ESTRUCTURAS Rev. C
APROBADO POR: Gerente de ingeniera : Ing. Juan Francisco Sanchez M. Gerente de proyecto Cliente
Rev. B C Hecho por: A.V.B.A A.V.B.A
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
INDICE 1.- GENERAL 1.1 1.2 1.3 1.4 1.5 1.6 1.7 ALCANCE CDIGOS Y ESTNDARES DOCUMENTOS DE REFERENCIA MATERIALES Y ESPECIFICACIONES PROPIEDADES DEL SUELO DE FUNDACIN PARMETROS SSMICOS CONSIDERACIONES GENERALES DE DISEO
2.- MEMORIA DE CALCULO 2.1 EMPUJES HIDRAULICOS ACTUANTES DEBIDO A LAS PRESIONES SERVICIO Y PRUEBA EN EL SISTEMA 2.1.1 DIAGRAMA TUBERIA ENTRADA PTAP 2.1.2 PROPIEDADES DE LA TUBERIA 2.1.3 RELLENO SOBRE LA TUBERIA 2.2 DISEO DEL BLOQUE DE ANCLAJE 2.2.1 DISEO DEL BLOQUE DE ANCLAJE N 1 2.2.1.1 GEOMETRA DEL BLOQUE BAS-1 2.2.1.2 PESO DE LA CIMENTACIN 2.2.1.3 FUERZAS SOBRE EL BLOQUE (ANALISIS DE FLEXIBILIDAD DE LA TUBERIA SAP2000) 2.2.1.4 TRASLACION Y ROTACION AL CENTRO GEOMETRICO DE LA CIMENTACION 2.2.1.5 CARGAS EN LA BASE DE LA CIMENTACION INCLUYENDO EL PESO DE LA CIMENTACION 2.2.1.6 COMBINACION DE CARGAS 2.2.1.7 VERIFICACIN DE LA CIMENTACIN 2.2.2 DISEO DEL BLOQUE DE ANCLAJE N 3 Y 4 2.2.3 DISEO DEL BLOQUE DE ANCLAJE N 5 2.2.4 DISEO DEL BLOQUE DE ANCLAJE N 6 2.2.4.1 GEOMETRIA DEL BLOQUE N 6 2.2.4.2 PESO DE LA CIMENTACION 2.2.4.3 FUERZAS SOBRE EL BLOQUE (ANALISIS DE FLEXIBILIDAD DE LA TUBERIA SAP2000) 2.2.4.4 TRASLACION Y ROTACION AL CENTRO GEOMETRICO DE LA CIMENTACION 2.2.4.5 CARGAS EN LA BASE DE LA CIMENTACION INCLUYENDO EL PESO DE LA CIMENTACION 2.2.4.6 COMBINACION DE CARGAS 2.2.4.7 VERIFICACION DE LA CIMENTACION 2.2.5 DISEO DEL BLOQUE DE ANCLAJE N 7 2.2.5.1 GEOMETRIA DEL BLOQUE N 7 2.2.5.2 PESO DE LA CIMENTACION 2.2.5.3 FUERZAS SOBRE EL BLOQUE (ANALISIS DE FLEXIBILIDAD DE LA TUBERIA SAP2000) 2.2.5.4 TRASLACION Y ROTACION AL CENTRO GEOMETRICO DE LA CIMENTACION 2.2.5.5 CARGAS EN LA BASE DE LA CIMENTACION INCLUYENDO EL PESO DE LA CIMENTACION 2.2.5.6 COMBINACION DE CARGAS 2.2.5.7 VERIFICACION DE LA CIMENTACION
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
1.- GENERAL
Diagrama de la tuberia 1.1 ALCANCE La presente memoria de calculo desarrolla el diseo de bloques de anclaje de concreto armado que sirvirn de soporte a la tuberia de 1000mm, 800mm, 700mm respectivamente ubicadas en el tramo de Ingreso a la Planta de Tratamiento de Agua Potable para Arequipa Metropolitana. 1.2 CODIGOS Y ESTANDARES American Society for Testing and Materials ASTM A570 American Water Works Association AWWA C200 American institute petroleum API 5L Reglamento Nacional de Construcciones (RNE) Norma E-030 Diseo ssmorresistente Reglamento Nacional de Construcciones (RNE) Norma E-060 Concreto armado American Concrete Institute Norma de Concreto Estructural ACI 318-08
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
