You are on page 1of 5

Frank Mohn Services AS

No. 17 1997
Revised June 2005

Service Bulletin

Keep you up to date with the latest news from Frank Mohn Services AS

Framo Submerged Cargo Pump

Planned Maintenance System

An efcient planned maintenance

system on board will keep your cargo pumping system in proper condition.

The maintenance system must clearly

highlight job specications and dene intervals as well as responsibilities.

The planned maintenance system for

Framo cargo pumping system is an important part of the Ships Quality Assurance System, ISO 9002.

A properly maintained system will

reduce unnecessary problems and increase the ships turnover.

General
For all ships trading world-wide, it will in the near future be required to have an approved Quality Assurance System ISO 9002 on board. An important part of your ships QA System will be a Planned Maintenance System for all the equipment on board, i.e. job specications, carried out by, approved by, inspection intervals as well as a separate record book for logging of results. There is no doubt that a properly maintained system will reduce operation costs and obtain a safe and sound ship.

Planned Maintenance System for Framo Cargo Pumping System


Approximately 1.200 ships are today equipped with Framo Cargo Pumping System. Some of them have already an approved Quality Assurance System on board, but the majority will have to develop and implement a QA System in the near future. To give these Framo Ships some guidance, we have in this Service Bulletin proposed a basic Planned Maintenance System on the next pages. The equipment on board, as well as the type of ship and trade may differ from ship to ship our proposal is therefore to be understood as guidance only.

Explanation to the following basic Planned Maintenance System


Equipment: is the main components in your specic Framo Cargo Pumping System. species the various activities. Note! A visual inspection of the cargo pumps top plate means visual control of local control valve, purging valve, ball valve, pressure gauge, et cetera. Repair when necessary. refer to the drawing in the Framo Service Manual. refer to Framo Service Manual.

Job Specications:

Drawing No.: Maintenance instruction:

Carried out by/Approved by: can vary from ship to ship, but it is a must that the responsibilities are clearly dened. Inspection intervals: can vary according to type of ship and trade and your own experience.

Proposed Planned Maintenance System for Framo Cargo Pumping System


Ref. Ships QA-System, ISO 9002
Equipment Submerged Cargo Pump
Purging of cofferdam Visual inspection of Cargo Pumps top plate Wear ring/ cap. control

Portable Pump
Function, Capacity, Drill test

Hydraulic Power Pack


Noise vibration leakage control Mechanical magnetic chip detector El. motor/ P.T.O. gear bearings clutch control Hydr. oil tank level

Hydr. Oil Tank


Hydr. oil tank bottom drain

Hydr. Oil Filters


P indicator, Main system lter box P indicator Auxiliary lters

Hydr. Control Valves/Panels


Main relief valve Pressure control valves Alarm check, switches, safety loop

Hydr. Oil Cooler


Water tubes Oil cooler anodes

Hydr. System
Air vent points: 1: on end of ring line 2: on lter box 3: on Cargo Pump 4: on hydr. tank

Job Specications
Drawing No. Maintenance instruction No. Carried out by Approved by
Date Inspection intervals when operated Running hours based Every 3rd month Annually Condition based

Diesel engine

Hydr. oil

Purging routine 1000-010-4 Pump man Chief Ofcer See purging routine X Pump man Chief Ofcer Pump man Chief Ofcer Recommended clearance less than 1 mm X Pump man Chief Ofcer Eng.

643-4-5

1400-068 643-4-678 Pump man Chief Eng.


Refer to manufacturers manual

Eng.

Eng.

Eng.

Eng. Chief Eng.

Pump man

Pump man

Eng. Chief Eng.

Eng.

Eng.

Eng. Chief Eng.

Eng.

Pump man Chief Ofcer When needed

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

Chief Eng.

X X

X X X

X X

X X

X X X X X X X X X

NB!

