RENCANA ANGGARAN DAN BIAYA ( RAB )

PENGEMBANGAN HOTEL MUTIARA KOTARAJA


JALAN RAYA KOTARAJA DALAM DISTRIK JAYAPURA SELATAN

I. BANGUNAN HOTEL

NO

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN
( Rp.)

JUMLAH
HARGA
( Rp.)

PEKERJAAN PENDAHULUAN

Pembongkaran dan pembersihan

Ls

1.00

2,500,000.00

2,500,000.00

Pasang papan bowplank

M1

152.50

36,545.00

5,573,112.50

Galian tanah pondasi

M3

118.74

32,000.00

3,799,680.00

Urugan tanah galian

M3

39.58

10,666.67

422,186.67

Urugan pasir dibawah lantai dan pondasi

M3

57.81

204,800.00

11,838,873.60

Cor lantai kerja ( 1 : 2 : 3 )

M3

5.11

907,800.00

4,642,489.20
28,776,341.97

PEKERJAAN PASANGAN

Pasang pondasi jalur batu kali 1:4

Pasang pondasi poer plat ( telapak beton )

M3

76.62

715,784.40

54,843,400.73

1,2 x 1,2 M ( camp. 1: 2 : 3 )

M3

15.62

3,875,000.00

60,527,500.00

1 x 1 M ( camp. 1 : 2 : 3 )

M3

0.70

3,875,000.00

2,712,500.00

0,75 x 0,75 M ( camp. 1 : 2 : 3 )

M3

1.38

3,875,000.00

5,347,500.00

Pasang balok Sloof 30/40

M3

21.87

3,875,000.00

84,746,250.00

Pasang balok Sloof 20/30

M3

2.42

3,875,000.00

9,377,500.00

Pasang balok Sloof 15/20

M3

1.50

3,637,800.00

5,456,700.00

Pasang kolom utama 35/35

M3

31.13

3,875,000.00

120,628,750.00

Pasang kolom utama 30/30

M3

7.89

3,875,000.00

30,573,750.00

Pasang pilar 20/20

M3

2.12

3,875,000.00

8,215,000.00

Pasang kolom praktis 10/10

M3

8.91

3,637,800.00

32,412,798.00

10

Pasang balok lantai utama 30/40

M3

56.89

3,875,000.00

220,448,750.00

11

Pasang balok lantai utama 20/30

M3

18.72

3,875,000.00

72,540,000.00

12

Pasang listplank beton 10/40

M3

3.12

3,875,000.00

12,090,000.00

13

Pasang ring balok 20/30

M3

8.78

3,875,000.00

34,022,500.00

14

Pasang ring balok 15/25

M3

4.62

3,637,800.00

16,806,636.00

15

Pasang tangga beton + bordes

M3

7.73

3,875,000.00

29,953,750.00

16

Pasang pelat lantai ( tebal 12 Cm )

M3

109.63

3,875,000.00

424,816,250.00

17

Pasang dak / lantai atap ( tebal 8 Cm )

M3

4.29

3,875,000.00

16,623,750.00

18

Pasang dinding batu tela 1 : 4

M3

241.62

801,156.00

193,575,312.72

19

Pasang glass block 1: 2

M3

2.20

4,692,256.00

10,322,963.20

20

Pasang batu kerawang 1 : 4

M3

0.64

1,352,256.00

865,443.84

21

Plesteran dinding 1 : 3

M2

4832.40

35,970.00

173,821,428.00

22

Pasang keramik dinding luar 20 x 30

M2

2416.20

226,310.00

546,810,222.00

23

Pasang keramik dinding dalam ( wc/km , dll )


Ukuran 20x20

M2

427.80

179,260.00

76,687,428.00

24

Pasang dinding marmer ( reception, bartender )

M2

20.00

263,360.00

5,267,200.00

25

Cor lantai / floor lantai papan tebal 8 10 Cm


( camp. 1 : 2 : 3 )

M3

39.48

798,820.00

31,537,413.60

26

Cor lantai ruangan, rabat dll. ( 1 : 3 : 5 )

M3

97.81

798,820.00

78,135,779.48

27

Pasang lantai keramik 40x40

M2

957.12

190,690.00

182,513,212.80

28

Pasang lantai keramik 30x30

M2

1168.66

181,815.00

212,479,917.90

29

Pasang lantai keramik 20x20

M2

151.75

176,839.00

26,835,318.25

30

Pasang spesi bingkai kusen ( 1 : 2 )

M3

8.95

35,970.00

0.00

321,787.62
2,781,316,712.14

1
C

2
PEKERJAAN KAYU

Pasang kuda - kuda + balok bubungan kayu


besi 5/10

M3

11.87

5,036,000.00

59,777,320.00

Pasang balok gording + skor angin kayu


besi 5/10

M3

8.10

3,916,000.00

31,719,600.00

Pasang kusen kayu besi 5/10

M3

6.39

5,014,400.00

32,042,016.00

Pasang bingkai kusen kayu besi 2/10

M2

127.80

200,600.00

25,636,680.00

Pasang gelagar lantai kayu besi 6/12

M3

2.86

5,400,000.00

15,444,000.00

Pasang balok bagi kayu besi 5/10

M3

3.36

5,036,000.00

16,920,960.00

Pasang lantai papan kayu besi 3/30

M2

394.80

200,600.00

79,196,880.00

Pasang papan listplank kayu besi 3/30

M2

83.40

200,600.00

16,730,040.00

Pasang pintu panil kaca

M2

32.34

650,240.00

21,028,761.60

10

Pasang pintu panil kayu

M2

134.44

285,900.00

38,436,396.00

11

Pasang jendela panil kaca

M2

98.84

650,240.00

64,269,721.60

12

Pasang pintu lipat ( kayu furniture )

Ls

1.00

5,000,000.00

5,000,000.00

13

Pasang ventilasi panil kaca

M2

86.50

650,240.00

56,245,760.00

14

Pasang partisi panil kayu

M2

14.40

285,900.00

4,116,960.00

14

Pasang panggung kayu besi 3/30 pada aula

M2

28.80

200,600.00

5,777,280.00

PEKERJAAN ATAP DAN PLAFOND

Pasang atap / Multiroof

M2

61.20

217,900.00

13,335,480.00

Pasang atap seng gelombang bjls 0,30

M2

1192.00

57,700.00

68,778,400.00

Pasang atap plastic sun shine / kaca biru

M2

19.20

150,000.00

2,880,000.00

Pasang nok / bubungan seng plat bjls 0,30

265.25

42,280.00

11,214,770.00

Pasang nok / bubungan multi

M1

56.00

42,280.00

2,367,680.00

Pasang plafond tripleks + rangka + list profil

M2

2094.23

133,662.00

279,918,970.26

Pasang plafond lat profil + rangka + list profil

M2

183.40

206,190.00

37,815,246.00

Pasang talang keev got ( jurai dalam ) seng


M1

15.00

79,800.00

1,197,000.00

472,342,375.20

plat bjls 0,30

417,507,546.26

PEKERJAAN RILLING
PENGGANTUNG

DAN

pasang rilling tangga dan dak lantai III


( pipa hitam Dia. 2.5 " )

dia. 2,5 " )


3

16,634,400.00

M2

15.75

650,000.00

10,237,500.00

Bh

101.00

149,000.00

15,049,000.00

Psg

525.00

41,000.00

21,525,000.00

Bh

424.00

24,500.00

10,388,000.00

Bh

424.00

20,750.00

Pasang grendel jendela dan ventilasi ( bahan


kuningan )

87,000.00

pasang engsel pintu, jendela, dan ventilasi


( bahan kuningan / ring nylon )

191.20

Pasang gagang pintu + kunci tanam 2 Slaag


( type Luks )

M1

Pasang tralis pada pilar kamar ( stainlees stell

Pasang hak / kaitan angin ( sistem drat/ type


luks )

8,798,000.00
82,631,900.00

PEKERJAAN LISTRIK

Pasang lampu gantung/ hias 75 Watt + saklar

Pasang lampu Philip XL 40 Watt + saklar


( veting sistim tanam )

576,750.00

1,153,500.00

Titik

74.00

411,750.00

30,469,500.00

Titik

84.00

386,750.00

32,487,000.00

Titik

73.00

356,750.00

26,042,750.00

Pasang lampu pijar 15 Watt + saklar ( veting


tanam )

2.00

Pasang lampu Philps XL 25 Watt + saklar


( veting sistim tanam )

Titik

Pasang lampu meja 15 Watt + saklar ( veting


sisitim duduk )

Titik

32.00

401,750.00

12,856,000.00

Pasang lampu hias dinding 25 Watt + saklar

Titik

75.00

476,750.00

35,756,250.00

Pasang stop kontak 200 Watt

Titik

76.00

336,750.00

25,593,000.00

Pasang AC split 2 PK + instalasi

Titik

40.00

2,600,000.00

104,000,000.00

Pasang AC split 6 PK + instalasi

Titik

9.00

6,500,000.00

58,500,000.00

10

Pasang kipas pengisap pada ventilasi / plafond


Km / Wc

Titik

35.00

250,000.00

8,750,000.00

11

Pasang skring boks 1 group

Titik

3.00

296,875.00

890,625.00

12

Pasang panel system pada gardu

Unit

1.00

3,000,000.00

3,000,000.00

13

Pasang instalasi sistem gynset

Unit

1.00

10,000,000.00

10,000,000.00
349,498,625.00

PEKERJAAN SANITAIR

Pasang closet duduk ( keramik )

Bh

35.00

903,975.00

31,639,125.00

Pasang shower

Pasang wastafel rias ( porselin )

Pasang wastafel dapur 2 Bak ( aluminium )

Pasangstop kran1/2 "

6
7

Titik

35.00

229,500.00

8,032,500.00

Bh

35.00

1,603,975.00

56,139,125.00

Bh

1.00

703,975.00

703,975.00

Titik

35.00

189,500.00

6,632,500.00

Pasang bak air lapis keramik

Bh

2.00

654,250.00

1,308,500.00

Pasang tanki air ( fiber glass ) 2500 Liter

Bh

2.00

2,500,000.00

5,000,000.00

Pasang saluran batu tela 1 : 2 ( dimensi 40x50)

M1

66.20

Pasang instalasi pipa air kotor Dia 3 "

M1

231.00

214,500.00

49,549,500.00

10

Pasang instalasi pipa air kotor Dia 4 "

M1

11.00

224,500.00

2,469,500.00

11

Pasang instalasi dari sumur ke tower ( pipa gip


M1

541.00

204,500.00

110,634,500.00

12

Pasang instalasi dari tower ke Km/wc ( pipa gip


M1

191.00

194,000.00

Dia 3/4 " )


Dia 1/2 "

#REF!

#REF!

37,054,000.00
#REF!

PEKERJAAN FINISHING

Cat atap seng gelombang + nok

M2

1192.00

27,600.00

32,899,200.00

Cat / kapur dinding

M2

106.10

25,015.00

2,654,091.50

Cat / kapur plafond triplekd

M2

4832.40

15,465.00

74,733,066.00

Politur halus / vernis plafond lat profil dan


M2

212.20

20,000.00

4,244,000.00
42,345,998.30

dinding partisi
5

Cat kilap kayu kusen, listplank, bingkai kusen,


daun pintu, jendela, dan ventilasi

M2

908.42

46,615.00

Cat kilap klasik besi rilling tangga dll.

M2

19.10

4,966.00

94,850.60

Residu kuda - kuda, gording, dll

M2

1198.20

9,650.00

11,562,630.00

Pembersihan akhir

Ls

1.00

150,000.00

150,000.00
168,683,836.40

Jumlah total

Rp.

#REF!

II. BANGUNAN KANOPI / HALL

NO

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN
( Rp.)

JUMLAH
HARGA
( Rp.)

PEKERJAAN PENDAHULUAN

Pasang papan bowplank

M1

34.00

36,545.00

1,242,530.00

Galian tanah pondasi

M3

26.75

32,000.00

856,000.00

Urugan tanah galian

M3

8.92

10,666.67

95,111.11

Cor lantai kerja ( 1 : 2 : 3 )

M3

5.11

907,800.00

4,642,489.20

PEKERJAAN PASANGAN

Pasang pondasi poer plat ( telapak beton )

6,836,130.31

1,5 x 1,5 M ( camp. 1: 2 : 3 )

M3

4.73

3,875,000.00

18,328,750.00

Pasang balok Sloof 30/40

M3

3.12

3,875,000.00

12,090,000.00

Pasang kolom utama 35/50

M3

5.46

3,875,000.00

21,157,500.00

Pasang ring balok 25/40

M3

2.60

3,875,000.00

10,075,000.00

Pasang listplank beton 10/50

M3

1.30

3,875,000.00

5,037,500.00

Pasang dak + talang beton

M3

1.28

3,875,000.00

4,960,000.00

Pasang keramik Dinding

M2

70.60

226,310.00

15,977,486.00

PEKERJAAN ATAP DAN PLAFOND

Pasang rangka atap / kuda -kuda ( bahan

87,626,236.00

pipa medium Dia 2 1/2 "

M1

80.00

87,000.00

6,960,000.00

Pasang atap plastic sun shine ( warna hijau )

M2

72.00

150,000.00

10,800,000.00

PEKERJAAN LISTRIK

Pasang lampu hias gantung 40 Watt + saklar

Pasang lampu hias dinding / kolom 20 Watt +

17,760,000.00

saklar

Titik

1.00

576,750.00

576,750.00

Titik

6.00

476,750.00

2,860,500.00
3,437,250.00

PEKERJAAN FINISHING

Cat kilap / klasik besi pipa rangka atap

M2

8.04

4,966.00

39,926.64

Pembersihan akhir

Ls

1.00

150,000.00

150,000.00
189,926.64

Jumlah total

Rp.

115,849,542.95

III. BANGUNAN POS JAGA / SATPAM

NO

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN
( Rp.)

JUMLAH
HARGA
( Rp.)

