February 16th, 2012 Robert Smith, Director, Innovation The Minto Group
Presentation Outline
Who we are and what we do Strategies and Processes From single buildings to community initiatives Lessons learned
Who We Are
Design Parameters
Net 45 performance Build tight Double wall construction R-44 exterior walls R-60 roof/ceiling R-40 basement walls R-15 under slab Target 0.5 ACH
Exterior Insulation
10
Air Tightness
Natural Ventilation
Operable windows Vertical and horizontal ventilation No cooling requirement Thermal mass Performance exceeds energy model!!
13
Technologies
Finished Product
1 Baseline Model - Code Ontario Building Code construction, HVAC systems and lighting Typical process loads and occupancy
2 Design Model - LEED Best practice construction, HVAC systems and lighting Same process loads and occupancy as Baseline 10-25% improvement over baseline
3 Load Model Same as Design Calculate hourly demands by setting heating and cooling plant efficiencies to 100% Assume identical pumping energy to Design model
In Suite Lighting Common Area Lighting Sub metering Renewable Electricity Windows
District Energy
District Energy
Lessons Learned
Quality control Its not easy the first time The benefits out way the challenges Engage the experts Measure, then measure again! We would like to help