SUPPLY, DELIVERY, ERECTION AND COMMISSIONING OF HSC PUMPSETS. S.No 1 Qty.

Description of Work Supply and delivery of horizontal split casing centrifugal pump conforming to IS 1520 with CI casing and split glands, stainless steel shaft, hydraulically and dynamically balanced bronze impellers, capable of discharging 3000 lpm of water against a total head of 30m of water column due to all causes and with the accessories such as GM air release cock, Grease cup, GI priming funnel, MS lifting hook, drip water GI pipe connections, leading to the outside of pump house rubber water deflector, double flap foot valve, Gm strainer including unique tyre type coupling, common MS fabricated base to mount pump and motor and other standard fittings etc. complete Pumps shall be capable of discharging the above quantity at the head noted at the minimum NPSHA at site conditions as per the drawing enclosed. The pump offered shall be suitable for the Discharge and head mentioned above. The shut-off head shall be at least 25% over and above the head at duty point. 3000 lpm x 30 m Supply & delivery of horizontal squirrel cage induction motor 1500 RPM ( The motor should not get over load at any point of operation between lowest water level and maximum water level motor should have sufficient starting torque at 40% tapping in auto starter so as to start at 40% of rated voltage against all coupled loads supplier has to be mention clear the make flow, head efficiency and impeller diameter details and pump characteristic curves of all pumps with authorization letter to be provide service back up from the manufacturer) Supply and delivery of LT floor mounted type fully automatic AC -3 Phase 415 V air cooled reactor type air break FCMA soft starter suitable for the squirrel cage motors offered along with starter panel line contractor, timer, overload relays start/stop push button ,instrument panel including CT coils, selector switches, indication lamps digital type ammeter in 16 SWG sheet steel housing and paint with air drying polythene as per ISS complete set Rate/unit Amount in Rs.

a b

2Sets 2Sets

1,49,000/set 1,10,169/set

2,98,000 2,20,338

2nos

98,562/each

1,97,124

S.No 3

Qty. 2sets

Description of Work Supply and delivery of 150 mm dia pressure gauge suitable for above pump set on delivery side to be erected 2 Nos before and 1 No after the valves including required specials and ring stop lovelock etc complete. Supply, delivery of floor mounting cubical type vermin, weather and dust proof powder coated factory made M.V Panel board fabricated with frame enclosed with M.S sheet of 16 gauge with hinged front door and railway type lock and key arrangements with proper incoming. Incoming a.200Amps,500 V,3 phase TPN switch with HRC fuses to receive supply from TNEB-1No b. Suitable 96 mm digital ammeter with phase selector switch-1set c. Suitable 96 mm digital Voltmeter with Phase selector switch-1set d. RYB indication lamps of LED ON/OFF type1set Outgoing: 200 Amps T.P switch with HRC fuses for controlling the HSC Centrifugal Pump sets with two lock one key mechanical interlocking arrangements - 2 Nos 63 Amps T.P. switch with HRC fuses for controlling the capacitor and Spare: .2 Nos 32 Amps T.P switch with HRC fuses for lighting. Circuit. 1 No. Supply and delivery of 1.1KV grade 3.5 core 50 sq. mm steel armored al. conductor cable as per 2relevant I.S.S. Laying the above cables from EB to MV panel Board through LT metering as per IE rules. Jointing the above cables including the cost of jointing materials as per IE rules. Supply and delivery of 3 core 35 sq. mm al. conductor cable for connecting motor and M.V. Panel through starter Laying the above cables for connecting CF motors and MV Panel through starter Jointing the above cables including the cost of jointing materials as per IE rules.

Rate/unit 1,815/set

Amount in Rs. 3,630

1set

1,65,000/set

1,65,000

5.a

50m

329/m

16,450

b c 6 .a

50m 6Jts 50m

31/m 700/joint 253/m

1,550 4,200 12,650

b c

50m 8Jts

25/m 500/joint

1,250 4,000

S.No 7.a.

Qty. 10m

Description of Work

Rate/unit 78/m

b c 8

10.a

b c d 11

12

13.a b. C d. e. f. g. h. i. j.

Supply and delivery of 1.1KV grade 3 core 16 sq. mm steel armored aluminum conductor cable as per 3relevant I.S.S. 10m Laying the above cables from panel board to capacitor as per IE rules 2Jts Jointing the above cables including the cost of jointing materials as per IE rules. 10 Supply, Delivery of 10 KVAR Medium Voltage KVAR power capacitor dielectric as per IS 2834 Suitable for 415 Volt 3 Phase, 50 Hz, AC Supply duly banked with copper bus bars of ample current carrying capacity, sheet steel terminal cover, bushings with terminals, 1set Providing twin GI Earthing the pump room and MV panel board, starter & other installations as per IE rules 5Point Lighting the pump room and Control room using 2.5 Sq. mm cable to be taken through PVC Conduit complete with switch circuit fuses etc. with the following light fittings with ISI Markings 2Nos 40 W Box type Twin tube light with Copper chock and Condenser Completed 1No 150 W Sodium vapor fittings and lamp for external lighting and campus lighting 1No 10 Amps MC plug with MCB 1Set Supply and delivery of LT metering Board to install LT meter along with 6 Nos of aerial fuse, earth link etc to receive the EB supply at pump room. 2sets Erection, testing and commissioning of the Centrifugal pump sets, in the sump , MV Panel Board, Change over switches, starters etc., in the pump room. After commissioning the vibration limit should be within 0.1mm and the temperature of the bearings should 2nos 200mm x 250mm x 400mm (L) MS D/F Taper 2nos 250mm CI non return valve PN 1.6 2nos 250mm CI sluice Valve PN 1 2nos 250mm CI D/F 90 degree bend 1no 250mm DI D/F 'T' joint 1no 250mm x 0.5m CI D/F pipe 1no 250mm x 0.75m CI D/F pipe 3nos 250mm x 1.0m CI D/F pipe 1no 250mm x 1.5m CI D/F pipe 2nos 250mm x 300mm x 400mm (L) MS D/F Taper

Amount in Rs. 780

20/m 400/joint 450/KVAr

200 800 4,500

7,500/set

7,500

650/point

3,250

950/each 4,250/each 870/each 15,000/set

1,900 4,250 870 15,000

7,500/each

15,000

3,600/each 16,800/each 16,800/each 5,175/each 8,627/each 4,056/each 5,366/each 6,614/each 9,173/each 6,200/each

7,200 33,600 33,600 10,350 8,627 4,056 5,366 19,842 9,173 12,400

k. l. m. n.

100Kg 50Kg 2nos 700Kg

MS Blot nut with Double Washer 3mm RI sheet 1m x 2m 250mm x 300mm x 400mm (L) MS D/F Taper 300mm MS specials and pipes for suction side Total Rupees

82/each 75/Kg 3,600/each 87/Kg

8,200 3,750 7,200 60,900 12,02,506