2004-09-03
1,56Page 1 , Total56
confidentiality level
Revision record
Date 2004-08-23 2004-12-02 2005-01-26 Revision version 0.01 0.1 0.3 change Description Revised According to Feedback Dated 2005-01-26 Author Lee Kong Wah Lee Kong Wah Lee Kong Wah
2004-09-03
2,56Page 2 , Total56
confidentiality level
Table of Contents 1. Introduction...................................................................................................................... 7 2. Workflow & Work Packages ............................................................................................ 7 2.1. Detailed RNP Workflow (Outdoor) ................................................................................... 7 2.1.1. Preliminary RNP & Work Packages ........................................................................... 9 2.1.2. Cell-Level RNP ........................................................................................................ 10 2.2. Common Detailed RNP Workflow (Indoor) .................................................................... 10 2.2.1. Coverage Objective Analysis ................................................................................... 11 2.2.2. Survey & Measurement ........................................................................................... 11 2.2.3. Coverage Prediction & Capacity Dimensioning........................................................ 12 2.2.4. DAS component Selection ....................................................................................... 12 2.2.5. Co-system Analysis ................................................................................................. 12 2.2.6. DAS Design ............................................................................................................. 13 2.2.7. Handover Design ..................................................................................................... 13 3. Preliminary RNP ............................................................................................................ 15 3.1. Information Collection .................................................................................................... 15 3.2. Nominal Network Planning ............................................................................................ 15 3.2.1. Rollout Plan ............................................................................................................. 16 3.2.2. Site Survey .............................................................................................................. 16 3.2.3. Radio Propagation Test ........................................................................................... 19 3.2.4. Propagation Model Tuning....................................................................................... 21 3.2.5. Area Categorization ................................................................................................. 23 3.2.6. Select Usable Site Or Add Nominal Sites ................................................................ 25 3.2.7. Antenna Selection Analysis ..................................................................................... 25 3.2.8. Initial Engineering Parameter Planning.................................................................... 26 3.2.9. Coverage Thresholds Determination ....................................................................... 28 3.2.10. Basic Coverage Prediction ............................................................................. 32 3.2.11. Traffic Model Analysis..................................................................................... 33 3.2.12. Service Model Analysis................................................................................... 33 4. Cell-Level RNP .............................................................................................................. 33 4.1. Site Survey .................................................................................................................... 33 4.2. Engineering Parameter Planning ................................................................................... 34 4.2.1. Overall Process........................................................................................................ 34 4.2.2. Site Related Parameter Planning Procedure ........................................................... 37 4.2.3. Antenna Related Parameter Planning Procedure .................................................... 42 4.3. Co-Site Interference Analysis ........................................................................................ 48 4.3.1. General Descriptions ............................................................................................... 48 4.3.2. Analysis ................................................................................................................... 49 4.3.3. Project Related Issues ............................................................................................. 49 4.4. Spectrum Clearance Test .............................................................................................. 50 4.4.1. General Descriptions ............................................................................................... 50 4.5. Cell Parameter Plan....................................................................................................... 50 4.5.1. General Description ................................................................................................. 50 4.6. TMA Application Analysis .............................................................................................. 55 4.7. Repeater Application Analysis ....................................................................................... 55 4.8. 4 Antenna Transmit Diversity Analysis .......................................................................... 55
2004-09-03
3,56Page 3 , Total56
confidentiality level
List of Tables
1 Example of Node B Rollout Plan ......................................................................................... 16 2 Engineering Parameter List................................................................................................. 27 3 Example of Site Template To Add Nominal Site in UNET Planning Tool ............................ 27 4 Example of Link Budget Calculation.................................................................................... 30 5 Example of Ec Threshold Calculation ................................................................................. 31 6 Example of EcIo Threshold Calculation .............................................................................. 32 7 Equipment Characteristics Description ............................................................................... 40
2004-09-03
4,56Page 4 , Total56
confidentiality level
List of Figures
Fig1. Fig2. Fig3. Fig4. Fig5. Fig6. Fig7. Fig9. Fig10. Fig11. Fig12. Fig13. Fig14. Fig15. Fig16. Fig17. Fig18. Fig19. Fig20. Common Detailed RNP Flow ........................................................................................... 8 Nominal Network Planning Flow ...................................................................................... 9 Indoor RNP Flow ........................................................................................................... 14 Site Survey Flow............................................................................................................ 18 Model Tuning Flow ........................................................................................................ 22 Example Of Area Categorization ................................................................................... 24 Overall Engineering parameter analysis procedure (green field operator)..................... 35 Overall Engineering parameter analysis procedure (Existing operator)......................... 36 Procedure for site related parameter setting (green field operator).......................... 38 Procedure for site related parameter setting (existing operator) .............................. 39 Procedure for equipment selection .......................................................................... 42 Procedure for antenna related parameter setting..................................................... 43 Procedure of Antenna Location Selection................................................................ 44 Antenna Type Selection Procedure ......................................................................... 46 Procedure Of Antenna Azimuth Planning ................................................................ 47 Procedure Of Antenna Downtilt Adjustment............................................................. 48 RNC Area Planning Procedure ................................................................................ 52 Paging Area Planning Procedure............................................................................. 53 Procedure of Manual Neighbor List Planning........................................................... 55
2004-09-03
5,56Page 5 , Total56
confidentiality level
This document describes the procedure of the Detailed Radio Network Planning Process which involves various aspects and stages. Both the Greenfield and Existing 2G operator will be discussed while from the Radio Coverage perspective, Outdoor and Indoor System will also be covered in this document. List of abbreviations Abbreviations Full spelling PRNP Preliminary Radio Network Planning NNP Nominal Network Planning CW Continuous Wave DAS Distributed Antenna System IRS Integrated Radio System UL Uplink DL Downlink TU3 Typical Urban 3Km/H TU30 Typical Urban 30Km/H RFQ Request For Quotation RFP Request For Proposal MAPL Maximum Allowed Path Loss SC Scrambling Code LA Location Area RA Routing Area URA Utran Registration Area SA Service Area Chinese explanation
2004-09-03
6,56Page 6 , Total56
confidentiality level
1. Introduction
This document aims to describe from high level, the procedure of the Detailed Radio Network Planning Process (hereinafter referred to as Detailed RNP). Detailed RNP involves various aspects and stages. From the customer type point of view, both the Greenfield and Existing 2G operator will be discussed. The main difference between the 2 is mainly lying on the need of reusing the existing BTS sites when dealing with an existing 2G operator. From the Radio Coverage perspective, both Outdoor and Indoor System are discussed in this document. Most of the RNP stages explained in this document involve the use of outputs from one or more work packages. They will be briefly explained in this document in order to provide a general idea on the overall Detailed RNP Process. However, explanations given in this document are based on the corresponding detailed guidelines that will be crossed reference throughout the entire document. For more information on the technical aspects and details at the operating level, readers are advised to refer to these guidelines.
