Professional Documents
Culture Documents
.1
...3
3
(1) .....3
(2) ....3
..4
..4
(1)
4
(2)
5
.5
.6
(1)
(2)
...7
(3)
...7
8
...9
9
9
(1)
.....10
(2)
....
10
.....
(3)
10
.12
..12
iii
..13
..13
.14
.14
.14
.14
.15
..15
16
1 ...16
2 ...18
(1)
.18
(2)
.18
(3)
.18
(4)
.19
(5)
.19
(6)
.20
1. ..20
2. ..21
3. ..21
3 .22
pH .23
24
..
..28
31
..
iv
..34
...39
88 5 1
18
88 4 13
(1) :
(2)
(1) :
(2)
(1)
MS-DOS UNIX
Lotus 1-2-3
(2)
(3)
(1)
(2)
(3)
10
11
(
)
()
2
/
12
13
8
14
15
16
(1)
(2)
(3) EPROM
(4)
17
(1)
(2)
1.
2.
3.
(3)
1.
18
2.
3.
4.
(4)
1.
2.
3.
(5)
4.
5.
6.
1.
2.
19
3.
(6)
1.
:
(1).
(2).
(3).
(4).
(5).
2.
20
(1).
(2).
(3).
(4).
(5).
3.
21
pH
pH
1.
2.
pH
3.
4.
22
1.
2.
,
2-1
2-2
23
2-3
3.
3-1
3-2
3-3
3-4
4.
4-1
4-2
4-3
24
4-4
4-5
4-6
5.
6.
6-1
6-2
6-3
25
6-4
6-5
6-6 /
6-7
6-8
6-9
26
1
1
(1)
(2)
(3)
2
(1)
(2)
(3)
(4)
(5)
3
(1)
(2)
(3)
4
(1)
(2)
(3)
(4)
5
(1)
(2)
(3)
(4)
6
(1)
(2)
(3)
(4)
7
(1)
(2)
(3)
(4)
(5)
27
(6)
8
(1)
(2)
(3)
(4)
(5)
9
(1)
(2)
(3)
(4)
10
(1)
(2)
(3)
(4)
(5)
11
(1)
(2)
(3)
(4)
(5)
12
(1)
(2)
(3)
(4)
(5)
(6)
13
(1)
(2)
(3)
(4)
(5)
(6)
14
(1)
28
(2)
(3)
2
1
(1)
(2) /
2
3
(1)
(2)
4
(1)
(2)
(3)
(4)
5
(1)
(2)
(3)
(4)
29
1
1
2 GMP
3
(1)
(2)
4
(1)
(2)
(3)
2
1
2
3
4
3
1
(1)
(2)
(3)
(4)
(5)
2
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
3
(1)
(2)
30
(3)
(4)
4
(1)
(2)
(3)
4
1
(1)
(2)
(3)
(4)
(5)
(6)
2
(1)
(2)
(3)
(4)
(5)
(6)
3
(1)
(2)
(3)
(4)
(5)
(6)
(7)
4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
31
5
(1)
(2)
(3)
(4)
6
(1)
(2)
(3)
(4)
(5)
5
1
(1)
(2)
(3)
(4)
(5)
(6)
2
(1)
(2)
(3)
3
(1)
(2)
4
(1)
(2)
(3)
(4)
(5)
1
1
(1)
32
(2)
(3)
(4)
2
(1)
(2)
(3)
3
(1)
(2)
I/P
2
1
(1) CPU
(2)
(3)
(4)
(5)
2
(1)
(2)
(3)
(4)
(5)
3
1
(1)
(2)
(3)
(4)
2
(1)
(2)
3
(1)
(2)
(3)
(4)
33
(5)
(6)
4
(1)
(2)
(3)
(4)
(5)
(6)
5
(1)
(2)
(3)
(4)
(5)
4
1
(1)
(2)
(3)
2
5
1
(1)
(2)
(3)
(4)
2
(1)
(2)
(3)
(4)
(5)
6
1
(1)
(2)
34
(3)
2
(1)
(2)
(3)
3
(1)
(2)
(3)
4
(1)
(2)
(3)
(4)
(5)
5
(1)
(2)
(3)
(4)
(5)
(6)
6
(1)
(2)
(3)
(4)
(5)
(6)
7
1
(1)
(2)
(3)
(4)
(5)
2
(1)
(2)
35
(3)
(4)
3
(1)
(2)
(3)
4
(1)
(2)
(3)
5
(1)
(2)
(3)
(4)
(5)
(1)
(2)
(3)
(6)
6
(1)
(2)
(3)
(4)
(5)
(6)
7
36
(Acceptance criteria)
(Access control)
(Analog)
0 1
(Analog Data)
(Application software)
(Batch testing))
(Boundary value)
(Branching test)
(Change control)
(Commissioning)
(Computer system)
(Computer-related system)
37
(Computerized system specification)
(Computerized system)
(Configurable software)
Excel
(Controlled function)
(Critical process parameter)
(Data integrity)
(Default value)
(Design specification)
(Digitalized Data)
/
(Embedded program)
(Environmental factors)
(Final Data)
38
(Firmware) EPROM
(Firm acceptance test, FAT)
(Functional requirement)
(Functional specification)
(Functional testing)
(Installation qualification)
(On-going evaluation)
(Operating environment)
(Operating system)
(Operational qualification)
(Packaged system)
39
(Path testing)
(Performance qualification)
(Policy)
(Process)
(Processed data)
(Process validation)
(Program listing)
(Programmable logic control, PLC)
(Real-time testing)
(Resources allocation)
(Security control)
(Source code)
(Statement testing)
40
(Structural verification)
(User)
(Vendor) deliver
41