Statement
Motivation:
- to
Materials:
1. Hard plastic sheets 2. Gravel 3. Sand 4. Soil
PROCEDURE1. Preparation of Cofferdam From the given standard sized sheets we will be preparing a closed rectangular shaped cofferdam so that they indicate the perimeters of the construction that is to be built. 2. Dewatering-During unwatering (pumping the water to outside of cofferdam) a cofferdam in cohesion less soils, The upward flow from the surrounding groundwater induces a quick condition, which results In loss of strength at the bottom. In other words, if the flow is upward then the Water pressure tends to lift the soil element. If the upward water pressure is high enough the Effective stresses in the soil disappear, no frictional strength can be mobilized and the soil Behaves as a fluid. To prevent quick condition, the head difference causing flow, i.e. the difference between the
groundwater table level and the standing water level within the cofferdam., will be kept low.
This is to be kept in place using rubbles which will slightly raise the water level.
The fine aggregate and sand will be split so that the aggregates interlock properly .
PLAN