2004-09-03
7,56Page 7 , Total56
confidentiality level
2004-09-03
8,56Page 8 , Total56
confidentiality level
confidentiality level
its existing sites might need to take place in this stage of planning. This is to acquire the sites information to determine their reuse feasibility. Site information in this context refers to site location (whether it falls into the search ring of the nominal plan), Site height (whether the height fulfills the coverage and interference control objective). All the involved work packages in this stage of planning are listed below: Information Collection Nominal Network Planning Initial Engineering Parameter Planning Coverage Threshold Determination Coverage Prediction Area Survey Site Survey (Optional) CW Test (Optional) Propagation Model Analysis Antenna Selection Analysis Service Model Analysis (Optional) Traffic Model Analysis(Optional) System Simulation(Optional) Should the PRNP is carried out during the presales stage, some of the work packages marked as Optional in the above can be bypassed if time and cost constraints. On the other hand, should the PRNP is carried out during the post sales stage, all the involved work packages are vital to ensure the overall RNP quality.
confidentiality level
categorized into 3 different scenarios i.e. Single WCDMA System Multi System (e.g. GSM/WCDMA/CDMA) involving single operator IRS (Integrated Radio System) involving multi operators Fig3shows the general flow for the Indoor RNP which clearly shows the involved work packages listed below: Coverage Objective Analysis Survey & Measurement Coverage Prediction & Capacity Dimensioning DAS component Selection Co-system Analysis DAS Design Handover Design
confidentiality level
system is involved. The test results will be used to model the indoor propagation for later stage of coverage prediction.
It is often the case where an existing 2G indoor DAS is already operating within the involved building and the WCMDA system is required by the operator to share the existing infrastructure. Therefore, the coverage prediction can refer to the existing indoor coverage. This is achieved by measuring the existing 2G coverage and convert the measurements to the appropriate WCDMA frequency and transmit power to simulate the WCDMA coverage should the indoor system is to reuse the existing 2G indoor DAS. For more information on this technique, please refer to << WCDMA RNP >>.
As for the indoor capacity dimensioning, it is principally identical to the outdoor system. The equivalent traffic of each supported service is determined involving the customer first, then, applying the forecasted indoor subscriber, the overall effective traffic is worked out and cross checked with the offered capacity of the designed indoor system. Should the involved building has an existing 2G system, the traffic statistics of this existing system can be used to obtained a more reliable traffic forecast.
confidentiality level
transmission. These potential interference can be prevented by carefully selecting the DAS components as well as altering the existing indoor 2G frequency plan. For more information, please refer to << WCDMA RNP >>.
2004-09-03
13,56Page 13 , Total56
confidentiality level
2004-09-03
14,56Page 14 , Total56
confidentiality level
3. Preliminary RNP
3.1. Information Collection
In this document, Information Collection is treated as a standalone work package that marks the start of the detailed RNP. All the required information serves as the inputs to other work pages that take place at different stages of the RNP lifecycle. The required information includes but not limited to: Contractual Requirement Network Objectives Rollout Plan & Constraints Details of the customer existing network and co-location preference if any Competing operator strategy or performance The source of Information includes: Customer Relevant Governing Authorities Relevant Departments within the Company Information Providers and etc. In order to make the information collection process more efficient, different templates (checklists) targeting different operator type (Greenfield or existing 2G Operator) will be used. All the information required as the inputs to different work packages are grouped and categorized into common and unique categories. With this, the chances of repeated effort in acquiring identical information in different stages of the RNP will be minimized. For more information on the required information and the templates involved, please refer to the guideline entitled WCDMA RNP. In a project implementation, most of required information appeared to be in the forms of hardcopy or electronics copy which might not be ready to be shared by the source right at the start of the project. Furthermore, some required information is dependant on certain decisions which are yet to be made along the RNP process. Therefore, it is common to split the information collection into phases. Depending on the commencing date of the work packages involved, the relevant information can be acquired progressively.
confidentiality level
confidentiality level
NodeB site surveys activity in this context extends to cover both the candidate site search and site surveys as illustrated with its workflow in the following section. 3.2.2.2. Survey Procedure The following figure shows the generalized workflow of the NodeB Site Survey activity.