1.3 DOCUMENTOS DE REFERENCIA CAC2-PG-03-CD-01 CAC2-PG-03-ET-001 CAC2-OLL-03-109 CAC2-OLL-03-110 CAC2-OLL-03-111 CAC2-OLL-03-112 CRITERIOS DE DISEO ESTRUCTURAL ESPECIFICACIN TCNICAS GENERALES DE ESTRUCTURAS Plano estructural de bloques de anclaje para codos de GRP 28, 46 y 50 Plano estructural del bloque de anclaje para codos de acero 45 Plano estructural del bloque de anclaje para codos de acero 90 Plano estructural del bloque de anclaje para una yee de acero
1.4 MATERIALES Y ESPECIFICACIONES Tuberia de Acero Tuberia Diametro Limite de Fluencia Resistencia a la Traccin Coeficiente de Dilatacin Concreto Estructural Esfuerzo Mnimo de Compresin Peso Unitario Acero de Refuerzo Esfuerzo Mnimo de Fluencia Recubrimiento Libre Concreto vaciado sobre terreno
: : : : :
API 5LX X60 1000mm, 800mm y 700mm 4220 kg/cm 5270 kg/cm 1.170 E-05 cm/C/m
: :
f'c = gc =
fy = 4200 kg/cm2
e =
7.50 cm
1.5 PROPIEDADES DEL SUELO DE FUNDACIN Los parmetros geolgicos utilizados en el diseo de los Bloques de Anclaje fueron tomados de acuerdo a los ensayos realizados en campo. Resultados de Laboratorio: Clasificacin del Suelo : Peso Volumetrico : Angulo de Friccin : : Cohesin SM 1.80 gr/cm 32 0.0 kg/cm
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
1.6 PARMETROS SSMICOS Factor de zona Coeficiente de acerleracin horizontal de sismo 1.7 CONSIDERACIONES GENERALES DE DISEO Para el diseo de los bloques de anclaje se ha considerado que las fuerzas generadas por el cambio del sentido flujo del agua y por fuerzas ssmicas en sentido de los empujes del agua son soportadas por la fuerza de friccin existente entre el suelo - concreto y los empujes pasivos y activos del terreno de fundacin. Para el diseo de la tubera forzada se consideraron los siguientes estados de carga o condiciones: 1) Condicin Normal: Operacin Normal de flujo mximo/flujo minimo y condicin de tuberia nueva 2) Condicin Extraordinaria: Prueba Hidrosttica 3) Condicin Sismo: Fuerzas Sismicas y operacin normal Z: Kh : 0.40 0.20
GEOMETRIA Para el diseo de los bloques de anclaje se ha considerado la geometria que se muestra a continuacin:
Factores de seguridad empleados C. Normal Deslizamiento Vuelco Sismo 1.50 2.00 1.00 C.Extraord. 1.10 1.50 -
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
2.- MEMORIA DE CALCULO 2.1 EMPUJES HIDRAULICOS ACTUANTES DEBIDO A LAS PRESIONES SERVICIO Y PRUEBA EN EL SISTEMA 2.1.1 DIAGRAMA TUBERIA ENTRADA PTAP MODELO MATEMATICO El modelamiento matemtico de la tubera ha sido desarrollado en el programa SAP2000, en donde se han aplicado las cargas debido a las presiones de prueba, servicio y presiones del relleno del suelo, temperatura y sismo, la estructura analisada consiste en un tramo en forma de codo, a continuacin se presenta el modelo matematico analizado:
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
2.1.2 PROPIEDADES DE LA TUBERIA Densid. Tub. (gr/cm) 7.85 Diametro Nominal (mm) 1000 Diametro Externo (mm) 1019.00 Espesor de la tuberia (mm) 9.50 Densidad Volumen de Peso del Lineal Agua Agua tuberia (m/m) (kg/m) (kg/m) 236.5 0.800 800.4 Peso Agua superficial (kg/cm) 0.025
Material