PEKERJAAN PENDAHULUAN

Pasang papan bowplank

M1

22.00

36,545.00

803,990.00

Galian tanah pondasi

M3

2.25

32,000.00

72,000.00

Urugan tanah galian

M3

0.84

10,666.67

8,960.00

Urugan pasir dibawah lantai dan pondasi

M3

1.44

204,800.00

294,912.00

Urugan karang peninggi lantai

M3

8.10

108,800.00

881,280.00
2,061,142.00

PEKERJAAN PASANGAN

Pasang pondasi jalur batu kali 1 : 4

M3

4.20

715,784.40

3,006,294.48

Pasang sloof 15/20

M3

0.36

3,637,800.00

1,309,608.00

Pasang ring balok15/20

M3

0.36

3,637,800.00

1,309,608.00

Pasang kolom praktis

M3

0.11

3,637,800.00

400,158.00

Cor spesi bingkai kusen ( 1 : 2 )

M3

0.17

35,970.00

6,231.80

Cor plat beton meja dan tempat tidur

M3

0.48

3,637,800.00

1,746,144.00

Pasang dinding batu tela 1 : 4

M3

3.95

801,156.00

3,164,566.20

Plesteran dinding 1 : 3

M3

39.50

35,970.00

1,420,815.00

Pasang lantai keramik

M2

25.50

181,815.00

4,636,282.50

Pasang keramik dinding luar

M2

39.50

226,310.00

8,939,245.00
25,938,952.98

PEKERJAAN KAYU

Pasang kuda - kuda kayu besi 5/10

M3

0.53

5,036,000.00

2,669,080.00

Pasang balok gording kayu besi 5/10

M3

0.27

3,916,000.00

1,057,320.00

Pasang kusen kayu besi 5/10

M3

0.12

5,014,400.00

601,728.00

Pasang bingkai kusen kayu besi 2/10

M2

2.48

200,600.00

497,488.00

Pasang listplank kayu besi 3/30

M2

6.60

200,600.00

1,323,960.00

Pasang pintu panil kayu besi

M2

1.68

285,900.00

480,312.00

Pasang jendela panil kaca

M2

4.20

650,240.00

2,731,008.00

PEKERJAAN ATAP DAN PLAFOND

Pasang atap / multiroof

M2

38.50

217,900.00

8,389,150.00

Pasang nok multiroof

M1

16.00

42,280.00

676,480.00

Pasang plafond tripleks + rangka + list profil

M2

20.25

133,662.00

9,360,896.00

2,706,655.50
11,772,285.50

PEKERJAAN LISTRIK & PENGGANTUNG

Pasang lampu Philips XL 40 Watt + saklar

Pasang lampu Pijar 20 Watt + saklar

Pasang Stop kontak 200 Watt

Pasang gagang + kunci pintu tanam 2 slaag

Pasang engsel pintu, jendela , ( bahan kuningan

Titik

1.00

386,750.00

386,750.00

356,750.00

0.00

Titik

6.00

336,750.00

2,020,500.00

Bh

1.00

149,000.00

149,000.00

dengan ring nylon )

Psg

5.00

41,000.00

205,000.00

Pasang grendel jendela ( bahan kuningan )

Bh

4.00

24,500.00

98,000.00

Pasang hak / kaitan angin ( sistem drat )

Bh

4.00

20,750.00

83,000.00

0.00

2,407,250.00

PEKERJAAN FINISHING

Cat / kapur plafond

M2

20.25

15,465.00

313,166.25

Cat / kapur dinding

M2

39.50

25,015.00

988,092.50

Cat kilap kayu kusen, daun pintu, jendela,


957,472.10

bingkai kusen dan papan listplank

M2

20.54

46,615.00

Residu kuda - kuda, gording Dll

M2

0.48

9,650.00

4,632.00

Pembersihan akhir

Ls

1.00

150,000.00

150,000.00
2,413,362.85

Jumlah total

Rp.

53,953,889.33

IV. BANGUNAN PENUNJANG

NO

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN
( Rp.)

JUMLAH
HARGA
( Rp.)

PEKERJAAN AREAL PARKIR

Cut and file landasan lama

Ls

1.00

Timbunan lapisan atas ( klas A )

M3

Pasang Paving block

M3

10,000,000.00

10,000,000.00

772.00

30,000.00

23,160,000.00

54.04

249,210.00

13,467,308.40
46,627,308.40

PEKERJAAN PAGAR

Pasang dinding batu tela 1 : 4

M3

19.88

801,156.00

15,926,981.28

Pasang sloof 15/20

M3

6.57

3,637,800.00

23,900,346.00

Pasang ring balok15/20

M3

6.57

3,637,800.00

23,900,346.00

Pasang kolom praktis

M3

3.40

3,637,800.00

12,368,520.00

Plesteran dinding 1 : 3

M2

397.60

35,970.00

14,301,672.00

Pasang panel pagar ( kombinasi talais besi


dan pipa gip dibuat bermotif )

M2

81.00

650,000.00

52,650,000.00

Pasang lampu hias pada tiang kolom pagar

Titik

36.00

476,750.00

17,163,000.00

10

Cat dinding pagar

M2

397.60

25,015.00

9,945,964.00

12

Cat klasik besi panel pagar

M2

20.25

4,966.00

100,561.50
143,047,865.28

PEKERJAAN TAMAN

Timbunan tanah pilihan ( htanah hitam )

M3

0.53

144,800.00

76,744.00

Tanam tanaman hias

Ls

0.27

5,000,000.00

1,350,000.00

Pasang lampu taman 40 Watt + saklar

M3

0.12

501,750.00

60,210.00

Pasang drainase batu kali 1 : 3 ( Ukuran 50/70 )

M1

23.37

715,784.40

16,727,881.43
18,214,835.43

Jumlah total

Rp.

207,890,009.11

RENCANA ANGGARAN DAN BIAYA ( RAB )


PENGEMBANGAN HOTEL MUTIARA KOTARAJA
JALAN RAYA KOTARAJA DALAM DISTRIK JAYAPURA SELATAN

REKAPITULASI
I
II
III
IV

PEKERJAAN BANGUNAN HOTEL


PEKERJAAN BANGUNAN KANOPI / HALL
PEKERJAAN BANGUNAN POS JAGA SATPAM
PEKERJAAN BANGUNAN PENUNJANG

Rp.
Rp.
Rp.
Rp.

#REF!
115,849,542.95
53,953,889.33
207,890,009.11

#
#
#
#

REAL COST
PERENCANAAN /
PENGAWASAN
TOTAL COST
DIBULATKAN

7%

Rp.

#REF!

Rp.

#REF!

Rp.
Rp.

#REF!
5,300,776,000.00

TERBILANG : LIMA MILYAR TIGA RATUS JUTA TUJUH RATUS TUJUH PULUH ENAM
RIBU RUPIAH

ANALISA SATUAN PEKERJAAN


TAHUN ANGGARAN 2005

NO

URAIAN JENIS PEKERJAAN

M3 papan bowplank
M3 Kayu skoor 5/10
Kg Paku campu
H/O Tukang kayu
H/O Kepala tukang kayu
H/O Pekerja
H/O Mandor

1,500,000.00
1,250,000.00
12,000.00
60,000.00
65,000.00
40,000.00
80,000.00

7,500.00
6,250.00
2,400.00
16,200.00
1,755.00
1,320.00
1,120.00
36,545.00

40,000.00
80,000.00

30,000.00
2,000.00
32,000.00

40,000.00
80,000.00

40,000.00
2,640.00
42,640.00
160,000.00

192,000.00
12,000.00
800.00
204,800.00

80,000.00

96,000.00
12,000.00
800.00
108,800.00

110,000.00

132,000.00
12,000.00
800.00
144,800.00

195,000.00
200,000.00
45,500.00

159,900.00
108,000.00
309,400.00
240,000.00
24,000.00
60,000.00
6,500.00
907,800.00

40,000.00
80,000.00

40,000.00
80,000.00

1,00 M3 URUGAN TANAH PILIHAN


1.2000 M3 Urugan tanah pilihan
0.3000 H/O Pekerja
0.0100 H/O Mandor

1,00 M3 URUGAN KARANG


1.2000 M3 Karang urug
0.3000 H/O Pekerja
0.0100 H/O Mandor

1,00 M3 URUGAN PASIR URUG


1.2000 M3 Pasir urug
0.3000 H/O Pekerja
0.0100 H/O Mandor

1,00 M3 GALIAN TANAH KERAS


1.0000 H/O Pekerja galian tanah
0.0330 H/O Mandor

JUMLAH
HARGA
SATUAN
( Rp.)

1,00 M3 GALIAN TANAH BIASA ( - 1 M )


0.7500 H/O Pekerja galian
0.0250 H/O Mandor

HARGA
SATUAN
BAHAN
( Rp.)

1,00 M1 PEMASANGAN BOWPLANK


0.0050
0.0050
0.2000
0.2700
0.0270
0.0330
0.0140

HARGA
SATUAN
UPAH
( Rp.)

40,000.00
80,000.00

1,00 M3 PEKERJAAN BETON BERTULANG


( KOLOM,BALOK BEBAS TINGGI S/D
4 M1, PESLAT LANTAI , DAK , LEVEL
SETINGGI 3 M ( CAMP. 1: 2 : 3 )

PEKERJAAN COOR BETON


0.8200 M3 Kerikil coor beton
0.5400 M3 Pasir pasang
6.8000 Zak semen ( 50 Kg )
6.0000 H/O Pekerja
0.3000 H/O Mandor
1.0000 H/O Tukang batu
0.1000 H/O Kepala tukang batu

40,000.00
80,000.00
60,000.00
65,000.00

PEKERJAAN BESI BETON


110.0000 Kg besi beton polos
2.0000 Kg Kawat ikat beton
0.1000 H/O Kepala tukang besi
1.0000 H/O Tukang besi
6.7500 H/O Pekerja
PEKERJAAN BEKESSTING ( CETAKAN )
0.4000 M3 Papan bekessting
0.7000 M3 Stegger ( 32 batang )
4.0000 Kg Paku campur
0.1000 H/O Kepala tukang kayu
0.3000 H/O Mandor
1.0000 H/O Tukang kayu
4.0000 H/O Tukang bongkar cetakan
6.0000 H/O Pekerja

12,900.00
13,000.00

1,419,000.00
26,000.00
6,500.00
60,000.00
270,000.00
1,781,500.00

1,500,000.00
1,250,000.00
12,000.00

600,000.00
875,000.00
48,000.00
6,500.00
24,000.00
60,000.00
240,000.00
240,000.00
2,093,500.00

65,000.00
60,000.00
40,000.00

65,000.00
80,000.00
60,000.00
60,000.00
40,000.00

JADI 1 M3 BETON BERTULANG TERSEBUT


ADALAH (
A +
B
+
C ) =

3,875,000.00

1,00 M3 PEKERJAAN BETON BERTULANG


( KOLOM JEPIT, RING BALOK, DAN SLOOF
( CAMP. 1: 2 : 3 )

PEKERJAAN COOR BETON


0.8200 M3 Kerikil coor beton
0.5400 M3 Pasir pasang
6.8000 Zak semen ( 50 Kg )
6.0000 H/O Pekerja
0.3000 H/O Mandor
1.0000 H/O Tukang batu
0.1000 H/O Kepala tukang batu
PEKERJAAN BESI BETON
110.0000 Kg besi beton polos
2.0000 Kg Kawat ikat beton
0.1000 H/O Kepala tukang besi
1.0000 H/O Tukang besi
6.0000 H/O Pekerja
PEKERJAAN BEKESSTING ( CETAKAN )
0.4000 M3 Papan bekessting
4.0000 Kg Paku campur
0.1000 H/O Kepala tukang kayu
0.3000 H/O Mandor
1.0000 H/O Tukang kayu
6.0000 H/O Pekerja

195,000.00
200,000.00
45,500.00

159,900.00
108,000.00
309,400.00
240,000.00
24,000.00
60,000.00
6,500.00
907,800.00

12,900.00
13,000.00

1,419,000.00
26,000.00
6,500.00
60,000.00
240,000.00
1,751,500.00

1,500,000.00
12,000.00

600,000.00
48,000.00
6,500.00
24,000.00
60,000.00
240,000.00
978,500.00

40,000.00
80,000.00
60,000.00
65,000.00

65,000.00
60,000.00
40,000.00

65,000.00
80,000.00
60,000.00
40,000.00

JADI 1 M3 BETON BERTULANG TERSEBUT


ADALAH (
A +
B
+
C ) =

1,00 M3 PEKERJAAN BETON TANPA


TULANGAN CAMP. 1 : 2 : 3
0.8200
0.5400
6.8000
6.0000
0.3000
1.0000
0.1000

1
10

3,637,800.00

M3 Kerikil coor beton


M3 Pasir beton / pasang
Zak semen ( 50 Kg )
H/O Pekerja
H/O Mandor
H/O Tukang batu
H/O Kepala tukang batu

2
1,00 M3 PEKERJAAN BETON TANPA
TULANGAN CAMP. 1 : 3 : 5

195,000.00
200,000.00
45,500.00
40,000.00
80,000.00
60,000.00
65,000.00

159,900.00
108,000.00
309,400.00
240,000.00
24,000.00
60,000.00
6,500.00
907,800.00

0.9000
0.5400
4.5400
6.0000
0.3000
0.5000
0.0500

11

195,000.00
100,000.00
206,570.00
240,000.00
24,000.00
30,000.00
3,250.00
798,820.00

2,800.00
200,000.00

140,000.00
36,400.00
6,000.00
650.00
24,000.00
42,160.00
249,210.00

950.00
200,000.00
45,500.00
7,000.00

77,900.00
2,000.00
5,460.00
1,400.00
60,000.00
6,500.00
20,000.00
6,000.00
179,260.00

7,500.00
200,000.00
45,500.00
7,000.00

124,950.00
2,000.00
5,460.00
1,400.00
60,000.00
6,500.00
20,000.00
6,000.00
226,310.00

15,500.00
200,000.00
45,500.00
7,000.00

96,875.00
8,000.00
18,200.00
1,400.00
18,600.00
2,015.00
40,000.00
5,600.00
190,690.00

40,000.00
80,000.00
60,000.00
65,000.00

Bh PAVING
M3 Pasir pasang
H/O Tukang batu
H/O Kepala tukang batu
H/O Mandor
H/O pekerja

60,000.00
65,000.00
80,000.00
40,000.00

Bh Ubin porselin 11 x 11 Cm
M3 Pasir pasang
Zak semen ( 50 Kg 0
Kg Semen warna
H/O Tukang batu
H/O Kepala tukang batu
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

Bh Ubin porselin 20 x 30 Cm
M3 Pasir pasang
Zak semen ( 50 Kg 0
Kg Semen warna
H/O Tukang batu
H/O Kepala tukang batu
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M2 PASANG LANTAI KERAMIK


UKURAN 40 X 40 Cm
6.2500
0.0400
0.4000
0.2000
0.3100
0.0310
1.0000
0.0700

1
16

M3 Kerikil coor beton


M3 Pasir beton / pasang
Zak semen ( 50 Kg )
H/O Pekerja
H/O Mandor
H/O Tukang batu
H/O Kepala tukang batu

1,00 M2 PASANG KERAMIK DINDING


UKURAN 20 X 30 Cm
16.6600
0.0100
0.1200
0.2000
1.0000
0.1000
0.5000
0.0750

15

195,000.00
200,000.00
45,500.00

40,000.00
80,000.00
60,000.00
65,000.00

1,00 M2 PASANG UBIN DINDING PORSELIN


UKURAN 11 X 11 Cm
82.0000
0.0100
0.1200
0.2000
1.0000
0.1000
0.5000
0.0750

14

175,500.00
108,000.00
206,570.00
240,000.00
24,000.00
30,000.00
3,250.00
787,320.00

1,00 M2 PASANG PAVINGBLOCK


50.0000
0.1820
0.1000
0.0100
0.3000
1.0540

13

195,000.00
200,000.00
45,500.00

1,00 M3 PEKERJAAN BETON TANPA


TULANGAN CAMP. 1 : 3 : 6 ( utk lt tbl.7-10 Cm)
1.0000
0.5000
4.5400
6.0000
0.3000
0.5000
0.0500

12

M3 Kerikil coor beton


M3 Pasir beton / pasang
Zak semen ( 50 Kg )
H/O Pekerja
H/O Mandor
H/O Tukang batu
H/O Kepala tukang batu

Bh tegel keramik 40x40


M3 Pasir pasang
Zak semen Pc ( 50 Kg )
Kg Semen warna
H/O Tukang batu
H/O Kepala tukang batu
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M2 PASANG LANTAI KERAMIK


