You are on page 1of 16

Non-Gazetted

TARIFF ITEMS

TABLE OF CONTENTS
VESSEL CHARGES
1. 2. Water Supply Wharf Cleaning Charges Page 2 Page 2

CARGO CHARGES
1. 2. 3. 4. 5. 6. 7. 8. 9. Additional Handling Charge Removal Charges Transshipment And Re-Export Cargo Store Rent On Shut-Out Cargo Surcharge On Loose Cargo Standby Charges For Prai Wharf Wharf Handling Charges For Dry Bulk Cargo Loaded Or Discharged At Prai Wharf Hire Of Mechanical Equipment Hire Of Special Equipment At PBCT/Prai Wharf/ Butterworth Wharves Page 3 Page 3 Page 3 Page 4 Page 4 Page 4 Page 4 Page 5 Page 5

CONTAINER CHARGES
1. 2. 3. 4. 5. 6. Change Of Status Reefer Container Services Surcharge For Lifting/Shifting Overheight Containers Hire of Container Crane Miscellaneous Charges For Containers Operation Surcharge For Urgent Stufng/Unstufng Page 6 Page 6 Page 7 Page 7 Page 8 Page 8

MISCELLANEOUS CHARGES
1. 2. Miscellaneous Services And Facilities Hire Of Gears Page 9 Page 9 Page 10 Page 11

SECURITY SERVICES FIRE SERVICES/EMERGENCY RESPONSE

NON-GAZETTED TAFIFF ITEMS_

VESSEL CHARGES
1. Water Supply
SERVICES
Minimum charge to be imposed based on a minimum quantity of 10,000 liters of water Each subsequent 1,000 liters

(RM)
26.00

2.60

2.

Wharf Cleaning Charges


SERVICES
Cleaning - water + labour Cleaning - water + labour + detergent

(RM)
300.00 400.00

_NON-GAZETTED TAFIFF ITEMS

CARGO CHARGES
1. Additional Handling Charge
Per tonne or part thereof (RM)
2.00

SERVICES
For delivery to/receiving from lighter instead of vehicle (no charge is made for cargo moved along the wharf direct from ship to lighters or vice versa)

2.

Removal Charges
Per tonne or part thereof (RM)
4.00

SERVICES
Charge for removal of cargo within port areas where such service is not covered under other tariff items

3.

Transshipment And Re-Export Cargo


Per tonne or part thereof (RM)

SERVICES
Store Rent (a) Shipped within 3 weeks calculated from the date of completion of discharge by the rst carrier until the time the second vessel is berthed (b) Shipped after the third week storage charge after free storage period

Nil

11.70

NON-GAZETTED TAFIFF ITEMS_

4.

Store Rent On Shut-Out Cargo


Per tonne or part thereof (RM)
5.20

SERVICES
Export cargo shut-out by the vessel will be subject to long storage rental of RM5.20 per tonne per week from the date the cargo is shut out

5.

Surcharge For Loose Cargo


Per tonne or part thereof (RM)
0.55

SERVICES
Receiving at wharf and delivering to vehicle or railway wagon via shed or open area or vice versa

6.

Standby Charges For Prai Wharf


Per tonne or part thereof (RM)
20.80 26.00

SERVICES
Week day or Sunday Public Holiday

7.

Wharf Handling Charges For Dry Bulk Cargo Loaded Or Discharged At Prai Wharf
Per tonne or part thereof (RM)
2.60

SERVICES
Direct handling for dry bulk cargo at Prai Wharf (Import/Export) (including wharf labour)

_NON-GAZETTED TAFIFF ITEMS

8.

Hire Of Mechanical Equipment


Per tonne or part thereof (RM)
19.50

SERVICES
1. Forklift trucks at wharf 2. Crane (a) Lifting capacity up to 5 tonnes (b) Exceeding 5 tonnes and up to 15 tonnes

25.00 50.00

To be applied only when cranage or handling charges cannot be raised on tonnage rate. Charges shall be raised from the time the equipment arrives at the place of work to the time of dismissal.

9.

Hire Of Special Equipment At PBCT/ Prai Wharf/ Butterworth Wharves


SERVICES
Shore labour for handling of breakbulk cargo using lighter at Prai Wharf - per tonne or part thereof Use of Kone/Gottwald crane at PBCT - per tonne or part thereof Lifting of excavator at PBCT - per unit Lifting of bobcat at PBCT - per unit Disposal of debris Rental of cabin at BWCT and PBCT - per shift or part thereof

(RM)
1.14

4.55

490.00 245.00 455.00 15.00

NON-GAZETTED TAFIFF ITEMS_

CONTAINER CHARGES
1. Change Of Status
SERVICES
From LCL to FCL or from FCL to LCL in addition to LCL/FCL rate there shall be extra movement charges in accordance with the number of extra movement involved up to 20 ft length From LCL to FCL or from FCL to LCL in addition to LCL/FCL rate there shall be extra movement charges in accordance with the number of extra movement involved over 20 ft length

Per movement (RM)


45.00

70.00

The above charges shall not be imposed if the Commission is informed of the change of status at least 24 hours before the arrival of the vessel.

2.

Reefer Container Services


Connecting and disconnecting reefers at reefer yard including electricity consumption (per container per shift) Per container per shift or part thereof (RM)
13.00 26.00

SERVICES Up to 20 ft. length Over 20 ft. length

_NON-GAZETTED TAFIFF ITEMS

3.