ACERO
2.1.3 RELLENO SOBRE LA TUBERIA Peso Volumetrico del Terreno de Fundacin Profundidad de Enterramiento Esfuerzo Producido por el Terreno = h = = 1.80 gr/cm 1.20 m 0.216 kg/cm
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 1 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
2.2.1 DISEO DE BLOQUE DE ANCLAJ N1 Para el diseo del bloque de anclaje N 1, se ha considerado la geometria que se muestra a continuacion:
PLANTA
ELEVACION 2.2.1.1 GEOMETRA DEL BLOQUE BAS-1 A B H h Dn H' 3.60 8.00 3.60 0.10 1.00 3.70 m m m m m m Ver Sketch Ver Sketch Ver Sketch Ver Sketch Ver Sketch Profundidad de Cimentacin (H+h)
2.2.1.2 PESO DE LA CIMENTACIN Area (m) 28.8 28.8 0.79 0.03 Altura (m) 3.60 0.10 8.00 8.00 Volum (m) 97.2 2.88 6.28 0.24 Den (ton/m) 2.30 1.80 1.00 7.85 Peso (ton) 223.46 5.18 6.28 1.87 x(m) 0.00 0.00 0.00 0.00 y(m) 0.00 0.00 0.00 0.00 Peso Total del Bloque de Anclaje : Peso del Relleno : PESO TOTAL : 231.62 ton 5.18 ton 236.80 ton P.x 0.00 0.00 0.00 0.00 0.00 P.y 0.00 0.00 0.00 0.00 0.00
Posicin del Centro de Masa: Xcg = Ycg = Area Planta = Ixx = Iyy = 0.00 m 0.00 m 28.80 m 31.10 153.60 m4 m4
Momento de inercia de la cimentacin en direccin X.. Momento de inercia de la cimentacin en direccin Y..
cx (+) = cx ( - ) = cy (+) = cy ( - ) =
m m m m
Distancia desde el Centro Geomtrico al extremo derecho de la cimentacin Distancia desde el Centro Geomtrico al extremo Izquierdo de la cimentacin Distancia desde el Centro Geomtrico al extremo superior de la cimentacin Distancia desde el Centro Geomtrico al extremo Inferior de la cimentacin
8.00 3.60
m m
-0.18
Eje de coordenadas del anlisis de flexibilidad y de la zapata Fuerzas Anlisis de Flexibilidad en el Sistema de Coordenas X'-Y' Combinaci HY OPE1 OPE1+E1 OPE1+E2 OPE1-E1 OPE1-E2 Fx' (t) 0.00 0.00 0.46 0.00 -0.46 0.00 Fy' (t) 130.26 70.09 70.09 70.58 70.09 69.59 Fz' (t) -45.39 -45.39 -45.39 -45.39 -45.39 -45.38 Mx'(t.m) My'(t.m) 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 Mz'(t.m) 0.00 0.00 0.01 0.00 -0.01 0.00
HY: Prueba Hidrosttica OPE1: Cargas de Gravedad + Temperatura + Presion E1: Sismo X' E2: Sismo Y'
Cargas de Gravedad : Peso de tubera + Contenido Fuerzas por estado de carga en el Sistema de Coordenas X-Y (eje de la zapata) Combinaci HY OPE1 OPE1+E1 OPE1+E2 OPE1-E1 OPE1-E2 Fx' (t) 0.41 0.22 0.68 0.22 -0.23 0.22 Fy' (t) 130.26 70.09 70.09 70.58 70.09 69.59 Fz' (t) -45.39 -45.39 -45.39 -45.39 -45.39 -45.38 Mx'(t.m) My'(t.m) 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 0.97 0.00 Mz'(t.m) 0.00 0.00 0.01 0.00 -0.01 0.00
Fuerzas por estado de carga en el Sistema de Coordenas X-Y (ejes de la zapata) Estado HY OPE1 E1 E2 Fx' (t) 0.41 0.22 0.46 0.00 Fy' (t) 130.26 70.09 0.00 0.49 Fz' (t) -45.39 -45.39 0.00 -0.01 Mx'(t.m) My'(t.m) 0.97 0.00 0.97 0.00 0.00 0.00 0.00 0.00 Mz'(t.m) 0.00 0.00 0.01 0.00
Nota: Las cargas de operacin y las cargas de prueba tienen los mismos factores de combinacin que las cargas muertas.
