Table of Contents
Executive Summary ................................................................................................................................ 3 Need .................................................................................................................................................... 3 Solution ............................................................................................................................................... 3 Requirements.......................................................................................................................................... 5 Performance........................................................................................................................................ 5 Functionality........................................................................................................................................ 5 Economic ............................................................................................................................................. 5 Energy ................................................................................................................................................. 5 Environmental ..................................................................................................................................... 5 Maintainability .................................................................................................................................... 5 Manufacturability ................................................................................................................................ 5 Operational ......................................................................................................................................... 5 Reliability and Availability .................................................................................................................... 5 Usability .............................................................................................................................................. 5 Technical Section (Statement of Work).................................................................................................... 6 External appearance ................................................................................................................................ 7 Project scheduling ................................................................................................................................... 8 Cost and Payment Section ..................................................................................................................... 10 Management Section ............................................................................................................................. 10
Page 2
whenever the indicators exceed certain level every month. This violates the customers
Figure 1 Collect electrical indicator in traditional way
right.
The most basic form of a general (energy consumption indicator) ECI which is the energy meter already installed in most homes exists several drawbacks. For example, users often complain that: We cant be using that muchIts just the two of us in this small house. I just dont know how the bills are so high I think there is something wrong with them.
Solution
The idea to avoid those issues is use device to record data automatically. It is not necessary to visit each house to record data. Also, it is possible to make a device with record data very accuracy. Inspiration from above idea, the goal of this project is to design and implement a system to do those tasks and some extra features.
Page 3
Page 4
The main-device can communicate to sub-devices and vice-verse. The main-device can connect and send the data to computer. The sub-devices can display the information for viewing. The sub-devices can record the energy consumption.
Functionality
Energy consumption Feedback System (ECFS) will send necessary data from user to electric provider It can display how much the energy users are using, used in nearby month and the price they have to pay
Economic
The total parts and manufacturing costs should not exceed than 1 million VND per unit.
Energy
Environmental
Maintainability
The system should have a modular design such that failed components can be removed and replaced by a technician in under 30 minutes
Manufacturability
Size: 150mm*100mm*50mm Weight: 300 gram It operates in the temperature range of 0 to 65 Degree Celsius The design will have a reliability in 5 years and will be operational 99% of the time
Operational
Usability
Page 5
Page 6
<Ngy> <thng> <nm> - <Gi>:<Pht> Ch h: <Nguyn Vn A> M s: <113114115> in tiu th: <999.999> Tin in thng trc: <999.999.999> VN Ln La chn Li Thot Xung
Figure 3 external appearance of ECFS
Ti
Turning to the benefits of this device in more details, not only electric workers, users, contractors, electric company but also the environment might get a lot of advantages. Firstly, for electronic workers, coming to each home to collect the electrical indexes is extremely labor extend. This device saves time and effort. As for users, they can observe how much energy they consume by watching directly the screen. By this way, they can control consuming electricity and then this resort makes a great contribution to save money and energy. Also, when this device is mass-produced, contractors can get great benefits economically at the time being and for a long term because after 5 years this devices will be produced again. Executing this plan saves manpower for the electric company because the owner can assign electric workers to do some other works more efficiently. At last, putting this item into practice promotes energy conscious of residents, saves nonrenewable resources such as coal, crude-oil this has positive impact on reducing green house effects, global warming. Obviously, saving energy makes count on the environment.
Page 7
Project scheduling
ID Activity Description Deliverables/ Checkpoint Duration People (days) Resources Precessors
1 1.1
Complete detailed design Circuit to convert AC220V into DC5V and verify it in simulation.
-Circuit schematic -Simulation verification -Identify parts -Place order -Receive parts Test output voltage
-Thang -Dieu
1.2
Purchase component Construct and Test Meter Design circuitry Build and Test
An
1.3 2 2.1
1.2
Complete detailed design Circuit to record electrical indicator and send information to Controller Verify it in simulation
10
2.2
Purchase components
-Identify parts -Place order -Receive parts -PCB -Solder components -Implement functions -Debug
An
2.1
2.3 Construct and Test 2.3.1 Hardware Build circuitry 2.3.2 Software -Write Code -Simulate it verification
7 8
Page 8
3 3.1
Complete detailed design Circuit to receive signal from Meter and Server, control LCD
-Circuit schematic -Simulation verification Identify parts Place order Receive parts
15
3.2
Purchase Component
Build circuitry -Write Code -Simulate it verification -Communicate with Meter -Communicate with Server -Control LCD
7 10
3.4
Test
10
3.3
4 4.1
Identify parts Place order Receive parts -Intergrate components -Stress Test -Launch product into lab Test data verifying functionality and requirement
-An
4.2 5
2 60
4.1 1 2 3 4
Page 9
Management Section
1. Organization of manager 2. Project budget
Input Description Personal services Consultant Project Manger Consultant Technical Support National Project Coordinator Travel Project Manager Consultant Technical Assistance Equipment Expendable equipment Non Expendable Equipment Materials and Supplies General Operating Expenses Support Cost Grand Total
Table 1 Project Budget
Account
Page 10