UKURAN 30 X 30 Cm
11.0000
0.0400
0.4000
0.2000

Bh tegel keramik 30x30


M3 Pasir pasang
Zak semen Pc ( 50 Kg )
Kg Semen warna

8,000.00
200,000.00
45,500.00
7,000.00

88,000.00
8,000.00
18,200.00
1,400.00

0.3100
0.0310
1.0000
0.0700

17

45,500.00
200,000.00

11,375.00
7,000.00
8,100.00
877.50
24,600.00
2,800.00
54,752.50

225,000.00
45,500.00
200,000.00

225,000.00
148,184.40
104,400.00
72,000.00
7,800.00
144,000.00
14,400.00
715,784.40

1,700.00
45,500.00
200,000.00

283,900.00
65,156.00
66,600.00
180,000.00
90,000.00
97,500.00
18,000.00
801,156.00

45,000.00
200,000.00

14,400.00
1,720.00
12,000.00
6,000.00
650.00
1,200.00
35,970.00

195,000.00
45,500.00
200,000.00

13,650.00
16,380.00
8,800.00
8,100.00
845.00
28,800.00
2,880.00
79,455.00

60,000.00
65,000.00
40,000.00
80,000.00

Zak semen ( 50 Kg )
M3 Pasir beton / pasang
H/O Tukang batu
H/O Kepala tukang batu
H/O Peketja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

m3 Batu kali / batu gunung


Zak semen PC ( 50 Kg )
M3 Pasir pasang
H/O Tukang batu
H/O Kepala tukang batu
H/O Peketja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

Bh batu tela
Zak semen PC ( 50 Kg )
M3 pasir pasang
H/O pekerja
H/O Tukang batu
H/O Kepala tukang batu
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

Zak semen PC ( 50 Kg )
M3 pasir pasang
H/O Pekerja
H/O Tukang batu
H/O Kepala tukang batu
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

1,00 M2 COR LANTAI BETON 6-7 Cm ( 1:3:5 )


0.0700
0.3600
0.0440
0.1350
0.0130
0.7200
0.0360

1
23

87,500.00
6,400.00
14,924.00
1,400.00
18,600.00
2,015.00
40,000.00
6,000.00
176,839.00

1,00 M2 PLESTERAN DINDING 1 : 3


0.3200
0.0086
0.3000
0.1000
0.0100
0.0150

22

3,500.00
200,000.00
45,500.00
7,000.00

1.00 M3 PASANGAN BATU TELA 1 : 4


167.0000
1.4320
0.3330
4.5000
1.5000
1.5000
0.2250

21

Bh tegel keramik 20x20


M3 Pasir pasang
Zak semen ( 50 Kg )
Kg Semen warna
H/O Tukang batu
H/O Kepala tukang batu
H/O Pekerja
H/O Mandor

1,00 M3 PASANG BATU KALI 1 : 4


1.0000
3.2568
0.5220
1.2000
0.1200
3.6000
0.1800

20

18,600.00
2,015.00
40,000.00
5,600.00
181,815.00

1,00 M2 COR LANTAI BAWAH KERAMIK


0.2500
0.0350
0.1350
0.0135
0.6150
0.0350

19

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M2 PASANG LANTAI KERAMIK


UKURAN 20 X 20 Cm
25.0000
0.0320
0.3280
0.2000
0.3100
0.0310
1.0000
0.0750

18

H/O Tukang batu


H/O Kepala tukang batu
H/O Pekerja
H/O Mandor

M3 Kerikil Coor beton


Zak semen Pc ( 50 Kg )
M3 pasir beton
H/O Tukang Batu
H/O Kepala tukang
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M3 PASANG KUDA-KUDA KY.BESI 5/10


BENTANG LEBIH 7,00 M1
1.1000
2.0000
36.0000
3.6000
12.0000
0.6000

M3 Kayu besi 5/10


Kg Paku campur
H/O Tukang kayu
H/O Kepala tukang kayu
H/O pekerja
H/O Mandor

1,900,000.00
12,000.00
60,000.00
65,000.00
40,000.00
80,000.00

2,090,000.00
24,000.00
2,160,000.00
234,000.00
480,000.00
48,000.00

5,036,000.00

24

1,00 M1 PASANG GORDING KY.MATOA 5/10


0.0050
0.1250
0.1200
0.0120
0.0400

M3 kayu matoa 5/10


Kg paku campur
H/O Tukang kayu
H/O Kepala Tukang kayu
H/O Pekerja

1,700,000.00
12,000.00

8,500.00
1,500.00
7,200.00
780.00
1,600.00
19,580.00
3,916,000.00

1,900,000.00
12,000.00

2,090,000.00
2,400.00
2,160,000.00
234,000.00
480,000.00
48,000.00
5,014,400.00

60,000.00
65,000.00
40,000.00

Utuk harga Per / M3 adalah

25

1,00 M3 PEKERJAAN KUSEN PINTU / JENDELA KAYU BESI


1.1000
0.2000
36.0000
3.6000
12.0000
0.6000

26

12,000.00

38,000.00
117,000.00
7,200.00
36,000.00
1,200.00
1,200.00
200,600.00

M3 Papan kayu besi tebal 2,5 Cm


M2 Kaca rybent tebal 5 Cm
H/O Tukang kayu
H/O Pekerja
H/O Kepala tukang
H/O Mandor
Kg Paku

1,900,000.00
180,000.00
60,000.00
40,000.00
65,000.00
80,000.00
12,000.00

19,000.00
144,000.00
360,000.00
80,000.00
39,000.00
8,000.00
240.00
650,240.00

M3 Papan kayu besi tebal 2,5 Cm


H/O Tukang kayu
H/O Pekerja
H/O Kepala tukang
H/O Mandor
Kg Paku

1,900,000.00
60,000.00
40,000.00
65,000.00
80,000.00
12,000.00

19,000.00
54,000.00
140,000.00
58,500.00
12,000.00
2,400.00
285,900.00

1,00 M2 PEKERJAAN JENDELA DAN VENTILASI KACA MATI


TEBAL 5 MM ( RYBENT )
4.0000
1.0000
2.0000
0.2000
0.2000
0.0100
0.0200

1
30

1,900,000.00
65,000.00
40,000.00
60,000.00
40,000.00

1,00 M2 PEKERJAAN PINTU PANIL KAYU BESI


0.0100
0.9000
3.5000
0.9000
0.1500
0.2000

29

M3 Papan kayu besi


H/O Tukang kayu
H/O Pekerja
H/O Kepal tukang
H/O Mandor
Kg Paku campur

1,00 M2 PEKERJAAN PINTU DAN JENDELA KACA PANIL


TEBAL 5 MM ( RYBENT )
0.0100
0.8000
6.0000
2.0000
0.6000
0.1000
0.0200

28

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M2 PEKERJAAN JALUSI. TOP GEVEL DAN LISTPLANK KAYU BESI


0.0200
1.8000
0.1800
0.6000
0.0300
0.1000

27

M3 Kayu besi 5/10


Kg Paku campuran
H/O Tukang kayu
H/O Kepala tukang kayu
H/O Pekerja
H/O mandor

M1 Lat kayu besi


M2 Kaca rybent tebal 5 MM
H/O Tukang kayu
H/O Pekerja
H/O Kepala tukang
H/O Mandor
Kg Paku

20,000.00
180,000.00
60,000.00
40,000.00
65,000.00
80,000.00
12,000.00

80,000.00
180,000.00
120,000.00
8,000.00
13,000.00
800.00
240.00
402,040.00

1,00 M2 PLAFOND TRIPLEKS DENGAN


PENGGANTUNG
0.3360
1.0000
0.0120
0.0200
0.8000
0.0800
0.2800
0.0140

Lembar tripleks ( tebal 4 MM )


M1 List Profil kayu besi 5/5
M3 Kayu penggantung
Kg Paku tripleks
H/O Tukang kayu
H/O Kepala tukang
H/O Pekerja
H/O Mandor

52,000.00
30,000.00
1,700,000.00
13,500.00
60,000.00
65,000.00
40,000.00
80,000.00

17,472.00
30,000.00
20,400.00
270.00
48,000.00
5,200.00
11,200.00
1,120.00

133,662.00

31

1,00 M2 PLAFOND LAT PROFIL DENGAN


PENGGANTUNG
2.5000
1.0000
0.0120
0.0200
0.8000
0.0800
0.2800
0.0140

32

36,000.00
30,000.00
1,700,000.00
13,500.00

90,000.00
30,000.00
20,400.00
270.00
48,000.00
5,200.00
11,200.00
1,120.00
206,190.00

45,000.00
16,000.00

32,400.00
4,000.00
4,000.00
12,000.00
1,300.00
4,000.00
57,700.00

60,000.00
12,000.00

396,000.00
3,000.00
6,000.00
13,000.00
800.00
4,000.00
422,800.00
42,280.00

45,000.00
15,000.00
1,900,000.00

135,000.00
15,000.00
95,000.00
360,000.00
39,000.00
140,000.00
14,000.00
798,000.00
79,800.00

65,000.00
1,700,000.00
20,000.00
13,000.00

92,950.00
20,400.00
80,000.00
3,250.00
4,000.00
12,000.00
1,300.00
4,000.00
217,900.00

60,000.00
65,000.00
40,000.00
80,000.00

1,00 M2 PASANG ATAP SENG GELOMBANG BJLS 0.30


0.7200
0.2500
0.1000
0.2000
0.0200
0.0500

33

Lembar papan kayu besi 2/10 disponing


M1 List Profil kayu besi 5/5
M3 Kayu penggantung
Kg Paku tripleks
H/O Tukang kayu
H/O Kepala tukang
H/O Pekerja
H/O Mandor

Lbr Seng gelombang Bjls 0,30


Kg Paku seng
H/O Pekerja
H/O Tukang kayu
H/O Kepala tukang
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

10,00 M1 PASANG NOK SENG PLAT BJLS 0,30


6.6000
0.2500
0.1000
0.2000
0.0200
0.0500

Lbr seng plat bjls 0.30


Kg Paku campuran
H/O Tukang kayu
H/O Kepala tukang kayu
H/O Pekerja
H/O mandor

60,000.00
65,000.00
40,000.00
80,000.00

*** Untuk Harga Per / M1 =

34

10,00 M1 PASANG TALANG ATAP / JURAI DALAM ( KEEV GOT )


3.0000
1.0000
0.0500
6.0000
0.6000
3.5000
0.1750

Lembar seng talang ( plat bjls 0.30 )


Kg Paku sumbat ( biaya solder )
M3 Papan kayu besi
H/O Tukang kayu
H/O Kepala tukang
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

*** Untuk Harga Per / M1 =

35

1,00 M2 PASANG ATAP / MULTI ROOF


1.4300
0.0120
4.0000
0.2500
0.1000
0.2000
0.0200
0.0500

1
36

Lbr multiroof
M3 Kayu penggantung
M1 Lat kayu besi
Kg Paku seng
H/O Pekerja
H/O Tukang kayyu
H/O Kepala tukang
H/O Mandor

95,000.00

95,000.00
54,000.00
149,000.00

29,000.00

29,000.00
12,000.00
41,000.00

12,500.00

12,500.00
12,000.00

60,000.00

1,00 PSG ENGSEL PINTU / JENDELA / VENTILASI


1.0000 Psg engsel kuningan
0.2000 H/O Tukang kayu

38

1,00 BH PASANG KUNCI TANAM 2 SLAAG


1.0000 Bh Kunci tanam type luks
0.9000 H/O Tukang kayu

37

40,000.00
60,000.00
65,000.00
80,000.00

60,000.00

1,00 BH GRENDEL KUNINGAN


1.0000 Bh grendel kuningan
0.2000 H/O Tukang kayu

60,000.00

24,500.00

39

1,00 BH HAK / KAIT ANGIN


1.0000 Psg Hak angin putar / drat
0.2000 H/O Tukang kayu

40

8,750.00

8,750.00
12,000.00
20,750.00

9,000.00

495,000.00
660,000.00
71,500.00
320,000.00
1,546,500.00
15,465.00

9,000.00
17,000.00
4,000.00

495,000.00
935,000.00
20,000.00
660,000.00
71,500.00
320,000.00
2,501,500.00
25,015.00

35,000.00
17,000.00
4,000.00
16,000.00
15,000.00

78,750.00
17,000.00
20,000.00
12,800.00
18,000.00
144,000.00
15,600.00
80,000.00
80,000.00
466,150.00
46,615.00

35,000.00
17,000.00
4,000.00
15,000.00

105,000.00
34,000.00
20,000.00
18,000.00
144,000.00
15,600.00
80,000.00
80,000.00
496,600.00
4,966.00

15,000.00

5,250.00
4,000.00
400.00
9,650.00

60,000.00

100,00 M2 CAT PLAFOND BARU ( 3 X CAT )


55.0000
11.0000
1.1000
8.0000

Kg Cat plafond
H/O Tukang cat
H/O Kepala tukang
H/O pekerja

60,000.00
65,000.00
40,000.00

*** Untuk Harga Per / M1 =

41

100,00 M2 CAT TEMBOK BARU / DINDING BARU ( 3 X CAT )


55.0000
55.0000
5.0000
11.0000
1.1000
8.0000

Kg Cat tembok
Kg Plammur
Lbr Kertas pasir / ampelas
H/O Tukang cat
H/O Kepala tukang
H/O Pekerja

60,000.00
65,000.00
40,000.00

*** Untuk Harga Per / M1 =

42

10,00 M2 CAT KAYU KILAP BARU ( 3 X CAT )


2.2500
1.0000
5.0000
0.8000
1.2000
2.4000
0.2400
2.0000
1.0000

Kg Cat kilap kayu


Ltr Minyak cat
Lbr Kertas ampelas
Kg Dempul
Kg cat dasr ( meni )
H/O Tukang cat
H/O Kepala tukang
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

*** Untuk Harga Per / M1 =

43

100,00 M2 CATBESI KILAP BARU ( 3 X CAT )


MENGGOSOK DAN MENI
3.0000
2.0000
5.0000
1.2000
2.4000
0.2400
2.0000
1.0000

Kg Cat kilap kayu


Ltr Minyak cat
Lbr Kertas ampelas
Kg cat dasr ( meni )
H/O Tukang cat
H/O Kepala tukang
H/O Pekerja
H/O Mandor

60,000.00
65,000.00
40,000.00
80,000.00

*** Untuk Harga Per / M1 =

44

100,00 M2 RESIDU KUDA - KUDA / GORDING / DLL


0.3500 Ltr Residu
0.1000 H/O Pekerja
0.0050 H/O Mandor

1
45

1,00 TITIK PASANG LAMPU TL 40 WATT


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

46

40,000.00
80,000.00

Set lampu TL 1 x 40 Watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

85,000.00
20,000.00
12,500.00

85,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
411,750.00

45,000.00
20,000.00
12,500.00

45,000.00
10,000.00
125,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 TITIK PASANG LAMPU TL 10 WATT


1.0000
0.5000
10.0000
2.0000

Set lampu TL 1 x 10 Watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja

40,000.00

1.5000 H/O Tukang listrik


0.1500 H/O Kepala tukang
0.1500 H/O Mandor

47

Set Lampu Philips 40 watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

Set Lampu Gantung 60 Watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

Set Lampu tempel 20 Watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

Set Lampu taman 20 Watt ( berdiri )


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

60,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
386,750.00

250,000.00
20,000.00
12,500.00

250,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
576,750.00

150,000.00
20,000.00
12,500.00

150,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
476,750.00

175,000.00
20,000.00
12,500.00

175,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
501,750.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 TITIK PASANG LAMPU MEJA