2.2.1.4 TRASLACION Y ROTACION AL CENTRO GEOMETRICO DE LA CIMENTACION CARGAS ANLISIS DE FLEXIBILIDAD Cargas de la tubera sobre la cimentacin Posicion de las fuerzas x y z 0.00 -0.50 1.80 P(t) HY -45.39 OPE1 -45.39 Ex 0.00 Ey -0.01 Vx ( t ) 0.41 0.22 0.46 0.00 Vy ( t ) 130.26 70.09 0.00 0.49 Mx (txm) 0.97 0.97 0.00 0.00 My (txm) 0.00 0.00 0.00 0.00 Mz (txm) 0.00 0.00 0.01 0.00 P (t) HY OPE1 Ex Ey -45.39 -45.39 0.00 -0.01 Cargas en el centro geomtrico de la cimentacin Pos. Cent. Geom. (m) x y z 0.00 0.00 0.00 V'x (t) 0.4 0.2 0.5 0.0 V'y (t) 130.26 70.09 0.00 0.49 Mx (txm) My (txm) -210.80 -102.50 0.00 -0.89 0.7 0.4 0.8 0.0
CARGAS PESO DE LA CIMENTACIN Cargas de la tubera sobre la cimentacin Posicion de las fuerzas x y z 0.00 0.00 1.80 P Vx ( t Vy ( t ) (t) ) -236.80 0.00 0.00 Mx (txm) 0.00 My (txm) 0.00 Mz (txm) 0.00 P CM Cargas en el centro geomtrico de la cimentacin Pos. Cent. Geom. (m) x y z 0.00 0.00 0.00 ( t Vx ( Vy ( Mx My ) t) t ) (txm) (txm) -236.80 0.00 0.00 0.00 0.00
CM
2.2.1.5 CARGAS EN LA BASE DE LA CIMENTACION INCLUYENDO EL PESO DE LA CIMENTACION P(t) HY+CM OPE1+CM Ex Ey -282.19 -282.19 0.00 -0.01 Vx ( t ) 0.41 0.22 0.46 0.00 Vx ( t ) Mx My ( ( txm ) txm ) 130.26 -210.80 0.74 70.09 -102.50 0.40 0.00 0.00 0.82 0.49 -0.89 0.00
2.2.1.6 COMBINACION DE CARGAS P(t) S1 S2 S3 S4 S5 S6 = = = = = = HY + CM OPE1 + CM OPE1 + CM + 0.7Ex OPE1 + CM - 0.7Ex OPE1 + CM + 0.7Ey OPE1 + CM - 0.7Ey S1 S2 S3 S4 S5 S6 -282.19 -282.19 -282.19 -282.19 -282.20 -282.19 Vx ( t ) 0.41 0.22 0.54 -0.10 0.22 0.22 Vx ( t ) 130.26 70.09 70.09 70.09 70.43 69.74 Mx ( My txm ) ( txm ) -210.80 0.74 -102.50 0.40 -102.49 0.97 -102.50 -0.18 -103.12 0.40 -101.87 0.40
ex max ey max Verif. Excent. (m) (m) 2.09 2.09 2.09 2.09 2.09 2.09 0.94 0.94 0.94 0.94 0.94 0.94 Ok Ok Ok Ok Ok Ok
sACT-MAX Factor sU
VERIFICACION DE VOLTEO
Direccin x-x Comb. SL1 SL2 SL3 SL4 SL5 SL6 Mact y 0.74 0.40 0.97 -0.18 0.40 0.40 Mr y 1,128.77 1,128.77 1,128.77 -1,128.77 1,128.78 1,128.75 F.S. 1,525.01 2,844.20 1,162.28 6,361.50 2,831.93 2,856.58 F.S. Req. 1.50 1.50 1.50 1.50 1.50 1.50 Verif. FSVx OK OK OK OK OK OK Mact x -210.80 -102.50 -102.49 -102.50 -103.12 -101.87 Mr x -507.95 -507.94 -507.94 -507.94 -507.95 -507.94 Direccin y-y F.S. 2.4 4.96 4.96 4.96 4.93 4.99 F.S. Req. 1.50 1.50 1.50 1.50 1.50 1.50 Verif. FSVy OK OK OK OK OK OK