2004-09-03
17,56Page 17 , Total56
confidentiality level
2004-09-03
confidentiality level
3.2.2.3. Project Related Issues Depending on the type of operator dealt with, the time of the survey activity could differ within the entire lifecycle of the Detailed RNP Planning. When dealing with a Greenfield operator, site survey should be integrated within the Engineering Parameter Analysis (For more details, please refer to guideline entitled WCDMA RNP Engineering Parameter Analysis). With this, most of Engineering Parameter Outputs such as site or antenna related parameters will rely on the outcome of the survey activities. For the case of an existing 2G operator, it is anticipated that if not all, majority of the operators 2G sites and their respective engineering parameters will be reused due to cost, fast deployment concerns and 2G/3G coverage strategy. Therefore, the site survey in this context involves mainly the acquisition and confirmation of all the 2G engineering parameters. With this, the survey activity should take place prior to the coverage prediction stage as the survey outputs serve as the primary input to the predictions. When dealing with an existing 2G operator, there is a possibility of bypassing the survey activity as the 2G site information is usually documented and made available for reference. The reason of skipping the survey activity is mainly to speed up the network deployment process. However, this option is only viable provided the documented 2G site information is proven accurate and well maintained.
confidentiality level
WCDMA Pilot Power (CPICH Ec) or existing GSM Broadcast Channel Power (BCCH RxLev). More details on the test can be obtained from the guideline entitled WCDMA RNP . Radio Propagation Test in this context extends to cover both outdoor and indoor sites. For the case of indoor system, the test involves mainly the measurement of the existing Indoor GSM Broadcast Channel Power (BCCH RxLev). Instead of using these test output to develop an Indoor propagation model, the output is used to determine the feasibility of sharing the existing GSM Indoor infrastructure in offering WCDMA coverage. More details on how the Indoor Propagation Test result is used in designing an Indoor WCDMA system can be obtained from the guideline entitled WCDMA RNP . 3.2.3.2. Test Procedure Regardless to the network scenario (indoor or outdoor system) or the type of propagation test (CW, CPICH Ec or BCCH RxLev), the test procedure normally involves the following steps: Information Collection Site Selection Test Transmitter Setup (not relevant to CPICH Ec or BCCH RxLev test) Measurement Test result processing and Analysis For more details on the above, standard operating procedure of the test as well as a comparison on the type of propagation test, please refer to detailed guideline entitled << WCDMA RNP >>. 3.2.3.3. Project Related Issues Radio Propagation Test makes available accurate propagation model that serves as the basis of quality Radio Network Plan. However the test itself is both time and labor intensive exercise. Therefore, in a project implementation, Radio Propagation Test can sometimes be treated as an optional item to bypass when cost and time are of great concern. Should the Radio propagation test is bypassed, the quality of the Radio Network Plan should still be ensured. This can be achieved by reusing certain propagation models that were already developed in the past under similar propagation environment. A guideline entitled WCDMA RNP compiles and summarizes all the internally tuned propagation models and it is made available for reference. Should an Existing 2G Operator project decide to carry out its own Radio Propagation Test, the choice of radio signal between CW and BCCH RxLev relies not only on the result accuracy, it will also depends on the project cost and time consideration. In general, a Radio Propagation Test on the existing BCCH RxLev consumes less time as no access and installation to the base station sites is necessary.
2004-09-03 All rights reserved 20,56Page 20 , Total56
confidentiality level
2004-09-03
21,56Page 21 , Total56
confidentiality level
For the case of UNET Empirical Model, the definition of model parameter and tuning procedure differ from the ones with Enterprise. For more information, please refer to Huawei UNET User Manual. For the case of Theoretical Model, no individual Model Tuning Guideline will be developed as it is not foreseen to be widely used in the future projects. However, Tuning Procedure on these models can be obtained from their respective user and reference guide
2004-09-03
22,56Page 22 , Total56
confidentiality level
3.2.4.4. Project Related Issues Similar to Radio Propagation Test, Radio Propagation Model Tuning can sometimes treated as an optional item to bypass when cost and time are of great concern. Should the Radio Propagation Model Tuning is bypassed, the quality of the Radio Network Plan should still be ensured. This can be achieved by reusing certain propagation models that were already developed in the past under similar propagation environment. A guideline entitled WCDMA RNP compiles and summarizes all the internally tuned propagation models and it is made available for reference.
Depth of coverage (Indoor, outdoor or Incar) Propagation Channel Type (TU3, TU30 & etc.) Penetration loss (Indoor or Incar) Propagation models Slow fade standard deviation The following figure shows an example of Area Categorization provided by an operator during the bidding stage. In the figure, the operator had clearly divided the targeted coverage area into different clutter type. Usually, the Targeted Service Type, Depth of Coverage is also provided by the operator for the network dimensioning purpose. In this case, Area Survey will need to focus on the acquisition of information in the field to determine the suitable Propagation Channel Type, Penetration Loss, Propagation Models, Slow Fade Standard Deviation for various area category. If the Area Categorization is not provided at any stage of the RNP by the operator, then it will be the responsibility of the RF team to work out the area category by involving operator intensively.
2004-09-03
23,56Page 23 , Total56
confidentiality level
Similar to the Radio Propagation Test & Propagation Model Tuning work packages, Area Categorization can be well performed prior to the RN Dimensioning stage. The acquired information will be used then as the inputs to the WCDMA RNP , where the number of Node B sites are estimated over each of these Area Categories. Most importantly, the second usage of the above acquired information is to work out the required Ec & EcIo threshold for the relevant area category. These thresholds will be applied during the coverage prediction to ensure the support of the relevant service. 3.2.5.2. Project Related Issues Area survey is usually carried out during the RN Dimensioning stage should the required information mentioned in the previous section is not made available or fully available by the operator. All the acquired information at that stage should be reused to derive the coverage radius as well as thresholds in the NNP stage. This is to ensure technical integrity and customer confidence upon us.