The above Maintenance System is for guidance only. The equipment on each Framo ship may be different from ship to ship. Framo can, however, be consulted to work out a specic maintenance plan for your ship or you have to use the information in your Framo Service Manual together with your experience. Please dont forget auxiliary equipment such as: Ballast Pumps, Tank Washing Pumps, Bow Thruster Motor, etc.

Ten Rules to remember...


1. Purge the cargo pumps cofferdam before and after discharge. Log and evaluate the purging result. Take necessary action. 2. Never start any dismantling of the cargo pump before you have identied the problem. Always pressure test the cargo pumps cofferdam to identify any leak. Always remember to use the correct tools from the Framo tool box. 3. Use only genuine Framo parts. 4. If you have any problems with capacity, stripping or parallel pumping, check the cargo pumps condition against the performance curve. 5. During discharge: Regulate the hydraulic system pressure to approx. 15 bar above the highest consumer regulate cargo pump capacity by hydraulic pressure, not by throttling of cargo valve. 6. Avoid air in the hydraulic system. Deairate the system on a regular basis. 7. Keep the hydraulic system clean. Cleanliness is absolutely necessary. 8. Take a hydraulic oil sample, every 3rd month for particle counting (ISO 4406). Every 12th month full analyze according to Framo standard 1400.063. 9. Never mix the hydraulic oil with lub. oil. 10. Implement a planned maintenance system for the complete cargo pumping system.

For further information please contact our Framo Service Ofces worldwide.

Frank Mohn Services AS


Head ofce: Frank Mohn AS, P.O. Box 98 Sltthaug, 5851 Bergen, Norway, Phone: + 47 55 99 90 00, Telefax: + 47 55 99 93 80 Frank Mohn Flaty AS, Flaty, 5918 Frekhaug, Norway, Phone: + 47 55 99 94 00, Telefax: + 47 55 99 95 81 Frank Mohn Fusa AS, P.O. Box 10, 5641 Fusa, Norway, Phone: + 47 55 99 96 00, Telefax: + 47 55 99 97 80 Frank Mohn Services AS, P.O. Box 44 Sltthaug, 5851 Bergen, Norway, Phone: + 47 55 99 92 00, Telefax: + 47 55 99 93 82 Framo Engineering AS, P.O. Box 174 Sandsli, 5862 Bergen, Norway, Phone: + 47 55 92 88 00, Telefax: + 47 55 92 89 00 Frank Mohn Nederland BV, Edisonweg 18, P.O. Box 305, 3200 AH Spijkenisse, The Netherlands, Phone: + 31 181 619311, Telefax: + 31 181 611193 Frank Mohn Houston Inc, 1802 West D Street, La Porte, Texas 77571-4601, USA, Phone: + 1 281 471 7920 , Telefax: + 1 281 842 5450 Frank Mohn Singapore Pte Ltd, 17 Tuas View Circuit, Singapore 637575, Phone: + 65 6210 2400, Telefax: + 65 6210 2401 Frank Mohn AS Sweden Ofce, Askims Industrivg 1A, 43634 Askim, Sweden, Phone: + 46 31 682085, Telefax: + 46 31 681048 Frank Mohn Nippon K.K., City-haz Chojamachi Building 6 - 3, Chojamachi 2-chome, Naka-ku, Yokohama 231-0033, Japan, Phone: + 81 45 253 7155, Telefax: + 81 45 253 7188 Frank Mohn Korea Ofce, Rm. 309, Yachting Center Bldg., 1393, Woo-1 Dong, Haeundai-Ku, Pusan, Korea, Phone: + 82 51 743 6942, Telefax: + 82 51 743 6944 Frank Mohn China Ltd, Unit 1008 Pine City, 8 Dong An Road, Shanghai 200032, China, Phone: +86 21 6443 8845, Telefax: +86 21 6443 8846 Frank Mohn do Brasil Ltda, Av. Presidente Vargas, 463 - 19 Andar, Rio de Janeiro CEP 20071-003, Brazil, Phone: + 55 21 2507 7898, Telefax: + 55 21 2507 7888

BODONI HUS 8461