VERIFICACIN DE DESLIZAMIENTO Coeficiente de friccin Suelo - Cimentacin : Combinacin SL1 SL2 SL3 SL4 SL5 SL6 V act (t) 130.26 70.09 70.09 70.09 70.43 69.74 V resis(t) 141.10 141.10 141.10 141.10 141.10 141.09 FSD 1.08 2.01 2.01 2.01 2.00 2.02 FSV Req. 1.10 1.50 1.10 1.10 1.10 1.10
= 0.50
Verif. FSD MAL OK OK OK OK OK
Nota: El factor de seguridad en la combinacin que incluye la prueba Hidrosttica se ha considerado 1.1 dado que es una carga temporal
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
2.2.2
DISEO DEL BLOQUE DE ANCLAJE N 3 Y 4 Datos Referidos a la Tuberia Materi al ACERO (kg/m) 248.1 PN SN Dex (mm) (mm)e (mm) BL (mm) () At (mm)Bt (mm) Dm ------1019 1000 9.5 1650 90.0 393.4 668.0 Ct (mm) 549.3
Pto 3
Dimensiones de los Bloques de Anclajes Pto 3 () B (mm) Progresiva D (mm) D' (mm) H (mm) h (mm) Acon (m) Vcon (m) 707 ENTRADA PTAP 2000 560 2000 1200 90.0 7.73 13.37 1242 1360 A (mm) C (mm)
Pto 3
Pesos, Presiones y Fuerzas Dm P1 P2 W1 W2 W3 W4 (mm) (kg/cm (kg/cm (ton) (ton) (ton) (ton) 2.04 ENTRADA PTAP 1000 30.8 3.3 45.1 4.08 10.0 Progresiva
E1 (ton) 22.7
E2 (ton) 45.32
Pto 3
SUCS SM
()
Verificacion de la Capacidad Portante del Suelo en Condicin Normal Co Qadm Qadm Qterre FSterr Df (m) FSc Conformidad (t/m) (t/m) (Resist. (Asent) no >1 1.67 2.71 3.00 61.43 22.9 32.0 0.0 5.83 3.93 ok
Pto 3
SUCS SM
()
Verificacion de la Capacidad Portante del Suelo en Condicin de Sismo Co Qadm Qadm Qterre FSterr Df (m) FSc Conformidad (t/m) (t/m) (Resist. (Asent) no >1 1.67 2.71 3.00 81.70 30.46 5.83 32.0 0.0 5.23 ok
Pto 3
SUCS SM
()
Verificacion de la Capacidad Portante del Suelo en Condicin de Prueba Co Qadm Qadm Qterre FSterr Df (m) FSc Conformidad (t/m) (t/m) (Resist. (Asent) no >1 1.67 2.71 3.00 61.43 22.9 32.0 0.0 5.83 3.93 ok
Pto 3
Calculo de Fuerzas Producidas por Efecto de Sismos y Empuje de Ea Eae Ep F Ka Kae Kp (ton) (ton) (ton) (ton) ENTRADA PTAP 0.39 0.278 0.432 3.255 1.7 2.6 35.1 17.6 Progresiva
Pto 3
Verificacion de Estabilidad por Deslizamiento Enor Esis FS nor FS ext FS sis Fext Conformidad (ton) (ton) >1.50 >1.10 >1.00 1.12 24.4 47.021 34.32 2.16 1.53 ok
Pto 3
M1 (tonm) 46.86
Verificacion de Estabilidad por Volteo M2 M3 FSV FSV ext FSV sis (ton- (tonnor >1.20 >1.10 m) m) 24.20 25.05 >1.50 1.89 3.66 3.53
Conformidad ok
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
(kg/m) 103.0
PN 16
SN 2500
BL (mm) 1100
() 50.0
At (mm) 574.5
Bt (mm) 824.3
Ct (mm) 499.7
B (mm) 1632
C (mm) 2341
D (mm) 1459
D' (mm) 0
H (mm) 3200
h (mm) 1200
() 50.0
Pto 1
Pesos, Presiones y Fuerzas P2 P1 W1 (ton) W2 (ton) W3 (ton) W4 (ton) E1 (ton) E2 (ton) Sis (ton) (kg/cm) (kg/cm) 8.67 16.47 102.0 4.6 3.5 110.6 69.6 132.32 22.13