Surcharge For Lifting/Shifting Overheight Containers


Per container per hour or part thereof (RM)

SERVICES
Surcharge for lifting overheight containers, in addition to FCL/LCL charge - per container per hour (a) Up to 20 ft. length (b) Over 20 ft. length Surcharge for shifting overheight containers, in addition to normal shifting charges (a) Within same hatch or bay (using ports crane) (i) Up to 20 ft. length (ii) Over 20 ft. length (b) With landing and reshipping operation (using ships derrick) (i) Up to 20 ft. length (ii) Over 20 ft. length (c) With landing and reshipping operation (using ports crane) (i) Up to 20 ft. length (ii) Over 20 ft. length

195.00 292.50

65.00 97.50

130.00 195.00

260.00 390.00

NON-GAZETTED TAFIFF ITEMS_

4.

Hire Of Container Crane


Per container per hour or part thereof (RM)
520.00 780.00 1,040.00

SERVICES
Lifting heavy lift (a) Up to 15 tonnes (b) Above 15 tonnes up 20 tonnes (c) Above 20 tonnes up 35 tonnes Shifting heavy lift (a) Within same hatch or bay (i) Up to 15 tonnes (ii) Above 15 tonnes up to 20 tonnes (iii) Above 20 tonnes up to 35 tonnes (b) With landing and re-shipping (i) Up to 15 tonnes (ii) Above 15 tonnes up to 20 tonnes (iii) Above 20 tonnes up to 35 tonnes

520.00 780.00 1,040.00

780.00 1,170.00 1,560.00

5.

Miscellaneous Charges For Containers Operation


SERVICES
Late submission of DE/shipping order - per document Late submission on K3I (list of container to be discharged) - per submission Ship Planning charges (a) basic charges - per planning (b) rst 100 moves (c) next 600 moves - per move (d) next 600 moves and above - per move Checking of seal - per unit

(RM)
60.00 30.00

200.00 NIL 2.00 1.00 1.50

_NON-GAZETTED TAFIFF ITEMS

6.

Surcharge For Urgent Stufng/Unstufng


SERVICES
Request for urgent unstufng not in accordance with the CFS unstufng schedule shall be subject to a surcharge, if the request is complied with. This surcharge is payable by the importer. (a) Up to 20 ft. length (b) Over 20 ft. length Cargo for stufng should be sent to the Commission together with the relevant document 36 hours before the loading vessel is due to berth alongside. Request received after the above time limit will be subject to a surcharge. The surcharge is inclusive of all overtime charges. Acceptance of such request will depend on facilities being available. This surcharge is payable by the exporter. (a) Up to 20 ft. length (b) Over 20 ft. length

Per unit (RM)

130.00 195.00

130.00 195.00

NON-GAZETTED TAFIFF ITEMS_

MISCELLANEOUS CHARGES
1. Miscellaneous Services And Facilities
SERVICES
1. Documents - per document (a) Certicates on custody, statements of stock, etc. (b) Supply extra copies of bills Use of Space - per shift per sq. meter Charges for use of space such as opening up making, packages for examination, assembling, repacking or re- palletizing, etc. (a) Inside shed (b) Outside shed Use of Weighbridge - per weighing In the case of loading vehicles, the charges will include the weighing of empty vehicle before loading or after unloading when required. Clerical and Labour Service - per person per shift (a) Labourer, storeman (b) Mechanical equipment driver, crane driver (c) Clerk

(RM)
6.50 1.30

2.

2.60 1.30 3.25

3.

4.

19.50 32.50 39.00

2.

Hire Of Gears
Per unit per shift or part thereof (RM)
0.50 6.50 24.00 6.50

Equipment
Pallets Barriers Container slings Walkie - talkie

Per unit per day or part thereof (RM)

10_NON-GAZETTED TAFIFF ITEMS

SECURITY SERVICES
SERVICES Constable/Security Assistant Security Ofcer Per person per hour or part thereof (RM)
15.00 25.00

NON-GAZETTED TAFIFF ITEMS_ 11

FIRE SERVICES/EMERGENCY RESPONSE


SERVICES
1. Fire ghting/emergency tug (a) within harbour limit (< 100 metre) (i) rst hour (ii) each subsequent half hour (b) outside harbour limit (< 100 metre) (i) rst hour (ii) each subsequent half hour (c) within habour limit (> 100 metre) (i) rst hour (ii) each subsequent half hour

Per unit per hour or part thereof (RM)

364.00 182.00

728.00 364.00

598.00 299.00

(d) outside harbour limit (> 100 metre) (i) rst hour (ii) each subsequent half hour 2. 3. 4. 5. 6. Fire Engine Fireman - per person per hour Fire ofcer - per person per hour Fire equipment (pump, delivery hose, nozzle etc) Extinguishing res, emergency & others (per hour)

1,196.00 598.00 33.00 15.00 25.00 30.00 600.00

** the charges not inclusive of water consumption, foam, OSR equipment etc. The users will be charged base on actual cost involved.

12_NON-GAZETTED TAFIFF ITEMS

PENANG PORT SDN. BHD. (283544D)


No. 1, Pesara King Edward 10300 Georgetown, Penang, Malaysia

604 210 2287 F 604 261 1017 info@penangport.com.my www.penangport.com.my


T E

You might also like