Professional Documents
Culture Documents
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
EARTHWORKS
A
SITE CLEARANCE
m2
9,754.00
8,910.00
8,910.00
7,218.00
1,692.00
m3
8,258.00
5,022.00
5,022.00
5,022.00
0.00
1,464.00
1,464.00
9,754.00
7,260.88
81.0%
100.0%
CBR Test
no.
4.00
4.00
4.00
0.00
100.0%
no.
4.00
4.00
4.00
0.00
100.0%
376.00
1.00
no.
Item 1.00
1.00
Item 1.00
1.00
Item 1.00
1.00
Item 1.00
1.00
Item
Item
1.00
1.00
1.00
1.00
486.35
416.01
70.34
To turf area
m2
500.00
500.00
m2
141.00
141.00
m2
500.00
500.00
490.00
306.09
306.09
262.97
180.26
180.26
153.04
A
B
500.00
500.00
85.5%
TREE
C
Delonix Regia
no.
15.00
15.00
Tabebuai Rosea
no.
23.00
23.00
no.
3.00
3.00
no.
9.00
9.00
Lagerstroemia Indica
Peltophorum pterocarpum (Yellow
Flame)
Thevitia Peruviana
no.
6.00
6.00
Filicium Decipiens
no.
6.00
6.00
PALM
F
no.
5.00
5.00
Livistonia Rotundifolia
no.
5.00
5.00
Page 1 of 14
Area 1
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
5.00
5.00
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
Petunia spp.
no.
740.00
740.00
no.
230.00
230.00
Pennisetum Rubrum
no.
135.00
135.00
no.
100.00
100.00
no.
120.00
120.00
Bougainvilla Spectabilis
no.
250.00
250.00
Petunia Hybrida
no.
475.00
475.00
no.
230.00
230.00
PROVISION OF MAINTENANCE
all costs and expences in connection with
maintenance
Provision for Water
Item 1.00
1.00
Item 1.00
1.00
m2
4,172.00
2,971.00
Type 1
no.
64.00
63.00
46.00
46.00
0.00
no.
11.00
12.00
8.00
8.00
0.00
256.00
256.00
290.00
no.
20.00
no.
2.00
no.
100.00
no.
9.00
9.00
5.00
5.00
0.00
325.00
325.00
273.00
no.
20.00
100.0%
100.0%
1.00
0.00
100.0%
BENCH
C
to bench type 1
Page 2 of 14
Area 1
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
DUST BIN
D
no.
35.00
20.00
FINISHES
A
B
C
325.00
2,971.00
4,172.00
m2
325.00
m2
2,971.00
no.
11.00
to juxtaposed green
no.
1.00
1.00
to turf box
no.
9.00
9.00
6.00
m2
4,172.00
39.00
26.00
26.00
26.00
26.00
26.00
26.00
0.00
0.00
0.00
26.00
100.0%
100.0%
0.0%
47.00
8.00
39.00
17.0%
31.6%
100mmx450mmx25mm
32.00
100mmx125mmx25mm; to sides
64.00
no.
65.00
Pole Light
a. Installation of foundation
b. Installation of sleeves & cables
c. Installation of Pole light
66.7%
Bollard Light
no.
100.00
75.00
Wall Light
no.
40.00
10.00
0.00
Uplight
no.
120.00
107.00
76.00
24.00
52.00
600.00
439.00
Step Light
no.
70.00
28.00
20.00
0.00
20.00
896.00
730.50
730.50
0.00
100.0%
316.00
267.25
267.25
0.00
100.0%
316.00
267.25
267.25
0.00
258.00
190.00
190.00
0.00
no.
6.00
6.00
6.00
0.00
UTILITIES
TELECOMMUNICATION
A
B
C
D
100.0%
100.0%
100.0%
31.3%
no.
1.00
1.00
no.
