Professional Documents
Culture Documents
DATOS INICIALES
Pu =
sadm =
b(col) =
t(col) =
fy =
f 'c =
9
7.00
0.30
0.30
4200
210
Altura de la zapata =
Columna
Ton (mayorado)
Ton/m (mayorado)
m
m
Kg /cm
Kg /cm
0.30
Zapata
d = 0.30 - 0.08 =
5.99
0.22
Ton/m
m
d/2=
rea A = Pu / s =
7.3 / 13.99 =
A = L L = .64 , L =
0.64
0.81
m
m
Pu / L = 7.3 / 0.60 =
20.25
Ton/m
su =
0.11
65.28
Ton/m
vu = Vu / ( bd ) = su x L x e / (L x d)
20.25
= x 0.08 / 0.22 =
7.36
Ton/m
135.49
Ton/m
Ton/m
vu < vn
O.K.
REVISIN DE PUNZONAMIENTO
vu < vn'
O.K.
ANLISIS DE FLEXIN
M = w x Lvol / 2
w = su x L
L vol = .30 m
M = 20.25 x 0.60 x 0.30 / 2 =
0.55
Tonm
b=
d=
60 cm
22 cm
As =
2.38
K = M / (b x d) =
p =
0.00189
0.0005
cm (total)
Cant. Barra No. (esp)
4 # 3 ( @ 0.15 )
2 # 4 ( @ 0.30 )
2 # 5 ( @ 0.30 )
1 # 8 ( @ 0.60 )
DATOS INICIALES
Pserv=
Pu =
sadm =
b(col) =
t(col) =
4.86
7.29
15.00
0.30
0.30
Ton
Ton
Ton/m
m
m
fy =
f 'c =
4200
210
Kg /cm
Kg /cm
Altura de la zapata =
factor=
0.30
1.5
d = 0.30 - 0.07 =
13.99
0.22
Ton/m
m
d/2=
rea A = Pserv / s =
4.9 / 13.99 =
A = L L = .35 , L =
0.35
0.60
m
m
Pu / L = 7.3 / 0.60 =
20.25
Ton/m
su =
0.11
vu < vn
vu = Vu / ( bd ) = su x L x e / (L x d)20.25
=
x 0.08 / 0.22 =
65.28
Ton/m
7.36
Ton/m
135.49
Ton/m
O.K.
REVISIN DE PUNZONAMIENTO
vn' = 0.85 x 1.1 x (f 'c) (x 10) =
vu < vn'
vu = Vu / ( bod ) =
/ ( Permetro x d )
21.54
Ton/m
O.K.
ANLISIS DE FLEXIN
M = w x Lvol / 2
w = su x L
M = 20.25 x 0.60 x 0.30 / 2 =
0.55
b=
d=
60 cm
22 cm
As =
2.38
L vol = .30 m
Tonm
K = M / (b x d) =
p =
0.00189
0.0005
cm (total)
Cant.
4
2
2