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

53

60,000.00
20,000.00
12,500.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 TITIK PASANG LAMPU HIAS TAMAN ( Berdiri )


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

52

30,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
356,750.00

1,00 TITIK PASANG LAMPU ( TEMPEL DINDING )


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

51

30,000.00
20,000.00
12,500.00

1,00 TITIK PASANG LAMPU HIAS ( GANTUNG )


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

50

Set lampu pijar


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

1,00 TITIK PASANG LAMPU PHILPS XL


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

49

90,000.00
9,750.00
12,000.00
371,750.00

1,00 TITIK PASANG LAMPU PIJAR ( Veting tanam )


1.0000
0.5000
10.0000
2.0000
1.5000
0.1500
0.1500

48

60,000.00
65,000.00
80,000.00

Set Lampu taman 15 Watt


Bh Saklar
M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

75,000.00
20,000.00
12,500.00

75,000.00
10,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
401,750.00

20,000.00
12,500.00

20,000.00
125,000.00
80,000.00
90,000.00
9,750.00
12,000.00
336,750.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 TITIK PASANG STOP KONTAK


1.0000
10.0000
2.0000
1.5000
0.1500
0.1500

Bh Stop kontak 200 watt


M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

54

1,00 TITIK PASANG SKRING KHAS 1 GROUP


1.0000
3.5000
1.5000
1.2500
0.1250
1.0000

55

Set wastafel keramik ( KIA )


Zak semen PC ( 50 Kg )
M3 Pasir pasang
H/O Pekerja
H/O Tukang batu
H/O Kepala tukang
H/O Mandor

Set wastafel aluminium


Zak semen PC ( 50 Kg )
M3 Pasir pasang
H/O Pekerja
H/O Tukang batu
H/O Kepala tukang
H/O Mandor

Set Shower Luks


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

Set stop kran dll


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

1,500,000.00
45,500.00
200,000.00

1,500,000.00
2,275.00
6,000.00
20,000.00
66,000.00
6,500.00
3,200.00
1,603,975.00

600,000.00
45,500.00
200,000.00

600,000.00
2,275.00
6,000.00
20,000.00
66,000.00
6,500.00
3,200.00
703,975.00

75,000.00

75,000.00
68,000.00
60,000.00
6,500.00
20,000.00
229,500.00

35,000.00

35,000.00
68,000.00
60,000.00
6,500.00
20,000.00
189,500.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 BH PASANG BAK MANDI LAPIS PORSELIN


250.0000
0.9500
30.0000
1.2000
0.9500
2.5000
0.2500
0.0250
0.2500

61

800,000.00
2,275.00
6,000.00
20,000.00
66,000.00
6,500.00
3,200.00
903,975.00

1,00 TITIK PASANG STOP KRAN AIR


1.0000
1.7000
1.0000
0.1000
0.2500

60

Set closet duduk keramik ( KIA )


Zak semen PC ( 50 Kg )
M3 Pasir pasang
H/O Pekerja
H/O Tukang batu
H/O Kepala tukang
H/O Mandor

1,00 TITIK PASANG SHOWER


1.0000
1.7000
1.0000
0.1000
0.2500

59

800,000.00
45,500.00
200,000.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 BH PASANG WASTAFEL CUCI 2 BAK


1.0000
0.0500
0.0300
0.5000
1.1000
0.1000
0.0400

58

30,000.00
43,750.00
60,000.00
75,000.00
8,125.00
80,000.00
296,875.00

1,00 BH PASANG WASTAFEL KERAMIK I BAK


1.0000
0.0500
0.0300
0.5000
1.1000
0.1000
0.0400

57

30,000.00
12,500.00

1,00 BH PASANG CLOSET DUDUK


1.0000
0.0500
0.0300
0.5000
1.1000
0.1000
0.0400

56

Set skring khas 1 group


M1 kabel / pipa union
H/O Pekerja
H/O Tukang listrik
H/O Kepala tukang
H/O Mandor

Bh ubin porselin ( 11 x 11 Cm )
Zak semen PC ( 50 Kg )
Bh Batu tela
Kg Semen Pc ( warna )
M3 Pasir pasang
H/O Pekerja
H/O Tuknag batu
H/O Kepala tukang
H/O Mandor

900.00
45,500.00
1,700.00
7,000.00
200,000.00

225,000.00
43,225.00
51,000.00
8,400.00
190,000.00
100,000.00
15,000.00
1,625.00
20,000.00
654,250.00

79,000.00

39,500.00
68,000.00
60,000.00
6,500.00
20,000.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 M1 PASANG INSTALASI PIPA AIR BERSIH 1/2 "


0.5000
1.7000
1.0000
0.1000
0.2500

Set Pipa medium + aksesoris


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

194,000.00

62

1,00 M1 PASANG INSTALASI PIPA AIR BERSIH 3/4 "


0.5000
1.7000
1.0000
0.1000
0.2500

63

100,000.00

50,000.00
68,000.00
60,000.00
6,500.00
20,000.00
204,500.00

120,000.00

60,000.00
68,000.00
60,000.00
6,500.00
20,000.00
214,500.00

140,000.00

70,000.00
68,000.00
60,000.00
6,500.00
20,000.00
224,500.00

40,000.00
60,000.00
65,000.00
80,000.00

1,00 M1 PASANG INSTALASI PIPA AIR KOTOR 3 "


0.5000
1.7000
1.0000
0.1000
0.2500

64

Set Pipa medium + aksesoris


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

Set Pipa PVC+ aksesoris


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

1,00 M1 PASANG INSTALASI PIPA AIR KOTOR 4 "


0.5000
1.7000
1.0000
0.1000
0.2500

Set Pipa PVC + aksesoris


H/O Pekerja
H/O Tukang pipa
H/O Kepala tukang
H/O Mandor

40,000.00
60,000.00
65,000.00
80,000.00

162000
101,360.00
263360

25000
4,175,000.00
517,256.00
4,692,256.00

D. PEMBUATAN PAGAR
NO

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN
( Rp.)

JUMLAH
HARGA
( Rp.)

A PEKERJAAN PENDAHULUAN
1

Pasang papan bowplank

M'

11.33

#REF!

#REF!

Galian tanah untuk pondasi

M3

12.96

#REF!

#REF!

Urugan galian

M3

4.32

#REF!

#REF!
#REF!

PEKERJAAN PASANGAN

Pasang pondasi jalur batu kali

M3

7.20

#REF!

#REF!

Pasang Balok sloof 15/20

M3

1.08

#REF!

#REF!

Pasang kolom pagar 30/30

M3

1.80

Pasang dinding batu tela 1 : 4

M3

6.56

#REF!

#REF!

Pasang beton list tanpa tulangan 1 : 2

M3

0.59

#REF!

#REF!

Plesteran dinding bermotif batu alam 1 : 3

M2

130.83

4,306,100.00

43,575.00

7,750,980.00

5,700,699.38
#REF!

C PEKERJAAN PANEL PAGAR


1

Pasang panel tralis bermotif

M3

34.75

450,000.00

15,637,500.00

Pasang pintu panel tralis bermotif sistem geser

M3

8.05

500,000.00

4,025,000.00

Pasang pintu panel tralis bermotif sistem ayun

M3

4.90

450,000.00

D PEKERJAAN FINISHING

2,205,000.00
21,867,500.00

Cat / Kapur dinding

M2

130.83

26,420.00

Pembersihan akhir

Ls

1.00

250,000.00

3,456,396.50
250,000.00
3,706,396.50

JUMLAH TOTAL

Rp.

#REF!

RENCANA ANGGARAN DAN BIAYA ( RAB )


PEKERJAAN
LOKASI
TAHUN ANGGARAN

NO

: PEMBANGUNAN PUSKESMAS PERMANEN ( SATU LANTAI )


TIPE / LUAS 454.00 M2
: DISTRIK MUARA TAMI KOTA JAYAPURA
: 2008

URAIAN JENIS PEKERJAAN

SAT

VOLUME

HARGA
SATUAN

JUMLAH
HARGA

( Rp.)

( Rp.)

A PEKERJAAN PENDAHULUAN
1

Survey dan pengukuran

Ls

1.00

750,000.00

750,000.00

Pembersihan lokasi

M2

339.00

10,075.00

3,415,425.00

Pasang direksi kett, kamp. Tukang , gudang bahan & alat

M2

35.25

332,325.00

11,714,456.25

Pasang papan nama proyek

Ls

1.00

300,000.00

300,000.00

Dokumentasi dan pelaporan

Ls

1.00

1,350,000.00

1,350,000.00

17,529,881.25

B PEKERJAAN TANAH & PASIR


1
2
3
3
4
5

Pasang papan bowplank


Galian tanah untuk pondasi jalur ( - 1 M )
Galian tanah untuk pondasi titik ( + 1 M )
Urugan galian tanah
Urugan karang peninggi lantai
Urugan pasir dibawah lantai

M'
M3
M3
M3
M3
M3

100.00
95.76
37.50
50.67
120.81
16.18

32,265.00
41,375.00
44,250.00
13,791.67
174,150.00
347,150.00

3,226,500.00
3,962,070.00
1,659,375.00
698,823.75
21,039,061.50
5,616,887.00

36,202,717.25

C PEKERJAAN PASANGAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Cor beton lantai kerja ( 1 : 3 : 5 )


Pasang pondasi titik / poer plat beton ( 200 Kg )
Pasang pondasi jalur batu kali
Pasang batu kosong / anstamping ( batu kosong )
Cor beton sloof utama 30/40 ( 200 Kg )
Cor beton sloof anak 20/20 ( 200 Kg )
Cor beton sloof biasa 15/20 ( 175 Kg )
Cor beton kolom utama 40/40 ( 200 Kg )
Cor beton kolom anak 30/30 ( 200 Kg )
Cor beton kolom praktis 15/15 ( 175 Kg )
Cor beton balok lantai utama 30/35 ( 200 Kg )
Cor beton balok lantai anak 20/30 ( 200 Kg )
Cor beton ring balok 15/20 ( 175 Kg )
Cor beton pelat lantai ( tebal 12 Cm ) 175 Kg
Cor beton tangga dan bordes ( 175 Kg )
Pasang dinding batu tela 1 : 4 ( dinding & rollag )
Pasang dinding batu tela 1 : 2 ( KM/WC )
Plesteran dinding 1 : 4
Plesteran dinding 1 : 2
Cor beton lantai bawah keramik
Pasang lantai keramik 40/40
Pasang lantai keramik 30/30
Pasang lantai keramik 20/20 ( KM/WC, meja beton )
Pasang dinding keramik 25/20

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M3
M2
M2
M2
M2

1.01
6.62
46.55
17.96
8.88
0.72
2.99
6.62
5.99
4.41
12.21
2.61
6.71
15.63
5.04
66.51
12.56
1191.60
168.20
16.95
34.00
347.00
25.13
82.45

1,360,700.00
8,075,685.00
1,124,060.00
468,625.00
8,075,685.00
8,075,685.00
7,530,310.00
8,075,685.00
8,075,685.00
7,530,310.00
8,075,685.00
8,075,685.00
7,530,310.00
7,530,310.00
7,530,310.00
1,062,565.00
1,107,665.00
58,180.00
65,636.00
1,360,700.00
248,760.00
299,760.00
284,760.00
282,820.00

1,371,585.60
53,493,337.44
52,324,993.00
8,414,161.88
71,712,082.80
5,814,493.20
22,534,452.68
53,493,337.44
48,405,655.89
33,217,138.70
98,604,113.85
21,077,537.85
50,490,728.55
117,698,745.30
37,952,762.40
70,673,854.56
13,908,395.57
69,327,288.00
11,039,975.20
23,063,865.00
8,457,840.00
104,016,720.00
7,154,595.00
23,318,509.00

1,007,566,168.90
Rencana Anggaran Dan Biaya ( RAB ) : Pembangunan Polindes ( Tipe / luas 80.00 M2 )

D PEKERJAAN KAYU
1
2
3
4
5
6
7
8
9
10

Pasang kuda - kuda, skor angin, dll kayu besi 5/10


Pasang balok gording kayu matoa 5/10
Pasang kusen kayu besi 5/10
Pasang papan listplank kayu besi 2.5/20
Pasang pintu panel kayu besi
Pasang pintu lapis dobel teakwood + seng plat Bjls 0.20
Pasang jendela panel kaca ky. Besi ( ryben 5 Mm )
Pasang ventilasi panel kaca ky. Besi ( ryben 5 Mm )
Pasang jendela dan ventilasi kaca mati ( ryben 5 Mm )
Pasang dinding partisi + rangka ( dobel teakwood )

PEKERJAAN ATAP DAN PLAFOND

1
2
3
4
5

Pasang atap ( seng gel.persegi Bjls 0.30 dicat warna )


Pasang nok / bubungan ( seng plat bjls 0.30 Mm )
Pasang keev got jurai dalam ( seng plat bjls 0.30 Mm )
Pasang plafond tripleks tbl 3 mm + rangka
Pasang list profil ky. 5/5

PEKERJAAN LISTRIK

1
2
3
4
5
6
7
8

Pasang lampu Philps 40 Watt


Pasang lampu Philps 20 Watt
Pasang lampu Philps 15 Watt
Pasang saklar tunggal
Pasang saklar ganda
Pasang stop kontak
Pasang sekring boks
Biaya penyambungan PLN

M3
M3
M3
M2
M2
M2
M2
M2
M2
M2

4.57
1.55
2.72
34.20
57.12
9.75
30.80
32.15
5.00
70.95

5,810,000.00
3,968,750.00
7,103,000.00
275,400.00
625,250.00
311,920.48
669,653.33
669,653.33
272,500.00
333,796.33

26,531,655.50
6,151,562.50
19,330,814.50
9,418,680.00
35,714,280.00
3,041,224.69
20,625,322.67
21,529,354.67
1,362,500.00
23,682,849.85

167,388,244.38
M2
M'
M'
M2
M'

167.55
123.00
50.00
406.13
446.00

82,520.00
41,720.00
41,720.00
155,610.83
19,712.50

13,826,226.00
5,131,560.00
2,086,000.00
63,198,227.74
8,791,775.00

93,033,788.74
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Ls

25.00
10.00
16.00
8.00
15.00
16.00
2.00
1.00

396,750.00
389,750.00
316,750.00
329,270.00
424,270.00
344,270.00
352,250.00
3,000,000.00

9,918,750.00
3,897,500.00
5,068,000.00
2,634,160.00
6,364,050.00
5,508,320.00
704,500.00
3,000,000.00

37,095,280.00

G PEKERJAAN PENGGANTUNG
1
2
3
4
5
6

Pasang gagang / kunci pintu ( 2 slaag )


Pasang engsel pintu
Pasang engsel jendela dan ventilasi
Pasang grendel jendela dan ventilasi
Pasang grendel pintu ( KM/WC )
Pasang hak / kait angin luks

Bh
Psg
Psg
Bh
Bh
Psg

34.00
36.00
132.00
132.00
5.00
132.00

199,500.00
72,800.00
57,800.00
43,200.00
35,200.00
45,800.00

6,783,000.00
2,620,800.00
7,629,600.00
5,702,400.00
176,000.00
6,045,600.00

28,957,400.00

H PEKERJAAN SANITAIR
1
2
3
4
5
6
7
8
9
10
11
12
13

Pasang closet duduk ( porselin )