1.00
1.00
1.00
0.00
100.0%
1.00
0.0%
WATER SUPPLY
764.00
680.00
679.00
1.00
99.9%
318.00
276.00
276.00
0.00
100.0%
318.00
276.00
276.00
0.00
Page 3 of 14
100.0%
Area 1
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
no
1.00
1.00
0.00
1.00
Testing of waterline
unit
1.00
1.00
1.00
0.00
no
12.00
12.00
12.00
0.00
114.00
114.00
114.00
0.00
E
F
% Accom
(B / A)
0.0%
100.0%
100.0%
100.0%
85.1%
578.00
578.00
0.00
400.00
303.00
303.00
0.00
400.00
275.00
275.00
0.00
45.00
30.00
30.00
0.00
904.00
100.00%
100.0%
100.0%
100.0%
904.00
0.00
100.00%
1,175.00
810.00
810.00
0.00
100.0%
200.00
90.00
90.00
0.00
100.0%
no
6.00
4.00
4.00
0.00
470.00
191.00
215.00
191.00
191.00
no
6.00
4.00
0.00
400.00
275.00
100.0%
279.00
0.00
100.0%
4.00
0.0%
275.00
2,006.00
1,998.00
40.64%
0.0%
8.00
99.60%
no
63.00
42.00
42.00
0.00
100.0%
no
63.00
42.00
42.00
0.00
100.0%
Pull boxes
no
12.00
9.00
9.00
0.00
100.0%
no
1.00
1.00
1.00
0.0%
Irrigation controller
no
1.00
1.00
1.00
0.0%
no
1.00
1.00
1.00
0.0%
Valve boxes
no
9.00
6.00
4.00
33.3%
Satellite Controller
Common wire AWG (Red, Black, Green,
White)
Underground warning tapes
no
1.00
1.00
1.00
0.0%
1,600.00
1,600.00
1,600.00
0.00
400.00
303.00
303.00
0.00
100.0%
791.00
1,029.00
1,010.00
19.00
98.2%
301.00
200.00
200.00
0.00
100.0%
J
K
SEWERAGE
2.00
100.0%
140.00
140.00
0.00
100.0%
200.00
200.00
0.00
100.0%
100.0%
40.00
40.00
40.00
0.00
15.00
15.00
0.00
15.00
380.00
380.00
380.00
0.00
4.00
3.00
3.00
0.00
100.0%
4.00
4.00
0.00
4.00
0.0%
Manhole
no
Chamber
no
Page 4 of 14
0.0%
100.0%
Area 1
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
no
25.00
25.00
25.00
0.00
100.0%
200mm backdrop
no
2.00
2.00
2.00
0.00
100.0%
no
3.00
3.00
3.00
0.00
no
5.00
5.00
5.00
0.00
no
12.00
12.00
12.00
0.00
100.0%
100.0%
100.0%
AREA 1- VARIATIONS
Ite
m
Description
Unit
Qty
New Qty
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
14.00
0.00
0.00
14.00
100.0%
0.0%
Pillar Light
no
50.0%
20.00
a. Installation of foundation
b. Installation of Pillar light
B
14.00
14.00
Recessed Light
no
ELECTRICAL MANHOLES
no
23.00
20.00
2.00
18.00
10.0%
14.00
14.00
12.00
12.00
12.00
12.00
12.00
12.00
0.00
0.00
100.0%
100.0%
1.00
1.00
1.00
0.00
1.00
100.0%
0.0%
2.00
2.00
2.00
0.00
2.00
100.0%
0.0%
257.40
595.10
73.39%
89.8%
11.3%
262.12
139.00
66.79%
75.5%
0.0%
589.25
0.00%
0.0%
SIGNAGE
A
Advertising Signage
no
2.00
a. Installation of foundation
b. Installation of advertising signage
B
Directional Signage
no
3.00
a. Installation of foundation
b. Installation of directional signage
DUST BIN
Supply & installation of
1450x400x1200mm high dust bin
fabricated from aluminum sheet and
angles including GI mesh bushket. Finish
shall be powder coated to standard RAL
LOOSE FURNITURE
no.