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
1
7.32 3.13
Conformidad ok
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
1
7.32 4.16
Conformidad ok
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
1
7.32 3.13
Conformidad ok
0.40
Ka 0.264
Kae 0.411
Kp 3.392
F (ton) 44.7
Fext 138.515
FS nor
>1.50
2.09
Conformidad ok
M1 (ton-m) 218.66
M2 (ton-m) 118.37
M3 (ton-m) 122.21
Conformidad ok
Proyecto Alto Cayma N CAC2 AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS NCAC2-OLL-03-MC-102 Rev. C Fecha: 23/07/2011
CODO 28
Datos Referidos a la Tuberia
Pto 1 Progresiva 0 Material GRP
(kg/m) 103.0
PN 16
SN 2500
e (mm) 11.5
BL (mm) 600
() 28.0
At (mm) 459.5
Bt (mm) 740.5
Ct (mm) -----
Et (mm) -----
Le (mm) 510
B (mm) 851
C (mm) 1649
D (mm) -----
H (mm) 3200
h (mm) 1200
() 28.0
P1 (kg/cm) 8.67
P2 (kg/cm) 16.47
W1 (ton) 53.1
W2 (ton) 2.4
W3 (ton) 1.8
W4 (ton) 57.6
E1 (ton) 39.9
E2 (ton) 75.74
()
33.0
Co (t/m ) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
Qterreno 7.20
Conformidad ok
()
33.0
Co (t/m ) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
Qterreno 7.20
Conformidad ok
()
33.0
Co (t/m ) 0.0
(t/m)
1.40
Df (m) 3.36
FSc 3.00
Qterreno 7.20
Conformidad ok
0.40
Ka 0.264
Kae 0.411
Kp 3.392
Ea (ton) 3.5
Ep (ton) 86.0
F (ton) 23.3
Fext 79.204
FS nor
>1.50
2.52
Conformidad ok
M1 (ton-m) 125.07
M2 (ton-m) 67.66
M3 (ton-m) 69.81
Conformidad ok
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS
2.2.4 DISEO DEL BLOQUE DE ANCLAJE N 6 Para el diseo del bloque de anclaje N 6, se ha considerado la geometria que se muestra a continuacion:
PLANTA
ELEVACION 2.2.4.1 GEOMETRIA DEL BLOQUE BAS-1 A B H h Dn H' 4.00 4.00 2.80 0.50 1.00 3.30 m m m m m m Ver Sketch Ver Sketch Ver Sketch Ver Sketch Ver Sketch Profundidad de Cimentacin (H+h)
2.2.4.2 PESO DE LA CIMENTACION Area (m) 16.0 16.0 0.79 0.03 Altura (m) 2.80 0.50 4.00 4.00 Volum (m) Den (ton/m) 41.5 2.30 8.00 1.80 3.14 1.00 0.12 7.85 Peso (ton) 95.54 14.40 3.14 0.94 x(m) 0.00 0.00 0.00 0.00 y(m) 0.00 0.00 0.00 0.00 Peso Total del Bloque de Anclaje : Peso del Relleno : PESO TOTAL : 99.62 ton 14.40 ton 114.02 ton P.x 0.00 0.00 0.00 0.00 0.00 P.y 0.00 0.00 0.00 0.00 0.00
Posicin del Centro de Masa: Xcg = 0.00 m Ycg = 0.00 m Area Planta = Ixx = Iyy = 16.00 m 21.33 21.33 m4 m4
Momento de inercia de la cimentacin en direccin X.. Momento de inercia de la cimentacin en direccin Y..