Pasang watafel porselin
Pasang wastafel cucui aluminium ( 2 Bak 0
Pasang stop kran air 1/2 " + 1ntalasi
Pasang instalasi air bersih ( pipa Gip 1/2 " )
Pasang instalasi air kotor ( pipa PVC 3" )
Pasang instalasi air kotor ( pipa PVC 4 " )
Pasang fool drain KM/WC
Pasang dinding bak air, septictank , resapan dan saluran
batu tela 1 : 2
Plesteran dinding 1 : 2
Pasang keramik pada dinding bak ( 20/25 )
Cor beton pelat penutup septictank ( 75 Kg )
Pasang pipa penguapan septictank ( GIP 2 ")

Bh
Bh
Bh
Titik
M'
M'
M'
Buah

5.00
3.00
1.00
8.00
20.00
15.00
20.00
5.00

1,782,200.00
1,651,291.67
853,291.67
465,437.50
115,700.00
116,375.00
136,375.00
25,000.00

8,911,000.00
4,953,875.00
853,291.67
3,723,500.00
2,314,000.00
1,745,625.00
2,727,500.00
125,000.00

M3
M2
M2
M3
M'

2.60
52.00
52.00
0.40
2.00

1,107,665.00
65,636.00
282,820.00
5,348,810.00
171,950.00

2,879,929.00
3,413,072.00
14,706,640.00
2,139,524.00
343,900.00

48,836,856.67

PEKERJAAN CAT DAN FINISHING

1
2
3

Kapur / cat dinding


Kapur cat plafond
Cat kilap kayu kusen, listplank, daun pintu & jendela,
Jalusi, dll.
Politur, vernis halus dinding partis
Cat kilap atap ( seng gelombang )
Residu rangka atap ( kuda - kuda, gording, dll )
Pembersihan akhir

4
4
5
6

M2
M2

1359.60
406.13

34,710.00
30,626.00

47,191,716.00
12,438,137.38

M2
M2
M2
M2
Ls

313.17
141.90
167.55
367.20
1.00

63,573.50

19,908,995.13

31,072.50
9,725.00
100,000.00

5,206,197.38
3,571,020.00
100,000.00

88,416,065.88

Rencana Anggaran Dan Biaya ( RAB ) : Pembangunan Polindes ( Tipe / luas 80.00 M2 )

RENCANA ANGGARAN DAN BIAYA ( RAB )

PEKERJAAN
LOKASI
TAHUN ANGGARAN

: PEMBANGUNAN PUSKESMAS PERMANEN ( SATU LANTAI )


TIPE / LUAS 454.00 M2
: DISTRIK MUARA TAMI KOTA JAYAPURA
: 2008

REKAPITULASI
A
B
C
D
E
F
G
H
I

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH & PASIR
PEKERJAAN PASANGAN
PEKERJAAN KAYU
PEKERJAAN ATAP & PLAFOND
PEKERJAAN LISTRIK
PEKERJAAN PENGGANTUNG
PEKERJAAN SANITAIR
PEKERJAAN CAT DAN FINISHING

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,529,881.25
36,202,717.25
1,007,566,168.90
93,033,788.74
37,095,280.00
37,095,280.00
28,957,400.00
48,836,856.67
88,416,065.88

REAL COST
P P N 10 %

Rp.
Rp.

1,394,733,438.69

TOTAL COST
DIBULATKAN

Rp.
Rp.

1,534,206,782.56

139,473,343.87

1,300,000,000.00

TERBILANG : SATU MILYAR TIGA RATUS JUTA RUPIAH

jayapura , maret 2008

DAFTAR HARGA SATUAN UPAH DAN BAHAN


TRIWULAN KETIGA (AGUSTUS S/D DESEMBER 2008 )

NO

URAIAN BAHAN

SATUAN

HARGA SATUAN

HARGA SATUAN

( DALAM KOTA )
4

( MUARA TAMI )
5

KELOMPOK TENAGA KERJA


1
2
3
4

II

Pekerja
Tukang
Kepala Tukang
Mandor

H/O
H/O
H/O
H/O

57,500.00
78,500.00
85,000.00
95,000.00

KELOMPOK HARGA BAHAN


( UNTUK LOKASI MUARA TAMI BAHAN DARI LUAR + BIAYA ANGKUTAN )

KAYU ( Balok, Papan, List, Tripleks dll )

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
B

Papan bekesting ( kayu putih )


Kayu buah ( steger )
Steger ( kayu balok campur )
Papan kayu besi ( tebal 2.5 Cm )
Balok kayu besi 5/10 Cm
Kayu besi 10/10 Cm
Balok Kayu besi 5/5 Cm
Papan kayu matoa ( 2.5 Cm )
Balok kayu matoa 5/10
Balok kayu matoa 5/5
List Profil Kayu matoa 5/5 Cm
List Profil Kayu matoa 4/4 Cm
List Profil Kayu matoa 3/3 CM
List Profil kayu matoa 2/2 Cm
Tripleks ukuran pintu
Tripleks tebal 3 Mm
Tripleks tebal 6 Mm
Tripleks tebal 9 Mm
Multipleks tebal 12 Mm
Multipleks tebal 20 Mm
Multipleks tebal 30 Mm
Teakwod tebal 6 Mm
Fermika

M3
M3
Btg
M3
M3
M3
M3
M3
M3
M3
Btg
Btg
Btg
Btg
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

1,900,000.00
1,625,000.00
30,000.00
2,900,000.00
2,900,000.00
2,900,000.00
2,900,000.00
2,100,000.00
2,100,000.00
2,100,000.00
40,000.00
35,000.00
25,000.00
15,000.00
47,000.00
65,000.00
95,000.00
150,000.00
197,000.00
240,000.00
360,000.00
124,000.00
213,000.00

1,925,000.00
1,650,000.00
55,000.00
2,925,000.00
2,925,000.00
2,925,000.00
2,925,000.00
2,125,000.00
2,125,000.00
2,125,000.00
45,000.00
40,000.00
30,000.00
20,000.00
52,000.00
70,000.00
100,000.00
155,000.00
202,000.00
245,000.00
365,000.00
129,000.00
218,000.00

M3
M3
M3
M3
M3
M3
M3
M3

160,000.00
215,000.00
152,000.00
230,000.00
354,000.00
280,000.00
391,000.00
504,000.00

429,000.00
355,000.00
466,000.00
579,000.00

GALIAN C ( Pasir, Batu, Kerikil, Karang dll )


1
2
3
4
5
6
7
8

Urugan tanah biasa


Urugan tahah humus / hitam
Karang urug
Karang cor
Kerikil cor ( kerikil kali pilihan )
Batu kali / batu pecah ( Gunung )
Batu pecah 5/7
Batu pecah 3/5

1
9
10
11
12
13
14
15
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

2
Batu pecah 2/3
Batu pecah 1/2 ( scren )
Pasir beton
Pasir urug
Batu tela
Batu kerawang
Paving block

M3
M3
M3
M3
Buah
Buah
Buah

600,000.00
620,000.00
285,000.00
250,000.00
2,500.00
6,700.00
3,500.00

675,000.00
695,000.00
360,000.00
325,000.00
3,000.00
7,000.00
4,000.00

Zak
Kg
Btg
Btg
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
M2

74,000.00
15,000.00
35,000.00
50,000.00
150,000.00
200,000.00
65,000.00
95,000.00
150,000.00
4,000.00
13,000.00
17,000.00
65,000.00
1,500.00
5,000.00
350,000.00

80,000.00
17,500.00
45,000.00
60,000.00
225,000.00
275,000.00
140,000.00
170,000.00
225,000.00
6,000.00
15,000.00
19,000.00
67,000.00
3,500.00
7,000.00
360,000.00

Kg
Kg
Buah
Kg
Roll
M'
Kg
Kg
Kg
Buah
Btg
Btg
Btg
Btg
Btg
Buah
Btg
Btg
Btg
Btg
Btg
Lbr
Lbr

14,500.00
14,700.00
9,000.00
20,000.00
177,000.00
23,000.00
17,000.00
22,000.00
20,000.00
1,500.00
850,000.00
1,420,000.00
315,000.00
128,000.00
90,000.00
20,000.00
125,000.00
135,000.00
145,000.00
155,000.00
175,000.00
950,000.00
1,200,000.00

19,500.00
19,700.00

SEMEN DAN PORSELIN


Portland Cemend ( PC ) 50 Kg
PC. Semen Warna ( Putih )
List gypsump 7/7 Cm ( 2 M' )
List gypsump 10/10 Cm ( 2 M' )
Gypsump tebal ( tebal 6 Mm )
Gypsump tebal ( tebal 9 Mm )
Kalsiboard ( tebal 3 Mm )
Kalsiboard ( tebal 6 Mm )
Kalsiboard ( tebal 9 Mm )
Keramik lantai 20/20 Cm
Keramik lantai 30/30 Cm
Keramik lantai 40/40 Cm
Keramik lantai 60/60 Cm
Ubin dinding 11/11 Cm
Keramik dinding 20/25 Cm
Batu alam
BESI DAN PIPA
Besi beton polos
Besi beton ulir
Mur + baut Dia 10 - 20 Cm. 1/2 "
Kawat ikat beton ( benrat )
Kawat duri ( 50 M' )
Kawat Ayam
Paku campuran
Paku Tripleks
Paku Seng + ring karet
Paku tembok
Pipa Giv 4 " ( tebal ) 6 M'
Pipa Giv 6 " ( tebal ) 6 M'
Pipa Giv 2" (tebal ) 6 M'
Pipa Giv 3/4 " ( tebal ) 6 M'
Pipa Giv 1/2 " ( tebal ) 6 M1
Acsesories pipa Giv / Medium
Besi L 30 30 3 Mm ( 6 M' )
Besi L 40 40 3 Mm ( 6 M' )
Besi L 50 50 4 Mm ( 6 M' )
Besi L 60 60 5 Mm ( 6 M' )
Besi L 70 70 6 Mm ( 6 M' )
Besi plat ( tebal 3 Mm )
Besi plat ( tebal 4 Mm )

860,000.00
1,430,000.00
325,000.00
138,000.00
100,000.00
135,000.00
145,000.00
155,000.00
165,000.00
185,000.00
960,000.00
1,210,000.00

SENG DAN PLASTIK

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
E

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M'
M'
M'
M'
Btg
Btg
Btg
Btg
Buah
Btg
Btg

48,000.00
68,000.00
48,000.00
68,000.00
53,000.00
95,000.00
53,000.00
43,000.00
39,000.00
17,000.00
12,000.00
30,000.00
23,000.00
90,000.00
155,000.00
235,000.00
15,000.00
150,000.00
145,000.00

Buah
Buah
Buah
Buah
Buah
Buah
Set
Buah
Set
Set
Set
Buah
Buah
Buah
Buah
Buah
Buah
Set
Set
Psg
Psg
Buah
Buah
Psg
Psg
Buah
Buah

15,000.00
35,000.00
20,000.00
15,000.00
57,000.00
200,000.00
1,643,000.00
850,000.00
1,521,000.00
591,000.00
723,000.00
20,000.00
51,000.00
2,700,000.00
4,600,000.00
2,000,000.00
1,850,000.00
276,000.00
105,000.00
35,000.00
20,000.00
7,500.00
10,000.00
8,000.00
18,000.00
10,000.00
18,000.00

51,000.00
71,000.00
51,000.00
71,000.00
54,500.00
96,500.00
54,500.00
44,500.00
40,500.00

28,000.00
95,000.00
160,000.00
240,000.00
155,000.00
150,000.00

SANITAIR DAN PENGGANTUNG

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
F

kran 1/2 " biasa


Kran 1/2 " Luks
Stop Kran 3/4 " Biasa
Stop Kran 1/2 " Biasa
Shower Plastik
Shower Luks
Closet Duduk Porselin
Closet Jongkok Porselin
Wastafel Rias ( porselin )
Watafel Cuci ( St.Steel ) 1 Bak
Wastafel Cuci ( St.Steel ) 2 Bak
Floor Drain Penutup Plastic
Floor Drain Penutup Metal
Tanki air Fiber Glass 2500 Liter
Tanki air Fiber Glass 5000 Liter
Tanki air St.Steel 1000 Liter
Mesin Pompa air Sanyo 250 watt
Kunci dan Gagang pintu 2 slaag ( luks )
Kunci dan Gagang pintu 2 slaag ( biasa )
Engsel Pintu kuningan ( ring nylon )
Engsel Jendela kuningan ( ring nylon )
Grendel kuningan ( kecil )
Grendel Jendela
Hak / Kait angin kuningan( biasa )
Hak / Kait angin drat ( luks )
Handell /Gagang jendela biasa
Handell /Gagang jendela Luks ( kuningan )

1,648,000.00
855,000.00
1,526,000.00
596,000.00
728,000.00

2,715,000.00
4,615,000.00
2,015,000.00

CAT, LEM DAN ALAT LISTRIK


1
2
3
4

Seng plat Bjls 0.20 Mm


Seng plat Bjls 0.30 Mm
Seng Gelombang Bjls 0.20 Mm
Seng Gelombang Bjls 0.30 Mm
Multiroof Metal Bjls 0.30 Mm 77x100 cm
Multiroof Berpasir77x100 cm
Sakura Roof Bjls 0.30 Mm 77x100 cm
Sakura Roof Bjlas 0.20 Mm 77x100 cm
Nok / Bubungan seng plat Bjls 0.30 Mm
Has nyamuk ( kawat )
Has nyamuk ( nylon )
Kawat harmonika ( warna )
Pipa PVC 1/2 " Tebal ( 4 M' )
Pipa PVC 3/4 " Tebal ( 4 M' )
Pipa PVC 3 " Tebal ( 4 M' )
Pipa PVC 4 " Tebal ( 4 M' )
Acsesories PVC
Talang PVC kotak 20/20
Talang PVC 1/2 Lingkaran Dia 20

plammur
Kertas amplas
Cat kilap kayu
Cat kilap besi

Kg
Lembar
Kg
Kg

17,000.00
6,000.00
39,000.00
39,000.00

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Cat atap seng / genteng


Kapur dinding / plafond ( luks )
Kapur dinding / plafond ( biasa )
Cat dasr ( meni )
Teak 0il / politur
Minyak cat ( tenner )
Lem kayu ( fox )
Lem PVC
Lampu TL/XL 40 Watt + ( kap down light )
Lampu TL/XL 20 Watt + ( kap down light )
Lampu Balon Philips 15 Watt + kap ( Down Light )
Lampu Balon Philips 25 Watt + kap ( Down light )
Lampu Balon Philips 40 Watt + kap ( Down Light )
Lampu Balon Philips 60 Watt + kap ( Down Light )
Saklar engkel / Tunggal ( inbow )
Saklar seri / Ganda ( inbow )
Stop Kontak ( inbow )
Pipa medium 1/2 " ( tipis )
Pipa medium 1/2 " ( tebal )
Kabel NYM 2 x 2.5 Mm
Kabel NYY 2 X 2.5 Mm
Skring kas 1 Group + ACC

Kg
Kg
Kg
Kg
Kg
Liter
Kg
Buah
Set
Set
Set
Set
Set
Set
Set
Set
Set
Btg
Btg
M'
M'
Set

32,000.00
10,300.00
10,300.00
19,700.00
44,000.00
20,000.00
32,000.00
10,000.00
85,000.00
78,000.00
200,000.00
225,000.00
255,000.00
300,000.00
25,000.00
30,000.00
25,000.00
12,000.00
14,000.00
10,000.00
13,800.00
35,000.00

III HARGA SEWA PERALATAN BERAT


1 Excafator 80 - 140

Jam

2 Cutter pilar G7 - 100


3 Loadder
4 Mobilisasi alat berat

Jam
Jam
Ls

550,000.00
600,000.00
375,000.00
5,000,000.00

Catatan :
Harga - harga tersebut diatas sudah termasuk PPN, PPH, Galian " C ", Retrebusi dan Pajak - pajak lainnya.