35.00
BENCH
A
no.
34.00
no.
20.00
0.00
Pedestrian (2200x500x125)
m2
Fixed Size
Custom Size
m2
no.
Vehicular (2250x500x150)
m2
Fixed Size
Custom Size
m2
no.
2,532.20
671.00
1,068.75
139.00
m2
m2
no.
2,274.80
75.90
806.63
0.00
-
589.25
103.00
Page 5 of 14
0.00
Area 1
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
New Qty
Gridline 22 1/2-6f
Quantity as per
Actual
Hand-over (A) Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
16.67%
35.00
set
7.00
6.00 2.00
4.00
33.3%
PC2- (S1)
no
28.00
24.00 8.00
16.00
33.3%
PC2- (S2)
no
28.00
24.00
24.00
0.0%
PC2- (S3)
no
28.00
24.00
24.00
0.0%
10.00
97.8%
450.40
100.00
450.40
440.40
100.00
97.50
2.50
97.5%
120.00
120.00
117.50
220.00
220.00
215.00
2.50
97.9%
10.40
10.40
10.40
5.00
97.7%
0.00
100.0%
ln
973.00
735.00
644.00
91.00
87.6%
Grid A
ln
399.00
297.00
267.00
30.00
89.9%
Grid B
ln
175.00
141.00
131.00
10.00
92.9%
Grid C
ln
399.00
297.00
246.00
51.00
82.8%
m2
547.88
485.43
265.03
220.40
54.6%
FINISHES
For Foot Path Tiles
A
Bench type 3
91.25
91.25
63.05
28.20
69.1%
m2
96.00
96.00
58.00
38.00
60.4%
m2
175.75
175.75
60.00
115.75
m2
30.00
19.94
19.94
0.00
m2
25.37
0.00
0.00
0.00
Juxtaposed (1 nos)
37.50
37.50
37.50
0.00
57.45
41.95
23.66
18.29
56.4%
m2
34.56
23.04
2.88
20.16
12.5%
m2
194.46
180.98
3.28
177.70
1.8%
Bench type 3
m2
110.00
110.00
0.00
110.00
0.0%
m2
42.00
42.00
0.00
42.00
0.0%
13.48
0.00
0.00
0.00
m2
22.09
22.09
3.28
18.81
14.8%
m2
6.89
6.89
0.00
6.89
0.0%
Page 6 of 14
34.1%
100.0%
100.0%
Area 1
Remarks
Complete
Complete
Complete
Page 7 of 14
Area 1
Remarks
Revised sizes.
Revised sizes.
Complete
Complete
Not applicable.
Complete
Page 8 of 14
Area 1
Remarks
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Page 9 of 14
Area 1
Remarks
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Remaining
Remaining
Complete
Complete
Complete
Remaining
Remaining
Remaining
Remaining
Remaining
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Covers not installed.
Page 10 of 14
Area 1
Remarks
Complete
Complete
Complete
Complete
Complete
Remarks
Complete
Installed sleeves & cables.
Mock-up
Complete
Complete
Installed sleeves & cables.
Complete
Installed sleeves & cables.
Page 11 of 14
Area 1
Remarks
Complete
Not Hand-overed to
ARCO.
Complete
Page 12 of 14
Week no.
Week Ending:
Sr.
No.