cx (+) = cx ( - ) = cy (+) = cy ( - ) =
m m m m
Distancia desde el Centro Geomtrico al extremo derecho de la cimentacin Distancia desde el Centro Geomtrico al extremo Izquierdo de la cimentacin Distancia desde el Centro Geomtrico al extremo superior de la cimentacin Distancia desde el Centro Geomtrico al extremo Inferior de la cimentacin
4.00 4.00
m m
-0.18
Eje de coordenadas del anlisis de flexibilidad y de la zapata Fuerzas Anlisis de Flexibilidad en el Sistema de Coordenas X'-Y' Combinaci HY OPE1 OPE1+E1 OPE1+E2 OPE1-E1 OPE1-E2 Fx' (t) 0.00 0.00 0.41 0.00 -0.41 0.00 Fy' (t) 64.27 47.53 47.53 47.95 47.53 47.95 Fz' (t) Mx'(t.m) My'(t.m) Mz'(t.m) -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00
OPE1:
HY: Prueba Hidrosttica Cargas de Gravedad + Temperatura + Presion E1: Sismo X' E2: Sismo Y'
Cargas de Gravedad : Peso de tubera + Contenido Fuerzas por estado de carga en el Sistema de Coordenas X-Y (eje de la zapata) Combinaci HY OPE1 OPE1+E1 OPE1+E2 OPE1-E1 OPE1-E2 Fx' (t) 0.20 0.15 0.56 0.15 -0.26 0.15 Fy' (t) 64.27 47.53 47.53 47.95 47.53 47.95 Fz' (t) Mx'(t.m) My'(t.m) Mz'(t.m) -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00
Fuerzas por estado de carga en el Sistema de Coordenas X-Y (ejes de la zapata) Estado HY OPE1 E1 E2 Fx' (t) 0.20 0.15 0.41 0.00 Fy' (t) 64.27 47.53 0.00 0.42 Fz' (t) Mx'(t.m) My'(t.m) Mz'(t.m) -40.41 0.55 0.00 0.00 -40.41 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Nota: Las cargas de operacin y las cargas de prueba tienen los mismos factores de combinacin que las cargas muertas.
2.2.4.4 TRASLACION Y ROTACION AL CENTRO GEOMETRICO DE LA CIMENTACION CARGAS ANLISIS DE FLEXIBILIDAD Cargas de la tubera sobre la cimentacin Posicion de las fuerzas x y z 0.00 -0.50 1.40 P(t) HY -40.41 OPE1 -40.41 Ex 0.00 Ey 0.00 Vx ( t ) 0.20 0.15 0.41 0.00 Vy ( t ) 64.27 47.53 0.00 0.42 Mx (txm) 0.55 0.55 0.00 0.00 My (txm) 0.00 0.00 0.00 0.00 Mz (txm) 0.00 0.00 0.00 0.00 P (t) HY OPE1 Ex Ey -40.41 -40.41 0.00 0.00 Cargas en el centro geomtrico de la cimentacin Pos. Cent. Geom. (m) x y z 0.00 0.00 0.00 V'x (t) 0.2 0.2 0.4 0.0 V'y (t) 64.27 47.53 0.00 0.42 Mx (txm) My (txm) -69.22 -45.79 0.00 -0.58 0.3 0.2 0.6 0.0
CARGAS PESO DE LA CIMENTACIN Cargas de la tubera sobre la cimentacin Posicion de las fuerzas x y z 0.00 0.00 1.40 P Vx ( Mx My Mz Vy ( t ) (t) t) (txm) (txm) (txm) CM -114.02 0.00 0.00 0.00 0.00 0.00 P CM t) -114.02 Cargas en el centro geomtrico de la cimentacin Pos. Cent. Geom. (m) x y z 0.00 0.00 0.00 ( Vx ( t Vy ( t Mx My ) ) (txm) (txm) 0.00 0.00 0.00 0.00