600,000.00
750,000.00
400,000.00
6,000,000.00

DAFTAR ANALISA SATUAN PEKERJAAN


SNI 2002 EDISI REVISI ( 2008 )
PEKERJAAN
LOKASI
T. ANGGARAN

: KOTA JAYAPURA
: 2008

NO

URAIAN PEKERJAAN

UPAH KERJA

HARGA BAHAN

JUMLAH HARGA

1 M2 PEKERJAAN PEMBERSIHAN LOKASI


0.1000 H/O

Pekerja

95,000.00

0.0100 H/O

Mandor

57,500.00

9,500.00
575.00
10,075.00

1 M2 PEKERJAAN DIREKSI KEET


0.1000 M3

Kayu Matoa

2,100,000.00

210,000.00

1.0000 Lbr

Seng gelombang BJLS 0.20

48,000.00

48,000.00

0.1000 Kg

Paku Campur

17,000.00

0.3000 H/O

Pekerja

57,500.00

17,250.00

0.5000 H/O

Tukang kayu

78,500.00

39,250.00

0.0500 H/O

Kepala tukang

85,000.00

4,250.00

0.1250 H/O

Mandor

95,000.00

11,875.00

1,700.00

332,325.00

1 M' PEKERJAAN UKUR DAN PAS. BOWPLANK


0.0080 M3

Papan dan balok kayu matoa

0.0200 Kg

Paku campur

2,125,000.00

0.1000 H/O

Pekerja

57,500.00

5,750.00

0.1000 H/O

Tukang kayu

78,500.00

7,850.00

0.0100 H/O

Kepala tukang

85,000.00

850.00

0.0050 H/O

Mandor

95,000.00

17,000.00

17,000.00
340.00

475.00
32,265.00

1 M3 PEKERJAAN GALIAN TANAH (Kedalaman >1 M')


0.2500 H/O

Pekerja

57,500.00

0.0250 H/O

Mandor

95,000.00

0.0500 Jam

Alat bantu ( alat berat / Ecsavator )

14,375.00
2,375.00
550,000.00

27,500.00
44,250.00

1 M3 PEKERJAAN GALIAN TANAH (Kedalaman <1 M' )


0.5500 H/O

Pekerja

70,000.00

0.0250 H/O

Mandor

115,000.00

38,500.00
2,875.00
41,375.00

1 M3 PEKERJAAN URUGAN KEMBALI GALIAN TANAH (Kedalaman >1 M' )


0.2500 (1/4)

14,750.00

1 M3 PEKERJAAN URUGAN KEMBALI GALIAN TANAH (Kedalaman <1 M' )


0.2500 (1/4)

Biaya galian tanah

Biaya galian tanah

13,791.67

1 M3 PEKERJAAN URUGAN PASIR


1.0000 M3

Pasir urug

0.3000 H/O

Pekerja

70,000.00

325,000.00

0.0100 H/O

Mandor

115,000.00

325,000.00
21,000.00
1,150.00
347,150.00

ANALIS HARGA SATUAN PEKERJAAN

1 M3 PEKERJAAN URUGAN KARANG


1.0000 M3

Karang Urug / Timbun

0.3000 H/O

Pekerja

70,000.00

152,000.00

0.0100 H/O

Mandor

115,000.00

152,000.00
21,000.00
1,150.00
174,150.00

10

1 M3 PEKERJAAN URUGAN SIRTU ( PASIR BERBATU )


1.0000 M3

Sirtu

0.3000 H/O

Pekerja

70,000.00

100,000.00

0.0100 H/O

Mandor

115,000.00

100,000.00
21,000.00
1,150.00
122,150.00

11

1 M3 PEKERJAAN URUGAN TANAH PILIHAN ( HITAM )


1.0000 M3

Tanah hitam / humus

0.3000 H/O

Pekerja

70,000.00

215,000.00

0.0100 H/O

Mandor

115,000.00

215,000.00
21,000.00
1,150.00
237,150.00

12

1 M3 PEKERJAAN ANSTAMPING ( BATU KOSANG )


1.0000 M3

Batu kali / gunung

1.5000 H/O

Pekerja

70,000.00

355,000.00

0.0750 H/O

Mandor

115,000.00

355,000.00
105,000.00
8,625.00
468,625.00

13

1 M3 PEKERJAAN PONDASI ALUR BATU KALI / GUNUNG


1.0000 M3

Batu kali / gunung

355,000.00

355,000.00

0.5000 M3

Pasir pasang

360,000.00

180,000.00

3.2570 Zak

Semen ( 50 Kg )

80,000.00

260,560.00

3.6000 H/O

Pekerja

57,500.00

207,000.00

1.2000 H/O

Tukang batu

78,500.00

94,200.00

0.1200 H/O

Kepala tukang

85,000.00

10,200.00

0.1800 H/O

Mandor

95,000.00

17,100.00
1,124,060.00

14

1 M3 PEKERJAAN PASANG BATU TELA 1 : 4


167.0000 Bh

Batu tela

2,500.00

417,500.00

360,000.00

119,880.00

80,000.00

114,560.00

0.3330 M3

Pasir pasang

1.4320 Zak

Semen ( 50 Kg )

4.5000 H/O

Pekerja

57,500.00

258,750.00

1.5000 H/O

Tukang batu

78,500.00

117,750.00

0.1500 H/O

Kepala tukang

85,000.00

12,750.00

0.2250 H/O

Mandor

95,000.00

21,375.00
1,062,565.00

15

1 M3 PEKERJAAN PASANG BATU TELA 1 : 2


167.0000 Bh

Batu tela

2,500.00

417,500.00

0.1665 M3

Pasir pasang

360,000.00

2.7450 Zak

Semen ( 50 Kg )

59,940.00

80,000.00

219,600.00

4.5000 H/O

Pekerja

57,500.00

258,750.00

1.5000 H/O

Tukang batu

78,500.00

117,750.00

0.1500 H/O

Kepala tukang

85,000.00

12,750.00

0.2250 H/O

Mandor

95,000.00

21,375.00
1,107,665.00

16

1 M2 PEKERJAAN PLESTERAN DINDING 1 : 4 ( Tebal 1.5 Cm )


0.0210 M3

Pasir pasang

0.1040 Zak

Semen ( 50 Kg )

360,000.00

0.4000 H/O

Pekerja

57,500.00

23,000.00

0.2000 H/O

Tukang batu

78,500.00

15,700.00

0.0200 H/O

Kepala tukang

85,000.00

1,700.00

0.0200 H/O

Mandor

95,000.00

80,000.00

7,560.00
8,320.00

1,900.00
58,180.00

ANALIS HARGA SATUAN PEKERJAAN

17

1 M2 PEKERJAAN PLESTERAN DINDING 1 : 2 ( Tebal 1.5 Cm )


0.0170 M3

Pasir pasang

0.2152 Zak

Semen ( 50 Kg )

360,000.00

6,120.00

80,000.00

17,216.00

0.4000 H/O

Pekerja

57,500.00

23,000.00

0.2000 H/O

Tukang batu

78,500.00

15,700.00

0.0200 H/O

Kepala tukang

85,000.00

1,700.00

0.0200 H/O

Mandor

95,000.00

1,900.00
65,636.00

18

1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3

BETON ( CAMP. 1 : 2 : 3 )
0.8100 M3

Kerikil

429,000.00

347,490.00

0.5400 M3

Pasir pasang

360,000.00

194,400.00

5.4400 Zak

Semen ( 50 Kg )

80,000.00

435,200.00

2.0000 H/O

Pekerja

57,500.00

115,000.00

0.3500 H/O

Tukang batu

78,500.00

27,475.00

0.0350 H/O

Kepala tukang

85,000.00

2,975.00

1.0000 H/O

Mandor

95,000.00

95,000.00
1,217,540.00

1 KG. B E S I
1.0500 Kg

Besi beton

19,500.00

20,475.00

0.0150 Kg

Kawat ikat ( benrat )

20,000.00

300.00

0.0070 H/O

Pekerja

57,500.00

402.50

0.0070 H/O

Tukang besi

78,500.00

549.50

0.0007 H/O

Kepala tukang

85,000.00

59.50

0.0003 H/O

Mandor

95,000.00

28.50
21,815.00

BEGESTING ( CETAKAN )
0.0260 M3

Papan Begesting

1,925,000.00

50,050.00

0.0550 M3

Kayu balok 5/10

2,125,000.00

116,875.00

0.5000 Btg

Stegger / kayu buah ( 32 batang )

30,000.00

15,000.00

0.4000 Kg

Paku Campur

17,000.00

0.3200 H/O

Pekerja

57,500.00

18,400.00

0.1670 H/O

Tukang bongkar cetakan

78,500.00

13,109.50

0.3300 H/O

Tukang kayu

78,500.00

25,905.00

0.0330 H/O

Kepala tukang

85,000.00

2,805.00

0.0060 H/O

Mandor

95,000.00

6,800.00

570.00
249,514.50

JADI UNTUK 1 M3 BETON BERTULANG DIPERLUKAN 10 M2BEGESTING MAKA ( C X 10 )

2,495,145.00

DAN UNTUK PEKERJAAN BETON BERTULANG ADALAH (A +D )

3,712,685.00

MAKA HASIL (E) DIJUMLAHKAN DENGAN HASIL X (B) DENGAN MASING - MASING BERAT BESI ADALAH :
BETON 1 : 2 : 3 ( 75 Kg BESI )

5,348,810.00

BETON 1 : 2 : 3 ( 100 Kg BESI )

5,894,185.00

BETON 1 : 2 : 3 ( 125 Kg BESI )

6,439,560.00

BETON 1 : 2 : 3 ( 150 Kg BESI )

6,984,935.00

BETON 1 : 2 : 3 ( 175 Kg BESI )

7,530,310.00

BETON 1 : 2 : 3 ( 200 Kg BESI )

8,075,685.00

BETON 1 : 2 : 3 ( 225 Kg BESI )

8,621,060.00

BETON 1 : 2 : 3 ( 275 Kg BESI )

9,711,810.00

BETON 1 : 2 : 3 ( 300 Kg BESI )

10,257,185.00

BETON 1 : 2 : 3 ( 325 Kg BESI )

10,802,560.00

ANALIS HARGA SATUAN PEKERJAAN

19

1 M3 PEKERJAAN COR BETON TUMBUK ( TEBAL 7 S/D 10 Cm )


0.9000 M3

Kerikil

429,000.00

386,100.00

0.5400 M3

Pasir pasang

360,000.00

194,400.00

4.5400 Zak

Semen ( 50 Kg )

80,000.00

363,200.00

6.0000 H/O

Pekerja

57,500.00

345,000.00

0.5000 H/O

Tukang batu

78,500.00

39,250.00

0.0500 H/O

Kepala tukang

85,000.00

4,250.00

0.3000 H/O

Mandor

95,000.00

28,500.00
1,360,700.00

20

1 M3 PEKERJAAN PASANG BATU KERAWANG 1 : 4


277.0083 Bh

Batu kerawang

6,700.00

1,855,955.68

0.1765 M3

Pasir pasang

360,000.00

2.8450 Zak

Semen ( 50 Kg )

63,540.00

80,000.00

227,600.00

4.5000 H/O

Pekerja

57,500.00

258,750.00

1.5000 H/O

Tukang batu

78,500.00

117,750.00

0.1500 H/O

Kepala tukang

85,000.00

12,750.00

0.2250 H/O

Mandor

95,000.00

21,375.00
2,557,720.68

21

1 M2 PEKERJAAN PASANG LANTAI KERAMIK


PEKERJAAN SIAR / SPESI BAWAH KERAMIK
0.0400 M3

Pasir pasang

360,000.00

14,400.00

0.3280 Zak

Semen ( 50 Kg )

80,000.00

26,240.00

0.2000 Kg

Semen Warna

15,000.00

1.0000 H/O

Pekerja

57,500.00

57,500.00

0.3100 H/O

Tukang batu

78,500.00

24,335.00

0.0310 H/O

Kepala tukang

85,000.00

2,635.00

0.0700 H/O

Mandor

95,000.00

3,000.00

6,650.00
134,760.00

22

UNTUK KERAMIK 10 X 10 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

184,760.00

UNTUK KERAMIK 20 X 20 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

284,760.00

UNTUK KERAMIK 30 X 30 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

299,760.00

UNTUK KERAMIK 40 X 40 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

248,760.00

UNTUK KERAMIK 60 X 60 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

268,760.00

UNTUK MARMER 60 X 60 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

334,760.00

1 M2 PEKERJAAN PASANG KERAMIK DINDING


PEKERJAAN SIAR / SPESI BAWAH KERAMIK
0.0075 M3

Pasir pasang

0.4500 Zak

Semen ( 50 Kg )

360,000.00

2,700.00

80,000.00

36,000.00

0.2000 Kg

Semen Warna

1.0000 H/O

Pekerja

57,500.00

57,500.00

0.3100 H/O

Tukang batu

78,500.00

24,335.00

0.0310 H/O

Kepala tukang

85,000.00

2,635.00

0.0700 H/O

Mandor

95,000.00

15,000.00

3,000.00

6,650.00
132,820.00

UNTUK KERAMIK 10 X 10 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

182,820.00

UNTUK KERAMIK 20 X 20 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

232,820.00

UNTUK KERAMIK 20 X 25 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

282,820.00

UNTUK KERAMIK 30 X 30 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

332,820.00

UNTUK KERAMIK 40 X 40 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

382,820.00

UNTUK KERAMIK 60 X 60 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

432,820.00

UNTUK MARMER 60 X 60 ADALAH = ( PEKERJAAN SIAR + H1RGA 1 DOS KERAMIK )