56
12-Mar-09
Project Components/Activities
Cumulative Progress-Previous
Planned
Actual
1.45%
Actual
Actual
1.45%
1.45%
1.45%
Variance
REMARKS
Earthworks
1.45%
Hard Landscape
10.56%
a. Planter Box
0.66%
0.66%
0.66%
0.66%
0.66%
0.00%
Completed
0.18%
0.18%
0.18%
0.18%
0.18%
0.00%
Completed
b. Linear Bench
0.93%
0.93%
0.91%
-0.02%
97.84% Completed
Bench type 3
0.28%
97.50%
97.50%
0.28%
97.90%
97.90%
0.28%
97.70%
Precast Sidewall
0.09%
95.00%
-1.40%
63.4% Completed
-0.98%
17% Completed
-1.59%
64% Completed
-1.02%
13% Completed
0.00%
0.93%
97.70%
5.00%
100.00%
3.58%
2.27%
3.58%
2.18%
0.09%
Pedestrian (2200x500x125)
2.33%
69.64%
3.75%
73.39%
Vehicular (2250x500x150)
0.84%
66.14%
0.65%
66.79%
0.41%
0.00%
1.18%
1.18%
1.18%
0.20%
4.03%
2.02%
87.60%
1.49%
44.80%
0.52%
1.80%
Soft Landscape
0.00%
0.00%
1.18%
16.67%
e. Finishes
Cultivating
3.58%
0.91%
c. Permatrak Planks
Completed
4.03%
1.17%
1.17%
0.20%
16.67%
2.44%
0.15%
4.03%
2.59%
87.60%
9.80%
54.60%
1.80%
0.15%
0.00%
1.17%
0.15%
0.14%
0.1313%
0.23%
0.20%
Provision of Maintenace
0.47%
63.40%
63.40%
3.38%
a. Pole Lights
0.66%
0.66%
0.44%
0.66%
0.44%
-0.22%
66.7% Completed
b. Bollard Lights
0.45%
0.45%
0.08%
0.45%
0.08%
-0.37%
18% Completed
c. Wall Lights
0.09%
0.09%
0.09%
0.00%
-0.09%
d. Up Lights
0.46%
0.46%
0.46%
0.15%
-0.31%
33% Completed
e. LED Lights
0.97%
0.97%
0.97%
0.00%
-0.97%
f. Step Lights
0.11%
0.11%
0.11%
0.00%
-0.11%
0.16%
0.16%
0.16%
0.00%
-0.16%
h. Metal Railing
0.35%
0.35%
0.35%
0.00%
-0.35%
i. Dust Bin
0.13%
0.12%
0.13%
0.00%
-0.13%
Utilities/ MEP
0.15%
0.008%
3.18%
0.00%
0.00%
0.48%
0.48%
0.48%
0.00%
Completed
0.48%
0.15%
0.48%
0.15%
-0.33%
31% Completed
0.79%
0.78%
0.79%
0.78%
-0.01%
99% Completed
0.48%
0.48%
0.41%
0.48%
0.41%
-0.07%
81% Completed
0.95%
0.95%
0.93%
0.95%
0.93%
-0.02%
98% Completed
33.30%
1.99%
1.23%
34.53%
1.99%
1.28%
29.45%
0.00%
-29.45%
13.83%
0.00%
-13.83%
97.55%
13.63%
-83.98%
a. Telecommunication
0.48%
0.48%
b. Electrical (Substation)
0.48%
c. Water Supply
0.79%
d. Irrigation
e. Sewerage
Kiosk Construction
34.49%
Sub-structure
15.52%
Super structure
18.97%
14.39%
Super structure
17.58%
Metal Sculpture
12.81%
31.97%
28.17%
13.80%
12.77%
100.00%
93.97%
1.06%
13.39%
3.58%
0.24%
97.55%
13.63%
Feb-08
Project Components/Activities
Wt. %
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
18-22
23-29
1-7
8-14
15-21
22-28
29-4
5-11
12-18
19-25
26-2
3-9
10-16
17-23
24-30
31-6
7-13
14-20
21-27
28-4
5-11
12-18
19-25
26-1
2-8
9-15
16-22
23-29
30-5
6-12
13-19
20-26
27-3
4-10
11-17
18-24
25-31
1-7
8-14
15-21
22-28
29-5
6-12
13-19
20-26
27-3
4-10
11-17
18-24
25-31
1-7
8-14
15-21
22-28
1-7
8-14
15-21
22-28
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
0.145%
0.145%
0.145%
0.145%
0.145%
0.145%
0.145%
0.145%
0.145%
0.145%
0.008%
1 Earthworks
10.56%
2 Hard Landscaping
a. Planter Box
0.66%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
0.060%
b. Turf Flat
0.18%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
0.015%
c. Linear Bench
0.93%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
0.072%
d. Permatrak Planks
3.58%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