2.2.4.5 CARGAS EN LA BASE DE LA CIMENTACION INCLUYENDO EL PESO DE LA CIMENTACION P(t) HY+CM OPE1+CM Ex Ey -154.42 -154.42 0.00 0.00 Vx ( t ) 0.20 0.15 0.41 0.00 Vx ( t ) 64.27 47.53 0.00 0.42 Mx My ( ( txm ) txm ) -69.22 0.28 -45.79 0.21 0.00 0.58 -0.58 0.00
2.2.4.6 COMBINACION DE CARGAS P(t) S1 S2 S3 S4 S5 S6 = = = = = = HY + CM OPE1 + CM OPE1 + CM + 0.7Ex OPE1 + CM - 0.7Ex OPE1 + CM + 0.7Ey OPE1 + CM - 0.7Ey S1 S2 S3 S4 S5 S6 -154.42 -154.42 -154.42 -154.42 -154.43 -154.42 Vx ( t ) 0.20 0.15 0.44 -0.14 0.15 0.15 Vx ( t ) 64.27 47.53 47.53 47.53 47.82 47.24 Mx ( My txm ) ( txm ) -69.22 0.28 -45.79 0.21 -45.79 0.61 -45.79 -0.20 -46.20 0.21 -45.38 0.21
ex ey max Verif. Excent. q11 (t/m2) q12 (t/m2) q13 (t/m2) q14 (T/m2) max (m) (m) -0.45 1.05 1.05 Ok 16.17 3.19 16.11 3.14 -0.30 1.05 1.05 Ok 13.96 5.38 13.92 5.34 -0.30 1.05 1.05 Ok 14.00 5.42 13.89 5.30 -0.30 1.05 1.05 Ok 13.93 5.34 13.96 5.38 -0.30 1.05 1.05 Ok 14.00 5.34 13.96 5.30 -0.29 1.05 1.05 Ok 13.93 5.42 13.89 5.38
= 0.50
FSV Req. 1.10 1.50 1.10 1.10 1.10 1.10 Verif. FSD OK OK OK OK OK OK
Nota: El factor de seguridad en la combinacin que incluye la prueba Hidrosttica se ha considerado 1.1 dado que es una carga temporal
Proyecto Alto Cayma N CAC2 AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE AREQUIPA METROPOLITANA - LOTE 2 MEMORIA DE CALCULO: BLOQUES DE ANCLAJE - INGRESO PTAP ESTRUCTURAS NCAC2-OLL-03-MC-102 Rev. C Fecha: 23/07/2011
(kg/m) 103.0
PN 16
SN 2500
Dm (mm) 1100
e (mm) 11.5
BL (mm) 900
() 45.0
At (mm) 433.2
Bt (mm) 657.4
Ct (mm) 448.3
Et (mm) 896.70
Le (mm) 1510
B (mm) 1898
C (mm) 2474
D (mm) 1249
D' (mm) 0
H (mm) 2600
h (mm) 1200
() 45.0
P1 (kg/cm) 8.67
P2 (kg/cm) 16.47
W1 (ton) 76.7
W2 (ton) 4.9
W3 (ton) 9.6
W4 (ton) 91.7
E1 (ton) 63.1
E2 (ton) 119.82
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.06
FSc 3.00
Qterreno 6.27
Conformidad ok
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.06
FSc 3.00
Qterreno 6.27
Conformidad ok
()
33.0
Co (t/m) 0.0
(t/m)
1.40
Df (m) 3.06
FSc 3.00
Qterreno 6.27
Conformidad ok
0.40
Ka 0.264
Kae 0.411
Kp 3.392
Ea (ton) 6.1
Ep (ton) 101.9
F (ton) 37.1
Fext 125.909
FS nor
>1.50
2.01
Conformidad ok
M1 (ton-m) 161.98
M2 (ton-m) 88.20
M3 (ton-m) 91.64
Conformidad ok