2004-09-03
24,56Page 24 , Total56
confidentiality level
confidentiality level
it is foreseen that certain ratio of dualband (1710~2170 / 1710~2170 MHz or 824~960 / 1710~2170 MHz) or even triple band antenna (824~960 / 1710~2170 / 1710~2170 MHz) usage would arise. From an existing operator perspective, the tendency of Site Co-locating & Antenna Sharing is mainly due to the aims to speed up network implementation. This if not carefully dealt with by the RNP team, will tend to overlook the risk of affecting the network quality. The drawbacks of using dualband or triple band antenna are: Higher risk of inter-system interference due to spurious transmission and inter-modulation High restriction on future WCDMA coverage optimization as room for WCMDA coverage adjustment is limited to avoid affecting existing 2G coverage Therefore, it is important for the RNP team to work closely with the existing operator to ensure that the use of these antenna type is not overly done up to the point where the overall network quality is put in jeopardy. Besides considering the choice of antenna operating band, the choice of other technical specification like Antenna Gain, Beamwidth and Downtilt usually needs to refer to the existing 2G antennas specifications. This is because an existing operator would always prefer to mimic the existing 2G coverage. Therefore, on most of the co-located sites, the choice of the antenna will rely on the specification of the existing 2G antennas. In this context, the outcome of the Antenna Selection Analysis is likely to be a 2G to 3G antenna mapping table which recommends the types of WCDMA antenna to be added near the existing 2G antenna (separate 2G/3G antennas) or to replace the existing 2G antenna (shared 2G/3G antenna). 3.2.7.3. Greenfield Operator As mentioned previously in section 3.2.5, the overall coverage area is divided into various categories like Dense Urban, Urban, Rural, Highway and etc. Each of these area categories will have unique propagation environment and their coverage requirement. These in turns will determine the general sector configuration on area category basis. Furthermore, different area category observes different needs in coverage and interference control which also in turns determines the choice of antenna from the perspective of antenna gain, beamwidth, polarization type, downtilt. For more information on the technical consideration when selecting the antenna types, please refer to a more detailed guideline entitled << WCDMA RNP >>.
Items
Site Location Height
2004-09-03
Parameters
26,56Page 26 , Total56
confidentiality level
Equipment Type (NodeB / RRU / Repeater) Sector Configuration (Cell & Sector No.) Antenna Position Type Down-tilt Azimuth TMA Feeder type
2 Engineering Parameter List
First of all, if a Greenfield operator is dealt with, where the use of existing sites is limited, most of the Engineering parameter can be set as standard default by creating some site templates in the planning tool for different Area category. For example in UNET tool, a standard site template for Dense Urban area category is shown in the following 3. It should be noted that the choice of Antenna type should refer to the output of a previous step called Antenna Selection Analysis as described in 3.2.7.
Dense Urban Site Template Number Of Sector 3 Hexagonal Radius 500m Azimuth 0/120/240 Mech. DT 8 Antenna Height 30m Antenna Type UMWD06513-6D Max BTS Pwr 43dBm Pilot Pwr 33dBm SCH Pwr 17dBm Other CCH Pwr 27dBm
3 Example of Site Template To Add Nominal Site in UNET Planning Tool
Hexagonal Radiuss value indicated in 3 should come from the cell radius prediction described in 3.2.4. This radius defines a hexagon around the site created using the template to help speeding up the process of Adding Nominal Sites described in 3.2.6. For the case of Existing Operator, where most of the Node B sites will be selected from the list of operators usable site, most the initial engineering parameter will be set as the existing 2G settings. This is due to the fact that operator tends to mimic the existing coverage 2G coverage as they know the existing 2G coverage had all these while been optimized to cover where they are supposed to. These parameters usually are height, sector configuration, antenna location,
27,56Page 27 , Total56
2004-09-03
confidentiality level
confidentiality level
more information, please refer to the guidelines entitled WCDMA RNP and WCDMA RNP . 3.2.9.3. Link Budget Calculation The Link Budgets developed during the Network Dimensioning stage serve as the inputs to the Coverage Objectives Determination. Extracted from the WCDMA RNP , the following figure is an example of the standard Link Budget targeting different clutters and services. From this example, it is observed (based on line item (dB), which is hereinafter referred to as MAPL) that for the case of Dense Urban (Uplink CS64k, Downlink PS384k), the overall coverage will be downlink limited. However, for the case of Urban (Uplink CS64k, Downlink CS64k), the overall coverage will be uplink limited. For the purpose of Ec threshold determination, the smaller MAPL between uplink and downlink will be taken.
