Proposed west edge of pavement to match existing location

k 8.0 sidewal 5.0 bike lane

SECTION A-A
PR TEMP EASEMENT

End reconstruction of west sidewalk and curb & gutter 15:1 Taper

VIENNA BEEF

Approx. 175 retaining wall modification

EXISTING ~ DAMEN AVE 33 1 8 & VAR 5 10 10 10 VARIES 12-20 5 33

VARIES

PR ROW

EX ROW

EX ROW

10

1.5

s (5) 10 lane
R

30

5.0 bike lane k 8.0 sidewal

ONLY

Begin barrier-protected bike lane (both sides)

255

MIDTOWN

(5) 10 lanes 5 10

SW

5 bike lane 10 sidewalk


SW

to
ONLY

n
EX ROW EX ROW SW PARKING ENTRANCE SW SW SW

30

EX ROW SW

45
SW C&G

FULLERTON

WB-50
AASHTO 2004 (US)

30
SW PARKING ENTRANCE SW EX ROW SW PRIVATE ENTRANCE SW

25

R
SW SW PARKING ENTRANCE SW EX ROW SW EX ROW DRV SW SW

Fullerton

(3) 10 lanes 11 lane 10 sidewalk

SW

14 shared lane 8.5 sidewalk

6.8 additional ROW required from vacant lot 0.7 strip of ROW required from Popeyes

ONLY

ONLY

Sidewalk transitions from 8 to 10 over 20 Sidewalk transitions from 10 to 8 over 22 15:1 taper

Outside lane transitions from 12.8 to 14.0 over 41

SW

Begin barrier-protected bike lane

Outside lane transitions from 13.0 to 12.8 over 94

Begin barrier-protected bike lane

Begin street parking

DAMEN

10 sidewalk 8 parking 13 lane 10 lane

10 sidewalk 13 lane

es lan ) 1 b ) 1 f cur ) (2 e o curb fac of (to ce .5 to fa 5 ( 0 1

C I

Y T

HC OF C I A G
13 8 7

City of Chicago Department of Transportation

R R A A TE h D 4t M
UR BS I N
O HO RT

x Damen / Elston / Fullerton Intersection Improvement p re s

CH

scale in feet

ONLY

ONLY

ONLY
MIDTOWN BLDG

B
EX PCC SIDEWALK

2.0%

1.5%

1.5%

2.0%

PR HMA, PCC BASE & GRANULAR SUBBASE PR HMA SURFACE COURSE VIENNA BEEF PARKING LOT ENTRANCE PR PAVT RECONSTRUCTION

REROUTED ELSTON

EX GRAVITY RETAINING WALL

PR HMA BINDER COURSE EX PCC BASE COURSE EX SUBBASE GRANULAR MATERIAL EX GRAVITY RETAINING WALL PR MSE WALL

ONLY

N. DAMEN AVE.
TYPICAL PROPOSED CROSS SECTION BRIDGE RETAINING WALL MODIFICATION LOOKING NORTH (NOT TO SCALE)
AA

0 S) -5 B 04 (U W TO 20

SH

ls

EX ROW SW

ONLY

ONLY

(5) 11 lanes to edges of pavement


ONLY

SECTION B-B

Damen

PR ~ REROUTED NORTH ELSTON AVENUE

48.5 PR. ROW 11 6.5


BIKE LANE (CYCLE TRACK)

48.5 PR. ROW

11

11

11

11

11

6.5
BIKE LANE (CYCLE TRACK)

11

1.5%

2.0%

2.0%

1.5%

PR PCC SIDEWALK PR PAVEMENT PR BARRIER CURB & GUTTER PR BARRIER CURB & GUTTER

PR PCC SIDEWALK

COLORED/PERMEABLE CONCRETE (OPTIONAL)

COLORED/PERMEABLE CONCRETE (OPTIONAL)

SECTION B-B
rb)

ONLY

u fc eo fac rb) u (to fc ar. 12 & V ace o f 6.5 (to .7 11 11


30
ONLY

REROUTED N. ELSTON AVE.


TYPICAL PROPOSED CROSS SECTION (NOT TO SCALE)

ONLY

Partially shadowed left turn lane

30:1 taper

Begin street parking

NOTE: All measurements to face of curb unless otherwise noted

Alfred Benesch & Company 205 North Michigan Avenue, Suite 2400