CPAA PipeClass Pipe Load Summary Sheet DESIGN OF 450 DIA.

RRJ DRAINAGE PIPE


Client And Project Details Job number: Client: Project: Description: 0233/BPPI/09 PT. ARSANA Saluran Kampung Seratus Perak Drainage Design: Designer: Company: File:

Page 1 of 1

Date: 14-Mei-2009 Arsana BAPTIS WIDHIADI,ST BORAL PIPE & PRECAST INDONESIA New Project

Design Parameters Installation Condition: Pipe Nominal Diameter (mm): Pipe External Diameter, D (mm): Soil Type: Soil Density (kN/m): Soil Parameter Km: Trench Width, B (m): Height Of Fill, H (m): Support Type: Bedding Factor: trench 450 534 clayey sand 18 0,1500 0,850 0,200 H2 2,0

Long Term Load Cases/Combinations Considered (controlling load case/combination highlighted) Load Description* earth T44(AS3725) (Other)
All loads in kN/m. *Includes earth load at fill height shown.

Fill Height (m) 0,200 0,200

Wg/2,0 1,0 1,0

Wq/1,5 44,7

Tc 1,0 45,8

Pipe Class 2 6

Controlling Loads: Minimum Test Load:

earth + T44(AS3725) vehicle Tc = 1,0 + 44,7 = 45,8 kN/m

Adopt 450 dia. Class 6 RRJ pipe (450/6 RRJ) in accordance with AS/NZS 4058:2007.
Design Notes: 1. Long term live loads are considered as acting directly on the pipe (no distribution) in accordance with AS/NZS 3725:2007. 2. A nominal pipe wall thickness of 38 mm has been assumed.

PipeClass v1.2.3 CPAA, Locked Bag 2011, St Leonards, NSW 1590

CPAA PipeClass Pipe Installation and Quantities Sheet INSTALLATION OF 450 DIA. CLASS 6 RRJ DRAINAGE PIPE
Client And Project Details Job number: Client: Project: Description: 0233/BPPI/09 PT. ARSANA Saluran Kampung Seratus Perak Drainage Design: Designer: Company: File:

Page 1 of 1

Date: 14-Mei-2009 Arsana BAPTIS WIDHIADI,ST BORAL PIPE & PRECAST INDONESIA New Project

Design Parameters Installation Condition: Pipe Nominal Diameter (mm): Pipe External Diameter, D (mm): Trench Width, B (m): Height Of Fill, H (m): Support Type: Excavation Volume (solid) (m/m): trench 450 534 0,850 0,200 H2 0,8

Installation Quantities Quantities(m/m) Support Zone Bed zone Haunch zone Overlay zone Backfill Depth (mm) X = 100 Y = 165 O = 150 50 Solid 0,085 0,082 0,277 0,043 Loose 0,102 0,098 0,000 0,000 Minimum Zone Compaction (%) Density Index (for cohesionless soils) 60 60 as per project specification as per project specification Relative Density (standard compaction) as per project specification as per project specification

Material Grading Requirements Sieve Size (mm) Bed & Haunch Zones (% mass passing) Construction Equipment Requirements No construction vehicles considered. Design Notes: 1. All bed and haunch zone material passing the 0.075 mm sieve to have low plasticity (AS 1726). 2. Ordinary fill material to have no stones > 150 mm dia., and no more than 20% to be 75-150 mm. 3. For additional information refer to the project specification. 4. A nominal pipe wall thickness of 38 mm has been assumed. 75.0 19.0 100 9.5 2.36 100-50 0.60 90-20 0.30 60-10 0.15 25-0 0.075 10-0

PipeClass v1.2.3 CPAA, Locked Bag 2011, St Leonards, NSW 1590

CPAA PipeClass Detailed Load Report DESIGN OF 450 DIA. CLASS 6 RRJ DRAINAGE PIPE
Client And Project Details Job number: Client: Project: Description: 0233/BPPI/09 PT. ARSANA Saluran Kampung Seratus Perak Drainage Design: Designer: Company: File:

Page 1 of 1

Date: 14-Mei-2009 Arsana BAPTIS WIDHIADI,ST BORAL PIPE & PRECAST INDONESIA New Project

Long Term Load Cases/Combinations Considered (controlling load case/combination highlighted) Load Description* earth T44(AS3725) (Other)
All loads in kN/m. *Includes earth load at fill height shown

Fill Height (m) 0,200 0,200

Wg/2,0 1,0 1,0

Wq/1,5 44,7

Tc 1,0 45,8

Pipe Class 2 6

earth Height of fill, H = 0,200 m Trench Condition, vertical walls Spangler coefficient, Ct = 0,227 Working load due to earth fill, Wg = 3,0 kN/m Positive Projection Check Settlement ratio, rs = 1,000 Projection ratio, p = 0,700 Plane of equal settlement height, He = 0,200 Modified Spangler coefficient, C'e = 1,058 Working load due to earth fill, Wg = 2,0 kN/m Positive projection controls, adopt Wg = 2,0 kN/m T44(AS3725) (Other) T44(AS3725): Standard Vehicle, AS/NZS 3725:2007 - T44 Truck Load Footprint width at top of pipe, L1 = 0,400 m Footprint length at top of pipe, L2 = 0,200 m Footprint area, A = 0,080 m2 Load on footprint = 48,0 kN Impact factor = 1,37 Live load pressure at top of pipe, q = 822,000 kPa Minimum of L2 and D, S = 0,200 m Effective supporting length of pipe, Le = 0,981 m Working load due to live load, Wq = 67,1 kN/m