2004-09-03
29,56Page 29 , Total56
confidentiality level
Dense Urban
Uplink Downlink PS384k CS64k
Urban
Uplink CS64k Downlink CS64k
(dBm) Tx(dB) Tx(dB) Tx(dBi) EIRP(dBm) Rx(dBi) Rx(dB) Rx(dB) (dB) EbvsN0(dB) (dBm) (dB) (dB) (dB) (dBm) (dB) (dB) (dB) (dB) (dB) UE(m) (m) (dB) (km)
2-Ant NoDiv 3 Sectors Yes No TU3 21.00 0.00 0.00 0.00 21.00 17.00 3 0 5.20 3.48 -120.26 50% 3.01 1.5 3.14 -129.61 38.00 3.00 0.00 17.00 52.00 0 0 0 7.00 4.72 -106.44 75% 1.91 0 0.96 -103.57 22 11.7 95% 14.15 5.99 120.45 0.00 119.42
2-Ant NoDiv 3 Sectors Yes No TU30 21.00 0.00 0.00 0.00 21.00 17.00 3 0 5.20 3.79 -119.95 50% 3.01 1.5 0.95 -131.49 22 9.4 90% 6.97 4.10 127.62 1.5 30.00 1950 2140 COST231-HATA 0.53 0.53 4.10 128.91 29.80 3.00 0.00 17.00 43.80 0 0 0 7.00 5.96 -112.98 75% 4.40 1.5 0.1 -109.98
3.2.9.4. Capacity Dimensioning As mentioned previously, capacity dimensioning is embedded in the link budget calculation during the RN dimensioning stage. Operator often requests a fix percentage of UL/DL loading for the basic RN design. On the other hand, operator might or might not provide information on the traffic and service models. If certain traffic and service models were defined and provided, the
2004-09-03 All rights reserved 30,56Page 30 , Total56
confidentiality level
resultant traffic from the models should first be distributed onto each cell either based on even distribution assumption or according to certain traffic distribution pattern if made available. From there, the design of a fix percent of UL & DL loading (for example 50% UL & 75% DL) is examined against its capability in supporting the offered traffic. If the result is positive, then the fix percentage Link Budget will be final and used to derive the coverage threshold. Should the result is found negative, then, depending on which link is limiting, different methods will be adopted to cater for the traffic. For the case of uplink being limiting, the cell radius of the limiting link needs to be artificially reduced in order to cover less traffic, this in turns leads to the need of more Node B sites to cater for the traffic. For the case of downlink being limiting, additional carriers should first be the solution before considering adopting the same method for uplink limiting case as additional site involves higher cost as compared to additional carriers. For more information on Capacity Dimensioning, please refer to guideline entitled WCDMA RNP . 3.2.9.5. Coverage Thresholds Determination With the final Link Budget Calculation obtained, relevant information can be extracted from the Link Budget to work out both the Ec & EcIo Thresholds. Ec Extending the above example for the case of Urban Area, the final Link Budget shows that the Uplink is limiting while the resultant MAPL fulfilled the anticipated traffic. From there, the following calculation will lead to the CS64 Thresholds for the Urban Area.
A B C D E F G H I J K L M N O P Q Item Max Power of UE Atenna Gain of UE NF of NodeB Rx bit rate of service EbvsNo in UL Sensitivity in UL UL loading noise rise SHO Gain fast fading margin max CL in UL PL_CL - PL_DL max CL in DL CPICH Tx Pwr Indoor Penetration Loss Slow Fade Margin Indoor RSCP Threshold CS64 21.00 0.00 5.20 64 3.79 -116.95 50% 3.01 1.50 0.95 135.49 1.37 136.86 33.00 22.00 9.40 -72.46 Calculation
F=-174+C+E+10Log(1000D) H=-10Log(1-G)
Q=N-M+O+P
2004-09-03
31,56Page 31 , Total56
confidentiality level
EcIo Regardless to the coverage requirement of Indoor or Outdoor, as well as the traffic demand, the EcIo Thresholds for various services can be derived with the following calculation.
A B C D Item bit rate of service DL EbvsNo P_TCH - P_CPICH EcvsIo required CS64 64 5.9 0 -11.882 Calculation
33dBm-33dBm D=B-10Log(3840/A)-C
3.2.9.6. Project Related Issues During the project implementation stage, the initial Link Budget derived during the Dimensioning stage might require modification when more and more technical and financial information or decisions are made. Therefore, it is important to keep the Link Budget up to date and the same process of Coverage Thresholds Determination should be repeated in order to obtain the updated Thresholds to be use in the prediction tool. In terms of Ec determination during the project implementation, the Slow Fade Margin assumed in the Dimensioning stage can be excluded from the calculation should a Theoretical Propagation Model (eg, Ray Tracing) is used. However, a prediction margin might need to be considered and this decision should be made aware to the operator as it affects Radio Network Plan significantly. For more information, please refer to << Prediction statistics threshold>>.
3.2.10.
3.2.10.1. General Description Basic Coverage Prediction involves both Ec and EcIo analysis using planning tool like NetAct Enterprise and UNET. In both the analysis, the performance of the radio network plan in supporting the required service is represented by the CPICH Ec and EcIo prediction. This methodology is already explained in 3.2.9. Should the performance of the initial RN plan is found lack, the initial engineering parameter will be adjusted in order to meet both the Ec & EcIo objective. This usually takes several iteration before a good performance is achieved. 3.2.10.2. Ec Performance Checking Ec performance is usually the firstly checked. Depending on the type of service being designed for, the corresponding Ec Threshold derived in section 3.2.9.5 will be adopted in the checking. Should Ec strength is found lack in certain area, depending on the importance of that particular area, the solution will be: Adjusting the azimuth, Downtilt, type of nearby antenna Adding sector on nearby site Adding site (RRU, repeater or Node-B) in the middle of the coverage hole or new sectors on
2004-09-03 All rights reserved 32,56Page 32 , Total56
confidentiality level
nearby sites 3.2.10.3. EcIo Performance Checking Once Ec performance is meeting the objective, EcIo will be checked. Depending on the type of service being designed for, the corresponding Ec Threshold derived in section 3.2.9.5 will be adopted in the checking. Should Ec strength is found lack in certain area, depending on the importance of that particular area, the solution will be: Adjusting the azimuth, Downtilt, type of nearby antenna Adding site (RRU, repeater or Node-B) in the middle of the bad EcIo zone Cell combining Frequency changing 3.2.10.4. Project Related Issues When an existing operator is dealt with, the process of adjusting the initial engineering parameter is likely made final if the information gathered with regards to the existing sites is reliable. In other words, the step of Engineering Parameter Planning described in the Cell Level RNP will likely focus on new nominal sites, or on those existing sites that are close to the newly added nominal sites once these new sites location are finalized after the survey. For the case of Greenfield operator, the Initial Engineering Parameter adjustment during the NRP is preliminary as most of them involve new sites that are yet to be acquired. Therefore, the adjustment is only to improve the overall performance while a more realistic adjustment will only be carried out during the Cell Level Planning where the location of the sites are finalized and with the situations of the rooftop are understood.
