS is added.
2N+1UPSUPS(
AB)

92

93

( N , N+1 , 2N , 2N+1 )

94

N , N+1 ( ), N+2

95

( N , N+1 , 2N , 2N+1 )

96

Rack Air
Containment

1: ,
InRow SC

2: ,

NetShelter SX

3: ,

Design Portal

99

100

101

Operation

1.
2.

3. PUE
4.

5.
6.

7.
102

Operation

1. By Rack
2. By Site

3. By one time
4. By Nodes

5.

Free Charge ~

103


Operations
StruxureWare for Data Centers:
Monitoring Suite

Cluster

Monitoring

iPhone app.
Blackberry app.

3D

104

Report

105

Report --- Quote report

106

Report --- Quote report

107

Report --- Quote report

108

Report --- CTO report

109

Report --- CTO report

110

Report --- CTO report

111

Report --- CTO report

112

Report --- CTO report

113

Report --- CTO report

114

Submit

115

116

You might also like