You are on page 1of 1

1

10

Fre ig Te htlin rm er Tr ina av ell l ing Cr an e


11
12

OUTLINE SPECIFICATION
L Twr

13

Coach and Lorry Park


5

14

El Sub Sta

16
17

W ar d

Bd y

18

CR

Tr av ell ing Cr an e

Depot
STA NL

24 8

GRASS SEEDING:150mm depth approved site won topsoil over clean, ripped subsoil. Cultivate and seed with RT16 grass seed mix at 35g/m2, including pre-seed fertiliser. 3 cuts and weed-free at completion. TURFING: minimum 150mm consolidated depth clean, free draining approved site won topsoil ameliorated with 25mm coarse/medium sand nominal 10mm depth horticultural sand worked into topsoil surface and raked off to running levels Rowlawn RB Medallion turf laid stretching lap all joints close butted, dressed with sand soil mix and brushed.slow release fertiliser applied at 70gm/m2, 3 cuts sward established and weed free at completion. GROUNDCOVER PLANTING 300mm depth approved imported topsoil over clean, ripped subsoil.Cultivate, adding compost, and plant with 3 litre pot grown plants at 9/m2. 50mm depth composted bark mulch nish.
24 4

El Sub Sta

WB
Lane Hope

Depot
L Twr

24 6

o 78 75 t

EY
STR EET

SL

BEECH HEDGES 400mm depth approved imported topsoil over clean, ripped subsoil.Cultivate, adding compost, and plant with 80-100mm 1+2 bare root feathered transplants at 10 per linear metre, in triple staggered rows at 300mm centres.50mm depth composted bark mulch nish. 1100mm high metal post and wire fencing. MIXED HEDGES 400mm depth approved imported topsoil over clean, ripped subsoil. Cultivate, add compost, supply and plant in single species blocks of min 12no. plants, planted in 2 offset rows (7/linear metre): 50%Crataegus monogyna 60/80cm high, 1+2 transplant, thick collar, well feathered to base. 20%Prunus spinosa 1+2 transplant, 60/80cm thick collar, well feathered to base. 15%Ligustrum vulgare 1+2 transplant 60/80cm high, three breaks, well feathered thick collar. 5% Corylus avellana 1 + 2 transplant 60/80cm well feathered thick collar 5% Rosa avense 1+2 transplant 60/80cm min 3 breaks 5% Ilex aquifolium 3L container grown 40-60cm feathered from base. 50mm depth composted bark mulch nish. 1100mm high metal post and wire fencing. SPECIMEN TREES 2000 x 2000 x 750mm pit lled with approved site topsoil, with compost.Tree pit drainage connecting to local drainage trench granular backll. 20/25cm Semi mature trees, Norway Maple 2.4m clear stem, full, evenly branching full crown,container grown, from approved selected supplier. Planted with aeration pipe, stake and ties.1.0m diameter x 50mm depth composted bark mulch nish. EXISTING TREES Trees to be retained are identied on Tree Constraints plan and to be protected to BS 5837 using 2.40m protective fencing mounted on scaffold poles. Refer to Tree Constraints Plan.

o 70 63 t

1e

8m 17.5 BM
62
El Sub Sta
1

61

Pa vilio n

SL

L Twr L Twr

FB

A1 Industrial Park
CP

El S ub Sta s

Wa rd B dy
CR
L Twr

214
216

L Twr

18.6m

Depot

54

STA

NLE

Sketch view of pedestrian entrance steps and ramp with feature walls

Y ST REET

DUD DING STO

52

ARK N P
44 14
m 4.62 BM 2

PA R K AVEN UE
23.2m Posts
Ward Bdy

El Sub Sta

22.6m

PL

E AC

LAN

DU

M HA
0m 23.3 BM

SPORTS PITCHES 3G all weather football pitches to CEC approved standard and requirements, with perimeter and pitch division fencing. Pitch fencing 3m high and 5m high at goal ends. Welded mesh sports fence galvanised and polyester coated to RAL 6005 (moss green). Multi mesh as a single skin panel to lower 1.2m of fence to be 6mm vertical bars at 50mm centres and 8mm horizontal bars at 68mm centes with additional 8mm bar on reverse on every third horizontal xed to two square hollow section horizontal rails. Mesh above 1.2m to be 6mm bars at 50mm centres vertically sandwiched betwee two 8mm bars at 200mm centres. 4.10m long x 80 x 40 x 3mm rectangular hs posts at 2.5m centres in 900mm square concrete foundation Grade ST4.2no 3m x 3m double leaf vehicle access gate. 2no 2mhigh x 1.2m wide single leaf personnel gate. Gates to open outwards. 10m high lighting columns - refer to Rybka layout.
SCE NT

40

15

CHR
2

ISTIA

CRE

25.9m
8

EXISTING WOODLAND PLANTING Existing Millenium woodland retained where possible, protected during construction works, to comply with BS 5837 SUPPLEMENTARY WOODLAND PLANTING Pit plant between existing remaining woodland planting and cultivate and notch plant adacent to school boundary fence. Sprial guards, necessary additives and timber stakes. Allow for 25% of total area of millenium planting retained for supplement planting. Species mix: 25% Quercus robur / 25% Fraxinus excelsior / 20% Acer campestre / 10% corylus avellana / 10% ilex aquifolium / 10% prunus spinosa