3.2.11.
Pending
3.2.12.
Pending
4. Cell-Level RNP
4.1. Site Survey
Cell-Level RNP starts with the site survey activity on all the existing sites (those which are not surveyed in PRNP) and proposed new nominal sites. As previously mentioned, the process of site survey in this document extends to cover the site search. For the case of Greenfield operator, most of the survey work is carried out in this level of RNP while for the case of existing operator, which involves most their existing 2G sites, the survey work might well been conducted
2004-09-03 All rights reserved 33,56Page 33 , Total56
confidentiality level
during the PRNP as described in 3.2.2. More details on the site survey principles can be found in the corresponding guideline entitle WCDMA RNP.
operators respectively. It is the input information that makes the difference of engineering parameter between green field and existing network planning. Since site co-location is often adopted as a solution by existing operator, it is therefore designated in Fig9, the planned site number in the initial rollout has a great influence on the engineering parameter analysis. In the case where the targeted site number in the initial rollout is found higher than the number of existing 2G sites, the same site survey process applied for the green field case will be carried out. Contrary to that, if the targeted site number in the initial rollout is found lower than the number of existing 2G sites, then site elimination shall be performed via planning tool since less site is planned to be installed.
2004-09-03
34,56Page 34 , Total56
confidentiality level
Fig7. Overall Engineering parameter analysis procedure (green field operator) Fig8.
2004-09-03
35,56Page 35 , Total56
confidentiality level
Fig9. Overall Engineering parameter analysis procedure (Existing operator) 36,56Page 36 , Total56
2004-09-03
confidentiality level
confidentiality level
hot. Interference Related Consideration During and after the survey, RF engineer should consider making full use of the surrounding obstacles in order to minimize the unwanted signal spillover from the candidate sites. This is because site selected without considering interference toward surroundings might decrease the whole network performance in terms of coverage as well as capacity.
Fig10.
2004-09-03
38,56Page 38 , Total56
confidentiality level
Fig11.
Procedure for site related parameter setting (existing operator) 39,56Page 39 , Total56
2004-09-03
confidentiality level
For the case of existing operator (please refer to Fig11), the Site Related Parameter planning involves some additional steps described as Eliminate Sites & Add Sites. Should the initial rollout site number found lower than the existing 2G sites, then some sites will need to be eliminated in order to keep the rollout number consistent with the plan. The site elimination is based on the Ec & EcIo prediction results. First of all, existing sites which are meant for 2G capacity purposes are eliminated as capacity is of the least concern in initial 3G rollout. Should the remaining site number still exceed the initial rollout number, then sites that impose excessive overlap will be eliminated. Often in a real project involving existing operator, the site remaining site number at this stage should be found close to the rollout number after the first 2 rounds of elimination. Should the number still found to be excessive, the 3rd round of elimination will prioritize those sites that impose worst EcIo problems. Contrary to the site elimination, sites will need to be added in the case of initial rollout site number higher than the existing 2G sites. The process of adding sites will first tackle Ec problem followed by EcIo and capacity problems. Beside the site location and height, adequate equipment type should be selected to ensure the desired coverage and capacity from the specific site. In the hope of selecting appropriate equipment type in each site, first we need to know hardware characteristics of available equipments from coverage as well as capacity point of view. 7 summarizes the key features of each equipment type.
Equipment Type DL (Max. Tx pwr) Node B 3812 3806 3806A 3802C RRU Repeater 3802C Optic fiber RF
*** *** *** 1 Outdoor *** 20 W 20 W 20 W 20 W 20 W -130 dBm (4 way div.) -130 dBm (4 way div.) -130 dBm (4 way div.) -130 dBm (4 way div.) * -128 dBm (2 way div.)** *** ***
* This feature is able to be provided only 1cell 1carrier configuration ** The sensitivity might be degraded due to intermediate optic link
*** H/W characteristics linked with repeater is vendor dependent. Generally the maximum transmit power is lower than standard NodeB and uplink coverage (i.e. sensitivity) is dependent on intermediate link and adopted diversity technique. Unlike NodeB & RRU, repeater is not
2004-09-03 All rights reserved 40,56Page 40 , Total56
confidentiality level
capacity-independent equipment, which means the traffic coming from repeater coverage shares the capacity of donor NodeB. Fig12 shows the procedure for selecting adequate equipment to complete site related parameter setting. Once the site location and height is determined, the expected coverage is predicted. Coupled with the traffic forecast, the Node-B equipment type can be decided by going through several decision making indicated in Fig12. First of all, site with wide coverage will definitely require a Node-B. As to the type of Node-B, it will depend on the amount of traffic and the location of the equipment. For example, site with High traffic expected will require the use of Node-B type 3812 and vice versa. However, the possible location of the equipment will also play a role in determining the equipment. The rule of thumb will be, indoor installation will always require smaller Node-B type in size as the indoor location is often restricted in terms of installation space. In the other hand, if the expected coverage is small, the choice of equipment type is mainly between repeater and RRU, with some exceptions given to hot spot area with relatively Medium level of traffic forecast and also to site with no suitable donor site in terms of received level. Small coverage site with Low traffic forecast will need to check the availability of optical link. If optical link is not available, then RF repeater will be the choice. Contrary to that, if the optical link is available, the choice of the equipment, depending on the pilot pollution potential, the choice between RRU and Optical repeater will be made.