482,820.00

ANALIS HARGA SATUAN PEKERJAAN

23

1 M2 PEKERJAAN PASANG PAVING BLOCK


33.3400 Bh

Paving block

3,500.00

116,690.00

0.0700 M3

Pasir pasang

360,000.00

25,200.00

1.0540 H/O

Pekerja

57,500.00

60,605.00

0.1000 H/O

Tukang batu

78,500.00

7,850.00

0.0100 H/O

Kepala tukang

85,000.00

850.00

0.0300 H/O

Mandor

95,000.00

2,850.00
214,045.00

24

1 M3 PEKERJAAN PASANG KUDA - KUDA / KONSUL KAYU BESI (KY. KELAS I / SEJENIS )
1.1000 M3

Kayu besi 5/10

2.0000 Kg

Paku Campur

8.0000 H/O

Pekerja

57,500.00

460,000.00

24.0000 H/O

2,900,000.00
17,000.00

3,190,000.00
34,000.00

Tukang kayu

78,500.00

1,884,000.00

2.4000 H/O

Kepala tukang

85,000.00

204,000.00

0.4000 H/O

Mandor

95,000.00

38,000.00
5,810,000.00

25

1 M3 PEKERJAAN PASANG GORDING KAYU MATOA ( KY. KELAS II / SEJENIS )


1.1000 M3

Kayu matoa 5/10

2.5000 Kg

Paku Campur

5.0000 H/O

Pekerja

57,500.00

287,500.00

15.0000 H/O

2,100,000.00
17,000.00

2,310,000.00
42,500.00

Tukang kayu

78,500.00

1,177,500.00

1.5000 H/O

Kepala tukang

85,000.00

127,500.00

0.2500 H/O

Mandor

95,000.00

23,750.00
3,968,750.00

26

1 M2 PEKERJAAN PASANG JALUSI KAYU BESI ( KY. KELAS I / SEJENIS )


0.0220 M3

Papan kayu besi 2/10

0.1000 Kg

Paku Campur

2,900,000.00

63,800.00

17,000.00

0.0800 H/O

Pekerja

57,500.00

1,700.00
4,600.00

0.2500 H/O

Tukang kayu

78,500.00

19,625.00

0.0250 H/O

Kepala tukang

85,000.00

2,125.00

0.4160 H/O

Mandor

95,000.00

39,520.00
131,370.00

27

1 M3 PEKERJAAN PASANG KUSEN KAYU BESI (KY. KELAS I / SEJENIS )


1.1000 M3

Kayu besi 5/10

2.0000 Kg

Paku Campur

2,900,000.00
17,000.00

3,190,000.00
34,000.00

12.0000 H/O

Pekerja

57,500.00

690,000.00

36.0000 H/O

Tukang kayu

78,500.00

2,826,000.00

3.6000 H/O

Kepala tukang

85,000.00

306,000.00

0.6000 H/O

Mandor

95,000.00

57,000.00
7,103,000.00

28

1 M2 PEKERJAAN PASANG LISTPLANK KAYU BESI ( KY. KELAS I / SEJENIS )


0.0275 M3

Papan kayu besi 2.5/20

0.1000 Kg

Paku Campur

2,900,000.00

0.6000 H/O

Pekerja

57,500.00

34,500.00

1.8000 H/O

Tukang kayu

78,500.00

141,300.00

0.1800 H/O

Kepala tukang

85,000.00

15,300.00

0.0300 H/O

Mandor

95,000.00

17,000.00

79,750.00
1,700.00

2,850.00
275,400.00

29

1 M' PEKERJAAN PASANG CERUCUK KAYU BESI 10/10 (KY. KELAS I / SEJENIS )
0.0100 M3

Balok kayu besi 10/10

0.0058 Jam

Alat bantu ( Ecsavator )

2,900,000.00

0.5000 H/O

Pekerja

57,500.00

28,750.00

0.2500 H/O

Tukang kayu

78,500.00

19,625.00

0.0250 H/O

Kepala tukang

85,000.00

2,125.00

0.0050 H/O

Mandor

95,000.00

550,000.00

29,000.00
3,190.00

475.00
83,165.00

ANALIS HARGA SATUAN PEKERJAAN

30

1 M2 PEKERJAAN PASANG DINDING PARTISI (DOBEL / LUAR DALAM )


0.0250 M3

Balok kayu besi 5/10

0.1667 Kg

Paku campur

2,900,000.00

0.2500 H/O

Pekerja

57,500.00

14,375.00

1.7000 H/O

Tukang kayu

78,500.00

133,450.00

0.1700 H/O

Kepala tukang

85,000.00

14,450.00

0.1000 H/O

Mandor

95,000.00

17,000.00

72,500.00
2,833.33

9,500.00
247,108.33

31

UNTUK TRIPLEKS TEBAL 3 MM ADALAH = ( PEKERJAAN PARTISI + 0.6728 X HARGA TRIPLEKS )

294,204.33

UNTUK TRIPLEKS TEBAL 6 MM ADALAH = ( PEKERJAAN PARTISI + 0.6728 X HARGA TRIPLEKS )


UNTUK TEAKWOOD TEBAL 4 MM ADALAH = ( PEKERJAAN PARTISI + 0.6728 X HARGA TEAKWOOD )

314,388.33

UNTUK PAPAN KY.BESI TEBAL 2 CM ADALAH ( PEKERJAAN PARTISI + 0.04 X HARGA PAPAN )
UNTUK KALSIBOARD TEBAL 3 MM ADALAH = ( PEKERJAAN PARTISI + 0.6728 X HARGA KALSIBOARD )

364,108.33

UNTUK GYPSUMP TEBAL 6 MM ADALAH = ( PEKERJAAN PARTISI + 0.6728 X HARGA GYPSUMP )

398,488.33

333,796.33
341,300.33

1 M2 PEKERJAAN PASANG ATAP GELOMBANG


0.2000 Kg

Paku seng / ardeks

0.1000 H/O

Pekerja

57,500.00

17,500.00

3,500.00
5,750.00

0.2000 H/O

Tukang kayu

78,500.00

15,700.00

0.0200 H/O

Kepala tukang

85,000.00

1,700.00

0.0500 H/O

Mandor

95,000.00

4,750.00
31,400.00

32

UNTUK SENG GELOMBANG BJLS 0.20 ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA SENG )

68,120.00

UNTUK SENG GELOMBANG BJLS 0.30 ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA SENG )

82,520.00

UNTUK SENG GALVANIS BJLS 0.30 ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA SENG )

83,240.00

UNTUK SENG GALVANIS BJLS 0.20 ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA SENG )
UNTUK ATAP PLASTIK GELOMBANG BESAR ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA ATAP )

78,200.00

UNTUK ATAP PLASTIK GELOMBANG KECIL ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA ATAP )

71,000.00

UNTUK ATAP ARDEKS GELOMBANG BESAR ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA ARDEKS )

89,000.00

UNTUK ATAP ARDEKS GELOMBANG KECIL ADALAH = ( PEKERJAAN ATAP + 0.72 X HARGA ARDEKS )

81,800.00

74,600.00

10 M' PEKERJAAN PASANG NOK SENG ( BUBUNGAN )


6.6000 Lbr

Seng plat BJLS 0.30

40,500.00

0.2500 Kg

Paku seng / ardeks

20,000.00

267,300.00
5,000.00

0.0400 M3

Papan kayu besi 2/10

2,925,000.00

117,000.00

0.1000 H/O

Pekerja

57,500.00

5,750.00

0.2000 H/O

Tukang kayu

78,500.00

15,700.00

0.0200 H/O

Kepala tukang

85,000.00

1,700.00

0.0500 H/O

Mandor

95,000.00

4,750.00
417,200.00

MAKA UNTUK 1 M' ADALAH ( DIBAGI 10 )

33

41,720.00

1 M2 PEKERJAAN PASANG ATAP GENTENG METAL


0.0075 M3

Reng kayu besi 5/5

2,925,000.00

21,937.50

0.0048 M3

Kasau Kayu besi 3/4

2,925,000.00

14,040.00

0.2000 Kg

Paku campur

17,000.00

3,400.00

0.1000 H/O

Pekerja

57,500.00

5,750.00

0.2000 H/O

Tukang kayu

78,500.00

15,700.00

0.0200 H/O

Kepala tukang

85,000.00

1,700.00

0.0500 H/O

Mandor

95,000.00

4,750.00
67,277.50

UNTUK ATAP MULTIROOF BERPASIR ADALAH = ( PEKERJAAN ATAP + HARGA MULTIROOF )

163,777.50

UNTUK ATAP MULTIROOF METAL ADALAH = ( PEKERJAAN ATAP + HARGA MULTIROOF )

121,777.50

UNTUK ATAP SAKURAROOF METAL ADALAH = ( PEKERJAAN ATAP + HARGA SAKURAROOF )

111,777.50

ANALIS HARGA SATUAN PEKERJAAN

34

1 M2 PEKERJAAN PASANG PLAFOND TRIPLEKS + RANGKA


0.0175 M3

Kayu matoa 5/5

0.0200 Kg

Paku campur

2,125,000.00
17,000.00

340.00

0.1000 Kg

Paku tripleks

22,000.00

2,200.00

0.1667 Kg

lem kayu tau sejenisnya

0.2800 H/O

Pekerja

57,500.00

16,100.00

0.8000 H/O

Tukang kayu

78,500.00

62,800.00

0.0800 H/O

Kepala tukang

85,000.00

6,800.00

0.0140 H/O

Mandor

95,000.00

32,000.00

37,187.50

5,333.33

1,330.00
132,090.83

35

UNTUK TRIPLEKS TEBAL 3 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA TRIPLEKS )

155,610.83

UNTUK TRIPLEKS TEBAL 4 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA TRIPLEKS )

158,970.83

UNTUK TRIPLEKS TEBAL 6 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA TRIPLEKS )


UNTUK LAMBRESERING PROFIL 2/7 KY. MATOA ADALAH = (PEKERJAAN PLAFOND + 0.02 X HARGA KAYU )

165,690.83

UNTUK KALSIBOARD TEBAL 3 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA KALSIBOARD )

179,130.83

UNTUK GYPSUMP TEBAL 6 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA GYPSUMP )

207,690.83

UNTUK GYPSUMP TEBAL 9 MM ADALAH = (PEKERJAAN PLAFOND + 0.336 X HARGA GYPSUMP )

224,490.83

174,590.83

1 M' PEKERJAAN PASANG LIST PLAFOND


0.0125 Kg

Paku campur

17,000.00

0.0125 Kg

lem kayu tau sejenisnya

32,000.00

0.1000 H/O

Tukang kayu

78,500.00

212.50
400.00
7,850.00
8,462.50

UNTUK LAT KAYU MATOA 2/3 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT )

36

9,462.50

UNTUK LAT KAYU BESI 2/3 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT )
UNTUK LAT PROFIL KAYU 3/3 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT PROFIL )

10,212.50

UNTUK LAT PROFIL KAYU 4/4 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT PROFIL )

18,462.50

UNTUK LAT PROFIL KAYU 5/5 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT PROFIL )

19,712.50

UNTUK LAT PROFIL KAYU 7/7 ADALAH = ( PEKERJAAN LIST + 0.25 X HARGA PER BTG. LAT PROFIL )

20,337.50

UNTUK LAT PROFIL GYPSUMP 5/5 ADALAH = ( PEKERJAAN LIST + 0.5 X HARGA PER BTG. LAT PROFIL )

30,962.50

UNTUK LAT PROFIL GYPSUMP 7/7 ADALAH = ( PEKERJAAN LIST + 0.5 X HARGA PER BTG. LAT PROFIL )

38,462.50

UNTUK LAT PROFIL GYPSUMP 10/10 ADALAH = ( PEKERJAAN LIST + 0.5 X HARGA PER BTG. LAT PROFIL )

50,962.50

15,962.50

1 M2 PEKERJAAN PASANG PINTU / JENDELA PANIL KACA ( AYUN / JUNGKIT )


0.0800 M3

Papan kayu besi

2,925,000.00

234,000.00

0.1667 Kg

Paku campur

17,000.00

2,833.33

0.2000 Kg

lem kayu / sejenisnya

32,000.00

0.9200 H/O

Pekerja

57,500.00

52,900.00

2.7600 H/O

Tukang kayu

78,500.00

216,660.00

0.2760 H/O

Kepala tukang

85,000.00

23,460.00

0.1000 H/O

Mandor

95,000.00

6,400.00

9,500.00
545,753.33

37

UNTUK KACA RYBEN TEBAL 5 MM ADALAH = ( PEKERJAAN PANIL + 0.420 LBR HARGA KACA )

669,653.33

UNTUK KACA BENING TEBAL 5 MM ADALAH = ( PEKERJAAN PANIL + 0.420 LBR HARGA KACA )

642,353.33

1 M2 PEKERJAAN JENDELA KACA MATI


4.0000 Btg

List kayu besi (lat )

14,000.00

0.0500 Kg

Paku campur

17,000.00

56,000.00

1.0000 H/O

Tukang kayu

78,500.00

78,500.00

0.1000 H/O

Kepala tukang

85,000.00

8,500.00

0.0500 H/O

Mandor

95,000.00

850.00

4,750.00
148,600.00

UNTUK KACA RYBEN TEBAL 5 MM ADALAH = ( PEKERJAAN JENDELA + 0.420 LBR HARGA KACA )

272,500.00

UNTUK KACA BENING TEBAL 5 MM ADALAH = ( PEKERJAAN JENDELA + 0.420 LBR HARGA KACA )

245,200.00

ANALIS HARGA SATUAN PEKERJAAN

38

1 M2 PEKERJAAN PASANG PINTU / JENDELA PANIL KAYU


0.0900 M3

Papan kayu besi

2,925,000.00

263,250.00

0.1000 Kg

Paku campur

17,000.00

1,700.00

0.2000 Kg

lem kayu / sejenisnya

32,000.00

1.0000 H/O

Pekerja

57,500.00

57,500.00

3.4500 H/O

Tukang kayu

78,500.00

270,825.00

0.2450 H/O

Kepala tukang

85,000.00

20,825.00

0.0500 H/O

Mandor

95,000.00

6,400.00

4,750.00
625,250.00

39

1 M2 PEKERJAAN PASANG PINTU LAPIS


0.0140 M3

Papan kayu besi

0.0500 Kg

Paku campur

2,925,000.00

0.2500 H/O

Pekerja

57,500.00

14,375.00

1.7000 H/O

Tukang kayu

78,500.00

133,450.00

0.1700 H/O

Kepala tukang

85,000.00

14,450.00

0.1000 H/O

Mandor

95,000.00

17,000.00

40,950.00
850.00

9,500.00
213,575.00

40

UNTUK TRIPLEKS TEBAL 3 MM ADALAH = ( PEKERJAAN PINTU + 0.336 X HARGA TRIPLEKS )

237,095.00

UNTUK TEAKWOOD MM ADALAH = ( PEKERJAAN PINTU + 0.336 X HARGA TEAKWOOD )

280,439.00

1 M2 PEKERJAAN PASANG PINTU LAPIS + SENG PLAT BJLS 0.20 PADA BAG. DALAM
0.0140 M3

Papan kayu besi

2,925,000.00

40,950.00

0.6173 Lbr

Seng plat BJLS 0.20 MM

51,000.00

31,481.48

0.0500 Kg

Paku campur

17,000.00

0.2500 H/O

Pekerja

57,500.00

14,375.00

1.7000 H/O

Tukang kayu

78,500.00

133,450.00

0.1700 H/O

Kepala tukang

85,000.00

14,450.00

0.1000 H/O

Mandor

95,000.00

850.00

9,500.00
245,056.48

41

UNTUK TRIPLEKS TEBAL 3 MM ADALAH = ( PEKERJAAN PINTU + 0.336 X HARGA TRIPLEKS )

268,576.48

UNTUK TEAKWOOD ADALAH = ( PEKERJAAN PINTU + 0.336 X HARGA TEAKWOOD )

311,920.48

1 BH PEKERJAAN PASANG GAGANG PINTU ( KUNCI TANAM )


0.7500 H/O

Tukang kayu

78,500.00

58,875.00

0.3750 H/O

Mandor

95,000.00

35,625.00
94,500.00

42

UNTUK KUNCI TANAM TABUNG 1 SLAAG ADALAH - ( PEKERJAAN PASANG + HARGA GAGANG )
UNTUK KUNCI TANAM PELAT SEMI LUKS 2 SLAAG ADALAH - ( PEKERJAAN PASANG + HARGA GAGANG )

139,500.00

UNTUK KUNCI TANAM PELAT LUKS 2 SLAAG ADALAH - ( PEKERJAAN PASANG + HARGA GAGANG )

