SECTION 01010 SUMMARY OF WORK

PART 1 GENERAL 1.1 DESCRIPTION OF WORK USE PAR. A. AND B. BELOW FOR PC CONTRACTS. A. Scope of Work: COMPLETE PAR. BELOW WITH BRIEF DESCRIPTION OF FACILITY(S) TO BE CONSTRUCTED. 1. The work of this contract includes the procurement and construction in accordance with the contract documents. ENUMERATE MAJOR WORK TASKS IN PAR. 2 BELOW. 2. The work includes, but is not limited to the following: a. b. c. B. The Contractor shall be responsible for the procurement and construction required for a complete and operable facility including all required materials, services and equipment whether or not specified or shown on the drawings. Contractor's attention is directed to the separate volume entitled Specification Data for Contract No. _______ dated ________. This document is incorporated into the Contract by reference. FOR EPC CONTRACTS, USE PARA. A. AND B. BELOW.

RCMYAS Guide Spec. Rev J. 25 Oct. 00

IV-01010-1

Contract No.

A.

Scope of Work: COMPLETE PAR. BELOW WITH BRIEF DESCRIPTION OF FACILITY(S) TO BE ENGINEERED, PROCURED AND CONSTRUCTED 1. The work of this contract includes the engineering, procurement and construction in accordance with the contract documents. ENUMERATE MAJOR WORK TASKS IN PAR. 2 BELOW 2. The work includes, but is not limited to the following: a. b. c. 3. Engineering requirements are detailed in Section 01011 (Technical Requirements.)

B.

The Contractor shall be responsible for the engineering, procurement and construction required for a complete and operable facility including all required materials, services and equipment whether or not specified or shown on the drawings. Contractor's attention is directed to the separate volume entitled Specification Data for Contract No. ________ dated _______. This document is incorporated into the Contract by reference. Contractor shall prepare Operation and Maintenance Manuals. Spares: SELECT SPARES OPTION FROM PAR. 1 THROUGH 4 BELOW. 1. Contractor shall prepare a Recommended Spare Parts List (RSPL) for normal operation of all equipment and buildings and procure approved spare parts as cost reimbursable items. Contractor shall prepare a Recommended Spare Parts List (RSPL) for normal operation of all equipment and buildings. Spare parts will be provided by others. IV-01010-2 Contract No.

C. D.

2.

RCMYAS Guide Spec. Rev J. 25 Oct. 00

3. 4.

Contractor shall prepare a Spare Parts List (SPL) and provide operational spare parts as a part of the fixed price. Contractor shall provide certain specified spare parts as a part of the fixed price. Contractor shall prepare a Recommended Spare Parts List (RSPL) for normal operation of all equipment and buildings, and approved spare parts shall be provided on a cost reimbursable basis.

E.

Location: INSERT BRIEF DESCRIPTION OF THE WORK SITE LOCATION.

1.2 A.

WORK SCHEDULE AND COORDINATION Coordinate the work with the Royal Commission in accordance with the requirements of the Special Conditions Article entitled "Contract Schedule" and Specification Section 01030, Project Procedures. FOR EPC CONTRACTS, ADD PAR. B, C AND D BELOW.

B.

All engineering design documents as required by Specification Section 01011 shall be approved as final by the Royal Commission prior to submittal of shop drawings, samples and miscellaneous submittals; procurement; or construction. Shop drawings, samples and miscellaneous submittals shall be submitted in accordance with the requirements of Specification Section 01340 and accepted by the Royal Commission prior to the procurement and construction of those materials and equipment requiring such acceptance. The Contractor may perform the work in sequence which varies from that as defined in Paragraphs B and C above, if a detailed schedule and narrative of his proposed plan to accomplish the work is submitted to the Royal Commission and is accepted. The schedule and narrative shall be in the form as specified in the Specification Section entitled "Scheduling and Reporting Requirements" to indicate all proposed engineering design, design submittals, design review periods, shop drawing submittals, shop drawing review periods, procurement and construction activities.

C.

D.

RCMYAS Guide Spec. Rev J. 25 Oct. 00

IV-01010-3

Contract No.

1.3 A.

COORDINATION WITH RELATED WORK BY OTHERS Coordinate the work of this contract with the work by others provided under separate contract(s). These contracts include, but are not limited to the following: 1. 2. 3. FOR PC CONTRACTS, USE PARA. BELOW IF DOCUMENTS ARE TO BE FURNISHED FOR INFORMATION. FOR EPC CONTRACTS, THIS LISTING SHOULD BE IN SECTION 01011.

1.4 A.

INFORMATION TO BE FURNISHED TO CONTRACTOR The following documents will be furnished to the Contractor, for information only, at the commencement of work: 1. 2.

+ + END OF SECTION 01010 + +