2004-09-03
41,56Page 41 , Total56
confidentiality level
Fig12.
confidentiality level
Fig13.
4.2.3.1. Antenna Position Fig14 shows a more detail procedure for Antenna location selection. There are several considerations to made when deciding the location of the antenna on a site and they are : Ensuring the desired coverage The selected location should have a good view towards the desired dominant area
2004-09-03 All rights reserved 43,56Page 43 , Total56
confidentiality level
Antenna Pole Type The type of pole mounting type indirectly determines the location of the antenna, often is the case where pole mount type is preferred for the sake of easy access Maximum Downtilt Angle Inter-system Interference The selected antenna location should ensure sufficient isolation to/from other co-located system. For more information on the isolation requirement with regards to different system, please refer to a more detailed guideline entitled << WCDMA RNP >>. Should the isolation requirement is found insufficient, then certain solution such as applying rejection filter might be required.
Fig14.
4.2.3.2. Antenna Type Antenna Type Selection in this stage is usually referring to the selection of antenna from a
2004-09-03 All rights reserved 44,56Page 44 , Total56
confidentiality level
pool of antennas which is already been made during the Antenna Selection Analysis described under NNP in 3.2.7. As explained in section 3.2.7, the choice of the antenna type with regards to where the sites fall into in terms of area categorization such as Dense Urban, Urban, rural and etc. In addition to that, additional consideration will also need to be taken on per site bases to further ensure that the chosen antenna type fully meets the requirement on the particular sites. Fig15 shows the procedure of Antenna Selection Procedure on per site basis. First of all, if there is insufficient mounting space on the site, then it is likely to choose low gain antenna as its size is usually small to fit the limiting mounting space. If mounting space is not an issue, then the number of sector, the height of the site and the intended coverage of the sector will all play a role in determining the type of antenna from the perspectives of tilting mechanism, vertical beamwidth, horizontal beamwidth and gain.
2004-09-03
45,56Page 45 , Total56
confidentiality level
Fig15.
4.2.3.3. Azimuth In this stage of planning, the initial azimuth setting decided during the NNP stage is adjusted according to the real rooftop situation during and after the site survey. The input to the planning will be the prediction result, intended dominant coverage, antenna type selected and number of sector per site. When adjusting the sector azimuth to maximize the intended dominant coverage being covered, the minimum allowed angle between adjacent sectors will need to be kept as well.
46,56Page 46 , Total56
2004-09-03
confidentiality level
Fig16.
4.2.3.4. Mechanical & Electrical Downtilt Similar to the antenna azimuth, the initial mechanical & Electrical Downtilt decided during the NNP will also need to be adjusted in this stage of planning. Fig17 shows the basic procedure with regards to the downtilt adjustment. Based on the desired coverage and the effective antenna height, the downtilt of the antenna is determined and checked against its maximum allowed downtilt and the desired performance. Should the calculated downtilt fulfills both criteria, then the downtilt is final, if not, more iteration in adjustment is required to find the best solution.
2004-09-03
47,56Page 47 , Total56
confidentiality level
Fig17.
4.2.3.5. Accessory Device Type Accessory device type application is normally decided during the initial engineering parameter planning described in NNP. For example, all sites which fall into the rural category that observes high tower will design to apply MHA. This is to extend the coverage and indirectly, reduce the number of site required for coverage purpose. The other accessory to be determined its type is the feeder cable. Depending on the distance between the equipment and the antenna location on per site basis, the type of the feeder will be decided to ensure reasonable feeder loss.
confidentiality level
the inter-system interference needs to be prevented by ensuring sufficient separation/isolation between the antenna systems.
4.3.2. Analysis
Co-Site Interference Analysis involves all the Radio Technologies Systems that are likely to share the same location with the designed WCDMA sites. In general, all the following systems needs to have their impact, based on their respective equipment specifications, analyzed. WCDMA NodeB & GSM 900MHz BS WCDMA NodeB & GSM 1800MHz BS WCDMA NodeB & PHS BS WCDMA NodeB & CDMA2000 BS WCDMA NodeB & TD-SCDMA2000 BS WCDMA NodeB & WCDMA BS With this, recommendations or rules of installation should be made clear and practiced on all the following co-locating scenarios: Omni versus Omni Antenna Omni versus Directional Antenna Directional versus Directional Antenna Shared Antenna & Feeder Shared Antenna But Separate Feeder Separate Antenna But Shared feeder All the above with the addition of TMA Shared Indoor Distributed Antenna The recommendations or rules of installation shall include but not limit to the following: Horizontal Separation Distance Between Separate Antenna Vertical Separation Distance Between Separate Antenna Crossing Angle Between Separate Antenna with different Vertical & Horizontal Separation Distance Isolation Between ports of Share Antenna The use of additional Rejection Filters For more information on the Co-Site Interference Analysis, please refer to the guideline entitled WCDMA RNP .
confidentiality level
analysis on various scenarios should be carried out either on the site or lab based on per project basis. This is to find out the minimum acceptable separation and the results could lead to the use of additional filters or high performing coupler.