370,500.00

199,500.00

1 PSG PEKERJAAN ENGSEL


0.3000 H/O

Tukang kayu

78,500.00

23,550.00

0.1500 H/O

Mandor

95,000.00

14,250.00
37,800.00

43

UNTUK ENGSEL PINTU H KUNINGAN RING NYLON ADALAH - ( PEKERJAAN PASANG + HARGA ENGSEL )

72,800.00

UNTUK ENGSEL PINTU H BIASA ADALAH - ( PEKERJAAN PASANG + HARGA ENGSEL )


UNTUK ENGSEL JENDELA H KUNINGAN RING NYLON ADALAH - ( PEKERJAAN PASANG + HARGA ENGSEL )

47,800.00

UNTUK ENGSEL JENDELA H BIASA ADALAH - ( PEKERJAAN PASANG + HARGA ENGSEL )

47,800.00

57,800.00

1 BH PEKERJAAN PASANG GRENDEL


0.2000 H/O

Tukang kayu

78,500.00

0.1000 H/O

Mandor

95,000.00

15,700.00
9,500.00
25,200.00

UNTUK GRENDEL JENDELA TYPE LUKS ADALAH - ( PEKERJAAN PASANG + HARGA GRENDEL )
UNTUK GRENDEL PINTU KM/WC TYPE KUNINGAN ADALAH - ( PEKERJAAN PASANG + HARGA GRENDEL )

ANALIS HARGA SATUAN PEKERJAAN

43,200.00
35,200.00

44

1 PSG PEKERJAAN HAK / KAIT ANGIN


0.3000 H/O

Tukang kayu

78,500.00

23,550.00

0.1500 H/O

Mandor

95,000.00

14,250.00
37,800.00

45

UNTUK HAK ANGIN JENDELA TYPE DRAT ADALAH - ( PEKERJAAN PASANG + HARGA HAK ANGIN )

55,800.00

UNTUK HAK ANGIN JENDELA TYPE KAIT ( KUNINGAN ) ADALAH - ( PEKERJAAN PASANG + HARGA HAK ANGIN )

45,800.00

1 TITIK PEKERJAAN PASANG LAMPU LISTRIK


Fitting ulir ( putih )

15,000.00

15,000.00

10.0000 M'

1.0000 Bh

Kabel NYM

10,000.00

100,000.00

1.0000 Bh

Isolasi + tali

3,000.00

3,000.00

10.0000 Bh

Paku kabel + cincin

500.00

5,000.00

0.4000 H/O

Pekerja

57,500.00

23,000.00

0.8000 H/O

Tukang listrik

78,500.00

62,800.00

1.2000 H/O

Kepala tukang

85,000.00

102,000.00

0.0100 H/O

Mandor

95,000.00

950.00
311,750.00

46

UNTUK LAMPU PHILIPS XL 10 S/D 20 WATT & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU )

389,750.00

UNTUK LAMPU PHILIPS XL 23 S/D 40 WATT & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU )

396,750.00

UNTUK LAMPU PHILIPS XL 50 S/D 80 WATT & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU )

401,750.00

UNTUK LAMPU PIJAR XL 5 S/D 40 WATT & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU )

316,750.00

UNTUK LAMPU HIAS GANTUNG & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU & KAP )

611,750.00

UNTUK LAMPU HIAS TANAM PLAFOND & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU & KAP )

431,750.00

UNTUK LAMPU HIAS TEMPEL DINDING & KAP ADALAH - ( PEKERJAAN PASANG + HARGA LAMPU & KAP )

411,750.00

1 TITIK PEKERJAAN PASANG SAKLAR TUNGGAL


6.0000 M'

Kabel NYM

1.0000 Bh

Isolasi + Pipa pvc

10.0000 Bh

Paku kabel + cincin

10,000.00

60,000.00

3,000.00

3,000.00

500.00

5,000.00

0.5000 H/O

Pekerja

57,500.00

28,750.00

1.0000 H/O

Tukang listrik

78,500.00

78,500.00

1.5000 H/O

Kepala tukang

85,000.00

127,500.00

0.0160 H/O

Mandor

95,000.00

1,520.00
304,270.00

47

UNTUK SAKLAR TYPE BIASA ADALAH - ( PEKERJAAN PASANG + HARGA SAKLAR )

329,270.00

UNTUK SAKLAR TYPE LUKS ADALAH - ( PEKERJAAN PASANG + HARGA SAKLAR )

334,270.00

1 TITIK PEKERJAAN PASANG SAKLAR GANDA


15.0000 M'
1.0000 Bh
10.0000 Bh

Kabel NYM
Isolasi + Pipa pvc
Paku kabel + cincin

10,000.00

150,000.00

3,000.00

3,000.00

500.00

5,000.00

0.5000 H/O

Pekerja

57,500.00

28,750.00

1.0000 H/O

Tukang listrik

78,500.00

78,500.00

1.5000 H/O

Kepala tukang

85,000.00

127,500.00

0.0160 H/O

Mandor

95,000.00

1,520.00
394,270.00

48

UNTUK SAKLAR TYPE BIASA ADALAH - ( PEKERJAAN PASANG + HARGA SAKLAR )

424,270.00

UNTUK SAKLAR TYPE LUKS ADALAH - ( PEKERJAAN PASANG + HARGA SAKLAR )

434,270.00

1 TITIK PEKERJAAN PASANG STOP KONTAK


7.5000 M'

Kabel NYM

1.0000 Bh

Isolasi + Pipa pvc

10.0000 Bh

Paku kabel + cincin

10,000.00

75,000.00

3,000.00

3,000.00

500.00

5,000.00

0.5000 H/O

Pekerja

57,500.00

28,750.00

1.0000 H/O

Tukang listrik

78,500.00

78,500.00

1.5000 H/O

Kepala tukang

85,000.00

127,500.00

0.0160 H/O

Mandor

95,000.00

1,520.00
319,270.00

UNTUK STOP KONTAK TYPE BIASA ADALAH - ( PEKERJAAN PASANG + HARGA STOP KONTAK )

344,270.00

UNTUK STOP KONTAK TYPE LUKS ADALAH - ( PEKERJAAN PASANG + HARGA STOP KONTAK )

354,270.00

ANALIS HARGA SATUAN PEKERJAAN

49

1 SET PEKERJAAN PASANG SEKRING BOX


10.0000 M'
1.0000 Bh
10.0000 Bh

Kabel NYM
Isolasi + Pipa pvc
Paku kabel + cincin

10,000.00

100,000.00

3,000.00

3,000.00

500.00

5,000.00

35,000.00

35,000.00

1.0000 Unit

Sekring kas

1.5000 H/O

Pekerja

57,500.00

86,250.00

1.2500 H/O

Tukang listrik

78,500.00

98,125.00

0.1250 H/O

Kepala tukang

85,000.00

10,625.00

0.1500 H/O

Mandor

95,000.00

14,250.00
352,250.00

50

1 BH PEKERJAAN PASANG CLOSET


0.1667 BTg

Pipa PVC Dia 4 " ( tebal )

0.1600 H/O

Pekerja

57,500.00

240,000.00

40,000.00
9,200.00

1.0000 H/O

Kepala tukang

85,000.00

85,000.00
134,200.00

UNTUK CLOSET JONGKOK SEMI LUKS ( PORSELIN ) ADALAH ( PEKERJAAN PASANG + HARGA CLOSET )

51

989,200.00

UNTUK CLOSET JONGKOK LUKS ( KERAMIK ) ADALAH ( PEKERJAAN PASANG + HARGA CLOSET )

1,134,200.00

UNTUK CLOSET DUDUK SEMI LUKS ( KERAMIK ) ADALAH ( PEKERJAAN PASANG + HARGA CLOSET )

1,782,200.00

UNTUK CLOSET DUDUK LUKS ( KERAMIK ) ADALAH ( PEKERJAAN PASANG + HARGA CLOSET )

2,134,200.00

1 BH PEKERJAAN PASANG WASTAFEL


0.3333 BTg

Pipa PVC 3/4 " + acsesories

0.1500 H/O

Pekerja

57,500.00

95,000.00

31,666.67
8,625.00

1.0000 H/O

Kepala tukang

85,000.00

85,000.00
125,291.67

52

UNTUK WASTAVEL RIAS TYPE LUKS ( KERAMIK DUDUK ) ADALAH ( PEKERJAAN PASANG + HARGA WASTAFEL )

2,125,291.67

UNTUK WASTAVEL RIAS SEMI LUKS (KERAMIK GANTUNG ) ADALAH ( PEKERJAAN PASANG + HARGA WASTAFEL )

1,651,291.67

UNTUK WASTAVEL DAPUR ALUMINIUM 1 BAK ADALAH ( PEKERJAAN PASANG + HARGA WASTAFEL )

721,291.67

UNTUK WASTAVEL DAPUR ALUMINIUM 2 BAK ADALAH ( PEKERJAAN PASANG + HARGA WASTAFEL )

853,291.67

1 M' PEKERJAAN PASANG PIPA JARINGAN AIR KOTOR (PIPA PVC TEBAL )
2.0000 Bh

Acsesories pipa ( soog, elbow, dll )

15,000.00

0.0600 Kg

Lem pipa PVC

10,000.00

30,000.00

0.2500 H/O

Pekerja

57,500.00

14,375.00

0.3500 H/O

Tukang pipa

78,500.00

27,475.00

0.0350 H/O

Kepala tukang

85,000.00

2,975.00

0.0100 H/O

Mandor

95,000.00

600.00

950.00
76,375.00

53

UNTUK PIPA PVC DIA 4 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

136,375.00

UNTUK PIPA PVC DIA 3 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

116,375.00

UNTUK PIPA PVC DIA 2 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

100,125.00

UNTUK PIPA PVC DIA 3/4 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

98,875.00

UNTUK PIPA PVC DIA 1/2 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

83,375.00

1 M' PEKERJAAN PASANG PIPA JARINGAN AIR BERSIH (PIPA GIV TEBAL )
2.0000 Bh

Acsesories pipa ( soog, elbow, dll )

20,000.00

40,000.00

1.0000 Ls

Alat bantu ( sni drat )

20,000.00

20,000.00

0.3500 H/O

Tukang pipa

85,000.00

0.0100 H/O

Mandor

95,000.00

29,750.00
950.00
90,700.00

UNTUK PIPA GIV DIA 1/2 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

115,700.00

UNTUK PIPA GIV DIA 3/4 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

125,200.00

UNTUK PIPA GIV DIA 2 ' ADALAH ( PEKERJAAN PASANG + 0.25 * HARGA PIPA )

171,950.00

ANALIS HARGA SATUAN PEKERJAAN

54

1 TITIK PEKERJAAN PASANG KRAN AIR ( TANPA INSTALASI )

0.5000 H/O

Tukang pipa

85,000.00

0.0500 H/O

Kepala tukang

95,000.00

42,500.00
4,750.00
47,250.00

55

UNTUK KRAN DIA 1/2 'BIASA ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

62,250.00

UNTUK KRAN DIA 2/2 'LUKS ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

57,250.00

UNTUK KRAN DIA 3/4 'BIASA ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

67,250.00

UNTUK KRAN DIA 3/4 'LUKS ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

82,250.00

1 TITIK PEKERJAAN PASANG KRAN AIR ( DENGAN INSTALASI )


3.0000 Btg

Pipa giv 1/2 "

90,000.00

270,000.00

4.0000 Bh

Acsesories pipa ( soog, elbow, dll )

20,000.00

80,000.00

1.0000 Ls

Alat bantu ( sni drat )

20,000.00

20,000.00

1.0000 H/O

Pekerja

57,500.00

57,500.00

0.2500 H/O

Tukang pipa

78,500.00

19,625.00

0.0250 H/O

Kepala tukang

85,000.00

2,125.00

0.0125 H/O

Mandor

95,000.00

1,187.50
450,437.50

56

UNTUK KRAN DIA 1/2 'BIASA ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

465,437.50

UNTUK KRAN DIA 1/2 'LUKS ADALAH ( PEKERJAAN PASANG + HARGA KRAN )

485,437.50

1O M2 PEKERJAAN CAT KILAP KAYU/ BESI + MENIE


4.2500 Kg

Cat kilap kayu / besi ( kualitas bagus )

39,000.00

0.2500 Kg

Menie

19,700.00

165,750.00
4,925.00

0.6700 Kg

Minyak cat/ tenner

20,000.00

13,400.00

0.0800 Kg

Dempul

17,000.00

1,360.00

5.0000 Lbr

Ampelas

6,000.00

30,000.00

2.0000 H/O

Pekerja

57,500.00

115,000.00

3.4000 H/O

Tukang cat

78,500.00

266,900.00

0.3400 H/O

Kepala tukang

85,000.00

28,900.00

0.1000 H/O

Mandor

95,000.00

9,500.00
635,735.00

UNTUK HARGA PER / M ADALAH = 624305/10

57

63,573.50

1 M2 PEKERJAAN TEAK OIL /VERNIS HALUS


0.1500 Kg

Vernis / teak oil

44,000.00

6,600.00

0.2000 Kg

Minyak cat/ tenner

20,000.00

4,000.00

0.0600 H/O

Pekerja

57,500.00

3,450.00

0.5000 H/O

Tukang cat

78,500.00

39,250.00

0.0500 H/O

Kepala tukang

85,000.00

4,250.00

0.0330 H/O

Mandor

95,000.00

3,135.00
60,685.00

58

1 M2 PEKERJAAN CAT DINDING TEMBOK ( 3 X SAPUAN + PLAMUR )


0.5500 Kg

Cat tembok ( kualitas bagus )

10,300.00

5,665.00

0.1000 Kg

Plamur tembok

17,000.00

1,700.00

1.0000 Lbr

Ampelas

0.1800 H/O

Pekerja

57,500.00

10,350.00

0.1100 H/O

Tukang cat

78,500.00

8,635.00

0.0110 H/O

Kepala tukang

85,000.00

935.00

0.0150 H/O

Mandor

95,000.00

1,425.00

6,000.00

6,000.00

34,710.00

59

1 M2 PEKERJAAN CAT plafond ( 3 X SAPUAN )


0.5500 Kg

Cat plafond ( kualitas bagus )

10,300.00

5,665.00

0.1000 Kg

Plamur

17,000.00

1,700.00

0.0080 Kg

Dempul

17,000.00

136.00

1.0000 Lbr

Ampelas

6,000.00

6,000.00

0.1000 H/O

Pekerja

57,500.00

5,750.00

0.1100 H/O

Tukang cat

78,500.00

8,635.00

0.0110 H/O

Kepala tukang

85,000.00

935.00

0.0190 H/O

Mandor

95,000.00

1,805.00
30,626.00

ANALIS HARGA SATUAN PEKERJAAN

60

1 M2 PEKERJAAN RESIDU RANGKA KAP


0.3500 Kg

Residu

0.1000 H/O

Pekerja

57,500.00

10,000.00

0.0050 H/O

Mandor

95,000.00

3,500.00
5,750.00
475.00
9,725.00

61

1 M2 PEKERJAAN CAT ATAP SENG / ARDEKS


0.5000 Kg

Cat atap ( kualitas bagus )

0.0800 H/O

Pekerja

57,500.00

32,000.00

16,000.00
4,600.00

0.1100 H/O

Tukang cat

78,500.00

8,635.00

0.0110 H/O

Kepala tukang

85,000.00

935.00

0.0095 H/O

Mandor

95,000.00

902.50
31,072.50