40
35

20

CR

52

Hot rolled asphalt with white chippings


25.0m

27.4m

CHRISTIAN
25
47

GROV E

ASPHALT FOOTWAY 3m wide Hot rolled asphalt footpath with limestone chippings spread at 1kg/m2.Sub-base to Engineer's specication.50 x 200mm concrete bullnosed edging with 50mm upstand to path. 6m high lighting columns atregular spacings - refer to Rybka lighting drawings. Golf ball stop fencing to East boundary footway at edge of golf course - to CEC approved standards. RESIN BOUND GRAVEL Park entrances, Pedestrian ramp, School Plaza & Car parking bays - resin bound gravel, Addaset 6mm'Wessex Pearl' silver grey,16mm thick laid to manufacturer's recommendations. Sub base to Engineer's specication. Parking bays and disabled / motorcycle parking delineated with white thermosplastic lining paint BLOCK PAVING Keyblok charcoal grey 100 x 200mm paving blocks, used as building trim / pedestrian access footway to west entrance/ car park entrance 'table' level with footway and to plaza area as contrast lines within the resin bound gravel.Sub base to Engineer's specication. STEPS Precast concrete step units - C30 concrete wet cast units with acid washed nish to uniform grey colour with inlaid contrast non-slip grip strips, hazard warning paving to top and bottom of steps and galvanised steel handrails

HOPE
LANE

30

62

BM 28.25m

51
57

25

30

59

K PA R

LAN

E
24 23

72

Sketch view of pedestrian entrance from Milton Road


57 61

22 21

72a

31.7m

61

31
18 17

MILTON ROAD CROSSING Proposed new Toucan pedestrian / cycle crossing to Engineer's detail CONCRETE WALLS Feature walls in precast concrete smooth polished nish, depicting school name, to main pedestrian entrance and Plaza north BUS STOP RELCOATION Bus stop - relocated 15m west from current location on Milton road, to Engineer's detail / CEC approved. ROADWAY / PLAYGROUND Car park roadway and rear School playground - dense bitumen macadem refer to Circle design landscape layout for detail of courtyards and Engineer's specication.
2 1

63

65

BRAND DRIVE
32

76
2
67

10

12 11

HOPE LANE

73

10

68

29.9m

PA R K

Duddingston Mains Cottages


7

69
86

DUD DIN

3 to 5

49

AVEN

Surgery

y Ward Bd

ROAD M ILTO N
35.7m

CR

Precast concrete steps, inlaid with grip strip and steel handrail

3a

1a

Gas Gov Warehouse 33.5m

34.1m
20

scen ston Cre Dudding

BM 35.57m

25

Duddingston Crescent
30

SELF BIND GRAVEL PATH Geotextile to formation layer. 150mm depth type 1 sub-base with 1in 30 camber from centreline. 2m wide 50mm depth, Cedec gold, as supplied by CED or equal and approved. 150 x 32mm long sawn larch timber edge boards.Topsoil verges brought to 15 mm above path surface level to allow for settlement. Reuse stripped site topsoil to ll levels. Reinstated soil verges to be raked, stonepicked and seeded with Rigby Taylor Mascot R16 rye free seed mix (or equal approved) at 35g/m2, 3 cuts weed free and fully established at Completion.

DUR HAM D ROA


b 10 10

UE

ON GST K PA R
6

77 96
Garage
8a

0m 31.6 BM
15
1

37

6a

PO 4a

32.6m TCB LB

M ILTO N

ROAD

32.9m
8

Cresce gston Duddin

nt

12

32.6m

21
1

23 25

39 41

59 61

BAILIE PLACE

63

75

11

Artificial pitch and fencing, with beech hedge


9

ALEN MAGD
1
47

AVENUE

11
10

REVISION G F E D C B A

NOTES Updated layout to co-ord with JMA and Circle 2m path added to north of golf course Minor adjustments to layout following architects comments Paths to West and East perimeter of park added along with new entrance and possible crossing points Main pedestrian entrance developed following discussion with planners

DATE 14.09.10 16.08.10 11.08.10 10.08.10

CHECKED SR NB SR SR

04.08.10 28.07.2010 Landscape co-ordination with Circle Design Steps & ramp added to pedestrian entrance, pitch repositioned,feature wall and seating added, disabled bays repositioned to within 45m of building entrance, levels adjusted 29.07.10

SR SR SR

Resin bound gravel

FOR PLANNING
NORTH

Resin bound gravel to Plaza and car park bays

Beech hedge and semi mature trees to car park

City of Edinburgh Council

Section through Milton Road, footway, car park, pitches and millennium planting to Golf course

PORTOBELLO HIGH SCHOOL

JOB NO 1775

Landscape Masterplan
July 2010

DRAWING NO: 1775/ 01


SCALE: 1:1250 @ A0

IANWHITEASSOCIATES LANDSCAPEARCHITECTSANDPLANNERS