confidentiality level
Ensure no co-SC between serving cell and neighbor cell Ensure no co-SC amongst neighbor cells of a serving cell Scrambling code planning can be carried out either by using planning tool like UNET or Enterprise. In general, these tools enable fully automated or semi-automatic (with user intervention) SC planning where the inputs will be the network plan, dominant coverage of each cell, neighbor relationship between cells and user restriction if any. Since the coverage prediction is used, the result of the SC plan using the tool is generally more accurate. On the other hand, the plan can also be done manually where a reuse distance is defined. For more information, please refer to a more detailed guideline entitled <<WCDMA RNP >> 4.5.1.2. Area Codes Planning Area Codes planning include RNC Area, Paging Area and service area planning. The output of the RNC Area planning is the RNC ID of each and every cell in the radio network plan while the Paging Area planning is the LA, RA & URA ID for the same cells. Service area planning output will be SA ID. RNC Area Planning The number of RNC within the entire radio network is normally decided in the stage of dimensioning. During dimensioning, the Node-B number, cell number, cell capacity and interfaces traffic will be analyzed to come out with the required number of RNC. RNC Area Planning in the stage of Cell-Level Planning will base on this previously defined number of RNC, further define the boundary of each and every RNC. Fig18 shows the general procedure of RNC Area Planning. The important rules to be adhere to during the RNC Area Planning is to ensure contiguous coverage under each RNC, minimized inter-RNC Handover, traffic balancing between RNC and minimized inter RNC Frame handover. For more information, please refer to a more detailed guideline entitled << WCDMA RNP >>
2004-09-03
51,56Page 51 , Total56
confidentiality level
RNC
// /NodeB
RNC
RNC ///NodeB
RNC
RNC
RNC
/ RNC
RNC_ID
Fig18.
Paging Area Planning Paging Area Planning involves the planning of size and boundary of LA, RA & URA which will ultimately define the paging capacity of the radio network. The general rule of the paging
2004-09-03 All rights reserved 52,56Page 52 , Total56
confidentiality level
area planning is to find a balance between paging success rate and paging traffic within the specific area. shows the general planning procedure for Paging Areas.
Start
LA RAURA
LARA URA
Fig19.
LA Planning The general rules for LA planning is to ensure appropriate size of the LA (to prevent overloading the paging channel) and minimized the amount of LA events at the borders of different LA. Meanwhile, it is also important to avoid expanding LA across the border of MSC and RNC. For more information, please refer to a more detailed guideline entitled << WCDMA RNP >>. RA Planning The general rules for RA planning is similar to the LA. In addition to this, RA should be a subset of LA and it should not be expanded across the SGSN and LA borders. URA Planning URA and RA has no direct relation, it is normally in the startup of the network, the URA is made the same size of the RNC area or a subset within the RNC area based on the administration district. As the network matures over time, URA size can be reduced or made
2004-09-03 All rights reserved 53,56Page 53 , Total56
confidentiality level
the same size of the RA. The general rule is to ensure the URA covers less than 75 cells. SA Planning Serving area should be a subset of LA and it is this code that the Core Network will base on for the service charge. In general, in one LA, 2 SA area can be planned, one for broadcasting and another for both CS & PS services. 4.5.1.3. Neighbor List Planning Neighbor list planning involve 3 types of neighbors i.e. Intra-frequency, inter-frequency & Inter-RAT. A good neighbor list plan is of great importance as it will determine the performance of cell selection/reselection & handover experienced by the UE within the network, which ultimately determine the performance of service perceived by the subscribers. The general rules for neighbor lists planning include: All Geographically adjacent cells should be made neighbors In general , all neighbor relations should be made 2-way Neighbors cells within a high site density area tends to have more neighbors but will need to ensure optimum number of neighbors Neighbors within neighbor list do not required prioritization In intra-frequency neighbor planning, the dominant coverage area of each cells serve as the inputs. All the geographically adjacent cells based on their dominant coverage area should be added as intra frequency neighbors during the planning stage and this list can be optimized during the optimization stage. Inter frequency neighbors need to be defined only when there are certain coverage area involves coverage from cells with different frequency. Usually, cells with different frequency are either for capacity or special coverage purposes. Inter-RAT neighbors need to be defined for the case of existing operator, provided the current WCDMA coverage is not sufficient and will need to rely on the wider GSM coverage for service continuity. Neighbor lists planning can either be carried out manually or using planning tools such as UNET or Enterprise. Planning tools method will base on the coverage prediction and normally found more accurate as compared to manual method. For more information on the prediction tool method, please refer to a more detailed guideline entitled <<WCDMA RNP >> Manual neighbor list planning is usually adopted when an existing operator is dealt with. In this case, as most of existing 2G sites will be co-located, the WCDMA neighbor lists planning can refer to the existing 2G neighbor relationship. This is a practical approach and can normally provide a good first cut of neighbor list plan knowing the existing 2G network had gone through certain optimization. Fig20 shows the general procedure of the manual neighbor list planning using existing 2G neighbor list information.
2004-09-03 All rights reserved 54,56Page 54 , Total56
confidentiality level
RNP Output
New 3G Cell?
2G Setting
Fig20.
2004-09-03
55,56Page 55 , Total56
confidentiality level
List of reference [1] ZHANGJUHUI ,WCDMA RNP [2] JIAXIANGGEN ,WCDMA RNP [3] WCDMA [4] WANGSHENGYOU,WCDMA RNP [5] ,WCDMA RNP [6] Phillipe Veyssiere, Prediction statistics threshold [7] WANGDEKAI,WCDMA RNP [8] JIQINGBIN,WCDMA RNP [9] JIAXIANGGEN,WCDMA RNP [10]YEHUANQIU ,WCDMA RNP