1.18%
0.148%
0.148%
0.148%
0.148%
0.148%
0.148%
0.148%
0.148%
f. Finishes
4.03%
1.008%
1.008%
1.008%
1.008%
0.293%
0.293%
0.293%
0.293%
3 Soft Landscaping
1.17%
4 Landscape Fixtures
3.38%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
0.163%
a. Pole Lights
0.66%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
0.025%
b. Bollard Lights
0.45%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
0.017%
c. Wall Lights
0.09%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
d. Uplights
0.46%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
0.018%
e. LED Lights
0.97%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
0.037%
f. Step Lights
0.11%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.004%
0.16%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
0.012%
h. Metal Railing
0.35%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
0.022%
i. Dust Bin
0.13%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
0.008%
3.18%
5 Utilities/ MEP
a. Telecommunication
0.48%
b. Electrical
0.48%
c. Water Supply
0.79%
d. Irrigation
0.48%
e. Sewerage
0.95%
6 Kiosk Construction
34.49%
31.97%
8 Metal Sculture
13.80%
TOTAL
0.044%
0.045%
0.044%
0.044%
0.044%
0.044%
0.044%
0.044%
0.044%
0.044%
0.044%
0.044%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.028%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.049%
0.028%
0.028%
0.028%
0.028%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.030%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
0.045%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.232%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.279%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.062%
1.279%
1.279%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.15%
0.15%
0.15%
0.15%
0.15%
0.15%
0.15%
0.15%
0.15%
0.15%
0.05%
0.08%
0.08%
0.28%
0.28%
0.41%
0.41%
0.41%
0.43%
0.43%
0.43%
0.43%
1.84%
1.84%
1.81%
1.81%
1.75%
3.13%
3.13%
3.14%
3.14%
4.05%
4.05%
4.37%
4.37%
2.96%
2.95%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.71%
3.60%
3.58%
1.29%
1.28%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.15%
0.30%
0.45%
0.60%
0.75%
0.90%
1.05%
1.20%
1.35%
1.50%
1.55%
1.63%
1.71%
1.99%
2.27%
2.68%
3.09%
3.50%
3.93%
4.36%
4.79%
5.22%
7.06%
8.90%
10.71%
12.52%
14.27%
17.40%
20.53%
23.67%
26.81%
30.86%
34.91%
39.28%
43.65%
46.61%
49.56%
53.27%
56.98%
60.69%
64.40%
68.11%
71.82%
75.53%
79.24%
82.95%
86.66%
90.37%
93.97%
97.55%
98.84%
100.12%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.12%
0.15%
0.21%
0.21%
0.95%
0.65%
0.26%
0.60%
0.31%
0.60%
0.60%
0.30%
0.18%
0.56%
0.00%
0.45%
0.84%
0.56%
0.24%
0.42%
0.12%
0.36%
0.25%
0.26%
0.35%
0.32%
0.28%
0.15%
0.25%
0.26%
0.35%
0.24%
0.15%
0.75%
0.32%
0.42%
0.04%
0.04%
0.12%
0.07%
0.00%
0.08%
0.24%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.12%
0.27%
0.48%
0.69%
1.64%
2.29%
2.55%
3.15%
3.46%
4.06%
4.66%
4.96%
5.14%
5.70%
5.70%
6.15%
6.99%
7.55%
7.79%
8.21%
8.33%
8.69%
8.94%
9.20%
9.55%
9.87%
10.15%
10.30%
10.55%
10.81%
11.16%
11.40%
11.55%
12.30%
12.62%
13.04%
13.08%
13.12%
13.24%
13.31%
13.31%
13.39%
13.63%